Você está na página 1de 150

BOLE

OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1
101
102
103
104
105
106
107
108
109
110
111
2

Discriminao
SERVIOS PRELIMINARES
BARRACAO DE OBRA
TAXA DA PREFEITURA PARA CONSTRUCAO
TAXA DO CREA OBRAS ACIMA DE 700M2
INSTALACOES PROVISORIAS DE AGUA
INSTALACOES PROVISORIAS DE ENERGIA
INSTALACOES PROVISORIAS DE ESGOTO
LOCACAO DA OBRA
PLACA DE OBRA - PADRAO GOVERNO FEDERAL
SONDAGEM PARA RECONHECIMENTO DO SUBSOLO
RASPAGEM E LIMPEZA DO TERRENO
TAPUMES DE CHAPA COMPENSADA, H = 2.20M
TOTAL DO ITEM 1
SERVIOS DE TERRAPLENAGEM

Und.

Quant.

Unitrio

m2
m2
Und.
Und.
Und.
Und.
m2
m2
Und.
m2
m2

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
201
3
301
4
401
5
501
502

Discriminao

Und.

COMPACTACAO DE ATERRO A 100% PROCTOR NORMAL

m3

TOTAL DO ITEM 2
MOBILIZACAO E DESMOBILIZACAO
MOBILIZAO E DESMOBILIZAO DE OBRA
TOTAL DO ITEM 3
INSTALACAO, OPERACAO E MANUTENCAO DO
CANTEIRO
INSTALACAO, MANUTENCAO E OPERACAO DO CANTEIRO
TOTAL DO ITEM 4
ADMINISTRACAO LOCAL
ADMINISTRAO LOCAL DA OBRA
TRANSPORTE

Quant.

Unitrio

TXKM

MS

MS
MS

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
503
504
6
601
602
603
7
701
702

Discriminao

Und.

ALIMENTACAO
EQUIPAMENTOS DE PROTECAO INDIVIDUAL
TOTAL DO ITEM 5
SERVIO EM TERRA

Quant.

Unitrio

MS
MS

m3
ESCAVACAO MANUAL DE VALAS ATE A PROF. DE 1 METRO
REATERRO COM APILOAMENTO
m3
ATERRO INTERNO SEM APILOAMENTO C/TRANSP. EM
m3
CARRINHO DE MAO
TOTAL DO ITEM 6
FUNDAES E SONDAGENS
EMBASAMENTO COM TIJOLO COMUM
M3
ESTACA A TRADO DIAM. 30CM INCLUSIVE FERRAGEM

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
703
704
705
706
707

708
709

Discriminao

Und.

ESCAVACAO MANUAL DE VALAS (SAPATAS E BLOCOS)


REATERRO COM APILOAMENTO (BLOCOS/SAPATAS)

M3
M3

ESCAVACAO TUBULOES A CEU ABERTO - (OBRAS CIVIS)


CONCRETO SIMPLES PARA LASTRO

M3
M3

CONCRETO ARMADO FCK=20 MPA USINADO BOMBEADO


LANCADO E ADENSADO PARA USO GERAL INCLUSIVE
FORMAS

M3

Quant.

Unitrio

CONCRETO ARMADO FCK=20MPA USINADO BOMBEADO


LANCADO E ADENSADO PARA TUBULAO
M3
FUNDACAO EM PEDRA RACHAO
M3
TOTAL DO ITEM 7

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
8
801
802
803
9
901
90101
90102

Discriminao

Und.

Quant.

Unitrio

ESTRUTURA
CONCRETO ARMADO FCK=20MPA USINADO BOMBEADO
LANCADO E ADENSADO PARA USO GERAL INCLUSIVE
FORMAS
LAJE PREMOLDADA CAP. E=2CM COM FERROS DE
DISTRIBUICAO
LAJE PREMOLDADA TRELICADA 12 CM
TOTAL DO ITEM 8
INST. ELETRICAS/TELEFONICAS/LOGICA
TRREO
ARANDELA A PROVA DE INTEMPERIES C/GRADE METALICA
SUP. 90 100W COMPLETA INCLUSIVE LAMPADA CONF.
PROJETO
BANDEJA PARA RACK DE TELECOMUNICACOES 1U

M3
M2
M2

UN
UN

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
90103
90104
90105
90106
90107
90108
90109
90110
90111
90112
90113
90114
90115

Discriminao
BASE PARA GLOBO OU DROPS (1 LAMPADA) BOCA 10"
BLOCO BER-10 (BLOCO DE ENGATE RAPIDO)
CABECOTE DE LIGA DE ALUMINIO DIAM 3"
CABO DE COBRE NU 10,00 mm2 (11,11M/KG)
CABO DE COBRE NU, 35,00 mm2
CABO SINTENAX 1 KV 10mm2
CABO SINTENAX 1 KV, 16mm2
CABO SINTENAX 1KV 2,5MM2
CABO SINTENAX 1 KV, 35mm2
CABO SINTENAX 1 KV, 4 mm2
CABO SINTENAX 1 KV 6 mm2
CABO SINTENAX 1 KV, 95mm2
CABO ISOLADO PVC P/750V 2,5 MM2

Und.

Quant.

Unitrio

UND
UND
UND
M
M
M
M
M
M
M
M
M
M

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
90116
90117
90118
90119
90120
90121
90122
90123
90124
90125
90126
90127

Discriminao
CABO ISOLADO PVC P/750V 4 MM2
CABO ISOLADO PVC P/750V 6 MM2
CABO ISOLADO PP (3X4mm2)
CABO LOGICO STP-4P CAT 5E
CABO TELEFONICO CI-50 10 PARES (USO INTERNO)
CABO TELEFONICO CI-50-10 PARES
CABO UTP-4P CAT 5E 24 AWG
CAIXA DE PASSAGEM METALICA 15X15X12CM
CAIXA DE PASSAGEM METALICA 40x40x12 CM
CAIXA DE DISTRIBUICAO TELEFONICA 60X60X12CM
CAIXA METALICA EXAGONAL PARA ARANDELA (SEXTAVADA
3X3")
CAIXA DE PASSAGEM OCTOGONAL F.M. DUPLA 4"

Und.

Quant.

Unitrio

M
M
M
M
M
M
M
UN
UN
UN
UND
UN

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
90128
90129
90130
90131
90132
90133
90134
90135
90136
90137
90138
90139
90140

Discriminao

Und.

