Escolar Documentos
Profissional Documentos
Cultura Documentos
OBRA-MDLL/CH
A
DE
ASUNTO
: Valorizacin de Obra N 03
OBRA: "Construccion 05 AULAS + SS.HH I.E SECUNDARIA LUTTO"
137,977.37
137,977.37
100.00%
48.00%
REAJUSTE (s)
PRESUPUESTO
SUB-TOTAL
1,872.60
1,872.60
DEDUCCION
Amortizacin Ad.Efectivo
Amortizacin Ad.Materiales
Total Deducciones
139,849.97
57,714.47
0.00
57,714.47
GASTOS DE LICITACION
MULTA
F.
82,135.50
0.00
0.00
En Efectivo
En I.G.V. ( 19%)
MONTO TOTAL DE LA VALORIZACION CON I.G.V.
RETENCION POR FIEL CUMPLIMIENTO (FC)
G.
Atentamente,
82,135.50
15,605.75
97,741.25
0.00
S/.
97,741.25
DESCRIPCION
ITEM
01.00.00
und.
OBRAS PROVISIONALES
ANTERIOR
PARCIAL S/.
METRADO
2,099.52
01.01.00
und
01.02.00
m2
01.03.00
GLB
01.04.00
TRANSPORTE DE ESCOMBROS
01.05.00
TRAZO Y REPLANTEO
02.00.00
MOVIMIENTO DE TIERRAS
1.00
VALORIZACION
ACTUAL
AVANCE
FISICO % METRADO
VALORIZACION
2,099.52
100.00%
AVANCE
FISICO %
0.00
0.00%
ACUMULADO
METRADO
VALORIZACION
AVANCE
FISICO %
2,099.52
100.00%
SALDO
METRADO
VALORIZACION
SALDO %
0.00
0.00%
412.91
412.91
1.00
412.91
100.00%
0.00
0.00
0.00%
1.00
412.91
100.00%
0.00
0.00
0.00%
300.00
2.39
717.00
300.00
717.00
100.00%
0.00
0.00
0.00%
300.00
717.00
100.00%
0.00
0.00
0.00%
1.00
682.60
682.60
1.00
682.60
100.00%
0.00
0.00
0.00%
1.00
682.60
100.00%
0.00
0.00
0.00%
m3
27.00
10.03
270.81
27.00
270.81
100.00%
0.00
0.00
0.00%
27.00
270.81
100.00%
0.00
0.00
0.00%
m2
270.00
0.06
16.20
270.00
16.20
100.00%
0.00
0.00
0.00%
270.00
16.20
100.00%
0.00
0.00
0.00%
7,881.24
100.00%
0.00
0.00%
7,881.24
100.00%
7,881.24
0.00
0.00%
02.01.00
m3
112.00
60.00
6,720.00
112.00
6,720.00
100.00%
0.00
0.00
0.00%
112.00
6,720.00
100.00%
0.00
0.00
0.00%
02.02.00
EXCAVACION MANUAL
m3
116.59
8.02
935.05
116.59
935.05
100.00%
0.00
0.00
0.00%
116.59
935.05
100.00%
0.00
0.00
0.00%
02.03.00
m3
116.59
1.94
226.18
116.59
226.18
100.00%
0.00
0.00
0.00%
116.59
226.18
100.00%
0.00
0.00
0.00%
0.00%
03.00.00
14,799.50
14,799.50
100.00%
0.00
0.00%
14,799.50
100.00%
0.00
03.01.00
CIMIENTOS CORRIDOS
11,674.35
11,674.35
100.00%
0.00
0.00%
11,674.35
100.00%
0.00
0.00%
11,674.35
100.00%
0.00
0.00%
11,674.35
100.00%
0.00
0.00%
03.01.01
03.02.00
03.02.01
03.02.02
72.48
161.07
m2
81.43
27.14
4.11
222.66
SOBRECIMENTACION
ENCOFRADO DE SOBRECIMIENTO
04.00.00
04.01.00
ZAPATAS
04.01.01
72.48
3,125.14
2,210.01
81.43
915.13
4.11
147,933.46
m3
04.01.02
04.01.03
04.02.00
11,674.35
0.00
72.48
3,125.14
100.00%
0.00
0.00%
2,210.01
100.00%
0.00
0.00
0.00%
81.43
0.00
0.00
0.00%
4.11
0.00
0.00%
915.13
100.00%
147,933.46
100.00%
11,421.76
0.00
11,421.76
100.00%
0.00
0.00
0.00%
5.99
