TRAFFIC IMPACT STUDY

CITY CHARTER SCHOOL PROJECT


City of Los Angeles, California
November 9, 2015

Prepared for:

City Charter School


11625 West Pico Boulevard
Los Angeles, CA 90064

LLG Ref. 5-13-0097-1

Prepared by:

Tin T. Nguyen
Transportation Engineer II

Under the Supervision of:

David S. Shender, P.E.


Principal

20931 Burbank Boulevard


Suite C
Woodland Hills, CA 91367
818.835.8648 T
818.835.8649 F

TABLE OF CONTENTS
SECTION

PAGE

1.0

Introduction ................................................................................................................................ 1
1.1 Study Area .......................................................................................................................... 3

2.0

Project Description ....................................................................................................................


2.1 Site Location .......................................................................................................................
2.2 Existing Project Site ...........................................................................................................
2.3 Proposed Project Description ............................................................................................

4
4
4
4

3.0

Site Access and Circulation ......................................................................................................


3.1 Vehicular Project Site Access ............................................................................................
3.2 Proposed Student Drop-Off and Pick-Up Operations ......................................................
3.2.1 Estimated Peak Vehicle Queue .............................................................................

6
6
8
8

4.0

Existing Street System ............................................................................................................... 10


4.1 Regional Highway System ................................................................................................ 10
4.2 Local Roadway System ..................................................................................................... 10
4.3 Roadway Descriptions ....................................................................................................... 12
4.4 Public Transit Services....................................................................................................... 13

5.0

Traffic Counts ............................................................................................................................ 16

6.0

Cumulative Development Projects .......................................................................................... 21


6.1 Related Projects .................................................................................................................. 21
6.2 Ambient Traffic Growth Factor......................................................................................... 28

7.0

Traffic Forecasting Methodology ............................................................................................ 29


7.1 Project Traffic Generation ................................................................................................. 29
7.2 Project Traffic Distribution and Assignment .................................................................... 30

8.0

Traffic Impact Analysis Methodology .................................................................................... 32


8.1 Impact Criteria and Thresholds ......................................................................................... 32
8.2 LADOT ATSAC/ATCS .................................................................................................... 37
8.3 Traffic Impact Analysis Scenarios .................................................................................... 37

9.0

Traffic Analysis .......................................................................................................................... 38


9.1 Existing Conditions ............................................................................................................ 38
9.1.1 Existing Conditions ............................................................................................... 38
9.1.2 Existing With Project Conditions ......................................................................... 38
9.2 Future Conditions ............................................................................................................... 38
9.2.1 Future Cumulative Baseline Conditions............................................................... 38
9.2.2 Future Cumulative With Project Conditions ........................................................ 43

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

TABLE OF CONTENTS (continued)


SECTION

PAGE

10.0 Congestion Management Program Traffic Impact Assessment ......................................... 48


10.1 Intersections ........................................................................................................................ 48
10.2 Freeways ............................................................................................................................. 49
10.3 Transit Impact Review ....................................................................................................... 49
11.0 Conclusions ................................................................................................................................. 50

LIST OF TABLES
SECTIONTABLE #

PAGE

41

Existing Transit Routes ............................................................................................................ 14

51

Existing Traffic Volumes ......................................................................................................... 17

61

Related Projects List and Trip Generation .............................................................................. 22

71

Project Trip Generation.................................................................................................... 31

81

City of Los Angeles Intersection Impact Threshold Criteria.................................................. 32

91

Levels of Service Summary ..................................................................................................... 39

LINSCOTT, LAW & GREENSPAN, engineers

ii

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

TABLE OF CONTENTS (continued)


LIST OF FIGURES
SECTIONFIGURE #

PAGE

11

Vicinity Map ............................................................................................................................. 2

21

Project Site Plan Ground Floor ............................................................................................. 5

31

Project Site Plan Access and Circulation ............................................................................. 7

41

Existing Lane Configurations .......................................................................................... 11

42

Existing Public Transit Routes ................................................................................................. 15

51

Existing Traffic Volumes Weekday AM Peak Hour ........................................................... 19

52

Existing Traffic Volumes Weekday PM Peak Hour............................................................ 20

61

Location of Related Projects .................................................................................................... 25

62

Related Projects Traffic Volumes Weekday AM Peak Hour.............................................. 26

63

Related Projects Traffic Volumes Weekday PM Peak Hour .............................................. 27

71

Project Trip Distribution Weekday AM Peak Hour ............................................................ 33

72

Project Trip Distribution Weekday PM Peak Hour ............................................................. 34

73

Project Traffic Volumes Weekday AM Peak Hour ............................................................. 35

74

Project Traffic Volumes Weekday PM Peak Hour.............................................................. 36

91

Existing With Project Traffic Volumes Weekday AM Peak Hour ..................................... 41

92

Existing With Project Traffic Volumes Weekday PM Peak Hour...................................... 42

93

Future Cumulative Baseline Traffic Volumes Weekday AM Peak Hour .......................... 44

94

Future Cumulative Baseline Traffic Volumes Weekday PM Peak Hour ........................... 45

95

Future Cumulative With Project Traffic Volumes Weekday AM Peak Hour ................... 46

96

Future Cumulative With Project Traffic Volumes Weekday PM Peak Hour .................... 47

APPENDICES
APPENDIX
A.

Manual Traffic Count Data

B.

CMA and Levels of Service Explanation


CMA Data Worksheets AM and PM Peak Hours

LINSCOTT, LAW & GREENSPAN, engineers

iii

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

TRAFFIC IMPACT STUDY

CITY CHARTER SCHOOL PROJECT


City of Los Angeles, California
November 5, 2015

1.0

INTRODUCTION

This traffic analysis has been conducted to identify and evaluate the potential traffic impacts
generated by the proposed City Charter School project at 3280 Motor Avenue located in the City
of Los Angeles. The project proposes the utilization of the existing commercial building as a
public charter school (grades 612) with a total enrollment of 840 students. The project site
location and general vicinity are shown in Figure 11.
The traffic analysis follows City of Los Angeles traffic study guidelines1 and is consistent with
traffic impact assessment guidelines set forth in the Los Angeles County Congestion
Management Program2. This traffic analysis evaluates potential project-related impacts at 22
key intersections in the vicinity of the project site. The study intersections were determined in
consultation with City of Los Angeles Department of Transportation (LADOT) staff. The
Critical Movement Analysis method was used to determine Volume-to-Capacity ratios and
corresponding Levels of Service for all 22 study intersections. A review also was conducted of
Los Angeles County Metropolitan Transportation Authority freeway and intersection monitoring
stations to determine if a Congestion Management Program transportation impact assessment
analysis is required for the proposed project.
This study (i) presents existing traffic volumes, (ii) includes existing traffic volumes with the
forecast net new traffic volumes from the proposed project, (iii) recommends mitigation
measures, where necessary, (iv) forecasts future cumulative baseline traffic volumes, (v)
forecasts future traffic volumes with the proposed project, (vi) determines future forecast with
project-related impacts, and (vii) recommends mitigation measures, where necessary.

Traffic Study Policies and Procedures, City of Los Angeles Department of Transportation, August 2014.
2010 Congestion Management Program for Los Angeles County, Los Angeles County Metropolitan
Transportation Authority, 2010.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

-1-

-2-

1.1

Study Area

Upon coordination with LADOT staff, 22 study intersections have been identified for evaluation
during the weekday morning and afternoon peak hours. The 22 study intersections provide local
access to the study area and define the extent of the boundaries for this traffic impact analysis.
Further discussion of the existing street system and study area is provided in Section 3.0.
The general location of the project in relation to the study locations and surrounding street
system is presented in Figure 11. The traffic analysis study area is generally comprised of those
locations which have the greatest potential to experience significant traffic impacts due to the
proposed project as defined by the Lead Agency. In the traffic engineering practice, the study
area generally includes those intersections that are:
a.

Immediately adjacent or in close proximity to the project site;

b.

In the vicinity of the project site that are documented to have current or projected
future adverse operational issues; and

c.

In the vicinity of the project site that are forecast to experience a relatively greater
percentage of project-related vehicular turning movements (e.g., at freeway ramp
intersections).

The locations selected for analysis were based on the above criteria, proposed school project
peak hour vehicle trip generation, the anticipated distribution of project vehicular trips, and
existing intersection/corridor operations.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

-3-

2.0

PROJECT DESCRIPTION

2.1

Site Location

The site of the proposed City Charter School project is located at 3280 Motor Avenue in the
West Los Angeles Community Plan area of the City of Los Angeles, California. The project site
is located at the northeast corner of the intersection of Motor Avenue and National Boulevard.
The project site location and general vicinity are shown in Figure 11. It is noted that City
Charter School operates an existing nearby facility at 11625 West Pico Boulevard.

2.2

Existing Project Site

The project site is currently developed with commercial buildings. In addition to the existing
retail and office uses that occupy the buildings, the site was previously occupied by an adult
education use. Vehicular access to the project site is provided via one driveway off of Motor
Avenue along the westerly property frontage. The westerly driveway provides access to both the
surface parking lot and the subterranean parking garage.

2.3

Proposed Project Description

The project applicant proposes to occupy and re-purpose the existing commercial building
(approximately 54,936 square feet of floor area) to provide a public charter school (grades 612)
with enrollment of up to 840 students. Vehicular access to the site will be provided via the
existing site driveway on Motor Avenue, as well as a proposed new site driveway on National
Boulevard. Construction and occupancy of the proposed project is planned to be completed by
year 2016. The site plan for the proposed City Charter School project is illustrated in Figure 2
1. Further discussion of the proposed project site access and circulation scheme is provided in
Section 3.0.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

-4-

-5-

3.0

SITE ACCESS AND CIRCULATION

The proposed site access scheme for the City Charter School project is displayed in Figure 31.
A description of the proposed site access and circulation scheme is provided in the following
subsections.

3.1

Vehicular Project Site Access

As previously noted, vehicular access to the project site is currently provided via the existing
driveway on Motor Avenue. However, due to the existing Century City Neighborhood Traffic
Management plan, left-turns and right-turns from National Boulevard to northbound Motor
Avenue are prohibited during the weekday morning commuter period (7:00 10:00 a.m.).
Further, the traffic signal green time on Motor Avenue at the National Boulevard intersection is
reduced to effectively meter northbound through traffic on Motor Avenue during this period
(i.e., to allow no more than 600 vehicles per hour on northbound Motor Avenue). These traffic
management measures have highly complicated vehicle access to the project site, particularly
during the morning commuter period. Thus, to better accommodate vehicles destined to the
school site and better disperse arrival traffic off of Motor Avenue the project proposes a
second site driveway to be provided on National Boulevard (for right-turn inbound traffic only).
The project driveways will serve student drop-off/pick-up operations and the on-site
subterranean parking garage. Student pick-up and drop-off operations will be conducted within
the surface parking area. Descriptions of the project site driveways are provided in the following
paragraphs.

Motor Avenue Project Driveway:


The existing Motor Avenue project driveway will provide access to the surface parking
area which will be used primarily by school faculty and visitors to the school. The Motor
Avenue project driveway is anticipated to accommodate full vehicular access ingress
(i.e., left-turn and right-turn ingress) and right-turn only egress.

National Boulevard Project Driveway:


The proposed National Boulevard project driveway will provide access to the student
drop-off/pick-up area. The inbound project driveway is anticipated to accommodate
limited vehicular access via right-turn ingress turning movements only.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

-6-

-7-

3.2

Proposed Student Drop-Off and Pick-Up Operations

The proposed charter school student drop-off/pick-up area is shown in Figure 3-1. Vehicles
destined to the charter school to drop-off or pick-up students will enter via the site driveway on
Motor Avenue or National Boulevard, circulate through the surface parking lot, complete the
student drop-off or pick-up, and then proceed back to the Motor Avenue driveway to exit the
site. The proposed drop-off/pick-up lane can accommodate approximately 12 vehicles queued
within the surface parking lot area.
To enhance student safety and better accommodate student drop-off/pick-up activities, it is
recommended that curbside parking be restricted along the project frontage on the east side of
Motor Avenue as well as on the north side of National Boulevard during the school drop-off and
pick-up activity periods.
3.2.1 Estimated Peak Vehicle Queue
Private vehicles are the main component that contributes to the vehicle queuing analysis during
the peak student drop-off and pick-up periods. The analysis focuses on the morning student
drop-off period as the pick-up of students tends to be dispersed on a relative basis throughout the
afternoon, particularly as students are involved with after-school activities.
The proposed project (without consideration of prior use trip credits) is forecast to generate 405
inbound trips and 259 outbound trips during the AM peak hour (refer to Section 7.0, Traffic
Forecasting Methodology, for a discussion of the projects trip generation forecasts). While the
ITE trip rates do not distinguish between trips related to staff arrivals and student drop-offs in the
morning, it can be generally assumed that the 259 outbound trips during the AM peak hour
would correlate with at least 259 inbound trips during this period related to student drop-off
operations. The remaining inbound vehicle trips during the AM peak hour are likely due to
administrative staff, visitors, etc., at the campus. Therefore, for this queuing analysis, it has been
assumed that approximately 259 vehicles would utilize the on-site vehicle queue area as part of
the student drop-off operations.
While the ITE forecasts are made for a peak one hour (i.e., 60 minute) period, it has been
observed that student drop-offs are typically concentrated in shorter timeframes leading up to the
start of classes for the day. Thus, for this analysis it has been conservatively (i.e., worst case)
assumed that the 259 vehicles would arrive in a 30 minute period, which is equivalent to
approximately 8.6 vehicles per minute. Multiplying this average arrival by two to approximate
the 95th percentile confidence level of a Poisson distribution (which is typically used by traffic
engineers in planning the lengths of left and right-turn pockets at intersections) results in an
estimated maximum of 17 vehicles per minute. As previously noted, the vehicle queue area can
accommodate up to a total of 12 passenger vehicles. Therefore, to provide for adequate vehicle
queuing on-site, it is recommended that student arrival and departure times be staggered. For
example, the Middle School could have commencement and dismissal times that are 30 minutes
earlier than the High School. In this way, the peak vehicle queue could be reduce by half (e.g. to
eight to nine vehicles). Based on the proposed staggering of student arrivals and departures, it is

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

-8-

concluded that the planned on-site vehicle queue area is adequate to accommodate the peak
demand of eight to nine queued vehicles during the morning student drop-off operation.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

-9-

4.0

EXISTING STREET SYSTEM

4.1

Regional Highway System

Regional access to the project site is provided by the I-10 (Santa Monica) Freeway as shown in
Figure 1-1. Brief descriptions of the I-10 Freeways are provided in the following paragraph:
I-10 (Santa Monica) Freeway is an east-west freeway connecting the City of Santa Monica with
the City of Los Angeles and the municipalities of the San Gabriel Valley and San Bernardino
County to the east. In the project vicinity, four mixed-flow freeway lanes are generally provided
in each direction on the I-10 Freeway with auxiliary merge/weave lanes provided between some
interchanges. Eastbound and westbound ramps are provided at Overland Avenue on the I-10
Freeway in the project area.

4.2

Local Roadway System

Immediate access to the project site is provided via Motor Avenue. The following study
intersections were selected in consultation with LADOT staff for analysis of potential impacts
due to the proposed project:
1. Sepulveda Boulevard / National Boulevard
2. Sepulveda Boulevard / Palms Boulevard
3. Westwood Boulevard / National Boulevard
4. Overland Avenue / Pico Boulevard
5. Overland Avenue / I-10 WB On-Off Ramp - National Boulevard
6. Overland Avenue / I-10 EB On-Ramp
7. Overland Avenue / National Place - National Boulevard
8. Overland Avenue / Palms Boulevard
9. Overland Avenue / Venice Boulevard
10. I-10 EB Off-Ramp / National Boulevard
11. National Boulevard - Mentone Avenue / Rose Avenue - National Boulevard
12. Motor Avenue / Pico Boulevard
13. Motor Avenue / Manning Avenue
14. Motor Avenue / National Boulevard
15. Motor Avenue / Palms Boulevard
16. Motor Avenue / Regent Street
17. Motor Avenue / Tabor Street
18. Motor Avenue / Venice Boulevard
19. Motor Avenue / Washington Boulevard
20. Palms Boulevard - National Boulevard / National Boulevard - Exposition Boulevard
21. National Boulevard / I-10 WB Off-Ramp - Manning Avenue
22. Castle Heights Avenue / National Boulevard
All 22 study intersections selected for analysis are presently controlled by traffic signals. The
existing lane configurations at the study intersections are displayed in Figure 41.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 10 -

- 11 -

4.3

Roadway Descriptions

A brief description3 of the important roadways in the project vicinity is provided in the following
paragraphs.
Sepulveda Boulevard is a north-south oriented roadway located west of the project site. Within
the project study area, Sepulveda Boulevard is designated as a Major Highway Class
II/Boulevard II by the City of Los Angeles. Two through travel lanes are generally provided in
both directions on Sepulveda Boulevard within the project study area. Separate exclusive leftturn lanes are provided on Sepulveda Boulevard at major intersections. Sepulveda Boulevard is
posted for a 35 miles per hour speed limit in the project vicinity.
Westwood Boulevard is a north-south oriented roadway located west of the project site. Within
the project study area, Westwood Boulevard is designated as a Secondary Highway/Avenue II by
the City of Los Angeles. Two southbound through travel lanes and one northbound through
travel lane are generally provided on Westwood Boulevard within the project study area.
Separate exclusive left-turn lanes are provided on Westwood Boulevard at major intersections.
Westwood Boulevard is posted for a 35 miles per hour speed limit in the project vicinity.
Overland Avenue is a north-south oriented roadway located west of the project site. Within the
project study area, Overland Avenue is designated as a Major Highway Class II/Boulevard II by
the City of Los Angeles. Two through travel lanes are generally provided in both directions on
Overland Avenue within the project study area. Separate exclusive left-turn lanes are provided
on Overland Avenue at major intersections. Overland Avenue is posted for a 35 miles per hour
speed limit in the project vicinity.
Motor Avenue is a north-south oriented roadway that borders the project site to the west. Within
the project study area, Motor Avenue is designated as a Major Highway Class II/Avenue II by
the City of Los Angeles. Two through travel lanes are generally provided in both directions on
Motor Avenue within the project study area. Separate exclusive left-turn lanes are provided on
Motor Avenue at major intersections. Motor Avenue is posted for a 35 miles per hour speed
limit in the project vicinity.
Pico Boulevard is an east-west oriented roadway that is located north of the project site. Within
the project study area, Pico Boulevard is designated as a Major Highway Class II/Avenue I by
the City of Los Angeles. Three through travel lanes are generally provided in both directions on
Pico Boulevard within the project study area. Separate exclusive left-turn lanes are provided on
Pico Boulevard at major intersections. Pico Boulevard is posted for a 35 miles per hour speed
limit in the project vicinity.
National Boulevard is an east-west oriented roadway that borders the project site to the south.
Within the project study area, National Boulevard is designated as a Secondary Highway/Avenue
I by the City of Los Angeles. Two through travel lanes are generally provided in both directions
3

The street designations provided refer to both the street standards adapted by the City in 1999, as well as the
Mobility Plan 2035 adopted by the City Council in August 2015.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 12 -

on National Boulevard within the project study area. Separate exclusive left-turn lanes are
provided on National Boulevard at major intersections. National Boulevard is posted for a 35
miles per hour speed limit in the project vicinity.
Palms Boulevard is an east-west oriented roadway that is located south of the project site.
Within the project study area, Palms Boulevard is designated as a Secondary Highway/Avenue II
by the City of Los Angeles. One through travel lane is generally provided in both directions on
Palms Boulevard within the project study area. Separate exclusive left-turn lanes are provided
on Palms Boulevard at major intersections. Palms Boulevard is posted for a 35 miles per hour
speed limit in the project vicinity.
Venice Boulevard is an east-west oriented roadway that is located south of the project site.
Within the project study area, Venice Boulevard is designated as a Major Highway Class
II/Boulevard II by the City of Los Angeles. Three through travel lanes are generally provided in
both directions on Venice Boulevard within the project study area. Separate exclusive left-turn
lanes are provided on Venice Boulevard at major intersections. Venice Boulevard is posted for a
35 miles per hour speed limit in the project vicinity.

4.4

Public Transit Services

Public transit service within the City Charter School project study area is currently provided by
Los Angeles County Metropolitan Transit Authority (Metro), Los Angeles Department of
Transportation (LADOT) Commuter Express, Santa Monica Big Blue Bus, and Culver CityBus.
A summary of the existing transit service, including the transit route, destinations and peak hour
headways is presented in Table 41. The existing public transit routes in the City Charter School
project site vicinity are illustrated in Figure 42.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 13 -

- 14 -

Westwood to Downtown Los Angeles


via Century City, Palms, I-10 Freeway

Palms to Santa Monica College


via Venice, Palms, Bundy

Westwood to Culver City Expo Station


via Palms

Century City to Culver City


via Rancho Park, Palms

Metro Green Line Station to UCLA


via Sepulveda

Commuter Express 431

Big Blue Bus 6

Big Blue Bus 12 / 12R

Culver City Bus 3

Culver City Bus 6

Palms Boulevard

National Boulevard

Palms Boulevard

Palms Boulevard

Motor Avenue

Motor Avenue

ROADWAY(S)
NEAR SITE

4
4
36

Total

LINSCOTT, LAW & GREENSPAN, engineers

3
4

4
4

2
-

3
6

NB
SB

NB
SB

NB
SB

EB
WB

EB
WB

EB
WB

LLG Ref. 5-13-0097-1


City Charter School Project

36

3
4

3
3

5
5

1
-

6
4

NO. OF BUSES/TRAINS
DURING PEAK HOUR
DIR
AM
PM

[1] Sources: Los Angeles County Metropolitan Transportation Authority (Metro) website, Los Angeles Department of Transportation (LADOT) Transit website,
Big Blue Bus website, and Culver City Bus website.

Downtown Los Angeles to Santa Monica


via Venice

DESTINATIONS

Metro Rapid 733

ROUTE

Table 4-1
EXISTING TRANSIT ROUTES [1]

- 15 -

5.0

TRAFFIC COUNTS

Manual traffic counts of vehicular turning movements were conducted at each of the study
intersections during the weekday morning and afternoon periods to determine the peak hour
traffic volumes. The manual traffic counts at the study intersections were conducted from 7:00
AM to 10:00 AM to determine the AM peak commuter hour and from 2:30 PM to 4:00 PM to
determine the PM peak hour (coincidently with peak student dismissal activities) in consultation
with LADOT staff. Additionally, the traffic counts conducted in February 2014 were increased
using an ambient growth rate of 1.0% (refer to Section 6.2, Ambient Traffic Growth Factor, for a
discussion of the growth factor utilized) to the existing year of 2015.
The weekday AM and PM peak period manual counts of vehicle movements at the study
intersections are summarized in Table 51. The existing traffic volumes at the study
intersections during the weekday AM and PM peak hours are shown in Figures 51 and 52,
respectively. Summary data worksheets of the manual traffic counts at the study intersections
are contained in Appendix A.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 16 -

Table 5-1
EXISTING TRAFFIC VOLUMES [1]
05-Nov-15

NO.

INTERSECTION

DATE

AM PEAK HOUR
PM PEAK HOUR
DIR BEGAN VOLUME [2] BEGAN VOLUME [2]

Sepulveda Boulevard /
National Boulevard

02/12/2014 NB
SB
EB
WB

7:30

1,774
565
1,554
841

3:00

1,126
1,247
1,367
867

Sepulveda Boulevard /
Palms Boulevard

02/12/2014 NB
SB
EB
WB

7:45

1,643
473
996
1,185

3:00

1,206
1,061
1,111
925

Westwood Boulevard /
National Boulevard

02/12/2014 NB
SB
EB
WB

7:45

750
539
1,237
491

3:00

357
1,018
1,058
545

Overland Avenue /
Pico Boulevard

02/12/2014 NB
SB
EB
WB

8:00

1,849
479
1,587
1,801

3:00

1,425
573
1,261
1,640

Overland Avenue /
I-10 WB On-Off Ramp National Boulevard

02/12/2014 NB
SB
EB
WB

7:45

2,274
1,323
983
845

2:30

1,440
1,661
842
1,084

Overland Avenue /
I-10 EB On-Ramp

02/12/2014 NB
SB
EB
WB

7:30

2,724
1,368
0
0

3:00

1,765
1,796
0
0

Overland Avenue /
National Place - National Boulevard

02/12/2014 NB
SB
EB
WB

7:45

2,122
535
499
1,622

2:45

1,311
927
880
955

Overland Avenue /
Palms Boulevard

02/12/2014 NB
SB
EB
WB

7:45

1,653
867
1,120
1,017

3:00

1,184
1,345
1,149
810

Overland Avenue /
Venice Boulevard

02/12/2014 NB
SB
EB
WB

8:00

1,787
1,601
1,064
1,232

3:00

1,033
1,432
1,614
1,438

10

I-10 EB Off-Ramp /
National Boulevard

02/12/2014 NB
SB
EB
WB

7:30

0
990
226
928

2:45

0
860
427
457

11

National Boulevard - Mentone Avenue /


Rose Avenue - National Boulevard

02/12/2014 NB
SB
EB
WB

7:30

180
500
79
716

3:00

45
775
100
428

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project

- 17 -

Table 5-1 (Continued)


EXISTING TRAFFIC VOLUMES [1]
05-Nov-15

NO.

INTERSECTION

DATE

AM PEAK HOUR
PM PEAK HOUR
DIR BEGAN VOLUME [2] BEGAN VOLUME [2]

12

Motor Avenue /
Pico Boulevard

02/12/2014 NB
SB
EB
WB

8:15

1,101
58
2,329
1,745

3:00

557
173
1,577
1,700

13

Motor Avenue /
Manning Avenue

02/12/2014 NB
SB
EB
WB

7:45

508
366
230
659

2:45

510
471
388
440

14

Motor Avenue /
National Boulevard

02/12/2014 NB
SB
EB
WB

7:30

594
516
473
471

2:45

479
586
752
202

15

Motor Avenue /
Palms Boulevard

02/12/2014 NB
SB
EB
WB

7:30

844
514
1,083
822

3:00

502
623
1,127
755

16

Motor Avenue /
Tabor Street

02/12/2014 NB
SB
EB
WB

7:30

733
460
114
282

3:00

468
644
81
127

17

Motor Avenue /
Regent Street

02/12/2014 NB
SB
EB
WB

7:30

654
515
145
228

2:45

451
664
130
83

18

Motor Avenue /
Venice Boulevard

02/12/2014 NB
SB
EB
WB

7:45

536
646
1,570
1,488

3:00

337
689
1,444
1,264

19

Motor Avenue /
Washington Boulevard

02/12/2014 NB
SB
EB
WB

7:45

0
434
1,274
1,124

2:45

0
404
1,153
1,124

20

Palms Boulevard - National Boulevard /


02/12/2014 NB
National Boulevard - Exposition Boulevard 02/20/2014 SB
EB
WB

7:45

1,436
838
270
388

3:00

1,064
1,032
523
168

21

National Boulevard /
I-10 WB Off-Ramp - Manning Avenue

7:45

1,581
1,075
150
314

3:00

1,244
808
166
633

22

Castle Heights Avenue /


National Boulevard

[1]
[2]

02/12/2014 NB
02/20/2014 SB
EB
WB

02/12/2014 NB
7:45
304
3:00
02/20/2014 SB
460
EB
1,247
WB
820
Counts conducted by National Data & Surveying Services
Note: Volumes conducted prior to existing year 2015 were increased using an ambient growth rate of 1.0%.

LINSCOTT, LAW & GREENSPAN, engineers

101
486
1,142
554

LLG Ref. 5-13-0097-1


City Charter School Project

- 18 -

- 19 -

- 20 -

6.0

CUMULATIVE DEVELOPMENT PROJECTS

The forecast of future pre-project conditions was prepared in accordance to procedures outlined
in Section 15130 of the CEQA Guidelines. Specifically, the CEQA Guidelines provide two
options for developing the future traffic volume forecast:
(A) A list of past, present, and probable future projects producing related or
cumulative impacts, including, if necessary, those projects outside the control of
the [lead] agency, or
(B) A summary of projections contained in an adopted local, regional or statewide
plan, or related planning document, that describes or evaluates conditions
contributing to the cumulative effect. Such plans may include: a general plan,
regional transportation plan, or plans for the reduction of greenhouse gas
emissions. A summary of projections may also be contained in an adopted or
certified prior environmental document for such a plan. Such projections may be
supplemented with additional information such as a regional modeling program.
Any such document shall be referenced and made available to the public at a
location specified by the lead agency.
Accordingly, the traffic analysis provides a highly conservative estimate of future pre-project
traffic volumes as it incorporates both the A and B options outlined in CEQA Guidelines for
purposes of developing the forecast.

6.1

Related Projects

A forecast of on-street traffic conditions prior to occupancy of the proposed project was prepared
by incorporating the potential trips associated with other known development projects (related
projects) in the area. With this information, the potential impact of the proposed project can be
evaluated within the context of the cumulative impact of all ongoing development. The related
projects research was based on information on file at the City of Los Angeles Departments of
Transportation and City of Culver City Planning Division. The list of related projects in the
project site area is presented in Table 61. The location of the related projects is shown in
Figure 61.
Traffic volumes expected to be generated by the related projects were provided by calculated
using rates provided in the Institute of Transportation Engineers (ITE) Trip Generation manual4.
The related projects respective traffic generation for the weekday AM and PM peak hours, as
well as on a daily basis for a typical weekday, is summarized in Table 61. The distribution of
the related projects traffic volumes to the study intersections during the weekday AM and PM
peak hours are displayed in Figure 62 and 63, respectively.

Institute of Transportation Engineers Trip Generation manual, 9th Edition, Washington, D.C., 2012.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 21 -

Table 6-1
RELATED PROJECTS LIST AND TRIP GENERATION [1]
PROJECT NAME/
PROJECT ADDRESS

PROJECT
STATUS

LA1

Bellwood Condominiums
10331 Bellwood Avenue

Proposed

Condominium

LA2

Simon Wiensenthal Center Expansion


9786 W. Pico Boulevard

Proposed

Museum
Private Events
Less Existing Uses

LA3

Mixed-Use
3115 S. Sepulveda Boulevard

Proposed

Specialty Retail
Condominium

LA4

The Palms Mixed-Use Project


10601 Washington Boulevard

Proposed

LA5

Century Plaza (Hyatt Regency Hotel)


2025 S. Avenue of the Stars

Proposed

Apartments
Office
Retail
Condominium
Office
Hotel
Spa/Fitness Facility
Quality Restaurant
High-Turnover (Sit-Down) Restaurant
Retail
Less Existing Uses

132
26,000
18,000
271
119,412
394
14,000
7,711
3,856
85,175

DU
GSF
GLSF
DU
GSF
Rooms
GSF
GSF
GSF
GLSF

LA6

Pico-Sepulveda Mixed-Use
11122 W. Pico Boulevard

Proposed

Apartments
Free-Standing Discount Store
Supermarket
Less Exisitng Uses

538
212,450
54,350
(6,500)

DU
GLSF
GLSF
GSF

LA7

Bellwood Avenue Senior Care & Medical Office


10330 W. Bellwood Avenue

Proposed

Medical Office
Assisted Living
Less Existing Uses

LA8

Motor Avenue Apartments


3425 S. Motor Avenue

Under
Construciton

Apartments
Retail
Less Existing Uses

LA9

United Oil 78
9815 W. National Boulevard

Proposed

Gas Station

LA10

Mixed-Use
11421 W. Olympic Boulevard

Proposed

Apartments
Specialty Retail

LA11

99 Cent Store - New


11040 W. Pico Boulevard

Proposed

Retail
Less Existing Uses

- 22 -

MAP
NO.

LINSCOTT, LAW & GREENSPAN, engineers

LAND USE DATA


LAND-USE
SIZE
City of Los Angeles
131 DU

PROJECT
DAILY
DATA
TRIP ENDS [2]
SOURCE
VOLUMES

AM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

PM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

[3]

549

44

46

36

19

55

[4]

1,713

139

103

242

210

159

369

772

46

27

73

53

58

111

2,050

82

68

150

101

151

252

69

12

81

131

123

20,476

277

355

632

952

901

1,853

958

50

58

25

88

113

115 DU
975 GLSF

651

39

45

32

15

47

12 VFP

977

30

31

61

52

53

105

89 DU
6,030 GLSF

682

10

36

46

34

21

55

19,819 GLSF

422

15

52

52

104

100,000 GSF
500 or 800 Seats

28,000 GLSF
138 DU

24,265 GSF
172 DU
(112) DU

[5]

(826)

(8)

LLG Ref. 5-13-0097-1


City Charter School Project

Table 6-1 (Continued)


RELATED PROJECTS LIST AND TRIP GENERATION [1]
MAP
NO.

PROJECT NAME/
PROJECT ADDRESS

PROJECT
STATUS

LAND USE DATA


LAND-USE
SIZE
City of Culver City

CC1

11012-11014 Washington Boulevard

Proposed

Commercial

CC2

Duquesne Avenue Condominiums


4139-4145 Duquesne Avenue

Proposed

Condominiums

CC3

11281 Washington Place

Proposed

Retail

CC4

Access Culver City


8770 Washington Boulevard

Under
Construction

CC5

Mazda
11215 Washington Boulevard

CC6

AM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

PM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

- 23 -

[7]

145

13

[8]

41

6,294 GLSF

[7]

269

11

12

23

Apartments
Retail

115 DU
31,240 GLSF

[6]
[7]

765
1,334

12
19

47
11

59
30

46
56

25
60

71
116

Proposed

Auto Dealership Addition

5,492 GSF

[9]

177

11

14

4058 Madison Avenue

Approved

Condominiums

[8]

23

CC7

Parcel B
9300 Culver Boulevard

Proposed

Mixed-Use

118,000 GLSF

[7]

5,039

70

43

113

210

228

438

CC8

Washington National
Northwest Corner of Washington Boulevard
and National Boulevard

Approved

Apartments
Office
Retail
Hotel

200
200,000
85,000
148

[6]
[10]
[7]
[11]

1,330
2,206
3,630
1,320

20
275
51
57

82
37
31
42

102
312
82
99

81
51
151
51

43
247
164
53

124
298
315
104

CC9

Culver Studios Ammend. No. 6


9336 Washington Boulevard

Proposed

Office

[10]

1,185

148

20

168

27

133

160

CC10

3846 Bentley Avenue

Proposed

Condominiums

4 DU

[8]

23

CC11

Globe Housing Project


4044-4068 Globe Avenue

Proposed

Condominiums

10 DU

[8]

58

CC12

Jazz Bakery
9814 Washington Boulevard

Proposed

Bakery/Caf

7,500 GSF

[12]

675

38

18

56

CC13

Sony
10202 Washington Boulevard

Proposed

Office

10,171 GSF

[10]

112

14

16

12

15

CC14

10808 Culver Boulevard

Under
Construction

Museum

12,596 GSF

[13]

426

17

26

17

18

35

CC15

11198 Washington Place

Approved

Commercial

[7]

164

14

CC16

11197 Washington Place

Proposed

Gas Station with Car Wash

[14]

917

36

35

71

42

41

83

LINSCOTT, LAW & GREENSPAN, engineers

3,385 GLSF

PROJECT
DAILY
DATA
TRIP ENDS [2]
SOURCE
VOLUMES

7 DU

4 DU

DU
GSF
GLSF
Rooms

107,438 GSF

3,850 GLSF
6 VFP

LLG Ref. 5-13-0097-1


City Charter School Project

Table 6-1 (Continued)


RELATED PROJECTS LIST AND TRIP GENERATION [1]
LAND USE DATA
LAND-USE

PROJECT
DAILY
DATA
TRIP ENDS [2]
SOURCE
VOLUMES

AM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

PM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

MAP
NO.

