URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Luas bangunan
Galian tanah pondasi
Rabatan lantai kerja
Footplat 90x90x20 (8 titik)
- Beton K225
- Pembesian
Kolom struktur 15/20 (8 titik)
- Beton K225
- Bekisting
- Pembesian
Balok struktur 15/20
- Beton K225
- Bekisting
- Pembesian
Plat cor
- Beton K225
- Bekisting
- Pembesian
Dinding Bata diatas plat (t = 1 m)
- Pek. Bata merah
- Pek. Kolom praktis
- Pek. Plesteran
- Pek. Cat
Keramik Tangga
Railing tangga
VOLUME
SATUAN
HARGA SATUAN
18.00
8.00
0.32
m2
m3
m3
1,800,000.00
33,804.38
652,129.59
1.30
136.08
m3
kg
810,384.78
11,225.79
1.01
13.44
105.84
m3
m2
kg
810,384.78
202,552.65
11,225.79
0.84
15.40
88.20
m3
m2
kg
810,384.78
202,552.65
11,225.79
2.18
18.13
228.38
m3
m2
kg
810,384.78
202,552.65
11,225.79
21.25
6.00
42.50
42.50
6.40
4.00
m2
m'
m2
m2
m2
m2
78,892.88
57,314.22
33,057.00
20,721.20
127,411.50
546,067.65
Jumlah
PPn (10%)
Total
TOTAL HARGA
TAMBAH BANGUNAN
REGENCY KAV. A-04
TOTAL HARGA
32,400,000.00
270,435.00
211,289.99
1,050,258.67
1,527,605.50
816,867.85
2,722,307.62
1,188,137.61
680,723.21
3,119,310.81
990,114.68
1,762,586.89
3,671,266.78
2,563,689.79
1,676,473.59
343,885.29
1,404,922.50
880,650.79
815,433.60
2,184,270.59
60,280,230.76
6,028,023.08
66,308,253.84
66,308,000.00
NO
A
1
2
3
4
9
10
URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Luas bangunan
Galian tanah pondasi
Rabatan lantai kerja
Footplat 90x90x20 (6 titik)
- Beton K225
- Pembesian
Sloof Struktur
- Beton K225
- Bekisting
- Pembesian
Kolom struktur 15/20 (6 titik)
- Beton K225
- Bekisting
- Pembesian
Balok struktur 15/20
- Beton K225
- Bekisting
- Pembesian
Plat cor
- Beton K225
- Bekisting
- Pembesian
Dinding Bata diatas plat (t = 1 m)
- Pek. Bata merah
- Pek. Kolom praktis
- Pek. Plesteran
- Pek. Cat
Pekerjaan talang datar
Pekerjaan tangga putar
VOLUME
SATUAN
HARGA SATUAN
18.00
6.00
0.24
m2
m3
m3
1,800,000.00
33,804.38
652,129.59
0.97
102.06
m3
kg
810,384.78
11,225.79
0.48
6.36
50.09
m3
m2
kg
810,384.78
202,552.65
11,225.79
0.76
13.44
79.38
m3
m2
kg
810,384.78
202,552.65
11,225.79
0.48
8.75
50.09
m3
m2
kg
810,384.78
202,552.65
11,225.79
1.35
11.25
141.75
m3
m2
kg
810,384.78
202,552.65
11,225.79
13.10
7.00
26.20
26.20
5.00
1.00
m2
m'
m2
m2
m'
unit
78,892.88
57,314.22
33,057.00
20,721.20
195,312.93
5,100,000.00
PEKERJAAN PENGEMBALIAN
Pekerjaan Atap
- Rangka atap galvalum
- Genteng beton
Pekerjaan Struktur praktis
- Sloof Praktis
- Kolom Praktis
- Balok Praktis
11.25
11.25
m2
m2
160,000.00
90,635.40
11.05
16.00
11.05
m'
m'
m'
77,446.98
57,314.22
78,390.78
TAMBAH BANGUNAN
REGENCY KAV. A-04
TOTAL HARGA
32,400,000.00
202,826.25
158,467.49
787,694.00
1,145,704.13
386,553.54
1,288,234.85
562,243.69
612,650.89
2,722,307.62
891,103.21
386,553.54
1,771,322.92
