Você está na página 1de 14
Section: 1 Qi Duration of an operation consists of maximum of 5 parameters ‘Mutiple Choee - Select one correct answer fom he options ist. Oo TRUE oO FALSE Section: 4 a2 Non stock item category does not require a material number. ‘Muttiple Chaice - Select one correct answer fom the options list * O TRE i oO FALSE Section: 4 3 —_ What options doas the SAP ECC systom offar to retrieve tha available capacity for work contors? Mote Choice Tsay have mpi coractansivar Sec eguted asim fom te optons st © __ Shitsequence * _Stondard availa capacty OD shimpien CD _ Interval of avaible capacity Section: 1 a4 Through distribution key non discrete input and output can be controlled ‘Mutiple Choice - Selectone corectanswer fom the options ist ~ (oe * oO FALSE Q5 For Matera staging to the workcenter in an event driven manner, what is the possibilty in SAP? Mutat Choc Saectorecorectenawerfom th cotene ist © oO ‘SAP-SCM KANBAN . © _ SAPS REPLENISHMENT oO ‘SAP-SCM PRODUCT STABILITY Oo None of the above section: 1 Q6 Planning date can be copied to Demand management from ? ‘ite Croce Tis may nave meftleconect answers. Selectrecorec arias) Fam te orton st O copa soP MRP 0 oO LIP oO section: section: ‘Wat isthe report hat colects all important information about a work center or a hierarchy of work centers of shit? Monge Chace Slaton coretarsvertomopteslst ° 000 ‘Tha final assembly of a rished product should only be tnggered when a customer order aves Which planning siratogy or the frished product do you use? une nae Saectorecanectanavertome care hat fo} ooo 1 ‘nich formula parameters affect tne capacity requirements “machine” (standart formula manutacturing: machine Sshittcoport Shift transfor report “Transfer report ‘Shit work center report 50.0 400 100 700 requirements)? ute Cac Sectone crac aver ton te optne at ° ° °o ° Standard value machina Operation quantity Baso quantity Splis Section: 1 @10 set the requirements planning indicator (102) ora storage locaton, what effect does this have onthe ATP neck? ope Choe Satetone canst anavertomte apnea | © _Therwis no checkin the plant dung an ATP checkin ts storage locaton © Thetis no eft ofthese soting on ATP Chock © _Trovoh nese setings are doe system wil cnr out ATP check fr this storage lection Section: 1 Q11 Planned orders always generate production dates, ‘Muttiple Choice - Seiectone correct answer fom tie optors fst oO TRUE oO FALSE ~ Q12__Ithe individualcollective indicator is left “blank”, the component is planned as ‘otiote Chic Select one corectancwer Fam te ofors iat © indvicua collective indwidual & collective ° O _— besedon header material oO Section: 4 Q13 The same PRT can be assigned to more than one operation on the same routing. Matiple Choice Select one corect answer rom ne optone lt. ~ oO TRUE 7 oO FALSE Section: 4 14 The folowing apply to task Hsts and routing Iotole Choce-Seletere core anenerfom he opto © __Thoyare the same and sigiy only one thing a © _Tasklistis used only for inspection while routing is gener and can be used by any © __Tesklist cannot be used by maintenance while a routng can be. © _ Routing is one category ofthe vatious task ist types that are there, section: 1 Q15 Whats aphase in master recipe? ‘utp Chota: Stone comecteneerfon he pte at © Phases act information forthe operation only Phase is used forthe capaci planning ony anal schedulng is done athe operation level Phases are used for schodulng purpose ony andthe confirmation can be performed a he operation love ooo ‘Allthe functions such as scheduling, confrmafon, cost calaton ae performed at phase level in master reone Section: QA1G With respect to MRP controllers the following options are availabe one Chee Set one corectanene To eee. © _ witht mR contro, te materials ar locate oa person oa group of persons who fare « responsible for montoring material avatabity © _ Wiis possibo to selec the planning resul por MRP controller, © _ TEMP contotler can atner be one person a a group of persons OQ __ Ahotthe sbove Section: { Q17 — ABON wth status 2 means ‘uote Chace. Saittone sorectaravarFomne consist ~ © _ BONS “active” that it can be usod for explosion * oO Bom is Inactive thal in cannol be exploded or released for planned order Section: 4 Q18 What supplies will MRP create to offset shortages? ‘Mumple Choice -Selectone correct answer fom te optonstist fe) Sales orders Planned Orders None of the above ° Oo Process orders ° Section: 1 Q19 which of the following are types of PRT? Mottple Choice - This may nave muliple correctanswere. Select required answers) tom the eptons list Oo Matorial Equipment Miscellaneous 0 © Component oO section: 4 20 When schoduing a routing inthe SAP ECC systom, which ofthe folowing ime elements isa intoroperation time? Fel stay ne [«] © Foatbonneposasen O Prmessng ine O stntine seeton: 4 24 What s the transaction code to run the Long Term planning run for Single item, Multi level? ‘Muto Choice -Sebctore caret answer tom be optons ist oO mo Mso2 Mst2 ° OQ woe ° Section: 4 22 Injoint production, the apportionment structuro is maintained in the material mastor of which product? OQ eproducts O retina co-proauct OO rrroatet ° allof the above Q23. Which of he following scheduling types can only be used