PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.

com

Pembangu
NO

KOEF.

SAT.

I
1

1 m2
0.1 OH
0.05 OH

1 m2
1.7
0.21
0.3
10.5
0.03
0.05
1.5

btg
m3
kg
kg
m3
m3
lbr

2
1
0.2
0.05

OH
OH
OH
OH

1.25
2.5
1.2
0.005
0.009
0.072

btg
kg
lbr
lbr
m3
m3

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
0.06 kg
0.45 kg

0.2
0.4
0.02
0.02

OH
OH
OH
OH

0.012 m3
0.02 kg
0.007 m3
0.1
0.1
0.01
0.005

OH
OH
OH
OH

II
1

1 m3
0.9 OH
0.045 OH

1 m3
1.05 OH
0.067 OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

2
1.2 m3
0.3 OH
0.01 OH

1 m3
0.3 OH
0.015 OH

0.35 OH
0.0223 OH

III
1

1 m3
384
692
1039
215

kg
m3
m3
ltr

1.65
0.275
0.028
0.083

OH
OH
OH
OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

10 kg
10.50
0.150

kg
kg

0.07
0.07
0.007
0.004

OH
OH
OH
OH

1 m2
0.04 m3
0.3 Kg
0.1 Ltr
0.52
0.26
0.026
0.026

OH
OH
OH
OH

1 m3
1.2 m3
91 kg
0.584 m3
1.5 OH
0.75 OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
0.075 OH
0.075 OH

IV
1

1 m3
384
692
1039
215

kg
m3
m3
ltr

1.65
0.275
0.028
0.083

OH
OH
OH
OH

10 kg
10.50
0.150

kg
kg

0.07
0.07
0.007
0.004

OH
OH
OH
OH

1 m2
0.045 m3
0.3 Kg
0.1 Ltr

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
0.52
0.26
0.026
0.026

OH
OH
OH
OH

1 m2
0.04
0.4
0.2
0.015
0.35
2

m3
Kg
Ltr
m3
Lbr
Btg

0.66
0.33
0.033
0.033

OH
OH
OH
OH

1 m2
0.04
0.4
0.2
0.018
0.35
2

m3
Kg
Ltr
m3
Lbr
Btg

0.66
0.33
0.033
0.033

OH
OH
OH
OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

1 m2
0.04
0.4
0.2
0.015
0.35
6

m3
Kg
Ltr
m3
Lbr
Btg

0.66
0.33
0.033
0.033

OH
OH
OH
OH

1 m2
0.03
0.4
0.15
0.015
0.35
2

m3
Kg
Ltr
m3
Lbr
Btg

0.66
0.33
0.033
0.033

OH
OH
OH
OH

1 m2
0.04 m3
0.4 Kg

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

0.2
0.018
0.35
2

Ltr
m3
Lbr
Btg

0.66
0.33
0.033
0.033

OH
OH
OH
OH

1 m2
0.04
0.4
0.2
0.015
0.35
6

m3
Kg
Ltr
m3
Lbr
Btg

0.66
0.33
0.033
0.033

OH
OH
OH
OH

V
1

1 kg
1.15 kg
0.06 kg
0.06
0.06
0.006
0.003

OH
OH
OH
OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

1 m3
1.1 m3
15 Kg
3 Kg
2.4
7.2
0.72
0.12

OH
OH
OH
OH

1 m2
0.014 m3
0.0036 m3
0.25 Kg
0.1
0.1
0.01
0.005

OH
OH
OH
OH

VI
1

1 m2
70 Buah
14.37 Kg
0.04 m3
0.3 OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
0.1 OH
0.01 OH
0.015 OH

1 m2
7.776 Kg
0.023 m3
0.3
0.15
0.015
0.015

OH
OH
OH
OH

1 m2
3.25 kg
0.20
0.10
0.010
0.010

OH
OH
OH
OH

VII
1

1 m3
1.1 m3
1.25 kg
1 kg
7 OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
21 OH
2.1 OH
0.35 OH

1 m2
0.024 m3
0.3 kg
0.8
2.4
0.24
0.04

OH
OH
OH
OH

1 m2
0.04 m3
0.05 kg
1
3
0.3
0.05

OH
OH
OH
OH

1 m2
1.1 m2
0.015 OH
0.15 OH
0.015 OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
0.00075 OH

VIII
1

1 m2
26.5 buah
10.4 kg
0.045 m3
1.62 kg
0.7
0.35
0.035
0.035

OH
OH
OH
OH

1 m2
26 Buah
9.3 Kg
0.018 m3
1.94 Kg
0.9
0.45
0.045
0.045

OH
OH
OH
OH

1 m2
11.87 buah
10 kg

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
0.045 m3
1.5 kg

0.7
0.35
0.035
0.035

OH
OH
OH
OH

1 m2
6.63 buah
9.8 kg
0.045 m3
1.3 kg
0.25
0.125
0.013
0.013

OH
OH
OH
OH

IX
1

1 m2
0.364 Lbr
0.11 Kg
0.1
0.05
0.005
0.005

OH
OH
OH
OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

X
1

1 bh
70
77
0.13
0.09
0.02
1.6

bh
kg
m3
m3
m3
kg

3.2
1.15
0.011
0.016

OH
OH
OH
OH

1 m'
1.2 m'
0.35 Ls
0.036
0.06
0.006
0.002

OH
OH
OH
OH

1 m'
1.2 m'
0.35 Ls
0.036 OH
0.06 OH
0.006 OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
0.002 OH

1 bh
1 bh
0.0025 bh
0.01
0.4
0.04
0.005

OH
OH
OH
OH

1 Unit
150 bh
120 Kg
0.3 m3
360 buah
6 Kg
6
3
0.3
0.03

OH
OH
OH
OH

1 unit
1 buah
0.06 kg
3.3 OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
1.5 OH
0.001 OH
0.16 OH

1 unit
1 buah
0.3 6 kg
0.01 m3
1.2
0.145
0.15
0.1

OH
OH
OH
OH

XI
1

1 Buah
1 Buah
0.01
0.5
0.01
0.005

OH
OH
OH
OH

1 Buah
1 Buah
0.005 OH
0.5 OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
0.005 OH
0.0025 OH

1 Buah
1 Buah
0.015
0.15
0.015
0.0075

OH
OH
OH
OH

1 Buah
1 Buah
0.01
0.1
0.01
0.005

OH
OH
OH
OH

XII
1

1 m2
0.2
0.15
0.17
0.26
0.01
0.03
0.2

kg
kg
kg
kg
bh
kg
lbr

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

0.07
0.009
0.006
0.003

OH
OH
OH
OH

1 m2
0.1 Kg
0.1 Kg
0.26 Kg
0.02
0.063
0.0063
0.003

OH
OH
OH
OH

1 m2
0.15 ltr
0.05 ltr
0.1 lbr
0.16
0.16
0.016
0.003

OH
OH
OH
OH

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

DAFTAR UNIT PEKERJAAN


Pembangunan Rumah Tinggal Type 25 Anggrek
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
Membersihkan lapangan dan perataan
TENAGA
Pekerja
Mandor

HARGA SATUAN

(Rp)

50,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Direksi Keet
BAHAN
Kayu dolken 8-10/4m
Kayu
Paku biasa 2"-5"
Portland semen
Pasir Beton
Koral Beton
Seng gelombang BJLS 32

19,000.00
4,500,000.00
14,000.00
1,220.00
220,000.00
240,000.00
50,000.00
TENAGA

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

65,000.00
50,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pagar sementara dari seng gelombang tinggi 1.80 m
BAHAN
Kayu dolken diameter 8-100/400cm
Portland semen
Seng gelombang 3"-5"
Pasir beton
Koral beton
Kayu 5/7 x 4 m kayu kruing

19,000.00
1,220.00
50,000.00
220,000.00
240,000.00
4,500,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Paku biasa 2'-5'


Meni besi

14,000.00
20,000.00
TENAGA

Tukang kayu
Pekerja
Kepala tukang
Mandor

65,000.00
50,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pengukuran dan pemasangan bowplank
BAHAN
Kayu 5/7 x 4 m kayu kruing
Paku biasa 2'-5'
Kayu papan 3/20 kruing
TENAGA
Tukang kayu
Pekerja
Kepala tukang
Mandor

4,500,000.00
14,000.00
5,300,000.00
65,000.00
50,000.00
70,000.00
60,000.00
.

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
PEKERJAAN TANAH
Menggali Tanah Biasa Sedalam 2m
TENAGA
Pekerja
Mandor

50,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Menggali Tanah Biasa Sedalam 3m
TENAGA
Pekerja
Mandor
Overhead dan Profit (10%)

50,000.00
60,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Harga Satuan Pekerjaan


Urugan Pasir
BAHAN
Pasir Urug

130,000.00
TENAGA

Pekerja
Mandor

50,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Urugan kembali tanah 2m
TENAGA
Pekerja
Mandor

50,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Urugan kembali tanah 3m
TENAGA
Pekerja
Mandor

50,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan

PEKERJAAN PONDASI
Pondasi Footplate beton bertulang mutu f'c=21,7 MPa (K250), slum (122)cm, w
BAHAN
Portland Semen
1,240.00
Pasir Beton
171.43
Kerikil Beton
192.59
Air
10.00
TENAGA
Pekerja
50,000.00
Tukang batu
65,000.00
Kepala tukang
70,000.00
Mandor
60,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pembesian dg Besi Polos atau Besi Ulir
BAHAN
Besi Beton (polos/ulir)
Kawat Beton
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor

13,000.00
16,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan

Memasang Bekisting untuk Pondasi


BAHAN
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1,750,000.00
14,000.00
8,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Memasang Pondasi Batu Kali, 1Pc : 8 PP
BAHAN
Batu Belah 15/20
Portland Sement
Pasir Pasang
TENAGA
Pekerja
Tukang Batu

200,000.00
1,240.00
210,000.00
50,000.00
65,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Kepala Tukang
Mandor

70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan

PEKERJAAN STRUKTUR BETON


Membuat Beton bertulang mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,5
BAHAN
Portland Semen
1,240.00
Pasir Beton
171.43
Kerikil Beton
192.59
Air
10.00
TENAGA
Pekerja
50,000.00
Tukang batu
65,000.00
Kepala tukang
70,000.00
Mandor
60,000.00
Overhead dan Profit (10%)
Harga Satuan Pekerjaan
Pembesian dg Besi Polos atau Besi Ulir
BAHAN
Besi Beton (polos/ulir)
Kawat Beton
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Overhead dan Profit (10%)
Harga Satuan Pekerjaan
Memasang Bekisting untuk Sloof
BAHAN
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
TENAGA

13,000.00
16,000.00
50,000.00
65,000.00
70,000.00
60,000.00

1,750,000.00
14,000.00
8,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Overhead dan Profit (10%)
Harga Satuan Pekerjaan
Memasang Bekisting untuk Kolom
BAHAN
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Klas II
Plywood tebal 9mm
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

50,000.00
65,000.00
70,000.00
60,000.00

1,750,000.00
14,000.00
8,000.00
4,500,000.00
120,000.00
19,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Memasang Bekisting untuk Balok
BAHAN
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Klas II
Plywood tebal 9mm
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Overhead dan Profit (10%)
Harga Satuan Pekerjaan

1,750,000.00
14,000.00
8,000.00
4,500,000.00
120,000.00
19,000.00
50,000.00
65,000.00
70,000.00
60,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Memasang Bekisting untuk Plat Lantai


BAHAN
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Klas II
Plywood tebal 9mm
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1,750,000.00
14,000.00
8,000.00
4,500,000.00
120,000.00
19,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Memasang Bekisting untuk Tangga
BAHAN
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Klas II
Plywood tebal 9mm
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1,750,000.00
14,000.00
8,000.00
4,500,000.00
120,000.00
19,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan

Memasang Bekisting untuk Ringbalok


BAHAN
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"

1,750,000.00
14,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Minyak Bekisting
Balok Kayu Klas II
Plywood tebal 9mm
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

8,000.00
4,500,000.00
120,000.00
19,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Memasang Bekisting untuk Plat Atap
BAHAN
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Klas II
Plywood tebal 9mm
Dolken Kayu Galam diameter 8 - 10 cm / 4 m
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1,750,000.00
14,000.00
8,000.00
4,500,000.00
120,000.00
19,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
PEKERJAAN PENUTUP ATAP
Pemasangan Rangka Kuda-kuda Besi Profil
BAHAN
Besi Profil
Meni Besi
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

14,250.00
25,000.00
50,000.00
65,000.00
70,000.00
60,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pemasangan konstruksi Gording, Kayu Klas II
BAHAN
Kayu Klas I (Kamfer), balok
Besi Strip
Paku Biasa 2" - 5"
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

7,500,000.00
14,200.00
16,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II
BAHAN
Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm
Reng (2x3) cm
Paku Biasa 2" - 5"
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

7,500,000.00
7,500,000.00
16,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan

PEKERJAAN DINDING
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP
BAHAN
Bata Merah 5 x 11 x 22
600.00
Portland Semen
1,240.00
Pasir Pasang
210,000.00
TENAGA
Pekerja
50,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Tukang Batu
Kepala Tukang
Mandor

65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm
BAHAN
Portland Semen
Pasir Pasang
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

1,220.00
165,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Memasang Acian
BAHAN
portland semen

1,220.00
TENAGA

Pekerja
Tukang batu
Kepala tukang
mandor

50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
PEKERJAAN KUSEN DAN PINTU
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I
BAHAN
Kayu Klas I (Jati) , Balok
20,500,000.00
Paku Biasa 2" - 5 "
16,000.00
Lem Kayu
20,000.00
TENAGA
Pekerja
50,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Tukang Kayu
Kepala Tukang
Mandor

