Escolar Documentos
Profissional Documentos
Cultura Documentos
Segunda Fase Concreto
Segunda Fase Concreto
CA = 2.4 tn/m3
Tabiques = 1.9 tn/m3
Columna C-1
Carga Muerta
Peso propio de la columna:
(2.40 tn/m3)x(2.60m)x(0.80m)x(0.40m)=1.997 tn
Peso de las vigas en X
(2.40 tn/m3)x(0.40m)x(0.70m)x(2.50m)= 1.68 tn
(2.40 tn/m3)x(0.25m)x(0.50m)x(2.50m)= 0.75 tn
Peso de las vigas en Y
(2.40 tn/m3)x(0.40m)x(0.70m)x(1.689m)= 1.135 tn
(2.40 tn/m3)x(0.40m)x(0.70m)x(3.421m)= 2.299 tn
Peso losa
(2.40 tn/m3)x(0.15m)x(3.671m)x(2.482m)= 3.280 tn
(2.40 tn/m3)x(0.15m)x(1.590m)x(2.482m)= 1.420 tn
Peso piso terminado
(0.10 tn/m2)x(2.88m)x(5.91m)= 1.700 tn
Peso tabiques
(1.90tn/m3)x(0.15m)x(2.40m)x(3.423m)= 2.34 tn
(1.90tn/m3)x(0.15m)x(2.40m)x(1.538m)= 1.05 tn
total = 17.573 tn
Carga Viva
(0.20 tn/m2)x(2.88m)x(5.91m)= 3.404 tn
Resumen
Pm total
35.15 tn
Pv total
6.81 tn
Metrado de cargas
CA = 2.4 tn/m3
Tabiques = 1.9 tn/m3
Columna C-3
Carga Muerta
Peso propio de la columna:
(2.40 tn/m3)x(2.60m)x(0.80m)x(0.40m)=1.997 tn
Peso de las vigas en X
(2.40 tn/m3)x(0.40m)x(0.40m)x(2.537m)= 0.974 tn
(2.40 tn/m3)x(0.40m)x(0.40m)x(2.778m)= 1.068 tn
Peso de las vigas en Y
(2.40 tn/m3)x(0.40m)x(0.70m)x(3.423m)= 2.300 tn
Peso losa
(2.40 tn/m3)x(0.15m)x(2.537m)x(3.671m)= 3.353 tn
(2.40 tn/m3)x(0.15m)x(2.537m)x(3.671m)= 3.353 tn
Peso piso terminado
(0.10 tn/m2)x(4.071m)x(5.716m)= 2.327 tn
Peso tabiques
(1.90tn/m3)x(0.15m)x(2.40m)x(3.421m)= 2.339 tn
total = 17.711 tn
Carga Viva
(0.20 tn/m2)x(4.071m)x(5.716m)= 4.654 tn
Resumen
Pm total
35.42 tn
Pv total
9.31 tn
Metrado de cargas
CA = 2.4 tn/m3
Tabiques = 1.9 tn/m3
Columna C-5
Carga Muerta
Peso propio de la columna:
(2.40 tn/m3)x(2.60m)x(0.80m)x(0.40m)=1.997 tn
Peso de las vigas en X
(2.40 tn/m3)x(0.40m)x(0.40m)x(2.162m)= 0.830tn
(2.40 tn/m3)x(0.40m)x(0.40m)x(2.538m)= 0.975 tn
Peso de las vigas en Y
(2.40 tn/m3)x(0.40m)x(0.70m)x(3.668m)= 2.465 tn
(2.40 tn/m3)x(0.40m)x(0.40m)x(1.511 m)=0.580 tn
Peso losa
(2.40
(2.40
(2.40
(2.40
tn/m3)x(0.15m)x(2.162m)x(1.511m)= 1.176 tn
tn/m3)x(0.15m)x(2.537m)x(1.511 m)= 1.380 tn
tn/m3)x(0.15m)x(2.162m)x(2.615 m)= 2.035 tn
tn/m3)x(0.15m)x(2.584m)x(2.537 m)= 2.360 tn
tn/m2)x(2.162m)x(1.511m)=
tn/m2)x(2.537m)x(1.511m)=
tn/m2)x(2.162m)x(2.615m)=
tn/m2)x(2.584m)x(2.537m)=
1.176
1.380
