Processing Offshore Crude Project Pkg-2

Civil, Building, Mechanical, E&I Works

Early Tendering Meeting


Processing Offshore Crude Project
Package 2
(Civil, Building, Mechanical, E&I Works)
30th Jul 2015

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

CONTENTS
1. PROJECT OVERVIEW
2. PROCURMENT
3. SUBCONTRACTING SCOPE
4. EXECUTION STRATEGY
5. SWOT ANALYSIS
6. CONTRACTUAL / COMMERCIAL KEY POINTS
7. PROJECT SCHEDULE

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW

Client/Company : Takreer

FEED/PMC

: Bechtel/Worley Parsons

Contractor

: SECL

Type of Project

: General Contracting

Site Location

: Ruwais, U.A.E

Estimated Value : ~100 MUSD

EPC Award

Project Duration : 34 months

www.al-hassan.com

: 4th Quarter 2015

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)


COMPANY operates two refineries; the Abu Dhabi Refinery with a processing
capacity of 88,000 BPSD of Crude Oil and Ruwais with processing capacity
of 420,000 BPSD of Crude Oil and Condensate.
COMPANY is currently implementing the Ruwais Refinery Expansion Project
(RRE) and Carbon Black Delayed Coker Project (CBDC). The RRE project is
currently in commissioning phase with crude processing capacity of
417,100 BPSD Murban crude. RRE is an RFCC based configuration with the
intent to maximize Propylene production.
The CBDC Project is currently in engineering, procurement and construction
phase to build a facility at Ruwais to manufacture UV Carbon Black, Semiconductive black and Anode Grade Green Coke utilizing the Slurry Oil from
the Residue Fluidized Catalytic Cracker (RFCC) to be installed as part of RRE
and the residue from the vacuum distillation unit in the existing Ruwais
Refinery.

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)


COMPANY intends to process the following offshore crudes at RRE, which is
currently designed for Murban Crude, which will be transferred by subsea
pipeline to onshore and will be further transferred by onshore lines to the
refinery.
Upper Zakum from Zirku Island
Das Blend from Das Island
RRE and CBDC units will be suitably modified to process 420,000 BPSD of
Upper Zakum crude, as part of the Processing Offshore Crude (POC) project,
and retain the ability to process 417,100 BPSD Murban crude. COMPANY
intends to process Das Blend crude at a capacity where major additional
physical change is not required over and above those changes required for
Upper Zakum crude processing. This capacity has been determined at
340,000 BPSD of Das Blend crude.
The scope of the project is to build new facilities and modify existing
facilities at Ruwais to process offshore crude.
www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)


The following new facilities are planned to be installed:
1.
2.
3.
4.

Atmospheric Residue Desulphuriser (ARDS)


Saturated Gas Plant - ARDS Gas Train
Hydrogen Manufacturing Unit (HMU) along with PSA
Sour Water Strippers (SWS), Amine Regeneration Unit
(ARU), Sulphur Recovery Units (SRU) and Tail Gas
Treatment Units (TGTU)
5. Associated open-art units, off-sites and utilities
6. Integration of above with RRE & CBDC
The following existing RRE facilities are planned to be significantly modified:
1. Crude Distillation Unit (CDU)
2. Saturated Gas Plant and Saturated LPG Splitter
3. LGO Diesel Hydrotreating Unit
4. HGO/LCO Mild Hydrotreating Unit
5. Sea Water System
6. Integration of above within RRE and with the PROJECT
www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)


Major Scope

Civil, Building, HVAC & Plumbing Works


A

Civil & Building Major Quantities


UOM

QUANTITIES
1
2
3
4
5
6
7
8
9
10
11
12

www.al-hassan.com

EARTHWORKS
CONCRETE WORKS
FORMWORK
REBAR WORKS
MASONARY WORKS
WATERPROOFING WORKS
PIPING WORK
FENCE
ROAD WORKS
FABRICATION & ERECTION OF STEEL
PILING
FIRE PROOFING

CUM 354,975
CUM
35,348
SQM 90,098
TON
3,690
CUM
1,046
SQM
261,799
M
3,157
M
2,806
SQM 14,833
TON
324
M
SQM

75,500
5,000

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)


Major Scope

Civil, Building, HVAC & Plumbing Works


B

Buildings (Package 2 & 3)


QTY

AREA(SQM)

VOLUME(CUM)
B.1 BLAST RESISTANT
1

MAIN 132 KV SUBSTATION

1,453

21,798
2

POC MAIN INTAKE SUBSTATION

1,093

9,292
3
79,172
4
1,094
5

MISC. SUBSTATIONS

9,314

OPERATOR SHELTORS

270

SATELITIE WORKSHOP

2,300

792

16,905
B.2 STEEL STRUCTURE
1
2,376
www.al-hassan.com

TEMPORARY FIELD SHELTERS

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)


