Project Name: FTTX GPON PROJECT

Project Number: 2052104


District

City

Western

Jeddah

Site Name
Jeddah North Area

Site Number
ZNJ523

CLLI Code

Job Number

HMDNKHAD

J-ZNJ523-00081
J-ZNJ523-00082
J-ZNJ523-00083

Mop Number: M-ERI-12637


Mop Type: FTTH
Date of MoP: 5/10/2010
Revision Status:
Vendor : Ericsson
Engineer ID: alargo
Engineer Name: alargo
SoW No: S-0033369
X Location : 3911'18.84"
Y Location : 2145'21.96"
Generated using MoPGenTools (R-1.5.9.3)

Document Change Record

Rev.
1.0

Date
5/10/2010

Description
Initial

By
alargo

Table Of Contents
1

INTRODUCTION2
1.1
1.2
1.3
1.4
1.5

DETAILED DESIGN...............................................................................11
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8

Scope of Work......2-3
Equipment Description.........................................................................................4-6
List of Materials....................................................................................................7-8
Schematic Diagram..................................................................................................9
Typical Network Diagram......................................................................................10

Rack Face Layout.............................................................................................11-14


Sub-Rack Layout & Table................................................................................15-16
Connectivity Tables (OLT - SPLITTER) ........................................17-19
Connectivity Tables (SPLITTER - ODF) ....................................20-31
Network Synchronization Diagram.......................................................................32
Physical & Logical Addressing Tables.................................................................33
Network Connectivity Tables................................................................................34
ICMS Diagram.......................................................................................................35

DC POWER................................................................................................36
3.1 Power Connectivity Drawing.................................................................................36
3.2 Power Connectivity Tables.....................................................................................37
3.2.1 GPON Power A & B - CAU.37
3.2.2 PDU 01 - CAU..38
3.2.3 PDU 02 - CAU..39
3.2.4 PDU 01 & 02 - DCDP...40
3.3 Power and Earth Cable Table..................................................................................41

APPROVALS..............................................................................................42
4.1 N.E. Generated Floor Plan......................................................................................42
4.2 Approved Floor Plan...............................................................................................43
4.3 Fuse Assignment Approval.....................................................................................44

ANNEX.......................................................................................................45
5.1
5.2

Project Name
Mop Type
Eng. Name
Site Name

Location Map.........................................................................................................45
Glossary............................................................................................................46-47

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Scope Of Work

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 1 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

1 INTRODUCTION
1.1 Scope Of Work
This SOW To project (FTTH) solution in (Jeddah North Area in Shelter ZNJ523) to provide 1 Outside
OLT with High Speed Internet Access (HSIA), and triple play services (Voice, Video, Data) using the
FTTH GPON architecture.

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Scope Of Work

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 2 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

FTTX Wireline Access Design

Requirements For

Improve and expand broadband network - the third phase FTTH

Ericsson
S-0033369
Revision No:

Marzook N Al Otaibi
Date Printed: 19/09/2010

Network Design

I. Main
1. General
By assuming
All dwelling units (Residential & Commercial) unit will be fibered
The type of ONT to serve each unit is single family unit (SFU) or single business unit (SBU).
1:2 splitters will be installed in the frame distribution frame (FDF) in the CO area and 1:32 splitters in FDT
located in OSP. Each 1:32 splitter will be distributed through secondary network.

Date Printed: 19/09/2010

Sow No: S-0033369

Rev. #: 2

Page 2 of 9

Network Design

2. General Requirements
All equipment must by have type approval from STC.
All MOP documentation must be depending on RFP.
Optical splitters should be preconnectorized with LC/APC connectors for mounting in pre-assembled
splitters cabinets.
Maximum distance (Reach) between OLT and ONT is 20Km.
Single fiber (Single Mode fiber G657) is used to connect the OLT located in the Central Office (CO), and the
ONTs located at the customer premises.
The routing and location of feeder route should consider the overall link budget which is 28dB, (Class B+), and
the position/location to ensure an easy access for the splitter cabinet.
Central Office (OLT) Requirements
The OLT PON port offers 2.5 Gbps bandwidth in down link and 1.25 Gbps in uplink.

Date Printed: 19/09/2010

Sow No: S-0033369

Rev. #: 2

Page 3 of 9

Network Design

3. Scope Description
This SOW To project (FTTH) solution in (Jeddah North Area in Shelter ZNJ523) to provide 1 Outside OLT with
High Speed Internet Access (HSIA), and triple play services (Voice, Video, Data) using the FTTH GPON
architecture.

Date Printed: 19/09/2010

Sow No: S-0033369

Rev. #: 2

Page 4 of 9

Network Design

II. Summary of Scope of Work


The following table summarizes the equipment/services to be installed on each site and ring, if applicable, for
this Scope of Work.

Ring

Site Name
ZNJ523
ZNJ523

ZNJ523
ZNJ523

ZNJ523
ZNJ523

Date Printed: 19/09/2010

Sow No: S-0033369

Elem Grp/Elem.
FTTX
FTTX

FTTX
FTTX

FTTX
FTTX

Equipment /Model Name


GPN Sc1 Model1
ISP Materials

GPN SC1 MODEL1-1


ISP Part

GPN Sc1 Model2


GPON OLT EDA1500 R6.0, 56xGPON
Ports

Rev. #: 2

Page 5 of 9

Network Design

III. CUL Requirements

Quantity Table For

Installation

Equipment Model/Services :

GPN Sc1 Model1

Ring No :
Site Number :

ZNJ523

ZNJ523

Unit Code

Unit Description

Qty

09gpn hw1316a

PATCHCORD 2MM SM 2SC/APC-2SC/APC 10M

56.00

09gpn hw1274a

PATCHCORD SM 1X10/125 2MM SC-SC/APC 5M

56.00

09gpn hw370a

Air guide shelf

1.00

09gpn hw1175a

ODF high 48 SC-duplex cut-out

3.00

09gpn hw444a

Adapter SC/APC-duplex

09gpn hw451a

Grounding Cable 25 mm sq. Yellow/Green

09gpn hw452a

Optical Patch Cord Cable LC-SC 50 meter each

2.00

09gpn se53p

Project Management per node

1.00

09gpn hw1225a

Splitter-ODF 16x(1x2) SC/APC

4.00

09gpn hw367a

EDA 1500 6.x BYB-Cabinet Basic

1.00

09gpn hw368a

BLM 1500 6.x in BYB, set of materials

1.00

09gpn hw369a

09gpn hw369a - Fiber Management System basic equipped

1.00

09gpn hw380a

PDU-14 (14x15A, max 2x62A)

2.00

09gpn hw384a

30m Power Cable, 2x16 mm2

4.00

09gpn se16d

Fiber Management Rack for OLT Installation, per site/ rack

1.00

09gpn se17c

Fiber Management Rack for ODF Box/Splitters etc & Fiber Cable Installation, per site/ rack

1.00

Date Printed: 19/09/2010

Sow No: S-0033369

144.00
40.00

Rev. #: 2

Page 6 of 9

Network Design

Remarks :

Equipment Model/Services :

GPN SC1 MODEL1-1

Ring No :
Site Number :

ZNJ523

ZNJ523

Unit Code

Unit Description

09gpn hw445a

Qty

PIGTAIL 0.9MM SM SC/APC 2M

288.00

Remarks :

Equipment Model/Services :

GPN Sc1 Model2

Ring No :
Site Number :

ZNJ523

ZNJ523

Unit Code

Unit Description

Qty

09gpn hw340a

XFP Module, 10km - 10GBaseLR

2.00

09gpn hw329a

FAB320, 320Gbps Switch Fabric/Node Cntr.