2,030.55
100.00%
0.00
0.00
0.00%
0.00
3,125.14
100.00%
0.00
0.00%
2,210.01
100.00%
0.00
0.00
0.00%
915.13
100.00%
0.00
0.00
0.00%
147,933.46
100.00%
0.00
0.00%
11,421.76
100.00%
0.00
0.00%
5.99
2,030.55
100.00%
0.00
0.00
0.00%
5.99
338.99
2,030.55
m3
14.99
346.88
5,199.73
14.99
5,199.73
100.00%
0.00
0.00
0.00%
14.99
5,199.73
100.00%
0.00
0.00
0.00%
kg
899.46
4.66
4,191.48
899.46
4,191.48
100.00%
0.00
0.00
0.00%
899.46
4,191.48
100.00%
0.00
0.00
100.00%
10,595.22
100.00%
0.00
0.00%
10,595.22
100.00%
0.00
0.00%
4.66
3,673.25
788.25
3,673.25
100.00%
0.00
0.00
0.00%
788.25
3,673.25
100.00%
0.00
0.00
0.00%
VIGAS DE CONECCIN
10,595.22
04.02.01
kg
788.25
04.02.02
m2
92.26
33.22
3,064.88
92.26
3,064.88
100.00%
0.00
0.00
0.00%
92.26
3,064.88
100.00%
0.00
0.00
0.00%
04.02.03
m3
10.00
385.71
3,857.10
10.00
3,857.10
100.00%
0.00
0.00
0.00%
10.00
3,857.10
100.00%
0.00
0.00
0.00%
45,825.28
100.00%
0.00
0.00%
45,825.28
100.00%
04.03.00
COLUMNAS
45,825.28
27,210.77
5,839.22
27,210.77
100.00%
0.00
0.00
0.00%
5,839.22
27,210.77
100.00%
0.00
0.00
0.00%
291.74
41.86
12,212.24
291.74
12,212.24
100.00%
0.00
0.00
0.00%
291.74
12,212.24
100.00%
0.00
0.00
0.00%
17.06
375.28
6,402.28
17.06
6,402.28
100.00%
0.00
0.00
0.00%
17.06
6,402.28
100.00%
0.00
0.00
0.00%
40,889.09
100.00%
0.00
0.00%
40,889.09
100.00%
kg
5,839.22
04.03.02
m2
04.03.03
m3
VIGAS
40,889.09
3,550.79
16,546.68
100.00%
0.00
0.00
0.00%
3,550.79
16,546.68
100.00%
0.00
0.00
0.00%
331.29
43.23
14,321.67
331.29
14,321.67
100.00%
0.00
0.00
0.00%
331.29
14,321.67
100.00%
0.00
0.00
0.00%
25.98
385.71
10,020.75
25.98
10,020.75
100.00%
0.00
0.00
0.00%
25.98
10,020.75
100.00%
0.00
0.00
0.00%
4,179.91
100.00%
0.00
0.00%
4,179.91
100.00%
1,280.20
100.00%
0.00
0.00
0.00%
274.72
1,280.20
100.00%
kg
3,550.79
04.04.02
m2
04.04.03
m3
ESCALERA
4,179.91
04.05.01
kg
274.72
04.05.02
ENCOFRADO DE ESCALERA
m2
23.75
04.05.03
m3
5.31
0.00%
36.21
859.99
23.75
859.99
100.00%
0.00
0.00
0.00%
23.75
859.99
100.00%
0.00
0.00
0.00%
384.13
2,039.73
5.31
2,039.73
100.00%
0.00
0.00
0.00%
5.31
2,039.73
100.00%
0.00
0.00
0.00%
35,022.19
100.00%
0.00
0.00%
35,022.19
100.00%
0.00
0.00%
7,569.06
1,716.34
7,569.06
100.00%
0.00
0.00
0.00%
1,716.34
7,569.06
100.00%
0.00
0.00
0.00%
215.70
47.85
10,321.25
215.70
10,321.25
100.00%
0.00
0.00
0.00%
215.70
10,321.25
100.00%
0.00
0.00
0.00%
24.05
400.96
9,643.09
24.05
9,643.09
100.00%
0.00
0.00
0.00%
24.05
9,643.09
100.00%
0.00
0.00
0.00%
2,035.00
3.68
7,488.80
2,035.00
7,488.80
100.00%
0.00
0.00
0.00%
2,035.00
7,488.80
100.00%
0.00
0.00
0.00%
37,744.69
100.00%
0.00
0.00%
37,744.69
100.00%
37,744.69