Major Scope

Civil, Building, HVAC & Plumbing Works


C
HVAC & PLUMBING WORK
QUANTITIES
1

HVAC MAIN EQUIPMENT INSTALLATION

HVAC AUX EQUIPMENT INSTALLATION

HVAC METEL DUCT WORK

HVAC PIPE WORK

UPVC PIPE FOR PLUMBING

6
7

UTILITY PIPING WORK


CONTROL CABLE & CABLE TRAY WORK

UOM

NOS

43
NOS

128
SQM

5,730

2,414
M

1,833

www.al-hassan.com

M
M

108
14,485

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)


Major scope
Sl.No.

ELECTRICAL WORKS

POWER TRANSFORMER, OIL TYPE TRANSFORMER/ DRY TYPE TRANSFORMERS

HV /MV/LV SWITCHGEAR PANELS

DIESEL ENGINE GENERATOR

CAPACITOR BANKS / VSD PANEL/NEUTRAL EARTHING RESISTORS

UPS , BATTERY & BATTERY CHARGER

LV BUS DUCT & DISTRIBUTION BOARD

FIRE ALARM SYSTEM

TELECOMMUNICATION SYSTEM(PAGING,P/A,CCTV,WIRELESS RADIO)

ELECTRICAL HEAT TRACING SYSTEM

10

HV/MV /LV POWER, CONTROL & EARTHING CABLES,

11

CABLE TRAY/LADDER AND CONDUIT

12

CABLE GLANDING & TERMINATION OF CABLES

13

LIGHTING FIXTURES & LIGHTING PANEL BOARD

14

LOCAL CONTROL STATIONS & JUNCTION BOXES

15

GROUNDING WIRE, LIGHTING ROD & ELECTRICAL EARTH PIT

16

SUPPORT INSTALLATION (STEEL ANGLE,CHANNEL,UNISTRUT etc.)

17

TESTS AND CHECKS OF ELECTRICAL INSTALLATIONS

18

PRE-COMMISSIONING & COMMISSIONING ASSISTANCE

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)


POC-02

Major Activities-Electrical Works

Qty

Unit

Power Transformer

20

Set

Neutral Earthing Resistor

43

Set

195

PNL

Emergency Diesel Generator Package

Set

UPS & Battery

Set

504

Set

1,383

EA

Set

System Cabinet for LAN/WAN/PAGA /UHF/CCTV , etc.

346

Set

MDF/IDF

Set

HV /MV/LV Switchgear Panels

Bus Duct
Fire Alarm System (Smoke Detector ,Heat Detector,Beacon,Sounder,Manual Call Point,Gas
Detector,etc.)
Control panel /Telecom cabinet/Relay Panel
Telecommunication System (PAGING,P/A,CCTV,WIRELESS RADIO)

Loud Speaker/Horn/Beacon

25

EA

CCTV Camera

437

Set

Analogue Phones /IP Phones

52
1,160,238

Set
Mtr

91,139

Mtr

14

Set

152

Set

121
2,467

EA
EA

41

EA

17,686
2,930

EA
KG

Lot

HV/MV /LV Power, Control, Telecom & Grounding Cables


Cable Tray/Ladder and Conduit
Distribution Board
Termination & Spacing Kit HV/MV
Fluorescent /High Pressure Sodium/Exit Lighting Fixture
Lighting Pole /Fence/Street HDG 6M/10M
Local Control Station
Cable Glands
Support Installation (Steel Angle (HDG), Steel Plate (HDG), Unistrut Channel etc.)
Earthing & Lightning Protection
www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)


Major scope

INSTRUMENT WORKS
Sl.No.
1

SYSTEM PANEL (DCS/PLC )

ANALYZER,GAS DETECTOR ,HORN,BEACON& ANALYZER SHELTER

FIELD INST.(TRANSMITTERS / PB STATION / SWITCHES)

CONTROL VALVES, ON / OFF / MOV VALVES

JUNCTION BOXES

PIPE,TUBE,CONDUIT PIPE

ANGLE /CHANNEl SUPPORTS, STANCHION & SUNSHADE

INSTRUMENT,POWER & FO CABLES LAYING

CABLE TRAY & FITTINGS

10

INSTRUMENT CABLE GLANDS & TERMINATION

11

CALIBRATION & LOOP TEST

12

PRE-COMMISSIONING & COMMISSIONING ASSISTANCE

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

1. PROJECT OVERVIEW (CONTINUE)

POC-02

Major Activities-Instrument Works

Qty

Unit

SYSTEM PANEL (DCS/PLC )