562,243.69
1,094,019.45
2,278,717.31
1,591,255.73
1,033,496.66
401,199.51
866,093.40
542,895.31
976,564.65
5,100,000.00
57,762,147.85
1,800,000.00
1,019,648.25
855,789.13
917,027.45
866,218.12
5,458,682.95
52,303,464.90
5,230,346.49
57,533,811.39
57,533,000.00
NO
A
1
2
3
4
URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Luas bangunan
Galian tanah pondasi
Rabatan lantai kerja
Footplat 90x90x20 (6 titik)
- Beton K225
- Pembesian
Sloof Struktur
- Beton K225
- Bekisting
- Pembesian
Kolom struktur 15/20 (6 titik)
- Beton K225
- Bekisting
- Pembesian
Balok struktur 15/20
- Beton K225
- Bekisting
- Pembesian
Plat cor
- Beton K225
- Bekisting
- Pembesian
Dinding Bata diatas plat (t = 1 m)
- Pek. Bata merah
- Pek. Kolom praktis
- Pek. Plesteran
- Pek. Cat
Pekerjaan talang datar
VOLUME
SATUAN
HARGA SATUAN
18.00
6.00
0.24
m2
m3
m3
1,800,000.00
33,804.38
652,129.59
0.97
102.06
m3
kg
810,384.78
11,225.79
0.43
5.76
45.36
m3
m2
kg
810,384.78
202,552.65
11,225.79
0.76
13.44
79.38
m3
m2
kg
810,384.78
202,552.65
11,225.79
0.43
7.92
45.36
m3
m2
kg
810,384.78
202,552.65
11,225.79
1.01
8.40
105.84
m3
m2
kg
810,384.78
202,552.65
11,225.79
11.65
4.00
23.30
23.30
5.00
m2
m'
m2
m2
m'
78,892.88
57,314.22
33,057.00
20,721.20
195,312.93
PEKERJAAN PENGEMBALIAN
Pekerjaan Atap
- Rangka atap galvalum
- Genteng beton
Pekerjaan Struktur praktis
- Kolom Praktis
- Balok Praktis
8.40
8.40
m2
m2
160,000.00
90,635.40
18.00
m'
57,314.22
14.40
m'
78,390.78
TOTAL PEKERJAAN KURANG BANGUNAN
Jumlah
PPn (10%)
Total
TOTAL HARGA
TAMBAH BANGUNAN
REGENCY KAV. A-04
TOTAL HARGA
32,400,000.00
202,826.25
158,467.49
787,694.00
1,145,704.13
350,086.22
1,166,703.26
509,201.83
612,650.89
2,722,307.62
891,103.21
350,086.22
1,604,216.99
509,201.83
816,867.85
1,701,442.26
1,188,137.61
919,101.99
229,256.86
770,228.10
482,803.84
976,564.65
50,494,653.13
1,344,000.00
761,337.36
1,031,655.88
1,128,827.23
4,265,820.47
46,228,832.66
4,622,883.27
50,851,715.92
50,851,000.00
NO
A
1
2
URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Luas bangunan
Dinding Pagar 3 m
- Pek. Bata merah
- Pek. Kolom praktis
- Pek. balok praktis
- Pek. Plesteran
- Pek. Cat
Dinding Pagar 1.75 m
- Pek. Bata merah
- Pek. Kolom praktis
- Pek. balok praktis
- Pek. Plesteran
- Pek. Cat
VOLUME
SATUAN
HARGA SATUAN
2.00
m2
1,800,000.00
12.00
6.00
4.00
24.00
24.00
m2
m'
m'
m2
m2
78,892.88
57,314.22
78,390.78
33,057.00
20,721.20
16.10
7.00
9.20
32.20
32.20
m2
m'
m'
m2
m2
84,268.85
57,314.22
78,390.78
33,057.00
20,721.20
TAMBAH BANGUNAN
REGENCY KAV. D-10
TOTAL HARGA
3,600,000.00
946,714.50
343,885.29
313,563.12
793,368.00
497,308.68
1,356,728.40
401,199.51
721,195.18
1,064,435.40
667,222.48
10,705,620.56
10,705,620.56
1,070,562.06
11,776,182.62
11,776,000.00
NO
A
1
2
URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Luas bangunan
Penambahan atap bangunan
1. Pasangan bata gewel
2. Kuda-kuda Galvalum
3. Rangka usuk reng galvalum
4. Genteng beton
5. Bubungan beton
Pembuatan pagar 3 m
1. Galian pondasi
2. Pas. Pondasi batu kali
3. Sloof praktis
4. Pas. Bata
5. Kolom Praktis
6. Balok Praktis
7. Plesteran
9. Pengecatan
Pas. Keramik Kamar mandi
1. Keramik lantai 20x20
2. Keramik dinding 20x25
VOLUME
SATUAN
HARGA SATUAN
3.00
m2
1,800,000.00
9.07
1.00
12.03
12.03
0.90
m2
unit
m2
m2
m'
78,892.88
700,000.00
165,000.00
90,635.40
72,957.85
4.04
3.23
11.55
34.65
15.00
13.05
69.30
69.30
m3
m3
m'
m2
m'
m'
m2
m2
33,804.38
499,215.00
77,446.98
78,892.88
57,314.22
78,390.78
33,057.00
20,721.20
2.25
9.28
m2
m2
123,617.26
159,403.50
TAMBAH BANGUNAN
REGENCY KAV. B-08
TOTAL HARGA
5,400,000.00
715,716.16
700,000.00
1,984,950.00
1,090,343.86
65,662.07
136,654.19
1,614,461.31
894,512.62
2,733,638.12
859,713.23
1,022,999.68
2,290,850.10
1,435,978.81
278,138.84
1,478,467.46
22,702,086.45
22,702,086.45
2,270,208.64
24,972,295.09
24,972,000.00
NO
A
1
URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Penambahan atap bangunan
1. Pasangan bata gewel
2. Kuda-kuda Galvalum
3. Rangka usuk reng galvalum
4. Genteng beton
5. Bubungan beton
Pembuatan pagar 3 m
1. Galian pondasi
2. Pas. Pondasi batu kali
3. Sloof praktis
4. Pas. Bata
5. Kolom Praktis
6. Balok Praktis
7. Plesteran
9. Pengecatan
10. Plesteran samping
Pas. Keramik Kamar mandi
1. Keramik lantai 20x20
2. Keramik dinding 20x25
VOLUME
SATUAN
HARGA SATUAN
3.37
1.00
12.03
12.03
0.90
m2
unit
m2
m2
m'
78,892.88
700,000.00
165,000.00
90,635.40
72,957.85
3.50
2.80
10.00
30.00
15.00
13.05
60.00
30.00
26.20
m3
m3
m'
m2
m'
m'
m2
m2
m2
33,804.38
499,215.00
77,446.98
78,892.88
57,314.22
78,390.78
33,057.00
20,721.20
33,057.00
2.25
9.28
m2
m2
123,617.26
159,403.50
TAMBAH BANGUNAN
REGENCY KAV. B-08
TOTAL HARGA
266,026.77
700,000.00
1,984,950.00
1,090,343.86
65,662.07
118,315.31
1,397,802.00
774,469.80
2,366,786.25
859,713.23
1,022,999.68
1,983,420.00
621,635.85
866,093.40
278,138.84
1,478,467.46
15,874,824.52
NO
A
1
2
3
URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Tambah luas bangunan
Bongkar tembok lama
Talang datar
VOLUME
19.50
1.00
7.50
SATUAN
m2
ls
m'
HARGA SATUAN
1,800,000.00
2,000,000.00
195,312.93
TAMBAH BANGUNAN
REGENCY KAV. B-08
TOTAL HARGA
35,100,000.00
2,000,000.00
1,464,846.98
38,564,846.98
BAHAN BANGUNAN
Pasir Urug
Pasir Pasang
Pasir Hitam
Pasir Cor
Pasir Silika
Tanah Urug
Sirtu
Tanah Urug Taman/Katel
Tanah Liat
Batu Belah Gunung
Batu Belah Kali
Batu Kali
Stenslah/batu pecah tangan 1/2
Stenslah/batu pecah tangan 2/3
Stenslah/batu pecah tangan 3/5
Stenslah/batu pecah tangan 4/6 - 5/7
Batu pecah mesin 1/1
Batu pecah mesin 1/2