PROJECT NAME/
PROJECT ADDRESS

PROJECT
STATUS

CC17

The Platform
8810-8850 Washington Boulevard
and 3920 Landmark Street

Under
Construction

Office
Retail

38,732 GSF
41,745 GLSF

[10]
[7]

427
1,783

53
25

7
15

60
40

10
74

48
81

58
155

CC18

NMS@Culver City
9901 Washington Boulevard

Under
Construction

Apartment

131 DU

[6]

21

26

23

12

35

50,473

1,540

1,128

2,668

2,434

2,858

5,292

SIZE

TOTAL

- 24 -

[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
[9]
[10]
[11]
[12]
[13]
[14]

nom. = nominal
Source: City of Los Angeles Department of Transportation, unless otherwise noted in the Project Data Source column.
Trips are one-way traffic movements, entering or leaving.
Final Environmental Impact Report for Bellwood Condominium Project , Christopher A. Joseph & Associates, March 2009.
Traffic Impact Study for Simon Wiesenthal Center Museum of Tolerance at 9786 Pico Boulevard (at Roxbury Drive) , Crain & Associates, October 2008.
Traffic Impact Study Report for Century Plaza Project , Crain & Associates, December 2009.
ITE Land Use Code 220 (Apartment) trip generation equation rates.
ITE Land Use Code 820 (Shopping Center) trip generation equation rates.
ITE Land Use Code 230 (Residential Townhome/Condominium) trip generation equation rates.
ITE Land Use Code 843 (Automobile Sales) trip generation equation rates.
ITE Land Use Code 710 (General Office Building) trip generation equation rates.
ITE Land Use Code 310 (Hotel) trip generation equation rates.
ITE Land Use Code 931 (Quality Restaurant) trip generation equation rates.
ITE Land Use Code 495 (Recreational/Community Center) trip generation equation rates.
ITE Land Use Code 946 (Gasoline/Service Station with Convenience Market and Car Wash) trip generation equation rates.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project

- 25 -

- 26 -

- 27 -

6.2

Ambient Traffic Growth Factor

In order to account for unknown related projects not included in this analysis, the existing traffic
volumes were increased at an annual rate of 1.0 percent (1.0%) per year to the year 2016 (i.e., the
anticipated year of project build-out). The ambient growth factor was based on general traffic
growth factors provided in the 2010 Congestion Management Program for Los Angeles County
(the CMP manual) and determined in consultation with LADOT staff. It is noted that based
on review of the general traffic growth factors provided in the CMP manual for the West/Central
L.A. area, it is anticipated that the existing traffic volumes are expected to increase at an annual
rate of less than 0.2% per year between the years 2010 and 2020. Thus, application of an annual
growth factor of 1.0% allows for a conservative, worst case forecast of future traffic volumes in
the area. Further, it is noted that the CMP manuals traffic growth rate is intended to anticipate
future traffic generated by development projects in the project vicinity. Thus, the inclusion in
this traffic analysis of both a forecast of traffic generated by known related projects plus the use
of an ambient growth traffic factor based on CMP traffic model data results in a conservative
estimate of future traffic volumes at the study intersections.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 28 -

7.0

TRAFFIC FORECASTING METHODOLOGY

In order to estimate the traffic impact characteristics of the City Charter School project, a multistep process has been utilized. The first step is trip generation, which estimates the total arriving
and departing traffic volumes on a peak hour and daily basis. The traffic generation potential is
forecast by applying the appropriate vehicle trip generation equations or rates to the project
development tabulation.
The second step of the forecasting process is trip distribution, which identifies the origins and
destinations of inbound and outbound project traffic volumes. These origins and destinations are
typically based on demographics and existing/anticipated travel patterns in the study area.
The third step is traffic assignment, which involves the allocation of project traffic to study area
streets and intersections. Traffic assignment is typically based on minimization of travel time,
which may or may not involve the shortest route, depending on prevailing operating conditions
and travel speeds. Traffic distribution patterns are indicated by general percentage orientation,
while traffic assignment allocates specific volume forecasts to individual roadway links and
intersection turning movements throughout the study area.
With the forecasting process complete and project traffic assignments developed, the impact of
the proposed project is isolated by comparing operational (i.e., Levels of Service) conditions at
the selected key intersections using existing and expected future traffic volumes without and
with forecast project traffic. The need for site-specific and/or cumulative local area traffic
improvements can then be evaluated and the significance of the projects impacts identified.

7.1

Project Traffic Generation

Traffic volumes expected to be generated by the proposed City Charter School project during the
weekday AM and PM peak hours, as well as on a daily basis, were estimated using rates
published in the ITE Trip Generation manual as well as the West Los Angeles Transportation
Improvement and Mitigation Specific Plan (TIMP).
Traffic volumes expected to be generated by the proposed project were based upon rates per
number of students. The following trip generation rates were used to forecast the traffic volumes
expected to be generated by the project land use components:

Private School: West Los Angeles TIMP trip generation average rates were used to
forecast the AM peak hour traffic volumes expected to be generated by the proposed
project.

Private School K-12: ITE Land Use Code 536 (Private School K-12) trip generation
average rates were used to forecast the AM peak hour directional distribution, PM peak
hour traffic volumes, and daily trips expected to be generated by the proposed project.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 29 -

The trip generation forecast for the proposed project is summarized in Table 71. As shown in
Table 71, a 15% adjustment was applied to the projects trip generation forecast to account for
trips expected to be made by public transit in lieu of the private automobile. As shown in Table
41 and Figure 42, the project site is well served by public transit, including the forthcoming
opening of the Metro Expo Line
In addition, the trip generation forecast includes a trip credit for the prior adult school that
operated at the site. It is noted that the trip generation forecast conservatively does not include a
trip credit for the existing commercial uses on the site (e.g., retail and restaurant space) as the
school is planned to occupy the site in phases; thus, some existing commercial tenants will be
permitted to remain on-site prior to full occupancy of the school.
Finally, as previously noted, it is recommended that the school stagger the start times of the
Middle School and High School so as to allow for better management of vehicle queuing on-site.
Conservatively, the effect of the staggering of the student start and dismissal times is not
included in the trip generation forecast for the project.
The trip generation forecast for the proposed project was submitted for review and approval by
LADOT staff. As shown in Table 71, the proposed project is expected to generate 556 net new
vehicle trips (314 inbound trips and 242 outbound trips) during the AM peak hour. During the
PM peak hour, the proposed project is expected to generate 306 net new vehicle trips (106
inbound trips and 200 outbound trips). Over a 24-hour period, the proposed project is forecast to
generate a net increase of 664 daily trip ends (332 inbound trips and 332 outbound trips) during a
typical weekday.

7.2

Project Traffic Distribution and Assignment

Project traffic volumes both entering and exiting the site have been distributed and assigned to
the adjacent street system based on the following considerations:

The site's proximity to major traffic corridors (i.e., Sepulveda Boulevard, Overland
Avenue, National Boulevard, Palms Boulevard, Venice Boulevard, I-10 Freeway, etc.);

Expected localized traffic flow patterns based on adjacent roadway channelization and
presence of traffic signals;

Existing intersection traffic volumes;

Ingress/egress availability at the project site assuming the site access and circulation
scheme described in Section 3.0;

Nearby population and employment centers as well as adjacent residential


neighborhoods;

Input from LADOT staff.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 30 -

Table 7-1
PROJECT TRIP GENERATION [1]
05-Mar-14

LAND USE
Proposed Project
Charter School (6-12) [3][4]

SIZE

DAILY
TRIP ENDS [2]
VOLUMES

840 Students

2,083

Less 15% Transit Use [5]

AM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

PM PEAK HOUR
VOLUMES [2]
IN
OUT
TOTAL

476

305

781

205

282

487

(312)

(71)

(46)

(117)

(31)

(42)

(73)

(1,107)

(91)

(17)

(108)

(68)

(40)

(108)

314

242

556

106

200

306

Prior Use
Adult School [6]

- 31 -

NET INCREASE

(900) Students

664

[1] Sources: ITE "Trip Generation", 9th Edition, 2012;


West Los Angeles Transportation Improvement and Mitigation Specific Plan (TIMP).
[2] Trips are one-way traffic movements, entering or leaving.
[3] ITE Land Use Code 536 (Private School K-12) trip generation average rates per number of students.
- Daily Trip Rate: 2.48 trips/student; 50% inbound and 50% outbound
- PM Peak Hour Trip Rate: 0.58 trips/student; 42% inbound/58% outbound
- AM Peak Hour directional distribution 61% inbound/39% outbound
[4] West Los Angeles TIMP Schools (a.m. rates) - Private School per student.
- AM Peak Hour Trip Rate: 0.93 trips/student
[5] A 15% transit use reduction applied based on the project site location within 1/3 mile of the Expo Line Palms station.
[6] ITE Land Use Code 540 (Junior/Community College) trip generation average rates per number of students.
- Daily Trip Rate: 1.23 trips/student; 50% inbound and 50% outbound
- AM Peak Hour Trip Rate: 0.12 trips/student; 84% inbound/16% outbound
- PM Peak Hour Trip Rate: 0.12 trips/student; 63% inbound/37% outbound

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project

The general, directional traffic distribution patterns for the proposed project are presented in
Figure 71. The forecast net new weekday AM and PM peak hour project traffic volumes at the
study intersections associated with the proposed project are presented in Figures 72 and 73,
respectively. The traffic volume assignments presented in Figure 72 reflects the traffic
distribution characteristics shown in Figure 71 and the project traffic generation forecast
presented in Table 71.

8.0

TRAFFIC IMPACT ANALYSIS METHODOLOGY

The study intersections were evaluated using the Critical Movement Analysis (CMA) method of
analysis that determines Volume-to-Capacity (v/c) ratios on a critical lane basis. The overall
intersection v/c ratio is subsequently assigned a Level of Service (LOS) value to describe
intersection operations. Level of Service varies from LOS A (free flow) to LOS F (jammed
condition). A description of the CMA method and corresponding Level of Service is provided in
Appendix B.

8.1

Impact Criteria and Thresholds

The relative impact of the added project traffic volumes to be generated by the proposed project
during the AM and PM peak hours was evaluated based on analysis of future operating
conditions at the study intersections, without and with the proposed project. The previously
discussed capacity analysis procedures were utilized to evaluate the future v/c relationships and
service level characteristics at each study intersection.
The significance of the potential impacts of project generated traffic was identified using the
traffic impact criteria set forth in LADOTs Traffic Study Policies and Procedures, August 2014.
According to the Citys published traffic study guidelines, the impact is considered significant if
the project-related increase in the v/c ratio is equal to or exceeds the thresholds presented in
Table 81.
Table 8-1
CITY OF LOS ANGELES
INTERSECTION IMPACT THRESHOLD CRITERIA
Final v/c

Level of Service

Project Related Increase in v/c

> 0.701 - 0.800

equal to or greater than 0.040

> 0.801 - 0.900

equal to or greater than 0.020

> 0.901

E or F

equal to or greater than 0.010

The Citys Sliding Scale Method requires mitigation of project traffic impacts whenever traffic
generated by the proposed development causes an increase of the analyzed intersection v/c ratio
by an amount equal to or greater than the values shown above.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 32 -

- 33 -

- 34 -

- 35 -

- 36 -

8.2

LADOT ATSAC/ATCS

The City of Los Angeles Automated Traffic Surveillance and Control (ATSAC) and Adaptive
Traffic Control System (ATCS) provides computer control of traffic signals allowing automatic
adjustment of signal timing plans to reflect changing traffic conditions, identification of unusual
traffic conditions caused by accidents, the ability to centrally implement special purpose short
term traffic timing changes in response to incidents, and the ability to quickly identify signal
equipment malfunctions. ATCS provides real time control of traffic signals and includes
additional loop detectors, closed-circuit television, an upgrade in the communications links and a
new generation of traffic control software. LADOT estimates that the ATSAC system reduces
the critical v/c ratios by seven percent (0.07). The ATCS system upgrade further reduces the
critical v/c ratios by three percent (0.03) for a total of 10 percent (0.10). According to the City of
Los Angeles, ATSAC/ATCS system upgrades for all 22 study intersections have been
implemented. As such, the Level of Service calculations reflect a 0.10 adjustment for all
analysis scenarios evaluated.

8.3

Traffic Impact Analysis Scenarios

Pursuant to LADOTs traffic study, Level of Service calculations have been prepared for the
following scenarios for the study intersections:
(a)

Existing (2015) conditions.

(b)

Condition (a) with completion and occupancy of the project.

(c)

Condition (b) with implementation of project mitigation measures where


necessary.

(d)

Condition (a) plus one percent (1.0%) annual ambient traffic growth through year
2016 and with completion and occupancy of the related projects (i.e., future
cumulative baseline)

(e)

Condition (d) with completion and occupancy of the project.

(f)

Condition (e) with implementation of project mitigation measures where


necessary.

The traffic volumes for each new condition were added to the volumes in the prior condition to
determine the change in capacity utilization at the study intersections.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 37 -

9.0

TRAFFIC ANALYSIS

The traffic impact analysis prepared for the study intersections using the CMA methodology and
application of the City of Los Angeles significant traffic impact criteria is summarized in Table
91. The CMA data worksheets for the analyzed intersections are contained in Appendix B.

9.1

Existing Conditions

9.1.1 Existing Conditions


As indicated in column [1] of Table 91, the following intersections are currently operating at
LOS E or worse:

Int No. 4: Overland Avenue / Pico Boulevard (AM peak hour)

Int. No. 5: Overland Avenue / I-10 WB Freeway Ramps National Boulevard


(AM and PM peak hours)

Int. No. 9: Overland Avenue / Venice Boulevard (AM peak hour)

As indicated in column [1] Table 91, the other 20 study intersections are presently operating at
LOS D or better during the weekday AM and PM peak hours under existing conditions. The
existing traffic volumes at the study intersections during the weekday AM and PM peak hours
are displayed in Figures 51 and 52, respectively.
9.1.2 Existing With Project Conditions
As shown in column [2] of Table 91, application of the Citys threshold criteria to the Existing
With Project scenario indicates that the proposed project is not expected to create significant
impacts at any of the 22 study intersections. Incremental, but not significant, impacts are noted at
the study intersections. Because there are no significant impacts, no traffic mitigation measures
are required or recommended for the study intersections under the Existing With Project
conditions. The existing with project traffic volumes at the study intersections during the
weekday AM and PM peak hours are illustrated in Figures 91 and 92, respectively.

9.2

Future Conditions

9.2.1 Future Cumulative Baseline Conditions


The future cumulative baseline conditions were forecast based on the addition of traffic
generated by the plus completion and occupancy of related projects, as well as the growth in
traffic due to the combined effects of continuing development, intensification of existing
developments and other factors (i.e., ambient growth). The v/c ratios at all of the study
intersections are incrementally increased with the addition of ambient traffic and traffic
generated by the related projects listed in Table 61.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 38 -

Table 9-1
SUMMARY OF VOLUME TO CAPACITY RATIOS
AND LEVELS OF SERVICE
AM AND PM PEAK HOURS
09-Nov-15

[1]

NO.

INTERSECTION

PEAK
HOUR

[2]

YEAR 2015
EXISTING
V/C
LOS

YEAR 2015
EXISTING
W/ PROJECT
V/C
LOS

CHANGE
V/C
[(2)-(1)]

SIGNIF.
IMPACT

[3]
YEAR 2016
FUTURE PREPROJECT
V/C
LOS

[4]
YEAR 2016
FUTURE WITH
PROJECT
V/C
LOS

CHANGE
V/C
[(4)-(3)]

SIGNIF.
IMPACT

- 39 -

Sepulveda Boulevard /
National Boulevard

AM
PM

0.890
0.870

D
D

0.899
0.872

D
D

0.009
0.002

NO
NO

0.916
0.911

E
E

0.925
0.912

E
E

0.009
0.001

NO
NO

Sepulveda Boulevard /
Palms Boulevard

AM
PM

0.798
0.704

C
C

0.801
0.711

D
C

0.003
0.007

NO
NO

0.828
0.753

D
C

0.831
0.760

D
C

0.003
0.007

NO
NO

Westwood Boulevard /
National Boulevard

AM
PM

0.687
0.621

B
B

0.695
0.628

B
B

0.008
0.007

NO
NO

0.707
0.654

C
B

0.716
0.661

C
B

0.009
0.007

NO
NO

Overland Avenue /
Pico Boulevard

AM
PM

0.976
0.880

E
D

0.984
0.885

E
D

0.008
0.005

NO
NO

1.003
0.929

F
E

1.011
0.935

F
E

0.008
0.006

NO
NO

Overland Avenue /
I-10 WB On-Off Ramp National Boulevard

AM
PM

1.261
1.028

F
F

1.268
1.035

F
F

0.007
0.007

NO
NO

1.275
1.040

F
F

1.283
1.046

F
F

0.008
0.006

NO
NO

Overland Avenue /
I-10 EB On-Ramp

AM
PM

0.666
0.499

B
A

0.666
0.499

B
A

0.000
0.000

NO
NO

0.677
0.507

B
A

0.677
0.507

B
A

0.000
0.000

NO
NO

Overland Avenue /
National Place - National Boulevard

AM
PM

0.775
0.734

C
C

0.793
0.745

C
C

0.018
0.011

NO
NO

0.815
0.776

D
C

0.833
0.787

D
C

0.018
0.011

NO
NO

Overland Avenue /
Palms Boulevard

AM
PM

0.878
0.843

D
D

0.887
0.854

D
D

0.009
0.011

NO
NO

0.897
0.866

D
D

0.906
0.877

E
D

0.009
0.011

NO
NO

Overland Avenue /
Venice Boulevard

AM
PM

0.941
0.791

E
C

0.950
0.796

E
C

0.009
0.005

NO
NO

0.975
0.871

E
D

0.984
0.876

E
D

0.009
0.005

NO
NO

10

I-10 EB Off-Ramp /
National Boulevard

AM
PM

0.685
0.389

B
A

0.685
0.389

B
A

0.000
0.000

NO
NO

0.705
0.423

C
A

0.705
0.423

C
A

0.000
0.000

NO
NO

11

National Boulevard - Mentone Avenue /


Rose Avenue - National Boulevard

AM
PM

0.258
0.272

A
A

0.258
0.281

A
A

0.000
0.009

NO
NO

0.282
0.297

A
A

0.282
0.306

A
A

0.000
0.009

NO
NO

12

Motor Avenue /
Pico Boulevard

AM
PM

0.771
0.699

C
B

0.760
0.705

C
C

-0.011
0.006

NO
NO

0.782
0.715

C
C

0.771
0.721

C
C

-0.011
0.006

NO
NO

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-14-0097-1


City Charter School Project

Table 9-1 (Continued)


SUMMARY OF VOLUME TO CAPACITY RATIOS
AND LEVELS OF SERVICE
AM AND PM PEAK HOURS
09-Nov-15

[1]

NO.

INTERSECTION

PEAK
HOUR

[2]

YEAR 2015
EXISTING
V/C
LOS

YEAR 2015
EXISTING
W/ PROJECT
V/C
LOS

CHANGE
V/C
[(2)-(1)]

SIGNIF.
IMPACT

[3]
YEAR 2016
FUTURE PREPROJECT
V/C
LOS

[4]
YEAR 2016
FUTURE WITH
PROJECT
V/C
LOS

CHANGE
V/C
[(4)-(3)]

SIGNIF.
IMPACT

- 40 -

13

Motor Avenue /
Manning Avenue

AM
PM

0.593
0.476

A
A

0.616
0.495

B
A

0.023
0.019

NO
NO

0.601
0.482

B
A

0.624
0.501

B
A

0.023
0.019

NO
NO

14

Motor Avenue /
National Boulevard

AM
PM

0.466
0.539

A
A

0.491
0.547

A
A

0.025
0.008

NO
NO

0.492
0.567

A
A

0.516
0.574

A
A

0.024
0.007

NO
NO

15

Motor Avenue /
Palms Boulevard

AM
PM

0.690
0.720

B
C

0.725
0.735

C
C

0.035
0.015

NO
NO

0.720
0.753

C
C

0.756
0.768

C
C

0.036
0.015

NO
NO

16

Motor Avenue/
Tabor Street

AM
PM

0.574
0.407

A
A

0.597
0.421

A
A

0.023
0.014

NO
NO

0.592
0.429

A
A

0.615
0.443

B
A

0.023
0.014

NO
NO

17

Motor Avenue /
Regent Street

AM
PM

0.480
0.413

A
A

0.502
0.425

A
A

0.022
0.012

NO
NO

0.497
0.435

A
A

0.519
0.447

A
A

0.022
0.012

NO
NO

18

Motor Avenue /
Venice Boulevard

AM
PM

0.720
0.522

C
A

0.741
0.529

C
A

0.021
0.007

NO
NO

0.765
0.603

C
B

0.786
0.611

C
B

0.021
0.008

NO
NO

19

Motor Avenue /
Washington Boulevard

AM
PM

0.661
0.495

B
A

0.668
0.501

B
A

0.007
0.006

NO
NO

0.681
0.532

B
A

0.689
0.539

B
A

0.008
0.007

NO
NO

20

Palms Boulevard - National Boulevard /


National Boulevard - Exposition Boulevard

AM
PM

0.675
0.522

B
A

0.706
0.543

C
A

0.031
0.021

NO
NO

0.611
0.567

B
A

0.667
0.597

B
A

0.056
0.030

NO
NO

21

National Boulevard /
I-10 WB Off-Ramp - Manning Avenue

AM
PM

0.762
0.665

C
B

0.777
0.681

C
B

0.015
0.016

NO
NO

0.782
0.700

C
B

0.797
0.716

C
C

0.015
0.016

NO
NO

22

Castle Heights Avenue /


National Boulevard

AM
PM

0.863
0.711

D
C

0.869
0.718

D
C

0.006
0.007

NO
NO

0.875
0.737

D
C

0.881
0.745

D
C

0.006
0.008

NO
NO

[a]

According to LADOT's "Traffic Study Policies and Procedures, " August 2014, a transportation impact on an intersection shall be deemed significant in accordance
with the following table:
Final v/c
LOS
Project Related Increase in v/c
> 0.701 - 0.800
C
equal to or greater than 0.040
> 0.801 - 0.900
D
equal to or greater than 0.020
> 0.901
E,F
equal to or greater than 0.010

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-14-0097-1


City Charter School Project

- 41 -

- 42 -

As presented in column [3] of Table 91, the following intersections are expected to operate at
LOS E or worse during the weekday AM and PM peak hours with the addition of growth in
ambient traffic and related project traffic under the future cumulative baseline conditions:

Int. No. 1: Sepulveda Boulevard / National Boulevard (AM and PM peak hours)

Int No. 4: Overland Avenue / Pico Boulevard (AM and PM peak hour)

Int. No. 5: Overland Avenue / I-10 WB Freeway Ramps National Boulevard


(AM and PM peak hours)

Int. No. 9: Overland Avenue / Venice Boulevard (AM peak hour)

The future cumulative baseline (existing, ambient growth and related projects) traffic volumes at
the study intersections during the weekday AM and PM peak hours are presented in Figures 93
and 94, respectively.
9.2.2 Future Cumulative With Project Conditions
As shown in column [4] of Table 91, application of the Citys threshold criteria to the Future
With Project scenario indicates that the proposed project is not expected to create significant
impacts at any of the 22 study intersections. Incremental, but not significant, impacts are noted at
the study intersections. Because there are no significant impacts, no traffic mitigation measures
are required or recommended for the study intersections under the Future With Project
conditions. The future cumulative with project (existing, ambient growth, related projects and
project) traffic volumes at the study intersections during the weekday AM and PM peak hours
are illustrated in Figures 95 and 96, respectively.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 43 -

- 44 -

- 45 -

- 46 -

- 47 -

10.0 CONGESTION MANAGEMENT PROGRAM TRAFFIC IMPACT ASSESSMENT


The Congestion Management Program (CMP) is a state-mandated program that was enacted by
the California State Legislature with the passage of Proposition 111 in 1990. The program is
intended to address the impact of local growth on the regional transportation system.
As required by the 2010 Congestion Management Program for Los Angeles County, a Traffic
Impact Assessment (TIA) has been prepared to determine the potential impacts on designated
monitoring locations on the CMP highway system. The analysis has been prepared in
accordance with procedures outlined in the 2010 Congestion Management Program for Los
Angeles County, County of Los Angeles Metropolitan Transportation Authority, 2010.
According to Section D.9.1 (Appendix D, page D-6) of the 2010 CMP manual, the criteria for
determining a significant transportation impact is listed below:
A significant transportation impact occurs when the proposed project increases
traffic demand on a CMP facility by 2% of capacity (V/C > 0.02), causing or
worsening LOS F (V/C > 1.00).
The CMP impact criteria apply for analysis of both intersection and freeway monitoring
locations.

10.1

Intersections

The following CMP intersection monitoring locations in the project vicinity have been identified:

CMP Station

Intersection

No. 15

Overland Avenue / Venice Boulevard

No. 71

La Cienega Boulevard / Venice Boulevard

The CMP TIA guidelines require that intersection monitoring locations must be examined if the
proposed project will add 50 or more trips during either the AM or PM weekday peak hours. As
shown in Figures 7-3 and 7-4, the proposed project will not add 50 or more trips during either
the AM or PM weekday peak hours (i.e., of adjacent street traffic) at the CMP monitoring
intersections in the project vicinity, which is stated in the CMP manual as the threshold criteria
for a traffic impact assessment. Therefore, no further review of potential impacts to intersection
monitoring locations that are part of the CMP highway system is required.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 48 -

10.2

Freeways

The following CMP freeway monitoring location has been identified in the project vicinity:

CMP Station

Location

No. 1011

I-10 Freeway east of Overland Avenue

The CMP TIA guidelines require that freeway monitoring locations must be examined if the
proposed project will add 150 or more trips (in either direction) during either the AM or PM
weekday peak periods. The proposed project will not add 150 or more trips (in either direction)
during either the AM or PM weekday peak hours to CMP freeway monitoring locations which is
the threshold for preparing a traffic impact assessment, as stated in the CMP manual. Therefore,
no further review of potential impacts to freeway monitoring locations that are part of the CMP
highway system is required

10.3

Transit Impact Review

As required by the 2010 Congestion Management Program for Los Angeles County, a review has
been made of the potential impacts of the project on transit service. As discussed in Subsection
4.5 herein, existing transit service is provided in the vicinity of the proposed City Charter School
project.
The project trip generation, as shown in Table 71, was adjusted by values set forth in the CMP
(i.e., person trips equal 1.4 times vehicle trips, and transit trips equal 3.5 percent of the total
person trips) to estimate transit trip generation. Pursuant to the CMP guidelines, the proposed
project is forecast to generate demand for 17 transit trips during the AM peak hour and 3 transit
trips during the PM peak hour. Over a 24-hour period, the proposed project is forecast to
generate demand for 47 daily transit trips. Therefore, the calculations are as follows:

AM Peak Hour = 556 1.4 0.035 = 28 Transit Trips

PM Peak Hour = 306 1.4 0.035 = 15 Transit Trips

Daily Trips = 664 1.4 0.035 = 33 Transit Trips

As shown in Table 41, six transit lines and routes are provided adjacent to or in close proximity
the project site. As outlined in Table 41, under the No. of Buses/Trains During Peak Hour
column, these six transit lines provide services for an average of (i.e., average of the directional
number of transit vehicles during the peak hours) generally 36 transit vehicles during the AM
peak hour and roughly 36 transit vehicles during the PM peak hour. Therefore, based on the
above calculated AM and PM peak hour trips, this would correspond to an insignificant number
of additional transit riders. It is anticipated that the existing transit service in the project area will
adequately accommodate the increase of project-generated transit trips. Thus, given the low
number of project-generated transit trips per transit vehicle, no project impacts on existing or
future transit services in the project area are expected to occur as a result of the proposed project.
LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 49 -

11.0 CONCLUSIONS
This traffic impact analysis has been prepared to evaluate the potential impacts to the local street
system due to the City Charter School project at 3280 Motor Avenue. A total of 22 intersections
were identified and analyzed in order to determine changes in operations following construction
and occupancy of the proposed project. Application of the impact threshold criteria from the
City of Los Angeles indicates that none of the 22 study intersections would be significantly
impacted by the forecast project traffic. Incremental but not significant impacts are noted at the
study intersections evaluated in this analysis. As no significant impacts are expected due to the
proposed project, no traffic mitigation measures are required or recommended for the study
intersections.
It is recommended that the Middle School and High School components of the project stagger
student start and dismissal times by at least 30 minutes to ensure that drop-off and pick-up
operations could be adequately accommodated on-site. The staggering of student start and
dismissal times further ensures that the traffic impacts of the project at the off-site intersections
well be less than significant.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt3.doc

- 50 -

APPENDIX A
MANUAL TRAFFIC COUNT DATA

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-Appendix Covers.docx

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Sepulveda Blvd

East/West

National Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

53
12
76

71
14
36

62
27
36

64
23
54

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

451

7.30

185

9.45

410

8.15

242

7.45

PM PK 15 MIN

310

15.30

352

15.45

369

15.45

237

14.30

AM PK HOUR

1760

7.15

662

9.00

1585

8.00

833

7.30

PM PK HOUR

1115

15.00

1235

15.00

1353

15.00

878

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

SOUTHBOUND Approach

Lt
202
242
198
80
175

Th
1206
1197
812
333
765

897

4313

Rt Total
234
1642
245
1684
238
1248
83
496
175
1115
975

6185

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt
264
348
286
157
329

TOTAL

1384

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

TOTAL

46
55
83
70
141

Th
243
319
342
260
772

Rt Total
146
435
204
578
237
662
141
471
322
1235

395

1936

1050

3381

WESTBOUND Approach
Th
811
1132
918
459
893

Rt
77
105
102
74
131

Total
1152
1585
1306
690
1353

4213

489

6086

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
574
621
573
365
701

298

2834

Rt

XING N/L

N-S
2077
2262
1910
967
2350

Ped
77
137
68
71
100

Sch
3
21
1
18
10

Ped
33
33
24
17
45

Sch
0
0
0
0
0

9566

453

53

152

TOTAL

42
56
61
53
86

XING S/L

XING W/L

XING E/L

70
75
65
53
71

Total
686
752
699
471
858

E-W
1838
2337
2005
1161
2211

Ped
20
20
18
24
51

Sch
0
0
0
0
0

Ped
56
50
33
33
69

Sch
0
0
0
0
0

334

3466

9552

133

241

Project ID: 14-5069-001


City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Day: Wednesday

TOTALS

Date: 2/12/2014

AM

Sepulveda Blvd

Sepulveda Blvd

National Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
1

NT
3

NR
0

SL
1

ST
2

SR
0

EL
2

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

36
51
58
57
65
62
61
54
50
52
51
45

240
325
322
319
320
294
297
286
255
204
159
194

45
54
71
64
54
70
52
69
78
61
50
49

9
15
13
9
20
13
11
11
19
17
27
20

40
52
64
87
73
81
81
84
84
80
89
89

26
30
38
52
53
56
53
42
48
52
61
76

55
61
69
79
94
90
92
72
79
68
64
75

130
168
281
232
287
294
270
281
257
247
210
204

2
15
27
33
27
26
26
26
27
33
27
15

6
8
11
17
16
16
7
17
9
12
16
24

104
104
157
209
173
166
122
160
138
151
139
145

18
20
16
16
22
14
22
17
19
16
15
15

711
903
1127
1174
1204
1182
1094
1119
1063
993
908
951

NL
NT
NR
SL
ST
SR
EL
ET
642
3215
717
184
904
587
898
2861
14.04% 70.29% 15.68% 10.99% 53.97% 35.04% 22.21% 70.76%
nb a
nb d
sb a
sb d
eb a
eb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

National Blvd

242

PEAK HR FACTOR :
CONTROL : Signalized

1255
0.973

259

55

305
0.932

199

332

1094
0.938

ER
284
7.02%

WL
WT
159
1768
7.44% 82.73%
wb a
nb d

WR
210
9.83%

TOTAL
12429
TOTAL

113

60

705
0.861

68

4687
0.973

Project ID: 14-5069-001


City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Day: Wednesday

TOTALS

Date: 2/12/2014

PM

Sepulveda Blvd

Sepulveda Blvd

National Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

National Blvd
WESTBOUND

NL
1

NT
3

NR
0

SL
1

ST
2

SR
0

EL
2

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

42
38
50
40
45
40

154
179
162
185
210
208

33
50
34
37
55
49

34
36
29
34
37
41

117
143
171
174
210
217

70
71
68
79
81
94

73
84
81
73
89
86

246
213
222
206
219
246

31
43
25
39
30
37

26
27
21
18
26
21

188
177
165
163
198
175

23
30
21
19
10
21

1037
1091
1049
1067
1210
1235

NL
NT
NR
SL
ST
SR
EL
ET
ER
WL
WT
255
1098
258
211
1032
463
486
1352
205
139
1066
15.83% 68.16% 16.01% 12.37% 60.49% 27.14% 23.79% 66.18% 10.03% 10.46% 80.21%
nb a
nb d
sb a
sb d
eb a
eb d
wb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

