Você está na página 1de 1

MV

1,500
200

2,300

100

500

1,800

200

GARBAGE
ROOM

4,200

350

150
SD

SP

cleaner's
sink

Smoke detector
Sprinkler
Ventilation Grill(300x300)

150

350

150

12

13

14

17

18

up

1,900

LIFT

LIFT

350
SP

SP

elect.
riser
duct

SP

SP

1,500
350

350

100

2,050

SP

SP

SD

100

900

CAFETERIA
4,650
200
SPACE
cemt screed ff

SP

200

150

100

200

2,600

LIFT

2,650
350

SD

100 1,300

S-14

Wall bracket

MV P&D
CAFE
Washrooms

SP

LIFT

BANK
Store

SP

SD

20

5,300

S-15

350

S-13a

LED lighting

2,000

2,750

19

SD

SP

SP

350

tea
room

MV

STORE

16

700

15

Diffused light panel

SP

11

CAFE
STORE

200 500
1,150
150 1,700

1,800

SP

10

LIFT

3,350

GOODS
LIFT

S-13SD

2,600

100

LIFT
6

3,400

granito ff

200

S-16

2,600

LIFT

LADIES

200

LOBBY

200

Access panel(400x400)

GENTS
1,900

BANK
Staff Entry

1,600

200

1,800

granito ff

350

1,300
350

P&D

1,000

200

LOBBY
150

350

350

350

2,600

200

2,600

300 150 100


100
1,000
1,000
150
975

2,600

1,800

100

750

DUCTS2,700

100 1,700

900
100

FEMALE
cer. floor
tiles

900
100
900
100

2,100

350

3,600
600

2,700

100 100

350 2,600 350

1,700 200

100 100
900 900

150

WHEEL
CHAIR
cer. floor
tiles

SP

SD

S-17

S-18
SP

SP
SD

C[31]03

Revision

LE ' MAC
APARTMENTS

C[31]04

SP

C[31]03

Date

Description of revision

UP
Affected drawings

Project title
Drawing type

PRODUCTION DRAWING
LOCATION DRAWING
GROUND FLOOR
LOBBY CEILING PLAN P-02

Job No.

314

Drawing No.
Scale
Drawn

1:200
J.A

Date
JULY 2013
L0(45)01
Revision
Checked

S.W.

Você também pode gostar