Escolar Documentos
Profissional Documentos
Cultura Documentos
Rating:
Location
Make:
FQAP/ITP
No:
Drawing
no:
Sl.
No
.
I
1
II
Parameters to be
Checked
N2 Pressure & Dew
point record: ( If
transformer oil sent
separately to site)
During dispatch at
factory
After receipt at site
Storage at site before
commissioning
Impact recorder analysis
:
Received at in a healthy
condition
Analysis report received
from manufacturer
before charging
Insulating oil checks
Start
Date/Time:
Finish
Date/Time:
Contractor
:
Observati
ons
Remar
ks
Shocks 3g
Page |1
Insulation resistance
test of Bushings CTs.
Continuity test of
Bushings CTs.
Secondary windings
resistance of Bushings
CTs.
Polarity test of Bushings
CTs.
Current ratio test of
Bushings CTs.
Knee point voltage test
of Bushings CTs.
Measurement of Tan
Delta & Capacitance of
Bushings.
III
1
2
3
6
7
**
No open loop
The expected deviation for this test
in the field is not more than 5.0% of
the factory test value.
Whether the polarity markings are
correct or not as per drawing.
Turns-ratio tolerance should be within
3 % of the nameplate specifications.
The magnetizing currents at KPV
(Knee point voltage) shall be less
than the specified value.
Tan delta & Capacitance values shall
be comparable with factory test
results and in no case shall be more
than 0.5 %.
Minimum 10 Mega ohm during
Commissioning after 1 minute.
( But minimum 100 Mega ohm during
factory test)
Pre commissioning checks
yes
yes
yes
yes
yes
yes
yes
Page |2
16
17
18
19
20
21
22
23
24
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
Yes, blue
Yes
yes
yes
Page |3
26
27
28
29
30
31
32
33
34
35
36
37
Ensure unused
secondary cores of
Bushing CTs, if any, has
been shorted
Check CT star point has
been formed properly
and grounded at one
end only as per scheme
Check that permanent
and adequate lighting
arrangements are ready
Check that labelling and
identification is
permanent and
satisfactory
Check that Buchholz
Relay is correctly
mounted with arrow
pointing towards
conservator
Check cables are
properly fixed and
ensure cable entry at
the bottom
Ensure all Power and
Control cable Terminals
are tightened
Check all cables and
Ferrules are provided
with Number as per
Cable Schedule (Cross
Ferruling to be checked)
Check that all cables are
correctly glanded
Check external cabling
from Junction Box to
Relay / Control Panel
Completed
Check that air has been
released from the
Radiators and their
headers/OLTC Buchholz
relay/Main
tank/tank/Bushing
turrets etc
Check that all radiator
bank valves on top and
bottom headers are
open
Check the flanges of
bushing & OLTC for any
crack after fixing
yes
yes
Yes
yes
yes
Yes
Yes
yes
yes
yes
yes
yes
yes
Page |4
Insulation Resistance
Measurement Including
PI & CC- CL:**
Magnetization Current
Test :
9
10
Measurement of
Winding Resistance :
(Results in Ohms)
Vector Group Test:
11
yes
Should be 1
Pre Commissioning Tests:
Results should match with Factory
test results.
Tan delta & Capacitance values shall
be comparable with factory test
results and in no case shall be more
than 0.5 %.
Tan delta & Capacitance values shall
be comparable with factory test
results and in no case shall be more
than 0.5 %.
Permissible limit of IR,
DAI(60sec/15sec) should be >1.3 and
PI(600sec/60sec) should be >1.25 To
2
If the excitation current is less than
50 milli-Amperes (mAmp), the
difference between the two higher
currents should be less than 10%. If
the excitation current is more than
50 mAmp, the difference should be
less than 5%. The value on the
outside legs should be within 15% of
each other and values for centre
leg should not be more than either
outside for a three phase
transformer. Results between similar
single phase units should not vary
more than 10%.
The variation of result should be
within 0.5 % from specified values
or factory test result.
When outer phase is excited, voltage
induced in the center phase shall be
50 to 90% of the applied voltage.
However, when the center phase is
excited then the voltage induced in
the outer phases shall be 30 to 70%
of the applied voltage.
The results should match with
Factory test results.
The expected deviation for this test
in the field is not more than 5.0% of
the factory test value.
Vector group & polarity has to be
conformed as per GTP
Protection settings as per approved
Effective Date: 10.10.2015
Page |5
Engineering Settings
Remarks:
Contractor
GreenkoExecution
Greenko - Quality
Name
Signature
Date
Minimum Ground Clearance :
S.
Voltage Category
No
11
KV
2.
High Voltage
Clearance
Clearance to Ground
a. Across street
b. Along street
c. Other areas
Clearance to buildings
a. Vertical from highest
object
b. Horizontal from nearest
point
22
KV
13
2
220 KV
KV
Minimum value in Meters
33
KV
6.1
5.8
4.6
6.1
5.8
5.2
6.1
5.8
5.2
2.5
3.66
3.66
1.2
1.83
1.83
66
KV
110K
V
6.1
6.1
5.5
6.1
6.1
6.1
3.9
7
2.1
4
4.58
2.75
6.1
6.1
6.1
4.5
8
2.7
5
7.0
7.0
7.0
5.49
3.66
Page |6