2.035
2.360
tn
tn
tn
tn
Peso tabiques
(1.90tn/m3)x(0.15m)x(2.40m)x(1.135m)= 0.776 tn
(1.90tn/m3)x(0.15m)x(2.40m)x(1.661m)= 1.136 tn
total = 22.661 tn
Carga Viva
(0.20 tn/m2)x(5.980m)x(5.099m)= 6.098 tn
Resumen
Pm total
45.32 tn
Pv total
12.20 tn
Metrado de cargas
CA = 2.4 tn/m3
Tabiques = 1.9 tn/m3
Columna C-7
Carga Muerta
Peso propio de la columna:
(2.40 tn/m3)x(2.60m)x(0.85m)x(0.40m)=2.122 tn
Peso de las vigas en X
(2.40 tn/m3)x(0.40m)x(0.40m)x(2.802m)= 1.705 tn
Peso de las vigas en Y
(2.40 tn/m3)x(0.40m)x(0.40m)x(1.508m)= 0.579 tn
(2.40 tn/m3)x(0.40m)x(0.40m)x(1.233m)= 0.473 tn
Peso losa
(2.40 tn/m3)x(0.15m)x(2.162m)x(1.432m)= 1.115 tn
(2.40 tn/m3)x(0.15m)x(2.162m)x(1.758 m)= 1.368tn
Peso tabiques
(1.90tn/m3)x(0.15m)x(2.40m)x(2.805m)= 1.919 tn
total
= 8.739 tn
Carga Viva
(0.20 tn/m2)x(2.412m)x(3.591m)= 1.732 tn
Resumen
Pm total
17.48 tn
Pv total
3.46 tn
Metrado de cargas
CA = 2.4 tn/m3
Tabiques = 1.9 tn/m3
Columna C-9
Carga Muerta
Peso propio de la columna:
(2.40 tn/m3)x(2.60m)x(0.85m)x(0.40m)=2.122 tn
Peso de las vigas en X
(2.40 tn/m3)x(0.40m)x(0.40m)x(2.538m)= 0.975 tn
(2.40 tn/m3)x(0.40m)x(0.40m)x(1.000m)= 0.384 tn
Peso de las vigas en Y
(2.40 tn/m3)x(0.40m)x(0.40m)x(0.791m)= 0.304 tn
(2.40 tn/m3)x(0.40m)x(0.40m)x(1.109m)= 0.426 tn
Peso losa
(2.40
(2.40
(2.40
(2.40
tn/m3)x(0.15m)x(2.537m)x(1.560m)=
tn/m3)x(0.15m)x(2.537m)x(0.809m)=
tn/m3)x(0.15m)x(2.537m)x(0.809m)=
tn/m3)x(0.15m)x(2.537m)x(0.809m)=
1.425 tn
0.739tn
0.739tn
0.739tn
tn/m2)x(2.537m)x(1.560m)=
tn/m2)x(2.537m)x(0.809m)=
tn/m2)x(2.537m)x(0.809m)=
tn/m2)x(2.537m)x(0.809m)=
0.396
0.205
0.205
0.205
tn
tn
tn
tn
Peso tabiques
(1.90tn/m3)x(0.15m)x(2.40m)x(1.769m)= 1.209 tn
total = 10.073 tn
Carga Viva
(0.20 tn/m2)x(3.891m)x(2.751m)= 2.141 tn
Resumen
Pm total
20.15 tn
Pv total
4.28 tn
Metrado de cargas
CA = 2.4 tn/m3
Tabiques = 1.9 tn/m3
Columna C-11
Carga Muerta
Peso propio de la columna:
(2.40 tn/m3)x(2.60m)x(0.1963)=1.225 tn
Peso de las vigas en X
(2.40 tn/m3)x(0.40m)x(0.40m)x(2.162m)= 0.83 tn
(2.40 tn/m3)x(0.40m)x(0.40m)x(2.538m)= 0.975 tn
Peso de las vigas en Y
(2.40 tn/m3)x(0.40m)x(0.40m)x(1.560m)= 0.599 tn
(2.40 tn/m3)x(0.40m)x(0.40m)x(2.197m)= 0.844 tn
Peso losa
(2.40
(2.40
(2.40
(2.40
tn/m3)x(0.15m)x(2.162m)x(1.560m)=
tn/m3)x(0.15m)x(2.162m)x(1.947m)=