CAIXA METALICA RETANGULAR 4"X4"X2"


CAIXA METALICA RETANGULAR 4"X2"X2"
CAIXA DE PASSAGEM 20X20X25 FUNDO DE BRITA
CAIXA DE PASSAGEM 35X60X50CM FUNDO DE CONCRETO
C/TAMPA R1
CAIXA DE PASSAGEM 50X50X60 FUNDO DE BRITA
CERTIFICADO DIGITAL
CONDULETE DE PVC 3/4" LB
CONDULETE DE PVC 3/4" T
CONDULETE DE PVC 3/4" X
CONVERSOR DE FIBRA OTICA
DISJUNTOR MONOPOLAR 10 A 30 A
DISJUNTOR TRIPOLAR 40 A 50 A
DISJUNTOR TRIPOLAR DE 10 A 35 A

UND
UND
UN

Quant.

Unitrio

UN
UN
UND
UN
UN
UN
UND
UN
UN
UN

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
90141
90142
90143
90144
90145
90146
90147
90148
90149
90150
90151
90152

Discriminao
DISJUNTOR TRIPOLAR 200 A
DISPOSITIVO RESIDUAL DIFERENCIAL - DR 125A ln 30 mA
DISPOSITIVO INTERNO OPTICO 1U PARA RACK
ELETRODUTO PVC ROSCAVEL 1" C/CONEXOES
ELETRODUTO PVC ROSCAVEL 2" C/CONEXOES
ELETRODUTO PVC ROSCAVEL 3" C/CONEXOES
ELETRODUTO PVC ROSCAVEL 3/4" C/CONEXOES
ELETRODUTO PVC ROSCAVEL 4" C/CONEXOES
ELETRODUTO DE FERRO GALVANIZADO 3", IN CLUSIVE
CONEXOES
ESPELHO DE BAQUELITE 4" X 2" 2 FUROS RJ-45
FIBRA OPTICA MONOMODO GELEADO
CABO DE COBRE NU 6,00 mm2 (18,00M/KG)

Und.

Quant.

Unitrio

UND
UND
UND
M
M
M
M
M
M
UN
UND
M

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
90153
90154
90155
90156
90157
90158
90159
90160
90161
90162

Discriminao
HASTE COOPERWELD 5/8", 3 M COM CONECTOR
INTERRUPTOR PARA VENTILADOR
INTERRUPTOR PARALELO SIMPLES 1 SECAO
INTERRUPTOR SIMPLES DE UMA SECAO
INTERRUPTOR SIMPLES DE DUAS SECOES
INTERRUPTOR SIMPLES DE TRES SECOES
INTERRUPTOR SIMPLES 1 TOMADA UNIV CONJUGADOS
LINE CORD UTP-4P CAT 5E FLEXIVEL 2,00M
LUMINARIA CIRCULAR COM VIDRO P/QUADRA 400W,
P/BASE E-40
LUMINARIA CONJ. COM 1 PETALA SIMPLES (ATE 400W)
PADRAO B

Und.

Quant.

Unitrio

UN
UN
UN
PC
UN
UN
UN
UND
UND
UND

10

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem

90163
90164
90165
90166
90167
90168
90169
90170
90171
90172

Discriminao
LUMINARIA FLUORESCENTE DE EMBUTIR 2X32 OU 2X40W
COMPLETA INCLUSIVE REATOR ELETRONICO AFP,
SOQUETE ANTIVIBRATORIO E LAMPADAS
ORGANIZADOR DE CABOS (GUIA)
PATCH CORD UTP-4P CAT 5E FLEXIVEL2,00M
PATCH PANEL PADRAO 19" CAT 5E COM 24 PORTAS
PETROLETE DE 1" C/TAMPA
PETROLETE DE 3/4" C/TAMPA
PETROLETE LL, IR OU LB 1" S/TAMPA
POSTE CIRCULAR EM F.G. D=100/60MM H=12M
POSTE DE CONCRETO QUAD. 10CM DE LADO C2,5M DE
COMPRIMENTO
PROJETOR CIRCULAR ATE 200W BASE E-27 COMPLETO
INCL. LAMPADA CONFORME PROJETO

Und.

Quant.

Unitrio

UND
UN
UN
UN
UND
UND
UND
UND
UND
UND

11

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem

90173
90174
90175
90176
90177
90178
90179
90180
90181
90182

Discriminao
PROJETOR RETANGULAR COM PORTA REATOR ATE 400W
BASE E40, COM REATOR AFP VM 150W E LAMPADA VM
OVOIDE DE 400W, COMPLETO
QUADRO DE DISTRIBUICAO CB 12-E-100A
QUADRO DE DISTRIBUICAO CB-12E - 50A
QUADRO DE DISTRIBUICAO CB-18E - 150A
QUADRO DE DISTRIBUICAO CB-50-E - 225A
RACK DE TELECOMUNICACOES FECHADO EM ACRILICO
19" 12 U's
RACK DE TELECOMUNICACOES FECHADO EM ACRILICO
19" 40 U's
REGUA COM 8 TOMADAS
RELE FOTELETRICO COM BASE
SWITCH 24 PORTAS 10/100Mbps

Und.

Quant.

Unitrio

UND
UND
UND
UND
UND
UND
UND
UN
UN
UN

12

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
90183
90184
90185
90186
90187
90188
90189
902
90201
90202
90203
90204
90205

Discriminao
TAMPA DE PVC 4"X2" COM FURO CENTRAL
TAMPA DE PVC 4"X2"x2" COM FURO CENTRAL
TOMADA DE 2 POLOS MAIS TERRA
TOMADA 3 POLOS + TERRA
TOMADA LOGICA RJ-45 TIPO KEYSTONE JACK CAT 5E
TOMADA UNIVERSAL
VENTILADOR PARA RACK
TOTAL DO SUB-ITEM
1 PAVIMENTO
CAIXA PLASTICA 4" X 2"
CAIXA PLASTICA 3" X 3"
LUVA PVC ROSCAVEL 1"
LUVA PVC ROSCAVEL 1 1/2"
LUVA PVC ROSCAVEL 1 1/4"

Und.

Quant.

