No.

KODE
1

KOEF

SAT.

URAIAN PAKERJAAN

B.27

JUMLAH
Rp
8=(4X7)

0.2000
1.0000
1.0000
0.5000
0.0500

m3
m3
org
org
org

1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TL


Kapur padam
Tanah liat
Pekerja
Tukang batu
Kepala tukang batu

196,000.00
55,000.00
34,500.00
48,875.00
51,750.00

155,725.00
39,200.00
55,000.00
34,500.00
24,437.50
2,587.50

1.0000
0.2000
1.0000
0.5000
0.0500

m3
m3
org
org
org

1 M3 PEK. LAPISAN PUDEL 1 KP : 5 PS


Pasir pasang
Kapur padam
Pekerja
Tukang batu
Kepala tukang batu

144,800.00
196,000.00
34,500.00
48,875.00
51,750.00

245,525.00
144,800.00
39,200.00
34,500.00
24,437.50
2,587.50

0.2500
0.0100
0.1250

org
org
lot

1 M3 MERATAKAN TANAH DAN DITIMBRIS


Pekerja
Mandor
Alat bantu

34,500.00
#REF!
13,750.00

#REF!
8,625.00
#REF!
1,718.75

0.1500
0.0125

org
lot

1 M2 MENGAMBIL DAN PASANGAN GEBALAN


Pekerja
Alat bantu

34,500.00
13,750.00

5,346.88
5,175.00
171.88

0.0500
0.0125

org
lot

1 M' MENGANGKUT GEBALAN RUMPUT


Pekerja
Alat bantu

34,500.00
13,750.00

1,896.88
1,725.00
171.88

1.2000
0.2000
0.0125

m2
org
lot

1 M2 PEKERJAAN GEBALAN RUMPUT SAMPAI TUMBUH


Gembalan rumput biasa
Pekerja
Alat bantu

13,700.00
34,500.00
13,750.00

23,511.88
16,440.00
6,900.00
171.88

m3
m3
m3
m3

1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3)
Pekerjaan galian (10 org) 50 % (Analis B1)
Pek. Galian tanah berbatu (10 org) 50 % (Analis B17)
Pek. Grading plant (10) 50 % (5 x Analis B5)
Beli tanah biasa + angkut max 10 km

13,800.00
25,000.00
1,725.00
49,950.00

91,845.00
8,280.00
15,000.00
8,625.00
59,940.00

95,700.00
1,312.50
144,800.00

534,373.00
114,840.00
265,125.00
70,228.00

34,500.00
48,875.00
51,750.00

51,750.00
29,325.00
3,105.00

B.28

B.29

B.30

B.31

B.32

B.33
0.6000
0.6000
5.0000
1.2000
III

HARGA SAT.
Rp
6

PEKERJAAN PONDASI

C.1
1.200
202.000
0.485

m3
Kg
m3

1M3 Pasang Pondasi Batu Kali 1Pc : 3 Ps


Batu Belah 15/20
Portland Sement
Pasir Pasang

1.500
0.600
0.060

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

1.1000
163.0000
0.5200
1.5000
0.6000
0.0600

m3
zak
m3
org
org
org

1 M3 PASANGAN BATU BELAH 1 : 4


Batu Belah 15/20
PC (50 kg)
Pasir pasang
Pekerja
Tukang batu
Kepala tukang batu

1.200
136.000
0.544

m3
Kg
m3

1M3 Pasang Pondasi Batu Kali 1Pc : 5 Ps


Batu Belah 15/20
Portland Sement
Pasir Pasang

1.500
0.600
0.060

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

C.1a

C.2

C:\Users\COMPAQ\Downloads\analisa swakelola - mandor

95,700.00
1,312.50
144,800.00
34,500.00
48,875.00
51,750.00

478,683.50
105,270.00
213,937.50
75,296.00
51,750.00
29,325.00
3,105.00

95,700.00
1,312.50
144,800.00

456,291.20
114,840.00
178,500.00
78,771.20

34,500.00
48,875.00
51,750.00

51,750.00
29,325.00
3,105.00