Escolar Documentos
Profissional Documentos
Cultura Documentos
OBRA :
Comercial (C-1)
CLIENTE :xxxxxx
mca
2 - HIDRANTE HI-2
a - Presso necessria no requinte : h2 =
13.1
b - Vazo no requinte com a presso necessria:
Q=
0.00208 m3/s =
138.00 l/min
c - Requinte :
13
mm
3 - DESNVEL ENTRE BOMBA E HI-1 =
4.86
3.97
mca
II - Perdas de Cargas
1 - POR TRECHOS
DIMETRO VAZO COMPRIM.
TRECHO
AB
BC
BD
MANG.
HI-1
MANG.
HI-2
ESG.
HI-1
ESG.
HI-2
(mm)
63
63
63
38
38
38X13
38X13
(l / min)
263.00
125.00
138.00
125.00
138.00
125.00
138.00
(m)
93.00
4.17
0.20
30
30
-
COMP.
EQUIV
(m)
34.67
15.60
14.30
-
COMP. PERDA
TOTAL UNIT.
(m)
(m / m)
127.67 0.0394
19.77
0.0100
14.50
0.0120
30.00
0.0782
30.00
0.0782
0.5175
0.5175
2 - PERDA TOTAL
a - At HI-1 : hf1 = J1 + J2 + J4 + J6
8.0963
PERDA
TOTAL
(mca)
5.0353
0.1969
0.1734
2.3466
2.3466
0.5175
0.5175
OBS
J1
J2
J3
J4
J5
J6
J7
b - At HI-2 : hf2 = J1 + J3 + J5 + J7
8.0728
16.31
mca
2 - Vazo
Q=
263.00
3 - Potncia
Potncia
=
~
l/min =
0.00438
m3/s
1.65593
2.0
CV
13.76
mca
17.76
mca
145.60 l/min
m/s