65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Klas I atau II
BAHAN
Kayu Klas II (Kamfer), papan
7,800,000.00
Lem Kayu
20,000.00
TENAGA
Pekerja
50,000.00
Tukang Kayu
65,000.00
Kepala Tukang
70,000.00
Mandor
60,000.00
Overhead dan Profit (10%)
Harga Satuan Pekerjaan
Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II
BAHAN
Kayu Klas II (Kamfer), papan
7,800,000.00
Lem Kayu
20,000.00
TENAGA
Pekerja
50,000.00
Tukang Kayu
65,000.00
Kepala Tukang
70,000.00
Mandor
60,000.00
Overhead dan Profit (10%)
Harga Satuan Pekerjaan
Pemasangan Kaca tebal 3 mm
BAHAN
Kaca tebal 5mm
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang

72,500.00
50,000.00
65,000.00
70,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Mandor

60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
PEKERJAAN LANTAI
Pemasang Lantai Keramik 20 x 20 cm
BAHAN
Ubin Keramik 20 x 20 cm
Portland Semen
Pasir pasang
Semen warna
TENAGA
Pekerja
Tukang batu
Kepala tukang
mandor

2,240.00
1,240.00
165,000.00
11,500.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pemasangan Dinding Keramik 20x20 cm,
BAHAN
Ubin Keramik 20 x 20 cm
Portland Semen
Pasir Pasang
Semen Warna
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

2,200.00
1,240.00
165,000.00
11,500.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pemasang Lantai Keramik 30 x 30 cm
BAHAN
Ubin Keramik 30 x 30 cm
Portland Semen

5,181.81
1,240.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Pasir Pasang
Semen Warna

165,000.00
11,500.00
TENAGA

Pekerja
Tukang batu
Kepala tukang
mandor

50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pemasangan Lantai Ubin Granito Uk. 40 x 40 cm
BAHAN
Ubin Granito 40 x 40 cm
Portland Semen
Pasir Pasang
Semen Warna
TENAGA
Pekerja
Tukang batu
Kepala tukang
mandor

68,333.33
1,240.00
165,000.00
11,500.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
PEKERJAAN LANGIT-LANGIT
Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm
BAHAN
Gypsum Board
62,000.00
Paku Sekrup
15,000.00
TENAGA
Pekerja
50,000.00
Tukang Kayu
65,000.00
Kepala Tukang
70,000.00
Mandor
60,000.00
Overhead dan Profit (10%)
Harga Satuan Pekerjaan

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

PEKERJAAN SANITASI DAN DRAINASE


Pemasangan Bak Kontrol Pas.Batu Bata
BAHAN
Batu Bata
Semen Portland
Pasir Pasang
Pasir Beton
Kerikil
Baja Tulangan
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

600.00
1,240.00
210,000.00
240,000.00
140,000.00
11,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pemasangan Pipa PVC tipe AW 4"
BAHAN
Pipa PVC 4"
Perlengkapan 35% x pipa
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

50,000.00
50,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pemasangan Pipa PVC tipe AW "
BAHAN
Pipa PVC "
Perlengkapan 35% x pipa
TENAGA
Pekerja
Tukang Batu
Kepala Tukang

6,500.00
6,500.00
50,000.00
65,000.00
70,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Mandor

60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pemasangan Kran " atau "
BAHAN
Kran Air
Sealtape
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

7,500.00
2,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Memasang Bak Mandi Batu Bata Vol. 0,30 m3
BAHAN
Batu Bata
Portland Semen
Pasir Pasang
Porselen 11 x 11 cm
Semen Nat
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

600.00
1,240.00
165,000.00
463.41
11,500.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Memasang Closet Duduk / Mono Blok
BAHAN
Kloset Duduk / Monoblok
Kelengkapan 6% dari harga Closet
TENAGA
Pekerja

900,000.00
900,000.00
50,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Tukang Batu
Kepala Tukang
Mandor

65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Memasang Wastafel
BAHAN
Wastafel
Perlengkapan 30% harga Wastafel
Portland Semen
Pasir pasang
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Overhead dan Profit (10%)
Harga Satuan Pekerjaan
PEKERJAAN KUNCI & KACA
Pemasangan Kunci Tanam Biasa
BAHAN
Kunci Tanam Biasa
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

450,000.00
450,000.00
1,240.00
165,000.00
50,000.00
65,000.00
70,000.00
60,000.00

135,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pemasangan Kunci Kamar Mandi
BAHAN
Kunci Tanam Kamar Mandi
TENAGA
Pekerja
Tukang Kayu

80,000.00
50,000.00
65,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Kepala Tukang
Mandor

70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pemasangan Engsel Pintu
BAHAN
Engsel pintu
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

5,000.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
Pemasangan Engsel Jendela
BAHAN
Engsel Jendela
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

2,250.00
50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan
PEKERJAAN PENGECATAN
Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
BAHAN
Cat Menie
21,000.00
Plamuur
25,000.00
Cat Dasar
36,500.00
Cat Penutup
52,000.00
Kuas
9,500.00
Pengencer
12,000.00
Amplas
3,500.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor

50,000.00
65,000.00
70,000.00
60,000.00

Overhead dan Profit (10%)


Harga Satuan Pekerjaan

Pengecatan tembok baru (1lap. Plamir, 1lap. Cat baru, 2lap. Cat Penutup)
BAHAN
Plamir
15,000.00
Cat Dasar
15,000.00
Cat Penutup 2 kali
20,000.00
TENAGA
Pekerja
50,000.00
Tukang Cat
65,000.00
Kepala Tukang
70,000.00
Mandor
60,000.00
Overhead dan Profit (10%)
Harga Satuan Pekerjaan
Pelaburan Bidang Kayu dengan Vernis
BAHAN
Vernis
Dempul
Ampelas
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Overhead dan Profit (10%)
Harga Satuan Pekerjaan

25,000.00
25,000.00
3,500.00
50,000.00
65,000.00
70,000.00
60,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

PEKERJAAN

ggal Type 25 Anggrek


UPAH KERJA

HARGA BAHAN

JUMLAH

(Rp)

(Rp)

(Rp)

5,000.00
3,000.00

5,000.00
3,000.00
8,000.00
800.00
8,800.00

32,300.00
945,000.00
4,200.00
12,810.00
6,600.00
12,000.00
75,000.00

32,300.00
945,000.00
4,200.00
12,810.00
6,600.00
12,000.00
75,000.00

130,000.00
50,000.00
14,000.00
3,000.00

130,000.00
50,000.00
14,000.00
3,000.00
1,284,910.00
128,491.00
1,413,401.00

23,750.00
3,050.00
60,000.00
1,100.00
2,160.00
324,000.00

23,750.00
3,050.00
60,000.00
1,100.00
2,160.00
324,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
840.00
9,000.00
13,000.00
20,000.00
1,400.00
1,200.00

840.00
9,000.00
13,000.00
20,000.00
1,400.00
1,200.00
459,500.00
45,950.00
505,450.00

54,000.00
280.00
37,100.00

54,000.00
280.00
37,100.00

6,500.00
5,000.00
700.00
300.00

6,500.00
5,000.00
700.00
300.00
103,880.00
10,388.00
114,268.00

45,000.00
2,700.00

45,000.00
2,700.00
47,700.00
4,770.00
52,470.00

52,500.00
4,020.00

52,500.00
4,020.00
56,520.00
5,652.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
62,172.00

156,000.00

156,000.00

15,000.00
600.00

15,000.00
600.00
171,600.00
17,160.00
188,760.00

15,000.00
900.00

15,000.00
900.00
15,900.00
1,590.00
17,490.00

17,500.00
1,340.00

17,500.00
1,340.00
18,840.00
1,884.00
20,724.00

MPa (K250), slum (122)cm, w/c = 0,56


476,160.00
118,629.56
200,101.01
2,150.00
82,500.00
17,875.00
1,960.00
4,980.00

476,160.00
118,629.56
200,101.01
2,150.00
82,500.00
17,875.00
1,960.00
4,980.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
904,355.57
90,435.56
994,791.13

136,500.00
2,400.00
3,500.00
4,550.00
490.00
240.00

3,500.00
4,550.00
490.00
240.00
147,680.00
14,768.00
162,448.00

70,000.00
4,200.00
3,600.00
26,000.00
16,900.00
1,820.00
1,560.00

70,000.00
4,200.00
3,600.00
26,000.00
16,900.00
1,820.00
1,560.00
124,080.00
12,408.00
136,488.00

240,000.00
112,840.00
122,640.00
75,000.00
48,750.00

136,500.00
2,400.00

240,000.00
112,840.00
122,640.00
75,000.00
48,750.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
5,250.00
4,500.00

5,250.00
4,500.00
608,980.00
60,898.00
669,878.00

0), slum (122)cm, w/c = 0,56


476,160.00
118,629.56
200,101.01
2,150.00
82,500.00
17,875.00
1,960.00
4,980.00

476,160.00
118,629.56
200,101.01
2,150.00
82,500.00
17,875.00
1,960.00
4,980.00
904,355.57
90,435.56
994,791.13

136,500.00
2,400.00
3,500.00
4,550.00
490.00
240.00

136,500.00
2,400.00
3,500.00
4,550.00
490.00
240.00
147,680.00
14,768.00
162,448.00

78,750.00
4,200.00
800.00

78,750.00
4,200.00
800.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
26,000.00
16,900.00
1,820.00
1,560.00

26,000.00
16,900.00
1,820.00
1,560.00
130,030.00
13,003.00
143,033.00

70,000.00
5,600.00
1,600.00
67,500.00
42,000.00
38,000.00
33,000.00
21,450.00
2,310.00
1,980.00

33,000.00
21,450.00
2,310.00
1,980.00
283,440.00
28,344.00
311,784.00

70,000.00
5,600.00
1,600.00
81,000.00
42,000.00
38,000.00
33,000.00
21,450.00
2,310.00
1,980.00

70,000.00
5,600.00
1,600.00
67,500.00
42,000.00
38,000.00

70,000.00
5,600.00
1,600.00
81,000.00
42,000.00
38,000.00
33,000.00
21,450.00
2,310.00
1,980.00
296,940.00
29,694.00
326,634.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

70,000.00
5,600.00
1,600.00
67,500.00
42,000.00
114,000.00
33,000.00
21,450.00
2,310.00
1,980.00

70,000.00
5,600.00
1,600.00
67,500.00
42,000.00
114,000.00
33,000.00
21,450.00
2,310.00
1,980.00
359,440.00
35,944.00
395,384.00

52,500.00
5,600.00
1,200.00
67,500.00
42,000.00
38,000.00
33,000.00
21,450.00
2,310.00
1,980.00

52,500.00
5,600.00
1,200.00
67,500.00
42,000.00
38,000.00
33,000.00
21,450.00
2,310.00
1,980.00
265,540.00
26,554.00
292,094.00

70,000.00
5,600.00

70,000.00
5,600.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
1,600.00
81,000.00
42,000.00
38,000.00
33,000.00
21,450.00
2,310.00
1,980.00

33,000.00
21,450.00
2,310.00
1,980.00
296,940.00
29,694.00
326,634.00

70,000.00
5,600.00
1,600.00
67,500.00
42,000.00
114,000.00
33,000.00
21,450.00
2,310.00
1,980.00

70,000.00
5,600.00
1,600.00
67,500.00
42,000.00
114,000.00
33,000.00
21,450.00
2,310.00
1,980.00
359,440.00
35,944.00
395,384.00

16,387.50
1,500.00
3,000.00
3,900.00
420.00
180.00

1,600.00
81,000.00
42,000.00
38,000.00

16,387.50
1,500.00
3,000.00
3,900.00
420.00
180.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
25,387.50
2,538.75
27,926.25

8,250,000.00
213,000.00
48,000.00
120,000.00
468,000.00
50,400.00
7,200.00

8,250,000.00
213,000.00
48,000.00
120,000.00
468,000.00
50,400.00
7,200.00
9,156,600.00
915,660.00
10,072,260.00

105,000.00
27,000.00
4,000.00
5,000.00
6,500.00
700.00
300.00

105,000.00
27,000.00
4,000.00
5,000.00
6,500.00
700.00
300.00
148,500.00
14,850.00
163,350.00

)cm Tebal 1/2 Bata Camp. 1SP : 3PP


42,000.00
17,818.80
8,400.00
15,000.00

42,000.00
17,818.80
8,400.00
15,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
6,500.00
700.00
900.00

6,500.00
700.00
900.00
91,318.80
9,131.88
100,450.68

9,486.72
3,795.00
15,000.00
9,750.00
1,050.00
900.00

15,000.00
9,750.00
1,050.00
900.00
39,981.72
3,998.17
43,979.89

3,965.00
10,000.00
6,500.00
700.00
600.00

3,965.00
10,000.00
6,500.00
700.00
600.00
21,765.00
2,176.50
23,941.50

22,550,000.00
20,000.00
20,000.00
350,000.00

9,486.72
3,795.00

22,550,000.00
20,000.00
20,000.00
350,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
1,365,000.00
147,000.00
21,000.00

1,365,000.00
147,000.00
21,000.00
24,473,000.00
2,447,300.00
26,920,300.00

187,200.00
6,000.00
40,000.00
156,000.00
16,800.00
2,400.00

40,000.00
156,000.00
16,800.00
2,400.00
408,400.00
40,840.00
449,240.00

312,000.00
1,000.00
50,000.00
195,000.00
21,000.00
3,000.00

312,000.00
1,000.00
50,000.00
195,000.00
21,000.00
3,000.00
582,000.00
58,200.00
640,200.00

79,750.00
750.00
9,750.00
1,050.00

187,200.00
6,000.00

79,750.00
750.00
9,750.00
1,050.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
45.00

45.00
91,345.00
9,134.50
100,479.50

59,360.00
12,896.00
7,425.00
18,630.00
35,000.00
22,750.00
2,450.00
2,100.00

59,360.00
12,896.00
7,425.00
18,630.00
35,000.00
22,750.00
2,450.00
2,100.00
160,611.00
16,061.10
176,672.10

57,200.00
11,532.00
2,970.00
22,310.00
45,000.00
29,250.00
3,150.00
2,700.00

57,200.00
11,532.00
2,970.00
22,310.00
45,000.00
29,250.00
3,150.00
2,700.00
174,112.00
17,411.20
191,523.20

61,508.08
12,400.00

61,508.08
12,400.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
7,425.00
17,250.00

