CONTRATO DE OBRA N
PROYECTO
MONTO CONTRATADO
S/. 444,733.41
S/. 375,896.96
S/. 444,733.41
MODALIDAD DE CONTRATO
SUMA ALZADA
PROPIETARIO
CONTRATISTA
CONSORCIO POMAROSA
REPRESENTANTE LEGAL
INGENIERO RESIDENTE
SUPERVISOR
ENTREGA DE TERRENO
PLAZO DE EJECUCION
90 DIAS CALENDARIOS
S/. 0.00
REINICIO DE TRABAJOS
AMPLIACION DE PLAZO
NO HAY
11 DE MAYO 2013
TO
CONSTRUCCION DE UN PONTON DE LA
Z
OBRA
CONTRATISTA
CONSORCIO POMAROSA
ING. RESIDENTE
FECHA
2/28/2012
MONTO
CONTRATO
(S/IGV)
DESCRIPCION
A:
%
ANTERIOR
VALORIZACION
ACTUAL
ACUMULADO
AVANCE
ACUMULADO
SALDO
POR
VALORIZAR
VALORIZACION CONTRACTUAL
FORMULA 01
376,896.95
0.00
123,349.24
123,349.24
32.73% 253,547.71
376,896.95
0.00
123,349.24
123,349.24
253,547.71
0.00%
32.73%
32.73%
67.27%
FORMULA 01
0.00
0.00
0.00
TOTAL (B)
0.00
0.00
0.00
0.00
123,349.24
123,349.24
"CONSTRUCCION DE UN PONTON DE LA
CALLE POMAROSA - PUERTO BERMUDEZ"
TOTAL (A)
AVANCE FISICO DE OBRA
B:
C:
REAJUSTES
AMORTIZACIONES
montos s/igv
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL (C)
0.00
0.00
0.00
0.00
0.00
0.00
123,349.24
123,349.24
0.00
18,844.85
18,844.85
GASTOS DE LICITACION
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL (D)
0.00
18,844.85
18,844.85
EN EFECTIVO (VN-D)
0.00
104,504.40
104,504.40
EN I.G.V. (18%*VN)
0.00
18,810.79
18,810.79
0.00
123,315.19
123,315.19
E:
RETENCIONES
AVANCE
CON IGV
IGV
SIN IGV
32.73%
145,552.11
22,202.86
123,349.24
10.00%
22,236.92
3,392.07
18,844.85
0.00
0.00
0.00
123,315.19
18,810.79
104,504.40
( R )
CONTRATISTA
SUPERVISOR
ING. RESIDENTE
FECHA
:
:
:
:
CONSORCIO POMAROSA
Ing. IVAN MESA
Ing. FELIX PAUCARHUANCA BENDEZU
2/28/2012
:
:
VALORIZACION
TOTAL
No.
MES
01
FEBRERO 2013
376,896.95
0.00
MONTO DEL
MONTO
ADELANTO
V
A
123,349.24
0.00
123,349.24
0.00
DE MATERIALES
MAROSA
ARHUANCA BENDEZU
0.00
0.00
CONTRATISTA
:
:
:
:
SUPERVISOR
ING. RESIDENTE
FECHA
:
:
VALORIZACION
TOTAL
No.
