Você está na página 1de 49
A GUIDE ON THE ADMINISTRATION OF PUBLIC WORKS CONTRACTS = Addendum No, 1 (updated to September 1989) @ KETUA PENGARAH KERYA RAYA, 1GU PEJABAT JKR MALAYSIA, KUALA LOMPUR, - A GUIDE | ON | THE ADMINISTRATION OF | PUBLIC WORKS CONTRACTS 5 ES TE OPO SEE TE | | Addendum No.1 (updated to September 1989) KETUA PENGARAM KERJA RAYA MALAYSIA, Su PEJABAT J KUALA LU wR, A Guide on The Administration of Public Works Contracts NCLUDING UPDATING UNTIL SEPTE | CORRIGENDA | | Pengiring Kata 1. Page (i) line 10 Insert "Kontrak dan" "and "Ukur" Chapter 2 Functional Organisation of the PWD 1. Page 3 Footnote 1 | Replace with I "* Treasury Circular No.15 ‘Treasury Circular No.12 of of 1982 dated 1.6.82 and 1987 dated 26.11.1987. | Amendment No.i to the same dated 11.6.85." 3. Project Implementation | 1. Page il paragraph 3.9.1, line 6 Delete "Approval of the Treasury is also obtained by the Client Department/ Ministry for tenders to be invited." te and Cost Planning and Control Chapter 4 - Preliminary Cost Esti 1. Page ié paragraph 4.3.2(c) Replace with “National Electricity “Tenaga Nasional Berhad." Board" A Guide on The Administration of Public Works Contracts CORRIGENDA INCLUDING UPDATING ITIL SEPTEMBER 1989 Chapter 5 - Preparation of Tender Documents Page 21 paragraph 5.1.1, line 3 Replace "...,..quantities” Page 24 footnote 7 Replace "Treasury Circular No. 1 of 1985 dated 6.8.85" Page 25 footnote 9 Replace “curcular" Page 26 At the end of footnote 10 after ",..dated 11.2.81" Pages 30 to 35, Replace entire pages Page 79 and 60 Replace Appendix 5N with "\....quantities’." with “Treasury Circular No. 12 of 1985 dated 6.8.85" with "Circular" add "and Addition No.1 to Treasury Circular No. 9 of 1990 dated 23.8.90," with new pages 30 to 35 attached. with new Appendix 5N attached. A Guide on The Administration of Public Works Contracts Page 85 Paragraph 6.1.1, Replac: "Vee. $50,000." line 1 Page 85 paragraph 6.1.3(a), line 3 Replace G .. Treasury." Page 85 paragraph 6.2.3 line 4 eplace +++ tender.” Page 85 At the end of paragraph 6.2.3 after "ww... tender." Page 86 At the end of paragraph Gish 2ieeint teria een cee (Chapter 14) DATING UNT: SEPTEMBER | Iw . Treasury. tender." add "However, for mechanical engineering works estimated to cost less than $50,000.00, quotations must be invited from amongst Bumiputera contractors only." aad “However, for mechanical and electrical engineering works estimated to cost less than $50,000.00, quotations must be invited from amongst Bumiputera contractors only. Non-Bumiputra contractors are only allowed to participate if the number of qualified Bumiputra contractors under the respective class, Hegd and sub-head is less than 5k 3 Amendment No.2 to Treasury Circular No.9 of 1987 dated 4.12.1989. A Guiue on The Administration of Public Works Contracts CORRIGENDA INCLUDING UPDATING UNTI EPTEMBER 1989 Chapter 6 - Invitation and Receipt of Tender (Cont'd) 6. af Page 88 footnote 12 Replace DGPW circular No. 1 of 1983 ....." Page 99 paragraph 7.2.1.