Unitrio

UN
UND
UN
UN
UN
UN
UND

UN
UN
UN
UN
UN

13

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
90206
90207
90208
90209
90210
90211
90212
90213
90214
90215
90216
90217
90218
90219

Discriminao
LUVA PVC ROSCAVEL 3/4"
BUCHA E ARRUELA METALICA DIAM 3/4"
CABO ISOLADO PVC P/750V 2,5 MM2
CABO ISOLADO PVC P/750V 4 MM2
CABO ISOLADO PVC P/750V 10 MM2
TOMADA 2 POLOS MAIS TERRA 20A 250V C/ CAIXA
INTERRUPTOR 01 TECLA SIMPLES 10A 250V C/CAIXA
DISJUNTOR MONOFASICO 10 A
DISJUNTOR MONOFASICO 15 A
DISJUNTOR TRIFASICO 10 A
DISJUNTOR TRIFASICO 15 A
DISJUNTOR TRIFASICO 40 A
BRACADEIRA N.3, C/ PARAFUSO 1"
BRACADEIRA N.5, C/ PARAFUSO 1 1/2"

Und.

Quant.

Unitrio

UN
UND
M
M
M
UN
UN
UN
UN
UN
UN
UN
UN
UN

14

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
90220
90221
90222
90223
90224
90225
90226
90227

Discriminao
BRACADEIRA N.4, C/ PARAFUSO 1 1/4"
BRACADEIRA N.6, C/ PARAFUSO 2"
BRACADEIRA METALICA TIPO "D" DIAM 3/4"
ELETRODUTO PVC RIGIDO SOLDAVEL 1" (32MM)
INCLUSIVE CONEXOES
ELETRODUTO PVC RIGIDO SOLDAVEL 1 1/2" (50MM),
INCLUSIVE
CONEXOES
ELETRODUTO PVC RIGIDO SOLDAVEL 1 1/4" (40MM),
INCLUSIVE
CONEXOES
ELETRODUTO PVC RIGIDO SOLDAVEL 2" (60MM)
INCLUSIVE CONEXOES
ELETRODUTO PVC RIGIDO SOLDAVEL 3/4" (25 MM),
INCLUSIVE CONEXOES

Und.

Quant.

Unitrio

UN
UN
UN
M
VR
M
M
M

15

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
90228
90229
90230
90231
90232

10
1001

Discriminao
LUMINARIA 2X40w, TUBULAR, COMPLETA, COM REATOR
PARTIDA RAPIDA
LAMPADA FLUORESCENTE 40 W
QUADRO DE DISTRIBUICAO P/24 CIRCUITOS, COM
BARRAMENTO
QUADRO DE DISTRIBUICAO P/16 CIRCUITOS, COM
BARRAMENTO
TOMADA UNIVERSAL 2P+T-10A
TOTAL DO SUB-ITEM
TOTAL DO ITEM 9
SUBESTACAO
CAIXA DE INSPECAO DE ATERRAMENTO
250X250X250MM

Und.

Quant.

Unitrio

UN
UN
PC
UN
UN

UN

16

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012

Discriminao
CAIXA DE PASSAGEM EM ALVENARIA 500X500X800MM
CAIXA PARA MEDIDOR TRIFASICO PADRAO
CONCESSIONARIA LOCAL
CHAVE FUSIVEL 15KV 100A
CRUZETA DE CONCRETO TIPO "T", DE 1900MM
CURVA DE 90 DE PVC RIGIDO 4"
DISJUNTOR TERMOMAGNETICO TRIPOLAR DE
200 A
ELETRODUTO PVC RIGIDO 4"
ELO FUSIVEL 6K
ISOLADOR POLIETILENO DE ANCORAGEM
ISOLADOR TIPO ROLDANA DE PORCELANA
ISOLADOR PINO 15KV COM ROSCA 25MM

Und.

Quant.

Unitrio

UN
UN
PC
PC
UND
UND
M
PC
UN
UND
PC

17

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1013
1014
1015
1016
11
1101
1102
1103
1104
1105

Discriminao
PARA-RAIOS DE DISTRIBUICAO TIPO VALVULA BLOCO
12KV, 5KA
POSTE DE CONCRETO SC 11/400
SUPORTE PARA TRANSFORMADOR EM POSTE DUPLO T
TRANSFORMADOR TRIFASICO 112,5KVA
TOTAL DO ITEM 10
INSTALAES HIDRO-SANITRIAS
CABIDE DE LOUCA TIPO GANCHO
CAIXA ALV. P/TORNEIRA DE JARDIM
CAIXA DE AREIA 60X60 C/GRELHA METALICA
CAIXA DE AREIA 80X80 C/ TAMPA DE CONCRETO
CAIXA DE GORDURA 160X0,90 C/TAMPA DE CONCRETO

Und.

Quant.

Unitrio

UND
UND
UN
PC

UN
UND
UN
UND
UND

18

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116

Discriminao
CAIXA DE GORDURA 600L CONCRETO
CAIXA DE INSPECAO 60X60CM COM TAMPA DE FERRO
FUNDIDO
CAIXA DE PASSAGEM 60X60 CM
CHUVEIRO ELETRICO METALICO COM BRACO METALICO
CAIXA SIFONADA 100 X 150 X 50 MM COMPLETA
CAIXA SIFONADA 150X185X75MM
RALO SECO 100 X 40
RALO SIFONADO CONICO 100 X 40 MM
CUBA DE LOUCA DE EMBUTIR OVAL
CUBA DUPLA INOX 84X50X20/25CM CH. 20
CUBA INOX 46X30X15CM E=6MM ACO 304 (CUBA N1)

Und.

Quant.

Unitrio

UND
UND
UND
UN
UN
UND
UN
UN
UN
UND
UND

19

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1117
1118
1119
1120
1121
1122
1123
1124
1125

Discriminao
CUBA INOX 60X50X35 CH. 20
FILTRO TANQUE INOX 3.000L/H INSTALADO
FOSSA SEPTICA 7500l AREA UTIL=4,10X4,35X2,00
HIDROMETRO DIAM. RAMAL 25MM VAZAO 3M/H
INSTALACAO DE CONJ. MOTOR-BOMBA CENTRIFUGA 1
HP
LAVATORIO COMPLETO COM COLUNA INCL. VALVULA
METALICA, SIFAO, LIGACAO E FIXADORES
LIGACAO FLEXIVEL PARA PIA METALICA 1/2"
MICTORIO COMPLETO DE LOUCA COM SIFAO INTEGRADO
INCL. VALVULA DE DESCARGA DE 1 LINHA VALVULA
METALICA DE ESGOTAMENTO E FIXADORES
PAPELEIRA DE - EMBUTIR

Und.