175

PEAK HR FACTOR :
CONTROL : Signalized

765
0.899

175

141

772
0.877

322

329

893
0.917

131

86

701
0.917

WR
124
9.33%

TOTAL
6689
TOTAL

71

4561
0.923

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Sepulveda Blvd

East/West

Palms Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

58
32
79

31
22
55

28
12
18

26
22
29

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

466

7.45

125

8.15

261

8.15

300

7.45

PM PK 15 MIN

324

15.45

295

15.45

295

15.45

270

15.00

AM PK HOUR

1715

7.15

473

8.15

994

8.00

1173

7.45

PM PK HOUR

1194

15.00

1050

15.00

1100

15.00

916

15.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

SOUTHBOUND Approach

Lt
196
178
148
60
127

Th
1348
1257
921
397
897

709

4820

Rt Total
162
1706
127
1562
101
1170
91
548
170
1194
651

6180

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
36
55
56
48
106

Th
252
339
331
268
819

301

2009

TOTAL
Rt

Th
551
826
603
373
875

Rt
43
53
49
28
103

Total
676
994
792
469
1100

527

3228

276

4031

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Total
337
469
456
368
1050

N-S
2043
2031
1626
916
2244

Ped
15
38
19
22
24

Sch
0
1
0
4
2

Ped
59
95
74
35
111

Sch
0
1
0
0
1

370

2680

8860

118

374

TOTAL

77
116
107
55
150

Th
701
889
774
299
671

505

3334

XING N/L

49
75
69
52
125

WESTBOUND Approach

82
115
140
68
122

XING S/L

Rt Total
127
905
160
1165
151
1032
39
393
95
916
572

4411

XING W/L

XING E/L

E-W
1581
2159
1824
862
2016

Ped
17
22
20
18
27

Sch
0
2
0
2
0

Ped
34
47
49
34
62

Sch
0
1
0
0
1

8442

104

226

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-002
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Sepulveda Blvd

Sepulveda Blvd

NORTHBOUND

SOUTHBOUND

Palms Blvd

Palms Blvd

EASTBOUND

WESTBOUND

NL
1

NT
3

NR
0

SL
1

ST
3

SR
0

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

43
41
51
61
48
50
37
43
31
43
39
35

286
347
354
361
279
326
319
333
281
240
199
201

34
41
43
44
45
32
25
25
28
24
21
28

9
8
7
12
13
11
17
14
11
12
15
18

46
49
63
94
72
91
82
94
83
83
81
84

11
7
13
18
21
23
14
17
16
14
25
14

12
24
23
23
27
30
28
30
37
35
29
39

63
98
189
201
180
217
214
215
169
170
138
126

4
8
9
22
19
14
11
9
17
9
11
12

12
16
24
25
27
30
33
26
32
18
27
30

110
146
207
238
230
217
223
219
194
202
184
194

31
30
29
37
29
46
38
47
45
35
40
31

661
815
1012
1136
990
1087
1041
1072
944
885
809
812

WR
438
14.12%

TOTAL
11264

NL
NT
522
3526
11.76% 79.45%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

196

PEAK HR FACTOR :
CONTROL : Signalized

1285
0.873

NR
390
8.79%

SL
ST
147
922
11.65% 73.06%
sb a
sb d

SR
193
15.29%

EL
ET
337
1980
13.69% 80.42%
eb a
eb d

ER
145
5.89%

WL
WT
300
2364
9.67% 76.21%
wb a
nb d

TOTAL
146

53

339
0.936

76

108

812
0.944

66

115

908
0.978

150

4254
0.936

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-002
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Sepulveda Blvd

Sepulveda Blvd

NORTHBOUND

SOUTHBOUND

Palms Blvd

Palms Blvd

EASTBOUND

WESTBOUND

NL
1

NT
3

NR
0

SL
1

ST
3

SR
0

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

30
30
30
38
35
24

173
224
168
226
254
249

37
54
48
38
33
51

26
22
39
18
20
29

123
145
166
205
220
228

19
33
22
29
36
38

29
39
32
34
25
31

182
191
203
207
233
232

12
16
28
25
18
32

32
23
51
35
35
29

150
149
193
180
149
149

16
23
26
22
25
22

829
949
1006
1057
1083
1114

WR
134
10.24%

TOTAL
6038

NL
NT
187
1294
10.73% 74.28%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

127

PEAK HR FACTOR :
CONTROL : Signalized

897
0.921

NR
261
14.98%

SL
ST
154
1087
10.86% 76.66%
sb a
sb d

SR
177
12.48%

EL
ET
190
1248
12.11% 79.54%
eb a
eb d

ER
131
8.35%

WL
WT
205
970
15.66% 74.10%
wb a
nb d

TOTAL
170

106

819
0.890

125

122

875
0.932

103

150

671
0.848

95

4260
0.956

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Westwood Blvd

East/West

National Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

23
48
34

44
15
63

81
18
52

62
9
17

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

196

7.45

143

7.45

350

8.15

141

7.45

PM PK 15 MIN

101

15.15

264

15.30

268

14.45

149

15.45

AM PK HOUR

749

7.30

534

7.45

1301

8.15

506

7.30

PM PK HOUR

362

14.45

1008

15.00

1065

14.30

540

15.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
154
190
164
59
100
667

SOUTHBOUND Approach

Th
486
495
345
97
232

Rt
14
30
23
14
21

Total
654
715
532
170
353

1655

102

2424

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt
208
292
289
133
189

TOTAL

1111

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
108
130
102
100
182

Th
187
256
198
201
510

622

1352

TOTAL
Rt Total
100
395
117
503
143
443
148
449
316
1008
824

2798

WESTBOUND Approach
Th
606
823
719
296
591

Rt
75
164
96
103
268

Total
889
1279
1104
532
1048

3035

706

4852

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
327
327
302
191
349

104

1496

Rt Total
134
468
116
463
140
468
70
281
160
540
620

2220

XING N/L

N-S
1049
1218
975
619
1361

Ped
6
14
11
8
24

Sch
0
0
0
0
2

Ped
26
26
13
11
18

Sch
0
0
0
0
0

5222

63

94

TOTAL

7
20
26
20
31

XING S/L

XING W/L

XING E/L

E-W
1357
1742
1572
813
1588

Ped
15
15
13
16
41

Sch
0
0
0
0
2

Ped
13
13
15
8
16

Sch
0
0
0
0
0

7072

100

65

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-003
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Westwood Blvd

Westwood Blvd

National Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

National Blvd
WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
1

SR
1

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

25
40
45
44
55
42
45
48
42
40
48
34

79
111
148
148
121
128
134
112
97
86
86
76

4
4
2
4
5
7
10
8
7
2
7
7

23
30
22
33
36
33
31
30
27
26
29
20

31
22
61
73
70
67
64
55
57
49
47
45

17
22
24
37
33
32
25
27
34
35
36
38

46
53
56
53
52
90
74
76
80
67
74
68

126
114
188
178
181
215
223
204
192
195
156
176

17
12
17
29
44
45
41
34
27
23
21
25

1
0
4
2
3
7
4
6
7
7
5
7

69
68
81
109
103
75
66
83
70
88
61
83

35
35
34
30
31
27
29
29
32
27
33
48

473
511
682
740
734
768
746
712
672
645
603
627

WR
390
27.88%

TOTAL
7913

NL
NT
508
1326
26.72% 69.75%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

186

PEAK HR FACTOR :
CONTROL : Signalized

531
0.948

NR
67
3.52%

SL
ST
340
641
25.35% 47.80%
sb a
sb d

SR
360
26.85%

EL
ET
789
2148
24.11% 65.65%
eb a
eb d

ER
335
10.24%

WL
WT
53
956
3.79% 68.33%
wb a
nb d

TOTAL
26

133

274
0.934

127

269

797
0.875

159

16

353
0.862

117

2988
0.973

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-003
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Westwood Blvd

Westwood Blvd

National Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

National Blvd
WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
1

SR
1

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

31
28
20
27
31
22

41
56
55
70
55
52

9
5
2
4
9
6

45
55
58
35
50
39

90
111
110
137
129
134

78
70
68
81
85
82

66
67
49
54
45
41

151
145
139
157
138
157

47
56
80
54
66
68

12
8
7
8
7
9

99
92
78
81
92
98

32
38
34
45
39
42

701
731
700
753
746
750

WR
230
28.01%

TOTAL
4381

NL
NT
159
329
30.40% 62.91%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

100

PEAK HR FACTOR :
CONTROL : Signalized

232
0.874

NR
35
6.69%

SL
ST
282
711
19.35% 48.80%
sb a
sb d

SR
464
31.85%

EL
ET
322
887
20.38% 56.14%
eb a
eb d

ER
371
23.48%

WL
WT
51
540
6.21% 65.77%
wb a
nb d

TOTAL
21

182

510
0.955

316

189

591
0.978

268

31

349
0.906

160

2949
0.979

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Overland Ave

East/West

Pico Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

84
7
20

3
1
1

73
12
67

99
14
72

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

497

9.00

142

9.15

435

8.45

476

8.00

PM PK 15 MIN

372

14.45

172

14.45

341

15.15

427

15.15

AM PK HOUR

1909

8.15

493

8.30

1574

8.15

1783

8.00

PM PK HOUR

1414

14.45

599

14.45

1249

15.00

1669

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt
269
284
262
144
316

TOTAL

1275

SOUTHBOUND Approach

Th
390
468
465
251
489
2063

Rt Total
818
1477
1079
1831
1045
1772
298
693
606
1411

Hours
7-8
8-9
9-10
14-15
15-16

3846

TOTAL

7184

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Lt
17
19
30
16
40

Th
342
440
403
254
500

122

1939

TOTAL
Rt

Th
757
1386
999
404
939

215

4485

Rt Total
113
908
128
1571
140
1188
107
530
258
1249

Total
386
474
454
280
567

N-S
1863
2305
2226
973
1978

Ped
13
16
11
20
36

Sch
0
0
0
0
0

Ped
5
20
14
8
21

Sch
0
0
0
0
0

100

2161

9345

96

68

746

5446

TOTAL

Hours
7-8
8-9
9-10
14-15
15-16

Lt
380
519
430
318
610

Th
1010
1230
974
480
971

TOTAL

2257

4665

XING N/L

27
15
21
10
27

WESTBOUND Approach

38
57
49
19
52

XING S/L

Rt

XING W/L

XING E/L

51
34
37
19
43

Total
1441
1783
1441
817
1624

E-W
2349
3354
2629
1347
2873

Ped
10
6
5
10
19

Sch
0
0
0
0
0

Ped
9
8
6
4
21

Sch
0
0
0
0
0

184

7106

12552

50

48

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-004
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

Pico Blvd

Pico Blvd

EASTBOUND

WESTBOUND

NL
2

NT
1

NR
2

SL
1

ST
2

SR
0

EL
1

ET
3

ER
0

WL
2

WT
3

WR
0

TOTAL

72
63
53
81
74
65
81
64
73
53
66
70

70
106
97
117
109
118
122
119
118
122
124
101

176
201
209
232
236
282
275
286
306
259
257
223

1
3
3
10
3
3
3
10
6
8
9
7

69
79
99
95
108
128
107
97
116
125
86
76

4
6
4
13
2
5
4
4
4
9
4
4

3
2
7
26
9
13
15
20
13
18
10
8

141
146
212
258
287
384
333
382
300
268
215
216

23
23
32
35
42
33
20
33
28
39
32
41

78
95
116
91
123
127
120
149
108
115
98
109

201
242
270
297
340
308
270
312
192
243
257
282

6
6
7
32
13
6
4
11
7
9
11
10

844
972
1109
1287
1346
1472
1354
1487
1271
1268
1169
1147

NL
NT
815
1323
16.04% 26.04%
nb a
nb d
PEAK HR START TIME :
800 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

284

PEAK HR FACTOR :
CONTROL : Signalized

468
0.958

NR
2942
57.91%

SL
ST
66
1185
5.02% 90.18%
sb a
sb d

SR
63
4.79%

EL
ET
144
3142
3.93% 85.68%
eb a
eb d

ER
381
10.39%

WL
WT
1329
3214
28.49% 68.90%
wb a
nb d

WR
122
2.62%

TOTAL
14726
TOTAL

1079

19

440
0.871

15

57

1386
0.903

128

519

1230
0.936

34

5659
0.951

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-004
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

Pico Blvd

Pico Blvd

EASTBOUND

WESTBOUND

NL
2

NT
1

NR
2

SL
1

ST
2

SR
0

EL
1

ET
3

ER
0

WL
2

WT
3

WR
0

TOTAL

73
71
73
85
68
90

101
150
103
121
134
131

147
151
139
154
165
148

4
12
10
8
14
8

99
155
113
143
117
127

5
5
6
7
9
5

13
6
8
22
11
11

225
179
241
259
191
248

53
54
73
60
75
50

150
168
168
164
147
131

262
218
246
254
225
246

12
7
11
9
10
13

1144
1176
1191
1286
1166
1208

NL
NT
460
740
21.86% 35.17%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

316

PEAK HR FACTOR :
CONTROL : Signalized

489
0.956

NR
904
42.97%

SL
ST
56
754
6.61% 89.02%
sb a
sb d

SR
37
4.37%

EL
ET
71
1343
3.99% 75.49%
eb a
eb d

ER
365
20.52%

WL
WT
928
1451
38.02% 59.44%
wb a
nb d

WR
62
2.54%

TOTAL
7171
TOTAL

606

40

500
0.897

27

52

939
0.916

258

610

971
0.951

43

4851
0.943

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Overland Ave

East/West

I-10 WB On-Off Ramp_National Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 3-6

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

76
19
11

71
4
15

83
7
8

125
3
24

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

594

8.45

345

7.45

275

8.15

223

7.45

PM PK 15 MIN

395

15.15

441

15.30

221

14.45

304

15.45

AM PK HOUR

2289

8.00

1340

7.30

1005

8.15

849

7.00

PM PK HOUR

1426

14.30

1722

15.00

834

14.30

1097

15.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

SOUTHBOUND Approach

1
0
2
2
4

Th
1046
1289
1254
376
824

4789

Rt Total
909
1956
1000
2289
693
1949
314
692
494
1322

Hours
7-8
8-9
9-10
14-15
15-16

Lt
356
443
341
252
482

Th
670
732
627
462
1128

3410

TOTAL

1874

3619

8208

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt
210
387
354
130
265

TOTAL

1346

TOTAL
Rt

111
128
90
61
76

Rt Total
422
743
455
970
423
867
237
428
468
809

Hours
7-8
8-9
9-10
14-15
15-16

466

2005

TOTAL

3817

Lt

XING N/L

69
85
102
84
112

Total
1095
1260
1070
798
1722

N-S
3051
3549
3019
1490
3044

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
4
12
12
5
16

Sch
0
0
0
0
2

452

5945

14153

49

TOTAL

XING W/L

WESTBOUND Approach
Th

XING S/L

79
80
59
89
191

Th
392
358
344
193
406

Rt Total
378
849
366
804
339
742
277
559
500
1097

498

1693

1860

4051

XING E/L

E-W
1592
1774
1609
987
1906

Ped
3
5
6
1
12

Sch
0
0
0
0
2

Ped
2
7
5
1
10

Sch
0
0
0
0
0

7868

27

25

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-005
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

I-10 WB On-Off
Ramp_National Blvd
EASTBOUND

I-10 WB On-Off
Ramp_National Blvd
WESTBOUND

NL
1

NT
3

NR
1

SL
2

ST
2

SR
0

EL
1.5

ET
0.5

ER
1

WL
0.5

WT
1.5

WR
1

TOTAL

0
0
1
0
0
0
0
0
0
0
1
1

202
264
268
312
320
319
307
343
336
330
299
289

179
212
274
244
240
254
255
251
166
178
183
166

58
77
114
107
120
115
94
114
87
103
71
80

146
140
176
208
194
206
179
153
155
182
142
148

9
9
21
30
27
22
8
28
20
27
19
36

33
31
62
84
80
99
96
112
106
97
69
82

21
26
32
32
27
36
37
28
27
13
21
29

94
93
116
119
90
140
133
92
99
122
109
93

13
10
23
33
27
26
16
11
11
8
25
15

97
92
100
103
95
85
91
87
89
78
77
100

110
96
85
87
83
86
105
92
72
90
78
99

962
1050
1272
1359
1303
1388
1321
1311
1168
1228
1094
1138

WR
1083
45.22%

TOTAL
14594

NL
NT
3
3589
0.05% 57.94%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

1258
0.982

NR
2602
42.01%

SL
ST
1140
2029
33.28% 59.24%
sb a
sb d

SR
256
7.47%

EL
ET
951
329
36.86% 12.75%
eb a
eb d

ER
1300
50.39%

WL
WT
218
1094
9.10% 45.68%
wb a
nb d

TOTAL
993

436

787
0.949

87

359

132
0.885

482

102

374
0.938

361

5371
0.967

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-005
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

I-10 WB On-Off
Ramp_National Blvd
EASTBOUND

I-10 WB On-Off
Ramp_National Blvd
WESTBOUND

NL
1

NT
3

NR
1

SL
2

ST
2

SR
0

EL
1.5

ET
0.5

ER
1

WL
0.5

WT
1.5

WR
1

TOTAL

0
2
0
1
1
2

205
171
199
250
205
170

168
146
140
144
97
113

129
123
125
124
130
103

230
232
264
280
280
304

47
37
28
26
31
27

67
63
56
62
70
77

29
32
21
24
19
12

111
126
123
120
113
112

46
43
56
37
49
49

91
102
86
101
97
122

145
132
108
126
133
133

1268
1209
1206
1295
1225
1224

WR
777
46.92%

TOTAL
7427

NL
NT
6
1200
0.30% 59.58%
nb a
nb d
PEAK HR START TIME :
230 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

825
0.903

NR
808
40.12%

SL
ST
734
1590
29.13% 63.10%
sb a
sb d

SR
196
7.78%

EL
ET
395
137
31.93% 11.08%
eb a
eb d

ER
705
56.99%

WL
WT
280
599
16.91% 36.17%
wb a
nb d

TOTAL
598

501

1006
0.956

138

248

106
0.943

480

182

380
0.951

511

4978
0.961

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Overland Ave

East/West

I-10 EB On-Ramp

Day:

Wednesday

Hours:

February 12, 2014

Date:

7-10 & 3-6

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

105
19
19

116
7
19

0
0
0

0
0
0

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

682

8.00

374

8.15

0.00

0.00

PM PK 15 MIN

514

15.15

463

15.45

0.00

0.00

AM PK HOUR

2697

7.30

1360

7.45

0.00

0.00

PM PK HOUR

1856

14.30

1778

15.00

0.00

0.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

SOUTHBOUND Approach

0
0
0
0
0

Th
1958
2261
1943
690
1301

8153

Rt Total
507
2465
406
2667
358
2301
184
874
447
1748

Hours
7-8
8-9
9-10
14-15
15-16

Lt
802
787
731
408
804

Th
359
467
373
382
974

1902

TOTAL

3532

2555

10055

EASTBOUND Approach
Hours
TOTAL

Lt

Rt

Rt
0

Total
0

Hours
0

TOTAL

Lt

Th
0

XING N/L

Total
1161
1254
1104
790
1778

N-S
3626
3921
3405
1664
3526

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
0
0
0
0
0

Sch
0
0
0
0
0

6087

16142

TOTAL

XING W/L

Rt
0

XING S/L

0
0
0
0
0

WESTBOUND Approach
Th

TOTAL

Total
0

E-W
0

XING E/L

Ped

Sch

Ped

Sch

26

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-006
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

I-10 EB On-Ramp

I-10 EB On-Ramp

EASTBOUND

WESTBOUND

NL
0

NT
3.5

NR
0.5

SL
2

ST
2

SR
0

EL
0

ET
0

ER
0

WL
0

WT
0

WR
0

TOTAL

0
0
0
0
0
0
0
0
0
0
0
0

391
469
551
547
566
560
575
560
509
498
477
459

140
125
119
123
116
115
88
87
87
93
94
84

195
179
215
213
181
234
199
173
164
222
189
156

47
66
95
151
125
140
117
85
93
93
85
102

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

773
839
980
1034
988
1049
979
905
853
906
845
801

NL
NT
0
6162
0.00% 82.90%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

2224
0.989

NR
1271
17.10%

SL
ST
2320
1199
65.93% 34.07%
sb a
sb d

SR
EL
ET
ER
WL
WT
WR
0
0
0
0
0
0
0
0.00% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
eb a
eb d
wb a
nb d

TOTAL
10952
TOTAL

473

843

511
0.905

0
0.000

0
0.000

4051
0.965

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-006
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

I-10 EB On-Ramp

I-10 EB On-Ramp

EASTBOUND

WESTBOUND

NL
0

NT
3.5

NR
0.5

SL
2

ST
2

SR
0

EL
0

ET
0

ER
0

WL
0

WT
0

WR
0

TOTAL

0
0
0
0
0
0

364
326
338
383
310
270

89
95
130
131
90
96

199
209
204
209
195
196

191
191
241
222
244
267

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

843
821
913
945
839
829

NL
NT
0
1991
0.00% 75.93%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

1301
0.850

NR
631
24.07%

SL
ST
1212
1356
47.20% 52.80%
sb a
sb d

SR
EL
ET
ER
WL
WT
WR
0
0
0
0
0
0
0
0.00% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
eb a
eb d
wb a
nb d

TOTAL
5190
TOTAL

447

804

974
0.960

0
0.000

0
0.000

3526
0.933

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Overland Ave

East/West

National Pl_National Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 3-6

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

44
19
29

16
4
10

35
15
40

59
29
29

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

553

7.30

142

7.45

133

8.00

427

7.45

PM PK 15 MIN

389

15.15

252

15.30

226

15.45

261

14.30

AM PK HOUR

2146

7.30

530

7.45

494

7.45

1607

7.30

PM PK HOUR

1327

14.30

973

15.00

886

15.00

984

14.30

NORTHBOUND Approach

SOUTHBOUND Approach

Hours
7-8
8-9
9-10
14-15
15-16

Lt
327
338
296
91
153

Th
1626
1712
1421
500
1095

TOTAL

1205

6354

Rt
8
9
16
12
25

Total
1961
2059
1733
603
1273

70

7629

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
27
34
31
33
99

Th
313
399
328
315
845

224

2200

TOTAL
Rt

Th
127
174
124
139
322

Rt Total
120
297
242
488
169
352
167
373
354
886

Hours
7-8
8-9
9-10
14-15
15-16

458

886

1052

TOTAL

2396

XING N/L

9
37
17
22
29

Total
349
470
376
370
973

N-S
2310
2529
2109
973
2246

Ped
30
38
27
7
20

Sch
0
0
0
0
0

Ped
0
0
0
0
1

Sch
0
0
0
0
0

114

2538

10167

122

WESTBOUND Approach

50
72
59
67
210

XING S/L

TOTAL

Lt
198
274
211
98
214

Th
385
379
258
102
220

Rt Total
789
1372
890
1543
817
1286
298
498
460
894

995

1344

3254

5593

XING W/L

XING E/L

E-W
1669
2031
1638
871
1780

Ped
20
33
29
3
19

Sch
0
0
0
0
0

Ped
4
8
8
4
10

Sch
0
0
0
0
0

7989

104

34

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-007
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

National Pl_National Blvd

National Pl_National Blvd

EASTBOUND

WESTBOUND

NL
1

NT
3

NR
0

SL
1

ST
2

SR
0

EL
1

ET
2

ER
0

WL
1

WT
1

WR
2

TOTAL

59
73
103
92
83
91
93
71
81
74
75
66

363
385
450
428
456
433
413
410
367
367
363
324

3
0
0
5
3
2
2
2
1
5
8
2

3
5
6
13
13
8
7
6
6
8
4
13

35
63
90
125
110
119
98
72
87
84
71
86

1
1
3
4
9
10
14
4
2
3
6
6

10
14
10
16
18
18
25
11
13
12
20
14

22
18
39
48
54
39
32
49
43
30
22
29

19
16
39
46
61
76
61
44
46
42
37
44

27
39
62
70
62
73
59
80
70
65
43
33

54
81
110
140
98
110
98
73
72
56
72
58

162
194
216
217
213
236
230
211
211
208
186
212

758
889
1128
1204
1180
1215
1132
1033
999
954
907
887

WR
2496
59.41%

TOTAL
12286

NL
NT
961
4759
16.70% 82.72%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

359

PEAK HR FACTOR :
CONTROL : Signalized

1730
0.969

NR
33
0.57%

SL
ST
92
1040
7.70% 87.03%
sb a
sb d

SR
63
5.27%

EL
ET
181
425
15.92% 37.38%
eb a
eb d

ER
531
46.70%

WL
WT
683
1022
16.26% 24.33%
wb a
nb d

TOTAL
12

41

452
0.933

37

77

173
0.929

244

264

446
0.940

896

4731
0.973

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-007
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Overland Ave

Overland Ave

NORTHBOUND

SOUTHBOUND

National Pl_National Blvd

National Pl_National Blvd

EASTBOUND

WESTBOUND

NL
1

NT
3

NR
0

SL
1

ST
2

SR
0

EL
1

ET
2

ER
0

WL
1

WT
1

WR
2

TOTAL

41
50
32
44
44
33

264
236
296
340
233
226

6
6
7
5
5
8

13
20
20
20
32
27

158
157
219
195
215
216

5
17
8
10
5
6

21
46
53
49
49
59

64
75
74
86
82
80

77
90
91
87
89
87

46
52
54
67
63
30

52
50
60
56
43
61

163
135
132
117
117
94

910
934
1046
1076
977
927

WR
758
54.45%

TOTAL
5870

NL
NT
244
1595
13.01% 85.02%
nb a
nb d
PEAK HR START TIME :
245 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

170

PEAK HR FACTOR :
CONTROL : Signalized

1105
0.834

NR
37
1.97%

SL
ST
132
1160
9.83% 86.37%
sb a
sb d

SR
51
3.80%

EL
ET
277
461
22.00% 36.62%
eb a
eb d

ER
521
41.38%

WL
WT
312
322
22.41% 23.13%
wb a
nb d

TOTAL
23

92

786
0.911

40

197

317
0.981

357

236

209
0.961

501

4033
0.937

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Overland Ave

East/West

Palms Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 3-6

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

32
17
17

24
12
14

28
11
32

34
13
55

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

442

7.30

232

8.30

298

7.45

273

7.45

PM PK 15 MIN

336

15.00

365

15.15

289

15.15

229

14.45

AM PK HOUR

1654

7.30

865

8.00

1112

7.30

1010

8.45

PM PK HOUR

1270

14.30

1332

15.00

1138

15.00

875

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

SOUTHBOUND Approach

Lt
147
129
105
53
91

Th
1325
1284
1091
505
931

525

5136

Rt Total
108
1580
177
1590
171
1367
69
627
150
1172
675

6336

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
174
207
146
48
120
695

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
55
62
59
35
90

Th
491
741
652
424
1149

301

3457

TOTAL
Rt

625
780
607
334
868

Rt
69
109
95
55
150

Total
868
1096
848
437
1138

3214

478

4387

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Total
602
865
775
511
1332

N-S
2182
2455
2142
1138
2504

Ped
66
19
15
9
84

Sch
2
0
0
0
0

Ped
105
38
27
7
86

Sch
2
0
0
0
2

327

4085

10421

193

263

TOTAL

81
141
121
70
109

Th
696
687
666
301
607

522

2957

XING N/L

56
62
64
52
93

WESTBOUND Approach
Th

XING S/L

Rt Total
132
909
172
1000
216
1003
72
443
86
802
678

4157

XING W/L

XING E/L

E-W
1777
2096
1851
880
1940

Ped
31
16
25
14
36

Sch
0
0
0
1
0

Ped
60
37
25
20
57

Sch
1
0
0
0
0

8544

122

199

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-008
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Overland Ave

Overland Ave

Palms Blvd

Palms Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
1

SL
1

ST
2

SR
0

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

26
42
35
44
30
36
32
31
15
25
32
33

282
318
383
342
324
325
345
290
291
262
297
241

22
29
24
33
38
40
48
51
46
40
48
37

7
13
15
20
15
15
15
17
15
16
14
14

81
89
166
155
194
173
200
174
193
167
145
147

10
4
17
25
11
18
17
16
9
21
20
14

43
37
47
47
55
53
49
50
38
46
34
28

77
127
194
227
189
197
192
202
169
165
135
138

7
12
26
24
18
35
23
33
18
24
31
22

22
22
19
18
33
35
37
36
26
29
34
32

119
167
187
223
177
171
159
180
178
156
157
175

32
40
28
32
40
32
50
50
49
54
61
52

728
900
1141
1190
1124
1130
1167
1130
1047
1005
1008
933

WR
520
17.86%

TOTAL
12503

NL
NT
381
3700
8.40% 81.55%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

142

PEAK HR FACTOR :
CONTROL : Signalized

1336
0.963

NR
456
10.05%

SL
ST
176
1884
7.85% 84.03%
sb a
sb d

SR
182
8.12%

EL
ET
527
2012
18.74% 71.55%
eb a
eb d

ER
273
9.71%

WL
WT
343
2049
11.78% 70.36%
wb a
nb d

TOTAL
159

65

722
0.925

71

204

805
0.930

100

123

730
0.922

154

4611
0.969

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-008
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Overland Ave

Overland Ave

Palms Blvd

Palms Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
1

SL
1

ST
2

SR
0

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

26
27
30
18
24
19

243
262
256
254
200
221

44
25
50
35
33
32

20
15
25
21
24
20

204
220
244
313
297
295

35
17
12
31
23
27

24
24
38
33
24
25

164
170
213
224
227
204

23
32
36
32
37
45

32
38
27
28
27
27

142
159
150
164
138
155

40
32
36
27
15
8

997
1021
1117
1180
1069
1078

WR
158
12.69%

TOTAL
6462

NL
NT
144
1436
8.00% 79.82%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

91

PEAK HR FACTOR :
CONTROL : Signalized

931
0.872

NR
219
12.17%

SL
ST
125
1573
6.78% 85.35%
sb a
sb d

SR
145
7.87%

EL
ET
168
1202
10.67% 76.32%
eb a
eb d

ER
205
13.02%

WL
WT
179
908
14.38% 72.93%
wb a
nb d

TOTAL
150

90

1149
0.912

93

120

868
0.984

150

109

607
0.916

86

4444
0.942

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Overland Ave

East/West

Venice Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

46
11
17

30
21
14

91
114
59

86
112
65

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

480

8.45

442

8.00

388

9.15

394

9.00

PM PK 15 MIN

299

14.30

371

15.15

412

15.30

378

15.00

AM PK HOUR

1769

8.00

1631

7.30

1408

9.00

1493

9.00

PM PK HOUR

1087

14.30

1418

15.00

1598

15.00

1424

15.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
148
232
122
68
127
697

SOUTHBOUND Approach

Th
963
1369
910
410
778
4430

Rt Total
105
1216
168
1769
126
1158
70
548
118
1023
587

5714

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
118
158
221
111
244
852

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
211
312
134
61
186

Th
1032
1094
685
352
1044

904

4207

TOTAL
Rt Total
183
1426
179
1585
125
944
77
490
188
1418
752

5863

WESTBOUND Approach
Th
539
775
1055
571
1234

Rt
76
120
132
71
120

Total
733
1053
1408
753
1598

4174

519

5545

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Th
1100
1001
1029
451
995

917

4576

Rt Total
109
1351
111
1220
185
1493
90
651
151
1424
646

6139

XING N/L

N-S
2642
3354
2102
1038
2441

Ped
35
61
65
58
153

Sch
0
2
1
2
1

Ped
62
57
75
38
92

Sch
0
0
0
0
0

11577

372

324

TOTAL

Lt
142
108
279
110
278

XING S/L

XING W/L

XING E/L

E-W
2084
2273
2901
1404
3022

Ped
56
66
72
48
135

Sch
1
1
0
0
0

Ped
48
43
54
24
62

Sch
1
0
0
0
1

11684

377

231

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-009
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/12/2014

AM

Overland Ave

Overland Ave

Venice Blvd

Venice Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
1

SL
1

ST
2

SR
1

EL
2

ET
3

ER
0

WL
2

WT
3

WR
0

TOTAL

31
40
40
37
53
59
55
65
31
28
30
33

205
224
250
284
337
342
331
359
270
215
248
177

22
18
24
41
27
49
36
56
23
28
37
38

36
46
54
75
79
84
70
79
33
40
26
35

214
250
265
303
322
241
246
285
202
193
142
148

39
42
56
46
41
65
23
50
27
25
34
39

21
17
36
44
43
39
37
39
54
59
60
48

78
102
175
184
170
185
216
204
281
292
274
208

19
12
24
21
28
32
37
23
41
37
28
26

28
34
40
40
28
26
33
21
74
67
65
73

234
290
318
258
252
253
273
223
268
261
271
229

27
26
27
29
30
25
34
22
52
42
47
44

954
1101
1309
1362
1410
1400
1391
1426
1356
1287
1262
1098

NL
NT
502
3242
12.12% 78.25%
nb a
nb d
PEAK HR START TIME :
800 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

232

PEAK HR FACTOR :
CONTROL : Signalized

1369
0.921

NR
399
9.63%

SL
ST
657
2811
16.61% 71.07%
sb a
sb d

SR
487
12.31%

EL
ET
497
2369
15.56% 74.17%
eb a
eb d

ER
328
10.27%

WL
WT
529
3130
13.02% 77.02%
wb a
nb d

WR
405
9.97%

TOTAL
15356
TOTAL

168

312

1094
0.896

179

158

775
0.908

120

108

1001
0.897

111

5627
0.987

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-009
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Overland Ave

Overland Ave

Venice Blvd

Venice Blvd

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
1

SL
1

ST
2

SR
1

EL
2

ET
3

ER
0

WL
2

WT
3

WR
0

TOTAL

35
33
30
31
35
31

226
184
217
201
179
181

38
32
32
28
34
24

24
37
45
54
53
34

166
186
228
274
259
283

36
41
46
43
49
50

58
53
63
63
67
51

292
279
318
293
312
311

37
34
23
27
33
37

50
60
82
63
72
61

217
234
254
223
256
262

35
55
42
39
32
38

1214
1228
1380
1339
1381
1363

WR
241
11.61%

TOTAL
7905

NL
NT
195
1188
12.41% 75.62%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

127

PEAK HR FACTOR :
CONTROL : Signalized

778
0.917

NR
188
11.97%

SL
ST
247
1396
12.95% 73.17%
sb a
sb d

SR
265
13.89%

EL
ET
355
1805
15.10% 76.78%
eb a
eb d

ER
191
8.12%

WL
WT
388
1446
18.70% 69.69%
wb a
nb d

TOTAL
118

186

1044
0.956

188

244

1234
0.970

120

278

995
0.942

151

5463
0.989

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

I-10 EB Off-Ramp

East/West

National Blvd

Day:

Wednesday

Hours:

February 12, 2014

Date:

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

0
0
0

38
0
10

26
8
33

44
36
21

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

0.00

296

9.15

69

8.00

261

7.45

PM PK 15 MIN

0.00

231

15.15

117

15.30

125

15.00

AM PK HOUR

0.00

1131

9.00

225

7.45

919

7.30

PM PK HOUR

0.00

851

14.45

441

15.00

477

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

SOUTHBOUND Approach

0
0
0
0
0

Th
0
0
0
0
0

Rt
0
0
0
0
0

Total
0
0
0
0
0

Hours
7-8
8-9
9-10
14-15
15-16

Lt
229
262
336
140
375

TOTAL

1342

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

TOTAL

Th
0
0
0
0
0

Rt Total
592
821
745
1007
795
1131
261
401
468
843

2861

4203

WESTBOUND Approach

0
0
0
0
0

Th
157
217
170
179
441

Rt
0
0
0
0
0

Total
157
217
170
179
441

1164

1164

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
801
814
504
239
438

2796

Rt

XING N/L

N-S
821
1007
1131
401
843

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
3
5
8
3
9

Sch
0
0
0
0
0

4203

28

TOTAL

0
0
0
0
0

XING S/L

XING W/L

XING E/L

0
0
0
0
0

Total
801
814
504
239
438

E-W
958
1031
674
418
879

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
0
0
0
0
0

Sch
0
0
0
0
0

2796

3960

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-010
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

I-10 EB Off-Ramp

I-10 EB Off-Ramp

National Blvd

SOUTHBOUND

National Blvd

EASTBOUND

WESTBOUND

NL
0

NT
0

NR
0

SL
1

ST
0

SR
1

EL
0

ET
2

ER
0

WL
0

WT
2

WR
0

TOTAL

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

37
45
67
80
70
56
55
81
81
90
71
94

0
0
0
0
0
0
0
0
0
0
0
0

118
137
161
176
171
199
172
203
212
206
177
200

0
0
0
0
0
0
0
0
0
0
0
0

27
24
41
65
69
49
42
57
49
42
33
46

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

131
174
235
261
213
210
221
170
145
123
124
112

0
0
0
0
0
0
0
0
0
0
0
0

313
380
504
582
523
514
490
511
487
461
405
452

NL

NT

NR

TOTAL VOLUMES :
0
0
0
APPROACH %'s : #DIV/0! #DIV/0! #DIV/0!

nb a

nb d

SL
ST
827
0
27.95%
0.00%
sb a
sb d

SR
2132
72.05%

EL
ET
0
544
0.00% 100.00%
eb a
eb d

ER
0
0.00%

WL
WT
0
2119
0.00% 100.00%
wb a
nb d

WR
0
0.00%

730 AM

PEAK HR START TIME :


PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

TOTAL
5622
TOTAL

0
0.000

273

0
0.957

707

224
0.812

919
0.880

2123
0.912

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-010
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

I-10 EB Off-Ramp

I-10 EB Off-Ramp

National Blvd

SOUTHBOUND

National Blvd

EASTBOUND

WESTBOUND

NL
0

NT
0

NR
0

SL
1

ST
0

SR
1

EL
0

ET
2

ER
0

WL
0

WT
2

WR
0

TOTAL

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

67
73
77
102
100
96

0
0
0
0
0
0

134
127
119
129
124
96

0
0
0
0
0
0

82
97
99
110
117
115

0
0
0
0
0
0

0
0
0
0
0
0

123
116
125
113
98
102

0
0
0
0
0
0

406
413
420
454
439
409

NL

NT

NR

TOTAL VOLUMES :
0
0
0
APPROACH %'s : #DIV/0! #DIV/0! #DIV/0!

nb a

nb d

SL
ST
515
0
41.40%
0.00%
sb a
sb d

SR
729
58.60%

EL
ET
0
620
0.00% 100.00%
eb a
eb d

ER
0
0.00%

WL
WT
0
677
0.00% 100.00%
wb a
nb d

WR
0
0.00%

245 PM

PEAK HR START TIME :


PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

TOTAL
2541
TOTAL

0
0.000

352

0
0.921

499

423
0.904

452
0.904

1726
0.950

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

National Blvd_Mentone Ave

East/West

Rose Ave_National Blvd

Day:

Wednesday

Hours:

February 12, 2014

Date:

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

5
10
2

47
11
39

2
2
1

45
17
20

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

49

7.45

141

7.45

24

7.45

191

7.30

PM PK 15 MIN

14

14.45

205

15.45

45

15.15

127

15.00

AM PK HOUR

178

7.30

495

7.30

88

7.45

716

7.15

PM PK HOUR

51

14.45

767

15.00

99

14.45

468

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

SOUTHBOUND Approach

1
2
4
2
1

Th
118
153
79
9
26

Rt
6
16
16
9
18

Total
125
171
99
20
45

10

385

65

460

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16

Lt
303
378
403
271
683

TOTAL

2038

TOTAL

Th

Rt

Th

Rt

Total

38
50
22
19
74

3
2
5
1
3

50
76
40
30
99

78

203

14

295

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

XING N/L

53
62
61
16
61

15
16
10
13
23

Total
371
456
474
300
767

N-S
496
627
573
320
812

Ped
11
10
10
10
27

Sch
0
0
0
0
1

Ped
23
25
9
12
17

Sch
0
0
0
0
0

253

77

2368

2828

68

86

WESTBOUND Approach

9
24
13
10
22

XING S/L

TOTAL

Th
5
5
6
3
9

38
38
13
19
48

28

156

Rt Total
593
636
565
608
322
341
204
226
367
424
2051

2235

XING W/L

XING E/L

E-W
686
684
381
256
523

Ped
4
13
11
6
14

Sch
0
0
0
0
1

Ped
4
2
5
13
9

Sch
0
1
0
0
0

2530

48

33

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-011
City: Los Angeles

National Blvd_Mentone Ave

NORTHBOUND

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Rose Ave_National Blvd

SOUTHBOUND

Rose Ave_National Blvd

EASTBOUND

WESTBOUND

NL
0

NT
1

NR
0

SL
1.5

ST
0.5

SR
1

EL
0

ET
1

ER
0

WL
0

WT
1

WR
1

TOTAL

0
0
0
1
0
0
1
1
2
1
1
0

10
20
43
45
31
43
37
42
32
19
11
17

0
2
1
3
7
4
1
4
3
10
1
2

51
50
87
115
116
90
67
105
119
98
77
109

7
9
17
20
13
18
7
24
17
16
16
12

2
3
4
6
5
4
4
3
2
4
2
2

1
2
1
5
10
4
6
4
6
4
1
2

4
9
7
18
14
15
13
8
7
5
5
5

0
0
2
1
0
1
1
0
3
0
1
1

0
0
0
5
1
1
0
3
2
1
2
1

5
3
8
22
21
10
6
1
5
2
6
0

106
146
183
158
169
131
155
110
86
78
91
67

186
244
353
399
387
321
298
305
284
238
214
218

WR
1480
93.38%

TOTAL
3447

NL
NT
7
350
1.77% 88.61%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NS/EW Streets: National Blvd_Mentone Ave

LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

162
0.908

NR
38
9.62%

SL
ST
1084
176
83.32% 13.53%
sb a
sb d

SR
41
3.15%

EL
ET
46
110
27.71% 66.27%
eb a
eb d

ER
10
6.02%

WL
WT
16
89
1.01%
5.62%
wb a
nb d

TOTAL
15

408

68
0.878

19

20

54
0.813

61
0.928

641

1460
0.915

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-011
City: Los Angeles

National Blvd_Mentone Ave

NORTHBOUND

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Rose Ave_National Blvd

SOUTHBOUND

Rose Ave_National Blvd

EASTBOUND

WESTBOUND

NL
0

NT
1

NR
0

SL
1.5

ST
0.5

SR
1

EL
0

ET
1

ER
0

WL
0

WT
1

WR
1

TOTAL

1
1
0
1
0
0

1
8
8
7
8
3

4
5
5
2
6
5

121
150
149
170
182
182

7
9
10
19
16
16

6
7
5
6
5
7

4
6
5
7
4
6

8
11
13
37
12
12

0
1
0
1
2
0

2
1
2
2
3
2

9
10
17
17
4
10

112
92
108
96
85
78

275
301
322
365
327
321

WR
571
87.85%

TOTAL
1911

NL
NT
3
35
4.62% 53.85%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NS/EW Streets: National Blvd_Mentone Ave

LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

26
0.804

NR
27
41.54%

SL
ST
954
77
89.41%
7.22%
sb a
sb d

SR
36
3.37%

EL
ET
32
93
24.81% 72.09%
eb a
eb d

ER
4
3.10%

WL
WT
12
67
1.85% 10.31%
wb a
nb d

TOTAL
18

683

61
0.935

23

22

74
0.550

48
0.835

367

1335
0.914

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Pico Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

19
8
13

11
1
0

74
17
53

86
20
63

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

297

9.00

21

9.00

643

8.45

507

7.45

PM PK 15 MIN

173

14.45

63

14.30

412

15.15

459

15.00

AM PK HOUR

1090

8.15

62

8.45

2306

8.15

1885

7.45

PM PK HOUR

587

14.45

204

14.30

1561

15.00

1693

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
212
241
214
84
155
906

SOUTHBOUND Approach

Th
6
13
22
7
5

Rt Total
403
621
730
984
751
987
211
302
391
551

Hours
7-8
8-9
9-10
14-15
15-16

53

2486

TOTAL

3445

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

TOTAL

Th

Rt

Total

Th
1079
1804
1477
565
1218

946

6143

Rt Total
141
1346
173
2257
115
1975
96
726
251
1561
776

7865

XING N/L

11
16
24
45
69

0
1
2
0
4

11
26
30
67
98

22
43
56
112
171

N-S
643
1027
1043
414
722

Ped
14
9
14
9
13

Sch
0
0
0
0
0

Ped
13
11
20
9
11

Sch
0
0
1
0
0

165

232

404

3849

59

64

WESTBOUND Approach

Lt
126
280
383
65
92

XING S/L

TOTAL

Hours
7-8
8-9
9-10
14-15
15-16

Lt
128
167
161
182
373

Th
1378
1468
1208
579
1244

TOTAL

1011

5877

Rt

XING W/L

XING E/L

68
198
275
58
66

Total
1574
1833
1644
819
1683

E-W
2920
4090
3619
1545
3244

Ped
14
8
17
10
14

Sch
0
0
0
0
0

Ped
0
0
0
0
0

Sch
0
0
0
0
0

665

7553

15418

63

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-012
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave

Pico Blvd

SOUTHBOUND

Pico Blvd

EASTBOUND

WESTBOUND

NL
1

NT
0

NR
2

SL
1

ST
0

SR
1

EL
1

ET
3

ER
0

WL
1

WT
3

WR
0

TOTAL

30
29
66
87
61
65
54
61
62
59
46
47

1
1
1
3
1
2
6
4
3
6
6
7

71
75
110
147
129
197
192
212
232
189
171
159

2
1
4
4
5
4
3
4
11
2
6
5

0
0
0
0
0
0
0
1
1
0
0
1

4
1
2
4
2
6
9
9
9
11
8
2

26
28
36
36
44
62
73
101
109
113
91
70

184
230
287
378
419
453
441
491
433
385
363
296

29
27
39
46
54
26
42
51
24
34
28
29

23
25
36
44
43
45
47
32
37
40
38
46

272
306
358
442
403
373
353
339
278
261
319
350

13
13
21
21
41
34
39
84
67
60
79
69

655
736
960
1212
1202
1267
1259
1389
1266
1160
1155
1081

WR
541
10.71%

TOTAL
13342

NL
NT
667
41
25.73%
1.58%
nb a
nb d
PEAK HR START TIME :
815 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

242

PEAK HR FACTOR :
CONTROL : Signalized

15
0.918

NR
1884
72.69%

SL
ST
51
3
42.15%
2.48%
sb a
sb d

SR
67
55.37%

EL
ET
789
4360
14.14% 78.16%
eb a
eb d

ER
429
7.69%

WL
WT
456
4054
9.03% 80.26%
wb a
nb d

TOTAL
833

22

2
0.679

33

345

1818
0.897

143

161

1343
0.949

224

5181
0.933

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-012
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave

Pico Blvd

SOUTHBOUND

Pico Blvd

EASTBOUND

WESTBOUND

NL
1

NT
0

NR
2

SL
1

ST
0

SR
1

EL
1

ET
3

ER
0

WL
1

WT
3

WR
0

TOTAL

35
49
43
42
44
26

4
3
1
2
2
0

90
121
80
88
112
111

23
22
19
15
14
21

0
0
2
2
0
0

40
27
32
22
22
22

31
34
20
20
30
22

294
271
285
333
288
312

40
56
63
59
60
69

104
78
102
93
80
98

303
276
339
305
282
318

28
30
18
17
14
17

992
967
1004
998
948
1016

NL
NT
239
12
28.02%
1.41%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

155

PEAK HR FACTOR :
CONTROL : Signalized

5
0.872

NR
602
70.57%

SL
ST
114
4
40.28%
1.41%
sb a
sb d

SR
165
58.30%

EL
ET
157
1783
6.86% 77.96%
eb a
eb d

ER
347
15.17%

WL
WT
555
1823
22.18% 72.86%
wb a
nb d

WR
124
4.96%

TOTAL
5925
TOTAL

391

69

4
0.807

98

92

1218
0.947

251

373

1244
0.917

66

3966
0.976

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Manning Ave

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

17
13
10

8
1
9

9
1
2

25
3
2

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

134

7.45

107

8.00

71

8.00

191

7.45

PM PK 15 MIN

139

14.45

132

14.45

116

15.30

119

15.30

AM PK HOUR

503

7.45

370

7.30

242

7.30

691

8.30

PM PK HOUR

505

14.45

470

14.30

395

15.00

436

14.45

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

SOUTHBOUND Approach

48
49
39
36
63

Th
309
423
404
182
321

Rt
39
25
23
41
91

Total
396
497
466
259
475

235

1639

219

2093

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
68
66
96
90
139

Th
214
260
196
154
286

459

1110

TOTAL
Rt

Th
118
128
108
107
261

Rt
50
73
55
41
116

Total
181
239
179
156
395

93

722

335

1150

Hours
7-8
8-9
9-10
14-15
15-16

Total
287
335
305
253
434

N-S
683
832
771
512
909

Ped
1
4
2
0
3

Sch
0
0
0
0
0

Ped
4
6
7
3
5

Sch
0
0
0
0
0

45

1614

3707

10

25

TOTAL

TOTAL

Lt
136
119
124
36
98

Th
231
284
274
93
170

513

1052

XING N/L

5
9
13
9
9

WESTBOUND Approach

13
38
16
8
18

XING S/L

Rt Total
155
522
237
640
233
631
87
216
136
404
848

2413

XING W/L

XING E/L

E-W
703
879
810
372
799

Ped
10
8
3
4
1

Sch
0
0
0
0
0

Ped
1
4
4
1
8

Sch
0
0
0
0
0

3563

26

18

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-013
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave

Manning Ave

SOUTHBOUND

Manning Ave

EASTBOUND

WESTBOUND

NL
1

NT
1

NR
1

SL
1

ST
1

SR
0

EL
1

ET
1

ER
1

WL
1

WT
1

WR
0

TOTAL

13
6
14
15
17
14
7
11
8
13
11
7

55
67
83
104
94
110
108
111
103
104
101
96

9
2
13
15
8
8
3
6
4
5
10
4

21
10
18
19
20
16
18
12
25
21
24
26

29
43
72
70
85
65
60
50
55
45
50
46

2
1
1
1
2
1
5
1
4
4
2
3

1
3
5
4
11
9
5
13
3
6
4
3

17
27
44
30
42
29
28
29
31
28
23
26

6
12
16
16
18
18
18
19
11
19
13
12

12
26
46
52
35
22
31
31
40
25
29
30

40
41
69
81
66
64
81
73
70
79
60
65

30
34
33
58
44
59
59
75
73
54
50
56

235
272
414
465
442
415
423
431
427
403
377
374

WR
625
34.86%

TOTAL
4678

NL
NT
136
1136
10.01% 83.59%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

53

PEAK HR FACTOR :
CONTROL : Signalized

416
0.938

NR
87
6.40%

SL
ST
230
670
24.81% 72.28%
sb a
sb d

SR
27
2.91%

EL
ET
67
354
11.19% 59.10%
eb a
eb d

ER
178
29.72%

WL
WT
379
789
21.14% 44.00%
wb a
nb d

TOTAL
34

73

280
0.846

29

129
0.803

70

140

292
0.853

220

1745
0.938

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-013
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave

Manning Ave

SOUTHBOUND

Manning Ave

EASTBOUND

WESTBOUND

NL
1

NT
1

NR
1

SL
1

ST
1

SR
0

EL
1

ET
1

ER
1

WL
1

WT
1

WR
0

TOTAL

16
20
11
22
15
15

85
97
74
90
85
72

19
22
24
22
23
22

45
45
35
35
35
34

74
80
63
80
79
64

2
7
1
3
3
2

4
4
2
5
8
3

45
62
56
68
71
66

14
27
14
30
37
35

18
18
31
18
28
21

38
55
41
49
48
32

45
42
26
37
43
30

405
479
378
459
475
396

WR
223
35.97%

TOTAL
2592

NL
NT
99
503
13.49% 68.53%
nb a
nb d
PEAK HR START TIME :
245 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

68

PEAK HR FACTOR :
CONTROL : Signalized

346
0.908

NR
132
17.98%

SL
ST
229
440
33.33% 64.05%
sb a
sb d

SR
18
2.62%

EL
ET
26
368
4.72% 66.79%
eb a
eb d

ER
157
28.49%

WL
WT
134
263
21.61% 42.42%
wb a
nb d

TOTAL
91

150

302
0.883

14

19

257
0.828

108

95

193
0.916

148

1791
0.935

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

National Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

32
27
20

24
9
4

45
7
36

14
27
6

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

162

7.30

145

8.00

139

8.00

129

8.00

PM PK 15 MIN

139

14.45

154

15.30

211

15.30

60

15.15

AM PK HOUR

604

7.15

511

7.30

468

7.30

480

7.45

PM PK HOUR

481

14.30

588

15.00

780

15.00

206

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
135
30
82
63
115
425

SOUTHBOUND Approach

Th
435
497
476
189
304

Rt
10
6
13
11
16

Total
580
533
571
263
435

1901

56

2382

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
26
44
23
13
36

Th
196
265
205
181
398

142

1245

TOTAL
Rt Total
152
374
164
473
151
379
95
289
154
588
716

2103

WESTBOUND Approach
Th

6
7
16
64
144

202
251
252
148
459

237

1312

Rt Total
129
337
178
436
180
448
88
300
177
780
752

2301

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
343
410
102
72
160

30

1087

Rt

XING N/L

N-S
954
1006
950
552
1023

Ped
16
17
13
10
23

Sch
0
0
0
0
0

Ped
15
20
13
10
22

Sch
0
0
0
0
0

4485

79

80

TOTAL

6
6
8
3
7

XING S/L

XING W/L

XING E/L

16
19
9
19
25

Total
365
435
119
94
192

E-W
702
871
567
394
972

Ped
14
10
12
8
25

Sch
0
1
0
0
0

Ped
12
20
12
6
18

Sch
0
0
0
0
0

88

1205

3506

69

68

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-014
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave

National Blvd

SOUTHBOUND

National Blvd

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
0

ET
2

ER
0

WL
0

WT
2

WR
0

TOTAL

34
51
40
10
14
6
7
3
13
20
32
17

80
96
121
138
125
125
123
124
121
122
125
108

3
2
1
4
2
2
1
1
3
5
1
4

3
5
4
14
17
10
8
9
7
8
6
2

25
37
73
61
71
65
57
72
55
46
45
59

20
28
43
61
57
35
42
30
45
32
47
27

3
0
1
2
1
2
1
3
1
8
4
3

28
38
51
85
84
56
45
66
79
54
49
70

23
19
42
45
54
45
32
47
52
47
39
42

0
0
1
5
2
0
3
1
3
1
1
3

55
72
102
114
119
102
113
76
33
28
16
25

4
3
4
5
8
4
5
2
2
4
2
1

278
351
483
544
554
452
437
434
414
375
367
361

NL
NT
247
1408
14.67% 83.61%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

70

PEAK HR FACTOR :
CONTROL : Signalized

509
0.907

NR
29
1.72%

SL
ST
93
666
7.59% 54.32%
sb a
sb d

SR
467
38.09%

EL
ET
29
705
2.38% 57.74%
eb a
eb d

ER
487
39.89%

WL
WT
20
855
2.18% 93.04%
wb a
nb d

WR
44
4.79%

TOTAL
5050
TOTAL

45

270
0.881

196

276
0.842

186

437
0.903

21

2033
0.917

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-014
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave

National Blvd

SOUTHBOUND

National Blvd

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
0

ET
2

ER
0

WL
0

WT
2

WR
0

TOTAL

26
37
39
26
29
21

92
97
68
78
80
78

6
5
3
4
8
1

6
7
14
8
5
9

83
98
80
97
116
105

54
41
39
42
33
40

31
33
34
47
33
30

65
83
96
107
129
127

41
47
38
49
49
41

1
2
2
2
2
1

39
33
47
47
33
33

6
13
3
11
5
6

450
496
463
518
522
492

WR
44
15.38%

TOTAL
2941

NL
NT
178
493
25.50% 70.63%
nb a
nb d
PEAK HR START TIME :
245 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

131

PEAK HR FACTOR :
CONTROL : Signalized

323
0.853

NR
27
3.87%

SL
ST
49
579
5.59% 66.02%
sb a
sb d

SR
249
28.39%

EL
ET
208
607
19.26% 56.20%
eb a
eb d

ER
265
24.54%

WL
WT
10
232
3.50% 81.12%
wb a
nb d

TOTAL
20

34

391
0.942

155

147

415
0.883

183

160
0.833

32

1999
0.957

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Palms Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

22
35
26

11
12
21

19
20
38

45
22
54

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

224

7.30

152

8.00

282

8.45

231

9.00

PM PK 15 MIN

155

14.30

170

15.30

314

15.15

204

15.00

AM PK HOUR

836

7.30

509

7.30

1076

8.00

885

9.00

PM PK HOUR

563

14.30

626

14.45

1116

15.00

777

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
202
251
174
63
104
794

SOUTHBOUND Approach

Th
450
355
367
191
306

Rt
98
148
105
48
87

Total
750
754
646
302
497

1669

486

2949

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
61
55
47
30
78

Th
230
355
316
218
446

271

1565

TOTAL
Rt

Th
702
922
656
316
937

Rt
54
58
98
42
91

Total
839
1076
860
409
1116

424

3533

343

4300

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Total
369
499
440
305
617

N-S
1119
1253
1086
607
1114

Ped
59
72
15
31
107

Sch
7
17
0
10
13

Ped
31
29
20
14
35

Sch
0
5
0
4
2

394

2230

5179

284

47

129

11

TOTAL

50
72
77
47
93

Th
682
688
732
322
643

339

3067

XING N/L

78
89
77
57
93

WESTBOUND Approach

83
96
106
51
88

XING S/L

Rt

XING W/L

XING E/L

43
18
76
19
12

Total
775
778
885
388
748

E-W
1614
1854
1745
797
1864

Ped
43
60
27
28
90

Sch
3
6
0
4
7

Ped
39
62
28
44
63

Sch
0
7
0
9
4

168

3574

7874

248

20

236

20

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-015
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave
SOUTHBOUND

Palms Blvd

Palms Blvd

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

37
44
59
62
60
59
79
53
47
43
47
37

85
110
141
114
113
86
84
72
95
75
101
96

23
16
24
35
47
36
38
27
24
22
29
30

11
13
14
23
21
11
8
15
13
9
15
10

34
41
79
76
96
77
82
100
95
69
70
82

8
18
30
22
35
25
14
15
24
16
22
15

18
18
23
24
25
27
20
24
31
24
28
23

98
151
217
236
235
214
230
243
178
169
155
154

7
10
23
14
16
18
9
15
28
22
19
29

11
10
9
20
15
16
19
22
19
17
18
23

136
168
199
179
174
174
176
164
202
179
178
173

10
10
12
11
3
2
7
6
10
16
34
16

478
609
830
816
840
745
766
756
766
661
716
688

NL
NT
627
1172
29.16% 54.51%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

240

PEAK HR FACTOR :
CONTROL : Signalized

454
0.933

NR
351
16.33%

SL
ST
163
901
12.46% 68.88%
sb a
sb d

SR
244
18.65%

EL
ET
285
2280
10.27% 82.16%
eb a
eb d

ER
210
7.57%

WL
WT
199
2102
8.16% 86.22%
wb a
nb d

WR
137
5.62%

TOTAL
8671
TOTAL

142

69

328
0.837

112

99

902
0.971

71

60

726
0.925

28

3231
0.962

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-015
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave
SOUTHBOUND

Palms Blvd

Palms Blvd

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
1

ET
2

ER
0

WL
1

WT
2

WR
0

TOTAL

33
30
31
20
23
30

93
98
84
74
80
68

29
19
27
25
18
17

14
16
25
17
17
19

106
112
95
117
128
106

25
32
18
24
25
26

28
23
15
31
27
15

159
157
228
259
215
235

22
20
26
24
23
18

27
20
25
22
29
17

158
164
172
162
150
159

9
10
7
1
1
3

703
701
753
776
736
713

NL
NT
167
497
20.90% 62.20%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

104

PEAK HR FACTOR :
CONTROL : Signalized

306
0.875

NR
135
16.90%

SL
ST
108
664
11.71% 72.02%
sb a
sb d

SR
150
16.27%

EL
ET
139
1253
9.11% 82.16%
eb a
eb d

ER
133
8.72%

WL
WT
140
965
12.32% 84.95%
wb a
nb d

WR
31
2.73%

TOTAL
4382
TOTAL

87

78

446
0.907

93

88

937
0.889

91

93

643
0.917

12

2978
0.959

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Regent St

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

17
28
17

15
22
14

5
6
2

5
5
1

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

173

7.45

150

9.00

63

8.30

64

8.00

PM PK 15 MIN

121

15.00

189

15.30

37

15.45

26

14.30

AM PK HOUR

648

7.30

549

8.15

190

8.00

226

7.30

PM PK HOUR

457

14.45

657

15.00

132

14.30

95

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

SOUTHBOUND Approach

12
26
12
5
11

Th
523
510
449
207
384

Rt
28
45
50
19
52

Total
563
581
511
231
447

66

2073

194

2333

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

TOTAL

18
24
28
13
41

Th
314
483
444
269
598

124

2108

Rt

Th
22
54
41
22
40

Rt
55
106
55
24
56

Total
90
190
131
65
129

Hours
7-8
8-9
9-10
14-15
15-16

130

179

296

605

TOTAL

Lt

Total
347
542
495
290
657

N-S
910
1123
1006
521
1104

Ped
11
13
14
6
22

Sch
0
1
0
0
1

Ped
9
19
9
6
19

Sch
1
0
0
0
0

99

2331

4664

66

62

TOTAL

Th
35
58
42
19
24

33
45
19
5
17

178

119

XING N/L

15
35
23
8
18

WESTBOUND Approach

13
30
35
19
33

XING S/L

Rt Total
104
172
68
171
60
121
24
48
41
82
297

594

XING W/L

XING E/L

E-W
262
361
252
113
211

Ped
22
38
14
19
37

Sch
2
2
0
1
0

Ped
14
24
15
17
27

Sch
0
3
0
0
0

1199

130

97

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-016
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave

Regent St

SOUTHBOUND

Regent St

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
0

ET
1

ER
0

WL
0

WT
1

WR
0

TOTAL

3
1
3
5
6
13
4
3
6
2
1
3

99
124
144
156
142
138
116
114
117
96
109
127

5
6
5
12
17
7
6
15
12
15
9
14

3
1
3
11
8
10
3
3
9
5
7
7

42
58
108
106
124
108
115
136
133
94
104
113

2
3
6
4
11
11
8
5
8
4
5
6

3
1
3
6
10
4
11
5
6
7
12
10

4
5
2
11
9
14
20
11
12
11
9
9

10
11
18
16
18
33
32
23
18
13
13
11

2
8
6
19
18
11
14
15
13
9
4
16

0
5
18
10
16
14
6
9
7
4
3
5

19
21
31
33
30
20
11
7
13
18
21
8

192
244
347
389
409
383
346
346
354
278
297
329

WR
232
50.00%

TOTAL
3914

NL
NT
50
1482
3.02% 89.55%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

27

PEAK HR FACTOR :
CONTROL : Signalized

580
0.936

NR
123
7.43%

SL
ST
70
1241
5.06% 89.67%
sb a
sb d

SR
73
5.27%

EL
ET
78
117
18.98% 28.47%
eb a
eb d

ER
216
52.55%

WL
WT
135
97
29.09% 20.91%
wb a
nb d

TOTAL
41

32

446
0.892

32

23

36
0.706

85

54

58
0.883

114

1528
0.934

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-016
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave

Regent St

SOUTHBOUND

Regent St

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
0

ET
1

ER
0

WL
0

WT
1

WR
0

TOTAL

2
3
5
1
1
4

103
104
103
90
100
91

8
11
13
13
13
13

4
9
12
8
12
9

146
123
142
142
173
141

3
5
4
7
4
3

11
8
7
8
8
10

7
15
11
11
7
11

11
13
16
14
10
16

7
12
5
6
4
9

4
1
3
7
5
2

15
9
13
13
8
7

321
313
334
320
345
316

WR
65
50.00%

TOTAL
1949

NL
NT
16
591
2.36% 87.17%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

11

PEAK HR FACTOR :
CONTROL : Signalized

384
0.924

NR
71
10.47%

SL
ST
54
867
5.70% 91.55%
sb a
sb d

SR
26
2.75%

EL
ET
52
62
26.80% 31.96%
eb a
eb d

ER
80
41.24%

WL
WT
43
22
33.08% 16.92%
wb a
nb d

TOTAL
52

41

598
0.869

18

33

40
0.872

56

24

17
0.788

41

1315
0.953

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Tabor St

Day:

Wednesday

Hours:

February 12, 2014

Date:

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

24
23
22

18
24
17

4
7
1

3
12
5

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

197

7.45

142

9.00

44

7.45

88

8.00

PM PK 15 MIN

130

14.30

184

15.30

26

15.45

44

14.45

AM PK HOUR

726

7.30

508

8.15

113

7.30

281

7.45

PM PK HOUR

481

14.30

638

14.45

93

15.00

134

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

SOUTHBOUND Approach

20
19
20
7
20

Th
612
575
517
233
417

Rt
19
32
19
7
15

Total
651
626
556
247
452

86

2354

92

2532

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16

Lt

TOTAL

15
14
23
16
21

Th
292
449
430
267
586

89

2024

TOTAL
Rt

Th

Rt

Total

30
20
20
8
28

29
41
37
8
41

86
86
76
26
93

105

106

156

367

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Total
321
492
486
301
633

N-S
972
1118
1042
548
1085

Ped
17
27
19
27
30

Sch
1
7
0
14
6

Ped
28
59
13
36
50

Sch
8
18
1
14
3

120

2233

4765

120

28

186

44

TOTAL

20
49
29
18
29

Th
25
43
21
13
19

145

121

XING N/L

14
29
33
18
26

WESTBOUND Approach

27
25
19
10
24

XING S/L

Rt Total
161
206
167
259
118
168
51
82
70
118
567

833

XING W/L

XING E/L

E-W
292
345
244
108
211

Ped
17
29
22
17
38

Sch
1
11
1
3
2

Ped
25
54
22
47
48

Sch
0
9
0
20
8

1200

123

18

196

37

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-017
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave

Tabor St

SOUTHBOUND

Tabor St

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
0

ET
1

ER
0

WL
0

WT
1

WR
0

TOTAL

6
2
4
8
8
7
2
2
6
3
6
5

114
145
175
178
173
143
135
124
133
113
133
138

2
3
3
11
9
7
13
3
9
3
2
5

3
1
4
7
3
5
0
6
5
8
5
5

43
55
100
94
115
100
107
127
128
92
95
115

3
3
7
1
8
11
5
5
9
6
9
9

3
5
7
12
9
5
6
5
4
3
8
4

1
4
10
15
4
9
2
5
9
2
5
4

3
5
4
17
6
15
12
8
10
10
9
8

1
2
8
9
20
15
8
6
10
4
10
5

3
2
10
10
21
9
10
3
8
4
6
3

33
39
48
41
47
41
50
29
33
25
31
29

215
266
380
403
423
367
350
323
364
273
319
330

WR
446
70.46%

TOTAL
4013

NL
NT
59
1704
3.22% 92.96%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

27

PEAK HR FACTOR :
CONTROL : Signalized

669
0.921

NR
70
3.82%

SL
ST
52
1171
4.00% 90.15%
sb a
sb d

SR
76
5.85%

EL
ET
71
70
28.63% 28.23%
eb a
eb d

ER
107
43.15%

WL
WT
98
89
15.48% 14.06%
wb a
nb d

TOTAL
30

19

409
0.903

27

33

38
0.642

42

52

50
0.793

177

1573
0.930

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-017
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave

Tabor St

SOUTHBOUND

Tabor St

EASTBOUND

WESTBOUND

NL
1

NT
2

NR
0

SL
1

ST
2

SR
0

EL
0

ET
1

ER
0

WL
0

WT
1

WR
0

TOTAL

3
4
6
5
6
3

121
112
118
99
100
100

6
1
2
4
6
3

8
8
6
6
6
3

139
128
136
147
171
132

9
9
10
4
7
5

4
6
5
6
7
6

5
3
8
9
4
7

4
4
11
6
11
13

8
10
6
5
10
8

6
7
5
5
4
5

24
27
14
17
16
23

337
319
327
313
348
308

WR
121
60.50%

TOTAL
1952

NL
NT
27
650
3.86% 92.99%
nb a
nb d
PEAK HR START TIME :
245 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

21

PEAK HR FACTOR :
CONTROL : Signalized

429
0.919

NR
22
3.15%

SL
ST
37
853
3.96% 91.33%
sb a
sb d

SR
44
4.71%

EL
ET
34
36
28.57% 30.25%
eb a
eb d

ER
49
41.18%

WL
WT
47
32
23.50% 16.00%
wb a
nb d

TOTAL
13

26

582
0.867

30

24

24
0.833

32

31

21
0.716

74

1307
0.939

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Venice Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