(c) line 3 After considered" Page 99 footnote 2 Replace “DGPW Circular No. 6 of 1981 dated 31.3.88." Page 99 footnote 4 Replace "DGPW Treasury Circular Page 103 paragraph 7.4.5, line 4 Replace “... Treasury for ratification.” Page 104 Top of the page Replace Paragraph number "6" with “DGPW Circular No. 3 of 1983 dated 17.2.83." valuation and Acceptance of Tenders insert footnote number 1 as "....considered’." with wl DGpw Circular No. 6 of 1981 dated 19.8.81." with “Treasury Circular No. 10 of 1985 dated 8.7.85." vith "\., Treasury for approval.” "Tee" ae 2 A Guide on The Administration of Public Works Contracts CORRIGENDA INCLUDING UPDATING UNTIL SEPTEMBER 1989 Chapter 8 - Contract Documents Page 121 Paragraph 8.3.3(c) Replace table showing "Contract Sum" and "Limit of liability” after the words ".,..,factors is as follows :!" Pages 126 to 140 Replace Appendix 8B and 8C with Contract Sum Not exceeding $25,000 $25,001 to $50,000 $50,001 to $150,000 $150,001 to $250,000 $250,001 to $500,000 $500,001 to $1 Million Exceeding $1 Million with new Appendix attached. Limit of Liability per accident for an unlimited Number of Accidents +++ $10,000 +++ $25,000 +++ $50,000 +++ $75,000 $100,000 +++ $150,000 $200 ,000 A Guide on The Administration of Public Works Contracts SEPTEMBER 1989 entire page Chapter 9 - Supervision, Monitoring Progress and Site Records 1. Page 143 Replace with footnote 1 “'D@pw Circular No. 12 of 1987 dated 5.11.87 and Amendment No. 1 and No. 2 to the same dated 13.12.1988 and 11.4,1989." 2. Page 144 footnote 2 Between "1988" and nsert "20.1.88". "dated" 3. Pages 148 and 149 Replace Appendix 9A new Appendix 9A attached. 4, Page 154 Replace with entire page new page 154 attached. Page 155 Replace with new page 155 attached. A Guide on The Administration of Public Works Contracts CORRIGENDA INCLUDING UPDATING UNTIL SEPTEMBER 1989 Chapter 10 - Delay and Extension of Time Page 182 paragraph (vii), line 1 eplace th ‘dopted" "adopted" Page 184 Titles of paragraph 10,5 and 10.6 After insert "Preparation... of Time" footnote number 1, as "Preparation .... of Time’ Page 185 paragraph 10.6.4, line 7 with . premiums paid from monies due to Contractor." Page 185 paragraph 10.6.5. (a) line 1 Replace “peroid" Page 185 paragraph 10.7.1, line 2 Replace : "(see Chapter 9).i" Page 185 Footnote number 2 Replace "DGPW.....5.11.87." Page 185 At the bottom of the page "..... premiums paid plus 58 to cover for administrative cost from monies due to Contractor’." with "period" with "(see Chapter 9). jth Ministry of Finance's letter reference (K&B)(8.09)735/10/1 Ila. 3 (44) dated 5.4.1989." ipsert “S"DGPW Circular No. 2 of 1991 dated 20.7.1991." A Guide on The Administration of Public Works Contracts CORRIGENDA INCLUDING UPDATING UNTIL SEPTEMBER 1989 Chapter 11 - Non-completion Page 189 Footnote 1 Replace with "De;w" "DGPW" Page 189 Paragraph 11.4 Replace heading with "Preparation and submis— sion of Certificate of Non-completion' Page 190 At the bottom of the page Page 190 footnote 2 Between "No." and "of 1977" Page 190 At the bottom of the page Replace DGPW Circular No. 12 of 1987 dated 5,11.1987." Preparation and submission of Certificate of Non-completion’ insert the following footnote 1 “guide Book on Better Contract Administration Practice issued together with DGPW circular no.12 of 1987 dated 5.11.87." dnsert age with “DGPW Circular No. 2 of 1991 dated 20.7.1991." A Guide on The Administration of Public Works Contracts CORRIGENDA INC! Page 197 paragraph 12.2.2. line 1 Replace “The right ........ as follows:" Page 198 paragraph 12.4.1, last paragraph, last line Replace action to be taken.” Page 198 At the bottom of the page Page 199 Paragraph 12.6.3, line 3 After the words "advance payment" Page 199 Delete footnote 1. Page 199 Replace footnote 2 UDING UPDATING UNTIL SEPTEMBER 198 loyment of Contractor 7 6 The right accrues to the Government to determine the employment of the Contractor if the latter defaults as follows:" with "action to be taken.!" insert the following footnote 1 "Iguide Book on Better Contract Administration Practice issued together with DGPW circular no.12 of 1987 dated 5.11.87." Insert "(if there remains a balance of advance payment not yet recovered) ," with "IDGPW Circular No. 2 of 1991 dated 20.7.1991." A Guide on The Administration of Public Works Contracts CHAPTER 12 - Determination of Employment of Contractor (Cont'd) ae 10. 11. Page 201, paragraph (h), line 2 insert between oh ‘materials’ and Page 201, paragraph (h), line 4 replace “articles"' Page 201, paragraph (h), line 5 replace “Warticles"' Page 201, paragraph (h), line & insert between sor! ‘materials' and Page 201, paragraph (i), line 4 Replace ; "..... his employment’. A certificate must be issued to the Contractor to state the amount of the costs and/or loss or damage him." claimed against the word ‘articles’ with “materials, articles and goods’ with “materials, articles and goods' the word “articles! sess his employment’, A certificate in a standard format must be issued to the Contractor to state the amount of the costs and/or loss or damage claimed against him’." 12. A Guide on The Administration of Public Works Contracts CORRIGENDA INCLUDING UPDATING UNTILL EPTEMBER 1989 Page 201, paragraph (i), line 5 Delete "(At the time of writing, a guide on how the claim against the Contractor should be calculated and what form the certificate should take is awaiting approval issued)" Page 201 Insert before being the following new paragraph 12.7.3: 12.7.3 A sample of the Final Certificate for contracts where the Contfactor's employment has been determined is given in Appendix 128’. The Conditions of Contract require that the certificate shall state separately among other things, the following: (a) Completion Cost This comprises: eo) The cumulative value of interim payments made to the Contractor; (ii) Payments due to sub-contractors, suppliers, etc.; (441) sums paid or due or to become due to other contractors or persons engaged by the Government to complete the works; (iv) Other costs or expenditure incurred by the Government in completing the Works including the cost of supervision during the contract period for the completion of the incomplete work; A Guide on The Administration of Public Works Contracts CORRIGENDA INCLUDING (b) ww) ATING UNTIL SEPTEMBER 1989 Expenses incurred due to re- tendering exercise including cost of preparing tender documents, payment, of consultants fees (if any) and cost of advertising tender notice; On-cost charge for administrative and re-tendering expenses incurred by the Government. The quantum of this charge as fixed by the Ministry of Finance is 10% on the total of the Contract Sum for completing the works and the expenses incurred due to the re-tendering exercise. Final Contract sum This comprises: (i) (ii) (iii) (iv) The original Contract Sum; Adjustment of the original Contract Sum due to variations, etc.; Deductions from (i) above for Liquidated and Ascertained Damages imposed on the original Contractor; Other deductions which _—the Government is entitled to make under the Contract. 