100.00%
0.00
0.00%
37,744.69
100.00%
1,716.34
04.06.02
ENCOFRADO DE LOSA
m2
04.06.03
m3
04.06.04
und
37,744.69
m2
0.00
4.41
kg
MURO DE LADRILLO KK
0.00%
0.00
274.72
35,022.19
05.01.00
0.00
1,280.20
4.66
LOSA ALIGERADA
04.06.01
05.00.00
0.00%
16,546.68
04.06.00
0.00
4.66
04.04.01
04.05.00
0.00%
4.66
04.03.01
04.04.00
0.00
418.92
90.10
37,744.69
418.92
0.00
418.92
0.00
0.00
0.00%
0.00
0.00%
0.00%
06.00.00
27,304.08
27,304.08
100.00%
0.00
0.00%
27,304.08
100.00%
0.00
06.01.00
TARRAJEOS
27,304.08
27,304.08
100.00%
0.00
0.00%
27,304.08
100.00%
0.00
0.00%
06.01.01
m2
514.30
20.76
10,676.87
514.30
10,676.87
100.00%
0.00
0.00
0.00%
514.30
10,676.87
100.00%
0.00
0.00
0.00%
06.01.02
m2
649.29
20.76
13,479.26
649.29
13,479.26
100.00%
0.00
0.00
0.00%
649.29
13,479.26
100.00%
0.00
0.00
0.00%
06.01.04
VESTIDURA DE DERRAMES M2
m2
197.86
15.91
3,147.95
197.86
3,147.95
100.00%
0.00
0.00
0.00%
197.86
3,147.95
100.00%
0.00
0.00
0.00%
DESCRIPCION
ITEM
07.00.00
und.
CIELORRASOS
ANTERIOR
PARCIAL S/.
METRADO
16,819.29
VALORIZACION
ACTUAL
AVANCE
FISICO % METRADO
VALORIZACION
16,819.29
100.00%
AVANCE
FISICO %
0.00
0.00%
ACUMULADO
METRADO
VALORIZACION
AVANCE
FISICO %
16,819.29
100.00%
SALDO
METRADO
VALORIZACION
SALDO %
0.00
0.00%
07.01.00
m2
192.50
22.79
4,387.08
192.50
4,387.08
100.00%
0.00
0.00
0.00%
192.50
4,387.08
100.00%
0.00
0.00
0.00%
07.03.00
m2
144.90
40.65
5,890.19
144.90
5,890.19
100.00%
0.00
0.00
0.00%
144.90
5,890.19
100.00%
0.00
0.00
0.00%
07.04.00
m2
120.28
16.77
2,017.10
120.28
2,017.10
100.00%
0.00
0.00
0.00%
120.28
2,017.10
100.00%
0.00
0.00
0.00%
07.05.00
m2
120.28
37.62
4,524.93
120.28
4,524.93
100.00%
0.00
0.00
0.00%
120.28
4,524.93
100.00%
0.00
0.00
0.00%
0.00
0.00%
39,687.54
100.00%
39,687.54
100.00%
08.00.00
PISOS Y PAVIMENTOS
39,687.54
0.00
0.00%
08.01.00
PERFILADO Y COMPACTADO
m2
186.23
4.35
810.10
0.00
0.00
0.00%
186.23
810.10
100.00%
186.23
810.10
100.00%
0.00
0.00
0.00%
08.03.00
m3
18.62
273.91
5,100.20
0.00
0.00
0.00%
18.62
5,100.20
100.00%
18.62
5,100.20
100.00%
0.00
0.00
0.00%
08.04.00
m2
94.91
17.10
1,622.96
0.00
0.00
0.00%
94.91
1,622.96
100.00%
94.91
1,622.96
100.00%
0.00
0.00
0.00%
08.05.00
m2
48.30
57.56
2,780.15
0.00
0.00
0.00%
48.30
2,780.15
100.00%
48.30
2,780.15
100.00%
0.00
0.00
0.00%
08.06.00
m2
289.80
101.36
29,374.13
0.00
0.00
0.00%
289.80
29,374.13
100.00%
289.80
29,374.13
100.00%
0.00
0.00
0.00%
218.64
11.17%
1,738.80
88.83%
1,957.44
100.00%
09.00.00
09.01.00
09.02.00
10.00.00
10.01.00
CONTRAZOCALOS
1,957.44
0.00
0.00%
24.00
9.11
218.64
24.00
218.64
100.00%
0.00
0.00
0.00%
24.00
218.64
100.00%
0.00
0.00
0.00%
168.00