Quant.

Unitrio

UND
UND
UN
UN
UND
UN
UND
M
UN

20

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1126
1127
1128
1129
1130
1131
1132
1133
1134
1135

Discriminao

Und.

REGISTRO DE GAVETA BRUTO 1"


REGISTRO DE GAVETA BRUTO 1 1/2"
REGISTRO DE GAVETA BRUTO 2"
REGISTRO DE GAVETA C/CANOPLA CROMADA DIAMETRO
1"
REGISTRO DE GAVETA C/CANOPLA CROMADA DIAMETRO 1
1/4"
REGISTRO DE GAVETA C/CANOPLA CROMADA DIAMETRO
3/4"
REGISTRO DE PRESSAO DE 1 LINHA C/CANOPLA
CROMADA 3/4"
SABONETEIRA DE LOUCA DE EMBUTIR
SIFAO PVC CROMADO P/ LAVATORIO 1"X1.1/2"
SIFAO METALICO PARA PIA 1.1/2"X2"

UN
UN
UN

Quant.

Unitrio

UN
UN
UN
UN
UN
UN
UN

21

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1136
1137
1138
1139
1140
1141
1142
1143

Discriminao
SIFAO PVC P/ TANQUE 1"X1.1/2"
SUMIDOURO D=1,60M PROF. 6,00M
TANQUE DE LOUCA COM COLUNA COMPLETO INCL.
VALVULA METALICA, SIFAO METALICO, LIGACAO FLEXIVEL
E FIXADORES
TORNEIRA DE BOIA 1" (25MM)
TORNEIRA DE BANCADA DE 1 LINHA PIA D=1/2 E 3/4"
TORNEIRA DE PARA JARDIM DE 1 LINHA C/BICO PARA
MANGUEIRA D-3/4"
TORNEIRA DE PAREDE DE 1 LINHA PARA BEBEDOURO
D=1/2"
TORNEIRA DE PAREDE DE 1 LINHA P/TANQUE D=1/2 E
3/4"

Und.

Quant.

Unitrio

UN
UN
UND
UN
UN
UN
UND
UND

22

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1144
1145
1146
1147
1148
1149
1150
1151

Discriminao
TORNEIRA PARA LAVATORIO D=1/2"
TORNEIRA PARA PIA D=1/2 E 3/4" PAREDE
TUBO DE FERRO GALVANIZADO 1 1/2" COM CONEXOES
TUBO DE PVC P/AGUAS PLUVIAIS 150 MM COM CONEXOES
TUBO DE PVC P/AGUAS PLUVIAIS 200 MM COM CONEXOES
TUBO DE PVC P/AGUAS PLUVIAIS 250 MM COM CONEXOES
TUBO DE PVC P/AGUAS PLUVIAIS 300 MM COM CONEXOES
TUBO PVC P/ESGOTO DIAMETRO 40MM C/ CONEXES

Und.

Quant.

Unitrio

UN
UN
M
M
M
M
M
M

23

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1152
1153
1154
1155
1156
1157
1158

Discriminao
TUBO PVC P/ESGOTO DIAMETRO 50MM C/ CONEXES
TUBO PVC P/ESGOTO DIAMETRO 100MM C/ CONEXES
TUBO PVC P/ESGOTO DIAMETRO 75MM C/ CONEXES
TUBO EM PVC SOLDAVEL MARROM INCL. CONEX. DIAM.
25MM
TUBO EM PVC SOLDAVEL MARROM INCL. CONEX. DIAM.
32MM
TUBO EM PVC SOLDAVEL MARROM INCL. CONEX. DIAM.
40MM
TUBO EM PVC SOLDAVEL MARROM INCL. CONEX. DIAM.
50MM

Und.

Quant.

Unitrio

M
M
M
M
M
M
M

24

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168

Discriminao
TUBO EM PVC SOLDAVEL MARROM INCL. CONEX. DIAM.
60MM
TUBO EM PVC SOLDAVEL MARROM INCL. CONEX. DIAM.
75MM
TUBO EM PVC SOLDAVEL MARROM INCL. CONEX. DIAM.
85MM
VALVULA DE DESCARGA CROMADA
VALVULA DE DESCARGA COM ACABAMENTO ANTIVANDALISMO
VALVULA DE FLUXO 3/4"
VALVULA DE RETENCAO HORIZONTAL 1"
VALVULA DE RETENCAO VERTICAL 1"
VALVULA METALICA P/BEBDOURO D=1"
VALVULA METALICA P/PIA 1.1/2"X3.3/4"

Und.

Quant.

Unitrio

M
M
M
UN
UND
UND
UN
UN
UND
UND

25

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1169
1170
1171
12
1201
1202
1203
1204
13

Discriminao

Und.

VALVULA P/PIA TIPO AMERICANA D=3.1/2" (METAL)


BACIA SIFONADA DE LOUCA BRANCA C/ TAMPA E
ACESSORIOS
BACIA SANITARIA PARA DEFICIENTE C/TAMPA E
ACESSORIOS
TOTAL DO ITEM 11
ALVENARIAS E DIVISRIAS
ALVENARIA TIJOLOS COMUM 1/2 VEZ
ALVENARIA DE TIJOLO COMUM 1/4 VEZ
ELEMENTO VAZADO DE CONCRETO
ALVENARIA DE TIJOLOS A VISTA COLOCADOS EM ESPELHO
ESP.20CM C/ARG. CIMENTO E AREIA 1:6
TOTAL DO ITEM 12
IMPERMEABILIZAO

UND

Quant.

Unitrio

UN
UN

M2
M2
M2
M2

26

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1301
1302
1303
14
1401
1402
1403

Discriminao
IMPERMEABILIZACAO DE VIGAS BALDRAMES E=2,0CM
IMPERMEABILIZACAO COM
ARGAMASSA SINTETICA
SEMI-FLEXIVEL
IMPERMEABILIZACAO
COM
CIMENTO CRISTALIZANTE
3 DEMAOS
TOTAL DO ITEM 13
ESTRUTURAS METLICAS
ESTRUTURA EM ACO AO36 PARA COBERTURA
ESTRUTURA ESPACIAL DE ALUMINIO PARA COBERTURA DA
RAMPA
ESTRUTURA METALICA DE ACO PARA SUSTENTACAO
DA RAMPA
TOTAL DO ITEM 14

Und.

Quant.