2.00

09gpn hw326a

FAB Pack Redundancy Cable

1.00

09gpn sw138b

EntriView Management License

1.00

09gpn hw335a

G28, 2x10GigE & 8x1GigE

2.00

09gpn sw123b

BLM 1500 System SW 6.0

1.00

09gpn hw332a

GP4, 4-Port GPON

09gpn hw323a

OLT1500, 17U RE Chassis Bundle

Date Printed: 19/09/2010

Sow No: S-0033369

14.00
1.00

Rev. #: 2

Page 7 of 9

Network Design

09gpn hw324a

17U Fiber Management Shelf

1.00

09gpn hw325a

Spare 17RU installation kit

1.00

09gpn sw124b

EDA1500 Multicast/IPTV License

1.00

09gpn sw125b

EDA1500 Wholesale/Open Access

1.00

09gpn sw127b

EDA1500 Routing System License

1.00

09gpn sw132b

100Gb/s capacity function

1.00

09gpn sw134b

PON SW License: 1 per PON-port

09gpn se12c

Configuration of a Fully Configured EDA1500 OLT, per Subrack

1.00

09gpn se13e

Engineering of a Fully ConfiguredEDA1500 OLT, per Subrack

1.00

09gpn se14c

Integration of a Fully ConfiguredEDA1500 OLT, per Subrack

1.00

09gpn se15d

Installation of a Fully ConfiguredEDA1500 OLT, per Subrack

1.00

56.00

Remarks :

IV. PRN's And Customers

The following table indicates the Planning Reference Numbers (PRN) and the STC internal customers that are
served by this SoW.
This table is for STC internal use only.
Site No./Site Name

PRN

Ring No.

Customer

ZNJ523

Interface

Assigned
Capacity
0.00

ZNJ523

V. Scope of Work Attachments

List of attachments.

Date Printed: 19/09/2010

Sow No: S-0033369

Rev. #: 2

Page 8 of 9

Network Design

End of Document

Date Printed: 19/09/2010

Sow No: S-0033369

Rev. #: 2

Page 9 of 9

Note:
1. 30% Discount is applied on GPN Sc1 Model2 - GPON OLT EDA1500 R6.0, 56xGPON Ports for
both Hardware and Software.

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Scope Of Work

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 3 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

1.2 Equipment Description

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Equipment Description

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 4 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Equipment Description

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 5 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

Technical Specifications
Delivery Contents:
Multifiber
Management
System

Switching
Units Cabinet

Switching units cabinet, equipped as ordered


Multifiber management cabinet, equipped as
ordered

Size [mm],
whd

800 2020 400

600 2020 600

Power
requirements

-48V DC HOD1)

Temperature
range

5C to 40C

Power
consumption

2 kW per OLT

Ordering Information
See ECP; EDA 1500 6.1 OLT GLOBAL, FAP 130 1262.

1) High Ohmic Distribution (HOD) is a power system in


which the voltage drop following a short circuit is limited
to 40.5 V DC.
In Low Ohmic Distribution (LOD) the voltage drop is not
controlled. In both cases a circuit breaker trips after
maximum 10 ms.

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Equipment Description

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 6 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

1.3 List of Materials

Model
Description

Model

Contract Unit
Code

ISP Materials
GPON Exchange ISP Materials - OLT Rack
GPN Sc1 Model 1
ISP Materials
09gpn hw367a
GPN Sc1 Model 1
ISP Materials
09gpn hw368a
GPN Sc1 Model 1
ISP Materials
09gpn hw451a
GPN Sc1 Model 1
ISP Materials
09gpn hw452a
GPON Exchange ISP Materials - SPLITTER Rack
GPN Sc1 Model 1
ISP Materials
09gpn hw369a
GPN Sc1 Model 1
ISP Materials
09gpn hw370a
GPN Sc1 Model 1
ISP Materials
09gpn hw380a
GPN Sc1 Model 1
ISP Materials
09gpn hw384a
GPN Sc1 Model 1
ISP Materials
09gpn hw1225a
GPN Sc1 Model 1

ISP Materials

09gpn hw1274a

GPON Exchange ISP Materials -OSP ODF Rack


GPN Sc1 Model 1
ISP Materials
09gpn hw369a
GPN Sc1 Model 1
ISP Materials
09gpn hw370a
GPN Sc1 Model 1
ISP Materials
09gpn hw1316a
GPN Sc1 Model 1
ISP Materials
09gpn hw1175a
GPN Sc1 Model 1
ISP Materials
09gpn hw444a
GPN Sc1 Model 1
ISP Materials
09gpn hw445a

Description

Qty

EDA 1500 6.x BYB-Cabinet Basic


EDA 1500 6.x BYB, set of materials
Grounding Cable 35mm sq. Yellow/Green
Optical Patch Cord Cable LC-SC 50meter each

1
1
40
2

Fiber Management System basic equipped


Air guide shelf
PDU-14 (14x15A, max 2x62A)
30m Power Cable, 2x16mm2
Splitter-ODF 16x(1x2) SC/APC
PATCHORD SM 1X10/125 2mm SC-SC/APC
5M

1
1
2
2
4

Fiber Management System basic equpped


Air guide shelf
PATCHCORD 2MM SM 2SC/APC-2SC/APC 10M
ODF high 48 SC-DUPLEX SLOTS
Adapter SC/APC-Duplex
PIGTAIL 0.0mm SM SC/APC 2M

1
1
56
3
144
288

56

Services
GNP Sc1 Model 1

ISP Materials

09gpn se16d

GNP Sc1 Model 1

ISP Materials

09gpn se17c

GNP Sc1 Model 1

ISP Materials

09gpn se53p

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Fiber Management Rack for OLT Installation,


per
site/rack
Fiber Management Rack for ODF Box/Splitters
etc & Fiber Cable installation, per site/rack
Project Management

Project Number

2052104

List of Materials

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 7 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

1
2
1

Contract
Unit
Code
GPON OLT EDA1500 R6.0, 56xGPON Ports
Model
Description

Model

Description

Qty

HW
GPN Sc1 Model2
GPN Sc1 Model2
GPN Sc1 Model2
GPN Sc1 Model2
GPN Sc1 Model2
GPN Sc1 Model2
GPN Sc1 Model2
GPN Sc1 Model2

GPN Sc1 Model2


GPN Sc1 Model2
GPN Sc1 Model2
GPN Sc1 Model2
GPN Sc1 Model2
GPN Sc1 Model2
GPN Sc1 Model2

GPN Sc1 Model2


GPN Sc1 Model2
GPN Sc1 Model2
GPN Sc1 Model2

Project Name
Mop Type
Eng. Name
Site Name

GPON OLT EDA 1500


R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports
GPON OLT EDA 1500
GPON OLT EDA 1500
R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports

09gpn hw324a

17U Fiber Management Shelf

09gpn hw326a

FAB Pack Reduntary Cable

09gpn hw329a

FAB320, 320Gbps Switch Fabric/ Node


Cntr.

09gpn hw335a

G28, 2x10Gig E & 8x1GigE

09gpn hw332a

GP4, 4-Port GPON

14

09gpn hw323a

OLT 1500, 17U RE Chassis Bundle

09gpn hw325a

Spare 17RU installation kit

09gpn hw340a

XFP Module, 10km - 10GBaseLR

GPON OLT EDA 1500


R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports

09gpn sw132b

100Gb/s capacity function

09gpn sw123b

BLM 1500 System SW 6.0

09gpn sw124b

BLM 1500 Multicast/IPTV License

GPON OLT EDA 1500

09gpn sw127b

EDA 1500 Routing System License

09gpn sw125b

BLM 1500 Wholesale/Open Access

09gpn sw138b

EntriView Management License

09gpn sw134b

PON SW License: 1 per PON-port

56

GPON OLT EDA 1500


R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports
GPON OLT EDA 1500
R6.0, 56xGPON Ports

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

09gpn se12c
09gpn se14c
09gpn se15d
09gpn se13e

Configuration of a Fully Configured EDA


1500
OLT, per Subrack
Integration of a Fully Configured EDA 1500
OLT, per Subrack
Installation of a Fully Configured EDA 1500
OLT, per Subrack
Engineering of a Fully Configured EDA 1500
OLT, per Subrack

Project Number

2052104

List of Materials

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 8 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

1
1
1
1

1.4 Schematic Diagram

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Schematic Diagram

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 9 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

1.5 Typical Network Diagram


STC OSS OVERLAY

Granite
(Inventory)

Project Name
Mop Type
Eng. Name
Site Name

Comptel
InfoVista
(Service (Performance)
Provisioning)

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Fault
Management

Project Number

2052104

Typical Network Diagram

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 10 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