tn/m3)x(0.15m)x(2.538m)x(1.560m)=
tn/m3)x(0.15m)x(2.538m)x(0.647m)=
1.214
1.515
1.425
0.591
tn
tn
tn
tn
tn/m2)x(2.162m)x(1.688m)=
tn/m2)x(2.162m)x(1.947m)=
tn/m2)x(2.538m)x(1.560m)=
tn/m2)x(2.538m)x(0.647m)=
0.365
0.356
0.396
0.164
tn
tn
tn
tn
Peso tabiques
total = 10.499 tn
Carga Viva
21.00 tn
8.48 tn
Metrado de cargas
CA = 2.4 tn/m3
Tabiques = 1.9 tn/m3
Columna C-2
Carga Muerta
Peso propio de la columna:
997 tn
(2.40 tn/m3)x(2.60m)x(0.80m)x(0.40m)=1.997 tn
Peso de las vigas en X
68 tn
75 tn
1.135 tn
2.299 tn
3.280 tn
1.420 tn
.34 tn
.05 tn
(1.90tn/m3)x(0.15m)x(2.40m)x(9.29m)= 6.354 tn
total
Carga Viva
(0.20 tn/m2)x(2.88m)x(5.91m)= 3.404 tn
(0.20 tn/m2)x(2.54m)x(4.07m)= 2.068 tn
Resumen
Pm total
52.69 tn
Pv total
10.94 tn
Metrado de cargas
CA = 2.4 tn/m3
Tabiques = 1.9 tn/m3
Columna C-4
Carga Muerta
Peso propio de la columna:
997 tn
(2.40 tn/m3)x(2.60m)x(0.80m)x(0.40m)=1.997 tn
Peso de las vigas en X
0.974 tn
1.068 tn
2.300 tn
3.353 tn
3.353 tn
.339 tn
total
Carga Viva
(0.20 tn/m2)x(5.980m)x(2.162m)= 2.586 tn
Resumen
Pm total
20.62 tn
Pv total
5.17 tn
Metrado de cargas
CA = 2.4 tn/m3
Tabiques = 1.9 tn/m3
Columna C-6
Carga Muerta
Peso propio de la columna:
997 tn
(2.40 tn/m3)x(2.60m)x(2.1m)x(0.40m)=5.241 tn
Peso de las vigas en X
0.830tn
0.975 tn
2.465 tn
0.580 tn
1.176 tn
= 1.380 tn
= 2.035 tn
= 2.360 tn
(2.40
(2.40
(2.40
(2.40
tn/m3)x(0.15m)x(2.537m)x(1.153m)= 1.053 tn
tn/m3)x(0.15m)x(2.537m)x(2.584 m)= 2.360 tn
tn/m3)x(0.15m)x(2.537m)x(2.478 m)= 2.263 tn
tn/m3)x(0.15m)x(5.755m)x(0.953 m)= 1.974 tn
tn/m2)x(2.537m)x(1.513m)=
tn/m2)x(2.537m)x(2.584m)=
tn/m2)x(2.537m)x(2.478m)=
tn/m2)x(5.755m)x(0.953m)=
0.384
0.656
0.614
0.091
tn
tn
tn
tn
Peso tabiques
.776 tn
.136 tn
(1.90tn/m3)x(0.15m)x(2.40m)x(2.537m)= 1.735 tn
(1.90tn/m3)x(0.15m)x(2.40m)x(2.476m)= 1.694tn
total
Carga Viva
(0.20 tn/m2)x(6.947m)x(3.890m)= 5.405 tn
Resumen
Pm total
44.11 tn
Pv total
10.81 tn
Metrado de cargas
122 tn
(2.40 tn/m3)x(2.60m)x(0.65m)x(0.40m)=1.622 tn
Peso de las vigas en X
1.705 tn
0.579 tn
0.473 tn
1.115 tn
= 1.368tn
.919 tn
CA = 2.4 tn/m3
Tabiques = 1.9 tn/m3
tn/m3)x(0.15m)x(2.537m)x(1.560m)= 1.425 tn
tn/m3)x(0.15m)x(2.162m)x(1.758 m)= 1.368 tn
tn/m3)x(0.15m)x(2.538m)x(1.758 m)= 1.606 tn
tn/m3)x(0.15m)x(2.162m)x(1.560m)= 1.214 tn
