NO. Koefisien
1
1
1
1
Alat :
Unit Mesin Waterjett + Aksesoris
Unit Boat service
Unit Theodolite + Aksesoris
Unit Alat Selam + Aksesoris
Alat bantu kerja lainnya
Bahan :
Tali pengikat nilon khusus
Kayu bulat atau persegi ukuran D=15cm, L=4m
1
6
1
Upah :
Org Mandor
Org Pekerja Harian
Org Operator Boat
1
1
1
1
2
1
1
1
1
Alat :
Unit Mesin Waterjett + Aksesoris
Unit Boat service
Unit Alat bantu kerja lainnya
Bahan :
Tali pengikat nilon khusus
Kayu bulat atau persegi ukuran D=15cm, L=4m
1
2
1
1
1
1
Upah :
Org Mandor
Org Pekerja Harian
Org Operator Boat
Org Pembantu Operator Boat
Org Kepala Tukang Pancang
Org Kepala Tukang Kayu
Alat :
Unit Boat Service
1
1
Unit Excavator
Unit Theodolite
1
6
1
2
1
2
1
1
1
1
Upah :
Org Mandor
Org Pekerja Harian
Org Kepala Tukang
Org Penyelam
Org Surveyor
Org Pembantu Surveyor
Org Operator Boat Service
Org Pembantu Operator Boat Service
Org Operator Excavator
Org Pembantu Operator Excavator
1
1
Alat :
Unit Mesin Sandpump type Submersible 12" + Crew (sewa)
Unit Boat Service
Bahan :
Upah :
2
6
1
1
1
2
1
1
Org Mandor
Org Pekerja Harian
Org Kepala Tukang
Org Penyelam
Org Surveyor
Org Pembantu Surveyor
Org Operator Boat Service
Org Pembantu Operator Boat Service
REKAPITULASI :
ANALISA HARGA PEKERJAAN PEMASANGAN GEOTUBE
UKURAN 5m x 2,5m x 20m
* Kapasitas Kerja 3 Unit Geotube Perhari (60 m').
* Mesin pengisi yang digunakan adalah Sand Pump kap. 150m3/jam Type Submersible
NO.
U RAIAN
BIAYA PENGADAAN, PEMASANGAN DAN PENGISIAN GEOTUBE 2 Unit (5m x 2,5m x 20m) un
BIAYA PENGADAAN, PEMASANGAN DAN PENGISIAN 1 UNIT GEOTUBE
BIAYA PENGADAAN , PEMASANGAN DAN PENGISIAN 1 M3
BIAYA PENGADAAN GEOTUBE 1 Unit (5m x 2,5m x 25m)
BIAYA PEMASANGAN DAN PENGISIAN 1 UNIT GEOTUBE
BIAYA PEMASANGAN DAN PENGISIAN GEOTUBE 1 M3
U RAIAN
GEOTUBE 20m
Boat Service
Excavator
Theodolite
Upah :
Mandor
Pekerja Harian
Kepala Tukang
Penyelam
Surveyor
Pembantu Surveyor
Operator Boat Service
Pembantu Operator Boat Service
Operator Excavator
Pembantu Operator Excavator
Upah :
Mandor
Pekerja Harian
Kepala Tukang
Penyelam
Surveyor
Pembantu Surveyor
Operator Boat Service
Pembantu Operator Boat Service
U RAIAN
GADAAN, PEMASANGAN DAN PENGISIAN GEOTUBE 2 Unit (5m x 2,5m x 20m) untuk 1 hari kerja
GADAAN, PEMASANGAN DAN PENGISIAN 1 UNIT GEOTUBE
GADAAN , PEMASANGAN DAN PENGISIAN 1 M3
VOLUME
SATUAN
HARGA
SATUAN
(Rp)
3.00 Unit
JUMLAH
HARGA
(Rp)
82,775,000
248,325,000
6,793,750
OTUBE 20m
GEOTUBE 20m
4.50
4.50
8.00
8.00
1.00
Jam
Jam
Jam
Jam
Ls
GEOTUBE 20m
62,500
125,000
37,500
200,000
100,000
281,250
562,500
300,000
1,600,000
100,000
2,843,750
5,000
55,000
650,000
1,650,000
2,300,000
125,000
100,000
100,000
125,000
600,000
100,000
Jumlah
130.00 m'
30.00 Batang
Jumlah
1.00 Hari
1.00 Hari
1.00 Hari
1.00
1.00
1.00
1.00
1.00
1.00
Hari
Hari
Hari
Hari
Hari
Hari
75,000
100,000
100,000
150,000
100,000
200,000
Jumlah
75,000
100,000
100,000
150,000
200,000
200,000
1,650,000
3,075,000
pipa
2.00 Jam
2.00 Jam
1.00 Ls
62,500
125,000
100,000
125,000
250,000
100,000
475,000
5,000
55,000
250,000
1,650,000
1,900,000
125,000
100,000
100,000
75,000
100,000
100,000
125,000
200,000
100,000
75,000
100,000
100,000
700,000
Jumlah
50.00 m'
30.00 Batang
Jumlah
1.00
1.00
1.00
1.00
1.00
1.00
OH
OH
OH
OH
OH
OH
Jumlah
5,750,000
Geotube
mukla air laut
20m
seabed
8.00 Jam
125,000
1,000,000
8.00 Jam
8.00 Jam
300,000
37,500
2,400,000
300,000
3,700,000
125,000
100,000
100,000
200,000
150,000
100,000
100,000
75,000
200,000
100,000
125,000
600,000
100,000
400,000
150,000
200,000
100,000
75,000
200,000
100,000
2,050,000
Jumlah
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
Jumlah
84,331,250
8.00 Jam
8.00 Jam
10,207,031
125,000
81,656,250
1,000,000
82,656,250
125,000
100,000
100,000
200,000
150,000
100,000
100,000
75,000
250,000
600,000
100,000
200,000
150,000
200,000
100,000
75,000
Jumlah
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
OH
OH
OH
OH
OH
OH
OH
OH
Jumlah
1,675,000
JUMLAH HARGA
248,325,000
6,793,750
3,075,000
5,750,000
84,331,250
uk 1 hari kerja
Rp./Unit
Rp./m3
348,275,000
116,091,667
464,367
Rp./Unit
Rp./Unit
Rp./m3
124,162,500
49,975,000
159,920
Ir. MUNAWAL
Site Manager
NO.
U RAIAN
Terbilang :
Satu Milyar Delapan Ratus Empat Juta Rupiah
VOLUME
HARGA
SATUAN
(Rp)
SATUAN
JUMLAH
HARGA
(Rp)
1.00 Bulan
400,000,000
400,000,000
1.00 Paket
750,000,000
750,000,000
350,000
70,000,000
24,000,000
24,000,000
200.00 Jam
1.00 Paket
7,000,000
2,000,000
60,000,000
800,000
24,000,000
1,000,000
30,000,000
1.00 LS
200,000,000
1.00 LS
75,000,000
JUMLAH
PROFIT 10%
TOTAL
1,640,000,000
164,000,000
1,804,000,000