Slot01

Project Name

Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

ER-CAU: Cur r e nt Adder Unit 2KW

Slot02

ER-C AU: Cur r ent Adde r Unit 2KW

GP4: 4-PORT GPON PACK - SBUIAEXEAA

LINE FILTER A: -48 VDC


LIN E FILTER B: -48 VDC

POWER
POWER

GP28: 2x10GE + 8x1GE Uplink Card - SBUIAEYEAB

GP28: 2x10GE + 8x1GE Uplink Card - SBUIAEYEAB

GP4: 4-PORT GPON PACK - SBUIAEXEAA

GP4: 4-PORT GPON PACK - SBUIAEXEAA

GP4: 4-PORT GPON PACK - SBUIAEXEAA

GP4: 4-PORT GPON PACK - SBUIAEXEAA

GP4: 4-PORT GPON PACK - SBUIAEXEAA

GP4: 4-PORT GPON PACK - SBUIAEXEAA

FAB3: Switch Fabric / Node Controller - SBCUAAGAab

FAB3: Switch Fabric / Node Controller - SBCUAAGAab

00 01 02 03 04 05 06 07 X

Slot04

Slot03

GP4: 4-PORT GPON PACK - SBUIAEXEAA

GP4: 4-PORT GPON PACK - SBUIAEXEAA

GP4: 4-PORT GPON PACK - SBUIAEXEAA

GP4: 4-PORT GPON PACK - SBUIAEXEAA

GP4: 4-PORT GPON PACK - SBUIAEXEAA

GP4: 4-PORT GPON PACK - SBUIAEXEAA

GP4: 4-PORT GPON PACK - SBUIAEXEAA

2 DETAILED DESIGN
2.1 Rack Face Layout

(LOCATION CODE: 01.101.01)

OLT RACK
Ericsson 18H 6W 6D

ERICS S ON ///
FAN TRAY

BLM 1500

Y 08 09 10 11 12 13 14 15

P01 (ER-BLM1500-GPON-SHLF)

P02 (ER-BLM1500-GPON-SHLF)

Cur r e nt Adde r Unit

P03 (ER-CAU-4U)

Project Number

2052104

Rack Face Layout

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 11 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

Project Name
Mop Type
Eng. Name
Site Name

Chassis Model Name

Location Code

BLM1500_GPON_SHLF
CAU_4U_Shelf

00.101.01/01
00.101.01/03

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Rack Face Layout

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 12 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

SPLITTER & ODF RACK


(LOCATION CODE: 00 101 02)
Ericsson 18H 6W 4D

ODF01 (ER-ODF-96P-PNL) 01-96


ODF02 (ER-ODF-96P-PNL) 97-192
ODF03 (ER)ODF-96P-PNL) 193-288
ODF04 (RESERVED FOR ODF)
ODF05 (RESERVED FOR ODF)
ODF06 (RESERVED FOR ODF)
ODF07 (RESERVED FOR ODF)
ODF08 (RESERVED FOR ODF)
ODF09 (RESERVED FOR ODF)
ODF10 (RESERVED FOR ODF)
SP08 (RESERVED FOR SPLITTER)
SP07 (RESERVED FOR SPLITTER)
SP06 (RESERVED FOR SPLITTER)
SP05 (RESERVED FOR SPLITTER)
SP04 (ER-16x(1:2)-SHELF) 49-56
SP03 (ER-16x(1:2)-SHELF) 33-48
SP02 (ER-16x(1:2)-SHELF) 17-32

ERICSSON ///

E RICSSON / //

E RICSSON / //

SP01 (ER-16x(1:2)-SHELF) 01-16

E RICSSON / //

I N 01

02

I N 01

02

IN

01

02

IN

01

02

IN

01

02

IN

01

02

IN

01

02

IN

01

I N 01

02

I N 01

02

IN

01

02

IN

01

02

IN

01

02

IN

01

02

IN

01

02

IN

01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

IN

01

02

IN

01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

IN

01

02

IN

01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

IN

01

02

IN

01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

IN

01

02

IN

01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

IN

01

02

IN

01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

I N 01

02

IN

01

02

IN

01

02

P03 (AIR GUIDE SHELF)


PW02 (ER-PDU-14F)

Power Distribution Unit

PW01 (ER-PDU-14F)

Power Distribution Unit

CABLE GUIDE

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

02

Project Number

2052104

Rack Face Layout

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 13 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

Project Name
Mop Type
Eng. Name
Site Name

Chassis Model Name

Location Code

ER_ODF_96P_PNL
ER_ODF_96P_PNL
ER_ODF_96P_PNL
ER_16x(1:2)_SHELF
ER_16x(1:2)_SHELF
ER_16x(1:2)_SHELF
ER_16x(1:2)_SHELF
AIR GUIDE SHELF
ER_PDU_14F
ER_PDU_14F

00.101.02/0DF01
00.101.02/0DF02
00.101.02/0DF03
00.101.02/SP04
00.101.02/SP03
00.101.02/SP02
00.101.02/SP01
00.101.02/PW03
00.101.02/PW02
00.101.02/PW01

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Rack Face Layout

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 14 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

Project Name

Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area
LINE FILTER A: -48 VDC

POWER
GP28: 2x10GE + 8x1GE Uplink Card - SBUIAEYEAB

GP28: 2x10GE + 8x1GE Uplink Card - SBUIAEYEAB

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

FAB3: Switch Fabric / Node Controller - SBCUAAGAab

FAB3: Switch Fabric / Node Controller - SBCUAAGAab

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

GP4: 4-PO RT GPON PACK - SBUIAEXEAA

2.2 Sub Rack Layout

ER-BLM1500-GPON-SHELF
(Location Code: 00.101.01/01)
FAN TRAY

ERICSSON ///

BLM 1500

00 01 02 03 04 05 06 07 X Y 08 09 10 11 12 13 14 15

LINE FILTER B: -48 VDC

POWER

Project Number

2052104

Sub Rack Layout

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 15 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

ER-BLM1500-GPON-SHLF
Slots

Descriptions

ER-BLM1500-FAN

SLOT 00

ER-GP4-SBUIAEXEAA

SLOT 01

ER-GP4-SBUIAEXEAA

SLOT 02

ER-GP4-SBUIAEXEAA

SLOT 03

ER-GP4-SBUIAEXEAA

SLOT 04

ER-GP4-SBUIAEXEAA

SLOT 05

ER-GP4-SBUIAEXEAA

SLOT 06

ER-GP4-SBUIAEXEAA

SLOT 07

ER-GP4-SBUIAEXEAA

SLOT X

ER-FAB3-SBCUAAGAab

SLOT Y

ER-FAB3-SBCUAAGAab

SLOT 08

ER-GP4-SBUIAEXEAA

SLOT 09

ER-GP4-SBUIAEXEAA

SLOT 10

ER-GP4-SBUIAEXEAA

SLOT 11

ER-GP4-SBUIAEXEAA

SLOT 12

ER-GP4-SBUIAEXEAA

SLOT 13

ER-GP4-SBUIAEXEAA

SLOT 14

ER-GP28-SBUIAEYEAB
Interfaces
-SLOT XFP: PORT X1 / ER-XFPLR-SBUIADECxx

SLOT 15

ER-GP28-SBUIAEYEAB
Interfaces
-SLOT XFP: PORT X1 / ER-XFPLR-SBUIADECxx

SLOT PWR-A

ER-BLM1500-PWR

SLOT PWR-B

ER-BLM1500-PWR

Project Name
Mop Type
Eng. Name
Site Name

Plugins

SLOT FAN

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Ericsson BLM 1500 GPON-OLT FAN


Plugin
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT Switch
Fabric/ Node Controller Pack with
External Timing
Ericsson BLM 1500 GPON-OLT Switch
Fabric/ Node Controller Pack with
External Timing
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 GPON-OLT 4PORT GPON Pack
Ericsson BLM 1500 Pluggable GE
Uplink Pack, 2x10GE and 8x1GE ports
Interfaces
-Ericsson 10GE XFP Transciever ER,
1310nn Single Mode 10km
Ericsson BLM 1500 Pluggable GE
Uplink Pack, 2x10GE and 8x1GE ports
Interfaces
-Ericsson 10GE XFP Transciever ER,
1310nn Single Mode 10km
Ericsson BLM1500 GPON-OLT Power
Plugin
Ericsson BLM1500 GPON-OLT Power
Plugin

Project Number

2052104

Sub Rack Layout

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 16 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

2.3 Connectivity Tables (OLT - SPLITTER)


GPON Termination
Site Number : ZNJ523

From Chassis
Location
OLT / Panel
No.