10.35
1,738.80
0.00
0.00
0.00%
168.00
1,738.80
100.00%
168.00
1,738.80
100.00%
0.00
0.00
0.00%
0.00
0.00%
2,620.01
100.00%
2,620.01
100.00%
0.00
0.00%
2,620.01
100.00%
2,620.01
100.00%
ZOCALOS
ZOCALO DE CERAMICO 0.33 x 0.33
2,620.01
m2
43.50
60.23
2,620.01
0.00
43.50
43.50
0.00
0.00
0.00%
0.00
0.00%
0.00%
11.00.00
COBERTURAS
28,308.73
28,308.73
100.00%
0.00
0.00%
28,308.73
100.00%
0.00
11.01.00
ESTRUCTURA DE TECHO
28,308.73
28,308.73
100.00%
0.00
0.00%
28,308.73
100.00%
0.00
0.00%
11.01.01
p2
810.00
13.23
10,716.30
100.00%
0.00
0.00
0.00%
810.00
10,716.30
100.00%
0.00
0.00
0.00%
11.01.02
478.40
11.02.00
m2
355.88
12.00.00
6,716.74
100.00%
0.00
0.00
0.00%
478.40
6,716.74
100.00%
0.00
0.00
0.00%
355.88
10,875.69
100.00%
0.00
0.00
0.00%
355.88
10,875.69
100.00%
0.00
0.00
0.00%
0.00
0.00%
8,505.29
100.00%
8,505.29
100.00%
165.52
100.00%
38.05
165.52
100.00%
9.52
685.44
0.00
0.00
0.00%
72.00
685.44
100.00%
72.00
685.44
100.00%
0.00
0.00
0.00%
1,759.87
0.00
0.00
0.00%
30.74
1,759.87
100.00%
30.74
1,759.87
100.00%
0.00
0.00
0.00%
48.90
2,347.20
0.00
0.00
0.00%
48.00
2,347.20
100.00%
48.00
2,347.20
100.00%
0.00
0.00
0.00%
3.81
351.57
1,339.48
0.00
0.00
0.00%
3.81
1,339.48
100.00%
3.81
1,339.48
100.00%
0.00
0.00
0.00%
9.00
245.31
2,207.79
0.00
0.00
0.00%
9.00
2,207.79
100.00%
9.00
2,207.79
100.00%
0.00
0.00
0.00%
0.00
0.00%
14,125.00
100.00%
14,125.00
100.00%
72.00
m2
30.74
12.04.00
CANALETA DE ZINC
48.00
12.05.00
m3
12.06.00
und
13.02.00
13.03.00
0.00%
57.25
m2
ENCOFRADO Y DESENCOFRADO
13.01.00
0.00
38.05
CARPINTERIA DE MADERA
0.00%
0.00
0.00%
12.03.00
13.00.00
0.00
0.00
12.02.00
16.00.00
478.40
10,875.69
0.00
38.05
15.01.00
6,716.74
30.56
165.52
m2
15.00.00
14.04
8,505.29
PERFILADO Y COMPACTADO
14.03.00
810.00
12.01.00
14.00.00
10,716.30
4.35
14,125.00
0.00
0.00%
1.00
8,500.00
8,500.00
0.00
0.00
0.00%
1.00
8,500.00
100.00%
1.00
8,500.00
100.00%
0.00
0.00
0.00%
1.80
625.00
1,125.00
0.00
0.00
0.00%
1.80
1,125.00
100.00%
1.80
1,125.00
100.00%
0.00
0.00
0.00%
CLOSET Y REPISAS
5.00
900.00
4,500.00
0.00
0.00
0.00%
5.00
4,500.00
100.00%
5.00
4,500.00
100.00%
0.00
0.00
0.00%
0.00
0.00%
6,000.00
100.00%
6,000.00
100.00%
0.00
0.00%
6,000.00
100.00%
6,000.00
100.00%
GLB
und
CARPINTERIA METALICA
MODULO BATERIA SSHH
6,000.00
6.00
1,000.00
m2
67.49
150.00
0.00
0.00%
235.08
7.11
1,671.42
0.00
0.00
0.00%
6,000.00
0.00
und
10,123.50
PINTURA
10,123.50
0.00
16,538.75
0.00
0.00%
0.00
0.00%
100.00%
0.00%
601.20
4,755.49
0.00%
1,159.20
8,937.43
0.00
0.00%
355.88
3,785.48
67.53%
0.00
1,744.97
100.00%
m2
601.20
7.91
4,755.49
0.00
0.00
16.03.00
m2
1,159.20
7.71
8,937.43
