FORMULIR STANDAR UNTUK

PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK

No. PAKET KONTRAK

NAMA PAKET

PROP / KAB / KODYA

ITEM PEMBAYARAN NO.

: 6.3 (5)

JENIS PEKERJAAN

: Lapis Aus Aspal Beton (AC-WC) t = 4 Cm

SATUAN PEMBAYARAN

: M2

NO.

KOMPONEN

A.

TENAGA

1.
2.

Pekerja
Mandor

SATUAN

(L01)
(L03)

Jam
Jam

PERKIRAAN
KUANTITAS

0.0152
0.0022

JUMLAH HARGA TEN


B.

BAHAN

1.
2.
3.
4.

Agregat Kasar
Agregat Halus
Filler
Aspal

(M03)
(M04)
(M05)
(M10)

M3
M3
Kg
Kg

0.0258
0.0217
7.3062
5.9063

JUMLAH HARGA BA
C.
1.
2.
3.
4.
5.
6.
7.
8.

PERALATAN
Wheel Loader
AMP
Genset
Dump Truck
Asphalt Finisher
Tandem Roller
P. Tyre Roller
Alat Bantu

(E15)
(E01)
(E12)
(E09)
(E02)
(E17)
(E18)

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Ls

0.0026
0.0022
0.0022
0.0881
0.0027
0.0027
0.0027
1.0000

JUMLAH HARGA PERALA


D.
E.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


OVERHEAD & PROFIT
% x D

F.

HARGA SATUAN PEKERJAAN ( D + E )

Note: 1

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.

Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.

Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-635

R STANDAR UNTUK
MASING-MASING HARGA SATUAN

PERKIRAAN VOL. PEK.

10,000.00

TOTAL HARGA (Rp.)

###

% THD. BIAYA PROYEK

40.50

HARGA
SATUAN
(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH
HARGA
(Rp.)

JUMLAH HARGA PERALATAN

0.00
0.00
0.00
0.00

eralatan, volume dan/atau ukuran

n satu satuan pekerjaan dari nomor


dipakai dan operator.

kaitan (tetapi tidak termasuk PPN

Você também pode gostar