Project Name
Mop Type
Eng. Name
Site Name

Connections From

Connections To

ER-BLM1500-GPON

ER-16x(1:2)-POS

From
Slot
Name

From Plugin
Name

From
Port
Name

To Chassis
Location Splitter /
Panel No.

To Port
Name

Logical
Splitter
Port

00.101.01/01

SLOT 00

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP01

SP01-IN

00.101.01/01

SLOT 00

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP01

SP02-IN

00.101.01/01

SLOT 00

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP01

SP03-IN

00.101.01/01

SLOT 00

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP01

SP04-IN

00.101.01/01

SLOT 01

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP01

SP05-IN

00.101.01/01

SLOT 01

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP01

SP06-IN

00.101.01/01

SLOT 01

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP01

SP07-IN

00.101.01/01

SLOT 01

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP01

SP08-IN

00.101.01/01

SLOT 02

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP01

SP09-IN

00.101.01/01

SLOT 02

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP01

SP10-IN

10

00.101.01/01

SLOT 02

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP01

SP11-IN

11

00.101.01/01

SLOT 02

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP01

SP12-IN

12

00.101.01/01

SLOT 03

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP01

SP13-IN

13

00.101.01/01

SLOT 03

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP01

SP14-IN

14

00.101.01/01

SLOT 03

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP01

SP15-IN

15

00.101.01/01

SLOT 03

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP01

SP16-IN

16

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Connectivity Tables (OLT - SPLITTER)

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 17 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

GPON Termination
Site Number : ZNJ523

From Chassis
Location
OLT / Panel
No.

Project Name
Mop Type
Eng. Name
Site Name

Connections From

Connections To

ER-BLM1500-GPON

ER-16x(1:2)-POS

From
Slot
Name

From Plugin
Name

From
Port
Name

To Chassis
Location Splitter /
Panel No.

To Port
Name

Logical
Splitter
Port

00.101.01/01

SLOT 04

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP02

SP01-IN

17

00.101.01/01

SLOT 04

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP02

SP02-IN

18

00.101.01/01

SLOT 04

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP02

SP03-IN

19

00.101.01/01

SLOT 04

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP02

SP04-IN

20

00.101.01/01

SLOT 05

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP02

SP05-IN

21

00.101.01/01

SLOT 05

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP02

SP06-IN

22

00.101.01/01

SLOT 05

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP02

SP07-IN

23

00.101.01/01

SLOT 05

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP02

SP08-IN

24

00.101.01/01

SLOT 06

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP02

SP09-IN

25

00.101.01/01

SLOT 06

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP02

SP10-IN

26

00.101.01/01

SLOT 06

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP02

SP11-IN

27

00.101.01/01

SLOT 06

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP02

SP12-IN

28

00.101.01/01

SLOT 07

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP02

SP13-IN

29

00.101.01/01

SLOT 07

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP02

SP14-IN

30

00.101.01/01

SLOT 07

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP02

SP15-IN

31

00.101.01/01

SLOT 07

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP02

SP16-IN

32

00.101.01/01

SLOT 08

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP03

SP01-IN

33

00.101.01/01

SLOT 08

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP03

SP02-IN

34

00.101.01/01

SLOT 08

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP03

SP03-IN

35

00.101.01/01

SLOT 08

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP03

SP04-IN

36

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Connectivity Tables (OLT - SPLITTER)

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 18 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

GPON Termination
Site Number : ZNJ523

From Chassis
Location
OLT / Panel
No.

Project Name
Mop Type
Eng. Name
Site Name

Connections From

Connections To

ER-BLM1500-GPON

ER-16x(1:2)-POS

From
Slot
Name

From Plugin
Name

From
Port
Name

To Chassis
Location Splitter /
Panel No.

To Port
Name

Logical
Splitter
Port

00.101.01/01

SLOT 09

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP03

SP05-IN

37

00.101.01/01

SLOT 09

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP03

SP06-IN

38

00.101.01/01

SLOT 09

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP03

SP07-IN

39

00.101.01/01

SLOT 09

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP03

SP08-IN

40

00.101.01/01

SLOT 10

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP03

SP09-IN

41

00.101.01/01

SLOT 10

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP03

SP10-IN

42

00.101.01/01

SLOT 10

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP03

SP11-IN

43

00.101.01/01

SLOT 10

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP03

SP12-IN

44

00.101.01/01

SLOT 11

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP03

SP13-IN

45

00.101.01/01

SLOT 11

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP03

SP14-IN

46

00.101.01/01

SLOT 11

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP03

SP15-IN

47

00.101.01/01

SLOT 11

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP03

SP16-IN

48

00.101.01/01

SLOT 12

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP04

SP01-IN

49

00.101.01/01

SLOT 12

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP04

SP02-IN

50

00.101.01/01

SLOT 12

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP04

SP03-IN

51

00.101.01/01

SLOT 12

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP04

SP04-IN

52

00.101.01/01

SLOT 13

ER-GP4SBUIAEXEAA

PORT 01

00.101.02/SP04

SP05-IN

53

00.101.01/01

SLOT 13

ER-GP4SBUIAEXEAA

PORT 02

00.101.02/SP04

SP06-IN

54

00.101.01/01

SLOT 13

ER-GP4SBUIAEXEAA

PORT 03

00.101.02/SP04

SP07-IN

55

00.101.01/01

SLOT 13

ER-GP4SBUIAEXEAA

PORT 04

00.101.02/SP04

SP08-IN

56

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 19 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

2.4 Connectivity Tables (SPLITTER - ODF)

OUT Termination
Site Number : ZNJ523
Connections From

Connections From

ER-16x(1:2)-POS

ER-ODF1-96P

From Chassis
Location
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Logical
Splitter
Port
1

10

11

12

From Port
Name

From Chassis
Location

To Port
Name

Logical
ODF
Port

SP01-OUT: 01

00.101.02/ODF01

PORT 01

SP01-OUT: 02

00.101.02/ODF01

PORT 02

SP01-OUT: 01

00.101.02/ODF01

PORT 03

SP01-OUT: 02

00.101.02/ODF01

PORT 04

SP01-OUT: 01

00.101.02/ODF01

PORT 05

SP01-OUT: 02

00.101.02/ODF01

PORT 06

SP01-OUT: 01

00.101.02/ODF01

PORT 07

SP01-OUT: 02

00.101.02/ODF01

PORT 08

SP01-OUT: 01

00.101.02/ODF01

PORT 09

SP01-OUT: 02

00.101.02/ODF01

PORT 10

10

SP01-OUT: 01

00.101.02/ODF01

PORT 11

11

SP01-OUT: 02

00.101.02/ODF01

PORT 12

12

SP01-OUT: 01

00.101.02/ODF01

PORT 13

13

SP01-OUT: 02

00.101.02/ODF01

PORT 14

14

SP01-OUT: 01

00.101.02/ODF01

PORT 15

15

SP01-OUT: 02

00.101.02/ODF01

PORT 16

16

SP01-OUT: 01

00.101.02/ODF01

PORT 17

17

SP01-OUT: 02

00.101.02/ODF01

PORT 18

18

SP01-OUT: 01

00.101.02/ODF01

PORT 19

19

SP01-OUT: 02

00.101.02/ODF01

PORT 20

20

SP01-OUT: 01

00.101.02/ODF01

PORT 21

21

SP01-OUT: 02

00.101.02/ODF01

PORT 22

22

SP01-OUT: 01

00.101.02/ODF01

PORT 23

23

SP01-OUT: 02

00.101.02/ODF01

PORT 24

24

Project Number

2052104

Connectivity Tables (SPLITTER - ODF)

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 20 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

OUT Termination
Site Number : ZNJ523
Connections From

Connections From

ER-16x(1:2)-POS
From Chassis
Logical
From Port
Location
Splitter
Name
Port
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP01
00.101.02/SP02
00.101.02/SP02
00.101.02/SP02
00.101.02/SP02
00.101.02/SP02
00.101.02/SP02
00.101.02/SP02
00.101.02/SP02