MES
01
+'AMORTIZ. MAT'!B22:C22
376,896.95
0.00
MONTO DEL
MONTO
ADELANTO
V
A
123,349.24
0.00
123,349.24
0.00
O EN DIRECTO
AROSA
RHUANCA BENDEZU
0.00
0.00
RESUMEN GENERAL
VALORIZACION N 1 - FEBRERO 2013
Proyecto
Contrato
Contratista
Ing. Residente
Supervisor
CONSORCIO POMAROSA
Ing. FELIX PAUCARHUANCA BENDEZU
Ing. IVAN MESA
ACUMULADO ACTUAL
FORMULA
DESCRIPCION
MONTOS CONTRATADOS
TOTAL
314,080.80
102,791.04
COSTO DIRECTO
314,080.80
102,791.04
314,080.80
102,791.04
31,408.08
10,279.10
31,408.08
10,279.10
376,896.95
123,349.24
67,841.45
22,202.86
SUB TOTAL 1
IMPUESTO GENERAL A LAS VENTAS (18%)
444,738.40
145,552.11
RESUMEN GENERAL
ACUMULADO ANTERIOR
EN EL PERIODO
TOTAL
TOTAL
0.00
102,791.04
0.00
102,791.04
0.00
102,791.04
0.00
10,279.10
0.00
10,279.10
0.00
123,349.24
0.00
22,202.86
0.00
145,552.11
Contrato
Contratista
Jefe de Conservacion
Modalidad de Ejeccin
CODIGO
DESCRIPCION
UND
METRADO
PRECIO
TOTAL
UNITARIO
SOLES
SOLES
PPTO 01
314,080.80
FORMULA 01
314,080.80
3,500.00
glb
1.00
2,500.00
2,500.00
1.02 CARTEL DE OBRA 2.40 x 3.60 MTS. INC. MAT. Y MANO DE OBRA
und
1.00
1,000.00
1,000.00
2,101.56
m2
200.00
2.28
456.00
m2
140.00
1.83
256.20
glb
1.00
1,389.36
1,389.36
Contrato
Contratista
Jefe de Conservacion
Modalidad de Ejeccin
CODIGO
DESCRIPCION
UND
METRADO
PRECIO
TOTAL
UNITARIO
SOLES
SOLES
3.00 DEMOLICIONES
4,036.14
m3
41.38
58.37
2,415.35
m3
55.87
29.01
1,620.79
34,440.92
4.01 EXCAVACIONES
4,370.06
m3
286.40
5.53
1,583.79
m3
343.56
8.11
2,786.27
4.02 RELLENOS
21,029.65
m3
338.86
31.45
10,657.15
m3
338.86
30.61
10,372.50
9,041.21
Contrato
Contratista
Jefe de Conservacion
Modalidad de Ejeccin
CODIGO
DESCRIPCION
UND
m3
METRADO
818.95
PRECIO
TOTAL
UNITARIO
SOLES
SOLES
11.04
9,041.21
44,925.24
44,925.24
m3
253.60
177.15
182,639.36
6.01 CIMENTACION
06.01.01
44,925.24
68,848.05
m3
101.44
390.49
39,611.31
m2
55.80
49.43
2,758.19
kg
2,528.41
6.43
16,257.68
kg
1,589.56
6.43
10,220.87
6.02 ESTRIBOS
85,741.33
Contrato
Contratista
Jefe de Conservacion
Modalidad de Ejeccin
CODIGO
DESCRIPCION
UND
METRADO
PRECIO
TOTAL
UNITARIO
SOLES
SOLES
m3
46.54
425.87
19,819.99
m3
28.57
425.87
12,167.11
m2
209.78
49.43
10,369.43
m2
41.48
37.43
1,552.60
kg
4,186.16
5.95
24,907.65
kg
2,828.46
5.95
16,829.34
2.80
34.01
95.23
13,131.39
m3
4.36
457.79
1,995.96
m2
28.86
48.47
1,398.84
kg
1,636.40
5.95
9,736.58
Contrato
Contratista
Jefe de Conservacion
Modalidad de Ejeccin
CODIGO
DESCRIPCION
UND
METRADO
PRECIO
TOTAL
UNITARIO
SOLES
SOLES
1,423.49
m3
0.82
457.79
375.39
m2
6.78
48.47
328.63
kg
120.92
5.95
719.47
13,495.11
m3
8.87
457.79
4,060.60
m2
50.62
48.47
2,453.55
kg
1,173.27
5.95
6,980.96
6,176.28
glb
1.00
6,176.28
6,176.28
3,467.44
Contrato
Contratista
Jefe de Conservacion
Modalidad de Ejeccin
CODIGO
DESCRIPCION
UND
METRADO
PRECIO
TOTAL
UNITARIO
SOLES
SOLES
und
2.00
853.36
1,706.72
und
2.00
880.36
1,760.72
1,405.92
m
8.00
175.74
10.00 BARANDAS
1,405.92
7,479.47
17.60
396.6
6,980.16
17.60
28.37