Unitrio

M2
M2
M2

KG
M2
M2

27

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
15
1501
1502
1503
1504
1505
1506
1507
16
1601

Discriminao
COBERTURAS
COBERTURA COM TELHA COLONIAL-PLAN
COBERTURA COM TELHA FIBER-GLASS C/VEU PROTECAO
1,5MM
TELHAMENTO COM TELHA DE ACO GALVANIZADO
TRAPEZOIDAL 0,5MM INCLUSIVE PINTURA
CUMEEIRA P/TELHA COLONIAL-PLAN
CUMEEIRA COM TELHA GALVANIZADA TRAPEZOIDAL
0,5MM
EMBOCAMENTO LATERAL DE OITOES
EMBOCAMENTO DE BEIRAL
TOTAL DO ITEM 15
ESQUADRIAS METALICAS
ESCADA MARINHEIRO EM METALON

Und.

Quant.

Unitrio

M2
M2
M2
M
M
M
M

28

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1602
1603
1604
1605
1606
1607
1608
1609
1610

Discriminao
ESCADA DE MARINHEIRO EM METALON COM PROTECAO
ESQUADRIA BASCULANTE COM FERRAGENS
ESQUADRIA DE CORRER C/FERRAGENS
ESQUADRIA GUICHE EM CHAPA 16
CANTONEIRA/GRADE PARA VIDRO COM FERRAGENS
ESQUADRIA EM METALON EM CHAPA 14 DOBRADA COM
FERRAGENS
GRADE DE FRENTE H=2,00M CONFORME PROJETO
GRADE PROTECAO DE FERRO CHATO 1/8"X7/8" NAS
ESQUADRIAS
GRADIL ELETROSOLDADO H=2,00M
GUARDA BICICLETAS

Und.

Quant.

Unitrio

M
M2
UND
M2
M2
M
M2
M
M

29

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1611
1612
1613
1614
1615
1616
1617
1618
1619

Discriminao
PORTA DE ABRIR EM CHAPA COM FERRAGENS
PORTA DE ABRIR PARA WC EM CHAPA COM FERRAGENS
PORTA ABRIR/VENEZIANA COM FERRAGENS
PORTA DE ABRIR/FIXA EM CHAPA 16 COM FERRAGENS
PORTA DE CORRER/FIXA EM CHAPA 16 COM FERRAGENS
PORTA DE FERRO DE ENROLAR COM FERRAGENS
PORTAO EM CHAPA TRAPEZOIDAL, TUBO DE ACO COM
FERRAGENS
PORTAO TELA EM CHAPA 16 C0M FERRAGENS
PORTAO TELA/CANO CHAPA 16 COM FERRAGENS

Und.

Quant.

Unitrio

M2
M2
M2
M2
M2
M2
M2
M2
M2

30

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1620
1621
17
1701
1702
18
1801
1802
1803
1804

Discriminao
VEDACAO JUNTA DE DILATACAOC CHAPA 16 PARAF.C/30PINTADA
VENEZIANA EM CHAPA 16 D=60CM 2 UNID
TOTAL DO ITEM 16
VIDROS
VIDRO LISO 3 MM
VIDRO MINI-BOREAL
TOTAL DO ITEM 17
REVESTIMENTO DE PAREDES
CHAPISCO COMUM
EMBOCO CIMENTO E AREIA 1:4
REBOCO PAULISTA COM ARG. CIMENTO E AREIA TRACO
1:6
REVESTIMENTO CERAMICO 10X10CM

Und.

Quant.

Unitrio

M
M2

M2
M2

M2
M2
M2
M2

31

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
1805
19
1901
1902
1903
1904
1905
20
2001

Discriminao
REVESTIMENTO COM CERAMICA 20X20
TOTAL DO ITEM 18
FORROS
CHAPISCO ROLADO (1:3 CIM E AREIA)+(1:10 COLA
E CIM)
CORNIJA DE GESSO
GESSO CORRIDO EM TETO
REBOCO PAULISTA EM FORRO CIMENTO E AREIA TRACO
1:6
FORRO EM PLACAS DE GESSO
TOTAL DO ITEM 19
REVESTIMENTO DE PISOS
PISO EM CERAMICA 40X40CM PEI 5

Und.

Quant.

Unitrio

M2

M2
M
M2
M2
M2

M2

32

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2002
2003
2004
2005
2006
2007
2008
2009
2010

Discriminao
CONCRETO DESEMPENADO INCLUSIVE LASTRO E=7CM
GRAMA EM PLACAS
GRANITINA C/OXIDO DE FERRO (ALTA RESISTENCIA) COM
REGUL. E=2CM E JUNTA PLASTICA 27MM
GRANITINA COM REGULAR. E=2CM E JUNTA PLASTICA
27MM
LADRILHO HIDRAULICO 40X40CM
LASTRO DE CONCRETO IMPERMEABILIZADO 1:3:6
PASSEIO PROTECAO EM CONCRETO DESEMPENADO
POLIDO 5CM 1:2,5:3,5
PISO CONCRETO DESEMPENADO 5CM 1:2,5:3,5
PISO CONCRETO DESEMPENADO 7CM 1:2,5:3,5

Und.

Quant.

Unitrio

M2
M2
M2
M2
M2
M2
M2
M2
M2

33

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2011
2012
2013
2014
2015
2016
21
2101
2102

Discriminao
PISO INTERTRAVADO COM BLOCO DE CONCRETO E=8
CM
PREPARO DE CONCRETO P/LASTRO SEM BETONEIRA
APLICACAO DE RESINA ACRILICA DUAS DEMAOS
RODAPE DE GRANITINA
RODAPE DE MASSA (CIM E AREIA 1:3)
PISO GRANITO CINZA ANDORINHA NATURAL EM PLACA
40X40CM
TOTAL DO ITEM 20
PINTURA
DEMARCACAO QUADRA/VAGAS TINTA BORRACHA
CLORADA
EMASSAMENTO ACRILICO 02 DEMAOS

Und.

Quant.

