ISION JB
Mew eas
eC rene
in complexity and inter
Cored Meee cd
eee eae cel
eteetue tere
Cee eee nia)
See enc
Deere
Coreen RR)
Fee a een
eee nD
Seem ean eed
Reet
Reem sees
Cee eel
this speed of change but also that
engi
eee ees een)
environmental challenges.
emt ce
solutions to these challenges and by
eee tire)
pe ate mtg tc)
Deere aeons
Deere
‘community, This then is a cross,
Recep seek oee tard)
De eek uence)
eee ict.
Reecukcuaten Le
educational, business, cultural and
Cae ae col
Drea ee nuns
eeu.
constructing futures
ou ecail
modem methods of construction, in
ate Roe eee ee
Cena
Ce mare ie
Petia acc etee ly
Cent aucun ies
Crete ecunets
Coro Mecca nes
Mee aed
elec ge eee
Pee he)
eine MoasolcNe TOY
eee cue oetagee ts eal
Cee eee mer!
eee cena
Pere mage
investment, new business and
CE ouieeaer nT
Sees oe eh
Cee ante coger
inthe area. We look to partner
Peerage
local colleges and schools and local
private sector organisations.iSeawces
Re Ae eee ae
Eee ele cells
(Pao ae eed ee
eee eee ad
ao Kd
pee ae avere
rane cee re
Ce at oe oe ee Le
Ee ae ee
Oe i ee aL
Sigchee he eect
Ra eesioeerenar seri
ca
pegs sisusaee chs
De eens
eke as
cre ions a
cae aoe
eer tra
SiN SUE it, Ed
Camel ier) Ate De
ene Gee
Eee aed
eM eenine
cst:
Pee aes ery
Us|
de ea
oro aSiavien ie RIV Ls}about us * +44]
NCE eee a
Dee Ceres
Rieu essai my
firstis construction delivery using
modem methods of construction
ences)
Pees kee ested
Stores eames
Pa ccn
Cea
For economic and poltical reasons
Precast
De ee
eect ene
Teer ae meant)
See ee ES
Re sc aa
Sree
primary light quage steel (LGS), a
material readily available in China, It
Cee
constructing futures
Constructing Futures have mastered
the abilty to use LGS in a manner
which creates a ‘system of building,
and which adds value to a low-cost
TLR cena]
fee nomics soled
erent
approach totally realised. Within this
process the services which CF can
provide include concept design,
ee eae
cette
Senet)
provided directly, others by strategic
Partners, depending on size and
location of projects
espa
available, sometimes from the equity
shareholders within Constructing
Futures,
Constructing Futures work where
possible in collaboration locally with
Seca
Sere ee uem eae]
customers the ifestyle change that
eres ee oes
Reece ct
local construction supply incustry,Bae A
Ch ae
prrerias
e Cen
PEM i Pe OCT Tey Terre Tey
PU eee SS be a ae Sees Ves ers
SARA Leroi sia
td
Cre Leet AAR
Sete eee ae ee
peered t ee
Ged aoa
we
i
een hin eS)
Ee
Dee iee Se sce
ragrirerir ie Pat
a tiarter tty
os
constructing futuresconstructing futures
tg eerene nee eg
eee ac reekeute
for mixed use development -
eters
erence eRe
Cee teuyegs
eee mem ae ic)
Reta eCss
structure is insufficient on its own.
- Using the 0.6-1.4 mm thickness
cold formed steel coil as the basic
Tei eee eee)
Been aie wate
See en
is about 400-600 mm, with infil glass
wool material
= Wall structural board uses
epee eimai
Bree nee Reece eal
Ree cae ecg
Cereal
CPL eee Ge eee
Se ee eee eel
aie Oe ee ey
eS ee A ers
Pe ae eae
Cm Sub aL
SCN ar eee Lee
SPR dae ee
cet
ie eR ECR iL Se
Caeao Lae os
Se hitahshonatebcteka acc
Ce i ela ees
Cae Leeae ence
external side of the structural board,
meeting local energy saving
eure aoe)
Cee Een tl
calculation).
Se er
ree aera
eee eu sacrad
ee ec
SRC nee ee aa
metal, brick or PVC cladding.
= Roofing system uses cold formed
thin wall roof structure, the structural
peril itera ee see]
Board or other sheathing board.
SMe tne ca
top of the roof structural board, anc
beneath there is the insulation layer
a eR ele Te CULE ol
tee etre)
Pea eke Me Sei acd
flat roof, steel or coment tle pitched
cn
Peep cules heute)
floor beams, and structural board on
rarer
Pucca ure ceca)
layer or timber batten to receive the
ete a Meteo a
Ce Ne Ree eg
eee Views
PE tcc a
Somes UL me
Evie earn oe
ee ate Gees
fe ee as
Ale.