Batu pecah mesin 2/3
Batu pecah mesin 3/5
Batu pecah mesin 4/6 - 5/7
Bata Merah
Batu Bata Tahan Api
Bata Berongga
Batako
Rooster
Batu Granito
Batu Teraso
Batu Palimanan
Batu Tempel Hitam
Hollow Blok (HB.20)
Hollow Blok (HB.15)
Hollow Blok (HB.10)
Paving Block Segi Empat Biasa
Paving Block Segi Empat Warna
Paving Block Segi Enam Biasa
Paving Block Segi Enam Warna
Paving Block Tiga Berlian Biasa
Paving Block Tiga Berlian Warna
Portland Cement (PC)
Portland Cement (PC) Tahan Api
Portland Cement (PC) Putih
Portland Cement (PC) Warna
SATUAN
1 m
1 m
1 m
1 m
1 Kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 kg
1 kg
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 kg
1 kg
1 kg
1 kg
HARGA
77,395.50
90,000.00
124,641.00
130,000.00
9,733.50
67,518.00
109,053.00
69,003.00
51,876.00
109,890.00
127,809.00
100,000.00
205,722.00
215,000.00
159,984.00
142,956.00
229,680.00
189,387.00
189,387.00
180,279.00
166,221.00
570.00
12,969.00
990.00
5,148.00
9,603.00
3,366.00
2,574.00
79,096.50
74,646.00
4,950.00
4,356.00
3,663.00
945.00
1,125.00
1,845.00
1,935.00
1,305.00
1,485.00
1,350.00
4,257.00
2,673.00
8,118.00
M040
1 kg
8,811.00
M041
M042
M043
M044
M045
M046
M047
M048
M049
M050
M051
M052
M053
M054
M055
M056
M057
M058
M059
M060
M061
M062
M063
M064
M065
M066
M067
M068
M069
M070
M071
M078
M079
M080
M081
M082
M083
M084
M085
M088
M089
M090
M091
M092
M093
M094
M095
M096
Kapur
Gamping
Semen Merah
Buis Beton 0.20 m
Buis Beton 0.30 m
Buis Beton 0.40 m
Buis Beton 0.50 m
Buis Beton 0.60 m
Buis Beton 0.80 m
Buis Beton 0.90 m
Buis Beton 1.00 m
Buis Beton U 0.20 m
Buis Beton U 0.30 m
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Balok Kayu Kelas III
Papan Kayu kelas III
Bambu 10 cm
Dolken Kayu 8 cm
List Kayu Profil
List Kayu 2/4
Gedeg (2.00 x 3.00) m
Bilik Bambu
Reng : 2/3, 3/5
Usuk : 5/7
Balok
1 m
1 kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 btg
1 btg
1 m
1 m
1 Ibr
1 m
1 m
1 m
1 m
1,402,434.00
990.00
186,921.00
36,949.50
47,322.00
62,653.50
78,151.50
104,643.00
190,323.00
207,427.50
265,450.50
32,980.50
41,481.00
8,698,441.50
8,625,865.50
8,625,865.50
10,542,609.00
11,021,818.50
11,021,818.50
4,958,415.00
4,958,415.00
5,559,435.00
6,611,220.00
6,661,305.00
6,939,900.00
5,960,115.00
5,960,115.00
6,260,625.00
6,761,475.00
6,761,475.00
6,761,475.00
9,015,300.00
9,265,725.00
9,516,150.00
11,018,700.00
11,269,125.00
11,519,550.00
3,305,610.00
3,712,500.00
23,661.00
27,594.00
7,821.00
3,636,171.00
39,402.00
78,804.00
13,226,314.50
13,226,314.50
12,757,500.00
M097
M098
M099
M100
M101
M102
M103
M104
M105
M106
M107
M108
M109
M110
M111
M112
M113
M114
M115
M116
M116.a
M116.b
M117
M118
M119
M120
M121
M122
M123
M124
M124.a
M124.b
M125
M126
M127
M128
M129
M130
M131
M132
M133
M134
M135
M136
M137
M138
M139
