POP I =

POP F =
q=
K1 =
K2 =
C=
Tinf =
L TOTAL =

1000 hab
1500 hab
200 l/hab.dia
1.2
1.5
0.8
0.0005 l/s.m
939

Qesg(i) =
Qesg(f) =
qm(i) =
qm(f) =
Txi =
Txf =

2.78 l/s
5 l/s
0.002961 l/s.m
0.005325 l/s.m
0.003461 l/s.m
0.005825 l/s.m

Projeto tcnico da rede de esgoto


Bacia:
Sub-Bacia
PLANILHA DE CLCULO HIDRULICO
Cidade:

PVm-PVj
(Trecho)

01-02
1.1
02-03
1.2
03-04
1.3
04-05
1.4
05-06
1.5
07-08
1.6
08-09
1.7
10-11
2.1
11-12
2.2
13-14
2.3
14-15
2.4
15-16
3.1
17-18
3.2
19-20
3.3

Taxa de
Vazo a Contr. Do
Extenso Contr. Lin. Montante Trecho
(m)
(l / s m)
(l/s)
(l/s)
Inicial
Inicial
Inicial
Final
Final
Final
0.0035
0.0000
0.2146
62
0.0058
0.0000
0.3611
0.0035
0.2146
0.2146
62
0.0058
0.3611
0.3611
0.0035
0.4291
0.2336
67.5
0.0058
0.7223
0.3932
0.0035
0.6627
0.2336
67.5
0.0058
1.1155
0.3932
0.0035
0.8963
0.2422
70
0.0058
1.5086
0.4077
0.0035
2.0348
0.2492
72
0.0058
3.4250
0.4194
0.0035
3.1803
0.0692
20
0.0058
5.3530
0.1165
0.0035
0.0000
0.2146
62
0.0058
0.0000
0.3611
0.0035
0.2146
0.2146
62
0.0058
0.3611
0.3611
0.0035
0.4291
0.2336
67.5
0.0058
0.7223
0.3932
0.0035
0.6627
0.2336
67.5
0.0058
1.1155
0.3932
0.0035
0.0000
0.2146
62
0.0058
0.0000
0.3611
0.0035
0.2146
0.2146
62
0.0058
0.3611
0.3611
0.0035
0.4291
0.2336
67.5
0.0058
0.7223
0.3932

Vazo a
Jusante
(l/s)
Inicial
Final
0.2146
0.3611
0.4291
0.7223
0.6627
1.1155
0.8963
1.5086
1.1385
1.9164
2.2840
3.8444
3.2495
5.4695
0.2146
0.3611
0.4291
0.7223
0.6627
1.1155
0.8963
1.5086
0.2146
0.3611
0.4291
0.7223
0.6627
1.1155

Vazo
Projeto
(l/s)
Inicial
Final
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.9
2.3
3.8
3.2
5.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5

Dimetro
( mm )
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150

21-22
3.4

67.5

0.0035
0.0058

0.6627
1.1155

0.2336
0.3932

0.8963
1.5086

1.5
1.5

150
150

iminimo = 0,0035*qp elevado na -0,47


It =Co terreno montante - c jus / l trecho

DATA:

n=0,010

Ip
Declividade
( m/m )
0.0040
0.0040
0.0030
0.0030
0.0057
0.0028
0.0150
0.0029
0.0029
0.0037
0.0037
0.0029
0.0029
0.0037

Cota do
Terreno
(m)
Mont.
Jus.
13.5
13.25
13.25
13
13
12.8
12.8
12.6
12.6
12.2
12.2
12
12
11.7
13
12.85
12.85
12.7
12.7
12.45
12.45
12.2
12.8
12.65
12.65
12.5
12.5
12.25

Cota do
Coletor
(m)
Mont.
Jus.
12.45
12.2
12.2
11.95
11.95
11.75
11.75
11.55
11.55
11.15
11.15
10.95
10.95
10.65
11.95
11.95

11.75
11.75

Prof. Do
Coletor
(m)
Mont.
Jus.
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
0.9
12.85
12.7
12.7
12.45
12.45
12.2
1.05
0.9
12.65
12.5
12.5
12.25

Calculo:

__/__/__

FOLHA

Calculado:

__/__/__

__ de __

Prof. Da
Singular.
a Jusante
(m)
1.05
1.05
1.05
1.05
1.11
1.11
1.11
1.08
1.11
1.11
1.11
1.08
1.11
1.11

Lmina
Liquida
(Y/D)

0.275
0.275
0.3
0.3
0.25
0.3
0.375
0.4
0.3
0.325
0.3
0.3
0.3
0.3
0.275
0.274
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3

Tenso
Trativa
(Pa)
Inicial
Final

Vc
(m/s)
Inicial
Final

0.0037

12.25
12

12.25
12

1.11

0.3
0.3

no inicio de rede
Cota coletor montante = Cota do terreno - profundidade do coletor jusan

inicio de rede
0,15 + 0,90
cota coletor montante = CotaTerreno - recobrimento (Tubo + recobrimeto
Cota coletor jusante = Cc montante - (I*Ltrecho)
Prof. Coletor = Cota terreno - Cota coletor

observaes

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Velocidade
Raio
Qp/Raiz Ip Vp/Raizip
Projeto Hidrulico
PVm-PVj
m/s
m
(Trecho)
Inicial
Inicial
Inicial
Inicial
Final
Final
Final
Final
01-02
0.404495 0.02385 0.023622
6.37
1.1
0.404495 0.02385 0.023622
6.37
02-03
0.404495 0.02385 0.023622
6.37
1.2
0.404495 0.02385 0.023622
6.37
03-04
0.364157 0.02385 0.027557
6.69
1.3
0.364157 0.02385 0.027557
6.69
04-05
0.364157 0.02385 0.027557
6.69
1.4
0.364157 0.02385 0.027715
6.69
05-06
0.456581 0.02385 0.019843
6.04
1.5
0.505716 0.02385 0.025351
6.69
07-08
0.382636 0.02385 0.043336
7.26
1.6
0.409515 0.02385 0.072942
7.77
08-09
0.819354 0.02385 0.026532
6.69
1.7
0.02385 0.044658
10-11
0.02385 0.027889
2.1
0.02385 0.027889
11-12
0.02385 0.027889
2.2
0.02385 0.027889
13-14
0.02385 0.024648
2.3
0.02385 0.024648
14-15
0.02385 0.024648
2.4
0.02385 0.024789
15-16
0.02385 0.027889
3.1
0.02385 0.027889
17-18
0.02385 0.027889
3.2
0.02385 0.027889
19-20
0.02385 0.024648
3.3
0.02385 0.024648

Beta
Rh/D
Inicial
Final
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159
0.159

0
0

21-22
3.4

0.02385
0.02385

0.024648
0.024789

0.159
0.159

o coletor jusante que chega no trecho mais profundo

5 + 0,90
o + recobrimeto)