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

13

14

15

16

17

18

19

20

From Chassis
Location

ER-ODF1-96P
To Port
Name

Logical
ODF
Port

SP01-OUT: 01

00.101.02/ODF01

PORT 25

25

SP01-OUT: 02

00.101.02/ODF01

PORT 26

26

SP01-OUT: 01

00.101.02/ODF01

PORT 27

27

SP01-OUT: 02

00.101.02/ODF01

PORT 28

28

SP01-OUT: 01

00.101.02/ODF01

PORT 29

29

SP01-OUT: 02

00.101.02/ODF01

PORT 30

30

SP01-OUT: 01

00.101.02/ODF01

PORT 31

31

SP01-OUT: 02

00.101.02/ODF01

PORT 32

32

SP01-OUT: 01

00.101.02/ODF01

PORT 33

33

SP01-OUT: 02

00.101.02/ODF01

PORT 34

34

SP01-OUT: 01

00.101.02/ODF01

PORT 35

35

SP01-OUT: 02

00.101.02/ODF01

PORT 36

36

SP01-OUT: 01

00.101.02/ODF01

PORT 37

37

SP01-OUT: 02

00.101.02/ODF01

PORT 38

38

SP01-OUT: 01

00.101.02/ODF01

PORT 39

39

SP01-OUT: 02

00.101.02/ODF01

PORT 40

40

00.101.02/ODF01

PORT 41

41

00.101.02/ODF01

PORT 42

42

00.101.02/ODF01

PORT 43

43

00.101.02/ODF01

PORT 44

44

00.101.02/ODF01

PORT 45

45

00.101.02/ODF01

PORT 46

46

00.101.02/ODF01

PORT 47

47

00.101.02/ODF01

PORT 48

48

00.101.02/ODF01

PORT 49

49

00.101.02/ODF01

PORT 50

50

00.101.02/ODF01

PORT 51

51

00.101.02/ODF01

PORT 52

52

00.101.02/ODF01

PORT 53

53

00.101.02/ODF01

PORT 54

54

Project Number

2052104

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 21 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

OUT Termination
Site Number : ZNJ523
Connections From

Connections From

ER-16x(1:2)-POS
From Chassis
Logical
From Port
Location
Splitter
Name
Port

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

From Chassis
Location

ER-ODF1-96P
To Port
Name

Logical
ODF
Port

00.101.02/ODF01

PORT 55

55

00.101.02/ODF01

PORT 56

56

00.101.02/ODF01

PORT 57

57

00.101.02/ODF01

PORT 58

58

00.101.02/ODF01

PORT 59

59

00.101.02/ODF01

PORT 60

60

00.101.02/ODF01

PORT 61

61

00.101.02/ODF01

PORT 62

62

00.101.02/ODF01

PORT 63

63

00.101.02/ODF01

PORT 64

64

00.101.02/ODF01

PORT 65

65

00.101.02/ODF01

PORT 66

66

00.101.02/ODF01

PORT 67

67

00.101.02/ODF01

PORT 68

68

00.101.02/ODF01

PORT 69

69

00.101.02/ODF01

PORT 70

70

00.101.02/ODF01

PORT 71

71

00.101.02/ODF01

PORT 72

72

00.101.02/ODF01

PORT 73

73

00.101.02/ODF01

PORT 74

74

00.101.02/ODF01

PORT 75

75

00.101.02/ODF01

PORT 76

76

00.101.02/ODF01

PORT 77

77

00.101.02/ODF01

PORT 78

78

00.101.02/ODF01

PORT 79

79

00.101.02/ODF01

PORT 80

80

00.101.02/ODF01

PORT 81

81

00.101.02/ODF01

PORT 82

82

00.101.02/ODF01

PORT 83

83

00.101.02/ODF01

PORT 84

84

Page 22 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

OUT Termination
Site Number : ZNJ523
Connections From

Connections From

ER-16x(1:2)-POS
From Chassis
Logical
From Port
Location
Splitter
Name
Port

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

From Chassis
Location

ER-ODF1-96P
To Port
Name

Logical
ODF
Port

00.101.02/ODF01

PORT 85

85

00.101.02/ODF01

PORT 86

86

00.101.02/ODF01

PORT 87

87

00.101.02/ODF01

PORT 88

88

00.101.02/ODF01

PORT 89

89

00.101.02/ODF01

PORT 90

90

00.101.02/ODF01

PORT 91

91

00.101.02/ODF01

PORT 92

92

00.101.02/ODF01

PORT 93

93

00.101.02/ODF01

PORT 94

94

00.101.02/ODF01

PORT 95

95

00.101.02/ODF01

PORT 96

96

Page 23 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

OUT Termination
Site Number : ZNJ523
Connections From

Connections From

ER-16x(1:2)-POS

ER-ODF2-96P

From Chassis
Location
00.101.02/SP02

Logical
Splitter
Port
21

00.101.02/SP02
00.101.02/SP02

22

00.101.02/SP02
00.101.02/SP02

23

00.101.02/SP02
00.101.02/SP02

24

00.101.02/SP02
00.101.02/SP02

25

00.101.02/SP02
00.101.02/SP02

26

00.101.02/SP02
00.101.02/SP02

27

00.101.02/SP02
00.101.02/SP02

28

00.101.02/SP02
00.101.02/SP02

29

00.101.02/SP02
00.101.02/SP02

30

00.101.02/SP02
00.101.02/SP02

31

00.101.02/SP02
00.101.02/SP02

32

00.101.02/SP02

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

From Port
Name

From Chassis
Location

To Port
Name

Logical
ODF
Port

SP01-OUT: 01

00.101.02/ODF02

PORT 01

97

SP01-OUT: 02

00.101.02/ODF02

PORT 02

98

SP01-OUT: 01

00.101.02/ODF02

PORT 03

99

SP01-OUT: 02

00.101.02/ODF02

PORT 04

100

SP01-OUT: 01

00.101.02/ODF02

PORT 05

101

SP01-OUT: 02

00.101.02/ODF02

PORT 06

102

SP01-OUT: 01

00.101.02/ODF02

PORT 07

103

SP01-OUT: 02

00.101.02/ODF02

PORT 08

104

SP01-OUT: 01

00.101.02/ODF02

PORT 09

105

SP01-OUT: 02

00.101.02/ODF02

PORT 10

106

SP01-OUT: 01

00.101.02/ODF02

PORT 11

107

SP01-OUT: 02

00.101.02/ODF02

PORT 12

108

SP01-OUT: 01

00.101.02/ODF02

PORT 13

109

SP01-OUT: 02

00.101.02/ODF02

PORT 14

110

SP01-OUT: 01

00.101.02/ODF02

PORT 15

111

SP01-OUT: 02

00.101.02/ODF02

PORT 16

112

SP01-OUT: 01

00.101.02/ODF02

PORT 17

113

SP01-OUT: 02

00.101.02/ODF02

PORT 18

114

SP01-OUT: 01

00.101.02/ODF02

PORT 19

115

SP01-OUT: 02

00.101.02/ODF02

PORT 20

116

SP01-OUT: 01

00.101.02/ODF02

PORT 21

117

SP01-OUT: 02

00.101.02/ODF02

PORT 22

118

SP01-OUT: 01

00.101.02/ODF02

PORT 23

119

SP01-OUT: 02

00.101.02/ODF02

PORT 24

120

Project Number

2052104

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 24 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