12 A Guide on The Administration of Public Works Contracts CORRIGENDA INCLUDING UPDATING UNTIL SEPTEMBER 1989 14, Page 201 At the bottom of the page, insert the following footnote 5 ") DGPW Circular No. 4 of 1990 dated 14.4,1990." 15. Insert new format as Appendix 12% in page 212A. 13 A Guide on The Administration of Public Works Contracts CORRIGENDA INCLUDING UPDATING UNTIL SEPTEMBER 1989 Chapter 13 - Completion, Handing Over and Defects Page 214 Paragraph 13.3.1, Line 2 Between "each" and ",etc," Page 214 Paragraph 13.3.2, Line 4 Between “Certificate)" and "apply" Page 217 APPENDIX 13A Line 22 Replace "Pengarah PUSAKABUMI Jabatan Perdana Menteri KUALA LUMPUR" (Samb.), Page 217, APPENDIX 13A Line 31 Between "Cawangan" and "Ukur" (Samb.), Page 219 APPENDIX 138 Line 36 Between “Cawangan” and "Ukur" (Samb.), Page 220 APPENDIX 13C, Line 13 Page 223 APPENDIX 138 Line 28 Between "Cawangan" and "Ukur" (Samb.), 14 insert "sec: on or part" insert "shall" with “Pengarah = Pusat Kontraktor Kementerian Perusahaan Awam, Tingkat 15 & 16, Medan MARA Jalan Raja Laut, 50350 KUALA LUMPUR" Khidmat nsert "Kontrak dan" insert “Kontrak dan" with "Works" insert "Kontrak dan" ———— A Guide on The Administration of Public Works Contracts CORR, PDATING UNTIL SEPTEMBER 1989 Chapter 15. 1. Page 301 Paragraph 15.2.1, Replace "$5 million)." Line 4 2. Page 301 Paragraph 15.2.1, Line 4 Between "a" and "provision" 3. Page 301 Paragraph 15.2.2, Line 2 Between "Sub-contractors"” "advance" and 4. Page 302 Paragraph 15.2.4, Replace "the site” line 3 5. Page 302 Paragraph 15.3.2 Replace the whole paragraph 15 "$5 million)-." insert "special" insert "and Nominated Suppliers" "site" with "15.3.2. To effect an interim payment, an Interim Certificate must be issued. The latest revision of the Interim Certificate, form PWD 66 (Revised 1988) as shown in Appendix 15A, must be used’. It must be noted that Appendix A to form PI Revised 1988), which previously used to show the payment accounts of Nominated Sub-contractors and Suppliers, now comes in three parts as follows: A Guide on The Administration of Public Works Contracts CORRIGENDA INCLUDING UPDATING UNTIL SEPTEMBER 1989 Chapter 15 - Advance and Interim Payments (Cont'd) (a) Appendix Al for payment accounts of Nominated Sub-contractors; | (b) Appendix AZ for payment accounts of Nominated Suppliers; and (c) Appendix ‘A3 for payment. accounts of assignees.' 6. Page 302, At the bottom of the page insert new footnote as follows: m “pepW Circular No.11 of 1988 dated 13.12.88." . 7. Page 303 Paragraph 15.3.3(d), Line | 2 Replace with "work." “work... 8. Page 303 | Paragraph 15.3.3(1)(iii), Last line Replace with "Contractors" "Contractor 9. Page 303, Renumber | footnote ! 10. Page 304 Paragraph 15.3.5, Line 3 Replace with "follows :‘" "follows :5" 11. Page 304 Replace . with footnote "™ Treasury v'"Treasury Circular No.13 of Circular No. of 1985 1985 dated 6.8.85," dated 6.8.85" 12. Page 308 Rename as - title —"SUBKONTRAKTOR- "SUBKONTRAKTOR- SUBKONTRAKTOR SUBKONTRAKTOR DINAMAKA" DINAMAKAN" 16 A Guide on The Administration of Public Works Contracts CORRIGENDA INCLUDING UPDATING UNTIL SEPT CHAPTER 16 - VARAIATION AND FINAL ACCOUNT Page 325 Paragraph 16.2.1, Line 5 Replace with 5 varied." 