Memorandum to Design & Supervision Consultants
Project: Expressway Programme Memo #: EXW-GENL-0000-PE-KBR-ME-00253
Project #: GENL Your Ref:
Contract #: All Contracts Date: 13 July 2014
ATTN: All Design and Supervision From: David O'Reilly
Consultants KBR Programme Director
Subject: Use of Standard Det
Is for Bridges
Dear Sirs,
Our Memorandum of 01 December 2013 (reference EXW-GENL-0000-PE-KBR-ME-00151)
included standard details for bridges for use on the Expressway Programme.
‘Our Memorandum of 24 March 2014 (reference EXW-GENL-0000-PE-KBR-ME-00111) instructed
that Authority and Utility Company standard details should be incorporated into designs by
reference and not by reproducing the standard details on the designers drawings
The nature of the bridge standard details are such that they were developed as generic details on
the basis that the designer would supplement/adjust them with project specific requirements as
deemed necessary. These details are therefore not suitable for use by reference only.
It is therefore confirmed that the instructions of our Memorandum of 24 March 2014 are not
applicable to the bridge standard details included with our Memorandum of 01 December 2013.
These details shall be used as follows:
1. The standard details are generic in nature and shall be further developed by the designer as
necessary to suit the particular application.
2. Where these standard details are adopted as the basis of any detail included in a design, the
designer shall be entirely responsible for the completed detail and all associated liability.
Designers must therefore satisfy themselves as to the suitability of the standard detail for the
proposed application.
3. Designers shall adopt the standard details shown as the basis of their design unless they
consider that a detail is unsuitable and agree with Ashghal that it shall not be used,
At the Structures Workshop of 20 May 2014, consultants requested copies of the AutoCAD files for
the bridge standard details to simplfy the production of drawings. In the interest of assisting
consultants with this matter and to ensure that details are adopted in as consistent a manner as
possible across the Programme, the drawing files are included on the attached CD. It must be noted
that these files are provided on a without prejudice basis and KBR do not in any way guarantee the
accuracy and/or completeness of the details contained therein. This issue of these files is for
information only and the consultants will be responsible for reviewing and checking the suitability of
all drawing files for their own use. Responsibility for the quality and content of all drawings produced
by the consultant using these drawing files will remain entirely with the consultant.
EXWV-GENL-0000-PE-KBR-ME-00253, Page 1 of2Yours faithfully,
Davi o Cdl
David O'Reilly
KBR
Programme Director
rah
Ne es
ccc: Kell Duckworth Asta
Step Elison~ KBR.
Malcolm Gate KER
Gary Fisher - KBR
fanide = KER
‘A Design Managers ~ KBR
‘All Consrucion Project Manages ~ KBR
Paper Copy Distribution: Please acknowledge receipt by returning a signed and dated copy ofthe fronts
EXW-GENL-0000.PE-KBR-ME-00253
&