OUT Termination
Site Number : ZNJ523
Connections From
From Chassis
Location

ER-16x(1:2)-POS
Logical
From Port
Splitter
Name
Port

00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03
00.101.02/SP03

Project Name
Mop Type
Eng. Name
Site Name

Connections From

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

33

34

35

36

37

38

39

40

From Chassis
Location

ER-ODF2-96P
To Port
Name

Logical
ODF
Port

SP01-OUT: 01

00.101.02/ODF02

PORT 25

121

SP01-OUT: 02

00.101.02/ODF02

PORT 26

122

SP01-OUT: 01

00.101.02/ODF02

PORT 27

123

SP01-OUT: 02

00.101.02/ODF02

PORT 28

124

SP01-OUT: 01

00.101.02/ODF02

PORT 29

125

SP01-OUT: 02

00.101.02/ODF02

PORT 30

126

SP01-OUT: 01

00.101.02/ODF02

PORT 31

127

SP01-OUT: 02

00.101.02/ODF02

PORT 32

128

SP01-OUT: 01

00.101.02/ODF02

PORT 33

129

SP01-OUT: 02

00.101.02/ODF02

PORT 34

130

SP01-OUT: 01

00.101.02/ODF02

PORT 35

131

SP01-OUT: 02

00.101.02/ODF02

PORT 36

132

SP01-OUT: 01

00.101.02/ODF02

PORT 37

133

SP01-OUT: 02

00.101.02/ODF02

PORT 38

134

SP01-OUT: 01

00.101.02/ODF02

PORT 39

135

SP01-OUT: 02

00.101.02/ODF02

PORT 40

136

00.101.02/ODF02

PORT 41

137

00.101.02/ODF02

PORT 42

138

00.101.02/ODF02

PORT 43

139

00.101.02/ODF02

PORT 44

140

00.101.02/ODF02

PORT 45

141

00.101.02/ODF02

PORT 46

142

00.101.02/ODF02

PORT 47

143

00.101.02/ODF02

PORT 48

144

00.101.02/ODF02

PORT 49

145

00.101.02/ODF02

PORT 50

146

00.101.02/ODF02

PORT 51

147

00.101.02/ODF02

PORT 52

148

00.101.02/ODF02

PORT 53

149

00.101.02/ODF02

PORT 54

150

Project Number

2052104

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 25 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

OUT Termination
Site Number : ZNJ523
Connections From

Connections From

ER-16x(1:2)-POS

ER-ODF2-96P

From Chassis
Location

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Logical
Splitter
Port

From Port
Name

Project Number

2052104

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

From Chassis
Location

To Port
Name

Logical
ODF
Port

00.101.02/ODF02

PORT 55

151

00.101.02/ODF02

PORT 56

152

00.101.02/ODF02

PORT 57

153

00.101.02/ODF02

PORT 58

154

00.101.02/ODF02

PORT 59

155

00.101.02/ODF02

PORT 60

156

00.101.02/ODF02

PORT 61

157

00.101.02/ODF02

PORT 62

158

00.101.02/ODF02

PORT 63

159

00.101.02/ODF02

PORT 64

160

00.101.02/ODF02

PORT 65

161

00.101.02/ODF02

PORT 66

162

00.101.02/ODF02

PORT 67

163

00.101.02/ODF02

PORT 68

164

00.101.02/ODF02

PORT 69

165

00.101.02/ODF02

PORT 70

166

00.101.02/ODF02

PORT 71

167

00.101.02/ODF02

PORT 72

168

00.101.02/ODF02

PORT 73

169

00.101.02/ODF02

PORT 74

170

00.101.02/ODF02

PORT 75

171

00.101.02/ODF02

PORT 76

172

00.101.02/ODF02

PORT 77

173

00.101.02/ODF02

PORT 78

174

00.101.02/ODF02

PORT 79

175

00.101.02/ODF02

PORT 80

176

00.101.02/ODF02

PORT 81

177

00.101.02/ODF02

PORT 82

178

00.101.02/ODF02

PORT 83

179

00.101.02/ODF02

PORT 84

180

Page 26 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

OUT Termination
Site Number : ZNJ523
Connections From

Connections From

ER-16x(1:2)-POS
From Chassis
Logical
From Port
Location
Splitter
Name
Port

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

ER-ODF2-96P
From Chassis
To Port
Location
Name

Logical
ODF
Port

00.101.02/ODF02

PORT 85

181

00.101.02/ODF02

PORT 86

182

00.101.02/ODF02

PORT 87

183

00.101.02/ODF02

PORT 88

184

00.101.02/ODF02

PORT 89

185

00.101.02/ODF02

PORT 90

186

00.101.02/ODF02

PORT 91

187

00.101.02/ODF02

PORT 92

188

00.101.02/ODF02

PORT 93

189

00.101.02/ODF02

PORT 94

190

00.101.02/ODF02

PORT 95

191

00.101.02/ODF02

PORT 96

192

Page 27 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

OUT Termination
Site Number : ZNJ523
Connections From

Connections From

ER-16x(1:2)-POS

ER-ODF3-96P

From Chassis
Location

00.101.02/SP03

Logical
Splitter
Port

From Port
Name

41

00.101.02/SP03
00.101.02/SP03

42

00.101.02/SP03
00.101.02/SP03

43

00.101.02/SP03
00.101.02/SP03

44

00.101.02/SP03
00.101.02/SP03

45

00.101.02/SP03
00.101.02/SP03

46

00.101.02/SP03
00.101.02/SP03

47

00.101.02/SP03
00.101.02/SP03

48

00.101.02/SP03
00.101.02/SP04

49

00.101.02/SP04
00.101.02/SP04

50

00.101.02/SP04
00.101.02/SP04

51

00.101.02/SP04
00.101.02/SP04

52

00.101.02/SP04

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

From Chassis
Location

To Port
Name

Logical
ODF
Port

SP01-OUT: 01

00.101.02/ODF03

PORT 01

193

SP01-OUT: 02

00.101.02/ODF03

PORT 02

194

SP01-OUT: 01

00.101.02/ODF03

PORT 03

195

SP01-OUT: 02

00.101.02/ODF03

PORT 04

196

SP01-OUT: 01

00.101.02/ODF03

PORT 05

197

SP01-OUT: 02

00.101.02/ODF03

PORT 06

198

SP01-OUT: 01

00.101.02/ODF03

PORT 07

199

SP01-OUT: 02

00.101.02/ODF03

PORT 08

200

SP01-OUT: 01

00.101.02/ODF03

PORT 09

201

SP01-OUT: 02

00.101.02/ODF03

PORT 10

202

SP01-OUT: 01

00.101.02/ODF03

PORT 11

203

SP01-OUT: 02

00.101.02/ODF03

PORT 12

204

SP01-OUT: 01

00.101.02/ODF03

PORT 13

205

SP01-OUT: 02

00.101.02/ODF03

PORT 14

206

SP01-OUT: 01

00.101.02/ODF03

PORT 15

207

SP01-OUT: 02

00.101.02/ODF03

PORT 16

208

SP01-OUT: 01

00.101.02/ODF03

PORT 17

209

SP01-OUT: 02

00.101.02/ODF03

PORT 18

210

SP01-OUT: 01

00.101.02/ODF03

PORT 19

211

SP01-OUT: 02

00.101.02/ODF03

PORT 20

212

SP01-OUT: 01

00.101.02/ODF03

PORT 21

213

SP01-OUT: 02

00.101.02/ODF03

PORT 22

214

SP01-OUT: 01

00.101.02/ODF03

PORT 23

215

SP01-OUT: 02

00.101.02/ODF03

PORT 24

216

Project Number

2052104

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 28 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

OUT Termination
Site Number : ZNJ523
Connections From

Connections From

ER-16x(1:2)-POS
From Chassis
Logical
From Port
Location
Splitter
Name
Port
00.101.02/SP04
00.101.02/SP04
00.101.02/SP04
00.101.02/SP04
00.101.02/SP04
00.101.02/SP04
00.101.02/SP04
00.101.02/SP04

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

53

54

55

56

From Chassis
Location

ER-ODF3-96P
To Port
Name

Logical
ODF
Port

SP01-OUT: 01

00.101.02/ODF03

PORT 25

217

SP01-OUT: 02

00.101.02/ODF03

PORT 26

218

SP01-OUT: 01

00.101.02/ODF03

PORT 27

219

SP01-OUT: 02

00.101.02/ODF03

PORT 28

220

SP01-OUT: 01

00.101.02/ODF03

PORT 29

221

SP01-OUT: 02

00.101.02/ODF03

PORT 30

222

SP01-OUT: 01

00.101.02/ODF03

PORT 31

223

SP01-OUT: 02

00.101.02/ODF03

PORT 32

224

00.101.02/ODF03

PORT 33

225

00.101.02/ODF03

PORT 34

226

00.101.02/ODF03

PORT 35

227

00.101.02/ODF03

PORT 36

228

00.101.02/ODF03

PORT 37

229

00.101.02/ODF03

PORT 38

230

00.101.02/ODF03

PORT 39

231

00.101.02/ODF03

PORT 40

232

00.101.02/ODF03

PORT 41

233

00.101.02/ODF03

PORT 42

234

00.101.02/ODF03

PORT 43

235

00.101.02/ODF03

PORT 44

236

00.101.02/ODF03

PORT 45

237

00.101.02/ODF03

PORT 46

238

00.101.02/ODF03

PORT 47

239

00.101.02/ODF03

PORT 48

240

00.101.02/ODF03

PORT 49

241

00.101.02/ODF03

PORT 50

242

00.101.02/ODF03

PORT 51

243

00.101.02/ODF03

PORT 52

244

00.101.02/ODF03

PORT 53

245

00.101.02/ODF03

PORT 54

246

Project Number

2052104

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 29 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