13
23
18

19
27
19

88
106
49

86
83
67

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

153

7.45

175

8.45

413

8.15

387

7.30

PM PK 15 MIN

95

14.45

179

15.45

373

15.00

343

15.00

AM PK HOUR

538

7.30

661

8.00

1611

8.00

1517

7.30

PM PK HOUR

350

14.45

682

15.00

1430

15.00

1251

15.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

SOUTHBOUND Approach

41
52
26
13
49

Th
397
404
329
125
248

Rt
36
29
39
25
37

Total
474
485
394
163
334

181

1503

166

1850

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt
96
147
121
66
112

Th
215
319
237
152
332

542

1255

TOTAL
Rt Total
107
418
195
661
194
552
106
324
238
682
840

2637

WESTBOUND Approach

95
118
120
76
131

Th
1071
1462
1191
567
1256

540

5547

Rt
11
31
32
20
43

Total
1177
1611
1343
663
1430

137

6224

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
1250
1283
1267
514
1099

288

5413

Rt

XING N/L

N-S
892
1146
946
487
1016

Ped
25
61
72
41
79

Sch
1
0
0
4
4

Ped
74
92
81
36
111

Sch
0
0
0
0
0

4487

278

394

TOTAL

57
63
70
28
70

XING S/L

XING W/L

XING E/L

78
76
84
32
82

Total
1385
1422
1421
574
1251

E-W
2562
3033
2764
1237
2681

Ped
26
45
49
35
49

Sch
1
0
0
2
1

Ped
56
55
48
27
83

Sch
0
1
0
2
1

352

6053

12277

204

269

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-018
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave
SOUTHBOUND

Venice Blvd

Venice Blvd

EASTBOUND

WESTBOUND

NL
1

NT
1

NR
1

SL
1

ST
2

SR
0

EL
1

ET
4

ER
0

WL
1

WT
4

WR
0

TOTAL

10
11
10
10
10
22
7
13
8
8
5
5

73
92
102
130
114
108
97
85
92
81
73
83

8
12
3
13
5
11
4
9
11
10
3
15

16
18
30
32
38
34
39
36
26
31
35
29

23
43
69
80
79
87
79
74
71
53
50
63

19
15
31
42
41
49
40
65
60
38
48
48

26
20
16
33
30
31
27
30
23
19
38
40

232
247
284
308
358
375
371
358
329
338
293
231

0
3
6
2
8
7
4
12
10
6
5
11

12
13
19
13
21
16
16
10
24
15
13
18

254
297
340
359
348
321
310
304
326
331
299
311

16
20
28
14
18
20
17
21
17
22
24
21

689
791
938
1036
1070
1081
1011
1017
997
952
886
875

NL
NT
119
1130
8.80% 83.52%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

49

PEAK HR FACTOR :
CONTROL : Signalized

449
0.868

NR
104
7.69%

SL
ST
364
771
22.32% 47.27%
sb a
sb d

SR
496
30.41%

EL
ET
333
3724
8.06% 90.15%
eb a
eb d

ER
74
1.79%

WL
WT
190
3800
4.49% 89.88%
wb a
nb d

WR
238
5.63%

TOTAL
11343
TOTAL

33

143

325
0.941

172

121

1412
0.941

21

66

1338
0.952

69

4198
0.971

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-018
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave
SOUTHBOUND

Venice Blvd

Venice Blvd

EASTBOUND

WESTBOUND

NL
1

NT
1

NR
1

SL
1

ST
2

SR
0

EL
1

ET
4

ER
0

WL
1

WT
4

WR
0

TOTAL

5
8
16
14
12
7

55
70
68
54
61
65

8
17
10
11
9
7

38
28
31
22
32
27

80
72
77
82
85
88

49
57
56
60
58
64

37
39
26
33
38
34

286
281
339
325
304
288

10
10
8
14
10
11

14
14
22
13
11
24

253
261
296
279
260
264

17
15
25
19
19
19

852
872
974
926
899
898

NL
NT
62
373
12.47% 75.05%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

49

PEAK HR FACTOR :
CONTROL : Signalized

248
0.888

NR
62
12.47%

SL
ST
178
484
17.69% 48.11%
sb a
sb d

SR
344
34.19%

EL
ET
207
1823
9.89% 87.10%
eb a
eb d

ER
63
3.01%

WL
WT
98
1613
5.37% 88.38%
wb a
nb d

WR
114
6.25%

TOTAL
5421
TOTAL

37

112

332
0.953

238

131

1256
0.958

43

70

1099
0.912

82

3697
0.949

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Motor Ave

East/West

Washington Blvd

Day:

Wednesday

Hours:

February 12, 2014

Date:

7-10 & 2:30-4

School Day:

Weather:

Chekrs:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

0
0
0

16
5
11

16
14
31

26
19
30

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

0.00

119

8.00

327

7.45

337

7.45

PM PK 15 MIN

0.00

107

15.45

301

15.45

299

15.00

AM PK HOUR

0.00

430

7.45

1261

7.45

1152

7.30

PM PK HOUR

0.00

415

15.00

1151

15.00

954

14.30

NORTHBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

SOUTHBOUND Approach

0
0
0
0
0

Th
0
0
0
0
0

Rt
0
0
0
0
0

Total
0
0
0
0
0

Hours
7-8
8-9
9-10
14-15
15-16

TOTAL

EASTBOUND Approach
Hours
7-8
8-9
9-10
14-15
15-16

Lt
320
323
281
108
201

TOTAL

1233

Lt

TOTAL

85
171
122
57
150

Th
0
0
0
0
0

Rt Total
180
265
259
430
200
322
135
192
265
415

585

1039

1624

WESTBOUND Approach
Th
647
920
757
425
950

Rt
0
0
0
0
0

Total
967
1243
1038
533
1151

3699

4932

Hours
7-8
8-9
9-10
14-15
15-16
TOTAL

Lt

Th
944
923
784
391
796

3838

Rt Total
142
1086
143
1066
108
892
46
437
124
920
563

4401

XING N/L

N-S
265
430
322
192
415

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
15
27
32
9
36

Sch
0
0
0
0
1

1624

119

TOTAL

0
0
0
0
0

XING S/L

XING W/L

XING E/L

E-W
2053
2309
1930
970
2071

Ped
0
0
0
0
0

Sch
0
0
0
0
0

Ped
2
7
7
3
10

Sch
0
0
0
0
1

9333

29

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-019
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Motor Ave

Motor Ave

Washington Blvd

SOUTHBOUND

Washington Blvd

EASTBOUND

WESTBOUND

NL
0

NT
0

NR
0

SL
1

ST
0

SR
1

EL
1

ET
2

ER
0

WL
0

WT
2

WR
0

TOTAL

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

5
17
31
32
43
46
35
47
40
32
27
23

0
0
0
0
0
0
0
0
0
0
0
0

26
37
54
63
76
72
63
48
56
50
38
56

57
81
70
112
91
84
73
75
81
72
63
65

115
132
185
215
205
235
246
234
231
195
182
149

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

185
204
257
298
221
233
213
256
225
178
186
195

30
42
31
39
30
43
36
34
26
27
25
30

418
513
628
759
666
713
666
694
659
554
521
518

NL

NT

NR

WR
393
12.91%

TOTAL
7309

TOTAL VOLUMES :
0
0
0
APPROACH %'s : #DIV/0! #DIV/0! #DIV/0!

nb a

nb d

SL
ST
378
0
37.17%
0.00%
sb a
sb d

SR
639
62.83%

EL
ET
924
2324
28.45% 71.55%
eb a
eb d

ER
0
0.00%

WL
WT
0
2651
0.00% 87.09%
wb a
nb d

745 AM

PEAK HR START TIME :


PEAK HR VOL :

Date: 2/12/2014

AM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

TOTAL
0

0.000

156

0
0.903

274

360

901
0.964

965
0.826

148

2804
0.924

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-019
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Motor Ave

Motor Ave

Washington Blvd

SOUTHBOUND

Washington Blvd

EASTBOUND

WESTBOUND

NL
0

NT
0

NR
0

SL
1

ST
0

SR
1

EL
1

ET
2

ER
0

WL
0

WT
2

WR
0

TOTAL

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

28
29
28
37
40
45

0
0
0
0
0
0

72
63
73
65
65
62

52
56
47
48
49
57

189
236
242
234
230
244

0
0
0
0
0
0

0
0
0
0
0
0

194
197
257
184
181
174

21
25
42
34
26
22

556
606
689
602
591
604

NL

NT

NR

WR
170
12.53%

TOTAL
3648

TOTAL VOLUMES :
0
0
0
APPROACH %'s : #DIV/0! #DIV/0! #DIV/0!

nb a

nb d

SL
ST
207
0
34.10%
0.00%
sb a
sb d

SR
400
65.90%

EL
ET
309
1375
18.35% 81.65%
eb a
eb d

ER
0
0.00%

WL
WT
0
1187
0.00% 87.47%
wb a
nb d

245 PM

PEAK HR START TIME :


PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND
LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

TOTAL
0

0.000

134

0
0.952

266

200

942
0.978

819
0.791

127

2488
0.903

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Palms Blvd-National Blvd

East/West

National Blvd-Exposition Blvd


Thursday

Day:
Hours:

Date:

February 20, 2014

7-10

Weather:

Chekrs:

School Day:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

16
1
20

33
10
49

19
10
10

7
8
0

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

377

8.30

240

9.30

77

7.30

98

8.00

AM PK HOUR

1422

7.45

931

9.00

287

7.30

384

7.45

NORTHBOUND Approach
Hours
7-8
8-9
9-10
TOTAL

Lt

SOUTHBOUND Approach

0
1
0

Th
1036
1338
1004

3378

Rt
44
73
62

Total
1080
1412
1066

179

3558

EASTBOUND Approach
Hours
7-8
8-9
9-10
TOTAL

Lt
117
122
150
389

Hours
7-8
8-9
9-10

Lt

TOTAL

2
0
0

Th
683
665
819

2167

TOTAL
Rt Total
130
815
120
785
112
931
362

2531

WESTBOUND Approach
Th
98
126
79

Rt
9
9
14

Total
224
257
243

303

32

724

Hours
7-8
8-9
9-10
TOTAL

Lt

Th
137
143
71

167

351

Rt

XING N/L

N-S
1895
2197
1997

Ped
46
46
37

Sch
0
1
0

Ped
0
1
0

Sch
0
0
0

6089

129

TOTAL

55
66
46

XING S/L

XING W/L

XING E/L

97
171
145

Total
289
380
262

E-W
513
637
505

Ped
0
0
0

Sch
0
0
0

Ped
39
35
24

Sch
0
0
0

413

931

1655

98

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5101-020
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Palms Blvd-National Blvd

Palms Blvd-National Blvd

National Blvd-Exposition Blvd National Blvd-Exposition Blvd

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
0

NT
2

NR
0

SL
1

ST
2

SR
0

EL
1

ET
1

ER
1

WL
1

WT
1

WR
1

TOTAL

0
0
0
0
1
0
0
0
0
0
0
0

148
253
302
333
325
330
358
325
290
283
222
209

7
7
11
19
25
12
19
17
13
13
17
19

1
0
1
0
0
0
0
0
0
0
0
0

130
158
193
202
168
191
139
167
193
206
215
205

35
28
33
34
20
30
46
24
32
27
25
28

12
28
41
36
20
38
27
37
31
50
35
34

14
19
35
30
46
30
29
21
23
15
22
19

3
1
1
4
2
4
1
2
2
5
3
4

8
14
15
18
18
16
14
18
12
10
9
15

21
29
43
44
36
46
39
22
26
19
17
9

18
17
28
34
44
34
41
52
40
37
40
28

397
554
703
754
705
731
713
685
662
665
605
570

NL
NT
1
3378
0.03% 94.94%
nb a
nb d
PEAK HR START TIME :
745 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/20/2014

AM

NORTHBOUND

LANES:

Day: Thursday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

1346
0.943

NR
179
5.03%

ST
SR
EL
ET
SL
2
2167
362
389
303
0.08% 85.62% 14.30% 53.73% 41.85%
sb a
sb d
eb a
eb d

ER
32
4.42%

WL
WT
WR
167
351
413
17.94% 37.70% 44.36%
wb a
nb d

TOTAL
7744

TOTAL
75

700
0.879

130

121

135
0.927

11

66

165
0.980

153

2903
0.963

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Palms Blvd_National Blvd

East/West

National Blvd_Exposition Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

2:30-4

Weather:

Chekrs:

School Day:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

10
2
25

9
3
11

12
3
6

4
6
1

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

PM PK 15 MIN

297

15.15

279

15.45

149

15.45

49

14.45

PM PK HOUR

1053

15.00

1022

15.00

518

15.00

176

14.45

NORTHBOUND Approach
Hours
14-15
15-16

Lt

TOTAL

SOUTHBOUND Approach

0
1

Th
346
900

Rt
47
152

Total
393
1053

1246

199

1446

EASTBOUND Approach
Hours
14-15
15-16
TOTAL

Lt

Hours
14-15
15-16

Lt

TOTAL

TOTAL

1
8

Th
432
926

1358

Rt

Th
70
237

Rt
8
10

Total
170
518

363

307

18

688

Hours
14-15
15-16
TOTAL

Lt

Total
479
1022

N-S
872
2075

Ped
9
23

Sch
0
0

Ped
0
0

Sch
0
0

134

1501

2947

127

TOTAL

Th

XING N/L

46
88

WESTBOUND Approach

92
271

XING S/L

Rt

Total

XING W/L

XING E/L

34
41

27
61

30
64

91
166

E-W
261
684

Ped
0
4

Sch
0
0

Ped
0
20

Sch
0
0

75

88

94

257

945

111

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-020
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Palms Blvd_National Blvd

Palms Blvd_National Blvd

National Blvd_Exposition Blvd National Blvd_Exposition Blvd

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
0

NT
2

NR
0

SL
1

ST
2

SR
0

EL
1

ET
1

ER
1

WL
1

WT
1

WR
1

TOTAL

0
0
1
0
0
0

180
166
225
255
192
228

24
23
47
42
29
34

0
1
0
2
4
2

211
221
227
227
212
260

25
21
22
32
17
17

43
49
59
55
75
82

27
43
55
57
61
64

5
3
1
3
3
3

15
19
15
7
10
9

11
16
17
15
17
12

16
14
12
14
20
18

557
576
681
709
640
729

ST
NL
NT
NR
SL
1
1246
199
9
1358
0.07% 86.17% 13.76%
0.60% 90.47%
nb a
nb d
sb a
sb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Date: 2/12/2014

PM

NORTHBOUND

LANES:

Day: Wednesday

TOTALS

PEAK HR FACTOR :
CONTROL : Signalized

900
0.886

152

926
0.916

SR
134
8.93%

EL
ET
363
307
52.76% 44.62%
eb a
eb d

ER
18
2.62%

WL
WT
WR
75
88
94
29.18% 34.24% 36.58%
wb a
nb d

TOTAL
3892

TOTAL
88

271

237
0.869

10

41

61
0.883

64

2759
0.946

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

National Blvd

East/West

I-10 WB Off-Ramp-Manning Ave


Thursday

Day:
Hours:

Date:

February 20, 2014

7-10

Weather:

Chekrs:

School Day:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

18
23
26

33
15
50

2
3
1

31
1
2

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

434

8.30

313

7.30

46

8.00

121

9.45

AM PK HOUR

1642

8.00

1064

7.30

149

7.30

370

9.00

NORTHBOUND Approach
Hours
7-8
8-9
9-10

Lt
366
408
311

TOTAL

1085

SOUTHBOUND Approach

Th
881
1234
985

Rt
0
0
0

Total
1247
1642
1296

3100

4185

EASTBOUND Approach
Hours
7-8
8-9
9-10
TOTAL

Lt

Hours
7-8
8-9
9-10
TOTAL

Lt
0
0
0

Th
643
586
722

1951

TOTAL
Rt Total
295
938
355
941
302
1024
952

2903

WESTBOUND Approach

66
81
59

Th
0
0
0

Rt
41
53
46

Total
107
134
105

206

140

346

Hours
7-8
8-9
9-10
TOTAL

Th
131
179
172

451

482

Rt

XING N/L

N-S
2185
2583
2320

Ped
20
0
0

Sch
0
0
0

Ped
0
21
14

Sch
0
0
0

7088

274

82

TOTAL

Lt
131
149
171

XING S/L

XING W/L

XING E/L

29
30
27

Total
291
358
370

E-W
398
492
475

Ped
35
1
0

Sch
1
0
0

Ped
5
29
30

Sch
0
0
0

86

1019

1365

36

64

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5101-021
City: Los Angeles
NS/EW Streets:

LANES:
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

National Blvd

National Blvd

NORTHBOUND

SOUTHBOUND

AM
I-10 WB Off-Ramp-Manning
Ave
EASTBOUND

Date: 2/20/2014
I-10 WB Off-Ramp-Manning
Ave
WESTBOUND

NL
1

NT
2

NR
0

SL
0

ST
1

SR
1

EL
1

ET
0

ER
1

WL
1

WT
0.5

WR
0.5

TOTAL

99
103
76
88
110
94
111
93
84
70
78
79

85
188
300
308
287
302
323
322
284
289
231
181

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

119
138
218
168
141
172
136
137
176
187
186
173

48
56
95
96
93
81
85
96
75
78
69
80

4
17
21
24
27
18
7
29
20
11
13
15

0
0
0
0
0
0
0
0
0
0
0
0

1
9
10
21
19
9
11
14
11
10
13
12

46
30
9
46
32
42
35
40
36
40
36
59

30
30
30
41
40
42
47
50
42
39
39
52

9
6
9
5
8
7
6
9
3
6
8
10

441
577
768
797
757
767
761
790
731
730
673
661

NL
NT
1085
3100
25.93% 74.07%
nb a
nb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Thursday

TOTALS

368

PEAK HR FACTOR :
CONTROL : Signalized

1197
0.986

NR
0
0.00%

ST
SR
EL
ET
SL
0
1951
952
206
0
0.00% 67.21% 32.79% 59.54%
0.00%
sb a
sb d
eb a
eb d

ER
WL
WT
140
451
482
40.46% 44.26% 47.30%
wb a
nb d

WR
86
8.44%

TOTAL
8453

TOTAL
0

699
0.850

365

90

0
0.810

59

129

153
0.845

29

3089
0.969

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

National Blvd

East/West

I-10 WB Off-Ramp_Manning Ave

Day:

Wednesday

Hours:

Date:

February 12, 2014

2:30-4

School Day:

Weather:

Chekrs:
YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

12
9
30

7
6
11

1
0
0

5
0
0

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

PM PK 15 MIN

322

15.15

224

15.15

47

15.45

182

14.45

PM PK HOUR

1232

15.00

807

14.45

164

15.00

651

14.45

NORTHBOUND Approach
Hours
14-15
15-16
TOTAL

Lt

SOUTHBOUND Approach

82
151

Th
387
1081

Rt
0
0

Total
469
1232

233

1468

1701

EASTBOUND Approach
Hours
14-15
15-16
TOTAL

Lt

Hours
14-15
15-16
TOTAL

Lt
0
0

Th
277
590

867

TOTAL
Rt

Th
0
0

Rt
19
43

Total
79
164

Hours
14-15
15-16

Total
371
800

N-S
840
2032

Ped
0
0

Sch
0
0

Ped
8
26

Sch
1
2

304

1171

2872

80

181

62

243

TOTAL

TOTAL

Lt
190
369

Th
115
184

559

299

XING N/L

94
210

WESTBOUND Approach

60
121

XING S/L

Rt

XING W/L

XING E/L

49
74

Total
354
627

E-W
433
791

Ped
0
0

Sch
0
0

Ped
11
73

Sch
2
1

123

981

1224

177

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-021
City: Los Angeles
NS/EW Streets:

LANES:
2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

National Blvd

National Blvd

NORTHBOUND

SOUTHBOUND

Date: 2/12/2014
PM
I-10 WB Off-Ramp_Manning I-10 WB Off-Ramp_Manning
Ave
Ave
EASTBOUND
WESTBOUND

NL
1

NT
2

NR
0

SL
0

ST
1

SR
1

EL
1

ET
0

ER
1

WL
1

WT
0.5

WR
0.5

TOTAL

47
35
41
39
39
32

198
189
262
283
253
283

0
0
0
0
0
0

0
0
0
0
0
0

128
149
146
165
127
152

47
47
54
59
60
37

35
25
26
21
37
37

0
0
0
0
0
0

10
9
18
7
8
10

93
97
79
81
106
103

55
60
36
55
59
34

24
25
18
19
16
21

637
636
680
729
705
709

NL
NT
233
1468
13.70% 86.30%
nb a
nb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

Day: Wednesday

TOTALS

151

PEAK HR FACTOR :
CONTROL : Signalized

1081
0.957

NR
0
0.00%

ST
SR
EL
ET
SL
0
867
304
181
0
0.00% 74.04% 25.96% 74.49%
0.00%
sb a
sb d
eb a
eb d

ER
WL
WT
WR
62
559
299
123
25.51% 56.98% 30.48% 12.54%
wb a
nb d

TOTAL
4096

TOTAL
0

590
0.893

210

121

0
0.872

43

369

184
0.866

74

2823
0.968

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Castle Heights Ave

East/West

National Blvd
Thursday

Day:
Hours:

Date:

February 20, 2014

7-10

Weather:

Chekrs:

School Day:

YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

5
8
0

8
11
10

21
16
24

26
15
41

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

AM PK 15 MIN

86

8.00

125

8.15

346

8.45

231

7.30

AM PK HOUR

301

7.30

455

7.30

1289

8.00

838

8.45

NORTHBOUND Approach
Hours
7-8
8-9
9-10
TOTAL

Lt

SOUTHBOUND Approach

65
40
44

Th
102
181
80

Rt
34
38
26

Total
201
259
150

149

363

98

610

EASTBOUND Approach
Hours
7-8
8-9
9-10
TOTAL

Lt
179
318
293
790

Hours
7-8
8-9
9-10
TOTAL

Lt
107
140
91

TOTAL

Th
40
57
35

338

132

Rt Total
167
314
206
403
233
359
606

1076

WESTBOUND Approach
Th
694
946
724

Rt
28
25
21

Total
901
1289
1038

2364

74

3228

Hours
7-8
8-9
9-10
TOTAL

Lt
10
8
23

Th
678
674
717

41

2069

XING N/L

N-S
515
662
509

Ped
32
18
8

Sch
0
0
0

Ped
19
16
19

Sch
0
0
0

1686

312

101

TOTAL
Rt

XING S/L

XING W/L

XING E/L

80
90
92

Total
768
772
832

E-W
1669
2061
1870

Ped
18
18
22

Sch
0
0
0

Ped
13
8
6

Sch
1
2
0

262

2372

5600

58

27

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5101-022
City: Los Angeles
NS/EW Streets:

7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45

AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM
AM

Date: 2/20/2014

AM

Castle Heights Ave

Castle Heights Ave

NORTHBOUND

LANES:

Day: Thursday

TOTALS

National Blvd

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
0

NT
1

NR
0

SL
1

ST
1

SR
0

EL
1

ET
1

ER
1

WL
1

WT
1

WR
0

TOTAL

11
11
27
16
9
11
10
10
10
16
8
10

3
18
29
52
66
50
34
31
32
19
18
11

7
4
9
14
11
7
8
12
10
4
5
7

15
19
22
51
50
42
24
24
30
17
18
26

4
7
12
17
23
22
9
3
9
11
6
9

23
38
51
55
49
61
41
55
61
57
54
61

27
54
52
46
72
73
86
87
71
76
84
62

76
132
252
234
244
224
223
255
233
219
157
115

2
3
10
13
13
2
6
4
8
6
4
3

4
1
0
5
3
1
1
3
7
5
6
5

124
163
213
178
168
155
173
178
178
182
187
170

15
25
18
22
16
33
24
17
29
25
21
17

311
475
695
703
724
681
639
679
678
637
568
496

ST
SR
EL
ET
NL
NT
NR
SL
149
363
98
338
132
606
790
2364
24.43% 59.51% 16.07% 31.41% 12.27% 56.32% 24.47% 73.23%
nb a
nb d
sb a
sb d
eb a
eb d
PEAK HR START TIME :
730 AM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

National Blvd

63

PEAK HR FACTOR :
CONTROL : Signalized

197
0.875

41

165

74
0.910

216

243

954
0.938

ER
74
2.29%

WL
WT
WR
41
2069
262
1.73% 87.23% 11.05%
wb a
nb d

TOTAL
7286

TOTAL
38

714
0.879

89

2803
0.968

City Of Los Angeles


Department Of Transportation

MANUAL TRAFFIC COUNT SUMMARY


STREET:
North/South

Castle Heights Ave

East/West

National Blvd

Day:

Wednesday

Hours:

Date:

February 12, 2014

2:30-4

School Day:

Weather:

Chekrs:
YES

SUNNY

NDS

District:

I/S CODE

N/B

S/B

E/B

W/B

2
0
0

5
4
0

12
7
29

9
6
11

DUALWHEELED
BIKES
BUSES

N/B

TIME

S/B

TIME

E/B

TIME

W/B

TIME

PM PK 15 MIN

27

15.30

142

14.45

305

15.45

148

15.15

PM PK HOUR

100

15.00

504

14.45

1131

15.00

550

14.45

NORTHBOUND Approach

SOUTHBOUND Approach

TOTAL

XING S/L

XING N/L

Hours
14-15
15-16

13
32

19
45

14
23

46
100

14-15
15-16

76
165

22
74

135
242

233
481

N-S
279
581

Ped
8
38

Sch
0
0

Ped
9
30

Sch
1
0

TOTAL

45

64

37

146

TOTAL

241

96

377

714

860

100

98

EASTBOUND Approach
Hours
14-15
15-16
TOTAL

Lt
112
245
357

WESTBOUND Approach
Th
331
842

Rt
11
44

Total
454
1131

1173

55

1585

Hours
14-15
15-16
TOTAL

Lt

TOTAL

8
15

Th
198
459

23

657

Rt

XING W/L

XING E/L

38
75

Total
244
549

E-W
698
1680

Ped
4
22

Sch
0
0

Ped
4
13

Sch
1
0

113

793

2378

62

64

Intersection Turning Movement


Prepared by:

National Data & Surveying Services


Project ID: 14-5069-022
City: Los Angeles
NS/EW Streets:

2:30
2:45
3:00
3:15
3:30
3:45

PM
PM
PM
PM
PM
PM

Date: 2/12/2014

PM

Castle Heights Ave

Castle Heights Ave

NORTHBOUND

LANES:

Day: Wednesday

TOTALS

National Blvd

SOUTHBOUND

EASTBOUND

WESTBOUND

NL
0

NT
1

NR
0

SL
1

ST
1

SR
0

EL
1

ET
1

ER
1

WL
1

WT
1

WR
0

TOTAL

6
7
6
9
9
8

11
8
7
12
13
13

6
8
9
4
5
5

27
49
49
51
27
38

7
15
16
18
19
21

57
78
64
64
54
60

49
63
54
70
62
59

182
149
198
212
205
227

6
5
8
7
10
19

3
5
2
5
4
4

100
98
123
125
121
90

25
13
20
18
16
21

479
498
556
595
545
565

ST
SR
EL
ET
NL
NT
NR
SL
45
64
37
241
96
377
357
1173
30.82% 43.84% 25.34% 33.75% 13.45% 52.80% 22.52% 74.01%
nb a
nb d
sb a
sb d
eb a
eb d
PEAK HR START TIME :
300 PM
TOTAL VOLUMES :
APPROACH %'s :

PEAK HR VOL :

National Blvd

32

PEAK HR FACTOR :
CONTROL : Signalized

45
0.926

23

165

74
0.904

242

245

842
0.927

ER
55
3.47%

WL
WT
WR
23
657
113
2.90% 82.85% 14.25%
wb a
nb d

TOTAL
3238

TOTAL
44

15

459
0.927

75

2261
0.950

APPENDIX B
CMA AND LEVELS OF SERVICE EXPLANATION
CMA DATA WORKSHEETS WEEKDAY AM AND PM PEAK HOURS

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-Appendix Covers.docx

CRITICAL MOVEMENT ANALYSIS (CMA) DESCRIPTION


Level of Service is a term used to describe prevailing conditions and their effect on traffic. Broadly interpreted, the Level of Service
concept denotes any one of a number of differing combinations of operating conditions which may take place as a roadway is
accommodating various traffic volumes. Level of Service is a qualitative measure of the effect of such factors as travel speed, travel
time, interruptions, freedom to maneuver, safety, driving comfort and convenience.
Six Levels of Service, A through F, have been defined in the 1965 Highway Capacity Manual. Level of Service A describes a
condition of free flow, with low traffic volumes and relatively high speeds, while Level of Service F describes forced traffic flow at
low speeds with jammed conditions and queues which cannot clear during the green phases.
Critical Movement Analysis (CMA) is a procedure which provides a capacity and level of service geometry and traffic signal
operation and results in a level of service determination for the intersection as a whole operating unit.
The per lane volume for each movement in the intersection is determined and the per lane intersection capacity based on the
Transportation Research Board (TRB) Report 212 (Interim Materials on Highway Capacity). The resulting CMA represents the ratio
of the intersection's cumulative volume over its respective capacity (V/C ratio). Critical Movement Analysis takes into account lane
widths, bus and truck operations, pedestrian activity and parking activity, as well as number of lanes and geometrics.
The Level of Service (abbreviated from the Highway Capacity Manual) are listed here with their corresponding CMA and Load
Factor equivalents. Load Factor is that proportion of the signal cycles during the peak hour which are fully loaded; i.e. when all of the
vehicles waiting at the beginning of green are not able to clear on that green phase.
Critical Movement Analysis Characteristics
Level of Service
A (free flow)

Load Factor

Equivalent CMA

0.0

0.00 - 0.60

B (rural design)

0.0 - 0.1

0.61 - 0.70

C (urban design)

0.1 - 0.3

0.71 - 0.80

D (maximum urban design)

0.3 - 0.7

0.81 - 0.90

E (capacity)
F (force flow)

0.7 - 1.0

0.91 - 1.00

Not Applicable

Not Applicable

SERVICE LEVEL A
There are no loaded cycles and few are even close to loaded at this service level. No approach phase is fully utilized by traffic and no
vehicle waits longer than one red indication.
SERVICE LEVEL B
This level represents stable operation where an occasional approach phase is fully utilized and a substantial number are approaching
full use. Many drivers begin to feel restricted within platoons of vehicles.
SERVICE LEVEL C
At this level stable operation continues. Loading is still intermittent but more frequent than at Level B. Occasionally drivers may
have to wait through more one red signal indication and backups may develop behind turning vehicles. Most drivers feel somewhat
restricted, but not objectionably so.
SERVICE LEVEL D
This level encompasses a zone of increasing restriction approaching instability at the intersection. Delays to approaching vehicles
may be substantial during short peaks within the peak hour, but enough cycles with lower demand occur to permit periodic clearance
of queues, thus preventing excessive backups. Drivers frequently have to wait through more than one red signal. This level is the
lower limit of acceptable operation to most drivers.
SERVICE LEVEL E
This represents near capacity and capacity operation. At capacity (CMA = 1.0) it represents the most vehicles that the particular
intersection can accommodate. However, full utilization of every signal cycle is seldom attained no matter how great the demand. At
this level all drivers wait through more than one red signal, and frequently through several.
SERVICE LEVEL F
Jammed conditions. Traffic backed up from a downstream location on one of the street restricts or prevents movement of traffic
through the intersection under consideration.

I/S #:

East-West Street:

North-South Street:

Sepulveda Boulevard

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:56 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
1
1
0
0
0

2
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

North-South:
East-West:
SUM:

69

712

61

114

1105

335

201

308

56

262

1268

244

No. of
Lanes

4
0
0
0
2
0

56

74

0.999

696
677
1373

74

398

61

114

616

184

201

255

62

232

634

244

Lane
Volume

0.899

North-South:
East-West:
SUM:

722

61

114

1118

335

201

308

62

262

1268

244

Total
Volume

0.890

0.990

690
671
1361

69

10

61
391

13

610
114

184

201

634
232

Project
Traffic

244

255

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
4
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
4
0
0
0
2
0

66

43

Added
Volume

1
0
1
1
0
0
0

2
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

70

719

62

115

1116

338

203

377

57

265

1324

246

Total
Volume

1
0
1
1
0
0
0

2
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

No. of
Lanes

0.925

1.025

725
684
1409

75

402

62

115

622

186

203

290

63

234

662

246

Lane
Volume

0.009
NO

1
0
1
1
0
0
0

2
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

No. of
Lanes

N/A

0.009

0.925

1.025

725
684
1409

75

402

62

115

622

186

203

290

63

234

662

246

Lane
Volume

CMA01

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

75

729

62

115

1129

338

203

377

63

265

1324

246

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

75

729

62

115

1129

338

203

377

63

265

1324

246

Total
Volume

Significant impacted?

10

13

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.916

1.016

719
678
1397

70

395

62

115

616

186

203

290

57

234

662

246

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA1

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

East-West Street:

North-South Street:

Sepulveda Boulevard

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:56 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
1
1
0
0
0

2
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

North-South:
East-West:
SUM:

72

708

87

132

902

332

325

780

142

177

773

177

No. of
Lanes

76

0.972

730
606
1336

76

396

87

132

519

183

325

553

144

134

387

177

Lane
Volume

0.872

North-South:
East-West:
SUM:

716

87

132

906

332

325

780

144

177

773

177

Total
Volume

0.870

0.970

730
604
1334

72

87
390

517
132

183

553
325

142

134

177
387

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

4
0
0
0
2
0

2015

2016
4
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
4
0
0
0
2
0

86

101

Added
Volume

1
0
1
1
0
0
0

2
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

73

715

88

133

911

335

328

874

143

179

882

179

Total
Volume

1
0
1
1
0
0
0

2
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

No. of
Lanes

0.912

1.012

780
612
1392

77

400

88

133

524

184

328

601

145

135

441

179

Lane
Volume

0.001
NO

1
0
1
1
0
0
0

2
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

No. of
Lanes

N/A

0.001

0.912

1.012

780
612
1392

77

400

88

133

524

184

328

601

145

135

441

179

Lane
Volume

CMA01

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

77

723

88

133

915

335

328

874

145

179

882

179

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

77

723

88

133

915

335

328

874

145

179

882

179

Total
Volume

Significant impacted?

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.911

1.011

780
610
1390

73

394

88

133

522

184

328

601

143

135

441

179

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA1

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

East-West Street:

North-South Street:

Sepulveda Boulevard

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

North-South:
East-West:
SUM:

152

917

116

67

820

109

77

342

54

147

1298

198

No. of
Lanes

2
0
0
0
2
0

54

0.901

703
649
1352

152

540

126

67

450

109

23

171

54

97

649

198

Lane
Volume

0.801

North-South:
East-West:
SUM:

152

927

126

67

833

109

77

342

54

160

1298

198

Total
Volume

0.798

0.898

703
644
1347

10

535
152

10

116

67

13

109
444

23

13

649
89

Project
Traffic

198

171

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
2
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
2
0
0
0
2
0

58

43

Added
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

159

934

123

68

834

110

78

403

58

149

1354

200

Total
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

No. of
Lanes

0.831

0.931

735
662
1397

159

552

133

68

458

110

23

202

58

96

677

200

Lane
Volume

0.003
NO

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

No. of
Lanes

N/A

0.003

0.831

0.931

735
662
1397

159

552

133

68

458

110

23

202

58

96

677

200

Lane
Volume

CMA02

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

159

944

133

68

847

110

78

403

58

162

1354

200

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

159

944

133

68

847

110

78

403

58

162

1354

200

Total
Volume

Significant impacted?