35,000.00
22,750.00
2,450.00
2,100.00

35,000.00
22,750.00
2,450.00
2,100.00
160,883.08
16,088.31
176,971.39

453,049.98
12,152.00
7,425.00
14,950.00
12,500.00
8,125.00
910.00
780.00

453,049.98
12,152.00
7,425.00
14,950.00
12,500.00
8,125.00
910.00
780.00
509,891.98
50,989.20
560,881.18

22,568.00
1,650.00
5,000.00
3,250.00
350.00
300.00

7,425.00
17,250.00

22,568.00
1,650.00
5,000.00
3,250.00
350.00
300.00
33,118.00
3,311.80
36,429.80

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

42,000.00
95,480.00
27,300.00
21,600.00
2,800.00
17,600.00
160,000.00
74,750.00
770.00
960.00

160,000.00
74,750.00
770.00
960.00
443,260.00
44,326.00
487,586.00

60,000.00
17,500.00
1,800.00
3,900.00
420.00
120.00

60,000.00
17,500.00
1,800.00
3,900.00
420.00
120.00
83,740.00
8,374.00
92,114.00

7,800.00
2,275.00
1,800.00
3,900.00
420.00

42,000.00
95,480.00
27,300.00
21,600.00
2,800.00
17,600.00

7,800.00
2,275.00
1,800.00
3,900.00
420.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
120.00

120.00
16,315.00
1,631.50
17,946.50

7,500.00
5.00
500.00
26,000.00
2,800.00
300.00

500.00
26,000.00
2,800.00
300.00
37,105.00
3,710.50
40,815.50

90,000.00
148,800.00
49,500.00
166,827.60
69,000.00
300,000.00
195,000.00
21,000.00
1,800.00

90,000.00
148,800.00
49,500.00
166,827.60
69,000.00
300,000.00
195,000.00
21,000.00
1,800.00
1,041,927.60
104,192.76
1,146,120.36

900,000.00
54,000.00
165,000.00

7,500.00
5.00

900,000.00
54,000.00
165,000.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
97,500.00
70.00
9,600.00

97,500.00
70.00
9,600.00
1,226,170.00
122,617.00
1,348,787.00

450,000.00
135,000.00
7,440.00
1,650.00
60,000.00
9,425.00
10,500.00
6,000.00

60,000.00
9,425.00
10,500.00
6,000.00
680,015.00
68,001.50
748,016.50

135,000.00
500.00
32,500.00
700.00
300.00

135,000.00
500.00
32,500.00
700.00
300.00
169,000.00
16,900.00
185,900.00

80,000.00
250.00
32,500.00

450,000.00
135,000.00
7,440.00
1,650.00

80,000.00
250.00
32,500.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com
350.00
150.00

350.00
150.00
113,250.00
11,325.00
124,575.00

5,000.00
750.00
9,750.00
1,050.00
450.00

5,000.00
750.00
9,750.00
1,050.00
450.00
17,000.00
1,700.00
18,700.00

2,250.00
500.00
6,500.00
700.00
300.00

2,250.00
500.00
6,500.00
700.00
300.00
10,250.00
1,025.00
11,275.00

at dasar, 2 Lp Cat Penutup)


4,200.00
3,750.00
6,205.00
13,520.00
95.00
360.00
700.00

4,200.00
3,750.00
6,205.00
13,520.00
95.00
360.00
700.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

3,500.00
585.00
420.00
180.00

3,500.00
585.00
420.00
180.00
33,515.00
3,351.50
36,866.50

aru, 2lap. Cat Penutup)


1,500.00
1,500.00
5,200.00
1,000.00
4,095.00
441.00
180.00

1,000.00
4,095.00
441.00
180.00
13,916.00
1,391.60
15,307.60

3,750.00
1,250.00
350.00
8,000.00
10,400.00
1,120.00
180.00

1,500.00
1,500.00
5,200.00

3,750.00
1,250.00
350.00
8,000.00
10,400.00
1,120.00
180.00
25,050.00
2,505.00
27,555.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-Semarang


50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

RENCANA ANGGARAN BIAYA


Pembangunan Rumah Tinggal Type 25 Anggrek
NO.
Uraian Pekerjaan
1. Pekerjaan Persiapan
1.1 Pembersihan Lokasi
1.2 Pembuatan Pagar Sementara
1.3 Pemasangan Bowplank
1.4 Air kerja
1.5 Listrik kerja
1.6 Direksi Keet
1.7 Pembuatan Papan Nama Proyek
2

Pekerjaan Tanah
2.1 Galian Tanah
2.1.1 Pondasi Foot Plate (3 m)
2.1.1 Pondasi Batu Kali (2 m)
2.2 Urugan Pasir
2.2.1 Urugan Pasir
2.3 Urugan Tanah Kembali
2.3.1 Pondasi Foot Plate
2.3.2 Pondasi Batu Kali
Pekerjaan Pasangan Pondasi
3.1 Pondasi Foot Plate
3.1.1 Penulangan Foot Plate
3.1.2 Bekisting Foot Plate
3.1.3 Pengecoran Foot Plate
3.2 Pondasi Batu Kali
3.2.1 Pondasi Batu Kali 1Pc : 8 PP
Pekerjaan Struktur
4.1 Pengecoran Beton
4.1.1 Sloof
4.1.2 Kolom Lantai 1
4.1.3 Balok
4.1.4 Plat Lantai
4.1.5 Tangga
4.1.6 Kolom Lantai 2
4.1.7 Ring Balk
4.1.8 Plat Atap

Volume

Satuan

642.675
103.500
92.470
1.000
1.000
9.000
1.000

m2
m'
m'
Ls
Ls
m2
Ls

131.044
74.025

m3
m3

11.120

m3

50.380
41.543

m3
m3

76.342
60.540
6.684

kg
m2
m3

65.810

m3

2.941
4.342
6.415
18.803
0.810
5.106
2.530
7.778

m3
m3
m3
m3
m3
m3
m3
m3

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-Semarang


50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

4.2

4.3

Penulangan Beton
4.2.1 Sloof
4.2.2 Kolom Lantai 1
4.2.3 Balok
4.2.4 Plat Lantai
4.2.5 Tangga
4.2.6 Kolom Lantai 2
4.2.7 Ring Balk
4.2.8 Plat Atap

346.894
1417.296
1411.321
876.821
63.803
1533.934
239.319
363.533

kg
kg
kg
kg
kg
kg
kg
kg

Bekisting Beton
4.3.1 Sloof
4.3.2 Kolom Lantai 1
4.3.3 Balok
4.3.4 Plat Lantai
4.3.5 Tangga
4.3.6 Kolom Lantai 2
4.3.7 Ring Balk
4.3.8 Plat Atap

39.800
100.500
107.210
157.625
13.142
119.330
51.210
65.203

m2
m2
m2
m2
m2
m2
m2
m2

308.807
354.897
783.997
890.760
710.154
733.592
68.100

m2
m2
m2
m2
m2
m2
m2

Pekerjaan Dinding
5.1 Pasangan Bata Camp 1 : 3 Lt.1
5.2 Pasangan Bata Camp 1 : 3 Lt.2
5.3 Pemasangan Plesteran 1 : 3 Lt 1
5.4 Pemasangan Plesteran 1 : 3 Lt 2
5.5 Acian Lt. 1
5.6 Acian Lt. 2
5.7 Pemasangan Dinding Keramik 20x20
Pekerjaan Kusen dan Pintu
6.1 Pekerjaan Kusen Pintu dan Jendela
6.1.1 Kusen Kayu Jati
6.2 Pekerjaan Daun Pintu & Jendela Kaca
6.2.1 Pekerjaan Daun Pintu
6.2.1.1 Pintu Kayu Kamfer
6.2.1.2 Pintu Garasi
6.2.1.3 Pintu Panel
6.2.2 Jendela Kaca
6.3 Pekerjaan Kaca

2.000

m3

50.382
39.538
1.000
4.944
5.900
25.978

m2
m2
unit
m2
m2
m2

Pekerjaan Kunci dan Penggantung


7.1 Kunci Tanam Biasa

15.000

bh

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-Semarang


50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

7.2 Kunci Kamar Mandi


7.3 Engsel Pintu
7.4 Engsel Jendela

5.000
57.000
24.000

bh
bh
bh

594.360
5.613
133.650

m2
m3
m2

1.000

Ls

10 Pekerjaan Plafond
10.1 Pemasangan Langit-langit Gypsum

133.650

m2

11 Pekerjaan Sanitasi dan Drainase


11.1 Septictank
11.2 Sumur resapan dan Rembesan
11.3 Bak Kontrol Pas Batu Bata
11.4 Pipa PVC tipe AW "
11.5 Pipa PVC tipe AW 4 "
11.6 Keran Air
11.7 Bak Mandi Batu Bata vol 0.3 m3
11.8 Closet Duduk
11.9 Wastafel
11.10 Pompa Air Listrik Simizu 100 watt

1.000
1.000
1.000
89.600
20.200
5.000
3.000
5.000
2.000
1.000

buah
buah
buah
m'
m'
buah
unit
unit
unit
buah

12 Pekerjaan Penutup Lantai


12.1 P. Lantai Keramik 20 x 20 cm
12.2 P. Lantai Keramik 30 x 30 cm
12.2 P. Lantai Ubin Granito 40 x 40 cm

23.450
53.674
231.475

m2
m2
m2

13 Pekerjaan Pengecatan
13.1 Pengecatan Tembok
13.2 Pengecatan Kayu
13.3 Pelaburan bidang kayu

595.604
52.382
26.666

m2
m2
m2

Pekerjaan Penutup Atap


8.1 Memasang Rangka k-k Profil
8.2 Pemasangan Konstruksi Gording
8.3 Pemasangan Ranka Atap Genteng
Pekerjaan Instalasi
9.1 Pekerjaan Listrik

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-Semarang


50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Fitting Lampu
Fitting Lampu panjang
Lampu downlight
Lampu philips
Lampu gantung
Lampu TL inbow
Lampu Taman
Box seksering
Box MCB
Saklar tunggal
Saklar ganda
Stop kontak
Mesin pompa
Kabel

56
2
27
22
3
2
4
1
1
12
17
24
1
256

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-Semarang


50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-Semarang


50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

N BIAYA

Type 25 Anggrek
Harga Satuan (Rp)
8,800.00
505,450.00
114,268.00
6,000,000.00
4,000,000.00
1,413,401.00
1,000,000.00

62,172.00
52,470.00
188,760.00
17,490.00
20,724.00

Jumlah (Rp)
92,256,585.96
5,655,540.00
52,314,075.00
10,566,361.96
6,000,000.00
4,000,000.00
12,720,609.00
1,000,000.00
15,872,453.85
12,031,359.32
8,147,267.57
3,884,091.75
2,099,011.20
2,099,011.20
1,742,083.33
881,146.20
860,937.13

669,878.00

71,396,070.96
27,311,399.78
12,401,653.95
8,260,561.92
6,649,183.91
44,084,671.18
44,084,671.18

994,791.13
994,791.13
994,791.13
994,791.13
994,791.13
994,791.13
994,791.13
994,791.13

367,967,522.57
48,471,197.81
2,925,680.71
4,319,383.09
6,381,585.10
18,705,057.62
805,780.82
5,079,403.51
2,516,821.56
7,737,485.41

162,448.00
136,448.00
994,791.13

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-Semarang


50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

162,448.00
162,448.00
162,448.00
162,448.00
162,448.00
162,448.00
162,448.00
162,448.00

101,577,451.06
5,635,223.65
23,023,690.06
22,926,627.38
14,243,781.78
1,036,466.97
24,918,451.04
3,887,689.29
5,905,520.88

143,033.00
311,784.00
326,634.00
395,384.00
292,094.00
311,784.00
326,634.00
395,384.00

217,918,873.70
5,692,713.40
31,334,292.00
35,018,431.14
62,322,403.00
3,838,699.35
37,205,184.72
16,726,927.14
25,780,222.95

100,450.68
100,450.68
43,979.89
43,979.89
23,941.50
23,941.50
191,523.20

187,933,277.55
31,019,873.14
35,649,644.98
34,480,079.83
39,175,504.83
17,002,151.99
17,563,292.87
13,042,729.92

449,240.00
3,000,000.00
640,200.00
449,240.00
100,479.50

83,028,572.37
53,840,600.00
53,840,600.00
26,577,715.92
23,927,199.92
17,762,051.12
3,000,000.00
3,165,148.80
2,650,516.00
2,610,256.45

185,900.00

4,747,875.00
2,788,500.00

26,920,300.00

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-Semarang


50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

124,575.00
18,700.00
11,275.00

622,875.00
1,065,900.00
270,600.00

27,929.25
10,072,260.00
163,350.00

94,967,351.91
16,600,029.03
56,535,595.38
21,831,727.50

10,000,000.00

10,000,000.00
10,000,000.00

36,429.80

4,868,842.77
4,868,842.77

3,000,000.00
4,000,000.00
487,586.00
17,946.50
92,114.00
40,815.50
1,146,120.36
1,348,787.00
748,016.50
380,000.00

23,218,701.78
3,000,000.00
4,000,000.00
487,586.00
1,608,006.40
1,860,702.80
204,077.50
3,438,361.08
6,743,935.00
1,496,033.00
380,000.00

176,672.10
176,971.39
560,881.18

143,471,325.35
4,142,960.75
9,498,673.90
129,829,690.70

15,307.60
36,866.50
27,555.00

11,783,190.42
9,117,267.79
1,931,141.00
734,781.63

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-Semarang


50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

9000
14500
30000
40000
50000
40000
100000
360000
500000
12000
20000
15000
700000
15200

504000
29000
810000
880000
150000
80000
400000
360000
500000
144000
340000
360000
700000
3891200
9148200

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-Semarang


50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-Semarang


50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

REKAPITULASI RENCANA ANGGARAN BIAYA


Pembangunan Rumah Tinggal Type 25 Anggrek
NO.
Uraian Pekerjaan
1 Pekerjaan Persiapan

Jumlah (Rp)
92,256,585.96

Pekerjaan Tanah

15,872,453.85

Pekerjaan Pasangan Pondasi

71,396,070.96

Pekerjaan Struktur

367,967,522.57

Pekerjaan Dinding

187,933,277.55

Pekerjaan Kusen dan Pintu

Pekerjaan Kunci dan Penggantung

Pekerjaan Penutup Atap

94,967,351.91

Pekerjaan Instalasi

10,000,000.00

10

Pekerjaan Plafond

4,868,842.77

11

Pekerjaan Sanitasi dan Drainase

11

Pekerjaan Penutup Lantai

12

Pekerjaan Pengecataan

83,028,572.37
4,747,875.00

23,218,701.78
143,471,325.35
11,783,190.42

JUMLAH
PPN 10%
JUMLAH
DIBULATKAN
TERBILANG

SATU MILYAR DUA RATUS DUA PULUH


ENAM RATUS ENAM PULUH RIBU R

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-Semarang


50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

AN BIAYA

ggrek

1,111,511,770.49
111,151,177.05
1,222,662,947.54
1,222,660,000.00

DUA RATUS DUA PULUH DUA JUTA


US ENAM PULUH RIBU RUPIAH

PROSENTASE BOBOT PEKERJAAN


Pembangunan Rumah Tinggal Type 25 Anggrek
NO.