a Mdm
cae ius
BSS Gee 2S
Dee Lee ie
a
Se ea ee eas
URC et Sale Last
Eoin
SP Et ee ae
oe eae
SE hae eee a
Ee Dec La
SUE So es ee LT
Dae Se Se Eg]
Cee oe
constructing futuresConstructing futurespee tL 2a RCo eg
re ike
ce re
Ca CL je teh tee stm
SS eae tee ake
Pe ete eo ae
aa De Pode
TN und ee
Plat Heat he 30Mab Re UK, Hy
pss tree te
Sustainability is the most concemed
ee ages feces
because it related closely to our
Reece acs
generations, and it related to our
Sees teed
industry counts for much in those
environmental protection, energy
Ree ecue
Cee eee naa)
that it consumes 40% of the total
energy consumption, 70% of the
Cee Rc
materials and 12% of the fresh water
Cee eeu
eed ee
greenhouse gas emission, and left
iterates ena
Cee aah
constructing futures
CPS ReD ea eee Sees
Ba ee ee eee a orn
RTs ale SS as
PSALASTLIT I, SbF fer ih OA]
See Led
1h, EEA Ao KEP REAP
eae sd
ee SLES
a oe aed
UR ae aie
ee ieee
Comuercere suis!
building construction industry has
Ce une oo
Reece tl
responsible designers, clients and
Cee estan
Deere Tues
Peel us ene oul)
Den teat
SM CMa
Asatte cd
Suites
Cate tna
Cee nas
ee Setsustainability #7 42
Se eee
Peers tee sz
eee ty eae s,
Pues tl
Se
SRR ale cae eis
ee eo eee cold
AHMAR, TMS I
eee er eee
and
re ae cc
ES Shs
Pee ees
lea be Lee oe
ened ueuhes
eee eee
CeCe at so a
Se aL
See ea deweaas
or ce eee
aha oe
SEPARA Foe EU * Set
Cece eee an
eae oe es
eae eae
eyereaa
Oe LE ees eae
i eee
Bese Soe ead
material, its weight is only 1/20 that
of the reinforced concrete structure
Se ete eae ary
recycled, and the materials used to
produce LGS studs can be all from
feos eee!
Sere ate)
eer aieuea wee)
Re Reuse eu)
reed
Stee! material is widely existing,
elect)
ectectatestel
esgic)
ear eeeet cr
Poe ones
with ife up to 60 years;
Beer ene areca
See eu ent
Pree ees utorier od
intensity, now LGS has been widely
eet erent
Pest epe cee
extemal wall and roof can easily
ee Marae
the requirement of thermal insulation
evens Leciicd
- Keeping excellent strength even
in 600 Celsius high temperature
Cem euatns yee ogee]
Pegs hres
eects
ens
See ieee
Petelee ease ta
Pena Canty
Pee eae yee
Seto
and reduce the cost, to achieve zero
ee
Beer
mens
een te aon)
Snel
Bred
Pern ee roamats:
pee aun
Pee eect ears
elccce sm keare nes
constructing futuresaareli, cle anu
CF focuses on using LGS material and offsite construction to deliver a range of diverse products, from high end
villas, low/medium rise houses, student accommodations, office buildings, resort hotels, elderly homes, affordable
housings, to farmers’ homes and reconstruction homes for victims. For diferent products demand, we offer different
solutions in terms of design, manufacturing, assembling, instalation, delivering, and the project cooperation modes.
Dea e tegen Loonie ey Leg ere a ae ten)
sustainable extent, is our common aspiration and goal with our client
Le eee ee GA eR eS Se cL LCS
Aa OT ae aE dad ELC e eee IN
CE ean hie SLO DE Leena eye
De RE bt de eee mL eam fos pCR eth 6.2 0 ae en ae OL ae
ck
ur clients/partners include govemment authorities, public sector, developers, schools, investors, and other
organizations.
Sn Sew e oe ee oa SR Soe Say
constructing futuresaalsli cee onuteza
resort hotel / elderly homes 4838 5 /#42G
Ae eae ee a2 ee ee ee See eee ee ee ae
CO Sea ee Se ee cE eee
When delivering resort hotel or elderly homes at some scenic spots, should pay special attention to the damage to the
natural environment due to construction activites. Less excavation, higher efficiency of material transportation and
ne ee a Meee nee ke ioc oc
constructing futuresaaleli cole anes
CS ee ee eS Le Oe ee a ee ee eee ee ce D
ee ON ee ee ie ee eee dee ee ae ee
PU ecg ee 2 eC La YU Leh ss ele Te aL ee)
eae se oe
The delivering of affordable housing usually require short construction period, less impact on the surroundings, and as
far as possible to be nice looking, The above images are the Murray Grove Apartment for key workers in London, itis
the first project ofits kind to use innovative steel framed modular construction techniques, after used for 10 years, itis
Pacer g kas Ua a oes af oe ete CE tue
located in Bourbon Lane, Loncon, this project's unique design and high quaity in construction, had won lots of national
Eres
constructing futuresAPM, SAUNA ER
RR
For any query, please contact with
our colleagues -
S846 Zou Shu
Aah ’i& Mob.
0086 135 0834 0838
ef ip4a Email
allyzs@hotmail.com
ik Jiu Mao
A#Bah IE Mob.
(0086 186 1101 2999
& Hn Email
miao,jiu@hotrail.com
3rd floor, Quality House
5-9 Quality Court,
Chancery Lane, London
WC2A 1HP
Tel. 0044 (0) 20 7841 5840
constructing futures}