7 varied." Page 325 Paragraph 16.2.5, Line 3 Replace with “sumare" "Sum are". Page 327 Paragraph 16.2.8(C) ,Line 2 Replace with "general" "General". Page 327 Paragraph 16.2.9(a)(iii) Insert between "the Contracts and" Page 327 Paragraph 16.2.9(b) (iii) Insert “Contracts and" Page 327 Paragraph 16.2.9(c)(iii) Insert “Contracts and" Page 328 Paragraph 16.2.9(d)(iii) "of" and "Quantity". between "the" and "Quantity". between "the" and "Quantity". Insert between “Contracts and” "the" and "Quantity" Page 328 Paragraph 16.2.10(a) Insert before “Contracts and" “Quantity” Page 328 Paragraph 16.2.10(b) Insert before "Contracts and" "Quantity" a7 10 i) 12. 13. 14. 15. 16. A Guide on The Administration of Public Works Contracts CORRIGENDA INCLUDING UPDAT iG UNTIL SEPTEMBER 1989 CHAPTER 16 ~ VARAIATION AND FINAL ACCOUNT (CONT'D) Page 328 Paragraph 16.2.10(c) Insert "Contracts and" Page 328 Paragraph 16.2.10(d) Insert “Contracts and" Page 329 Paragraph (iii), Line 2 Replace "detail" 16.2.14(a) Page 331 Paragraph 16.3.2(b), Line 1 Replace "work by the Contractor" Page 331 Paragraph Lines 1 & 2 Replace "caused the regular progress of the work by him to be disturbed,” 16.3.3(a), Page 331 Paragraph 16.3.5(c) Insert "Contracts and” Page 331 Paragraph 16.3.6, Insert "Contracts and" Line 2 18 before "Quantity". before "Quantity". with "detailed". "the Works". with "has materially affected the regular progress of the Works,". between "the" and "Quantity" between "the" and "Quantity" 17. 18. 19. 20. ain 22. 23. A Guide on The Administration of Public Works Contracts CORRIGENDA INCLUDING UPDATING UNTIL SEPTEMBER 1989 CHAPTER 1. Page 332, Footnote § Replace "dated 25.10.88" Page 333 Paragraph 16.4.4(b) Replace urveyor" Page 334 Paragraph 16.5.5, Insert neet Page 344 (APPENDIX 16H) Replace entire page Line 2 Page 349 (APPENDIX Line 17 Insert "Kontrak dan" 16L (Samb.)), Page 351 (APPENDIX Line 25 16M (Samb.)), "Kontrak dan" Page 359 (APPENDIX 16P) Repla (Fitnishes Quality)" VARAIATION AND FINAL ACCOUNT (CONT'D) with “dated 26.10.88". with "Surveyor". between "need" and "be". with new Page 344 attached. between "Cawangan" and "Ukur". en “Cawangan" and "Ukur". with "(Finishes Quality)". 19 Appendix 58 SENARAI SEMAKAN MENGEMUKAKAN TENDER PANDUAN KEPADA PENTENDER | Nowa ‘a. Senarai semakan ini adalah bertujuan bagi menolong pentender mengemukakan satu tender yang lengkap dan tanpa sebarang kesilapan, Semus pentender adalah dinaihatkan supaya menggunakan senari semakan int bagi ‘menyemak tender mereka sebelum menyerahkan tender masing-masing. b, Segala usaha telah diambil untuk menyenaraikan perkara-perkara yang lazimnya perty diambil tindakan oleh seorang pentender dalam mengemukakan tendemya. Walaupun begitu, adalah menjadi tanggungjawab Pentender sepenuhnya bagi menentukan lengkapnya sesuatu tender yang dikemukakannya itu. 5 il, Perihal Semakan ‘Tindakan/ Catatan ; |b0} Semakan Am . 