tn/m2)x(2.537m)x(1.560m)=
tn/m2)x(2.162m)x(1.758m)=
tn/m2)x(2.538m)x(1.758m)=
tn/m2)x(2.162m)x(1.560m)=
0.396
0.380
0.446
0.337
tn
tn
tn
tn
Peso tabiques
(1.90tn/m3)x(0.15m)x(2.40m)x(3.215m)= 2.199 tn
total
Carga Viva
(0.20 tn/m2)x(5.099m)x(3.718m)= 3.791 tn
Resumen
Pm total
27.95 tn
Pv total
7.58 tn
Metrado de cargas
CA = 2.4 tn/m3
Tabiques = 1.9 tn/m3
Columna C-10
Carga Muerta
Peso propio de la columna:
122 tn
(2.40 tn/m3)x(2.60m)x(1.10m)x(0.40m)=2.745 tn
Peso de las vigas en X
0.975 tn
0.384 tn
0.304 tn
0.426 tn
1.425 tn
0.739tn
0.739tn
0.739tn
Peso tabiques
.209 tn
total
Carga Viva
(0.20 tn/m2)x(4.035m)x(2.162m)= 1.745 tn
Resumen
Pm total
15.82 tn
Pv total
3.49 tn
Metrado de cargas
CA = 2.4 tn/m3
Tabiques = 1.9 tn/m3
Columna C-12
Carga Muerta
Peso propio de la columna:
(2.40 tn/m3)x(2.60m)x(2.50m)x(0.40m)=6.24 tn
Peso de las vigas en X
0.83 tn
0.975 tn
0.599 tn
0.844 tn
1.214
1.515
1.425
0.591
tn
tn
tn
tn
Peso tabiques
total
Carga Viva
23.35 tn
5.05 tn
x(0.40m)=1.997 tn
x(4.50m)= 3.024 tn
x(2.50m)= 0.75 tn
x(1.689m)= 1.135 tn
x(3.421m)= 2.299 tn
m)x(2.482m)= 3.280 tn
m)x(2.482m)= 1.420 tn
m)x(3.671m)= 3.353 tn
= 1.700 tn
= 1.034 tn
x(9.29m)= 6.354 tn
= 26.346 tn
= 3.404 tn
= 2.068 tn
x(0.40m)=1.997 tn
x(2.802m)= 1.076 tn
x(3.671m)= 2.467 tn
x(1.508 m)=0.579 tn
m)x(1.511m)= 1.176 tn
m)x(2.615 m)= 2.035 tn
m)= 0.978 tn
= 10.308 tn
m)= 2.586 tn
(0.40m)=5.241 tn
x(2.537m)= 0.974 tn
x(4.037m)= 2.713 tn
x(0.791m)= 0.304 tn
m)x(1.153m)= 1.053 tn
m)x(2.584 m)= 2.360 tn
m)x(2.478 m)= 2.263 tn
m)x(0.953 m)= 1.974 tn
m)=
m)=
m)=
m)=
0.384
0.656
0.614
0.091
tn
tn
tn
tn
x(2.537m)= 1.735 tn
x(2.476m)= 1.694tn
= 22.056 tn
m)= 5.405 tn
x(0.40m)=1.622 tn
x(2.162m)= 0.830 tn
x(2.537m)= 0.974 tn
x(1.508m)= 0.579 tn
x(1.560m)= 0.599 tn
m)x(1.560m)= 1.425 tn
m)x(1.758 m)= 1.368 tn
m)x(1.758 m)= 1.606 tn
m)x(1.560m)= 1.214 tn
m)=
m)=
m)=
m)=
0.396
0.380
0.446
0.337
tn
tn
tn
tn
x(3.215m)= 2.199 tn
= 13.975 tn
m)= 3.791 tn
x(0.40m)=2.745 tn
x(2.803m)= 1.076 tn
x(1.233m)= 0.473 tn
m)x(1.688m)= 1.314 tn
m)x(1.947m)= 1.515 tn
m)= 0.365 tn
m)= 0.421 tn
= 7.909 tn
m)= 1.745 tn
x(0.40m)=6.24 tn
x(2.537m)= 0.974 tn
x(5.162m)= 1.487 tn
x(1.105m)= 0.424 tn
m)x(1.560m)= 1.425 tn
m)x(0.647m)= 0.591 tn
m)= 0.396 tn
m)= 0.164 tn
= 11.674 tn
m)= 2.524tn