499.31
11.00 SEALIZACION
2,784.52
m2
1.49
875.54
1,304.55
und
2.00
189.64
379.28
10.44
105.43
1,100.69
Contrato
Contratista
Jefe de Conservacion
Modalidad de Ejeccin
CODIGO
DESCRIPCION
UND
METRADO
PRECIO
TOTAL
UNITARIO
SOLES
SOLES
12.00 ACCESOS
15,095.37
m3
200.63
53.91
10,815.96
m2
507.00
2.92
1,480.44
m3
50.70
13.88
703.72
m3
68.45
30.61
2,095.25
1,530.00
und
1.00
500
500.00
und
4.00
100
400.00
und
18.00
35
630.00
3,298.56
und
4.00
549.76
2,199.04
Contrato
Contratista
Jefe de Conservacion
Modalidad de Ejeccin
CODIGO
DESCRIPCION
UND
und
METRADO
2.00
PRECIO
TOTAL
UNITARIO
SOLES
SOLES
549.76
1,099.52
1,200.00
und
1.00
1,200.00
1,200.00
314,080.80
31,408.08
31,408.08
SUB TOTAL 1
IMPUESTO GENERAL A LAS VENTAS (18%)
376,896.95
67,841.45
VALORIZACION BRUTA
444,738.40
O BERMUDEZ
Monto Contratadol:
Plazo de Ejecuccin:
Fecha Reinicio de Obra:
Fecha Termino de Obra:
ACUMULADO ANTERIOR
Metrados
EN EL PERIODO
SOLES
Metrados
ACUMULADO ACTUAL
SOLES
Metrados
SOLES
0.00
102,791.04
102,791.04
0.00
102,791.04
102,791.04
Metrados
32.73%
SOLES
211,289.76
211,289.76
0.00
0.00
1.00
2,500.00
1.00
2,500.00
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
1,000.00
0.00
0.00
200.00
456.00
200.00
456.00
100.00%
0.00
0.00
0.00
0.00
140.00
256.20
140.00
256.20
100.00%
0.00
0.00
0.00
0.00
1.00
1,389.36
1.00
1,389.36
100.00%
0.00
0.00
O BERMUDEZ
Monto Contratadol:
Plazo de Ejecuccin:
Fecha Reinicio de Obra:
Fecha Termino de Obra:
ACUMULADO ANTERIOR
Metrados
EN EL PERIODO
SOLES
Metrados
ACUMULADO ACTUAL
SOLES
Metrados
SOLES
Metrados
SOLES
0.00
0.00
41.38
2,415.35
41.38
2,415.35
100.00%
0.00
0.00
0.00
0.00
55.87
1,620.79
55.87
1,620.79
100.00%
0.00
0.00
0.00
0.00
286.40
1,583.79
286.40
1,583.79
100.00%
0.00
0.00
0.00
0.00
343.56
2,786.27
343.56
2,786.27
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
338.86
10,657.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
338.86
10,372.50
O BERMUDEZ
Monto Contratadol:
Plazo de Ejecuccin:
Fecha Reinicio de Obra:
Fecha Termino de Obra:
ACUMULADO ANTERIOR
Metrados
EN EL PERIODO
SOLES
Metrados
ACUMULADO ACTUAL
SOLES
Metrados
SOLES
Metrados
SOLES
0.00
0.00
818.95
9,041.21
629.96
6,954.76
76.92%
188.99
2,086.45
0.00
0.00
144.87
25,664.32
144.87
25,664.32
57.13%
108.73
19,260.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
101.44
39,611.31
0.00
0.00
27.59
1,363.75
27.59
1,363.75
49.44%
28.21
1,394.44
0.00
0.00
1,895.32
12,186.94
1,895.32
12,186.94
74.96%
633.09
4,070.74
0.00
0.00
1,191.55
7,661.68
1,191.55
7,661.68
74.96%
398.01
2,559.19
O BERMUDEZ
Monto Contratadol:
Plazo de Ejecuccin:
Fecha Reinicio de Obra:
Fecha Termino de Obra:
ACUMULADO ANTERIOR
Metrados
EN EL PERIODO
SOLES
Metrados
ACUMULADO ACTUAL
SOLES
Metrados
SOLES
Metrados
SOLES
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
46.54
19,819.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
28.57
12,167.11
0.00
0.00
103.72
5,127.02
103.72
5,127.02
49.44%
106.06
5,242.40