1.1 Naskah salinan Dokumen Tender yang diberikan kepada pentender hendaklah ‘mengandungi dokumendokumen sepertimana yang disenaraikan di dalam Surat Jemputan Tender. Sila semak dan pastikan supaya semua dokumen-dokumen i terdapat pada Naskah Dokumen Tender anda sebelum meninggalkan pejabat di mana Dokumen Tender dikeluarkan. At 1.2. Adalah menjadi tanggungjawab scorang pentender untuk Wieneliti bahawa salinan- ; salinan itu adalah sebenarnya salinan-salinan dokumen yang termasuk dalam | Dokumen Meja Tender. lika terdapat apa-apa perbezaan atau percanggahan antara ‘mana-mana salinan yar. diberi kepada pentender dengan salinan dalam Dokumen Moja Tender atau antara mana-mana dokumen yang termasuk di dalamnya maka adalah menjadi tanggungjawab pentender untuk memohon secara bertulis kepada pilhak yang mengeluarkan Dokumen Tender tidak lewat dari tujuh (7) hari sebelum tarikh akhir yang ditetapkan dalam Notis Tender bagi penyerahan tender supaya dlibetulkan perbezaan atau percanggatan iu. 1.3 Sila semak Dokumen Tender anda dengan Dokumen Meja Tender yang dipamerkan bagi menentukan supaya tidak ada mukasurat yang tetinggal (1 pages) atau diberi lebih dari yang sepatutnya (duplication of pages). 1.4 entender tidak dibenarkan membuat apa-apa perubahan atau tambahan. kepada. ‘Borang Tender atau manamana Dokumen Tender yang lain yang boleh dianggap mengenakan had syarat atau perjanjian tambahan kepada syarat-syarat yang telah ditetapkan 441 dalam Dokumen Tender oleh Kerajaan. 1.5 Semua maklumat yang diisi oleh pentender hendaklah dengan menggunakan dakvwat tidak mudah luntur Jika ferdapatsebarang kesilapen dalam mengist ‘maklumat, Keslapan tersebut hendaklah dibetulkan dengan cara memotong kesilapan fersebut dengan satu garisan bersih melintang dan ditandatangani ringkas olgh pentender dan saksinya. Penggunaan pemadam getah atau kimia cectr adalah dilarang 30 Appendix 53 (Sanb.) Bit Perihal Semakan Tindakan/ a Catatan 2.0) Borang Tender KR 203C atau 2038 - Pind. 1/82) 2.1 Muka surat No. 1: Tidak perlu dis. 22 Muka surat No. 2: Akan dis oleh pihak yang mempelawa tender. 2.3. Muka surat No. 3: Para No.3: Isitempoh menyiapkan kerja mengikut unit ‘MINGGU’. Para No.4: Isi dengan perkataan dan juga angka, amaun tender (hendaklah sama dengan jumlah di Senarai Kuantiti ara No.5: Nyatakan bidang kerja Wang Kos Prima atau Wang Peruntukan Sementara yang “pentellder berniat mengambil bahagian rmentender dan juga berkelayakkan menjalankannya (mestilah berdaftar dengen PKK untuk menjalankan kerja tersebo!). Jka tidak, nyatakan tiada. 24 Muka surat No. 5: Para No, 10: Ii tarikh, tandatangan pentender (hendaklah seorang yang sah dibenarkan di sisi undangundang untuk menandatangani Kontrak bagi pihak Syarikat pentender), Turunkan Cop Syarikat pentender.Isi maklumat dan tandatangan saksi. b. 03 a =Rev.l [Naskah borang ini (jka dimasukkan dalam dokumen tendet) adalah untuk pengetahuan ddan maklumat pentender semata-mata, Janya tidak peri disi pada peringkat tender. [4.0] Ringkasan Tender dan Jadual Kadar Haga 4. Ringkasan Tender (Summary of Tender) 4.1.1 Semua item yang dijadualkan di ringkasan tender mestilah dihargakan. Harga bagi setiap item hendaklah mencerminkan harga sebenar untuk ‘melaksanakan item kerja berkenaan. Sebarang usaha memanipulasikan harga di antara item-item di ringkasan tender adalah ditegah. 44.2. Kerja Awalan (Preliminaries) = Pejabat tapak untuk Pegawai Penguasa. = Pentender dikehendaki menawarkan hanya satu di antara dua pilihan (enis rekabentuk JKR atau jenis mudalih (relocatable). Pentender hendakiah memotong pilihan yang tidak ditawarkan olehnya ‘ 4.13. Semak kiraan di Ringkasan tender dan pastikan jumlahnya betul dan pindahkan jumlah ini ke borang tender. | { EEE EEEESSSSSS'S_—~ ~~ Appendix 58 (sanb.) | 7 Bin, Perihal Semakan Tindakeny Catatan 414 IsiTarkh, 4.15 Turunkan Tandatangan Pentender 4.1.6 Turunkan Cop Syarikat Pemtender | 4.1.7 Isi maklumat dan tandatangan seksi. 