Unitrio

M2
M3
M2
M
M
M2

M
M2

34

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2103
2104
2105
2106
2107
2108
2109
2110
2111
2112

Discriminao
EMASSAMENTO COM MASSA PVA UMA DEMAO
FUNDO SUPER GALVITE 1 DEMAO
LETREIRO EM PAREDE FEITO A PINCEL
PINTURA ESMALTE SINTETICO EM PAREDES 2 DEMAOS
COM SELADOR
PINTURA ESMALTE ESQUADRIA DE FERRO COM FUNDO
ANTICORROSIVO
PINTURA POLIESPORTIVA 2 DEMAOS (PISOS E
CIMENTADOS)
PINTURA CERAMICA P/BEIRAL
PINTURA COM SELADOR ACRILICO
PINTURA ESMALTE EST. METAL. 1 DEMAO
PINTURA ESMALTE ESTRUTURA METALICA DUAS
DEMAOS

Und.

Quant.

Unitrio

M2
M2
UND
M2
M2
M2
M2
M2
M2
M2

35

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2113
2114
2115
2116
2117
22
2201
2202
2203
2204

Discriminao
PINTURA LATEX ACRILICA 02 DEMAOS COM SELADOR
PINTURA
PINTURA
PINTURA
PINTURA

LATEX ACRILICA 03 DEMAOS COM SELADOR


PVA LATEX DUAS DEMAOS COM SELADOR
PVA LATEX 2 DEMAOS SEM SELADOR
TEXTURIZADA COM SELADOR ACRILICO
TOTAL DO ITEM 21
ATERRAMENTO E PROTECAO CONTRA DESCARGAS
ATMOSFERICAS
CAPTOR TIPO FRANKLIN
CABO DE COBRE NU, 35,00 mm2
CABO DE COBRE NU, 50,00 mm2
TERMINAL AEREO COM SUPORTE GUIA P/QUINA

Und.

Quant.

Unitrio

M2
M2
M2
M2
M2

UN
M
M
UN

36

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2205
2206
23
2301
2302
2303
2304
2305
24

Discriminao
HASTE DE ATERRAMENTO EM CAIXA DE INSPECAO
SUPORTE GUIA REFORCADO
TOTAL DO ITEM 22
INSTALACOES DE COMBATE E PREVENCAO A
INCENDIO
EXTINTOR PQS 6KG
EXTINTOR PQS 4KG
EXTINTOR CO2 4KG
SUPORTE TIPO L PARA EXTINTOR
SINALIZADOR FOTOLUMINESCENTE PARA EXTINTOR
TOTAL DO ITEM 23
DIVERSOS

Und.

Quant.

Unitrio

UND
UND

UN
UN
UN
UND
UND

37

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2401
2402
2403
2404
2405
2406
2407
2408
2409

Discriminao
ARQUIBANCADA COM 2 DEGRAUS COMPLETA C/BL.
9X19X39
BANCADA DE CONCRETO POLIDO
BANCADA DE GRANITO COM ESPELHO
BANCO DE CONCRETO POLIDO E ALVENARIA
BARRA DE APOIO EM ACO INOX
BEBEDOURO EM ALVENARIA PARA 6
TORNEIRAS AZULEJADO, SEM INST. ELETRICA E HIDR. E
SAN. CONFORME DETALHAMENTO
CANALETA DE CONCRETO DESEMPENADO 30X5CM
C/GRELHA FERRO QUADRADO D=3/8"
ESCADA MARINHEIRO SEM GUARDA-CORPO FERRO
REDONDO
EXAUSTOR DIAMETRO 30CM

Und.

Quant.

Unitrio

M2
M2
M2
M
UN
UND
M
M
UN

38

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2410
2411
2412
2413
2414
2415

Discriminao
COIFA EM CHAPA GALVANIZADA EPOXI 95X70X60CM
C/TUBO
DE
SAIDA
CONJUNTO DE 03 MASTROS DE FERRO GALVANIZADO
PARA BANDEIRA PINTADO INCL. BASE CONF. PROJETO
QUADRO DE FORMICA SOBRE COMPENSADO 2,00X1,00M
QUADRO DE GIZ REVESTIDO COM LAMINADO
MELAMINICO COMPLETO CONF. DETALHE DE PROJETO
(SALAS DE AULA)
SINALIZACAO - PLACA AEREA A1 - 2,00X0,50M
SINALIZACAO - PLACA ESPECIAL E1 - 3,50MX0,60M +
SUPORTE

Und.

Quant.

Unitrio

UND
UND
UND
UND
UND
UND

39

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2416
2417
2418
2419
2420
2421
2422
2423

Discriminao
SINALIZACAO - PLACA ESPECIAL E2 - 1,50MX0,50M
ESTACIONAMENTO
SINALIZACAO - PLACAS AEREAS A2, A3, A4 E A5 1,00MX0,30M
SINALIZACAO - PLACAS P1 A P20 - 0,30MX0,40M
SINALIZACAO - PLACAS S1 A S7 - 0,21MX0,31M

Und.
-

CONJUNTO PARA VOLEIBOL COM PINTURA (2 SUPORTES)


TRAVE FG. PARA FUTEBOL SALAO PINTADA
SUPORTE EM TUBO INDUSTRIAL REMOVIVEL PARA TABELA
DE BASQUETE ASSENTADA E PINTADA INCLUSIE TABELA
TAMPAS METALICAS - 1,80M2

Quant.

Unitrio

UND
UND
UND
UND
CJ
UND
UND
UND

40

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem

2424
2425
2426

Discriminao
QUADRO DE GIZ LAM. MELAMINICO/CORTIA COMPL.
6,87X1,39M (LABORATORIO / AUDITORIO / BIBLIOTECA)
BATE-CARTEIRA DE MADEIRA H=18CM BOLEADO
CONF. DETALHE DE PROJETO
BRISES EM CHAPA METALICA 2,65MM FIXADAS EM
CANTONEIRAS CONF. DETALHE DE PROJETO

Und.

Quant.

Unitrio

UND
M
UND

2427

ARMARIOS SOB BANCADAS EM MADEIRA DE LEI


REVESTIDA COM LAMINADO MELAMINICO CONF. DETALHE
DE PROJETO

M2

2428

FECHAMENTO DE VO DO TELHADO EM VENEZIANA


VERDADEIRA COM QUADROS EM CHAPA DOBRADA 16
CONF. DETALHE DE PROJETO

M2

41

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2429
2430
2431
2432
2433
25
2501

Discriminao
PRATELEIRA DE MADEIRA APARELHADA CONF. DETALHE DE
PROJETO
ESTRADO DE MADEIRA CONF. DETALHE DE PROJETO
CONJUNTO DE MESA E QUATRO BANCOS EM CONCRETO
ARMADO CONF. DETALHE DE PROJETO
PLACA DE INAUGURACAO EM ALUMINIO 60X40CM
LIMPEZA FINAL DE OBRA
TOTAL DO ITEM 24
MURO, MURETA E CALCADA EXTERNA
MURO DIVISORIO DE TIJOLOS CERAMICOS 15 x 20;
H=2,00M; ALICERCE 30X40; BALDRAME 30 X30; PILAR
10X10 C. 2M; BLOCO 30X30X70CM REBOCADO E PINTADO
COM TINTA A BASE D'AGUA

Und.