OUT Termination
Site Number : ZNJ523
Connections From

Connections From

ER-16x(1:2)-POS
From Chassis
Logical
From Port
Location
Splitter
Name
Port

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

From Chassis
Location

ER-ODF3-96P
To Port
Name

Logical
ODF
Port

00.101.02/ODF03

PORT 55

247

00.101.02/ODF03

PORT 56

248

00.101.02/ODF03

PORT 57

249

00.101.02/ODF03

PORT 58

250

00.101.02/ODF03

PORT 59

251

00.101.02/ODF03

PORT 60

252

00.101.02/ODF03

PORT 61

253

00.101.02/ODF03

PORT 62

254

00.101.02/ODF03

PORT 63

255

00.101.02/ODF03

PORT 64

256

00.101.02/ODF03

PORT 65

257

00.101.02/ODF03

PORT 66

258

00.101.02/ODF03

PORT 67

259

00.101.02/ODF03

PORT 68

260

00.101.02/ODF03

PORT 69

261

00.101.02/ODF03

PORT 70

262

00.101.02/ODF03

PORT 71

263

00.101.02/ODF03

PORT 72

264

00.101.02/ODF03

PORT 73

265

00.101.02/ODF03

PORT 74

266

00.101.02/ODF03

PORT 75

267

00.101.02/ODF03

PORT 76

268

00.101.02/ODF03

PORT 77

269

00.101.02/ODF03

PORT 78

270

00.101.02/ODF03

PORT 79

271

00.101.02/ODF03

PORT 80

272

00.101.02/ODF03

PORT 81

273

00.101.02/ODF03

PORT 82

274

00.101.02/ODF03

PORT 83

275

00.101.02/ODF03

PORT 84

276

Page 30 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

OUT Termination
Site Number : ZNJ523
Connections From

Connections From

ER-16x(1:2)-POS
From Chassis
Logical
From Port
Location
Splitter
Name
Port

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

From Chassis
Location

ER-ODF3-96P
To Port
Name

Logical
ODF
Port

00.101.02/ODF03

PORT 85

277

00.101.02/ODF03

PORT 86

278

00.101.02/ODF03

PORT 87

279

00.101.02/ODF03

PORT 88

280

00.101.02/ODF03

PORT 89

281

00.101.02/ODF03

PORT 90

282

00.101.02/ODF03

PORT 91

283

00.101.02/ODF03

PORT 92

284

00.101.02/ODF03

PORT 93

285

00.101.02/ODF03

PORT 94

286

00.101.02/ODF03

PORT 95

287

00.101.02/ODF03

PORT 96

288

Page 31 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

2.5 Network Synchronization Diagram


OLT

Ports 1-4 (1 GigE)

Ethernet Aggregator
206-3 Moh

Ports 5-8 (1 GigE)

xx/xxx.xx/xx

Ports X1 (10GigE)
2/0/1

4/0/0

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

O
D
F

00/210.12/01 7Rx
00/210.12/01 8Tx
00/210.12/01 13Rx
00/210.12/01 14Tx

Project Number

2052104

Network Synchronization Diagram

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 32 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

Ports X2 (10GigE)

2.6 Physical & Logical Addressing Tables


Inband IP & VLAN
IP & VLAN Configuration Table
Eqpt Type

Label

Location

Service
QAM

28

EDA 1500

OLT-JEDD-ZNJ523-1

00.101.01/01

VOIP

2030

H.S.I

3047

N/A

N/A

N/A

VLAN ID

QAM

N/A

VOIP

N/A

H.S.I

N/A

OLT System IP

Gateway

OLT Subnet Mask

OLT SID

Fab-x:10.210.213.129

10.210.213.142

255.255.255.240

BLZDSZNJ523001

N/A

N/A

N/A

N/A

ONT & VoIP Configuration


NGN Softswitch & ONT Configuration for VoIP Service
OLT Hostname

Primary Softswitch
Location

OLT-JEDD-ZNJ523-1

Mujammah 214-00

10.209.20.50

N/A

N/A

N/A

Project Name
Mop Type
Eng. Name
Site Name

SBC

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Secondary Switch
Location
Rowais 202-00
N/A

ONT

SBC

IP Range

10.209.20.54

10.142.16.2 to
10.142.31.254

10.142.16.1

N/A

N/A

N/A

Project Number

2052104

Physical & Logical Addressing Tables

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 33 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

VoIP GW

VoIP Int IP
10.142.16.2
N/A

ONT Subnet Mask

# ONTs

255.255.240.0

--

N/A

N/A

2.7 Network Connectivity Tables

From Switch to ODF to GPON


Cisco 7609

ODF

Equipment

Site

Floor.Row.Bay/Pos Slot Bay Port Bandwidth

Cisco 7609

ZNJ523

Cisco 7609

ZNJ523

Equipment

Site

GPON

ODF Location

Port

10 G.E XFP IR

00/210.12/01

00/210.12/01/7RX

EDA1500-1

00.101/01/01

14

x1 (10 Gig E) Tx

10 G.E XFP IR

00/210.12/01

00/210.12/01/8RX

EDA1500-1

00.101/01/01

14

x1 (10 Gig E) Rx

ODF Location

Port

Floor.Row.Bay/Pos Slot Bay Port Bandwidth

Equipment Floor.Row.Bay/Pos Slot

Equipment Floor.Row.Bay/Pos Slot

Port

Port

From Switch Via Dark Fiber Connection to ODF to GPON


Cisco 7609
ODF
GPON
Equipment

Site

Cisco 7609

ZNJ523

Cisco 7609

ZNJ523

Equipment

Site

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Floor.Row.Bay/Pos Slot Bay Port Bandwidth

ODF Location

Port

10 G.E XFP SR

00/210.12/01

00/210.12/01/13RX

EDA1500-1

00.101/01/01

15

x1 (10 Gig E) Tx

10 G.E XFP SR

00/210.12/01

00/210.12/01/14RX

EDA1500-1

00.101/01/01

15

x1 (10 Gig E) Rx

ODF Location

Port

Floor.Row.Bay/Pos Slot Bay Port Bandwidth

Project Number

2052104

Network Connectivity Tables

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 34 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

Equipment Floor.Row.Bay/Pos Slot

Equipment Floor.Row.Bay/Pos Slot

Port

Port

2.8 ICMS Diagram

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

ICMS Diagram

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 35 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

3 DC POWER

3.1 Power Connectivity Diagram


Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Power Connectivity Diagram

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 36 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

3.2 Power Connectivity Table


3.2.1 GPON Power A & B CAU

Power Termination
Site Number : ZNJ523

From
Chassis
Location

Connections From
ER-BLM1500-GPON
From Slot
From Plugin Name
Name

From
Port
Name

To Chassis
Location

Connections To
ER-CAU-4U
To Slot To Plugin Name
Name

To Port
Name

00.101.01/01

SLOT PWR-A

ER-BLM1500-PWR

-48 VDC

00.101.01/03

SLOT01

ER-CAU-2KW/60A

PORT 48VDC/OUT

00.101.01/01

SLOT PWR-A

ER-BLM1500-PWR

RTRN

00.101.01/03

SLOT01

ER-CAU-2KW/60A

PORT 0VDC/OUT

00.101.01/01

SLOT PWR-B

ER-BLM1500-PWR

-48 VDC

00.101.01/03

SLOT02

ER-CAU-2KW/60A

PORT 48VDC/OUT

00.101.01/01

SLOT PWR-B

ER-BLM1500-PWR

RTRN

00.101.01/03

SLOT02

ER-CAU-2KW/60A

PORT 0VDC/OUT

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Power Connectivity Table

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 37 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

3.2.2 PDU 01 CAU


Power Termination
Site Number : ZNJ523
Connections From
ER-PDU-14F
From Chassis
From Port Name
Location

