Você está na página 1de 5

CURRICULUM VITAE

Personal Details
Name

Wikantiyoso Suyono

P/D of Birth

Klaten, December 18th 1986

Religion

Moslem

Gender/ Status

Male/ Married

Address

Pualam Green Village Blok A No. 6, Jl. Sirojul Munir RT.04/03,


Jatisari - Jatiasih Bekasi, Jawa Barat - 17426

Email

wikantiyoso.s@gmail.com, wikantiyoso.suyono@ericsson.com

Phone

+62878 8855 0300, +62812 9442 1222

Educational Background
School

Place

Graduate

Elementary Shcool

SD N 2 Gemblegan Klaten

1998

Yunior High School

SLTP N 4 KLATEN

2001

Senior High School

SMU N 3 KLATEN

2004

College

Elektronics & Instrumentation, Gadjah Mada University,


Majoring Electronics

2007

Introduction
I am Wikantiyoso Suyono, since 2008 I 've been work in telecommunications. My career started from a NOC
engineer at XL Axiata, my job at that time was the integration of new sites, monitoring sites and links/transmission and
optimization. Then in 2010 I moved to subcon, this is the place I started entering the field, set up a plan, organize
teams, manage finances, perform the installation, commissioning, ATP, even create and submit BAST. I do almost all the
work from start installation to billing. In 2011 I got into the transmission vendor ( NEC - Alita ) as a supervisor and in
2012 I went to Ericsson as implementation coordinator until now, this is where I finalize my ability, organize a team,
manage schedule / plan installation and when the site will RFS, sometimes also interview engineers. I am here as a
liaison between subcon, among engineers, among supervisors, superiors and subordinates, all parts with me and my
PM. Arduous task indeed, I have to distribute the information to all sections clearly so that our goals can be achieved on
time according to customer demand.

Page 1 / 5

Career Detail
1. PT. EXCELCOMINDO PRATAMA (XL AXIATA)
As a NCC Telco Impl BSS & Transmission Engineer (NOC)
Place

: Mega Kuningan, Jakarta Selatan

Period

: September 1, 2008 Mei 31, 2010

Job Descriptions
-

BSS configuration for Ericsson & Huawei (BTS & BSC).

BSS configuration activity is like Integrate new network element, add TRU, change network parameter, cascade/
uncascade site, troubleshooting problem in sites (BTS).

Performed cell moving inter BSC , Performed site in the same BSC and Reparenting/ Rehoming BTS.

BSC Software correction for ericsson vendor (IPA5, IPA11 And IPA18).

Performed BSC capacity expansion like add CSPB card and ET155 card , add GB/ GB Over IP, define RPP & RPG3
at GDM as HSL or PCU, GCP And Cut Over BSC.

Monitoring Radio MiniLink (Mini-link E) And Pasolink.

Activation channel optics, cross connect optics configuration for transmission link and Reroute.

2. PT. Tunggal Aurora


Place

: JL. Cipinang Baru Raya No.16, Rawamangun, Jakarta Timur

As a Field Koordinator (Subcont) for XL Project (RBS & TRM)


Period

: June 1, 2010 December 31, 2011

Job Descriptions
-

Installation, commissioning and integration RBS 2G and 3G, Swap and dismantle RBS.

Troubleshooting site problem (RBS and Transmission)

Make planning and Coordination with team installation & Integration RBS and Transmission project.

Make ATP Document make Invoice And Acceptance certificate after PO released and Submit to XL and Ericsson ID.

As a MBB Transmission Coordinator for XL Project (3G)


Period

: January 1, 2011 May 15, 2011

Job Descriptions
-

Installation and integration ML TN transmission for supporting 3G RBS.

Make planning and Coordination with team MBB Transmission project.

Installation, Swap, Pointing, Comissioning and Troubleshooting MiniLink E and TN.

Make ATP Document and Submit to XL and Ericsson ID.

Page 2 / 5

3. As a Supervisor Transmission Ipasolink Project in PT. Alita Praya Mitra for XL Project
Place

: JL. TB Simatupang Kav 12, Kebayoran Lama, Jakarta Selatan

Period

: May 16, 2011 Feb 1, 2012

Job Descriptions
-

Coordination with Operator (XL), RBS Vendor, Team or Subcon to finish the Ipasolink Transmission project
Migration and Penetration ( Supporting 3G Transmission).