0.00
0.00
27.08
1,013.77
27.08
1,013.77
65.30%
14.40
538.83
0.00
0.00
2,780.74
16,545.38
2,780.74
16,545.38
66.43%
1,405.42
8,362.27
0.00
0.00
1,878.86
11,179.21
1,878.86
11,179.21
66.43%
949.60
5,650.13
0.00
0.00
0.00
0.00
0.00
0.00%
2.80
95.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.36
1,995.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
28.86
1,398.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,636.40
9,736.58
O BERMUDEZ
Monto Contratadol:
Plazo de Ejecuccin:
Fecha Reinicio de Obra:
Fecha Termino de Obra:
ACUMULADO ANTERIOR
Metrados
EN EL PERIODO
SOLES
Metrados
ACUMULADO ACTUAL
SOLES
Metrados
SOLES
Metrados
SOLES
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.82
375.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.78
328.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
120.92
719.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.87
4,060.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
50.62
2,453.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,173.27
6,980.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
6,176.28
O BERMUDEZ
Monto Contratadol:
Plazo de Ejecuccin:
Fecha Reinicio de Obra:
Fecha Termino de Obra:
ACUMULADO ANTERIOR
Metrados
EN EL PERIODO
SOLES
Metrados
ACUMULADO ACTUAL
SOLES
Metrados
SOLES
Metrados
SOLES
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
1,706.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
1,760.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
1,405.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
17.60
6,980.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
17.60
499.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.49
1,304.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
379.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
10.44
1,100.69
O BERMUDEZ
Monto Contratadol:
Plazo de Ejecuccin:
Fecha Reinicio de Obra:
Fecha Termino de Obra:
ACUMULADO ANTERIOR
Metrados
EN EL PERIODO
SOLES
Metrados
ACUMULADO ACTUAL
SOLES
Metrados
SOLES
Metrados
SOLES
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
200.63
10,815.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
507.00
1,480.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
50.70
703.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
68.45
2,095.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
400.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
630.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
2,199.04
O BERMUDEZ
Monto Contratadol:
Plazo de Ejecuccin:
Fecha Reinicio de Obra:
Fecha Termino de Obra:
ACUMULADO ANTERIOR
Metrados
EN EL PERIODO
SOLES
Metrados
ACUMULADO ACTUAL
SOLES
Metrados
SOLES
Metrados
SOLES
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
1,099.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
1,200.00
0.00%
0.00
32.73%
102,791.04
102,791.04
32.73%
67.27%
211,289.76
0.00
0.00
10,279.10
10,279.10
10,279.10
10,279.10
21,128.98