M140
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Besi Beton Polos
Besi Beton Ulir
Besi Strip / Plat Plendes
Besi Beugel/Kawel
Baja Profil
Plat Baja
Roda Railling
Angker Bar / Dynabolt
Kabel prestressed
Pintu Besi Baja
Pintu Gulung Besi
Pintu Lipat
Rolling Door
Pagar Besi
Pintu Pagar besi
Pagar Model BRC tinggi 1 m
Pintu Pagar Model BRC tinggi 1 m
Profil Aluminium Putih
Profil Aluminium Coklat
Sunscream Aluminium
Pintu Fiber KM
Atap Aluminium
Bubung Atap Aluminium
Aluminium Foil/Sesalation
Baja Ringan
Kawat Galvanis 2 mm
Kawat Galvanis 3 mm
Kawat Beton/Bendrat RRT
Kawat Harmonika Gas
Kawat Duri
Kawat Nyamuk
Kawat Nyamuk/Kasa Plastik
Paku Kayu Segala Ukuran
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
bh
1 kg
1 kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 Unit
1 m
1 m
1 m
1 Kg
1 Kg
1 Kg
1 Kg
1 m
1 Kg
1 m
1 m
1 Kg
14,175,000.00
14,175,000.00
15,120,000.00
16,202,439.00
16,202,439.00
16,202,439.00
15,622,267.50
15,622,267.50
15,622,267.50
19,487,884.50
19,487,884.50
19,487,884.50
19,487,884.50
19,487,884.50
19,487,884.50
9,750.00
14,157.00
9,702.00
9,702.00
15,345.00
15,345.00
15,300.00
17,127.00
29,700.00
737,946.00
2,029,203.00
1,600,924.50
1,185,880.50
614,988.00
707,157.00
322,839.00
413,127.00
81,000.00
107,019.00
307,395.00
330,561.00
100,683.00
98,941.50
30,901.50
40,095.00
42,808.50
62,748.00
17,293.50
23,364.00
21,285.00
18,513.00
19,998.00
21,780.00
M141
M142
M143
M144
M145
M146
M147
M148
M148.a
M148.b
M148.c
M148.d
M148.e
M148.f
M148.g
M149
M150
M151
M152
M153
M154
M155
M156
M157
M158
M159
M160
M161
M162
M163
M164
M165
M166
M167
M168
M169
M170
M171
M172
M173
M173.a
M174
M175
M176
M177
M178
M179
M180
M181
1 Kg
1 bh
1 bh
1 bh
1 bh
1 kg
1 bh
1 kg
1 kg
1 tube
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ibr
1 lbr
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 lbr
1 Ibr
1 lbr
1 m
1 m
25,443.00
594.00
891.00
693.00
396.00
19,206.00
3,168.00
37,138.50
16,537.50
28,444.50
17,127.00
11,088.00
532,507.50
106,123.50
103,194.00
1,440.00
1,575.00
2,250.00
2,475.00
2,079.00
3,000.00
13,761.00
1,890.00
2,475.00
4,554.00
4,950.00
5,544.00
5,000.00
2,268.00
2,277.00
4,356.00
3,960.00
7,128.00
7,623.00
6,534.00
98,604.00
1,485.00
44,154.00
98,604.00
119,394.00
6,732.00
32,220.00
36,720.00
46,080.00
62,640.00
81,553.50
81,553.50
76,626.00
111,870.00
M182
M183
M184
M185
M186
M187
M188
M189
M190
M191
M192
M193
M194
M195
M196
M197
M198
M199
M200
M201
M202
M203
M204
M205
M206
M207
M208
M209
M210
M211
M212
M213
M214
M215
M216
M217
M218
M219
M220
M221
M222
M223
M224
M225
M226
M227
M228
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Ibr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Ibr
1 lbr
1 lbr
1 Ibr
1 lbr
1 Ibr
1 Ibr
1 Ibr
1 lbr
1 m
1 m'
1 Ibr