Troubleshooting VLAN Configuration in Ipaso with TRM team, subcon or 3G RBS engineer.

Make planning for Installation and Validation from End to end Ipasolink project to the team and subcont.

Coordination with the team to solve field problem (ex, obstacle, commcase, no space, building permitt issue, etc).

4. As a Coordinator in PT.Ericsson Indonesia


Place

: Wisma Pondok Indah, 10th Floor Jl. Sultan Iskandar Muda V TA, Jakarta 12310, Indonesia

As a BSC/RNC Coordinator for Telkomsel Project


Period

: Feb 2012 Oct 2013

Job Descriptions
-

Coordination (weekly meeting) with Customer (Telkomsel) , Planning team, Engineer and Subcon to finish the
target Implementation (Upgrade and New BSC/RNC).

Coordination and Troubleshooting BSC/RNC problem with engineer.

Make planning for Installation and Material Delivery after PO released.

Coordination to Schedule ATP, Document closing, Lack Of Material/ additional material, Hardware Problem/Faulty,
new/upgrade installation etc.

Release Material request number (delivery material, pulling back material to Warehouse relocation material, etc).

Collect and Maintenance BSC/RNC database.

Besides as a BSC-RNC coordinator I was also given the responsibility of coordinating migration OSS IP for Telkomsel
project
Period

: March 2013 June 2013

* The targets has achieved as given by the customer, handle as many as 26 TRC, 55 BSC and 13 RNC In 4 month.
Job Descriptions
-

Coordination with the customer about the target, the required material, what steps will be taken, the PIC will
take part and others.

Schedule and distribution the tasks to engineers.

Coordination with internal and external team / customer / other vendor (OSS team, transmission engineer,
routers PIC and field team if needed).

Follow up BaLap (Berita Acara Lapangan) document closing with the signature from the customer.

Page 3 / 5

As Transmission Coordinator Reg.4 for Isat Project


Period

: Oct 2013 Oct 2014

Job Descriptions
-

TRM RollOut Database Maintenance.

Arrange SP team to install as plan/target from RBS team.

Arrange engineer to maintenance, commissioning, monitoring, troubleshooting Minilink TN.

Weekly meeting with RBS team and transmission team.

Coordinate with customer for Request Permit, LOS report, VLAN configuration to Datacom.

Clearing Punchlist/ Rektification (Complete lack of ATP that has been rejected by customer)

Moving traffic and Dismantle old material (NEC/ML-E)

As RBS 2G Coordinator Jupiter XL Project


Period

: Oct 2014 Now

Job Descriptions
-

2G/ NBWO RollOut Database Maintenance.

Arrange SP team to install as plan/target from Customer.

Arrange engineer to maintenance, commissioning, monitoring, troubleshooting RBS.

Weekly meeting with Customer team and transmission(Huawei) team.

Coordinate with customer for Request Permit/ Acces to entering the site, commcase, site down, alarm, etc.

Skills Summary
1.

Understand to operate PC Software with using Windows and Linux as operating software include the
software application (Windows 98, 2000, server, Xp, Vista dan Linux/Unix).

2.

Understand to operate Winfiol/Citrix, moshell Tools for BSC/RBS Configuration (Ericsson Tools).

3.

Understand to operate HUAWEI Local Maintenance Terminal, for BSC Configuration (Huawei Tools).

4.

Understand to operate T2000 OPtiX iManager, for Transmission Configuration (Cross Connect Optics,
Reroute Tranmission Link, Activate/deactivate Channel) (Huawei Tools).

5.

Understand to operate OMT for RBS IDB configuration at local site (Ericsson Tools)

6.

Understand to operate Mini-Link Manager for Radio Transmission Monitoring (Ericsson Tools).

7.

Understand to assembly computer hardware for PC (Intel and AMD).

8.

Understand to use Microsoft Word, Excel (Vlook Up, Pivot), Power point, Outlook, etc.

Page 4 / 5

Interests
1.

Futsal/ Football.

2.

Bicycle.

3.

Watching movies and listening music.

Page 5 / 5

Você também pode gostar