URAIAN PEKERJAAN

I.
1

PEKERJAAN PERSIAPAN
Pembersihan Lokasi

Pembuatan Pagar Sementara

Pemasangan Bowplank

Air kerja

Listrik kerja

Direksi Keet

Pembuatan Papan Nama Proyek

II.
1

PEKERJAAN TANAH
Galian tanah 3 m

Galian tanah 2 m

Urugan Pasir

Urugan Tanah Kembali 3 m

Urugan Tanah Kembali 2 m

III.
1

PEKERJAAN PONDASI
Penulangan Foot Plate

Bekisting Foot Plate

Pengecoran Foot Plate

Pondasi Batu Kali

IV.
1

PEKERJAAN STRUKTUR
Pengecoran Sloof

Pengecoran Kolom Lt.1

Pengecoran Balok

PROSENTASE BOBOT PEKERJAAN ( % )


5,655,540.00
1,111,511,770.49
52,314,075.00
1,111,511,770.49
10,566,361.96
1,111,511,770.49
6,000,000.00
1,111,511,770.49
4,000,000.00
1,111,511,770.49
12,720,609.00
1,111,511,770.49
1,000,000.00
1,111,511,770.49

100

100

100

100

100

100

100

8,147,267.57
1,111,511,770.49
3,884,091.75
1,111,511,770.49
2,099,011.20
1,111,511,770.49
881,146.20
1,111,511,770.49
860,937.13
1,111,511,770.49

100

100

100

100

100

12,401,653.95
1,111,511,770.49
8,260,561.92
1,111,511,770.49
6,649,183.91
1,111,511,770.49
44,084,671.18
1,111,511,770.49

100

100

100

100

2,925,680.71
1,111,511,770.49
4,319,383.09
1,111,511,770.49
6,381,585.10

100

100

100

Pengecoran Plat Lantai

Pengecoran Tangga

Pengecoran Kolom Lt.2

Pengecoran Ring Balk

Pengecoran Plat Atap

Penulangan Sloof

10

Penulangan Kolom Lt. 1

11

Penulangan Balok

12

Penulangan Plat Lantai

13

Penulangan Tangga

14

Penulangan Kolom Lt. 2

15

Penulangan Ring Balk

16

Penulangan Plat Atap

17

Bekisting Sloof

18

Bekisting Kolom Lt. 1

19

Bekisting Balok

20

Bekisting Plat Lantai

21

Bekisting Tangga

22

Bekisting Kolom Lt. 2

23

Bekisting Ring Balk

24

Bekisting Plat Atap

V.
1

PEKERJAAN DINDING
Pasangan Bata Camp 1:3 Lt.1

1,111,511,770.49
18,705,057.62
1,111,511,770.49
805,780.82
1,111,511,770.49
5,079,403.51
1,111,511,770.49
2,516,821.56
1,111,511,770.49
7,737,485.41
1,111,511,770.49
5,635,223.65
1,111,511,770.49
23,023,690.06
1,111,511,770.49
22,926,627.38
1,111,511,770.49
14,243,781.78
1,111,511,770.49
1,036,466.97
1,111,511,770.49
24,918,451.04
1,111,511,770.49
3,887,689.29
1,111,511,770.49
5,905,520.88
1,111,511,770.49
5,692,713.40
1,111,511,770.49
31,334,292.00
1,111,511,770.49
35,018,431.14
1,111,511,770.49
62,322,403.00
1,111,511,770.49
3,838,699.35
1,111,511,770.49
37,205,184.72
1,111,511,770.49
16,726,927.14
1,111,511,770.49
25,780,222.95
1,111,511,770.49
31,019,873.14
1,111,511,770.49

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

Pasangan Bata Camp 1:3 Lt.2

Pemasangan Plesteran 1:3 Lt.1

Pemasangan Plesteran 1:3 Lt.2

Acian Lt.1

Acian Lt.2

Pemasangan Dinding Keramik 20x20

VI.
1

PEKERJAAN KUSEN DAN PINTU


Kusen Kayu Jati

Pintu Kayu Kamfer

Pintu Garasi

Pintu Panel

Jendela Kaca

Pekerjaan Kaca

VII.
1

PEKERJAAN KUNCI DAN PENGGANTUNG


Kunci Tanam Biasa

Kunci Kamar Mandi

Engsel Pintu

Engsel Jendela

VIII.
1

PEKERJAAN PENUTUP ATAP


Memasang Rangka k-k Profil

Pemasangan Konstruksi Gording

Pemasangan Rangka Atap Genteng

IX.
1

PEKERJAAN INSTALASI
Pekerjaan Listrik

X.
1

PEKERJAAN PLAFOND
Pemasangan Langit-Langit Gypsum

35,649,644.98
1,111,511,770.49
34,480,079.83
1,111,511,770.49
39,175,504.83
1,111,511,770.49
17,002,151.99
1,111,511,770.49
17,563,292.87
1,111,511,770.49
13,042,729.92
1,111,511,770.49

100

100

100

100

100

100

53,840,600.00
1,111,511,770.49
17,762,051.12
1,111,511,770.49
3,000,000.00
1,111,511,770.49
3,165,148.80
1,111,511,770.49
2,650,516.00
1,111,511,770.49
2,610,256.45
1,111,511,770.49

100

100

100

100

100

100

2,788,500.00
1,111,511,770.49
622,875.00
1,111,511,770.49
1,065,900.00
1,111,511,770.49
270,600.00
1,111,511,770.49

100

100

100

100

16,600,029.03
1,111,511,770.49
56,535,595.38
1,111,511,770.49
21,831,727.50
1,111,511,770.49

100

100

100

10,000,000.00
1,111,511,770.49

100

4,868,842.77

100

1,111,511,770.49
IX.
1

PEKERJAAN SANITASI
Septictank

Sumur Resapan dan Rembesan

Bak Kontrol Pas Batu Bata

Pipa PVC tipe AW "

Pipa PVC tipe AW 4 "

Keran Air

Bak Mandi Batu Bata vol 0.3 m3

Closet Duduk

Wastafel

10

Pompa Air Listrik Simizu 100 watt

XI
1

PEKERJAAN PENUTUP LANTAI


P. Lantai Keramik 20 x 20 cm

P. Lantai Keramik 30 x 30 cm

P. Lantai Ubin Granito 40 x 40 cm

XI
1

PEKERJAAN PENGECATAN
Pengecatan Tembok

Pengecatan Kayu

Pelaburan Bidang Kayu


TOTAL KESELURUHAN

3,000,000.00
1,111,511,770.49
4,000,000.00
1,111,511,770.49
487,586.00
1,111,511,770.49
1,608,006.40
1,111,511,770.49
1,860,702.80
1,111,511,770.49
204,077.50
1,111,511,770.49
3,438,361.08
1,111,511,770.49
6,743,935.00
1,111,511,770.49
1,496,033.00
1,111,511,770.49
380,000.00
1,111,511,770.49

100

100

100

100

100

100

100

100

100

100

4,142,960.75
1,111,511,770.49
9,498,673.90
1,111,511,770.49
129,829,690.70
1,111,511,770.49

100

100

100

9,117,267.79
1,111,511,770.49
1,931,141.00
1,111,511,770.49
734,781.63
1,111,511,770.49

100

100

100

BOBOT %
0.509
4.707
0.951
0.540
0.360
1.144
0.090

0.733
0.349
0.189
0.079
0.077

1.116
0.743
0.598
3.966

0.263
0.389
0.574

1.683
0.072
0.457
0.226
0.696
0.507
2.071
2.063
1.281
0.093
2.242
0.350
0.531
0.512
2.819
3.151
5.607
0.345
3.347
1.505
2.319

2.791

3.207
3.102
3.525
1.530
1.580
1.173

4.844
1.598
0.270
0.285
0.238
0.235

0.251
0.056
0.096
0.024

1.493
5.086
1.964

0.900

0.438

0.270
0.360
0.044
0.145
0.167
0.018
0.309
0.607
0.135
0.034

0.373
0.855
11.680

0.820
0.174
0.066
100.000

PERHITUNGAN JUMLAH TENAGA KERJA


PROYEK

: PEMBANGUNAN GEDUNG CONTROL ROOM OFFICE KM 30

NO.
I.

URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
Membersihkan Lapangan dan Perataan
0.1
0.05

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

OH
OH
OH
OH

OH

90.000

Pekerja

Total
(Orang)
7

10

6
1.80
3.60
0.18
0.18

4
1.73
1.73
0.17
0.09

1.000
15.000

Ls
m

154
3

1
16
10.00
5.00
1.00
0.25

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

PEKERJAAN TANAH
Galian Tanah biasa sedalam 3m
1.05

10

Tukang kayu
Pekerja
Kepala tukang
Mandor

Mobilisasi dan Demobilisasi Alat


Administrasi Proyek dan Dokumentasi
II.

Jumlah
Pekerja

4.50
2.25

69.000

Penyiapan Air Bersih dan Listrik Kerja


Direksi Keet
2
1
0.2
0.05

Durasi
(Hari)

Tukang kayu
Pekerja
Kepala tukang
Mandor

Pemasangan Bouwplank
0.1
0.1
0.01
0.005

450.000

Satuan

Pekerja
Mandor

Pagar sementara dari seng gelombang per 1m dan Papan Proyek


0.2
0.4
0.02
0.02

Volume

1.000
1.000

Ls
Ls

154
154

226.258

24

1
1

11
9.90

0.067

OH

Mandor

OH
OH

Pekerja
Mandor

Urugan Pasir
0.3
0.01

7.734

Urugan Tanah Kembali 3 m


0.35
0.0223

III.

OH
OH

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

1.5
0.75

OH
OH

6.516

7
5.38
0.90
0.09
0.27

2461.550

kg

9
4.31
4.31
0.43
0.25

17
11
5
1
1

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

9.298

19
15.34
2.56
0.26
0.77

Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang batu

18
16.85
1.07

61.303

Pondasi Batu Kali 1 Pc : 4 PP

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Pengecoran Pondasi Foot Plate beton bertulang K300


1.65
0.275
0.028
0.083

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Bekisting Pondasi Foot Plate


0.52
0.26
0.026
0.026

Pekerja
Mandor

Pembesian Pondasi Foot Plate


0.07
0.07
0.007
0.004

2.32
0.08
144.456

PEKERJAAN PONDASI
Pekerjaan Pembuatan Lantai Kerja
1.65
0.275
0.028
0.083

0.63

65.198

10

16
9.78
4.89

0.075
0.075

IV.
IV.1

OH
OH

PEKERJAAN STRUKTUR BETON


Pengecoran Sloof K300
1.65
0.275
0.028
0.083

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

8
6.69
1.11
0.11
0.34

6
4.48
0.75
0.08
0.23

9.945

20
16.41
2.73
0.28
0.83

0.033

1
0.05
0.01
0.00
0.00

Pekerja
Tukang batu
Kepala tukang
Mandor
Pekerja
Tukang batu

Pekerja
Tukang batu
Kepala tukang
Mandor

Pengecoran Kolom Lantai 2 K300


1.65
0.275

4.054

Pekerja
Tukang batu
Kepala tukang
Mandor

Pengecoran Tangga K300


1.65
0.275
0.028
0.083

1
6.59
1.10
0.11
0.33

2.716

Pengecoran Plat Lantai K300


1.65
0.275
0.028
0.083

Pekerja
Tukang batu
Kepala tukang
Mandor

Pengecoran Balok K300


1.65
0.275
0.028
0.083

3.996

Pekerja
Tukang batu
Kepala tukang
Mandor

Pengecoran Kolom Lantai 1 K300


1.65
0.275
0.028
0.083

0.49
0.49

Kepala tukang
Mandor

4.528

9
7.47
1.25

0.028
0.083

OH
OH

Pengecoran Ring Balk K300


1.65
0.275
0.028
0.083

IV.2

OH
OH
OH
OH

2.345

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

0.07
0.07
0.007

OH
OH
OH

1447.594

kg

11
5.07
5.07
0.51
0.29

kg

20
9.38
9.38
0.94
0.54

Pekerja
Tukang Besi
Kepala Tukang
Mandor

588.967

kg

4
2.06
2.06
0.21
0.12

Pekerja
Tukang Besi
Kepala Tukang
Mandor
Pekerja
Tukang Besi
Kepala Tukang

6
2.94
2.94
0.29
0.17

1340.493

Penulangan Tangga per 10kg

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Penulangan Plat lantai per 10kg


0.07
0.07
0.007
0.004

kg

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Penulangan Balok per 10kg


0.07
0.07
0.007
0.004

1
3.87
0.64
0.07
0.19

419.786

Penulangan Kolom Lantai 1 per 10kg


0.07
0.07
0.007
0.004

Pekerja
Tukang batu
Kepala tukang
Mandor

Penulangan Sloof per 10kg


0.07
0.07
0.007
0.004

0.13
0.38

Kepala tukang
Mandor

191.406

kg

3
1.34
1.34
0.13

0.004

OH

Penulangan Kolom Lantai 2 per 10kg


0.07
0.07
0.007
0.004

OH
OH
OH
OH

IV.3

OH
OH
OH
OH

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.66
0.33
0.033
0.033

Bekisting Tangga

OH
OH
OH
OH

kg

15
9.36
4.68
0.47
0.47

32
20.17
10.08
1.01
1.01

49.665

Bekisting Plat lantai

14

2.99
2.99
0.30
0.17

91.676

Bekisting Balok
0.66
0.33
0.033
0.033

427.758

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bekisting Kolom Lantai 1


0.66
0.33
0.033
0.033

2
6.28
6.28
0.63
0.36

54.000
OH
OH
OH
OH

kg

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Bekisting Sloof
0.52
0.26
0.026
0.026

1794.513

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Penulangan Ring Balk per 10kg


0.07
0.07
0.007
0.004

0.08

Mandor

52
32.78
16.39
1.64
1.64

83.500

44
27.56
13.78
1.38
1.38

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

14.646

0.66
0.33

OH
OH

Pekerja
Tukang batu

0.033
0.033

OH
OH

Kepala tukang
Mandor

Bekisting Kolom Lantai 2 per m2


0.66
0.33
0.033
0.033

OH
OH
OH
OH

V.