Quant.

Unitrio

M2
M2
CJ
UND
M2

42

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem

2502

2503
2504
2505
2506

Discriminao
MURETA SOB GRADIL EM ALVENARIA DE TIJOLOS
CERAMICOS 15X20; H=1,70M; ALICERCE 30X40;
BALDRAME
30
X30; PILAR 10X10 CADA 2M; BLOCO 30X30X70CM
REBOCADO E PINTADO COM TINTA A BASE D'AGUA
GRADIL DE FERRO C/BARRAS DE 5/8"X5/8" C/ TUBO F.G. 3"
E BARRA TRANSVERSAL 1.1/2"X1/4"
PINTURA ESMALTE SOBRE ESQUADRIA DE FERRO
INCLUSIVE BASE ANTI FERRUGINOSA
PISO CONCRETO DESEMPENADO 7CM 1:2,5:3,5,
INCLUSIVE CONTENCOES LATERAIS (CALCADA EXTERNA E
ESTACIONAMENTO)
MEIO FIO PRE-MOLDADO DE CONCRETO E SARJETAS DE
CONCRETO

Und.

Quant.

Unitrio

M2

M2
M2
M2
M

43

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2507
26
2601
2602
2603
2604
2605

Discriminao
CORRIMAO FERRO GALVANIZADO ESCADA E RAMPA
TOTAL DO ITEM 25
FACHADA PADRO
ESCAVACAO MANUAL DE VALAS
ALICERCE DE PEDRA ARGAMASSADA 1:6 CIMENTO E
AREIA
BALDRAME EM PEDRA ARGAM. 1:6 CIMENTO E AREIA
CONCRETO ARMADO FCK 20 MPA COM LANCAMENTO
ATERRO COMPACTADO COM AQUISICAO DE MATERIAL

Und.

Quant.

Unitrio

M3
M3
M3
M3
M3

44

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2606
2607
2608
2609
2610
2611
2612
2613

Discriminao
ALVENARIA DE TIJOLOS CERAMICOS 15X20CM, ESP.10CM,
COM ARG.CIMENTO E AREIA 1:5
CHAPISCO C/ARGAMASSA DE CIMENTO E AREIA 1:3
REBOCO CIMENTO E AREIA TRACO 1:6
IMPERMEABILIZACAO DE CALHAS OU LAJES COM MANTA
ASFALTICA TIPO MORTER PLAS 3MM
PORTAO DE FERRO C/BARRAS DE 5/8"X5/8" C/ TUBO F.G.
3" E BARRA TRANSVERSAL 1.1/2"X1/4" (MESMO PADRAO
DO GRADIL)
PINTURA ACRILICA 02 DEMAOS C/MASSA ACRILICA
PINTURA ESMALTE 2 DEMAOS EM ESQUADRIAS DE
MADEIRA EM SUPERFICIES EMASSADAS
TUBO DE PVC RIGIDO P/ ESGOTO 100 mm

Und.

Quant.

Unitrio

M2
M2
M2
M2
M2
M2
M2
M

45

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2614
2615
2616
27
2701
2702
2703
2704
2705
2706

Discriminao
PINTURA LATEX TEXTURA ACRILICA
PINTURA DO NOME DA ESCOLA
PINTURA DO LOGOTIPO DO GOVERNO
TOTAL DO ITEM 26
PASSARELA COBERTA
ESCAVACAO MANUAL DE VALAS
ATERRO COMPACTADO COM AQUISICAO DE MATERIAL
REATERRO COM APILOAMENTO
CONCRETO ARMADO FCK 20 MPA COM LANCAMENTO
PISO CONCRETO DESEMPENADO 7CM 1:2,5:3,5
MADEIRAMENTO P/COBERTURA COM TELHA CERAMICA
VAO ATE 7M, COM TESOURA

Und.

Quant.

Unitrio

M2
UND
UND

M3
M3
M3
M3
M2
M2

46

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
2707
2708
2709
2710

Discriminao
TELHA CERAMICA COLONIAL
CUMEEIRA C/TELHA CERAMICA CANAL INCL.
EMBOCAMENTO
EMBOCAMENTO DE BEIRAL
DESCUPINIZACAO C/OLEO QUEIMADO EM
MADEIRAMENTO TELHADO
TOTAL DO ITEM 27
TOTAL GERAL

Und.

Quant.

Unitrio

M2
M
M
M2

47

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem

Discriminao

Und.

Quant.

Unitrio

RESUMO DOS
tem
1
2
3
4
5
6
7
8
9

Discriminao
SERVIOS PRELIMINARES
SERVIOS DE TERRAPLENAGEM
MOBILIZACAO E DESMOBILIZACAO
INSTALACAO, OPERACAO E MANUTENCAO DO CANTEIRO
ADMINISTRACAO LOCAL
SERVIO EM TERRA
FUNDAES E SONDAGENS
ESTRUTURA
INST. ELETRICAS/TELEFONICAS/LOGICA

48

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem
10
11
12
13
14
15
16
17
18
19
20
21
22
23

Discriminao

Und.

Quant.

Unitrio

SUBESTACAO
INSTALAES HIDRO-SANITRIAS
ALVENARIAS E DIVISRIAS
IMPERMEABILIZAO
ESTRUTURAS METLICAS
COBERTURAS
ESQUADRIAS METALICAS
VIDROS
REVESTIMENTO DE PAREDES
FORROS
REVESTIMENTO DE PISOS
PINTURA
ATERRAMENTO E PROTECAO CONTRA DESCARGAS ATMOSFERICAS
INSTALACOES DE COMBATE E PREVENCAO A INCENDIO

49

BOLE
OBJETO:
MUNICPIO:
RECURSOS:
PREO CONTRATADO: R$

EMPRESA:
Contrato
tem

Discriminao

Und.

Quant.