0.00
0.00
16.04.00
m2
355.88
3.30
1,174.40
0.00
0.00
SISTEMA DE DESAGUE
1,744.97
100.00%
100.00%
16.02.00
17.01.00
100.00%
10,123.50
1,671.42
m2
5,606.01
10,123.50
16,538.75
INSTALACIONES SANITARIAS
67.49
235.08
16.01.00
17.00.00
6.00
6.00
67.49
10,123.50
100.00%
10,123.50
100.00%
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
16,538.75
100.00%
0.00
0.00%
235.08
1,671.42
100.00%
0.00
0.00
0.00%
100.00%
601.20
4,755.49
100.00%
0.00
0.00
0.00%
100.00%
1,159.20
8,937.43
100.00%
0.00
0.00
0.00%
1,174.40
100.00%
355.88
1,174.40
100.00%
0.00
0.00
0.00%
1,820.53
32.47%
5,606.01
100.00%
0.00
0.00%
0.00
0.00%
1,744.97
100.00%
0.00
0.00%
ACCESORIOS DE DESAGUE
GLB
1.00
305.50
305.50
1.00
305.50
100.00%
0.00
0.00
0.00%
1.00
305.50
100.00%
0.00
0.00
0.00%
17.01.02
und
33.00
4.79
158.07
33.00
158.07
100.00%
0.00
0.00
0.00%
33.00
158.07
100.00%
0.00
0.00
0.00%
17.01.03
30.00
9.46
283.80
30.00
283.80
100.00%
0.00
0.00
0.00%
30.00
283.80
100.00%
0.00
0.00
0.00%
17.01.04
80.00
12.47
997.60
80.00
997.60
100.00%
0.00
0.00
0.00%
80.00
997.60
100.00%
0.00
0.00
0.00%
17.01.01
DESCRIPCION
ITEM
17.02.00
17.02.01
und.
1.00
17.02.02
und
43.00
17.02.03
80.00
17.03.00
APARATOS SANITARIOS
17.03.02
17.04.00
298.30
VALORIZACION
ACTUAL
AVANCE
FISICO % METRADO
VALORIZACION
2,040.51
100.00%
298.30
100.00%
AVANCE
FISICO %
ACUMULADO
METRADO
0.00
0.00%
0.00
0.00
0.00%
1.00
VALORIZACION
AVANCE
FISICO %
2,040.51
100.00%
298.30
100.00%
SALDO
METRADO
VALORIZACION
SALDO %
0.00
0.00%
0.00
0.00
0.00%
298.30
1.00
4.87
209.41
43.00
209.41
100.00%
0.00
0.00
0.00%
43.00
209.41
100.00%
0.00
0.00
0.00%
19.16
1,532.80
80.00
1,532.80
100.00%
0.00
0.00
0.00%
80.00
1,532.80
100.00%
0.00
0.00
0.00%
0.00
0.00%
1,571.20
100.00%
1,571.20
100.00%
1,571.20
0.00
0.00%
APARATOS SANITARIOS
GLB
1.00
1,280.00
1,280.00
0.00
0.00
0.00%
1.00
1,280.00
100.00%
1.00
1,280.00
100.00%
0.00
0.00
0.00%
und
8.00
36.40
291.20
0.00
0.00
0.00%
8.00
291.20
100.00%
8.00
291.20
100.00%
0.00
0.00
0.00%
0.00
0.00%
249.33
100.00%
249.33
100.00%
CAJAS DE REGISTRO
249.33
0.00
0.00
0.00%
0.84
6.74
100.00%
0.84
6.74
100.00%
0.00
0.00
0.00%
2.97
41.75
124.00
0.00
0.00
0.00%
2.97
124.00
100.00%
2.97
124.00
100.00%
0.00
0.00
0.00%
0.34
348.80
118.59
0.00
0.00
0.00%
0.34
118.59
100.00%
0.34
118.59
100.00%
0.00
0.00
0.00%
0.00
0.00%
2,027.20
100.00%
2,027.20
100.00%
0.00
0.00%
2,027.20
100.00%
2,027.20
100.00%
m3
0.84
17.04.02
m2
17.04.03
m3
18.00.00
ESTRUCTURA DE MICROTRATAMIENTO
2,027.20
GBL
0.00%
6.74
EXCAVACION
ESTRUCTURA DE MICROTRATAMIENTO
0.00
8.02
17.04.01
18.01.00
METRADO
2,040.51
17.03.01
ANTERIOR
PARCIAL S/.