42° Jadual Kadar Harga 4.2.1 Penting: Sila baca fasal-fasal permulaan di muka surat SR2 dan SR38 di Jjadual kadar harga sebelum mengambil sebarang tindakan. Li 4.2.2 Muka surat SRI hendaktah jangan diisi pada peringkat tender, 42.3 Meneliti setiap item di jadual kadar harga dan buat pindaan jika ft pentender tidak setuju denga harga yang diperuntukkan. Pindaan hhendaklah dibuat dengan cara memotong kadar harga berkenaan dengan : satu garisan bersih melintang. Isi kadar yang ditawarkan oleh pentender c dan tandatangan ringkas disebelahnya. i 4.24 Mukasurat R37. + Isi peraus (4) Kenakan ata penurunan dirvang | yang diperuncukan, Jka tidak ada perubahan is “Thad atau “NIP. { Tandatangan pentender dan rik, : Tandatangan saksi dan tarikh. 42.5 Jadual kadar harga hendaklah disertakan bersama dengan lain-lain | dokumen semasa penyrahan tender slpes tndakaindakan di ast , iam , t i 42.1 Sila semak dokumen Senarai Kuantiti anda dengan Senarai Kuantt di dokumen Meja Tender yang dipamerkan bagi menentukan tidak ada x suka surat yang tertinggel (missing pages) atau terdapat muka surat yang | i sama dimasukkan lebih dari satu (duplication of pages). | F 5.2 Kerja Awalan (Preliminaries) : 5.2.1 Jika ada terdapat mana-mana item kerja awalan yang tidak melibatkan | \ kos kepada pentender maka ruang harga untuk item kerja tersebut | i hhendaklah diisi dengan anda (2). 522 Peis wai Pen Pentender hendaklah menawarkan (memilih) hanya satu di antara dua pilihan yang diberi (jenis rekabentuk JKR atau jenis mudah alih \ 32 Appendix 58 (Samb,) Perihal Semakan " Catatan ‘Senarai Kuantiti (Samb,) (relocatable). Pentender hendakleh memotong pilihan yang tidak ditawarkan olehny. 53. Menghargakan Senarai Kuanit 53.1 Semus item yang dijaduatkan di dalam Senarai Kuantiti hendaklah Gibargakan, Harga bagi setiap item hendaklah mencerminkan harga Sebenar sesuatu item itu, Sebarang usaha memanipulasiken harge dh auiara ltem-item atau di antara bahagian-bahagian di Senarai Kuantiti | adalahditegah. 532 Mengumpul/menyatukan (bracketing) harga untuk beberapa item yang betlainan adalah tidak digalakcen $4 Mensa harga. menjumlah dan memindahkan jumlah 54.1 Semak pengiraan harga bagi setiap item, 542 Semak jumlah setiap muka surat, 543. Pastikan bahawa jumh setiap muka surat yang betkensan dipindahkan ‘ke muka surat ‘ Summary of Tender’ dengan betul. *44 Pasikan bahawa jumiah setiap muka surat ‘Collection’ dipindah ke muka surat ‘Summary’ dengan betul, 53 ‘Sum z in bahawa jumlah di Summary’ atau “General Summary’ (di ‘mana berkenaan) dipindah ke borang Tender. 552 Isi jumlah amaun tender dalam angka dan perkataan di ruang yang | diperuntukkan. 553. Isitarkh, tandatangan dan Cop Syarikat Pentender | 554 Isimaklumatdan tandatangan saksi 60) qindskan ats Lampican-Lampiran i Dokumen Tender 61 Lampiran A. Bahanchahan yang berasal dari Malaysia ‘Untuk makduman pentender sahaja, 62 : Pads Jeoama dan nombor model kelengkapan pint-tingkap yang ditawarkan, Filibae hendsklah dibuat daripada jenama kelengkapes pintu-tingkap yang

Você também pode gostar