OH
OH
OH
OH

99.628

44.000

46
29.04
14.52
1.45
1.45

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN DINDING
Memasang Pas. Batu bata Camp 1 : 3 Lt. 1 per m2
0.3
OH
Pekerja
0.1
OH
Tukang batu
0.01
OH
Kepala tukang
0.015
OH
Mandor
Memasang Pas. Batu bata Camp 1 : 3 Lt. 2 per m2
0.3
OH
Pekerja
0.1
OH
Tukang batu
0.01
OH
Kepala tukang
0.015
OH
Mandor
Memasang Plesteran 1: 3 Lt. 1 per m2
0.3
OH
Pekerja
0.15
OH
Tukang batu
0.015
OH
Kepala tukang
0.015
OH
Mandor
Memasang Plesteran 1 : 3 Lt. 2 per m2

53
32.88
16.44
1.64
1.64

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bekisting Ring Balk per m2


0.66
0.33
0.033
0.033

3.22
1.61
0.16
0.16

213.074

15
10.65
3.55
0.36
0.53

201.194

11
7.54
2.51
0.25
0.38

542.648

52
32.56
16.28
1.63
1.63

502.388

40

0.3
OH
Pekerja
0.15
OH
Tukang batu
0.015
OH
Kepala tukang
0.015
OH
Mandor
Memasang Acian Lt. 1 per m2
0.20
0.10
0.010
0.010

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

0.25
0.125
0.013
0.013

VII.

OH
OH
OH
OH

402.388

14.000

5
3.27
1.63
0.16
0.16

64.500

24
15.05
7.53
0.75
0.75

119.875

16
9.99
4.99
0.52
0.52

Pekerja
Tukang Batu
Kepala Tukang
Pekerja

PEKERJAAN KUSEN
Pemasangan Kusen Pintu dan Jendela Kayu

21
13.41
6.71
0.67
0.67

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Pemasangan Lantai Keramik 40 x 40 cm

27
17.05
8.52
0.85
0.85

Pekerja
Tukang Batu
Kepala Tukang
Pekerja

Pemasangan Lantai Keramik 30 x 30 cm


0.7
0.35
0.035
0.035

Pekerja
Tukang batu
Kepala tukang
Mandor

Pemasangan Lantai Keramik 20 x 20 cm


0.7
0.35
0.035
0.035

426.148

Pekerja
Tukang batu
Kepala tukang
Mandor

Memasang Acian Lt. 2 per m2


0.20
0.10
0.010
0.010

25.12
12.56
1.26
1.26

7.645

22

OH

Pekerja

18

OH

Tukang Kayu

1.8

OH

Kepala Tukang

0.3

OH

Mandor

Pemasangan Daun Pintu Kayu


1

OH

Pekerja

OH

Tukang Kayu

0.3

OH

Kepala Tukang

0.05

OH

Mandor

Pemasangan Kaca

5.10
15.29
1.53
0.25
47.326

0.015

Pekerja

0.15

OH

Tukang Kayu

0.015

OH

Kepala Tukang

0.00075

OH

Mandor

Pemasangan Kunci Tanam Biasa


0.01

OH

Pekerja

0.5

OH

Tukang Kayu

0.01

OH

Kepala Tukang

0.005

OH

Mandor

Pemasangan Kunci Tanam Kamar Mandi


0.005

OH

Pekerja

0.5

OH

Tukang Kayu

0.005

OH

Kepala Tukang

0.0025

OH

Mandor

Pemasangan Engsel Pintu


OH

Pekerja

0.15

OH

Tukang Kayu

0.015

OH

Kepala Tukang

0.0075

OH

Mandor

Pemasangan Engsel Jendela

11.000

OH

Pekerja

0.1

OH

Tukang Kayu

6
0.11
5.50
0.11
0.06

4.000

2
0.02
2.00
0.02
0.01

10
0.77
7.65
0.77
0.38

34.000

0.01

2
0.05
0.54
0.05
0.00

51.000

0.015

41
9.47
28.40
2.84
0.47

7.183
OH

4
0.34
3.40

0.01

OH

Kepala Tukang

0.005

OH

Mandor

Pemasangan Kunci Selot

V.

OH

Pekerja

0.2

OH

Tukang Kayu

0.02

OH

Kepala Tukang

0.001

OH

Mandor

PEKERJAAN PENUTUPAN ATAP (KUBAH)


Memasang Rangka Kuda-Kuda Konvensional
OH
OH
OH
OH
OH
OH
OH
OH

0.1
0.1
0.01
0.005

OH
OH
OH
OH

0.4
0.2
0.02
0.02

OH
OH

0.144

1
0.17
0.52
0.05
0.01

10
4.78
4.78
0.48
0.24

13.000

4
2.60
1.30
0.13
0.13

Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Pekerja
Tukang Kayu

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Memasang Atap Genteng Glasur


0.15
0.075

0.07
0.04
0.00
0.00

95.650

Memasang Nok Genteng Beton


OH
OH
OH
OH

1.185

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Memasang Usuk dan Reng

5
0.42
4.20
0.42
0.02

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Memasang Konstruksi Gording


2.4
7.2
0.72
0.12

21.000

0.02

0.12
0.060
0.006
0.006

0.34
0.17

95.650

10

2
1.43
0.72

0.008
0.008

OH
OH

Memasang Talang 1/2 Lingkaran dan Seng Plaat


0.15
0.3
0.03
0.008

IX.

OH
OH
OH
OH

OH
OH
OH
OH

OH
OH
OH
OH

10

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

2
0.72
1.45
0.14
0.04

1.000
1.000
3.000

Ls
Ls

3
3
1

2
2
2
18.00
9.00
0.90
0.90

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Pekerjaan Kloset Duduk per unit


1
OH
Pekerja
1.5
OH
Tukang Batu
1.5
OH
Kepala Tukang
0.16
OH
Mandor
Pekerjaan Kran " atau "
0.01
OH
Pekerja
0.1
OH
Tukang Ledeng
0.01
OH
Kepala Tukang
0.005
OH
Mandor
Memasang Bak Cuci Piring Stainless Steel
0.03
0.3
0.03
0.0015

48.200

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN SANITASI
Pekerjaan Septictank
Pekerjaan Sumur Resapan dan Rembesan
Memasang Bak Mandi Batu Bata Vol. 0,30 m
6
3
0.3
0.3

0.08
0.08

Kepala Tukang
Mandor

3.000

4
1.00
1.50
1.50
0.16

10.000

1
0.10
1.00
0.10
0.05

1.000

1
0.03
0.30
0.03
0.00

Pekerjaan Pipa Galvanis "


0.036
0.06
0.006
0.0018

OH
OH
OH
OH

Pekerjaan Pipa Galvanis 3" per m


0.135
OH
Pekerja
0.225
OH
Tukang Ledeng
0.0225
OH
Kepala Tukang
0.0068
OH
Mandor
X.

XI.

PEKERJAAN FINSHING
Pengecatan Dinding per m2
0.02
OH
Pekerja
0.063
OH
Tukang Cat
0.0063
OH
Kepala Tukang
0.0025
OH
Mandor
Pekerjaan Rangka Penggantung per m2
0.15
OH
Pekerja
0.3
OH
Tukang Kayu
0.03
OH
Kepala Tukang
0.075
OH
Mandor
Pekerjaan Eternit per m2
0.03
OH
Pekerja
0.07
OH
Tukang kayu
0.007
OH
Kepala Tukang
0.004
OH
Mandor
Pemasangan Railing Tangga
Pemasangan Paving Block
PEKERJAAN INSTALASI
Instalasi Listrik

54.850

1
0.39
0.66
0.07
0.02

Pekerja
Tukang Ledeng
Kepala Tukang
Mandor

102.900

6
1.98
3.31
0.33
0.10

10

828.710

8
1.66
5.22
0.52
0.21

381.874

30
8.18
16.37
1.64
4.09

381.874

21
5.73
13.37
1.34
0.76

1.000
1.000

Ls
Ls

1
1

1
1

1.000

Ls

Instalasi Air

1.000

Ls

PERHITUNGAN JUMLAH TENAGA KERJA


PROYEK :
NO.
I.

Pembangunan Rumah Tinggal Type 25 Anggrek


URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN
Membersihkan Lapangan dan Perataan
0.1
0.05

OH
OH

Pekerja
Mandor

Pagar sementara dari seng gelombang per 1m


0.2
0.4
0.02
0.02

OH
OH
OH
OH

Tukang kayu
Pekerja
Kepala tukang
Mandor

Pemasangan Bouwplank
0.1
0.1
0.01
0.005

OH
OH
OH
OH

Tukang kayu
Pekerja
Kepala tukang
Mandor

OH
OH
OH
OH

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

Air kerja
Listrik kerja
Direksi Keet
2
1
0.2
0.05

Pembuatan Papan Nama Proyek


Mobilisasi dan Demobilisasi
II.

PEKERJAAN TANAH
Galian Tanah biasa sedalam 3m
1.05
0.067

OH
OH

Pekerja
Mandor

Galian Tanah biasa sedalam 2m


0.9
0.045

OH
OH

Pekerja
Mandor

OH
OH

Pekerja
Mandor

Urugan Pasir
0.3
0.01

Urugan Tanah Kembali 3 m


0.35
0.0223

OH
OH

Pekerja
Mandor

Urugan Tanah Kembali 2 m


0.3
0.015

III.

OH
OH

Pekerja
Mandor

PEKERJAAN PONDASI
Pembesian Pondasi Foot Plate
0.07
0.07
0.007
0.004

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Bekisting Pondasi Foot Plate


0.52
0.26
0.026
0.026

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pondasi Foot Plate beton bertulang K250


1.65
0.275
0.028
0.083

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

Pondasi Batu Kali 1 Pc : 8 PP


1.5
0.75
0.0075
0.0075

IV.
IV.1

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

PEKERJAAN STRUKTUR BETON


Pengecoran Sloof
1.65
0.275
0.028
0.083

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

Pengecoran Kolom Lantai 1


1.65
0.275
0.028
0.083

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

Pengecoran Balok
1.65
0.275
0.028
0.083

Pengecoran Plat Lantai


1.65
0.275

OH
OH

Pekerja
Tukang batu

0.028
0.083

OH
OH

Kepala tukang
Mandor

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

Pengecoran Tangga
1.65
0.275
0.028
0.083

Pengecoran Kolom Lantai 2


1.65
0.275
0.028
0.083

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

Pengecoran Ring Balk


1.65
0.275
0.028
0.083

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

Pengecoran Plat Atap


1.65
0.275
0.028
0.083

IV.2

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

Penulangan Sloof per 10kg


0.07
0.07
0.007
0.004

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Penulangan Kolom Lantai 1 per 10kg


0.07
0.07
0.007
0.004

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Penulangan Balok per 10kg


0.07
0.07
0.007
0.004

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Penulangan Plat lantai per 10kg


0.07
0.07
0.007
0.004

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Penulangan Tangga per 10kg


0.07
0.07

OH
OH

Pekerja
Tukang Besi

0.007
0.004

OH
OH

Kepala Tukang
Mandor

Penulangan Kolom Lantai 2 per 10kg


0.07
0.07
0.007
0.004

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Penulangan Ring Balk per 10kg


0.07
0.07
0.007
0.004

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Penulangan Plat Atap per 10kg


0.07
0.07
0.007
0.004

IV.3

OH
OH
OH
OH

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Bekisting Sloof per m2


0.52
0.26
0.026
0.026

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bekisting Kolom Lantai 1 per m2


0.66
0.33
0.033
0.033

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bekisting Balok per m2


0.66
0.33
0.033
0.033

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bekisting Plat lantai per m2


0.66
0.33
0.033
0.033

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bekisting Tangga per m2


0.66
0.33
0.033
0.033

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

Bekisting Kolom Lantai 2 per m2


0.66
0.33

OH
OH

Pekerja
Tukang Kayu

0.033
0.033

OH
OH

Kepala Tukang
Mandor

Bekisting Ring Balk per m2


0.66
0.33
0.033
0.033

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Bekisting Plat Atap per m2


0.66
0.33
0.033
0.033

V.