1 Ibr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Ibr
1 Ibr
1 lbr
1 Ibr
1 lbr
1 lbr
101,776.50
94,027.50
81,364.50
72,103.50
56,727.00
103,383.00
89,491.50
79,285.50
62,469.00
127,480.50
122,188.50
90,342.00
85,050.00
46,966.50
49,698.00
50,368.50
41,958.00
41,580.00
44,793.00
50,368.50
39,699.00
18,315.00
17,226.00
16,632.00
16,038.00
25,110.00
27,630.00
33,390.00
52,965.00
19,899.00
70,587.00
75,339.00
51,124.50
70,380.00
81,742.50
124,929.00
142,033.50
176,053.50
244,188.00
82,687.50
7,128.00
9,900.00
23,265.00
27,621.00
93,951.00
7,623.00
27,126.00
M229
M230
M231
M232
M233
M234
M235
M236
M237
M238
M239
M240
M241
M242
M243
M244
M245
M246
M247
M248
M249
M250
M251
M252
M253
M254
M255
M256
M257
M258
M259
M260
M261
M262
M263
M264
M265
M266
M267
M268
M269
M270
M271
M272
M273
M274
M275
M276
1 Ibr
1 Unit
1 Unit
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 set
1 set
1 set
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
91,377.00
151,011.00
1,508,598.00
313,038.00
1,603,948.50
62,667.00
39,303.00
43,956.00
141,750.00
331,978.50
209,034.00
2,112,169.50
427,896.00
219,186.00
301,077.00
938,916.00
1,056,132.00
1,086,277.50
1,327,630.50
438,669.00
31,383.00
53,262.00
15,741.00
62,667.00
93,366.00
110,943.00
91,080.00
146,286.00
31,482.00
24,192.00
19,404.00
12,573.00
9,450.00
21,546.00
12,177.00
170,761.50
134,190.00
126,621.00
36,193.50
131,638.50
11,812.50
79,191.00
120,204.00
232,470.00
334,521.00
117,274.50
175,864.50
198,450.00
M277
M278
M279
M280
M281
M282
M283
M284
M285
M286
M287
M288
M289
M290
M291
M292
M293
M294
M295
M296
M297
M298
M299
M299a
M299b
M299c
M299d
M300
M301
M302
M303
M304
M305
M306
M307
M308
M309
M310
M311
M312
M313
M314
M315
M316
M316.a
M317
M318
M319
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 bh
1 bh
1 bh
320,544.00
136,719.00
250,668.00
341,649.00
118,314.00
173,502.00
355,225.50
567,283.50
231,808.50
22,585.50
527,971.50
592,515.00
1,292,193.00
2,277.00
1,782.00
1,089.00
2,871.00
1,881.00
1,287.00
4,059.00
2,871.00
36,234.00
19,404.00
40,446.00
34,587.00
69,363.00
51,975.00
2,871.00
3,069.00
3,366.00
1,782.00
2,268.00
3,366.00
4,059.00
5,742.00
12,474.00
8,514.00
8,514.00
8,514.00
8,514.00
15,480.00
15,480.00
15,480.00
21,924.00
178,398.00
11,340.00
13,590.00
4,100.00
M320
M321
M322
M323
M324
M325
M326
M327
M328
M329
M330
M331
M332
M333
M333.a
M333.b
M333.c
M333.d
M333.e
M333.f
M333.g
M334
M335
M336
M337
M338
M339
M340
M341
M342
M343
M344
M345
M346
M347
M348
M349
M350
M351
M352
M353
M354
M355
M356
M357
M358
M359
M360
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
4,500.00
1,840.00
1,840.00
1,980.00
4,554.00
8,514.00
15,939.00
3,690.00
2,610.00
891.00
945.00
945.00
1,984.50
226,413.00
213,097.50
55,242.00
386,595.00
792.00
990.00
53,460.00