Unitrio

24
25
26
27

DIVERSOS
MURO, MURETA E CALCADA EXTERNA
FACHADA PADRO
PASSARELA COBERTA
TOTAL GERAL
IMPORTA A PRESENTE MEDIO O VALOR DE R$
CONSTRUTORA
SUPERVISORA

50

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Valores (
A Realizar
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Medido no
Perodo

Acumulado
Anterior

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

51

BOLETIM DE MEDIO

1
P

Total
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00

0.00

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

52

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00

Valores (
A Realizar
0.00
0.00

Medido no
Perodo
0.00
0.00
0.00

Acumulado
Anterior
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

53

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

54

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

55

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

56

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Valores (

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Medido no
Perodo
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Acumulado
Anterior
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

57

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00
0.00
0.00

Valores (

0.00
0.00
0.00

Medido no
Perodo
0.00
0.00
0.00

Acumulado
Anterior
0.00
0.00
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

58

BOLETIM DE MEDIO

1
P

Total
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00

Valores (

0.00

Medido no
Perodo
0.00

Acumulado
Anterior
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

59

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Valores (

0.00
0.00
0.00
0.00
0.00
0.00

Medido no
Perodo
0.00
0.00
0.00
0.00
0.00
0.00

Acumulado
Anterior
0.00
0.00
0.00
0.00
0.00
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

60

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

61

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

62

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Valores (
A Realizar
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Medido no
Perodo
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Acumulado
Anterior
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

63

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Valores (
A Realizar
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Medido no
Perodo
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Acumulado
Anterior
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

64

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00
0.00
0.00

Valores (

0.00
0.00
0.00

Medido no
Perodo
0.00
0.00
0.00

Acumulado
Anterior
0.00
0.00
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

65

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

66

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

67

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

68

BOLETIM DE MEDIO

1
P

Total
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00

Valores (

0.00

Medido no
Perodo
0.00

Acumulado
Anterior
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

69

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Valores (

0.00
0.00
0.00
0.00

Medido no
Perodo
0.00
0.00
0.00
0.00

Acumulado
Anterior
0.00
0.00
0.00
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

70

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00
0.00
0.00

Valores (

0.00
0.00
0.00

Medido no
Perodo
0.00
0.00
0.00

Acumulado
Anterior
0.00
0.00
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

71

BOLETIM DE MEDIO

1
P

Total
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00

Valores (

0.00
0.00

Medido no
Perodo
0.00
0.00

Acumulado
Anterior
0.00
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

72

BOLETIM DE MEDIO

1
P

Total
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00

Valores (

0.00
0.00

Medido no
Perodo
0.00
0.00

Acumulado
Anterior
0.00
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

73

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

74

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

75

BOLETIM DE MEDIO

1
P

Total
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00

Valores (

0.00

Medido no
Perodo
0.00

Acumulado
Anterior
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

76

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

77

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

78

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

79

BOLETIM DE MEDIO

1
P

Total
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00

Valores (

0.00

Medido no
Perodo
0.00

Acumulado
Anterior
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

80

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

81

BOLETIM DE MEDIO

1
P

Total
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00

Valores (
A Realizar
0.00

Medido no
Perodo
0.00
0.00

Acumulado
Anterior
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

82

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

83

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

84

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00
0.00
0.00

Valores (

0.00
0.00
0.00

Medido no
Perodo
0.00
0.00
0.00

Acumulado
Anterior
0.00
0.00
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

85

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

86

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00

Valores (
A Realizar
0.00
0.00

Medido no
Perodo
0.00
0.00
0.00

Acumulado
Anterior
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

87

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

88

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

89

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

90

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

91

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

92

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

93

BOLETIM DE MEDIO

1
P

Total
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00

0.00

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

94

BOLETIM DE MEDIO

1
P

Total

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

95

BOLETIM DE MEDIO

1
P

Total
0.00
0.00
0.00
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00
0.00
0.00
0.00
0.00

Valores (
A Realizar
0.00
0.00
0.00

Medido no
Perodo
0.00
0.00
0.00
0.00

Acumulado
Anterior
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

96

BOLETIM DE MEDIO

1
P

Total
0.00

Medida no
Perodo

Quantidades
Acumulada
Acumulada
Anterior
Atual
0.00
0.00

Valores (

0.00

Medido no
Perodo
0.00

Acumulado
Anterior
0.00

A Realizar

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

97

BOLETIM DE MEDIO

1
P

Medida no
Perodo

Total

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Perodo

Acumulado
Anterior

RESUMO DOS VALORES DA 1 MEDIO


Contrato
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Medido no
Acumulado
Perodo
Anterior
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

98

BOLETIM DE MEDIO

1
P

Medida no
Perodo

Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Quantidades
Acumulada
Acumulada
Anterior
Atual

Valores (
A Realizar

Medido no
Acumulado
Perodo
Anterior
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

99

BOLETIM DE MEDIO

1
P

Medida no
Perodo

Total

Quantidades
Acumulada
Acumulada
Anterior
Atual

0.00
0.00
0.00
0.00
0.00
0.00

Valores (
A Realizar

Medido no
Acumulado
Perodo
Anterior
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ZERO REAIS
GERENCIADORA

SEDUC

100

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

101

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

102

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

103

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

104

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

105

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

106

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo
Atual
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Contratual % Executado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

107

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo
Atual
0.00
0.00
0.00

Contratual % Executado
0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

108

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

109

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo
Atual
0.00
0.00
0.00
0.00
0.00
0.00

Contratual % Executado
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

110

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

111

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

112

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

113

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo
Atual
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Contratual % Executado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

114

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo
Atual
0.00
0.00
0.00

Contratual % Executado
0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

115

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

116

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

117

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

118

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

119

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo
Atual
0.00
0.00
0.00
0.00

Contratual % Executado
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

120

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo
Atual
0.00
0.00
0.00

Contratual % Executado
0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

121

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

122

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

123

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

124

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

125

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

126

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

127

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

128

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

129

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

130

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

131

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

132

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

133

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

134

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo
Atual
0.00
0.00
0.00

Contratual % Executado
0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

135

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

136

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

137

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

138

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

139

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

140

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

141

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00

0.00

0.00%

142

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

143

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

144

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

145

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

146

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

147

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual

Acumulado
Saldo Contrato % Executado
Atual
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%

148

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%

149

1 MEDIO
PERODO:

Valores (R$)
Acumulado
Saldo Contratual % Executado
Atual
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SEDUC

150