21,128.98
0.00
0.00
123,349.24
22,202.86
123,349.24
22,202.86
253,547.71
45,638.59
0.00
145,552.11
145,552.11
299,186.30
METRADOS EJECUTADOS
OBRA: "CONSTRUCCION DE UN PONTON DE LA CALLE POMAROSA - PUERTO BERMUDEZ"
Proyecto
Contrato
"CONSTRUCCION
DE UN PONTON
DE LA CONSTRUCCION
CALLE POMAROSA
PUERTO
BERMUDEZ"
CONTRATO DE EJECUCION
DE LA OBRA
DE- UN
PONTON
DE LA CALLE
POMAROSA - PUERTO BERMUDEZ
Contratista
CONSORCIO POMAROSA
CODIGO
PPTO 01
DESCRIPCION
UND
METRADO
glb
1.00
100%
1.02 CARTEL DE OBRA 2.40 x 3.60 MTS. INC. MAT. Y MANO DE OBRA
und
0.00
0%
m2
200.00
100%
m2
140.00
100%
glb
1.00
100%
m3
41.38
100%
m3
55.87
100%
m3
286.40
100%
m3
343.56
100%
m3
0.00
0%
m3
0.00
0%
m3
818.95
100%
3.00 DEMOLICIONES
m3
144.87
57%
m3
0.00
0%
m2
27.59
49%
kg
1,895.32
75%
kg
1,191.55
75%
m3
0.00
0%
m3
0.00
0%
m2
103.72
49%
m2
27.08
65%
kg
2,780.74
66%
kg
1,878.86
66%
0%
m3
0.00
0%
m2
0.00
0%
kg
0.00
0%
m3
0.00
0%
m2
0.00
0%
kg
0.00
0%
m3
0.00
0%
m2
0.00
0%
kg
0.00
0%
glb
0.00
0%
und
0.00
0%
und
0.00
0%
0.00
0%
0.00
0%
0.00
0%
m2
0.00
0%
und
0.00
0%
0.00
0%
m3
0.00
0%
m2
0.00
0%
m3
0.00
0%
m3
0.00
0%
und
0.00
0%
und
0.00
0%
und
0.00
0%
und
0.00
0%
und
0.00
0%
0.00
0%
und
32.73%
CURVA "S"
"CONSTRUCCION DE UN PONTON DE LA CALLE POMAROSA - PUERTO BERMUDEZ"
GRAFICO COMPARATIVO
PROGRAMADO VS
EJECUTADO
100.00%
100.00%
90.00%
84.18%
AVANC
E
80.00%
70.00%
60.00%
55.53%
50.00%
40.00%
32.73%
30.00%
20.00%
27.46%
PROGRAMADO
10.00%
0.00%
0.00%
EJECUTADO
MESES
MONTOS VALORIZADOS PROGRAMADOS ACTUALIZADOS
COSTO DIRECTO (SIN IGV)
PORCENTAJES
PORCENTAJES
MES
ENERO
FEBRERO 2013
MARZO 2013
ABRIL 21013
MAYO 2013
TOTAL
PARCIAL
ACUMUL.
PARCIAL
ACUMUL.
S/
S/
86,256.41
88,150.06
89,986.97
49,687.35
314,080.80
0.00
86,256.41
174,406.47
264,393.44
314,080.80
27.46%
28.07%
28.65%
15.82%
100.00%
0.00%
27.46%
55.53%
84.18%
100.00%
MES
PARCIAL
ACUMUL.
PARCIAL
S/
S/
FEBRERO 2013
MARZO 2013
ABRIL 21013
MAYO 2013
102,791.04
TOTAL
314,080.80
102,791.04
32.73%
32.73%
100.00%
84.18%
PROGRAMADO
EJECUTADO
ACUMUL.
%
0.00%
32.73%
CUADRO DE VALORIZACIONES
PROYECTO
ENTIDAD
UBICACIN
CONTRATISTA
SUPERVISION
COSTO DIRECTO:
PROVINCIA: OXAPAMAPA
DEPARTAMENTO: PASCO
S/. 444,733.41
S/. 314,080.80
0.034945
VALORIZACION
MONTO
GASTOS
GENERALES
SUB
K REAJUSTE
VALORIZACIO
N
TOTAL
REAJUSTADA
UTILIDAD
DIRECTO
(10%)
FECHA
(10%)
RETEN. 10%
POR FIEL
CUMPLIM
AMORTIZACION VALORIZACIO
AMORTIZACION
N
POR ADELANTO
POR ADELANTO
DE
DIRECTO
MATERIALES
NETA
KV
19.460388%
IGV
FACTOR DE
RELACION
NETO A
Factor
PAGAR
TOTAL
(18%)
2/28/2013
AVANCE
ACTUAL %
VAL/CD
19.460388%
b = 0.10*a
c = 0.10*a
d = a+b+c
f = d*e
L = f-g-h-i
m = 0.18*L
n = L+m
Q = n*p
102,791.04
10,279.10
10,279.10
123,349.24
1.000
123,349.24
0.00
18,844.85
0.00
104,504.40
18,810.79
123,315.19
1.00
123,315.19
32.73%
AVANCE
PROG.
ACUMULADO ACUMULADO
%
%
32.73%
49.91%
3.09%
53.00%
MONTO TOTAL
102,791.04
10,279.10
10,279.10
123,349.24
0.00
18,844.85
0.00
104,504.40
18,810.79
123,315.19
1.00