10

10

13

13

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.828

0.928

735
657
1392

159

547

123

68

451

110

23

202

58

88

677

200

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

Palms Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA2

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

East-West Street:

North-South Street:

Sepulveda Boulevard

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

North-South:
East-West:
SUM:

96

678

152

104

884

123

126

827

107

172

906

128

No. of
Lanes

2
0
0
0
2
0

107

96

0.811

560
656
1216

96

391

160

104

496

123

65

414

107

96

453

128

Lane
Volume

0.711

North-South:
East-West:
SUM:

686

160

104

888

123

126

827

107

176

906

128

Total
Volume

0.704

0.804

560
646
1206

96

152
387

494
104

123

65

453
96

Project
Traffic

128

414

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
2
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
2
0
0
0
2
0

12

12

81

93

Added
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

103

697

156

105

905

124

127

916

115

179

1008

129

Total
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

No. of
Lanes

0.760

0.860

619
671
1290

103

404

164

105

507

124

65

458

115

101

504

129

Lane
Volume

0.007
NO

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

No. of
Lanes

N/A

0.007

0.760

0.860

619
671
1290

103

404

164

105

507

124

65

458

115

101

504

129

Lane
Volume

CMA02

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

103

705

164

105

909

124

127

916

115

183

1008

129

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

103

705

164

105

909

124

127

916

115

183

1008

129

Total
Volume

Significant impacted?

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.753

0.853

619
661
1280

103

400

156

105

505

124

65

458

115

101

504

129

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

Palms Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA2

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

East-West Street:

North-South Street:

Westwood Boulevard

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

118

357

16

161

805

272

128

277

134

26

536

188

No. of
Lanes

2
0
0
0
2
0

134

0.795

670
522
1192

128

250

16

180

493

272

302

134

18

536

188

Lane
Volume

0.695

North-South:
East-West:
SUM:

128

372

16

180

805

272

128

302

134

26

536

188

Total
Volume

0.687

0.787

670
510
1180

10

15

238
118

19

16

161

272
483

25

536
18

Project
Traffic

188

277

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
2
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
2
0
0
0
2
0

31

20

Added
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

119

361

16

163

813

275

129

311

135

26

561

190

Total
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.716

0.816

696
528
1224

129

253

16

182

498

275

336

135

18

561

190

Lane
Volume

0.009
NO

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.009

0.716

0.816

696
528
1224

129

253

16

182

498

275

336

135

18

561

190

Lane
Volume

CMA03

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

129

376

16

182

813

275

129

336

135

26

561

190

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

129

376

16

182

813

275

129

336

135

26

561

190

Total
Volume

Significant impacted?

10

15

19

25

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.707

0.807

696
515
1211

119

240

16

163

488

275

311

135

18

561

190

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA3

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

East-West Street:

North-South Street:

Westwood Boulevard

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

162

352

31

271

597

191

319

515

184

21

234

101

No. of
Lanes

170

0.728

624
468
1092

170

267

31

277

437

191

224

523

184

234

101

Lane
Volume

0.628

North-South:
East-West:
SUM:

364

31

277

597

191

319

523

184

21

234

101

Total
Volume

0.621

0.721

616
465
1081

162

12

31
257

434
271

191

515
224

184

101
234

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

2
0
0
0
2
0

2015

2016
2
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
2
0
0
0
2
0

39

49

Added
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

164

356

31

274

603

193

322

559

186

21

285

102

Total
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.661

0.761

669
473
1142

172

270

31

280

442

193

226

567

186

285

102

Lane
Volume

0.007
NO

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.007

0.661

0.761

669
473
1142

172

270

31

280

442

193

226

567

186

285

102

Lane
Volume

CMA03

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

172

368

31

280

603

193

322

567

186

21

285

102

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

172

368

31

280

603

193

322

567

186

21

285

102

Total
Volume

Significant impacted?

12

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.654

0.754

661
470
1131

164

260

31

274

439

193

226

559

186

285

102

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA3

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

East-West Street:

North-South Street:

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/9/2015-10:05 AM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

2
0
2
1
0
0
0

1
0
2
0
1
0
0

1
0
1
1
0
0
0

2
0
1
0
2
0
0

North-South:
East-West:
SUM:

34

1242

524

129

1400

58

15

444

19

1090

473

287

No. of
Lanes

4
0
0
0
2
0

19

34

1.084

502
988
1490

34

425

288

58

700

58

15

236

19

312

483

168

Lane
Volume

0.984

North-South:
East-West:
SUM:

1242

524

142

1400

58

15

457

19

1090

483

306

Total
Volume

0.976

1.076

492
988
1480

34

288
425

13

700
50

58

15

13

10

473
312

19

Project
Traffic

158

230

3
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
4
0
SB-0
WB-0
2
0

Year of Count:
Projection Year:

3
0
SB-WB--

1.0
AM
4
0
0
0
2
0

35

22

Added
Volume

2
0
2
1
0
0
0

1
0
2
0
1
0
0

1
0
1
1
0
0
0

2
0
1
0
2
0
0

No. of
Lanes

North-South:
East-West:
SUM:

34

1254

529

130

1414

59

15

483

19

1101

500

290

Total
Volume

2
0
2
1
0
0
0

1
0
2
0
1
0
0

1
0
1
1
0
0
0

2
0
1
0
2
0
0

No. of
Lanes

1.011

1.111

529
998
1527

34

429

291

58

707

59

15

256

19

315

510

170

Lane
Volume

0.008
NO

2
0
2
1
0
0
0

1
0
2
0
1
0
0

1
0
1
1
0
0
0

2
0
1
0
2
0
0

No. of
Lanes

N/A

0.008

1.011

1.111

529
998
1527

34

429

291

58

707

59

15

256

19

315

510

170

Lane
Volume

CMA04

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

34

1254

529

143

1414

59

15

496

19

1101

510

309

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

34

1254

529

143

1414

59

15

496

19

1101

510

309

Total
Volume

Significant impacted?

13

13

10

19

Added
Volume

FUTURE CONDITION W/ PROJECT

11/9/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-3
SB-0
NB-3
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

1.003

1.103

519
998
1517

34

429

291

50

707

59

15

249

19

315

500

160

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

Volume

NB-EB--

3
0

Overland Avenue

Pico Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA4

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

East-West Street:

North-South Street:

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/9/2015-10:05 AM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

2
0
2
0
1
0
0

1
0
2
0
1
0
0

1
0
1
1
0
0
0

2
0
1
0
2
0
0

North-South:
East-West:
SUM:

43

981

616

261

948

53

27

505

40

612

494

319

No. of
Lanes

4
0
0
0
2
0

40

43

0.985

542
813
1355

23

491

339

173

474

53

27

268

40

502

184

Lane
Volume

0.885

North-South:
East-West:
SUM:

981

616

265

948

53

27

509

40

612

502

335

Total
Volume

0.880

0.980

534
813
1347

23

339
491

474
174

53

27

494
0

16

Project
Traffic

175

266

3
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
4
0
SB-0
WB-0
2
0

Year of Count:
Projection Year:

3
0
SB-WB--

1.0
PM
4
0
0
0
2
0

43

55

Added
Volume

2
0
2
0
1
0
0

1
0
2
0
1
0
0

1
0
1
1
0
0
0

2
0
1
0
2
0
0

No. of
Lanes

North-South:
East-West:
SUM:

43

991

622

264

957

54

27

553

40

618

554

322

Total
Volume

2
0
2
0
1
0
0

1
0
2
0
1
0
0

1
0
1
1
0
0
0

2
0
1
0
2
0
0

No. of
Lanes

0.935

1.035

602
821
1423

23

496

342

175

479

54

27

292

40

562

186

Lane
Volume

0.006
NO

2
0
2
0
1
0
0

1
0
2
0
1
0
0

1
0
1
1
0
0
0

2
0
1
0
2
0
0

No. of
Lanes

N/A

0.006

0.935

1.035

602
821
1423

23

496

342

175

479

54

27

292

40

562

186

Lane
Volume

CMA04

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

43

991

622

268

957

54

27

557

40

618

562

338

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

43

991

622

268

957

54

27

557

40

618

562

338

Total
Volume

Significant impacted?

16

Added
Volume

FUTURE CONDITION W/ PROJECT

11/9/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-3
SB-0
NB-3
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.929

1.029

594
821
1415

23

496

342

176

479

54

27

290

40

554

177

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

Volume

NB-EB--

3
0

Overland Avenue

Pico Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA4

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

East-West Street:

North-South Street:

Overland Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
1
1
0
1
0
0

1
1
0
0
1
0
0

2
0
1
1
0
0
0

0
0
3
0
1
0
0

North-South:
East-West:
SUM:

365

378

103

487

133

363

88

795

440

1003

1271

No. of
Lanes

19

242

1.368

1255
626
1881

113

378

103

487

248

248

112

466

252

1003

424

Lane
Volume

1.268

North-South:
East-West:
SUM:

365

378

103

487

133

363

112

820

459

1003

1271

Total
Volume

1.261

1.361

1245
626
1871

378
123

103

487

248
248

24

88

25

1003

Project
Traffic

442

2
0

EXISTING PLUS PROJECT

NB-EB--

424

Lane
Volume

EXISTING CONDITION

2
0

Volume

NB-EB--

4
0
0
3
2
0

2015

2016
4
0
SB-0
WB-3
2
0

Year of Count:
Projection Year:

2
0
SB-WB--

1.0
AM
4
0
0
3
2
0

35

22

Added
Volume

0
1
1
0
1
0
0

1
1
0
0
1
0
0

2
0
1
1
0
0
0

0
0
3
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

369

382

104

492

134

367

89

838

444

1013

1306

Total
Volume

0
1
1
0
1
0
0

1
1
0
0
1
0
0

2
0
1
1
0
0
0

1.283

1.383

1268
633
1901

114

382

104

492

251

251

113

488

255

1013

435

Lane
Volume

0.008
NO

0
1
1
0
1
0
0

1
1
0
0
1
0
0

2
0
1
1
0
0
0

0
0
3
0
1
0
0

No. of
Lanes

N/A

0.008

1.283

1.383

1268
633
1901

114

382

104

492

251

251

113

488

255

1013

435

Lane
Volume

CMA05

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

369

382

104

492

134

367

113

863

463

1013

1306

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

369

382

104

492

134

367

113

863

463

0
0
3
0
1
0
0

No. of
Lanes

Significant impacted?

24

25

19

1013

1306

Total
Volume

Change in v/c due to project:

1.275

1.375

1257
633
1890

125

382

104

492

251

251

89

464

244

435
1013

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-2
SB-0
NB-2
SB-0
EB-0
WB-3
EB-0
WB-3
2
2
0
0

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

I-10 Westbound On-Off Ramp/National

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA5

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

East-West Street:

North-South Street:

Overland Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
1
1
0
1
0
0

1
1
0
0
1
0
0

2
0
1
1
0
0
0

0
0
3
0
1
0
0

North-South:
East-West:
SUM:

516

384

184

485

107

250

139

1016

506

604

833

No. of
Lanes

16

278

184

516

1.135

891
669
1560

229

376

184

485

179

179

159

592

287

604

278

Lane
Volume

1.035

North-South:
East-West:
SUM:

384

184

485

107

250

159

1024

522

604

833

Total
Volume

1.028

1.128

882
669
1551

238

485

376

20

179

179

139

604

Project
Traffic

578

2
0

EXISTING PLUS PROJECT

NB-EB--

278

Lane
Volume

EXISTING CONDITION

2
0

Volume

NB-EB--

4
0
0
3
2
0

2015

2016
4
0
SB-0
WB-3
2
0

Year of Count:
Projection Year:

2
0
SB-WB--

1.0
PM
4
0
0
3
2
0

43

55

Added
Volume

0
1
1
0
1
0
0

1
1
0
0
1
0
0

2
0
1
1
0
0
0

0
0
3
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

521

388

186

490

108

253

140

1069

511

610

896

Total
Volume

0
1
1
0
1
0
0

1
1
0
0
1
0
0

2
0
1
1
0
0
0

1.046

1.146

900
676
1576

231

380

490

186

0.006
NO

0
1
1
0
1
0
0

1
1
0
0
1
0
0

2
0
1
1
0
0
0

0
0
3
0
1
0
0

No. of
Lanes

N/A

0.006

1.046

1.146

900
676
1576

231

380

186

490

180

180

160

619

290

610

299

Lane
Volume

CMA05

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

521

388

186

490

108

253

160

1077

527

610

896

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

180

180

160

619

290

610

299

Lane
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

521

388

186

490

108

253

160

1077

527

0
0
3
0
1
0
0

No. of
Lanes

Significant impacted?

20

16

610

896

Total
Volume

Change in v/c due to project:

1.040

1.140

891
676
1567

240

380

186

490

180

180

140

605

281

299
610

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-2
SB-0
NB-2
SB-0
EB-0
WB-3
EB-0
WB-3
2
2
0
0

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

I-10 Westbound On-Off Ramp/National

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA5

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
0
0
0
0
0
0

0
0
0
0
0
0
0

2
0
2
0
0
0
0

0
0
3
1
0
0
0

North-South:
East-West:
SUM:

516

851

478

2246

Volume

No. of
Lanes

2
0
0
0
2
0

468

0.766

1149
0
1149

271

468

478

681

Lane
Volume

0.666

North-South:
East-West:
SUM:

541

851

478

2246

Total
Volume

0.666

0.766

1149
0
1149

0
0

0
0

25

681
478

Project
Traffic

258

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
2
0
SB-0
WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
2
0
0
0
2
0

35

22

Added
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

2
0
2
0
0
0
0

0
0
3
1
0
0
0

No. of
Lanes

North-South:
East-West:
SUM:

556

860

483

2290

Total
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

2
0
2
0
0
0
0

0
0
3
1
0
0
0

No. of
Lanes

0.677

0.777

1166
0
1166

291

473

483

693

Lane
Volume

0.000
NO

0
0
0
0
0
0
0

0
0
0
0
0
0
0

2
0
2
0
0
0
0

0
0
3
1
0
0
0

No. of
Lanes

N/A

0.000

0.677

0.777

1166
0
1166

291

473

483

693

Lane
Volume

CMA06

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

581

860

483

2290

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

581

860

483

2290

Total
Volume

Significant impacted?

25

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.677

0.777

1166
0
1166

278

473

483

693

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

East-West Street:

NB-EB--

Overland Avenue

I-10 EB On-Ramp

North-South Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA6

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
0
0
0
0
0
0

0
0
0
0
0
0
0

2
0
2
0
0
0
0

0
0
3
1
0
0
0

North-South:
East-West:
SUM:

984

812

451

1314

Volume

No. of
Lanes

2
0
0
0
2
0

447

0.599

898
0
898

496

447

451

438

Lane
Volume

0.499

North-South:
East-West:
SUM:

992

812

451

1314

Total
Volume

0.499

0.599

898
0
898

0
0

0
0

451

492

Project
Traffic

438

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
2
0
SB-0
WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
2
0
0
0
2
0

43

55

Added
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

2
0
2
0
0
0
0

0
0
3
1
0
0
0

No. of
Lanes

North-South:
East-West:
SUM:

1037

820

456

1382

Total
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

2
0
2
0
0
0
0

0.507

0.607

911
0
911

523

451

456

460

Lane
Volume

0.000
NO

0
0
0
0
0
0
0

0
0
0
0
0
0
0

2
0
2
0
0
0
0

0
0
3
1
0
0
0

No. of
Lanes

N/A

0.000

0.507

0.607

911
0
911

523

451

456

460

Lane
Volume

CMA06

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

1045

820

456

1382

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

1045

820

0
0
3
1
0
0
0

No. of
Lanes

Significant impacted?

456

1382

Total
Volume

Change in v/c due to project:

0.507

0.607

911
0
911

519

451

460
456

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

East-West Street:

NB-EB--

Overland Avenue

I-10 EB On-Ramp

North-South Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA6

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

East-West Street:

North-South Street:

Overland Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:57 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
1
0
2
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
1
0
0
0

North-South:
East-West:
SUM:

905

450

267

246

175

78

37

457

41

12

1747

363

No. of
Lanes

4
0
0
2
2
0

25

41

0.793

0.893

652
576
1228

498

450

267

65

219

78

37

247

66

12

586

363

Lane
Volume

0.775

0.875

905

450

267

246

219

78

37

457

66

12

1747

363

Total
Volume

North-South:
East-West:
SUM:

498

627
576
1203

450

267

65

44

78
175

37

586
12

Project
Traffic

363

247

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
4
0
SB-0
WB-2
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
4
0
0
2
2
0

18

16

26

10

30

Added
Volume

1
0
1
0
2
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
1
0
0
0

No. of
Lanes

North-South:
East-West:
SUM:

932

471

270

253

203

79

37

472

71

12

1772

371

Total
Volume

1
0
1
0
2
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
1
0
0
0

No. of
Lanes

0.833

0.933

691
592
1283

513

470

270

68

247

79

37

255

96

12

595

371

Lane
Volume

0.018
NO

1
0
1
0
2
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
1
0
0
0

No. of
Lanes

N/A

0.018

0.833

0.933

691
592
1283

513

470

270

68

247

79

37

255

96

12

595

371

Lane
Volume

CMA07

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

932

471

270

253

247

79

37

472

96

12

1772

371

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

932

471

270

253

247

79

37

472

96

12

1772

371

Total
Volume

Significant impacted?

44

25

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-2
EB-0
WB-2
2
2
0
0

Change in v/c due to project:

0.815

0.915

666
592
1258

513

470

270

68

203

79

37

255

71

12

595

371

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

National Place-National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA7

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

East-West Street:

North-South Street:

Overland Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:57 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
1
0
2
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
1
0
0
0

North-South:
East-West:
SUM:

506

211

238

361

320

199

40

794

93

23

1116

172

No. of
Lanes

506

0.845

589
573
1162

278

211

238

275

335

199

40

417

101

23

380

172

Lane
Volume

0.745

North-South:
East-West:
SUM:

211

238

361

335

199

40

794

101

23

1116

172

Total
Volume

0.734

0.834

589
558
1147

278

238
211

15

320
275

199

417
40

93

23

172
380

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

4
0
0
2
2
0

2015

2016
4
0
SB-0
WB-2
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
4
0
0
2
2
0

47

41

33

12

37

17

Added
Volume

1
0
1
0
2
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
1
0
0
0

No. of
Lanes

North-South:
East-West:
SUM:

558

254

240

371

356

201

40

814

131

23

1144

182

Total
Volume

1
0
1
0
2
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
1
0
0
0

No. of
Lanes

0.787

0.887

609
611
1220

307

254

240

280

371

201

40

427

139

23

389

182

Lane
Volume

0.011
NO

1
0
1
0
2
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
1
0
0
0

No. of
Lanes

N/A

0.011

0.787

0.887

609
611
1220

307

254

240

280

371

201

40

427

139

23

389

182

Lane
Volume

CMA07

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

558

254

240

371

371

201

40

814

139

23

1144

182

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

558

254

240

371

371

201

40

814

139

23

1144

182

Total
Volume

Significant impacted?

15

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-2
EB-0
WB-2
2
2
0
0

Change in v/c due to project:

0.776

0.876

609
596
1205

307

254

240

280

356

201

40

427

131

23

389

182

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

National Place-National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA7

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

North-South:
East-West:
SUM:

156

737

124

101

813

206

72

729

66

161

1349

143

Volume

No. of
Lanes

3
0
0
0
2
0

66

0.987

741
665
1406

156

459

136

101

473

206

72

401

66

109

675

143

Lane
Volume

0.887

North-South:
East-West:
SUM:

156

761

136

101

844

206

72

729

66

177

1349

143

Total
Volume

0.878

0.978

741
653
1394

24

447
156

12

124

101

31

206
457

72

16

675
99

Project
Traffic

143

401

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
3
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
3
0
0
0
2
0

19

11

10

Added
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

158

763

125

102

832

208

73

746

67

163

1370

144

Total
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

No. of
Lanes

0.906

1.006

752
681
1433

158

473

137

102

483

208

73

410

67

111

685

144

Lane
Volume

0.009
NO

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

No. of
Lanes

N/A

0.009

0.906

1.006

752
681
1433

158

473

137

102

483

208

73

410

67

111

685

144

Lane
Volume

CMA08

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

158

787

137

102

863

208

73

746

67

179

1370

144

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

158

787

137

102

863

208

73

746

67

179

1370

144

Total
Volume

Significant impacted?

24

12

31

16

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.897

0.997

752
669
1421

158

461

125

102

467

208

73

410

67

101

685

144

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

East-West Street:

NB-EB--

Overland Avenue

Palms Boulevard

North-South Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA8

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

North-South:
East-West:
SUM:

87

613

110

152

877

121

94

1160

91

152

940

92

Volume

No. of
Lanes

87

0.954

719
640
1359

87

360

120

152

520

121

94

627

91

92

473

92

Lane
Volume

0.854

North-South:
East-West:
SUM:

633

120

152

888

121

94

1160

91

152

945

92

Total
Volume

0.843

0.943

719
625
1344

87

20

10

110
350

11

515
152

121

627
94

91

97

92
470

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

3
0
0
0
2
0

2015

2016
3
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
3
0
0
0
2
0

20

24

12

17

Added
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

88

639

111

154

910

122

95

1184

92

154

966

93

Total
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

No. of
Lanes

0.877

0.977

733
659
1392

88

374

121

154

538

122

95

640

92

94

486

93

Lane
Volume

0.011
NO

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
2
0
1
0
0

No. of
Lanes

N/A

0.011

0.877

0.977

733
659
1392

88

374

121

154

538

122

95

640

92

94

486

93

Lane
Volume

CMA08

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

88

659

121

154

921

122

95

1184

92

154

971

93

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

88

659

121

154

921

122

95

1184

92

154

971

93

Total
Volume

Significant impacted?

20

10

11

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.866

0.966

733
643
1376

88

364

111

154

532

122

95

640

92

99

483

93

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

East-West Street:

NB-EB--

Overland Avenue

Palms Boulevard

North-South Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA8

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

2
0
3
0
1
0
0

2
0
3
0
1
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

North-South:
East-West:
SUM:

112

1011

109

121

783

160

181

1105

315

170

1383

234

Volume

No. of
Lanes

4
0
3
0
2
0

315

1.050

1015
429
1444

341

60

266

88

93

559

315

110

700

234

Lane
Volume

0.950

North-South:
East-West:
SUM:

112

1023

109

121

799

160

181

1117

315

170

1399

234

Total
Volume

0.941

1.041

1007
425
1432

12

337
0

60

16

88
261

93

12

16

692
110

Project
Traffic

234

553

3
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
4
0
SB-3
WB-0
2
0

Year of Count:
Projection Year:

3
0
SB-WB--

1.0
AM
4
0
3
0
2
0

84

10

15

152

10

12

Added
Volume

2
0
3
0
1
0
0

2
0
3
0
1
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

113

1105

120

137

943

162

183

1126

318

180

1405

248

Total
Volume

2
0
3
0
1
0
0

2
0
3
0
1
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

No. of
Lanes

0.984

1.084

1029
461
1490

372

66

13

320

89

94

569

318

114

711

248

Lane
Volume

0.009
NO

2
0
3
0
1
0
0

2
0
3
0
1
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

No. of
Lanes

N/A

0.009

0.984

1.084

1029
461
1490

372

66

13

320

89

94

569

318

114

711

248

Lane
Volume

CMA09

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

113

1117

120

137

959

162

183

1138

318

180

1421

248

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

113

1117

120

137

959

162

183

1138

318

180

1421

248

Total
Volume

Significant impacted?

12

16

12

16

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-3
SB-3
NB-3
SB-3
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.975

1.075

1021
457
1478

368

66

13

314

89

94

563

318

114

703

248

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

3
0

East-West Street:

NB-EB--

Overland Avenue

Venice Boulevard

North-South Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA9

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

I/S #:

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

2
0
3
0
1
0
0

2
0
3
0
1
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

North-South:
East-West:
SUM:

153

1005

281

121

1246

246

190

1054

188

119

786

128

Volume

No. of
Lanes

153

0.896

660
572
1232

59

338

155

57

417

135

55

532

188

396

128

Lane
Volume

0.796

North-South:
East-West:
SUM:

1015

281

121

1251

246

190

1064

188

119

791

128

Total
Volume

0.791

0.891

655
570
1225

59

10

155
335

415
57

135

10

527
55

188

128
393

3
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

4
0
3
0
2
0

2015

2016
4
0
SB-3
WB-0
2
0

Year of Count:
Projection Year:

3
0
SB-WB--

1.0
PM
4
0
3
0
2
0

231

12

18

179

12

17

17

25

Added
Volume

2
0
3
0
1
0
0

2
0
3
0
1
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

155

1246

296

140

1437

248

192

1077

190

137

811

154

Total
Volume

2
0
3
0
1
0
0

2
0
3
0
1
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

No. of
Lanes

0.876

0.976

698
644
1342

60

419

163

63

481

136

56

544

190

408

154

Lane
Volume

0.005
NO

2
0
3
0
1
0
0

2
0
3
0
1
0
0

1
0
2
0
1
0
0

1
0
2
0
1
0
0

No. of
Lanes

N/A

0.005

0.876

0.976

698
644
1342

60

419

163

63

481

136

56

544

190

408

154

Lane
Volume

CMA09

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

155

1256

296

140

1442

248

192

1087

190

137

816

154

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

155

1256

296

140

1442

248

192

1087

190

137

816

154

Total
Volume

Significant impacted?

10

10

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
0
0
NB-3
SB-3
NB-3
SB-3
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.871

0.971

693
642
1335

60

415

163

63

479

136

56

539

190

406

154

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

3
0

East-West Street:

NB-EB--

Overland Avenue

Venice Boulevard

North-South Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

CMA9

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

I-10 EB Off-Ramp

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
0
2
0
0
0
0

0
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

928

226

714

276

No. of
Lanes

0.785

714
464
1178

464

148

714

301

Lane
Volume

0.685

North-South:
East-West:
SUM:

928

295

714

301

Total
Volume

0.685

0.785

714
464
1178

464
0

69

714

113

25

276

0
0

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

2
0
0
0
2
0

2015

2016
2
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
2
0
0
0
2
0

36

57

Added
Volume

0
0
2
0
0
0
0

0
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

No. of
Lanes

North-South:
East-West:
SUM:

973

285

721

279

Total
Volume

0
0
2
0
0
0
0

0
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

No. of
Lanes

0.705

0.805

721
487
1208

487

177

721

304

Lane
Volume

0.000
NO

0
0
2
0
0
0
0

0
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

No. of
Lanes

N/A

0.000

0.705

0.805

721
487
1208

487

177

721

304

Lane
Volume

CMA10

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

973

354

721

304

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

973

354

721

304

Total
Volume

Significant impacted?

69

25

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.705

0.805

721
487
1208

487

143

721

279

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA10

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

I-10 EB Off-Ramp

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:55 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
0
2
0
0
0
0

0
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

457

427

504

356

No. of
Lanes

0.489

504
229
733

229

225

504

364

Lane
Volume

0.389

North-South:
East-West:
SUM:

457

450

504

364

Total
Volume

0.389

0.489

504
229
733

229
0

23

504

214

356

0
0

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

2
0
0
0
2
0

2015

2016
2
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
2
0
0
0
2
0

87

71

Added
Volume

0
0
2
0
0
0
0

0
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

No. of
Lanes

North-South:
East-West:
SUM:

549

502

509

360

Total
Volume

0
0
2
0
0
0
0

0
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

No. of
Lanes

0.423

0.523

509
275
784

275

263

509

368

Lane
Volume

0.000
NO

0
0
2
0
0
0
0

0
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

No. of
Lanes

N/A

0.000

0.423

0.523

509
275
784

275

263

509

368

Lane
Volume

CMA10

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

549

525

509

368

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

549

525

509

368

Total
Volume

Significant impacted?

23

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.423

0.523

509
275
784

275

251

509

360

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA10

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
1
0
0
1
0
0

0
0
0
0
0
1
0

1
1
0
0
1
0
0

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

647

62

55

20

19

69

412

15

164

No. of
Lanes

241

0.358

421
89
510

69

79

20

19

241

241

180

Lane
Volume

0.258

North-South:
East-West:
SUM:

647

62

55

20

19

69

412

15

164

Total
Volume

0.258

0.358

421
89
510

69
0

20
79

19

180

Project
Traffic

241

0
0

EXISTING PLUS PROJECT

NB-EB--

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

3
0
0
1
2
0

2015

2016
3
0
0
SB-WB-1
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
3
0
0
1
2
0

19

31

11

Added
Volume

0
1
0
0
1
0
0

0
0
0
0
0
1
0

1
1
0
0
1
0
0

0
0
0
0
0
1
0

No. of
Lanes

North-South:
East-West:
SUM:

672

63

56

20

19

74

447

15

177

Total
Volume

0
1
0
0
1
0
0

0
0
0
0
0
1
0

1
1
0
0
1
0
0

0
0
0
0
0
1
0

No. of
Lanes

0.282

0.382

454
90
544

70

80

20

19

261

261

193

Lane
Volume

0.000
NO

0
1
0
0
1
0
0

0
0
0
0
0
1
0

1
1
0
0
1
0
0

0
0
0
0
0
1
0

No. of
Lanes

N/A

0.000

0.282

0.382

454
90
544

70

80

20

19

261

261

193

Lane
Volume

CMA11

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

672

63

56

20

19

74

447

15

177

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

672

63

56

20

19

74

447

15

177

Total
Volume

Significant impacted?

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-1
EB-0
WB-1
2
2
0
0

Change in v/c due to project:

0.282

0.382

454
90
544

70

80

20

19

261

261

193

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

National Boulevard-Mentone Avenue

Rose Avenue-National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA11

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
1
0
0
1
0
0

0
0
0
0
0
1
0

1
1
0
0
1
0
0

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

371

48

75

22

23

62

690

18

26

No. of
Lanes

16

376

371

0.381

429
114
543

57

105

22

23

384

384

45

Lane
Volume

0.281

North-South:
East-West:
SUM:

48

80

22

23

62

706

18

26

Total
Volume

0.272

0.372

421
109
530

9
57

100
0

22

23

45

Project
Traffic

376

0
0

EXISTING PLUS PROJECT

NB-EB--

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

3
0
0
1
2
0

2015

2016
3
0
0
SB-WB-1
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
3
0
0
1
2
0

44

13

34

Added
Volume

0
1
0
0
1
0
0

0
0
0
0
0
1
0

1
1
0
0
1
0
0

0
0
0
0
0
1
0

No. of
Lanes

North-South:
East-West:
SUM:

419

48

76

22

23

76

731

18

33

Total
Volume

0
1
0
0
1
0
0

0
0
0
0
0
1
0

1
1
0
0
1
0
0

0
0
0
0
0
1
0

No. of
Lanes

0.306

0.406

464
115
579

57

106

22

23

412

412

52

Lane
Volume

0.009
NO

0
1
0
0
1
0
0

0
0
0
0
0
1
0

1
1
0
0
1
0
0

0
0
0
0
0
1
0

No. of
Lanes

N/A

0.009

0.306

0.406

464
115
579

57

106

22

23

412

412

52

Lane
Volume

CMA11

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

419

48

81

22

23

76

747

18

33

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

419

48

81

22

23

76

747

18

33

Total
Volume

Significant impacted?

16

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-1
EB-0
WB-1
2
2
0
0

Change in v/c due to project:

0.297

0.397

456
110
566

57

101

22

23

404

404

52

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

National Boulevard-Mentone Avenue

Rose Avenue-National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA11

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
2
1
0
0
0

1
0
2
1
0
0
0

1
0
0
0
1
0
0

1
0
0
0
2
0
0

North-South:
East-West:
SUM:

226

1356

163

144

1836

348

33

22

841

15

244

No. of
Lanes

4
1
0
0
2
0

22

0.860

307
875
1182

226

527

188

144

660

348

22

285

244

Lane
Volume

0.760

North-South:
East-West:
SUM:

226

1356

188

144

1836

348

33

22

860

15

244

Total
Volume

0.771

0.871

322
875
1197

527
226

25

163

144

348
660

19

300

Project
Traffic

244

3
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
4
1
SB-0
WB-0
2
0

Year of Count:
Projection Year:

3
0
SB-WB--

1.0
AM
4
1
0
0
2
0

17

31

Added
Volume

1
0
2
1
0
0
0

1
0
2
1
0
0
0

1
0
0
0
1
0
0

1
0
0
0
2
0
0

No. of
Lanes

North-South:
East-West:
SUM:

228

1387

165

145

1885

351

33

22

849

15

246

Total
Volume

25

1
0
2
1
0
0
0

1
0
2
1
0
0
0

1
0
0
0
1
0
0

1
0
0
0
2
0
0

No. of
Lanes

0.771

0.871

309
889
1198

228

538

190

145

677

351

22

287

246

Lane
Volume

Significant impacted?

NO

1
0
2
1
0
0
0

1
0
2
1
0
0
0

1
0
0
0
1
0
0

1
0
0
0
2
0
0

No. of
Lanes

0.771

0.871

309
889
1198

228

538

190

145

677

351

22

287

246

Lane
Volume

N/A
CMA12

Fully mitigated?

v/c after mitigation: -0.011

North-South:
East-West:
SUM:

228

1387

190

145

1885

351

33

22

868

15

246

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

228

1387

190

145

1885

351

33

22

868

15

246

Total
Volume

Change in v/c due to project: -0.011

0.782

0.882

324
889
1213

228

538

165

145

677

351

22

19

0
302

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
1
1
NB-3
SB-0
NB-3
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

246

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

3
0

Volume

NB-EB--

Pico Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA12

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
2
1
0
0
0

1
0
2
1
0
0
0

1
0
0
0
1
0
0

1
0
0
0
2
0
0

North-South:
East-West:
SUM:

67

1256

377

254

1230

93

99

70

395

157

No. of
Lanes

67

0.805

227
880
1107

67

441

385

254

495

93

53

70

157

Lane
Volume

0.705

North-South:
East-West:
SUM:

1256

385

254

1230

93

99

70

411

157

Total
Volume

0.699

0.799

227
872
1099

67

377
441

495
254

93

53

70
0

16

157
0

3
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

4
1
0
0
2
0

2015

2016
4
1
SB-0
WB-0
2
0

Year of Count:
Projection Year:

3
0
SB-WB--

1.0
PM
4
1
0
0
2
0

44

30

Added
Volume

1
0
2
1
0
0
0

1
0
2
1
0
0
0

1
0
0
0
1
0
0

1
0
0
0
2
0
0

No. of
Lanes

North-South:
East-West:
SUM:

68

1313

381

257

1272

94

100

71

399

159

Total
Volume

1
0
2
1
0
0
0

1
0
2
1
0
0
0

1
0
0
0
1
0
0

1
0
0
0
2
0
0

No. of
Lanes

0.721

0.821

230
899
1129

68

460

389

257

510

94

53

71

159

Lane
Volume

0.006
NO

1
0
2
1
0
0
0

1
0
2
1
0
0
0

1
0
0
0
1
0
0

1
0
0
0
2
0
0

No. of
Lanes

N/A

0.006

0.721

0.821

230
899
1129

68

460

389

257

510

94

53

71

159

Lane
Volume

CMA12

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

68

1313

389

257

1272

94

100

71

415

159

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

68

1313

389

257

1272

94

100

71

415

159

Total
Volume

Significant impacted?