1.00
2,027.20
2,027.20
0.00
1.00
1.00
0.00
0.00
0.00%
0.00
0.00%
6,853.98
73.27%
2,500.53
26.73%
9,354.51
100.00%
0.00
0.00%
19.01.00
pto
36.00
125.14
4,505.04
36.00
4,505.04
100.00%
0.00
0.00
0.00%
36.00
4,505.04
100.00%
0.00
0.00
0.00%
19.02.00
pto
6.00
49.85
299.10
6.00
299.10
100.00%
0.00
0.00
0.00%
6.00
299.10
100.00%
0.00
0.00
0.00%
19.03.00
pto
6.00
59.44
356.64
6.00
356.64
100.00%
0.00
0.00
0.00%
6.00
356.64
100.00%
0.00
0.00
0.00%
19.04.00
pto
30.00
56.44
1,693.20
30.00
1,693.20
100.00%
0.00
0.00
0.00%
30.00
1,693.20
100.00%
0.00
0.00
0.00%
19.06.00
TABLERO DE DISTRIBUCIN
pza
1.00
306.85
306.85
0.00
0.00
0.00%
1.00
306.85
100.00%
1.00
306.85
100.00%
0.00
0.00
19.07.00
GLB
1.00
2,193.68
2,193.68
0.00
0.00
0.00%
1.00
2,193.68
100.00%
1.00
2,193.68
100.00%
0.00
0.00
20.00.00
0.00
0.00%
537.20
100.00%
537.20
100.00%
0.00
0.00%
537.20
100.00%
537.20
100.00%
19.00.00
20.01.00
INSTALACIONES ELECTRICAS
PIZARRAS ACRILICAS
21.01.00
PIZARRA ACRILICA
22.01.00
537.20
21.00.00
22.00.00
9,354.51
GLB
1.00
537.20
und
5.00
244.50
GLB
1.00
24,650.00
537.20
0.00
1,222.50
TRANSPORTE DE MATERIALES
1,222.50
0.00
24,650.00
TRANSPORTE DE MATERIALES
24,650.00
1.00
0.00
0.00%
0.00
0.00%
24,650.00
100.00%
24,650.00
100.00%
1.00
5.00
0.00
1,222.50
100.00%
1,222.50
100.00%
0.00
0.00%
0.00
0.00%
1.00
5.00
1.00
1,222.50
100.00%
1,222.50
100.00%
24,650.00
100.00%
24,650.00
100.00%
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
COSTO DIRECTO
425,845.45
318,398.61
74.77%
107,446.84
25.23%
425,845.45
100.00%
0.00
0.00%
37,673.34
28,167.82
74.77%
9,505.52
25.23%
37,673.34
100.00%
0.00
0.00%
UTILIDAD (8%)
34,067.64
25,471.89
74.77%
8,595.75
25.23%
34,067.64
100.00%
0.00
0.00%
SUB TOTAL
497,586.43
372,038.32
74.77%
125,548.11
25.23%
497,586.43
100.00%
0.00
0.00%
546,847.49
408,870.12
74.77%
137,977.37
25.23%
546,847.49
100.00%
0.00
0.00%
IGV (19%)
103,901.02
77,685.32
74.77%
26,215.70
25.23%
103,901.02
100.00%
0.00
0.00%
TOTAL PRESUPUESTO
650,748.52
486,555.44
74.77%
164,193.07
25.23%
650,748.52
100.00%
0.00
0.00%
OBRA
: CONSTRUCCION 05 AULAS + SS.HH I.E SECUNDARIA LUTTO
CONTRATISTA : EMPRESA PUMA ASOCIADOS S.C.R.L.