in capacity planning? Muitple Choice - Select one conectantwerfomthe onions ist ” Os Madpoint ie Os Foward O _ Only capacity requirements Os Backwara section: 1 @24 For BOM explosion in MRP, You must set the BOM status in the BOM header so thats active for MRP ‘Matie Croce Selctone comet aneweromthe eter st. Oo. me O Fase ~ ‘section: Q25 section: 4 1 Which types of objects can be changed with Engineering Change Management (ECM)? Mutige Choice -Tisrmay have mutple corect answers Selectrequired araier(s) For tie optons iat 0 Oo oO QO Master Recipe Resource Bill of material Material master 26 A compeny wishes to produce a component X It tls its engineering department to create @ BOM for that The ‘meteral sin the product developmesit stage and hence only cent level datas maintained inthe material master ‘Manele Crace -saectonecorectanster ome opts ke +! oO ° ° ° section: Q27 “The BOM cannot be creatod as thee is ne plant spectic view “The BOM can be created as 9 group BOM “The BOM can be created on MRP aroa kv “The BOM can be created on MRP Storage lacation level Capacity reduction is the result of ‘Multple Crea Tnie mey have mutipe covact araware Selectraqired anewerie) fom te optone ict oO 0 0 0 TECO! Lock of orders Close of orders Confirmation of orders Spliting of orders Section: { Q28 —_-Howcan the number of rescheduling exception messages be reduced or limited? Mutipte Chace - Tis may have muipe covectarswes.Selectregured arse) fom te options It ” o Not Change planning am (Tolerance Values CO Paanning time fence B Roduce all lead times to 1 section: 4 29. Whatis th altlorence between regenerative planning and net change planning? Melle Chace Set onecoretenne tom heaton at © Penning at materials while generating the planing fle, you can only plan materia for wich planning fle a exists © Planning atl materias based on demand, you plan all materials bases on previous production © Planning at! materials paral, planning all materials rom previous planning fle © Peming a materi nine lnning is carted out as @ backround ob Section: 30 Whats the stanadard operation time with star! time Zam, End time 3PM. break time 2 hour Efficiancy set at 80% Overload 110% Individual capacty$ 7 [pw] Mile Chace-seeetane cerectansuerRom te atone et © © s6hours O — Bthous OO 48hous O — es6hous section: 31 The frm your consulting wants a high cost material to not be stored in his warehouse, But be procured from an ‘extemal vendor only when an order fort comes. Which parameters would you set for it? twonee Croce Tema rave ate cores anuer Sats eearee anaes) rate ota it © _Bitamal procurement indicator in material master. Ds Maintain as nor-stock tem G_Sotspocia procurement ky “exten pracuremontiect production” _— Maintain in customization Section: 4 @Q32 = MPSisrun__. ‘Mutiple Choice Selectone caret anawer tom the optons ist nal oO After MRP run [=] O° Before DM but after SOP oO Before SOP & DM O° After DM before MRP Section: { Q33_—_ which of the following are relevant for cost settlement? ‘Muttpte Choice - Tis may nave mutdple corect answers. Select requred ansier(s} Fomine optons ist O so product Os byproduct oO waste product 0 scrap Section: 4 Q34 The individual / Collective indicator in the material Master datermines. Lustle Croce Select one comet enaver om bw ops it = © _ Whether a component is procured for a special customer requirement in the individual segment © _Whetner Requrement quantites of dependent metenals are grouped togetner during MRP run © _The Material Requirement Planning © _ The Special Procurement. Section: 4 @Q35 Quotas always determine a source using cumulative quantites. ‘Muttpe Choice - Stectone curectanswer om te optons it ~ oO TRUE a] oO FALSE Section: 4 36 Which of he folowing can be used to infuence the screen sequence and altrbutes(rcuired, visible, hiden) of ‘the material master record? Mule Choce Mis may tavemutplcoretanves Sekctigiee anor tom wonton it *) OC Userio mmatenal type oO OO Pint oO Section: 4 Q37 Is Sales order A Qty 15 PC and Seles order B Oty. 25 PC are booked on same date and stock is 0 PC IMotle Once is may have rl corctanvers Select reured reve) arte ctor (Separate Planned Order for each Sales Order shal be created ifindiveval indicator is set * _—_Onvone planned order is crested it individual indicat is set (Separate Planned Order for each Sas Order shal be coated if Colectve indicator sot Oty on piannod oxdoris coated if Colla indicator i sot Section: 4 38 Youcancontrol which material types can be used as header material when creating @ bom. etile Choco -Selectonecaractanever tom he anton et. . OO TRE oO FALSE, Section: 4 39 What are the activities possible on Sub operations? ‘Mutiple Choice - This may have meftple correct answers. Select required ansve(s) fom the options list & ‘Scheduling Os Costing O Capacity Planning 0 rescheduling Section: 1 @Q40 Which of the following is more relevant to a product group? utiple Choice - The may have mule coractanawere. Selactrequred anowers) Forte oatone lit (© _ both the product group and the members are plant dependent ‘Support cross-plant planning (© _ Proportional factors can be assigned to members of the product group (© _ based on characteristic in flexible planning

Você também pode gostar