16

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
1
1
NB-3
SB-0
NB-3
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.715

0.815

230
891
1121

68

460

381

257

510

94

53

71

159

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

3
0

Volume

NB-EB--

Pico Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA12

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
0
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

222

295

141

71

130

29

283

74

34

420

54

No. of
Lanes

2
0
0
0
2
0

74

0.716

528
546
1074

517

141

12

130

29

327

74

95

454

131

Lane
Volume

0.616

North-South:
East-West:
SUM:

222

295

141

77

130

29

318

74

165

454

131

Total
Volume

0.593

0.693

494
546
1040

517
0

141

44

29
130

35

131

34

420
0

77

Project
Traffic

54

292

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
2
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
2
0
0
0
2
0

Added
Volume

1
0
0
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

224

298

142

72

131

29

286

75

34

426

55

Total
Volume

1
0
0
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.624

0.724

535
551
1086

522

142

12

131

29

330

75

94

460

132

Lane
Volume

0.023
NO

1
0
0
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.023

0.624

0.724

535
551
1086

522

142

12

131

29

330

75

94

460

132

Lane
Volume

CMA13

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

224

298

142

78

131

29

321

75

165

460

132

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

224

298

142

78

131

29

321

75

165

460

132

Total
Volume

Significant impacted?

35

131

34

77

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.601

0.701

501
551
1052

522

142

45

131

29

295

75

426

55

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

Manning Avenue

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA13

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
0
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

149

195

96

109

260

19

14

305

152

92

349

69

No. of
Lanes

2
0
0
0
2
0

152

0.595

529
363
892

344

96

45

260

19

331

152

152

377

133

Lane
Volume

0.495

North-South:
East-West:
SUM:

149

195

96

111

260

19

14

317

152

200

377

133

Total
Volume

0.476

0.576

501
363
864

344
0

96

75

19
260

12

108

28

349
44

64

Project
Traffic

69

319

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
2
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
2
0
0
0
2
0

Added
Volume

1
0
0
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

150

197

97

110

263

19

14

310

154

93

353

70

Total
Volume

1
0
0
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.501

0.601

535
366
901

347

97

45

263

19

336

154

153

381

134

Lane
Volume

0.019
NO

1
0
0
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.019

0.501

0.601

535
366
901

347

97

45

263

19

336

154

153

381

134

Lane
Volume

CMA13

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

150

197

97

112

263

19

14

322

154

201

381

134

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

150

197

97

112

263

19

14

322

154

201

381

134

Total
Volume

Significant impacted?

12

108

28

64

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.482

0.582

507
366
873

347

97

75

263

19

324

154

45

353

70

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

Manning Avenue

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA13

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
1
0
1
0
0
0

0
1
0
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

21

441

188

279

198

273

45

514

71

No. of
Lanes

3
0
0
0
2
0

45

0.491

0.591

594
248
842

239

239

240

240

198

273

45

549

71

Lane
Volume

0.466

0.566

North-South:
East-West:
SUM:

559
248
807

21

441

188

279

198

273

45

549

71

Total
Volume

239

8
239

240
240

198

35

514
9

Project
Traffic

71

273

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
3
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
3
0
0
0
2
0

25

53

Added
Volume

0
1
0
1
0
0
0

0
1
0
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

21

470

190

335

200

276

45

521

72

Total
Volume

0
1
0
1
0
0
0

0
1
0
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.516

0.616

601
277
878

254

254

269

269

200

276

45

556

72

Lane
Volume

0.024
NO

0
1
0
1
0
0
0

0
1
0
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.024

0.516

0.616

601
277
878

254

254

269

269

200

276

45

556

72

Lane
Volume

CMA14

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

21

470

190

335

200

276

45

556

72

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

21

470

190

335

200

276

45

556

72

Total
Volume

Significant impacted?

35

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.492

0.592

566
277
843

254

254

269

269

200

276

45

521

72

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA14

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
1
0
1
0
0
0

0
1
0
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

32

162

185

419

148

157

395

34

20

326

132

No. of
Lanes

0.547

0.647

527
395
922

113

113

387

387

169

157

395

34

20

348

132

Lane
Volume

0.539

0.639

North-South:
East-West:
SUM:

527
384
911

32

162

185

419

169

157

395

34

20

348

132

Total
Volume

113

8
113

376
376

21

148

395
157

34

20

22

132
326

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

3
0
0
0
2
0

2015

2016
3
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
3
0
0
0
2
0

80

58

Added
Volume

0
1
0
1
0
0
0

0
1
0
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

32

244

187

481

149

159

401

34

20

330

133

Total
Volume

0
1
0
1
0
0
0

0
1
0
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.574

0.674

534
427
961

154

154

419

419

170

159

401

34

20

352

133

Lane
Volume

0.007
NO

0
1
0
1
0
0
0

0
1
0
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.007

0.574

0.674

534
427
961

154

154

419

419

170

159

401

34

20

352

133

Lane
Volume

CMA14

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

32

244

187

481

170

159

401

34

20

352

133

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

32

244

187

481

170

159

401

34

20

352

133

Total
Volume

Significant impacted?

21

22

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.567

0.667

534
417
951

154

154

409

409

149

159

401

34

20

330

133

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA14

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

28

733

61

72

911

100

113

331

70

143

459

242

No. of
Lanes

28

0.825

573
603
1176

28

399

88

72

515

100

63

331

70

99

494

242

Lane
Volume

0.725

North-South:
East-West:
SUM:

769

88

72

958

100

113

331

70

143

494

242

Total
Volume

0.690

0.790

573
553
1126

28

36

27

61
381

47

492
72

100

331
63

70

113

35

242
459

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

3
0
0
0
2
0

2015

2016
3
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
3
0
0
0
2
0

20

10

15

Added
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

29

749

82

73

929

103

124

342

77

159

465

244

Total
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.756

0.856

586
634
1220

29

407

109

73

525

103

73

342

77

105

500

244

Lane
Volume

0.036
NO

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.036

0.756

0.856

586
634
1220

29

407

109

73

525

103

73

342

77

105

500

244

Lane
Volume

CMA15

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

29

785

109

73

976

103

124

342

77

159

500

244

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

29

785

109

73

976

103

124

342

77

159

500

244

Total
Volume

Significant impacted?

36

27

47

35

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.720

0.820

586
583
1169

29

389

82

73

501

103

73

342

77

118

465

244

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

Palms Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA15

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

12

649

94

92

946

89

94

450

79

88

309

105

No. of
Lanes

12

0.835

555
635
1190

12

346

116

92

519

100

44

450

79

30

321

105

Lane
Volume

0.735

North-South:
East-West:
SUM:

679

116

92

946

100

94

450

79

88

321

105

Total
Volume

0.720

0.820

555
613
1168

12

30

22

94
331

519
92

11

89

450
50

79

41

12

105
309

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

3
0
0
0
2
0

2015

2016
3
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
3
0
0
0
2
0

16

24

16

34

Added
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

17

671

119

93

971

98

99

458

82

123

318

106

Total
Volume

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.768

0.868

564
673
1237

17

359

141

93

532

109

45

458

82

53

330

106

Lane
Volume

0.015
NO

1
0
1
1
0
0
0

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.015

0.768

0.868

564
673
1237

17

359

141

93

532

109

45

458

82

53

330

106

Lane
Volume

CMA15

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

17

701

141

93

971

109

99

458

82

123

330

106

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

17

701

141

93

971

109

99

458

82

123

330

106

Total
Volume

Significant impacted?

30

22

11

12

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.753

0.853

564
651
1215

17

344

119

93

532

98

50

458

82

64

318

106

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

Palms Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA15

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

179

51

53

42

38

33

27

413

19

30

676

27

No. of
Lanes

2
0
0
0
2
0

19

0.697

726
319
1045

283

53

116

36

29

437

19

30

707

27

Lane
Volume

0.597

North-South:
East-West:
SUM:

179

51

53

42

38

36

29

437

19

30

707

27

Total
Volume

0.574

0.674

695
316
1011

283
0

53

33
113

27

24

31

676
30

Project
Traffic

27

413

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
2
0
SB-0
WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
2
0
0
0
2
0

28

16

Added
Volume

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

181

52

54

42

38

33

27

445

19

30

699

27

Total
Volume

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.615

0.715

749
323
1072

287

54

116

36

29

469

19

30

730

27

Lane
Volume

0.023
NO

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.023

0.615

0.715

749
323
1072

287

54

116

36

29

469

19

30

730

27

Lane
Volume

CMA16

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

181

52

54

42

38

36

29

469

19

30

730

27

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

181

52

54

42

38

36

29

469

19

30

730

27

Total
Volume

Significant impacted?

24

31

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.592

0.692

718
320
1038

287

54

113

33

27

445

19

30

699

27

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

Tabor Street

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA16

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

75

21

31

32

24

24

30

588

26

13

433

21

No. of
Lanes

0.521

629
152
781

127

31

81

25

32

608

26

13

444

21

Lane
Volume

0.421

North-South:
East-West:
SUM:

75

21

31

32

24

25

32

608

26

13

444

21

Total
Volume

0.407

0.507

609
151
760

127
0

31

24
80

20

588
30

26

13

11

21
433

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

2
0
0
0
2
0

2015

2016
2
0
SB-0
WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
2
0
0
0
2
0

27

40

Added
Volume

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

76

21

31

32

24

24

30

621

26

13

477

21

Total
Volume

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.443

0.543

662
153
815

128

31

81

25

32

641

26

13

488

21

Lane
Volume

0.014
NO

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.014

0.443

0.543

662
153
815

128

31

81

25

32

641

26

13

488

21

Lane
Volume

CMA16

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

76

21

31

32

24

25

32

641

26

13

488

21

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

76

21

31

32

24

25

32

641

26

13

488

21

Total
Volume

Significant impacted?

20

11

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.429

0.529

642
152
794

128

31

80

24

30

621

26

13

477

21

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

Tabor Street

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA16

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

115

59

55

86

36

23

32

450

32

41

586

27

No. of
Lanes

2
0
0
0
2
0

32

0.602

651
252
903

229

55

145

23

32

472

34

41

617

27

Lane
Volume

0.502

North-South:
East-West:
SUM:

115

59

55

86

36

23

32

472

34

41

617

27

Total
Volume

0.480

0.580

618
252
870

229
0

55

23
145

32

22

31

586
41

Project
Traffic

27

450

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
2
0
SB-0
WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
2
0
0
0
2
0

24

16

Added
Volume

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

116

60

56

87

36

23

32

479

32

41

608

27

Total
Volume

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.519

0.619

673
255
928

232

56

146

23

32

500

34

41

639

27

Lane
Volume

0.022
NO

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.022

0.519

0.619

673
255
928

232

56

146

23

32

500

34

41

639

27

Lane
Volume

CMA17

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

116

60

56

87

36

23

32

501

34

41

639

27

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

116

60

56

87

36

23

32

501

34

41

639

27

Total
Volume

Significant impacted?

22

31

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.497

0.597

640
255
895

232

56

146

23

32

478

32

41

608

27

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

Motor Avenue

Regent Street

North-South Street:

I/S #:

CMA17

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

41

17

24

57

40

33

18

604

41

53

388

11

No. of
Lanes

41

0.525

633
154
787

82

24

130

33

18

622

43

53

399

11

Lane
Volume

0.425

North-South:
East-West:
SUM:

17

24

57

40

33

18

622

43

53

399

11

Total
Volume

0.413

0.513

615
154
769

24
82

130
0

33

18

604
18

41

53

11

11
388

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

2
0
0
0
2
0

2015

2016
2
0
SB-0
WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
2
0
0
0
2
0

26

37

Added
Volume

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

41

17

24

58

40

33

18

636

41

54

429

11

Total
Volume

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.447

0.547

665
155
820

82

24

131

33

18

654

43

54

440

11

Lane
Volume

0.012
NO

0
0
0
0
0
1
0

0
0
0
0
0
1
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.012

0.447

0.547

665
155
820

82

24

131

33

18

654

43

54

440

11

Lane
Volume

CMA17

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

41

17

24

58

40

33

18

654

43

54

440

11

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

41

17

24

58

40

33

18

654

43

54

440

11

Total
Volume

Significant impacted?

18

11

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.435

0.535

647
155
802

82

24

131

33

18

636

41

54

429

11

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

Motor Avenue

Regent Street

North-South Street:

I/S #:

CMA17

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
3
0
1
0
0

1
0
3
0
1
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

70

1351

67

21

1426

122

174

328

144

33

453

49

No. of
Lanes

3
0
0
0
2
0

144

0.841

611
588
1199

450

67

475

138

117

335

146

465

49

Lane
Volume

0.741

North-South:
East-West:
SUM:

73

1351

67

21

1426

138

186

335

146

33

465

49

Total
Volume

0.720

0.820

597
572
1169

450
0

67

16

122
475

12

113

12

453
0

Project
Traffic

49

328

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
3
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
3
0
0
0
2
0

93

162

20

15

Added
Volume

1
0
3
0
1
0
0

1
0
3
0
1
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

72

1458

68

21

1602

124

180

351

149

33

473

49

Total
Volume

1
0
3
0
1
0
0

1
0
3
0
1
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.786

0.886

636
626
1262

486

68

534

140

122

358

151

485

49

Lane
Volume

0.021
NO

1
0
3
0
1
0
0

1
0
3
0
1
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.021

0.786

0.886

636
626
1262

486

68

534

140

122

358

151

485

49

Lane
Volume

CMA18

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

75

1458

68

21

1602

140

192

358

151

33

485

49

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

75

1458

68

21

1602

140

192

358

151

33

485

49

Total
Volume

Significant impacted?

16

12

12

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.765

0.865

622
610
1232

486

68

534

124

118

351

149

473

49

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

Venice Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA18

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
3
0
1
0
0

1
0
3
0
1
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

North-South:
East-West:
SUM:

83

1110

71

43

1269

132

240

335

113

37

250

49

No. of
Lanes

0.629

390
507
897

27

370

71

19

423

137

182

341

115

254

49

Lane
Volume

0.529

North-South:
East-West:
SUM:

84

1110

71

43

1269

137

250

341

115

37

254

49

Total
Volume

0.522

0.622

384
502
886

370
27

71

19

132
423

10

335
174

113

49
250

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

3
0
0
0
2
0

2015

2016
3
0
0
SB-WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
3
0
0
0
2
0

245

200

24

34

Added
Volume

1
0
3
0
1
0
0

1
0
3
0
1
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

North-South:
East-West:
SUM:

87

1366

72

43

1482

136

244

362

116

37

287

49

Total
Volume

1
0
3
0
1
0
0

1
0
3
0
1
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

0.611

0.711

417
596
1013

29

455

72

19

494

141

184

368

118

290

49

Lane
Volume

0.008
NO

1
0
3
0
1
0
0

1
0
3
0
1
0
0

1
0
1
0
1
0
0

1
0
1
0
1
0
0

No. of
Lanes

N/A

0.008

0.611

0.711

417
596
1013

29

455

72

19

494

141

184

368

118

290

49

Lane
Volume

CMA18

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

88

1366

72

43

1482

141

254

368

118

37

291

49

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

88

1366

72

43

1482

141

254

368

118

37

291

49

Total
Volume

Significant impacted?

10

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.603

0.703

411
591
1002

29

455

72

19

494

136

176

362

116

286

49

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

Venice Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA18

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
0
1
1
0
0
0

1
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

149

975

910

364

277

158

No. of
Lanes

3
0
0
0
2
0

158

0.768

158
937
1095

152

564

455

373

98

158

Lane
Volume

0.668

North-South:
East-West:
SUM:

152

975

910

373

284

158

Total
Volume

0.661

0.761

158
926
1084

562
149

364
455

95

0
0

Project
Traffic

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
3
0
SB-0
WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
3
0
0
0
2
0

15

20

Added
Volume

0
0
1
1
0
0
0

1
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

No. of
Lanes

North-South:
East-West:
SUM:

150

990

924

383

300

160

Total
Volume

0
0
1
1
0
0
0

1
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

No. of
Lanes

0.689

0.789

160
964
1124

153

572

462

392

111

160

Lane
Volume

0.008
NO

0
0
1
1
0
0
0

1
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

No. of
Lanes

N/A

0.008

0.689

0.789

160
964
1124

153

572

462

392

111

160

Lane
Volume

CMA19

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

153

990

924

392

307

160

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

153

990

924

392

307

160

Total
Volume

Significant impacted?

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.681

0.781

160
953
1113

150

570

462

383

109

160

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

Washington Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA19

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Motor Avenue

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

0
0
1
1
0
0
0

1
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

128

827

951

202

269

135

No. of
Lanes

202

0.501

0.601

173
683
856

129

478

476

205

173

135

Lane
Volume

0.495

0.595

North-South:
East-West:
SUM:

168
680
848

129

827

478

951

205

275

135

Total
Volume

128

168

476

135

0
0

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

3
0
0
0
2
0

2015

2016
3
0
SB-0
WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
3
0
0
0
2
0

34

24

Added
Volume

0
0
1
1
0
0
0

1
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

No. of
Lanes

North-South:
East-West:
SUM:

129

843

969

238

296

136

Total
Volume

0
0
1
1
0
0
0

1
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

No. of
Lanes

0.539

0.639

182
728
910

130

487

485

241

182

136

Lane
Volume

0.007
NO

0
0
1
1
0
0
0

1
0
2
0
0
0
0

1
0
0
0
1
0
0

0
0
0
0
0
0
0

No. of
Lanes

N/A

0.007

0.539

0.639

182
728
910

130

487

485

241

182

136

Lane
Volume

CMA19

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

130

843

969

241

302

136

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

130

843

969

241

302

136

Total
Volume

Significant impacted?

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
3
3
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.532

0.632

177
724
901

129

486

485

238

177

136

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

Washington Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA19

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Palms Boulevard-National Boulevard

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-6:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
0
1
0
0
0

1
0
1
0
1
0
0

0
0
1
1
0
0
0

0
0
1
1
0
0
0

North-South:
East-West:
SUM:

155

167

67

11

136

122

131

707

76

1359

No. of
Lanes

36

0.806

718
491
1209

369

67

11

136

122

188

479

76

718

Lane
Volume

0.706

North-South:
East-West:
SUM:

155

214

67

11

136

122

188

770

36

76

1359

48

Total
Volume

0.675

0.775

718
444
1162

47

322
0

67

11

122
136

57

131

63

76

718

Project
Traffic

47

419

0
1

EXISTING PLUS PROJECT

NB-EB--

Lane
Volume

EXISTING CONDITION

0
1

Volume

NB-EB--

2
0
2
2
2
0

2015

2016
2
0
2
SB-WB-2
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
2
0
0
0
2
0

50

76

Added
Volume

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

No. of
Lanes

North-South:
East-West:
SUM:

157

219

68

11

213

123

132

714

77

1373

Total
Volume

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

No. of
Lanes

0.667

0.767

761
389
1150

139

266

68

224

123

189

483

36

77

725

48

Lane
Volume

0.056
NO

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

No. of
Lanes

N/A

0.056

0.667

0.767

761
389
1150

139

266

68

224

123

189

483

36

77

725

48

Lane
Volume

CMA20

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

157

266

68

11

213

123

189

777

36

77

1373

48

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

157

266

68

11

213

123

189

777

36

77

1373

48

Total
Volume

Significant impacted?

47

57

63

36

47

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.611

0.711

725
342
1067

157

219

68

224

123

132

423

77

725

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

National Boulevard-Exposition Boulev

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA20

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Palms Boulevard-National Boulevard

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-6:54 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
0
1
0
0
0

1
0
1
0
1
0
0

0
0
1
1
0
0
0

0
0
1
1
0
0
0

North-South:
East-West:
SUM:

65

62

41

10

239

274

89

935

154

909

No. of
Lanes

30

0.643

548
417
965

143

41

10

239

274

115

102

548
108

154

Added
Volume

532

0
0
SB-WB--

1.0
PM
2
0
0
0
2
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

No. of
Lanes

North-South:
East-West:
SUM:

66

178

41

10

343

277

90

944

156

918

Total
Volume

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

No. of
Lanes

0.597

0.697

575
471
1046

47

194

41

353

277

109

553

38

156

537

Lane
Volume

0.030
NO

1
0
1
0
1
0
0

1
0
0
1
0
0
0

1
0
1
1
0
0
0

1
0
1
1
0
0
0

No. of
Lanes

N/A

0.030

0.597

0.697

575
471
1046

47

194

41

353

277

109

553

38

156

537

Lane
Volume

CMA20

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

66

194

41

10

343

277

109

996

38

156

918

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

66

194

41

10

343

277

109

996

38

156

918

Total
Volume

Significant impacted?

16

19

52

30

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.567

0.667

545
455
1000

62

178

41

353

277

90

517

156

537

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

Lane
Volume

0.543

North-South:
East-West:
SUM:

65

78

41

10

239

274

108

987

38

154

909

Total
Volume

0.522

0.622

532
401
933

16

127
0

41

10

274
239

19

89

52

154

532

Project
Traffic

512

0
1

EXISTING PLUS PROJECT

NB-EB--

Lane
Volume

EXISTING CONDITION

0
1

Volume

NB-EB--

2
0
2
2
2
0

2015

2016
2
0
2
SB-WB-2
2
0

Year of Count:
Projection Year:

(Circular 212 Method)

Level of Service Workheet

National Boulevard-Exposition Boulev

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA20

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

National Boulevard

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:53 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
0
1
0
0
0

1
0
0
0
1
0
0

0
0
1
1
0
0
0

1
0
2
0
0
0
0

North-South:
East-West:
SUM:

29

155

130

60

91

369

706

1209

372

No. of
Lanes

372

0.877

921
285
1206

184

158

101

369

549

605

372

Lane
Volume

0.777

North-South:
East-West:
SUM:

29

155

158

159

101

369

728

1209

372

Total
Volume

0.762

0.862

910
275
1185

184
0

28

99

130

10

91
0

22

538
369

Project
Traffic

605

0
0

EXISTING PLUS PROJECT

NB-EB--

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

2015

2016
4
2
SB-0
WB-2
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
4
2
0
2
2
0

10

13

Added
Volume

1
0
0
1
0
0
0

1
0
0
0
1
0
0

0
0
1
1
0
0
0

1
0
2
0
0
0
0

No. of
Lanes

North-South:
East-West:
SUM:

32

157

141

61

92

373

713

1221

389

Total
Volume

1
0
0
1
0
0
0

1
0
0
0
1
0
0

0
0
1
1
0
0
0

1
0
2
0
0
0
0

No. of
Lanes

0.797

0.897

943
291
1234

189

169

102

373

554

611

389

Lane
Volume

0.015
NO

1
0
0
1
0
0
0

1
0
0
0
1
0
0

0
0
1
1
0
0
0

1
0
2
0
0
0
0

No. of
Lanes

N/A

0.015

0.797

0.897

943
291
1234

189

169

102

373

554

611

389

Lane
Volume

CMA21

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

32

157

169

160

102

373

735

1221

389

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

32

157

169

160

102

373

735

1221

389

Total
Volume

Significant impacted?

28

99

10

22

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
2
2
NB-0
SB-0
NB-0
SB-0
EB-0
WB-2
EB-0
WB-2
2
2
0
0

Change in v/c due to project:

0.782

0.882

932
281
1213

189

141

92

373

543

611

389

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

4
2
0
2
2
0

I-10 WB Off-Ramp-Manning Avenue

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA21

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

National Boulevard

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:53 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

SB-WB--

1
0
0
1
0
0
0

1
0
0
0
1
0
0

0
0
1
1
0
0
0

1
0
2
0
0
0
0

North-South:
East-West:
SUM:

75

186

373

43

122

212

596

1092

153

No. of
Lanes

153

75

0.781

561
513
1074

261

383

49

130

212

408

546

153

Lane
Volume

0.681

North-South:
East-West:
SUM:

186

383

125

130

212

603

1092

153

Total
Volume

0.665

0.765

557
495
1052

10

373
261

82

122
0

404
212

Project
Traffic

546

0
0

EXISTING PLUS PROJECT

NB-EB--

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

2015

2016
4
2
SB-0
WB-2
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
4
2
0
2
2
0

14

23

Added
Volume

1
0
0
1
0
0
0

1
0
0
0
1
0
0

0
0
1
1
0
0
0

1
0
2
0
0
0
0

No. of
Lanes

North-South:
East-West:
SUM:

81

188

391

43

123

214

602

1103

178

Total
Volume

1
0
0
1
0
0
0

1
0
0
0
1
0
0

0
0
1
1
0
0
0

1
0
2
0
0
0
0

No. of
Lanes

0.716

0.816

590
532
1122

269

401

36

131

214

412

552

178

Lane
Volume

0.016
NO

1
0
0
1
0
0
0

1
0
0
0
1
0
0

0
0
1
1
0
0
0

1
0
2
0
0
0
0

No. of
Lanes

N/A

0.016

0.716

0.816

590
532
1122

269

401

36

131

214

412

552

178

Lane
Volume

CMA21

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

81

188

401

125

131

214

609

1103

178

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

81

188

401

125

131

214

609

1103

178

Total
Volume

Significant impacted?

10

82

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
4
4
2
2
NB-0
SB-0
NB-0
SB-0
EB-0
WB-2
EB-0
WB-2
2
2
0
0

Change in v/c due to project:

0.700

0.800

586
514
1100

269

391

123

214

408

552

178

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

4
2
0
2
2
0

I-10 WB Off-Ramp-Manning Avenue

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA21

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:53 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

90

721

38

964

245

218

75

167

41

199

64

No. of
Lanes

2
0
0
0
2
0

167

90

0.969

471
983
1454

90

412

38

974

245

302

167

304

64

Lane
Volume

0.869

North-South:
East-West:
SUM:

734

38

974

245

227

75

167

41

199

64

Total
Volume

0.863

0.963

471
973
1444

90

13

9
406

10

964
38

245

304
0

Project
Traffic

64

293

0
0

EXISTING PLUS PROJECT

NB-EB--

2015

2016
2
0
SB-0
WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
AM
2
0
0
0
2
0

17

17

Added
Volume

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

0
0
0
0
0
1
0

No. of
Lanes

North-South:
East-West:
SUM:

94

728

38

974

264

237

76

172

41

201

65

Total
Volume

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

0
0
0
0
0
1
0

No. of
Lanes

0.881

0.981

479
993
1472

94

418

38

984

264

322

172

307

65

Lane
Volume

0.006
NO

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

0
0
0
0
0
1
0

No. of
Lanes

N/A

0.006

0.881

0.981

479
993
1472

94

418

38

984

264

322

172

307

65

Lane
Volume

CMA22

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

94

741

38

984

264

246

76

172

41

201

65

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

94

741

38

984

264

246

76

172

41

201

65

Total
Volume

Significant impacted?

13

10

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.875

0.975

479
983
1462

94

411

38

974

264

313

172

307

65

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

SB-WB--

Castle Heights Avenue

National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA22

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

East-West Street:

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11/5/2015-5:53 PM

Version: 1i Beta; 8/4/2011

REMARKS:

LEVEL OF SERVICE (LOS):

V/C LESS ATSAC/ATCS ADJUSTMENT:

VOLUME/CAPACITY (V/C) RATIO:

CRITICAL VOLUMES

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

MOVEMENT

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

Right Turns: FREE-1, NRTOR-2 or OLA-3?

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

76

464

15

44

850

247

244

75

167

23

45

32

No. of
Lanes

76

0.818

354
873
1227

76

272

15

44

858

247

322

167

100

32

Lane
Volume

0.718

North-South:
East-West:
SUM:

468

15

44

858

247

247

75

167

23

45

32

Total
Volume

0.711

0.811

351
865
1216

76

15
270

850
44

247

319
0

167

32
100

0
0

EXISTING PLUS PROJECT

NB-EB--

Project
Traffic

2
0
0
0
2
0

2015

2016
2
0
SB-0
WB-0
2
0

Year of Count:
Projection Year:

0
0
SB-WB--

1.0
PM
2
0
0
0
2
0

29

29

Added
Volume

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

0
0
0
0
0
1
0

No. of
Lanes

North-South:
East-West:
SUM:

82

469

15

44

859

278

275

76

174

23

45

32

Total
Volume

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

0
0
0
0
0
1
0

No. of
Lanes

0.745

0.845

386
881
1267

82

278

15

44

866

278

354

174

100

32

Lane
Volume

0.008
NO

1
0
1
1
0
0
0

1
0
1
0
1
0
0

1
0
0
1
0
0
0

0
0
0
0
0
1
0

No. of
Lanes

N/A

0.008

0.745

0.845

386
881
1267

82

278

15

44

866

278

354

174

100

32

Lane
Volume

CMA22

Fully mitigated?

v/c after mitigation:

North-South:
East-West:
SUM:

82

473

15

44

867

278

278

76

174

23

45

32

Total
Volume

FUTURE W/ PROJECT W/ MITIGATION

Added
Volume

PROJECT IMPACT

North-South:
East-West:
SUM:

82

473

15

44

867

278

278

76

174

23

45

32

Total
Volume

Significant impacted?

Added
Volume

FUTURE CONDITION W/ PROJECT

11/5/2015
Conducted by: National Data & Survey Date:
TTN
Project: City Charter School Project - 5-13Reviewed by:
2
2
0
0
NB-0
SB-0
NB-0
SB-0
EB-0
WB-0
EB-0
WB-0
2
2
0
0

Change in v/c due to project:

0.737

0.837

383
873
1256

82

276

15

44

858

278

351

174

100

32

Lane
Volume

FUTURE CONDITION W/O PROJECT

NB-EB--

Peak Hour:

Ambient Growth: (%):

(Circular 212 Method)

Level of Service Workheet

Lane
Volume

EXISTING CONDITION

0
0

Volume

NB-EB--

SB-WB--

Castle Heights Avenue

National Boulevard

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?

North-South Street:

I/S #:

CMA22

NORTHBOUND

SOUTHBOUND

EASTBOUND

WESTBOUND

3280MOTORCHARTERSCHOOLLADOTComments 

October22,2015

LLG Response to Comments 11/09/2015

Pleaseaddressthefollowing:
1. Page11,ExistingLaneConfigurations(Figure41)
Lane configuration and
A. Westood Bl & National Bl: the northbound configuration should be LT:1, TH: 1, RT: 1 analysis updated
B. Overland Ave & Fwy 10 EB on-ramp: northbound configuration should be 3-thorugh and 1-shared
through/right. Lane configuration and analysis updated
C. Exposition Bl & National Bl & Palms Bl: there needs to be an additional lane configuration bubble
that differentiates the lane configuration of the 2014 study traffic counts (currently shown) and the
lane configuration that exist now (and for the future analysis).Thefutureanalysisconfiguration

shouldbeasfollows:Lane configuration and analysis updated


i.
northbound configuration is LT:1, TH: 1, TH/RT: 1
ii.
southbound configuration is LT:1, TH:1, TH/RT: 1
iii.
eastbound configuration is LT:1, TH/RT: 1
iv.
westbound configuration is LT:1, TH:1, RT: 1
Traffic signal
D. Overland Ave & Pico Bl: add detail that notes difference in am/pm WB configuration (am reduces operation and
to 1 full through lane due to lack of peak hour parking restriction)due to Pico Bl parking restrictionanalysis updated
E. National Bl & Overland Ave: change operational RT overlap footnote ([A]) to the more restrictive
NRTOR footnote ([B]) Traffic signal operation and analysis updated
F. Rose / National & National / Mentone: remove NB and EB NRTOR notation ([B]). The restriction
only applies to Sunday farmer's market hours. Lane restrictions and analysis updated
G. Manning Ave & Palms Bl: remove EB free-RT notation ([C]). There is a stop sign and no exclusive
lane to turn into therefore, this is not a free flow move. Lane configuration and analysis updated
H. Manning Ave & Palms Ave: according to the count sheet the lane volumes should be as followsNB
LT: 399, NB TH: 1196The traffic volumes on the figure align with the current traffic count sheet now included in Appendix A.