INSPECTOR
: ARQ. BERNARDO NOA INCA
RESIDENTE
: ING. CLAUDIO PUMA HUAEC
D.U. N 078-2009 N016-2010-MDLL/CH
PROCESO
PERIODO DEL 01 DE OCTUBRE AL 30 DE OCTUBRE 2010
RESUMEN DE LA VALORIZACION N 04
DESCRIPCION
VALORIZACION CONTRACTUAL
PRESUPUESTO
TOTAL CONTRACTUAL (V)
% DE AVANCE DE OBRA A LA FECHA
REAJUSTES (S)
PRESUPUESTO
TOTAL REAJUSTES
VALORIZACION BRUTA (VB=V+S)
AMORTIZACIONES (A)
POR ADELANTO DIRECTO
POR MATERIALES
TOTAL AMORTIZACION
VALORIZACION NETA (VN=VB-A)
MULTA POR ATRASO DE OBRA (M)
MONTOS A PAGAR AL CONTRATISTA (FACTURAR)
EN EFECTIVO (VN--M)
EN I.G.V. (VN*0.19)
MONTO TOTAL CON I.G.V. (FACTURAR)
RETENCION POR FC (RFC)
AL MES DE JULIO
TOTAL RETENCIONES
TOTAL COMPROMISO
MONTO
CONTRATADO
546,847.49
546,847.49
VA. ACUMUL.
ANTERIOR
VALORIZACION
ACTUAL
VAL. ACUMUL.
ACTUAL
408,870.12
408,870.12
137,977.37
137,977.37
25.23%
546,847.49
546,847.49
5,157.46
5,157.46
414,027.58
1,872.60
1,872.60
139,849.97
7,030.06
7,030.06
553,877.55
51,655.03
0.00
51,655.03
362,372.55
0.00
57,714.47
0.00
57,714.47
82,135.50
0.00
109,369.50
0.00
109,369.50
444,508.05
0.00
362,372.55
68,850.78
431,223.33
82,135.50
15,605.75
97,741.25
444,508.05
84,456.54
528,964.58
%
AVANCE
100.00%
100.00%
100.00%
SALDO POR
VALORIZAR
0.00
0.00
0.00%
FORMULA POLINOMICA N 04
OBRA
CONTRATISTA
INSPECTOR
RESIDENTE
PROCESO
MCAMB
DESCRIPCION
Sep-10
Oct-10
39
100.00%
0.321
350.68
353.67
0.324
354.62
0.325
354.51
0.325
354.01
0.324
ACEITE
18.75%
0.064
695.66
703.78
0.012
711.71
0.012
710.60
0.012
710.77
0.012
30
73.44%
0.064
360.20
358.48
0.047
356.00
0.046
354.97
0.046
355.30
0.046
48
3.13%
0.064
334.24
333.52
0.002
332.05
0.002
330.41
0.002
330.88
0.002
49
4.68%
0.064
244.23
242.31
0.003
240.59
0.003
239.56
0.003
239.47
0.003
2.60%
0.615
480.58
515.98
0.017
512.32
0.017
512.17
0.017
517.91
0.017
12.52%
0.615
476.19
511.25
0.083
507.63
0.082
507.48
0.082
513.17
0.083
AGREGADO FINO
0.49%
0.615
722.44
704.65
0.003
711.80
0.003
712.53
0.003
716.63
0.003
AGREGADO GRUESO
0.65%
0.615
547.36
536.93
0.004
551.39
0.004
551.32
0.004
545.01
0.004
0.16%
0.615
807.52
739.18
0.001
728.57
0.001
759.60
0.001
778.99
0.001
0.49%
0.615
586.30
544.94
0.003
542.26
0.003
560.09
0.003
578.95
0.003
10
0.33%
0.615
320.26
318.74
0.002
318.37
0.002
318.05
0.002
319.03
0.002
12
0.98%
0.615
276.48
284.72
0.006
283.24
0.006
282.31
0.006
282.39
0.006
BLOQUE Y LADRILLO
17
9.11%
0.615
819.28
802.16
0.055
774.03
0.053
769.69
0.053