6,331.50
7,560.00
11,245.50
14,742.00
19,845.00
25,231.50
32,413.50
45,738.00
71,536.50
124,551.00
190,417.50
3,780.00
5,670.00
7,371.00
9,922.50
12,096.00
17,671.50
25,704.00
36,099.00
2,835.00
4,252.50
5,575.50
7,465.50
10,017.00
12,757.50
15,120.00
19,183.50
1,485.00
M361
M362
M363
M364
M365
M366
M367
M368
M369
M370
M371
M372
M373
M374
M375
M376
M377
M378
M379
M380
M381
M382
M383
M384
M385
M386
M387
M388
M389
M390
M391
M392
M393
M394
M395
M396
M397
M398
M399
M400
M400.a
M400.b
M400.c
M400.d
M400.e
M400.f
M400.g
M400.h
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
2,277.00
2,673.00
5,742.00
7,654.50
10,962.00
12,379.50
15,025.50
2,079.00
2,574.00
3,762.00
7,425.00
10,773.00
12,379.50
13,797.00
17,293.50
33,547.50
43,470.00
59,251.50
86,940.00
124,551.00
173,974.50
195,822.00
290,587.50
3,960.00
5,148.00
7,524.00
13,266.00
21,087.00
36,099.00
54,148.50
74,844.00
4,554.00
6,237.00
8,811.00
17,523.00
27,423.00
50,557.50
78,151.50
99,693.00
144,990.00
93,600.00
119,520.00
27,180.00
37,890.00
56,520.00
82,980.00
179,280.00
290,430.00
M401
M402
M403
M404
M405
M406
M407
M408
M409
M410
M411
M412
M413
M414
M415
M415.a
M415.b
M416
M417
M418
M419
M420
M421
M422
M423
M424
M425
M426
M427
M428
M429
M430
M430.a
M430.b
M430.c
M431
M432
M433
M434
M435
M436
M437
M438
M438a
M438b
M439
M440
M440.a
Kertas Gosok
Plamir Kayu
Plamir Tembok
Plamir Besi
Dempul Jadi
Minyak Cat
Spiritus
Sirlak
Cat meni kayu
Cat meni besi
Cat Dasar Kayu
Cat Dasar Tembok
Cat Dasar Besi
Cat Kayu
Cat Tembok
Cat Tembok Interior
Cat Tembok Eksterior
Cat Besi
Cat Genting
Waterproofing
Vernis
Politur Jadi
Kuas
Lem Kayu
Lem Pipa PVC
Lem vinyl
Residu atau Teer
Teak oli
Kalkarium
Kapur Sirih
Soda api
Sabun
Vinyl (30x30)cm
Batu Apung
Alang-Alang
Tandon Air PVC V = 0.5 m3
Tandon Air PVC V = 1.0 m3
Tandon Air Stainless V = 0.5 m3
Tandon Air Stainless V = 1.0 m3
Sumur Pompa Tangan Lengkap
Pompa Air
Kabel NYA 2.5 mm
Kabel NYA 4.0 mm
Kabel NYYHY 3x4 mm
Kabel NYYHY 3x1.5 mm
Stop Kontak
Saklar Broco Tunggal
Saklar Broco Ganda
1 Lbr
1 kg
1 kg
1 Kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 Ltr
1 Ltr
1 bh
1 kg
1 kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
1 bh
1 kg
1 ikat
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
4,455.00
20,592.00
12,771.00
35,739.00
31,284.00
19,008.00
14,175.00
157,212.00
34,114.50
35,343.00
33,858.00
25,740.00
39,897.00
70,290.00
47,025.00
84,645.00
97,119.00
71,631.00
125,212.50
146,097.00
33,858.00
73,237.50
12,969.00
29,502.00
33,858.00
56,983.50
26,829.00
2,277.00
8,514.00
4,653.00
22,585.50
39,879.00
21,420.00
38,016.00
4,158.00
688,905.00
1,218,955.50
1,905,214.50
3,190,414.50
187,299.00
751,275.00
4,356.00
7,425.00
12,969.00
7,821.00
26,271.00
32,035.50
36,666.00
M441
M442
M443
M444
M445