To Chassis Location

Connections To
ER-CAU-4U
To Slot Name To Plugin Name

To Port Name

00.101.02/PW01

PORT F01-15A

00.101.01/03

SLOT 01

ER-CAU-2KW/60A

PORT -48VDC/IN01

00.101.02/PW01

PORT F02-15A

00.101.01/03

SLOT 01

ER-CAU-2KW/60A

PORT -48VDC/IN02

00.101.02/PW01

PORT F03-15A

00.101.01/03

SLOT 01

ER-CAU-2KW/60A

PORT -48VDC/IN03

00.101.02/PW01

PORT F04-15A

00.101.01/03

SLOT 01

ER-CAU-2KW/60A

PORT -48VDC/IN04

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Power Connectivity Table

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 38 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

3.2.3 PDU 02 CAU


Power Termination
Site Number : ZNJ523
Connections From
ER-PDU-14F
From Chassis
From Port Name
Location

To Chassis Location

Connections To
ER-CAU-4U
To Slot Name To Plugin Name

To Port Name

00.101.02/PW02

PORT F01-15A

00.101.01/03

SLOT 02

ER-CAU-2KW/60A

PORT -48VDC/IN01

00.101.02/PW02

PORT F02-15A

00.101.01/03

SLOT 02

ER-CAU-2KW/60A

PORT -48VDC/IN02

00.101.02/PW02

PORT F03-15A

00.101.01/03

SLOT 02

ER-CAU-2KW/60A

PORT -48VDC/IN03

00.101.02/PW02

PORT F04-15A

00.101.01/03

SLOT 02

ER-CAU-2KW/60A

PORT -48VDC/IN04

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Power Connectivity Table

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 39 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

3.2.4 PDU 01 & 02 ISKRATEL RECTIFIER

D-SUB Termination
Site Number : ZNJ523
Connections From
ER-PDU-14F
From Chassis
From Port
Location
Name

To Port Name

00.101.02/PW01

PORT SUP

00.100.02/01

SLOT A18

DCDP-CB-50A

PORT -48VDC

00.101.02/PW02

PORT SUP

00.100.02/01

SLOT B19

DCDP-CB-50A

PORT -48VDC

Project Name
Mop Type
Eng. Name
Site Name

To Chassis Location

Connections To
IS-MPS500-48/762
To Slot
To Plugin Name
Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Power Connectivity Table

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 40 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

3.3 Power and Earth Cable Table

FROM
LOCATION

EQUIPMENT
ISKRATEL
Rectifier
ISKRATEL
Rectifier
ISKRATEL
Rectifier
ISKRATEL
Rectifier

Equipment Room-GF
Equipment Room-GF
Equipment Room-GF
Equipment Room-GF
Equipment Room-GF

Project Name
Mop Type
Eng. Name
Site Name

EARTH POINT

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

TO

CABLE

CB# Fuse#

Rating

Connection
Point

Flr/Row.Bay/Pan

Equipment

Cable Size
(mm )

Distance

Type

A18

50A

NEG-A

00.101.02/PW01

EDA 1500

16mm

12m

BLACK - 48

B19

50A

NEG-D

00.101.02/PW02

EDA 1500

16mm

12m

BLACK - 48

N/A

N/A

RTN (B+)

00.101.02/PW01

EDA 1500

16mm

12

RED (BGND)

N/A

N/A

RTN (D+)

00.101.02/PW02

EDA 1500

16mm

12m

RED (BGND)

N/A

N/A

PGND

N/A

EDA 1500

35mm

17m

YELLOW+GREEN
(PGND)

Project Number

2052104

Power and Earth Cable Table

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 41 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

4 APPROVALS

NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE NOTED.

LEGEND
PROPOSED EQUIPMENT
FUTURE EQUIPMENT

RBS
TRM

- RADIO BASE STATION


- TRANSMISSION

DF

- DISTRIBUTION FRAME

MDB

- MAIN DISTRIBUTION BOARD

HVAC - HEATING, VENTILATING AND AIR


CONDITIONING
TLTB - TOWER LIGHT TERMINATION BOX
BATB - BUILDING ALARM TERMINAL BOX
FACP/FPCP - FIRE ALARM PANEL/FIRE
PROTECTION CONTROL PANEL
RECT. - RECTIF IER
BATT. - BATTERY
SACP - SECURITY ACCESS CONTROL
PANEL

STC COMMENTS:
SITE SURVEY WORKS SHOULD BE SUBMMITED TO
BUILDING DEPARTMENT / PROJECT ELECTRO /
MECHANICAL DIVISION PRIOR TO IMPLEMENTATION
ERICSSON DRAWING NO.:

SHEET

193 05-IPA 128 6764 Uen

1 OF 1

APR 28,1 0 NEW OLT.

REV

DATE

DESCRIPTIONS

REVISIONS
CONFIDENTIALITY: THIS DRAW ING IS THE PROPERTY OF THE SAUDI
TEL ECOM CO. (STC). THE I NFORMATION CONTAINED HEREIN S HALL NOT BE
USED OR COPIED IN ANY M ANNE R WITHOUT WRITTEN PERM ISSION OF STC.

P.O. BOX 6121 RIYADH 11442 SAUDI ARABIA


TEL. (01) 246 1200
FAX. (01) 246 4932

TITLE: JEDDAH SITE - FTTH


ZNJ523
AL HAMADANEIAH AREA, JEDDAH
FLOOR PLAN DRAWING
DRAWN: AP RIL
CHE CKE D CADD:
CHE CKE D QUALI TY:
APPROVED:

4.1 N.E. Generated Floor Plan


Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

N.E. Generated Floor Plan

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 42 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

DESIGNED: APRIL

SCALE: NTS

DATE: APR 2 8,10

DRAWING NO:

ZNJ523_A-JA-Dc-0001

REV

4.2 Approved Floor Plan


Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Approved Floor Plan

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 43 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

4.3 Approved Fuse Assignment

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Approved Fuse Assignment

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 44 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

5 ANNEX
5.1 Location Maps
Location Map for Site: ZNJ523
X Location: 39 11' 18.84"
Y Location: 21 45' 21.96"

Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Location Maps

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 45 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

5.2 Glossary
AWG

Arrayed Waveguide Grating

BPON

Broadband PON

CAPEX

Capital EXPenditure

CO

Central Office

CAGR

Compound Annual Growth Rate

CPE

Customer-Premises equipment

DHCP

Dynamic Host Configuration Protocol

DNS

Domain Name System

DS

Down-Stream

DS1

Digital Signal 1

DSL

Digital Subscriber Line

DSLAM

Digital Access Multiplexer

E1

E-carrier level 1

EPON

Ethernet PON

FMC

Fixed Mobil Convergence

FSAN

Full Service Access Network

FTTB

Fiber To The Building

FTTC

Fiber To The Curb

FTTH

Fiber To The Home

FTTN

Fiber to the Node

GPON

Gigabit-capable PON

HDTV

High Definition Television

HSPA

High Speed Packet Access

IEEE
Engineers

Institute of Electrical and Electronics

IP

Internet Protocol

IPTV
Project Name
Mop Type
Eng. Name
Site Name

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

IP Television
Project Number

2052104

Glossary

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 46 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523

Project Name
Mop Type
Eng. Name
Site Name

ITU-T

International Telecommunication Union Telecommunication Standardization Sector

LTE

Long-Term Evolution

NAT

Network Address Translation

NGA

Next Generation Architecture

NG-PON

Next Generation PON

NNI

Network-Network Interface

ODN

Optical Distribution Network

OLT

Optical Line Termination

ONT

Optical Network Termination

ONU

Optical Network Unit

OPEX

Operational EXPenditure

PBX

Private Branch Exchange

PON

Passive Optical Network

POTS

Plain Old Telephony System

RF

Radio Frequency

SBU

Single Business Unit

SFU

Single Family Unit

TDM

Time Division Multiplexing

UNI

User-Network Interface

US

Up-Stream

VDSL

Very-high speed DSL

WBF

Wavelength Blocking Filter

WDM

Wavelength Division Multiplexing

XG-PON

10 Gbps GPON

FTTX GPON
PROJECT
FTTH
alargo
Jeddah North Area

Project Number

2052104

Glossary

Mop Number
Eng. ID

M-ERI-12637
alargo
Site Number

Page 47 of 47
5/10/2010
Remarks: MopGen Tools (R-1.5.9.3)
ZNJ523