770.30
0.053
21
12.85%
0.615
410.96
410.96
0.079
410.96
0.079
410.96
0.079
410.96
0.079
24
0.81%
0.615
270.36
269.75
0.005
269.92
0.005
269.60
0.005
269.58
0.005
FLETE TERRESTRE
32
6.50%
0.615
414.72
417.33
0.040
417.33
0.040
416.10
0.040
416.10
0.040
HERRAMIENTA MANUAL
37
0.81%
0.615
270.00
274.41
0.005
275.83
0.005
274.36
0.005
273.97
0.005
HORMIGON
38
2.11%
0.615
659.79
656.30
0.013
657.23
0.013
658.50
0.013
662.72
0.013
43
9.92%
0.615
740.75
734.99
0.061
735.30
0.061
739.01
0.061
757.52
0.062
44
6.34%
0.615
345.07
345.91
0.039
343.55
0.039
341.91
0.039
343.81
0.039
47
26.18%
0.615
415.58
430.83
0.167
430.83
0.167
430.83
0.167
430.83
0.167
PINTUTURA LATEX
54
2.76%
0.615
329.39
328.07
0.017
328.19
0.017
327.99
0.017
328.00
0.017
59
2.60%
0.615
182.58
184.05
0.016
184.05
0.016
184.05
0.016
180.69
0.016
PLANCHA GALVANIZADA
61
0.49%
0.615
319.31
317.29
0.003
315.04
0.003
315.50
0.003
316.06
0.003
72
0.98%
0.615
332.85
331.91
0.006
330.97
0.006
330.10
0.006
329.24
0.006
73
0.32%
0.615
369.57
367.20
0.002
366.82
0.002
365.25
0.002
365.38
0.002
1.000
BASE
Apr-10
Aug-10
INCID.
COEFICIENTE K
COEF.
Jul-10
COD.
INDICE
INDICE
1.014
INDICE
1.012
INDICE
1.011
1.014
Frmula Polinmica
Construccion 05 aulas+ ss.h
28-Jul-10
31-junio-2010
VAL
Valorizacin
Mes
109,369.50
546,847.49
Monto
CONTROL DE AMORTIZACION
DEL ADELANTO DIRECTO
MES
MONTO
SALDO
1
30-Jul-10
0.00
109,369.50
2
31-Aug-10
27,840.25
81,529.24
3
30-Sep-10
23,814.78
57,714.47
4
30-Oct-10
57,714.47
TOTAL
109,369.50
Ka
1.014
Reintegro
que NO
Corresponde
D = V*A/C (K / Ka - 1)
-58.53
-62.50
-8.36
-129.40
EJECUTADO
VALORIZACIONES
N
01
02
03
04
MES
Jul-10
Aug-10
Sep-10
Oct-10
SUB TOTAL
VALOR. ANTERIOR
REINT. A PAGAR
OBRA
: CONSTRUCCION 05 AULAS + SS.HH I.E SECUNDARIA LUTTO
CONTRATIST: EMPRESA PUMA ASOCIADOS S.C.R.L.
INSPECTOR : ARQ. BERNARDO NOA INCA
RESIDENTE : ING. CLAUDIO PUMA HUAEC
PROCESO D.U. N 078-2009 N016-2010-MDLL/CH
150,594.97
139,201.27
119,073.88
137,977.37
546,847.49
1.014
1.012
1.011
1.014
REINTEGRO
R
BRUTO
Vx(K-1)
Acumulado
AUTORIZADO
0.014
0.012
0.011
0.014
0.05
0.014
0.026
0.037
0.050
2,080.99
1,626.85
1,328.58
1,864.23
6,900.66
DEDUCCIONES
EFECTIVO
0.00
-58.53
-62.50
-8.36
REINTEGRO
MATERIAL
0.00
0.00
0.00
0.00
AUTORIZADO
2,080.99
1,685.38
1,391.08
1,872.60
7,030.06
5,157.46
1,872.60
PROCESO
Obra
Ubicacin
INSPECTOR
RESIDENTE
Contratista
VALORIZACION N 04
PERIODO DEL 01 DE OCTUBRE AL 30 DE OCTUBRE 2010