2. Page1920,ExistingTrafficVolumes(Figures51and52)
Pleaseclarifydifferencebetweenshownvolumesandnumberspresentedintheintersection
countsheetsforthefollowinglocations:
The traffic volumes on the figure align with the current
A. I-10 WB Off / Manning Ave & Palms Ave / National Blvdtraffic count sheet now included in Appendix A.
B. Castle Heights & Palms AveThe traffic volumes on the figure align with the current traffic count sheet now included in Appendix A.
C. Washington Bl & Motor AveTraffic volumes and analysis updated

3. Page3536,ProjectTrafficVolumes(Figures73and74)
Thefollowingcorrectionsareneeded:
A. Palms & Motor: I-10 WB Off: figure is incorrectly showing 44 project trips as right-turns which
should be left-turns. Project traffic volumes and analysis updated
B. Venice Bl & Motor Ave: NB TH project trips should be 12 not 9. Project traffic volumes and analysis updated
C. Rose & Motor: NB TH project trips shoud be 22 not 12. Project traffic volumes and analysis updated
D. Palms & Motor: figure is incorrectly showing 36 project trips as right-turns which should be leftturns. Project traffic volumes and analysis updated
E. Venice & Motor: NB TH project trips should be 4 not 3. Project traffic volumes and analysis updated


4. CorrespondingCMAcorrectionsshouldbemadeforeachofthecommentsgivenabove(as
appropriate)inadditiontothefollowing:
Traffic signal phasing and
A. I-10 WB Off / Manning Ave & Palms Ave / National Blvd: No. of phases should be 4 not 3.analysis updated
B. Motor & Pico: No. of phases should be 4 not 5.Traffic signal phasing and analysis updated

5. ReportismissingtrafficcountfortheExpo/National&Palmsintersection.
The traffic count sheet now included in Appendix A.

3280MOTORCHARTERSCHOOLLADOTComments 

October22,2015

LLG Response to Comments 11/09/2015

Pleaseaddressthefollowing:
1. Page11,ExistingLaneConfigurations(Figure41)
Lane configuration and
A. Westood Bl & National Bl: the northbound configuration should be LT:1, TH: 1, RT: 1 analysis updated
B. Overland Ave & Fwy 10 EB on-ramp: northbound configuration should be 3-thorugh and 1-shared
through/right. Lane configuration and analysis updated
C. Exposition Bl & National Bl & Palms Bl: there needs to be an additional lane configuration bubble
that differentiates the lane configuration of the 2014 study traffic counts (currently shown) and the
lane configuration that exist now (and for the future analysis).Thefutureanalysisconfiguration

shouldbeasfollows:Lane configuration and analysis updated


i.
northbound configuration is LT:1, TH: 1, TH/RT: 1
ii.
southbound configuration is LT:1, TH:1, TH/RT: 1
iii.
eastbound configuration is LT:1, TH/RT: 1
iv.
westbound configuration is LT:1, TH:1, RT: 1
Traffic signal
D. Overland Ave & Pico Bl: add detail that notes difference in am/pm WB configuration (am reduces operation and
to 1 full through lane due to lack of peak hour parking restriction)due to Pico Bl parking restrictionanalysis updated
E. National Bl & Overland Ave: change operational RT overlap footnote ([A]) to the more restrictive
NRTOR footnote ([B]) Traffic signal operation and analysis updated
F. Rose / National & National / Mentone: remove NB and EB NRTOR notation ([B]). The restriction
only applies to Sunday farmer's market hours. Lane restrictions and analysis updated
G. Manning Ave & Palms Bl: remove EB free-RT notation ([C]). There is a stop sign and no exclusive
lane to turn into therefore, this is not a free flow move. Lane configuration and analysis updated
H. Manning Ave & Palms Ave: according to the count sheet the lane volumes should be as followsNB
LT: 399, NB TH: 1196The traffic volumes on the figure align with the current traffic count sheet now included in Appendix A.


2. Page1920,ExistingTrafficVolumes(Figures51and52)
Pleaseclarifydifferencebetweenshownvolumesandnumberspresentedintheintersection
countsheetsforthefollowinglocations:
The traffic volumes on the figure align with the current
A. I-10 WB Off / Manning Ave & Palms Ave / National Blvdtraffic count sheet now included in Appendix A.
B. Castle Heights & Palms AveThe traffic volumes on the figure align with the current traffic count sheet now included in Appendix A.
C. Washington Bl & Motor AveTraffic volumes and analysis updated

3. Page3536,ProjectTrafficVolumes(Figures73and74)
Thefollowingcorrectionsareneeded:
A. Palms & Motor: I-10 WB Off: figure is incorrectly showing 44 project trips as right-turns which
should be left-turns. Project traffic volumes and analysis updated
B. Venice Bl & Motor Ave: NB TH project trips should be 12 not 9. Project traffic volumes and analysis updated
C. Rose & Motor: NB TH project trips shoud be 22 not 12. Project traffic volumes and analysis updated
D. Palms & Motor: figure is incorrectly showing 36 project trips as right-turns which should be leftturns. Project traffic volumes and analysis updated
E. Venice & Motor: NB TH project trips should be 4 not 3. Project traffic volumes and analysis updated


4. CorrespondingCMAcorrectionsshouldbemadeforeachofthecommentsgivenabove(as
appropriate)inadditiontothefollowing:
Traffic signal phasing and
A. I-10 WB Off / Manning Ave & Palms Ave / National Blvd: No. of phases should be 4 not 3.analysis updated
B. Motor & Pico: No. of phases should be 4 not 5.Traffic signal phasing and analysis updated

5. ReportismissingtrafficcountfortheExpo/National&Palmsintersection.
The traffic count sheet now included in Appendix A.

- 33 -

- 34 -

3280MOTORCHARTERSCHOOLLADOTComments

October22,2015

Pleaseaddressthefollowing:
1. Page11,ExistingLaneConfigurations(Figure41)
A. Westood Bl & National Bl: the northbound configuration should be LT:1, TH: 1, RT: 1
B. Overland Ave & Fwy 10 EB on-ramp: northbound configuration should be 3-thorugh and 1-shared
through/right.
C. Exposition Bl & National Bl & Palms Bl: there needs to be an additional lane configuration bubble
that differentiates the lane configuration of the 2014 study traffic counts (currently shown) and the
lane configuration that exist now (and for the future analysis).Thefutureanalysisconfiguration

shouldbeasfollows:
i.
northbound configuration is LT:1, TH: 1, TH/RT: 1
ii.
southbound configuration is LT:1, TH:1, TH/RT: 1
iii.
eastbound configuration is LT:1, TH/RT: 1
iv.
westbound configuration is LT:1, TH:1, RT: 1
D. Overland Ave & Pico Bl: add detail that notes difference in am/pm WB configuration (am reduces
to 1 full through lane due to lack of peak hour parking restriction)due to Pico Bl parking restriction
E. National Bl & Overland Ave: change operational RT overlap footnote ([A]) to the more restrictive
NRTOR footnote ([B])
F. Rose / National & National / Mentone: remove NB and EB NRTOR notation ([B]). The restriction
only applies to Sunday farmer's market hours.
G. Manning Ave & Palms Bl: remove EB free-RT notation ([C]). There is a stop sign and no exclusive
lane to turn into therefore, this is not a free flow move.
H. Manning Ave & Palms Ave: according to the count sheet the lane volumes should be as followsNB
LT: 399, NB TH: 1196

2. Page1920,ExistingTrafficVolumes(Figures51and52)
Pleaseclarifydifferencebetweenshownvolumesandnumberspresentedintheintersection
countsheetsforthefollowinglocations:
A. I-10 WB Off / Manning Ave & Palms Ave / National Blvd
B. Castle Heights & Palms Ave
C. Washington Bl & Motor Ave

3. Page3536,ProjectTrafficVolumes(Figures73and74)
Thefollowingcorrectionsareneeded:
A. Palms & Motor: I-10 WB Off: figure is incorrectly showing 44 project trips as right-turns which
should be left-turns.
B. Venice Bl & Motor Ave: NB TH project trips should be 12 not 9.
C. Rose & Motor: NB TH project trips shoud be 22 not 12.
D. Palms & Motor: figure is incorrectly showing 36 project trips as right-turns which should be leftturns.
E. Venice & Motor: NB TH project trips should be 4 not 3.

4. CorrespondingCMAcorrectionsshouldbemadeforeachofthecommentsgivenabove(as
appropriate)inadditiontothefollowing:
A. I-10 WB Off / Manning Ave & Palms Ave / National Blvd: No. of phases should be 4 not 3.
B. Motor & Pico: No. of phases should be 4 not 5.

5. ReportismissingtrafficcountfortheExpo/National&Palmsintersection.

TRAFFIC IMPACT STUDY

CITY CHARTER SCHOOL PROJECT


City of Los Angeles, California
August 27, 2015

Prepared for:

City Charter School


11625 West Pico Boulevard
Los Angeles, CA 90064

LLG Ref. 5-13-0097-1

Prepared by:

Tin T. Nguyen
Transportation Engineer II

Under the Supervision of:

David S. Shender, P.E.


Principal

20931 Burbank Boulevard


Suite C
Woodland Hills, CA 91367
818.835.8648 T
818.835.8649 F

TABLE OF CONTENTS
SECTION

PAGE

1.0

Introduction ................................................................................................................................ 1
1.1 Study Area .......................................................................................................................... 3

2.0

Project Description ....................................................................................................................


2.1 Site Location .......................................................................................................................
2.2 Existing Project Site ...........................................................................................................
2.3 Proposed Project Description ............................................................................................

4
4
4
4

3.0

Site Access and Circulation ......................................................................................................


3.1 Vehicular Project Site Access ............................................................................................
3.2 Proposed Student Drop-Off and Pick-Up Operations ......................................................
3.2.1 Estimated Peak Vehicle Queue .............................................................................

6
6
8
8

4.0

Existing Street System ............................................................................................................... 10


4.1 Regional Highway System ................................................................................................ 10
4.2 Local Roadway System ..................................................................................................... 10
4.3 Roadway Descriptions ....................................................................................................... 12
4.4 Public Transit Services....................................................................................................... 13

5.0

Traffic Counts ............................................................................................................................ 16

6.0

Cumulative Development Projects .......................................................................................... 21


6.1 Related Projects .................................................................................................................. 21
6.2 Ambient Traffic Growth Factor......................................................................................... 28

7.0

Traffic Forecasting Methodology ............................................................................................ 29


7.1 Project Traffic Generation ................................................................................................. 29
7.2 Project Traffic Distribution and Assignment .................................................................... 30

8.0

Traffic Impact Analysis Methodology .................................................................................... 32


8.1 Impact Criteria and Thresholds ......................................................................................... 32
8.2 LADOT ATSAC/ATCS .................................................................................................... 37
8.3 Traffic Impact Analysis Scenarios .................................................................................... 37

9.0

Traffic Analysis .......................................................................................................................... 38


9.1 Existing Conditions ............................................................................................................ 38
9.1.1 Existing Conditions ............................................................................................... 38
9.1.2 Existing With Project Conditions ......................................................................... 38
9.2 Future Conditions ............................................................................................................... 38
9.2.1 Future Cumulative Baseline Conditions............................................................... 38
9.2.2 Future Cumulative With Project Conditions ........................................................ 43

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

TABLE OF CONTENTS (continued)


SECTION

PAGE

10.0 Congestion Management Program Traffic Impact Assessment ......................................... 48


10.1 Intersections ........................................................................................................................ 48
10.2 Freeways ............................................................................................................................. 49
10.3 Transit Impact Review ....................................................................................................... 49
11.0 Conclusions ................................................................................................................................. 50

LIST OF TABLES
SECTIONTABLE #

PAGE

41

Existing Transit Routes ............................................................................................................ 14

51

Existing Traffic Volumes ......................................................................................................... 17

61

Related Projects List and Trip Generation .............................................................................. 22

71

Project Trip Generation.................................................................................................... 31

81

City of Los Angeles Intersection Impact Threshold Criteria.................................................. 32

91

Levels of Service Summary ..................................................................................................... 39

LINSCOTT, LAW & GREENSPAN, engineers

ii

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

TABLE OF CONTENTS (continued)


LIST OF FIGURES
SECTIONFIGURE #

PAGE

11

Vicinity Map ............................................................................................................................. 2

21

Project Site Plan Ground Floor ............................................................................................. 5

31

Project Site Plan Access and Circulation ............................................................................. 7

41

Existing Lane Configurations .......................................................................................... 11

42

Existing Public Transit Routes ................................................................................................. 15

51

Existing Traffic Volumes Weekday AM Peak Hour ........................................................... 19

52

Existing Traffic Volumes Weekday PM Peak Hour............................................................ 20

61

Location of Related Projects .................................................................................................... 25

62

Related Projects Traffic Volumes Weekday AM Peak Hour.............................................. 26

63

Related Projects Traffic Volumes Weekday PM Peak Hour .............................................. 27

71

Project Trip Distribution Weekday AM Peak Hour ............................................................ 33

72

Project Trip Distribution Weekday PM Peak Hour ............................................................. 34

73

Project Traffic Volumes Weekday AM Peak Hour ............................................................. 35

74

Project Traffic Volumes Weekday PM Peak Hour.............................................................. 36

91

Existing With Project Traffic Volumes Weekday AM Peak Hour ..................................... 41

92

Existing With Project Traffic Volumes Weekday PM Peak Hour...................................... 42

93

Future Cumulative Baseline Traffic Volumes Weekday AM Peak Hour .......................... 44

94

Future Cumulative Baseline Traffic Volumes Weekday PM Peak Hour ........................... 45

95

Future Cumulative With Project Traffic Volumes Weekday AM Peak Hour ................... 46

96

Future Cumulative With Project Traffic Volumes Weekday PM Peak Hour .................... 47

APPENDICES
APPENDIX
A.

Manual Traffic Count Data

B.

CMA and Levels of Service Explanation


CMA Data Worksheets AM and PM Peak Hours

LINSCOTT, LAW & GREENSPAN, engineers

iii

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

TRAFFIC IMPACT STUDY

CITY CHARTER SCHOOL PROJECT


City of Los Angeles, California
August 27, 2015

1.0

INTRODUCTION

This traffic analysis has been conducted to identify and evaluate the potential traffic impacts
generated by the proposed City Charter School project at 3280 Motor Avenue located in the City
of Los Angeles. The project proposes the utilization of the existing commercial building as a
public charter school (grades 612) with a total enrollment of 840 students. The project site
location and general vicinity are shown in Figure 11.
The traffic analysis follows City of Los Angeles traffic study guidelines1 and is consistent with
traffic impact assessment guidelines set forth in the Los Angeles County Congestion
Management Program2. This traffic analysis evaluates potential project-related impacts at 22
key intersections in the vicinity of the project site. The study intersections were determined in
consultation with City of Los Angeles Department of Transportation (LADOT) staff. The
Critical Movement Analysis method was used to determine Volume-to-Capacity ratios and
corresponding Levels of Service for all 22 study intersections. A review also was conducted of
Los Angeles County Metropolitan Transportation Authority freeway and intersection monitoring
stations to determine if a Congestion Management Program transportation impact assessment
analysis is required for the proposed project.
This study (i) presents existing traffic volumes, (ii) includes existing traffic volumes with the
forecast net new traffic volumes from the proposed project, (iii) recommends mitigation
measures, where necessary, (iv) forecasts future cumulative baseline traffic volumes, (v)
forecasts future traffic volumes with the proposed project, (vi) determines future forecast with
project-related impacts, and (vii) recommends mitigation measures, where necessary.

Traffic Study Policies and Procedures, City of Los Angeles Department of Transportation, August 2014.
2010 Congestion Management Program for Los Angeles County, Los Angeles County Metropolitan
Transportation Authority, 2010.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

-1-

-2-

1.1

Study Area

Upon coordination with LADOT staff, 22 study intersections have been identified for evaluation
during the weekday morning and afternoon peak hours. The 22 study intersections provide local
access to the study area and define the extent of the boundaries for this traffic impact analysis.
Further discussion of the existing street system and study area is provided in Section 3.0.
The general location of the project in relation to the study locations and surrounding street
system is presented in Figure 11. The traffic analysis study area is generally comprised of those
locations which have the greatest potential to experience significant traffic impacts due to the
proposed project as defined by the Lead Agency. In the traffic engineering practice, the study
area generally includes those intersections that are:
a.

Immediately adjacent or in close proximity to the project site;

b.

In the vicinity of the project site that are documented to have current or projected
future adverse operational issues; and

c.

In the vicinity of the project site that are forecast to experience a relatively greater
percentage of project-related vehicular turning movements (e.g., at freeway ramp
intersections).

The locations selected for analysis were based on the above criteria, proposed school project
peak hour vehicle trip generation, the anticipated distribution of project vehicular trips, and
existing intersection/corridor operations.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

-3-

2.0

PROJECT DESCRIPTION

2.1

Site Location

The site of the proposed City Charter School project is located at 3280 Motor Avenue in the
West Los Angeles Community Plan area of the City of Los Angeles, California. The project site
is located at the northeast corner of the intersection of Motor Avenue and National Boulevard.
The project site location and general vicinity are shown in Figure 11. It is noted that City
Charter School operates an existing nearby facility at 11625 West Pico Boulevard.

2.2

Existing Project Site

The project site is currently developed with commercial buildings. In addition to the existing
retail and office uses that occupy the buildings, the site was previously occupied by an adult
education use. Vehicular access to the project site is provided via one driveway off of Motor
Avenue along the westerly property frontage. The westerly driveway provides access to both the
surface parking lot and the subterranean parking garage.

2.3

Proposed Project Description

The project applicant proposes to occupy and re-purpose the existing commercial building
(approximately 54,936 square feet of floor area) to provide a public charter school (grades 612)
with enrollment of up to 840 students. Vehicular access to the site will be provided via the
existing site driveway on Motor Avenue, as well as a proposed new site driveway on National
Boulevard. Construction and occupancy of the proposed project is planned to be completed by
year 2016. The site plan for the proposed City Charter School project is illustrated in Figure 2
1. Further discussion of the proposed project site access and circulation scheme is provided in
Section 3.0.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

-4-

-5-

3.0

SITE ACCESS AND CIRCULATION

The proposed site access scheme for the City Charter School project is displayed in Figure 31.
A description of the proposed site access and circulation scheme is provided in the following
subsections.

3.1

Vehicular Project Site Access

As previously noted, vehicular access to the project site is currently provided via the existing
driveway on Motor Avenue. However, due to the existing Century City Neighborhood Traffic
Management plan, left-turns and right-turns from National Boulevard to northbound Motor
Avenue are prohibited during the weekday morning commuter period (7:00 10:00 a.m.).
Further, the traffic signal green time on Motor Avenue at the National Boulevard intersection is
reduced to effectively meter northbound through traffic on Motor Avenue during this period
(i.e., to allow no more than 600 vehicles per hour on northbound Motor Avenue). These traffic
management measures have highly complicated vehicle access to the project site, particularly
during the morning commuter period. Thus, to better accommodate vehicles destined to the
school site and better disperse arrival traffic off of Motor Avenue the project proposes a
second site driveway to be provided on National Boulevard (for right-turn inbound traffic only).
The project driveways will serve student drop-off/pick-up operations and the on-site
subterranean parking garage. Student pick-up and drop-off operations will be conducted within
the surface parking area. Descriptions of the project site driveways are provided in the following
paragraphs.

Motor Avenue Project Driveway:


The existing Motor Avenue project driveway will provide access to the surface parking
area which will be used primarily by school faculty and visitors to the school. The Motor
Avenue project driveway is anticipated to accommodate full vehicular access ingress
(i.e., left-turn and right-turn ingress) and right-turn only egress.

National Boulevard Project Driveway:


The proposed National Boulevard project driveway will provide access to the student
drop-off/pick-up area. The inbound project driveway is anticipated to accommodate
limited vehicular access via right-turn ingress turning movements only.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

-6-

-7-

3.2

Proposed Student Drop-Off and Pick-Up Operations

The proposed charter school student drop-off/pick-up area is shown in Figure 3-1. Vehicles
destined to the charter school to drop-off or pick-up students will enter via the site driveway on
Motor Avenue or National Boulevard, circulate through the surface parking lot, complete the
student drop-off or pick-up, and then proceed back to the Motor Avenue driveway to exit the
site. The proposed drop-off/pick-up lane can accommodate approximately 12 vehicles queued
within the surface parking lot area.
To enhance student safety and better accommodate student drop-off/pick-up activities, it is
recommended that curbside parking be restricted along the project frontage on the east side of
Motor Avenue as well as on the north side of National Boulevard during the school drop-off and
pick-up activity periods.
3.2.1 Estimated Peak Vehicle Queue
Private vehicles are the main component that contributes to the vehicle queuing analysis during
the peak student drop-off and pick-up periods. The analysis focuses on the morning student
drop-off period as the pick-up of students tends to be dispersed on a relative basis throughout the
afternoon, particularly as students are involved with after-school activities.
The proposed project (without consideration of prior use trip credits) is forecast to generate 405
inbound trips and 259 outbound trips during the AM peak hour (refer to Section 7.0, Traffic
Forecasting Methodology, for a discussion of the projects trip generation forecasts). While the
ITE trip rates do not distinguish between trips related to staff arrivals and student drop-offs in the
morning, it can be generally assumed that the 259 outbound trips during the AM peak hour
would correlate with at least 259 inbound trips during this period related to student drop-off
operations. The remaining inbound vehicle trips during the AM peak hour are likely due to
administrative staff, visitors, etc., at the campus. Therefore, for this queuing analysis, it has been
assumed that approximately 259 vehicles would utilize the on-site vehicle queue area as part of
the student drop-off operations.
While the ITE forecasts are made for a peak one hour (i.e., 60 minute) period, it has been
observed that student drop-offs are typically concentrated in shorter timeframes leading up to the
start of classes for the day. Thus, for this analysis it has been conservatively (i.e., worst case)
assumed that the 259 vehicles would arrive in a 30 minute period, which is equivalent to
approximately 8.6 vehicles per minute. Multiplying this average arrival by two to approximate
the 95th percentile confidence level of a Poisson distribution (which is typically used by traffic
engineers in planning the lengths of left and right-turn pockets at intersections) results in an
estimated maximum of 17 vehicles per minute. As previously noted, the vehicle queue area can
accommodate up to a total of 12 passenger vehicles. Therefore, to provide for adequate vehicle
queuing on-site, it is recommended that student arrival and departure times be staggered. For
example, the Middle School could have commencement and dismissal times that are 30 minutes
earlier than the High School. In this way, the peak vehicle queue could be reduce by half (e.g. to
eight to nine vehicles). Based on the proposed staggering of student arrivals and departures, it is

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

-8-

concluded that the planned on-site vehicle queue area is adequate to accommodate the peak
demand of eight to nine queued vehicles during the morning student drop-off operation.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

-9-

4.0

EXISTING STREET SYSTEM

4.1

Regional Highway System

Regional access to the project site is provided by the I-10 (Santa Monica) Freeway as shown in
Figure 1-1. Brief descriptions of the I-10 Freeways are provided in the following paragraph:
I-10 (Santa Monica) Freeway is an east-west freeway connecting the City of Santa Monica with
the City of Los Angeles and the municipalities of the San Gabriel Valley and San Bernardino
County to the east. In the project vicinity, four mixed-flow freeway lanes are generally provided
in each direction on the I-10 Freeway with auxiliary merge/weave lanes provided between some
interchanges. Eastbound and westbound ramps are provided at Overland Avenue on the I-10
Freeway in the project area.

4.2

Local Roadway System

Immediate access to the project site is provided via Motor Avenue. The following study
intersections were selected in consultation with LADOT staff for analysis of potential impacts
due to the proposed project:
1. Sepulveda Boulevard / National Boulevard
2. Sepulveda Boulevard / Palms Boulevard
3. Westwood Boulevard / National Boulevard
4. Overland Avenue / Pico Boulevard
5. Overland Avenue / I-10 WB On-Off Ramp - National Boulevard
6. Overland Avenue / I-10 EB On-Ramp
7. Overland Avenue / National Place - National Boulevard
8. Overland Avenue / Palms Boulevard
9. Overland Avenue / Venice Boulevard
10. I-10 EB Off-Ramp / National Boulevard
11. National Boulevard - Mentone Avenue / Rose Avenue - National Boulevard
12. Motor Avenue / Pico Boulevard
13. Motor Avenue / Manning Avenue
14. Motor Avenue / National Boulevard
15. Motor Avenue / Palms Boulevard
16. Motor Avenue / Regent Street
17. Motor Avenue / Tabor Street
18. Motor Avenue / Venice Boulevard
19. Motor Avenue / Washington Boulevard
20. Palms Boulevard - National Boulevard / National Boulevard - Exposition Boulevard
21. National Boulevard / I-10 WB Off-Ramp - Manning Avenue
22. Castle Heights Avenue / National Boulevard
All 22 study intersections selected for analysis are presently controlled by traffic signals. The
existing lane configurations at the study intersections are displayed in Figure 41.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 10 -

- 11 -

4.3

Roadway Descriptions

A brief description3 of the important roadways in the project vicinity is provided in the following
paragraphs.
Sepulveda Boulevard is a north-south oriented roadway located west of the project site. Within
the project study area, Sepulveda Boulevard is designated as a Major Highway Class
II/Boulevard II by the City of Los Angeles. Two through travel lanes are generally provided in
both directions on Sepulveda Boulevard within the project study area. Separate exclusive leftturn lanes are provided on Sepulveda Boulevard at major intersections. Sepulveda Boulevard is
posted for a 35 miles per hour speed limit in the project vicinity.
Westwood Boulevard is a north-south oriented roadway located west of the project site. Within
the project study area, Westwood Boulevard is designated as a Secondary Highway/Avenue II by
the City of Los Angeles. Two southbound through travel lanes and one northbound through
travel lane are generally provided on Westwood Boulevard within the project study area.
Separate exclusive left-turn lanes are provided on Westwood Boulevard at major intersections.
Westwood Boulevard is posted for a 35 miles per hour speed limit in the project vicinity.
Overland Avenue is a north-south oriented roadway located west of the project site. Within the
project study area, Overland Avenue is designated as a Major Highway Class II/Boulevard II by
the City of Los Angeles. Two through travel lanes are generally provided in both directions on
Overland Avenue within the project study area. Separate exclusive left-turn lanes are provided
on Overland Avenue at major intersections. Overland Avenue is posted for a 35 miles per hour
speed limit in the project vicinity.
Motor Avenue is a north-south oriented roadway that borders the project site to the west. Within
the project study area, Motor Avenue is designated as a Major Highway Class II/Avenue II by
the City of Los Angeles. Two through travel lanes are generally provided in both directions on
Motor Avenue within the project study area. Separate exclusive left-turn lanes are provided on
Motor Avenue at major intersections. Motor Avenue is posted for a 35 miles per hour speed
limit in the project vicinity.
Pico Boulevard is an east-west oriented roadway that is located north of the project site. Within
the project study area, Pico Boulevard is designated as a Major Highway Class II/Avenue I by
the City of Los Angeles. Three through travel lanes are generally provided in both directions on
Pico Boulevard within the project study area. Separate exclusive left-turn lanes are provided on
Pico Boulevard at major intersections. Pico Boulevard is posted for a 35 miles per hour speed
limit in the project vicinity.
National Boulevard is an east-west oriented roadway that borders the project site to the south.
Within the project study area, National Boulevard is designated as a Secondary Highway/Avenue
I by the City of Los Angeles. Two through travel lanes are generally provided in both directions
3

The street designations provided refer to both the street standards adapted by the City in 1999, as well as the
Mobility Plan 2035 adopted by the City Council in August 2015.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 12 -

on National Boulevard within the project study area. Separate exclusive left-turn lanes are
provided on National Boulevard at major intersections. National Boulevard is posted for a 35
miles per hour speed limit in the project vicinity.
Palms Boulevard is an east-west oriented roadway that is located south of the project site.
Within the project study area, Palms Boulevard is designated as a Secondary Highway/Avenue II
by the City of Los Angeles. One through travel lane is generally provided in both directions on
Palms Boulevard within the project study area. Separate exclusive left-turn lanes are provided
on Palms Boulevard at major intersections. Palms Boulevard is posted for a 35 miles per hour
speed limit in the project vicinity.
Venice Boulevard is an east-west oriented roadway that is located south of the project site.
Within the project study area, Venice Boulevard is designated as a Major Highway Class
II/Boulevard II by the City of Los Angeles. Three through travel lanes are generally provided in
both directions on Venice Boulevard within the project study area. Separate exclusive left-turn
lanes are provided on Venice Boulevard at major intersections. Venice Boulevard is posted for a
35 miles per hour speed limit in the project vicinity.

4.4

Public Transit Services

Public transit service within the City Charter School project study area is currently provided by
Los Angeles County Metropolitan Transit Authority (Metro), Los Angeles Department of
Transportation (LADOT) Commuter Express, Santa Monica Big Blue Bus, and Culver CityBus.
A summary of the existing transit service, including the transit route, destinations and peak hour
headways is presented in Table 41. The existing public transit routes in the City Charter School
project site vicinity are illustrated in Figure 42.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 13 -

- 14 -

Westwood to Downtown Los Angeles


via Century City, Palms, I-10 Freeway

Palms to Santa Monica College


via Venice, Palms, Bundy

Westwood to Culver City Expo Station


via Palms

Century City to Culver City


via Rancho Park, Palms

Metro Green Line Station to UCLA


via Sepulveda

Commuter Express 431

Big Blue Bus 6

Big Blue Bus 12 / 12R

Culver City Bus 3

Culver City Bus 6

Palms Boulevard

National Boulevard

Palms Boulevard

Palms Boulevard

Motor Avenue

Motor Avenue

ROADWAY(S)
NEAR SITE

4
4
36

Total

LINSCOTT, LAW & GREENSPAN, engineers

3
4

4
4

2
-

3
6

NB
SB

NB
SB

NB
SB

EB
WB

EB
WB

EB
WB

LLG Ref. 5-13-0097-1


City Charter School Project

36

3
4

3
3

5
5

1
-

6
4

NO. OF BUSES/TRAINS
DURING PEAK HOUR
DIR
AM
PM

[1] Sources: Los Angeles County Metropolitan Transportation Authority (Metro) website, Los Angeles Department of Transportation (LADOT) Transit website,
Big Blue Bus website, and Culver City Bus website.

Downtown Los Angeles to Santa Monica


via Venice

DESTINATIONS

Metro Rapid 733

ROUTE

Table 4-1
EXISTING TRANSIT ROUTES [1]

- 15 -

5.0

TRAFFIC COUNTS

Manual traffic counts of vehicular turning movements were conducted at each of the study
intersections during the weekday morning and afternoon periods to determine the peak hour
traffic volumes. The manual traffic counts at the study intersections were conducted from 7:00
AM to 10:00 AM to determine the AM peak commuter hour and from 2:30 PM to 4:00 PM to
determine the PM peak hour (coincidently with peak student dismissal activies) in consultation
with LADOT staff. Additionally, the traffic counts conducted in February 2014 were increased
using an ambient growth rate of 1.0% (refer to Section 6.2, Ambient Traffic Growth Factor, for a
discussion of the growth factor utilized) to the existing year of 2015.
The weekday AM and PM peak period manual counts of vehicle movements at the study
intersections are summarized in Table 51. The existing traffic volumes at the study
intersections during the weekday AM and PM peak hours are shown in Figures 51 and 52,
respectively. Summary data worksheets of the manual traffic counts at the study intersections
are contained in Appendix A.

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project
O:\0097\report\0097-rpt2.doc

- 16 -

Table 5-1
EXISTING TRAFFIC VOLUMES [1]
23-Jul-15

NO.

INTERSECTION

DATE

DIR

AM PEAK HOUR
PM PEAK HOUR
BEGAN VOLUME [2] BEGAN VOLUME [2]

Sepulveda Boulevard /
National Boulevard

02/12/2014

NB
SB
EB
WB

7:30

1,774
565
1,554
841

3:00

1,126
1,247
1,367
867

Sepulveda Boulevard /
Palms Boulevard

02/12/2014

NB
SB
EB
WB

7:45

1,643
473
996
1,185

3:00

1,206
1,061
1,111
925

Westwood Boulevard /
National Boulevard

02/12/2014

NB
SB
EB
WB

7:45

750
539
1,237
491

3:00

357
1,018
1,058
545

Overland Avenue /
Pico Boulevard

02/12/2014

NB
SB
EB
WB

8:00

1,849
479
1,587
1,801

3:00

1,425
573
1,261
1,640

Overland Avenue /
I-10 WB On-Off Ramp National Boulevard

02/12/2014

NB
SB
EB
WB

7:45

2,274
1,323
983
845

2:30

1,440
1,661
842
1,084

Overland Avenue /
I-10 EB On-Ramp

02/12/2014

NB
SB
EB
WB

7:30

2,724
1,368
0
0

3:00

1,765
1,796
0
0

Overland Avenue /
National Place - National Boulevard

02/12/2014

NB
SB
EB
WB

7:45

2,122
535
499
1,622

2:45

1,311
927
880
955

Overland Avenue /
Palms Boulevard

02/12/2014

NB
SB
EB
WB

7:45

1,653
867
1,120
1,017

3:00

1,184
1,345
1,149
810

Overland Avenue /
Venice Boulevard

02/12/2014

NB
SB
EB
WB

8:00

1,787
1,601
1,064
1,232

3:00

1,033
1,432
1,614
1,438

10

I-10 EB Off-Ramp /
National Boulevard

02/12/2014

NB
SB
EB
WB

7:30

0
990
226
928

2:45

0
860
427
457

11

National Boulevard - Mentone Avenue /


Rose Avenue - National Boulevard

02/12/2014

NB
SB
EB
WB

7:30

180
500
79
716

3:00

45
775
100
428

LINSCOTT, LAW & GREENSPAN, engineers

LLG Ref. 5-13-0097-1


City Charter School Project

- 17 -

Table 5-1 (Continued)


EXISTING TRAFFIC VOLUMES [1]
23-Jul-15

NO.

INTERSECTION

DATE

DIR

AM PEAK HOUR
PM PEAK HOUR
BEGAN VOLUME [2] BEGAN VOLUME [2]

12

Motor Avenue /
Pico Boulevard

02/12/2014

NB
SB
EB
WB

8:15

1,101
58
2,329
1,745

3:00

557
173
1,577
1,700

13

Motor Avenue /
Manning Avenue

02/12/2014

NB
SB
EB
WB

7:45

508
366
230
659

2:45

510
471
388
440

14

Motor Avenue /
National Boulevard

02/12/2014

NB
SB
EB
WB

7:30

594
516
473
471

2:45

479
586
752
202

15

Motor Avenue /
Palms Boulevard

02/12/2014

NB
SB
EB
WB

7:30

844
514
1,083
822

3:00

502
623
1,127
755

16

Motor Avenue /
Tabor Street

02/12/2014

NB
SB
EB
WB

7:30

733
460
114
282

3:00

468
644
81
127

17

Motor Avenue /
Regent Street

02/12/2014

NB
SB
EB
WB

7:30

654
515
145
228

2:45

451
664
130
83

18

Motor Avenue /
Venice Boulevard

02/12/2014

NB
SB
EB
WB

7:45

536
646
1,570
1,488

3:00

337
689
1,444
1,264

19

Motor Avenue /
Washington Boulevard

02/12/2014

NB
SB
EB
WB

7:45

0
434
1,274
1,124

2:45

0
404
1,153
1,124

20

02/12/2014
Palms Boulevard - National Boulevard /
National Boulevard - Exposition Boulevard

NB
SB
EB
WB

7:45

1,436
838
270
388

3:00

1,064
1,032
523
168

21

National Boulevard /
I-10 WB Off-Ramp - Manning Avenue

02/12/2014

NB
SB
EB
WB

7:45

1,581
1,075
150
314

3:00

1,244
808
166
633

22

Castle Heights Avenue /


National Boulevard

02/12/2014

NB
SB
EB
WB

7:45

304
460
1,247
820

3:00

101
486
1,142
554

[1]
[2]

Counts conducted by National Data & Surveying Services


Note: Volumes conducted prior to existing year 2015 were increased using an ambient growth rate of 1.0%.