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN DINDING
Memasang Pas. Batu bata Camp 1 : 3 Lt. 1 per m2
0.3
OH
Pekerja
0.1
OH
Tukang batu
0.01
OH
Kepala tukang
0.015
OH
Mandor
Memasang Pas. Batu bata Camp 1 : 3 Lt. 2 per m2
0.3
OH
Pekerja
0.1
OH
Tukang batu
0.01
OH
Kepala tukang
0.015
OH
Mandor
Memasang Plesteran 1: 3 Lt. 1 per m2
0.3
OH
Pekerja
0.15
OH
Tukang batu
0.015
OH
Kepala tukang
0.015
OH
Mandor
Memasang Plesteran 1 : 3 Lt. 2 per m2
0.3
OH
Pekerja
0.15
OH
Tukang batu
0.015
OH
Kepala tukang
0.015
OH
Mandor
Memasang Acian Lt. 1 per m2
0.20
0.10
0.010
0.010

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

Memasang Acian Lt. 2 per m2


0.20
0.10
0.010
0.010

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

Memasang Dinding Keramik 20 x 20 per m2

0.90
0.45
0.045
0.045

VI.
VI.1

VI.2

VII.

OH
OH
OH
OH

Pekerja
Tukang batu
Kepala tukang
Mandor

PEKERJAAN KUSEN DAN PINTU


Pekerjaan Kusen Kayu Jati per m3
7
OH
Pekerja
21
OH
Tukang Kayu
2.1
OH
Kepala Tukang
0.35
OH
Mandor
Pekerjaan Pintu Kayu Kamfer per m2
0.8
OH
Pekerja
2.4
OH
Tukang Kayu
0.24
OH
Kepala Tukang
0.04
OH
Mandor
Pekerjaan Pintu Garasi
Pekerjaan Pintu Panel Kayu Kamfer per m2
1
OH
Pekerja
3
OH
Tukang Kayu
0.3
OH
Kepala Tukang
0.05
OH
Mandor
Pekerjaan Jendela Kaca Kayu Kamfer per m2
0.8
OH
Pekerja
2.4
OH
Tukang Kayu
0.24
OH
Kepala Tukang
0.24
OH
Mandor
Pekerjaan Kaca per m2
0.015
OH
Pekerja
0.15
OH
Tukang Kayu
0.015
OH
Kepala Tukang
0.00075
OH
Mandor
PEKERJAAN KUNCI DAN PENGGANTUNG
Pekerjaan Kunci Tanam Biasa
0.01
OH
Pekerja
0.5
OH
Tukang Kayu
0.01
OH
Kepala Tukang
0.005
OH
Mandor
Pekerjaan Kunci Kamar Mandi
0.005
OH
Pekerja
0.5
OH
Tukang Kayu
0.005
OH
Kepala Tukang
0.0025
OH
Mandor
Pekerjaan Engsel Pintu

0.015
OH
0.15
OH
0.015
OH
0.0075
OH
Pekerjaan Engsel Jendela
0.01
OH
0.1
OH
0.01
OH
0.005
OH
VIII.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN PENUTUPAN ATAP


Memasang rangka k-k Profil
0.06
0.06
0.006
0.003

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Memasang Konstruksi Gording


2.4
7.2
0.72
0.12

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Memasang Rangka Atap Genteng


0.1
0.1
0.01
0.005

OH
OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

IX.

PEKERJAAN INSTALASI
Instalasi Listrik

X.

PEKERJAAN PLAFOND
Pekerjaan Langit-Langit Gypsum per m2
0.1
OH
Pekerja
0.05
OH
Tukang Kayu
0.005
OH
Kepala Tukang
0.005
OH
Mandor

XI.

PEKERJAAN SANITASI
Pekerjaan Septictank
Pekerjaan Sumur Resapan dan Rembesan
Pekerjaan Bak Kontrol Pas Batu Bata
3.2
OH
Pekerja
1.15
OH
Tukang Batu
0.011
OH
Kepala Tukang
0.016
OH
Mandor

Pekerjaan Pipa PVC tipe AW 1/2" per m


0.036
OH
Pekerja
0.06
OH
Tukang Batu
0.006
OH
Kepala Tukang
0.002
OH
Mandor
Pekerjaan Pipa PVC tipe AW 4" per m
0.036
OH
Pekerja
0.06
OH
Tukang Batu
0.006
OH
Kepala Tukang
0.002
OH
Mandor
Pekerjaan Kran per unit
0.01
OH
Pekerja
0.4
OH
Tukang Batu
0.04
OH
Kepala Tukang
0.005
OH
Mandor
Pekerjaan Bak Mandi Batu Bata vol 0.3 m3
6
OH
Pekerja
3
OH
Tukang Batu
0.3
OH
Kepala Tukang
0.03
OH
Mandor
Pekerjaan Closet Duduk per unit
3.3
OH
Pekerja
1.5
OH
Tukang Batu
0.001
OH
Kepala Tukang
0.16
OH
Mandor
Pekerjaan Wastafel per unit
1.2
OH
Pekerja
0.145
OH
Tukang Batu
0.15
OH
Kepala Tukang
0.1
OH
Mandor
Pekerjaan Pompa Air Listrik Simizu 100 watt
XII.

PEKERJAAN PENUTUP LANTAI


Pekerjaan Keramik 20x20 cm
0.7
OH
Pekerja
0.35
OH
Tukang batu
0.035
OH
Kepala tukang
0.035
OH
Mandor
Pekerjaan Keramik 30x30 cm
0.7
OH
Pekerja
0.35
OH
Tukang kayu
0.035
OH
Kepala Tukang
0.035
OH
Mandor
Pekerjaan Lantai Ubin Granito Uk. 40x40 cm
0.25
OH
Pekerja

XIII.

0.125
OH
Tukang kayu
0.013
OH
Kepala Tukang
0.013
OH
Mandor
PEKERJAAN PENGECATAN
Pengecatan Tembok per m2
0.02
OH
Pekerja
0.063
OH
Tukang Cat
0.0063
OH
Kepala Tukang
0.003
OH
Mandor
Pengecatan Kayu per m2
0.07
OH
Pekerja
0.009
OH
Tukang Cat
0.006
OH
Kepala Tukang
0.003
OH
Mandor
Pelaburan Bidang Kayu per m2
0.16
OH
Pekerja
0.16
OH
Tukang Cat
0.016
OH
Kepala Tukang
0.003
OH
Mandor

AH TENAGA KERJA

mah Tinggal Type 25 Anggrek


durasi
(hari)

vol
642.675

jumlah
pekerja
9

total
(orang)
11

7.14
3.57
103.500

13
4.14
8.28
0.41
0.41

92.470

4
1.85
1.85
0.18
0.09

1.000
1.000
9.000

92
92
5

1
1
6
3.60
1.80
0.36
0.09

1.000
1.000

1
1

1
1

131.044

12

12
11.47
0.73

74.025

12

6
5.55
0.28

11.120

3
3.34
0.11

50.380

9
8.82
0.56

41.543

7
6.23
0.31

76.342

4
1.78
1.78
0.18
0.10

60.540

17
10.49
5.25
0.52
0.52

6.684

5
3.68
0.61
0.06
0.18

65.810

19
12.34
6.17
0.06
0.06

2.941

6
4.85
0.81
0.08
0.24

4.342

9
7.16
1.19
0.12
0.36

6.415

13
10.58
1.76
0.18
0.53

18.803

38
31.02
5.17

0.53
1.56
0.810

2
1.34
0.22
0.02
0.07

5.106

10
8.42
1.40
0.14
0.42

2.530

5
4.17
0.70
0.07
0.21

7.778

8
6.42
1.07
0.11
0.32

346.894

5
2.43
2.43
0.24
0.14

1417.296

21
9.92
9.92
0.99
0.57

1411.321

11
4.94
4.94
0.49
0.28

876.821

13
6.14
6.14
0.61
0.35

63.803

1
0.45
0.45

0.04
0.03
1533.934

12
5.37
5.37
0.54
0.31

239.319

4
1.68
1.68
0.17
0.10

363.533

5
2.54
2.54
0.25
0.15

39.800

17
10.35
5.17
0.52
0.52

100.500

27
16.58
8.29
0.83
0.83

107.210

28
17.69
8.84
0.88
0.88

157.625

28
17.34
8.67
0.87
0.87

13.142

14
8.67
4.34
0.43
0.43

119.330

18
11.25
5.63

0.56
0.56
51.210

18
11.27
5.63
0.56
0.56

65.203

17
10.76
5.38
0.54
0.54

308.807

22
15.44
5.15
0.51
0.77

354.897

19
13.31
4.44
0.44
0.67

783.997

14

27
16.80
8.40
0.84
0.84

890.760

16

27
16.70
8.35
0.84
0.84

710.154

12

19
11.84
5.92
0.59
0.59

733.592

15

16
9.78
4.89
0.49
0.49

68.100

14

8.76
4.38
0.44
0.44

2.000

8
1.75
5.25
0.53
0.09

39.538

15
3.51
10.54
1.05
0.18

1.000
4.944

1
2

1
11
2.47
7.42
0.74
0.12

5.900

11
2.36
7.08
0.71
0.71

25.978

5
0.39
3.90
0.39
0.02

15.000

8
0.15
7.50
0.15
0.08

5.000

3
0.03
2.50
0.03
0.01

57.000

11

0.86
8.55
0.86
0.43
24.000

3
0.24
2.40
0.24
0.12

594.360

26
11.89
11.89
1.19
0.59

5.613

12
2.69
8.08
0.81
0.13

133.650

14
6.68
6.68
0.67
0.33

1.000

133.650

7
4.46
2.23
0.22
0.22

1.000
1.000
1.000

2
2
2

3
2
2
1.60
0.58
0.01
0.01

89.600

1
0.40
0.67
0.07
0.02

20.200

1
0.36
0.61
0.06
0.02

5.000

1
0.02
0.67
0.07
0.01

3.000

9
6.00
3.00
0.30
0.03

5.000

8
5.50
2.50
0.00
0.27

2.000

3
2.40
0.29
0.30
0.20

1.000

23.450

13
8.21
4.10
0.41
0.41

53.674

20
12.52
6.26
0.63
0.63

231.475

13
8.27

4.13
0.43
0.43
595.604

11
2.38
7.50
0.75
0.36

52.382

5
3.67
0.47
0.31
0.16

26.666

5
2.13
2.13
0.21
0.04

NO

JENIS
PEKERJAAN

PEKERJAAN PERSIAPAN

II

PEKERJAAN TANAH

III

PEKERJAAN PONDASI

IV

PEKERJAAN BETON
BERTULANG

PEKERJAAN PENUTUP
ATAP

VI

PEKERJAAN DINDING

VII

PEKERJAAN KUSEN

URAIAN
PEKERJAAN
Pembersihan Lokasi
Pembuatan Pagar Sementara
Pemasangan Bowplank
Air kerja
Listrik kerja
Site Office dan Basecamp Pekerja
Pembuatan Papan Nama Proyek
Galian tanah
Urugan Tanah Kembali
Penulangan Foot Plate
Bekisting Foot Plate
Pengecoran Foot Plate
Pengecoran Sloof
Pengecoran Kolom Lt.1
Pengecoran Balok dan Plat Lantai
Pengecoran Tangga ke Lantai 2
Pengecoran Kolom Lt.2
Pengecoran Balok dan Plat Atap
Pengecoran Tangga ke Dak
Penulangan Sloof
Penulangan Kolom Lt. 1
Penulangan Balok dan Plat Lantai
Penulangan Tangga ke Lantai 2
Penulangan Kolom Lt. 2
Penulangan Balok dan Plat Atap
Penulangan Tangga ke Dak
Bekisting Sloof
Bekisting Kolom Lt. 1
Bekisting Balok dan Plat Lantai
Bekisting Tangga ke Lantai 2
Bekisting Kolom Lt. 2
Bekisting Balok dan Plat Atap
Bekisting Tangga ke Dak
Memasang Atap polykarbonate
Rangka Galvanis
Pasangan Bata Camp 1:2 Lt.1
Pasangan Bata Camp 1:2 Lt.2
Plesteran dan Acian Lt.1
Plesteran dan Acian Lt.2
Kusen Kayu Ulin'
Kusen Almunium
Kusen Baja
Pintu Kayu Ulin
Pintu Kaca
Pintu Plat
Pekerjaan Kaca

BOBOT
%
0.340
4.240
0.653
0.327
0.327
2.517
0.082
0.158
0.023
6.587
0.462
0.476
0.475
0.711
2.490
0.282
0.579
2.661
0.179
1.740
1.607
4.504
0.053
1.386
3.806
0.025
0.418
2.584
10.647
0.950
2.400
10.396
0.592
0.114
0.082
3.032
2.634
4.248
3.690
0.378
0.013
0.082
0.445
0.527
0.082
0.228

VIII

IX

XI
XII

XIII

Pekerjaan Rangka Penggantung


Pekerjaan Eternit
Septictank
Sumur Resapan dan Rembesan
Closet jongkok
PEKERJAAN SANITASI Closet Pria (urinoir)
Wastafel
Kran
Pipa Galvanis 4"
Kunci Tanam Biasa
Kunci Kamar Mandi
PEKERJAAN KUNCI DAN
Engsel Pintu
PENGGANTUNG
Engsel Jendela
Engsel Angin

4.051
0.568
0.082
0.163
0.092
0.075
0.027
0.007
1.212
0.024
0.023
0.052
0.039
0.137

Pekerjaan Granit 60x60 Terang

3.668

PEKERJAAN PLAFOND

PEKERJAAN PENUTUP
LANTAI

Pekerjaan Granit 20x60 Gelap


Pengecatan Tembok
PEKERJAAN PENGECATAN Pengecatan Kayu
Pelaburan Bidang Kayu
Stop Kontak
Saklar Tunggal
Saklar Ganda
Stop Kontak AC
AC Cassete 5 PK
AC Split 1 PK
Lampu TL 2x40 Watt
PEKERJAAN INSTALASI Downlight 9 Watt
Barret 20 Watt
Box Sekering
Pipa PVC "
Sparing Telepon
Pesawat Telepon
Kabel Telepon
JUMLAH
BOBOT KUMULATIF

0.093
0.726
0.028
0.024
0.019
0.007
0.004
0.026
6.642
0.333
1.297
0.110
0.018
0.002
0.200
0.0001
0.012
0.010
100.00

DURASI
hari
2
1
1
92
92
2
1
2
2
2
2
2
7
3
7
3
3
7
3
2
2
3
3
3
3
3
2
3
3
3
3
4
3
3
3
4
4
3
3
2
2
2
2
2
2
2

