Você está na página 1de 2

AIM METAL FABRICATION

078 A. MABINI ST. CAINTA RIZAL

NOV. 24, 2015


ATTN: SIS. SALLY VERAS
MPC HEAD
DM-2 CHAPEL
CAINTA RIZAL
RE: PROPOSED LABOR COST FOR STEEL WORKS
ITEM NO.
PARTICULARS
QTY
AMT
A
STEEL WINDOW -AWNING
1
1.2 MTS X 2.0 MTS
12
24,000
2
1.2 MTS X 1.5 MTS
4
7,000
B
SWING DOOR WITH FIXED
4
4250 17,000
C
SLIDING DOOR WITH FIXED 1
7,000
TOTAL
55,000
INCLUSION HEREIN ARE A FOLLOWS
1. ELECTRIC TOOLS AND MACHINERIES.
2. INSTALLATION OF FINISH PRODUCTS.
EXCLUDED ARE AS FOLLOWS
1. MATERIALS AND CONSUMABLES
2. GLAZING AND MASONRY.
NOTE: VAT EXCLUSIVE

UNIT

U/C

SETS

2000

SETS

1750
SETS
SET

7000

DESIGN: AS PER PLAN


DURATION: 30-35 DAYS COMPLETION
TERMS :
WEEKLY BILLING
APPLICATION OF PRIMER PAINT ONLY
ALL WORKS GUARANTY
VERY TRULY YOURS,
DENNIS C. GUARDA

CONTRACTOR
7348134/09995775241