107

PNL

ANALYZER,GAS DETECTOR ,HORN,BEACON& ANALYZER SHELTER

166

SET

2,054

SET

409

SET

FIELD INST.(TRANSMITTERS / PB STATION / SWITCHES,GAUGES)


CONTROL VALVES, ON / OFF / MOV VALVES
INSTRUMENT,POWER & FO CABLES LAYING

322,418

JUNCTION BOXES
CABLE TRAY & FITTINGS

88

EA

50,744

EA

PIPE,TUBE,CONDUIT PIPE
ANGLE /CHANNEl SUPPORTS, STANCHION & SUNSHADE

305
60,621

FO TERMINATION

230

CALIBRATION & LOOP TEST

4,608

www.al-hassan.com

MTR

MTR
KG
POINTS
LOT

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

2. PROCUREMENT

Civil

CIVIL BULK MATERIAL

Mechanical

E&I

www.al-hassan.com

PIPE SUPPORTS
GROUTING FOR EQUIPMENT
ROOFING & SIDING WORK (S/W PANEL, FLASHING, GUTTER,
COMPOSITION PANEL, GALVANIZED SHEET)

E&I BULK MATERIAL

ALUMINUM

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

3. SUBCONTRACTING WORK
Civil

www.al-hassan.com

PILING WORK

75,500

ROAD WORKS

14,833

SQM

STEEL FABRICATION & SUPPLY

300

TON

SUNSHADE METAL CANOPY

40

NOS

METAL FIRE RESISTANT DOORS/WINDOWS/LOUVERS

450

SQM

FIRE PROOFING

RAISED FLOOR

800

SQM

FALSE CEILING

500

SQM

5,000 CUM

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

3. SUBCONTRACTING WORK
Mechanical

RT

17,661

SHT

MT/PT/PMI

39,422

JT

PWHT

5,729

DI

SURFACE PREPARATION & PAINTING

48,897

SQM

PIPING INSULATION

44,218

EQUIPMENT INSULATION

8,277

SQM

WELD JOINT WRAPPING

18,002

DI

REFRACTORY

256

TON

PSV POPPING TEST

122

EA

VALVE LEAKAGE TEST

793

EA

HYDRAULIC BOLT TENSIONING

20

EA

F.O CABLE TERMINATION & SPLICING WORKS

E&I

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works
4. EXECUTION STRATEGY (Pre Mobilization / TSF Setup)

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works
4. EXECUTION STRATEGY (Pre Mobilization / TSF Setup)

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works
4. EXECUTION STRATEGY (Pre Mobilization / TSF Setup)
Project HSE Requirements
Al Hassan HSE manual shall be prepared based on guidelines set by Main
contractors HSE plan and Scope of work.
Ratio of HSE inspectors
TAKREER HSE Matrix
TAKREER Training Matrix
Project Quality Control Requirements
Al Hassan QC manual shall be prepared based on guidelines set by Main
contractors QC plan and Scope of work.
Requirement of QC Inspectors wrt scope and manpower.
Third Party Inspection if any.

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

4. EXECUTION STRATEGY (Sequence)

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

5. SWOT ANALYSIS
STRENGTH

WEAKNESS

Ongoing Experience in in NEB III Ra/Sn Project Similar Mechanical


Scope.
OPPORTUNITIES
More exposure to Takreer for
future expansion/development
projects.
Possibility of developing AHEC
own Painting, Insulation Team
Incl. PQ.
Competitor: Punj Lloyd,

www.al-hassan.com

THREATS
Other potential competitors.

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

6. CONTRACTUAL / COMMERCIAL POINTS


Contract Type
Indirect
up to 10%
Advance Payment

: Re-measurable basis for Direct costs and


cost on Lump sum Basis
: 10% of subcontract price

Advance Payment Bond : 10% of subcontract price, to furnished within


14 days of subcontract sign, valid until initial acceptance & released
within 30 days after initial acceptance
Performance Bond
: 10% of subcontract price, to furnished
within 14 days of subcontract sign, valid until initial acceptance &
released within 30 days after initial acceptance
Warranty Bond
: 10% of final, adjusted subcontract price prior
to receiving initial acceptance certificate, valid until warranty period
expiration & released within 30 days after issuance of final acceptance
certificate
Warranty Period
www.al-hassan.com

: 15 months from initial acceptance

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

6. CONTRACTUAL / COMMERCIAL POINTS

Retention
: 10% of subcontract price, applied to
monthly progress payment & payable within 45 days from initial
acceptance after receiving warranty bond

Progress Payment

LD for Delay
: 0.5% of subcontract price for each day up to
maximum 10% of subcontract price

www.al-hassan.com

: Within 45 days

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

7. PROJECT SCHEDULE

www.al-hassan.com

Processing Offshore Crude Project Pkg-2


Civil, Building, Mechanical, E&I Works

Thank You

www.al-hassan.com