2
0.340

0.0078
0.008

0.653
0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0020

0.0020

0.0020
0.079

0.0020
0.079

0.0020

0.0020

0.0020

4.240
0.0078
0.008
2.517
0.0020

3.294
0.231
0.238

2
2
4
4
1
1
1
1
1
3

2
2
3
3
3
3

3
3
3
6.77
6.77

0.36
7.13

0.67
7.80

0.10
7.90

0.10
8.00

0.02
8.01

0.02
8.03

3.78
11.81

10

11

12

13

14

15

16

17

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.068
0.356

0.068
0.356

0.068

0.068

0.068

0.068

0.068

0.415

0.415
0.047

0.047

0.023
3.294
0.231
0.238

0.097
0.060

0.060
0.870

0.870
0.804

0.870

0.870
0.804

0.870

0.870
0.804

0.870

0.870
0.804

0.197

0.197

3.78
15.59

0.04
15.63

0.50
16.13

0.50
16.63

3.98
20.61

3.98
24.59

0.33
24.92

0.33
25.25

3.40
28.65

MINGGU KE 22
23

18

19

20

21

24

25

26

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.068

0.136

0.068

0.068

0.068

0.136

0.068

0.068

0.068

0.415

0.415

0.415

0.415

0.047

0.047

0.870

0.870

0.870

0.870

0.870

0.870

0.870

0.870

0.038

0.038

0.097
1.331
0.870

0.804
1.501

0.804

0.804
1.501

0.804

0.804
1.501
1.501

0.804

0.870

0.804
1.501
1.501
0.197
0.038

0.804

0.870

0.804
1.501
0.870

0.804
1.501
0.870

0.804
1.501
0.870

0.097

0.870

0.804
1.501
0.870

0.097
1.331

0.038

0.197

0.758
1.416
1.230
0.189

0.008

0.008

0.242
0.009
0.008

3.40
32.04

12.93
44.98

4.28
49.25

0.242
0.009
0.008

3.73
52.99

0.33
53.32

12.30
65.62

3.40
69.01

4.22
73.23

4.28
77.51

27

28

29

30

31

32

33

34

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.068

0.068

0.068

0.068

0.047

0.047
0.097

0.097

0.804

0.804

0.804

0.804

0.804

0.804

0.804

0.804

0.038

0.038

0.197

0.197

0.758

0.758

1.416
1.230

1.416
1.230
0.189

0.008

3.73
81.24

0.33
81.57

3.40
84.97

3.40
88.36

1.834

1.834

0.047

0.047

1.94
90.30

1.94
92.23

3.42
95.66

0.21
95.87

35

36

37

38

39

40

41

42

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.189

0.021

2.026
0.284
0.021

2.026
0.284
0.021

0.006

0.006

0.006

0.067

0.067

0.067

0.004
0.003
0.12
96.47

0.004
0.003
2.43
98.90

0.004
0.003
2.43
101.33

2.026
0.284

0.242
0.009
0.008

0.28
96.15

0.21
96.35

2.33
103.65

0.02
103.67

0.02
103.69

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-

Semarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

DAFTAR

UPAH PEKERJA

SUMBER
DATA
D A E R A H

NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

JENIS
Pekerja
Mandor
Tukang listrik
Tukang kayu
Kep. tk. kayu
Tukang batu
Kep. tk. batu
Tukang besi
Kep. tk. besi
Tukang cat
Kep. tk. cat
Tukang plitur
Tukang jalan
Tukang gali
Tukang masak aspal
Tk. leideng
Masinis
Pemb. Masinis
Penjaga api
Penjaga malam
Sopir
Pembantu Sopir

:
:

BAHAN

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-

Semarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

DAFTAR UPAH PEKERJA


SUMBER DATA : PASARAN BEBAS
DAERAH
: KOTA SEMARANG

NO

JENIS PEKERJA

SATUAN

HARGA

1
1
2
3
4
5
6
7
8
9
10
11
12
13

3
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

4
50,000
65,000
65,000
65,000
65,000
65,000
65,000
50,000
70,000
70,000
70,000
70,000
60,000

Pekerja
Tukang Batu
Tukang Kayu
Tukang Plitur
Tukang Besi
Tukang Cat
Tukang Listrik
Tukang Gali
Kep. Tukang Batu
Kep. Tukang Kayu
Kep. Tukang Besi
Kep. Tukang Cat
Mandor

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-

Semarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

PASARAN
BEBAS
KOTA SEMARANG & SEKITAR

KET.
SATUAN
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

HARGA
50,000
60,000
65,000
65,000
70,000
65,000
70,000
65,000
70,000
65,000
70,000
65,000
50,000
50,000
50,000
65,000
125,000
100,000
50,000
50,000
125,000
100,000

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 Tembalang-

Semarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

JA

KETERANGAN
5
1 Hari = 8 Jam kerja

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

DAFTAR HARGA BAHAN


SUMBER DATA : PASARAN BEBAS
DAERAH
: KOTA SEMARANG

No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

Jenis Pekerjaan
Kayu dolken 8-10/4m
Kayu 5/7 x 4 m kayu kruing
Paku biasa 2'-5'
Portland Semen
Pasir Beton
Koral Beton
Seng gelombang BJLS 32
Meni besi
Kayu papan 3/20 kruing
Air
Besi Beton (polos/ulir)
Kawat Beton
Kayu Klas III (Terentang)
Minyak Bekisting
Balok Kayu Klas II
Plywood tebal 9mm
Besi Profil
Kayu Klas I (Kamfer), balok
Besi Strip
Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm
Reng (2x3) cm
Bata Merah 5 x 11 x 22
Pasir Pasang
Kayu Klas I (Jati) , Balok
Lem Kayu
Kayu Klas II (Kamfer), papan
Kaca tebal 5mm
Ubin Keramik 20 x 20 cm
Semen warna
Ubin Granito 40 x 40 cm
Ubin Keramik 30 x 30 cm
Gypsum Board
Paku Sekrup

Satuan
btg
m3
kg
kg
m3
m3
lbr
kg
m3
ltr
kg
kg
m3
Ltr
m3
Lbr
kg
m3
Kg
m3
m3
Buah
m3
m3
kg
m3
m2
buah
kg
buah
buah
Lbr
Kg

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

Kerikil
Baja Tulangan
Pipa PVC 4"
Pipa PVC "
Kran Air
Sealtape
Porselen 11 x 11 cm
Semen Nat
Kloset Duduk / Monoblok
Wastafel
Kunci Tanam Biasa
Kunci Tanam Kamar Mandi
Engsel pintu
Engsel Jendela
Cat Menie
Plamir kayu
Cat Dasar Kayu
Cat Penutup Kayu
Kuas
Pengencer
Amplas
Plamir Tembok
Cat Dasar Dinding
Cat Penutup 2 kali Dinding
Vernis
Dempul
Ampelas

m3
kg
m'
m'
bh
bh
buah
Kg
buah
buah
Buah
Buah
Buah
Buah
kg
kg
kg
kg
bh
kg
lbr
Kg
Kg
Kg
ltr
ltr
lbr

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Harga
19,000
4,500,000
16,000
1,240
240,000
240,000
50,000
25,000
5,300,000
10
13,000
16,000
1,750,000
8,000
4,500,000
120,000
14,250
7,500,000
14,200
7,500,000
7,500,000
600
210,000
20,500,000
20,000
7,800,000
72,500
2,240
11,500
68,333
5,182
62,000
15,000

Keterangan

m3
m3

lbr
kg
Kg

m3

Buah

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

140,000
11,000
50,000
6,500
7,500
2,000
463
11,500
900,000
450,000
135,000
80,000
5,000
2,250
21,000
25,000
36,500
52,000
9,500
12,000
3,500
15,000
15,000
20,000
25,000
25,000
3,500

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

Pasir Beton
Kerikil Beton

171.43
192.59

Seng gelombang 3"-5"

50000

Meni Besi

25000

Paku Biasa 2" - 5"

16000

Pasir Pasang

Ubin Keramik 20 x 20 cm

165000

2200

PT. UTAMA KARYA KONSTRUKSIJl. Banjarsari No.28 TembalangSemarang 50273Telp (024) 70314364 Fax. (024) 6187584e-mail : utamakarya@gmail.com

No
1

4
4.1

4.2

4.3

4.4

4.5

4.6

Nama Kegiatan
PEKERJAAN PERSIAPAN
a
Pembersihan Lokasi
b
Pembuatan Pagar Sementara dan Papan Proyek
c
Pemasangan Bowplank
d
Air dan Listrik Kerja
f
Direksi Keet
g
Administrasi dan Dokumentasi
h
Mobilisasi dan Demobilisasi
PEKERJAAN TANAH
a
Galian Tanah
c
Urugan Pasir
d
Urugan Tanah Kembali
PEKERJAAN PONDASI
a
Pembuatan Lantai Kerja
b
Penulangan Pondasi Foot Plate
c
Bekisting Pondasi Foot Plate
d
Pengecoran Pondasi Foot Plate
e
Pondasi Batu kali
PEKERJAAN STRUKTUR
Pekerjaan Sloof
a
Penulangan Sloof
b
Bekisting Sloof
c
Pengecoran Sloof
Pekerjaan Kolom Lantai 1
a
Penulangan Kolom Lantai 1
b
Bekisting Kolom Lantai 1
c
Pengecoran Kolom Lantai 1
Pekerjaan Balok
a
Bekisting Balok
b
Penulangan Balok
c
Pengecoran Balok
Pekerjaan Plat Lantai
a
Bekisting Plat Lantai
b
Penulangan Plat Lantai
c
Pengecoran Plat Lantai
Pekerjaan Tangga
a
Penulangan Tangga
b
Bekisting Tangga
c
Pengecoran Tangga
Pekerjaan Kolom Lantai 2
a
Penulangan Kolom Lantai 2

Durasi
10
10
4
154
3
154
154
24
1
3
2
4
3
1
10

1
3
1
2
3
1
1
1
1
2
2
1
1
3
1
2

4.7

9
10
11

b
Bekisting Kolom Lantai 2
c
Pengecoran Kolom Lantai 2
Pekerjaan Ring Balk
a
Bekisting Ring Balk
b
Penulangan Ring Balk
c
Pengecoran Ring Balk
PEKERJAAN DINDING
a
Pasangan Bata Camp 1 : 3 Lt.1
b
Pasangan Bata Camp 1 : 3 Lt.2
c
Pemasangan Plesteran 1 : 3 Lt 1
d
Pemasangan Plesteran 1 : 3 Lt 2
e
Acian Lt. 1
f
Acian Lt. 2
g
Pemasangan Dinding Keramik 20x20
PEKERJAAN KUSEN DAN PINTU
a
Kusen Kayu Jati
b
Pintu Kayu Kamfer
c
Pintu Garasi
d
Pintu Panel
e
Jendela Kaca
f
Pekerjaan Kaca
PEKERJAAN KUNCI DAN PENGGANTUNG
a
Kunci Tanam Biasa
b
Kunci Kamar Mandi
c
Engsel Pintu
d
Engsel Jendela
PEKERJAAN PENUTUP ATAP
a
Memasang Rangka k-k Profil
b
Pemasangan Konstruksi Gording
c
Pemasangan Ranka Atap Genteng
PEKERJAAN INSTALASI
a
Pekerjaan Listrik
PEKERJAAN PLAFOND
a
Pemasangan Langit-Langit Gypsum
PEKERJAAN SANITASI DAN DRAINASE
a
Septictank
b
Sumur resapan dan Rembesan
c
Bak Kontrol Pas Batu Bata
d
Pipa PVC tipe AW "
e
Pipa PVC tipe AW 4 "
f
Keran Air
g
Bak Mandi Batu Bata vol 0.3 m3
h
Closet Duduk
i
Wastafel
j
Pompa Air Listrik Simizu 100 watt

2
1
1
1
1
6
8
14
16
12
15
7
8
9
1
2
2
1
1
1
1
1
3
5
2
2
3
2
2
2
8
2
3
3
3
1
1

12

13

PEKERJAAN PENUTUP LANTAI


a
Lantai Keramik 20 x 20 cm
b
Lantai Keramik 30 x 30 cm
c
Lantai Ubin Granito 40 x 40 cm
PEKERJAAN PENGECATAN
a
Pengecatan Tembok
b
Pengecatan Kayu
c
Pelaburan bidang kayu

2
3
7
5
1
2

Pekerja
70
60
16
154
48
154
154
264
2
54
14
36
51
19
160

6
45
8
22
96
8
52
20
6
28
8
20
3
15
1
28

11

11

11

11

11

11

11

106
9
46
6
5
22
19
27
27
19
16
14
8
15
1
11
11
5
8
3
3
3
26
12
14
7
7
3
2
2
1
1
1
9
8
3
1

