Você está na página 1de 5

EQUIPE

BAAJATINGA

Preparation of car
One week before competition the car is
dismounted;
Each piece receive maintenance;
The car is mounted to competition;
Components are regulated like tire pressure,
break fluid;
All bolt receive double check.

Substitute components
All subsystem have a substitute components;
Two days before go to competition, subsystem
boss need complete a checklist for him
subsystem;
The checklist include components and tools that
will be used;
The team save the substitute components in two
big wood box, the tools in toolbox and tool cabinet
as well;
Save small thing in the tool car and use it in same

Organization of truck and


work space
The car goes mounted on top of the truck;
All tools goes on top of the truck;
The members go in the bus;
The work space is strictly monitored by bosses
and need to keep organized all the time;
The team use the philosophy: used, save in the
same place that you took.

Monitor the car


During competition all the time have at least two
people near the car;
During night two people need sleep near the car.
Normally, new members sleep with the car in the
first competition.

Você também pode gostar