13
20
13
11
5
5
13

13

13

13

13

13

13

8
11

10

11

12

13

14

15

11
13

13

13

13

13

10
1
6

13

13

15

15

15

15

15

18

16

17

18

10
1
6

1
6

1
6

1
11

19

20

21

22

23

1
6
1
1

11

15

19

19

20

3
2

2
2

18

19

19

21

22

23

23

24

24

25

26

27

28

29

30

31

8
3

4
22

4
12

18

10

10

11

11

17

28

28

28

32

33

34

35

36

37

38

39

11

7
19

7
19

27

28

28

13

5
22

12
6

28

28

29

30

30

31

31

20

40

41

42

43

44

45

46

47

21
8

32

34

34

35

27
9

25
13

9
25

31

34

36

36

36

37

38

40

48

49

50

51

52

53

54

55

38

38

38

38

8
13
17

21

13
8

1
14
2
17

16

17

40

40

40

40

40

40

40

42

DURA
56

57

58

59

60

61

62

63

18

18

18

15

11

30
10

22

22

22

21

21

22

27

11

10

20

42

42

42

43

44

44

44

44

DURASI (HARI)
64
65

66

67

68

69

70

71

12
4
5

16

21

1
1

1
1

31

25
24

14
43

15
44

15
46

32

25

29

33

51

59

61

63

72

73

74

75

76

77

78

79

15
20
27

28
37

26
37

27
36

27
34

27
34

27
32

15
42

64

67

65

65

63

63

61

59

80

81

82

83

84

85

86

87

14
38

10
40

22
25

13
19

10
19

10
19

10
19

10
19

15

15

15

15

15

54

52

49

49

46

46

46

46

88

89

90

91

92

93

94

95

19
10

19
10

19
10

19
10

15

15

15

15

17
16

15
16

1
10

12

30

24

11

11
5

46

46

46

46

46

45

43

42

96

97

98

99

100

101

102

103

16
14

16
14

16
11

18
17

17
14

17
14

14
14

8
9
11
3
26

7
7

40

41

40

40

40

40

37

35

104

105

106

107

108

109

110

111

26

26
5

14

18

10

13
14

14

3
13

6
9

10

5
3
1

35

33

32

28

27

25

24

23

112

113

114

115

116

117

118

119

20
20

20

20
13

22

22

22

22

13

15

13

15

13

15

15

120

121

122

123

124

125

126

127

13

13

13
11

15

15

15

11

13

11

13

11

13

11

13

13

128

129

5
5

5
12

No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

yy

Mobilisasi dan Demobilisasi


Administrasi Poryek dan Dokumentasi
Pengadaan Listrik Kerja dan Fasilitas Air Bersih
Pembersihan Lokasi Proyek, Pemagaran Area dan Pemasangan Papan nama Proyek
Pembuatan Direksi Keet, Gudang, Pengukuran dan Pemasangan Bouwplank
Penggalian Galian Tanah
Pekerjaan Urugan Pasir
Pekerjaan Pondasi Footplate
Pekerjaan Pondasi Batu Kali
Pekerjaan Urugan Tanah
Pekerjaan Sloof
Pekerjaan Kolom Lantai 1
Pekerjaan Balok
Pekerjaan Plat Lantai
Pekerjaan Tangga
Pekerjaan Kolom Lantai 2
Pekerjaan Ring Balk dan Plat Atap
Pemasangan Trassram dan Pasangan Batu Bata
Pekerjaan Plesteran dan Acian
Pekerjaan Pemasangan Keramik
Pemasangan Kusen Pintu dan Jendela
Pemasangan Daun Pintu, Jendela, Engsel, Kunci
Perakitan Atap Kayu
Pemasangan Genteng Pres
Pemasangan Talang
Pembuatan Septictank dan Peresapan
Pemipaan Saluran Air Bersih dan Air Kotor
Pemasangan Kloset, Kran, Bak Mandi dan Bak Cuci
Pekerjaan Instalasi Listrik
Pengecatan, Pekerjaan Plafond Gypsum, Pemasangan Railing dan Paving Block

Durasi
154
154
154
20
7
24
1
10
10
3
5
6
3
5
5
5
3
14
22
9
9
12
8
10
10
6
12
6
6
21

Pekerja
154
154
154
130
64
264
2
120
160
54
59
126
72
116
19
143
57
178
761
102
198
234
32
20
20
12
47
16
30
334

1
1
1
1
5

2
1
1
1
5

3
1
1
1
5

4
1
1
1
6

5
1
1
1
6

6
1
1
1
6

7
1
1
1
6

8
1
1
1
6

9
1
1
1
7

10
1
1
1
7

10

11
1
1
1
7

10

12
1
1
1
7

10

13
1
1
1
7

10

14
1
1
1
7

10

15
1
1
1
7

10

16
1
1
1
7

10

10

17
1
1
1
8

18
1
1
1
8

11

19
1
1
1
8

11

20
1
1
1
5
4

11

12

21

22

23

24

25

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

10

10

11

11

11

13

13

14

14

14

26

27

28

29

30

31

32

33

34

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

7
4

11

11

11

11

11

11

12

12

14

14

14

14

14

14

14

15

15

35

36

37

38

39

40

41

42

43

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

12

12

12

12

12

12

12

12

12

15

15

15

15

15

15

15

15

15

44

45

46

47

48

49

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

12

10

10

10

10

10

15

15

15

15

15

50

51

52

1
1
1

1
1
1

1
1
1

2
8

12

12

15

15

15

15

53

54

55

56

57

58

59

60

61

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

12

12

13

13

14

14

10
6

16

17

15

15

16

16

17

17

19

19

20

1
1
1

1
1
1

DURASI (HARI)
64
65
66
1
1
1
1
1
1
1
1
1

17

18

18

62

20

63

21

19

21

19

22

22

67

68

1
1
1

1
1
1

15

15

22

22

69

70

1
1
1

1
1
1

21

22

24

25

71

72

73

1
1
1

1
1
1

1
1
1

14
9

23

17
6

74

75

76

77

78

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

23

23

24

24

26

79
1
1
1

27

Chart Title
Row 35

26

26

26

26

26

27

27

29

30

80

81

82

83

84

85

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

27

18
9

27

28

26
3

26
4

30

30

30

31

32

33

86

87

88

1
1
1

1
1
1

1
1
1

5
28

3
31

4
30

36

37

37

89

90

1
1
1

1
1
1

24

26

10

91

38

93

94

95

96

97

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

19
16

19
9

19
9

10

24

25

28

28

37

92

40

40

41

41

41

42

42

98

99

100

101

102

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

33

33

27

27

104

105

106

1
1
1

1
1
1

1
1
1

1
1
1

37

37

38

38

27

42

103

42

42

42

42

45

45

46

46

107

108

109

110

111

112

113

114

115

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

40

39

39

39

32

32

32

31

30

3
2
2

2
2

2
2

2
2

2
2

46

45

45

45

44

44

44

43

42

116

117

118

119

120

121

122

123

124

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

30

32

31

31

31

35

35

36

36

2
2

2
2

2
2

2
2

2
2

5
42

42

41

41

41

40

40

39

39

125

126

127

128

129

130

131

132

133

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

12

12

12

11

11

11

11

11

11

21

21

21

20

20

20

19

19

18

36

36

36

34

34

34

33

33

32

134

135

136

1
1
1

1
1
1

1
1
1

20

21

14

8
32

1
1
1

14
32

137
1
1
1

26
31

138
1
1
1

25
29

139
1
1
1

24
28

140
1
1
1

23
27

141
1
1
1

21
26

142

20
24

23

143
1
1
1

144
1
1
1

19

1
1
1

18
22

145
1
1
1

17
21

146
1
1
1

16
20

147
1
1
1

15
19

148
1
1
1

14
18

149
1
1
1

13
17

150
1
1
1

12
16

151

11
15

14

152
1
1
1

153
1
1
1

10

1
1
1

10
13

154

10
13

13

NO

II
III

IV

VI

VII

URAIAN
PEKERJAAN
Pembersihan Lokasi
Pembuatan Pagar Sementara
Pemasangan Bowplank
PEKERJAAN
Air kerja
PERSIAPAN
Listrik kerja
Site Office dan Basecamp Pekerja
Pembuatan Papan Nama Proyek
Galian tanah
PEKERJAAN TANAH
Urugan Tanah Kembali
Penulangan Foot Plate
PEKERJAAN PONDASI Bekisting Foot Plate
Pengecoran Foot Plate
Pengecoran Sloof
Pengecoran Kolom Lt.1
Pengecoran Balok dan Plat Lantai
Pengecoran Tangga ke Lantai 2
Pengecoran Kolom Lt.2
Pengecoran Balok dan Plat Atap
Pengecoran Tangga ke Dak
Penulangan Sloof
Penulangan Kolom Lt. 1
Penulangan Balok dan Plat Lantai
PEKERJAAN BETON
Penulangan Tangga ke Lantai 2
BERTULANG
Penulangan Kolom Lt. 2
Penulangan Balok dan Plat Atap
Penulangan Tangga ke Dak
Bekisting Sloof
Bekisting Kolom Lt. 1
Bekisting Balok dan Plat Lantai
Bekisting Tangga ke Lantai 2
Bekisting Kolom Lt. 2
Bekisting Balok dan Plat Atap
Bekisting Tangga ke Dak
PEKERJAAN PENUTUP Memasang Atap polykarbonate
ATAP
Rangka Galvanis
Pasangan Bata Camp 1:2 Lt.1
Pasangan Bata Camp 1:2 Lt.2
PEKERJAAN DINDING
Plesteran dan Acian Lt.1
Plesteran dan Acian Lt.2
Kusen Kayu Ulin'
Kusen Almunium
JENIS PEKERJAAN

PEKERJAAN KUSEN

BOBOT
%
0.340
4.240
0.653
0.327
0.327
2.517
0.082
0.158
0.023
6.587
0.462
0.476
0.475
0.711
2.490
0.282
0.579
2.661
0.179
1.740
1.607
4.504
0.053
1.386
3.806
0.025
0.418
2.584
10.647
0.950
2.400
10.396
0.592
0.114
0.082
3.032
2.634
4.248
3.690
0.378
0.013

Kusen Baja
VII
PEKERJAAN KUSEN Pintu Kayu Ulin
Pintu Kaca
Pintu Plat
Pekerjaan Kaca
Pekerjaan Rangka Penggantung
VIII PEKERJAAN PLAFOND
Pekerjaan Eternit
Septictank
Sumur Resapan dan Rembesan
Closet jongkok
IX PEKERJAAN SANITASI Closet Pria (urinoir)
Wastafel
Kran
Pipa Galvanis 4"
Kunci Tanam Biasa
Kunci Kamar Mandi
PEKERJAAN KUNCI
X
Engsel Pintu
DAN PENGGANTUNG
Engsel Jendela
Engsel Angin
PEKERJAAN PENUTUP Pekerjaan Granit 60x60 Terang
XI
LANTAI
Pekerjaan Granit 20x60 Gelap
Pengecatan Tembok
PEKERJAAN
XII
Pengecatan Kayu
PENGECATAN
Pelaburan Bidang Kayu
Stop Kontak
Saklar Tunggal
Saklar Ganda
Stop Kontak AC
AC Cassete 5 PK
AC Split 1 PK
Lampu TL 2x40 Watt
XIII PEKERJAAN INSTALASI
Downlight 9 Watt
Barret 20 Watt
Box Sekering
Pipa PVC "
Sparing Telepon
Pesawat Telepon
Kabel Telepon
JUMLAH
BOBOT KUMULATIF

0.082
0.445
0.527
0.082
0.228
4.051
0.568
0.082
0.163
0.092
0.075
0.027
0.007
1.212
0.024
0.023
0.052
0.039
0.137
3.668
0.093
0.726
0.028
0.024
0.019
0.007
0.004
0.026
6.642
0.333
1.297
0.110
0.018
0.002
0.200
0.0001
0.012
0.010
100.00

DURASI
hari
2
1
1
92
92
2
1
2
2
2
2
2
7
3
7
3
3
7
3
2
2
3
3
3
3
3
2
3
3
3
3
4
3
3
3
4
4
3
3
2
2

2
0.340

0.0078
0.008

0.653
0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0020

0.0020

0.0020
0.079

0.0020
0.079

0.0020

0.0020

0.0020

4.240
0.0078
0.008
2.517
0.0020

3.294
0.231
0.238

2
2
2
2
2
2
2
4
4
1
1
1
1
1
3

2
2
3
3
3
3

3
3
3
6.77
6.77

0.36
7.13

0.67
7.80

0.10
7.90

0.10
8.00

0.02
8.01

0.02
8.03

3.78
11.81

10

11

12

13

14

15

16

17

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.068
0.356

0.068
0.356

0.068

0.068

0.068

0.068

0.068

0.415

0.415
0.047

0.047

0.023
3.294
0.231
0.238

0.097
0.060

0.060
0.870

0.870
0.804

0.870

0.870
0.804

0.870

0.870
0.804

0.870

0.870
0.804

0.197

0.197

3.78
15.59

0.04
15.63

0.50
16.13

0.50
16.63

3.98
20.61

3.98
24.59

0.33
24.92

0.33
25.25

3.40
28.65

MINGGU KE 22
23

18

19

20

21

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0020

0.0020

0.0020

0.0020

0.068

0.136

0.068

0.068

0.415

0.415
0.047

24

25

26

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0020

0.0020

0.0020

0.0020

0.0020

0.068

0.136

0.068

0.068

0.068

0.415

0.415

0.870

0.870

0.870

0.870

0.870

0.870

0.870

0.870

0.038

0.038

0.047

0.097

0.097
1.331

1.331
0.870

0.870

0.804
1.501
0.870

0.804
1.501

0.804

0.804
1.501

0.804

0.870

0.804

0.804
1.501
1.501

1.501
1.501
0.197
0.038

0.804
1.501
0.870

0.804
1.501
0.870

0.804

0.870

0.804
1.501
0.870

0.097

0.038

0.804

0.197

0.758
1.416
1.230
0.189

0.008

0.008

0.242
0.009
0.008

3.40
32.04

12.93
44.98

4.28
49.25

0.242
0.009
0.008

3.73
52.99

0.33
53.32

12.30
65.62

3.40
69.01

4.22
73.23

4.28
77.51

27

28

29

30

31

32

33

34

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.068

0.068

0.068

0.068

0.047

0.047
0.097

0.097

0.804

0.804

0.804

0.804

0.804

0.804

0.804

0.804

0.038

0.038

0.197

0.197

0.758

0.758

1.416
1.230

1.416
1.230
0.189

0.008

1.834
0.047

3.73
81.24

0.33
81.57

3.40
84.97

3.40
88.36

1.94
90.30

1.834
0.047

1.94
92.23

3.42
95.66

0.21
95.87

35

36

37

38

39

40

41

42

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0078
0.008

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.0020

0.189

0.021

2.026
0.284
0.021

2.026
0.284
0.021

0.006

0.006

0.006

0.067

0.067

0.067

0.004
0.003
0.12
96.47

0.004
0.003
2.43
98.90

0.004
0.003
2.43
101.33

2.026
0.284

0.242
0.009
0.008

0.28
96.15

0.21
96.35

2.33
103.65

0.02
103.67

0.02
103.69