M446
M447
M448
M449
M450
M451
M452
M453
M454
M455
M456
M457
M458
M459
M460
M460.a
M460.b
M460.c
M460.d
M461
M462
M463
M464
M464.a
M465
M466
M467
M468
M469
M470
M471
M471a
M472
M473
M474
M475
M476
M477
M478
M479
M480
M481
M482
Las doof
Isolator
T dos PVC
Pipa PVC 5/8"
Fiting Flafond
Zekering Kast Lokal 1 Group
Zekering Kast Lokal 2 Group
Zekering Kast Lokal 3 Group
Lampu TL Komplit 20 Watt
Lampu TL Komplit 40 Watt
Lampu XL (Lilin) 5 Watt
Lampu XL (Lilin) 8 Watt
Lampu XL (Lilin) 14 Watt
Lampu XL (Lilin) 18 Watt
Lampu XL (Lilin) 23 Watt
Lampu Pijar 5 - 40 Watt
Lampu Pijar 50 -100 Watt
Tambah Daya 2200 Watt
Pasang Baru PLN
Pipa Arde
Splits Dia 1
Timah
Kawat BC
Klemp
Rumput Lamur
Rumput Manila
Semak Hias
Pohon Pelindung
Gebalan rumput
Tali ijuk
ljuk
Waterstop Lebar 150 mm
Waterstop Lebar 200 mm
Waterstop Lebar 230 mm
Rumput Common Bermuda Grass
Pupuk
Obat Tanaman
Tali Plastik 0.8 cm
Elektroda
Minyak bekisting
Formika (90 x 120) cm
Strorox 100
Formtie
Batacote
Rapidrant
Puzzdith - 100 XR
Seal Tape / TBA
Bensin Industri
1 bh
1 m
1 bh
1 Ljr
1 bh
1 Unit
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ls
1 Ls
1 m
1 bh
1 kg
1 m
1 bh
1 m
1 m
1 m
1 btg
1 m
1 kg
1 m
1 m
1 m
1 m
1 m
1 kg
1 ltr
1 m
1 kg
1 ltr
1 lbr
1 kg
1 bh
1 kg
1 Gln
1 Ltr
1 bh
1 ltr
594.00
792.00
990.00
7,087.50
10,296.00
63,976.50
92,988.00
127,764.00
61,141.50
93,753.00
27,027.00
30,051.00
33,925.50
36,477.00
42,525.00
17,577.00
29,200.50
3,505,950.00
5,008,500.00
108,306.00
72,859.50
412,209.00
42,808.50
2,079.00
20,880.00
17,820.00
12,001.50
182,668.50
14,940.00
17,820.00
144,630.00
40,446.00
72,859.50
84,861.00
13,167.00
2,430.00
85,286.70
2,250.00
35,046.00
2,574.00
156,321.00
102,762.00
8,712.00
7,821.00
39,402.00
79,002.00
2,079.00
4,950.00
M482.a
M483
M483.a
M484
M485
M486
M487
M488
M489
M490
M491
M492
M493
M494
M495
M496
M497
M498
M499
M500
M501
M502
M503
M504
M505
M505
M506
Bensin Umum
Solar Industri
Solar Umum
Minyak Pelumas
Grease
Air Bersih
Kuas 4"
Lampu Mercury
Jaring PEDT Mesh 2,5 cm
Rumput Sintetis (30x30)cm
Kalsiboard 4.5 mm
Kalsiboard 9 mm
Eternit 100x100 tbl 3,5 mm
Metal furing
Kawat seng polos
Ramset / Dynabolt
Lapis aluminum jeruk
Pipa stainless steel 2"
Stud Track 7,6
Gypsum Board 12 mm
Usuk Canal C 75. 0.75
Reng Purlin R 36.055
Baut
Batu sisir
Coating batu alam
Engsel casement 15 "
Tempered kaca
1 Itr
1 Itr
1 Itr
1 Itr
1 kg
1 Itr
1 bh
1 bh
1 bh
1 bh
1 lbr
1 lbr
1 lbr
1 m'
1 Kg
1 Bh
1 m2
1 m'
1 m'
1 lbr
1 m1
1 m1
1 bh
1 m
1 kg
bh
m2
4,819.50
5,400.00
4,356.00
45,738.00
26,037.00
27.00
12,969.00
214,560.00
28,440.00
14,220.00
108,000.00
143,923.50
16,537.50
13,050.00
21,375.00
4,500.00
27,000.00
112,500.00
22,500.00
76,500.00
13,500.00
9,000.00
90.00
71,910.00
40,500.00
29,250.00
450,000.00
AN
KETERANGAN
HSPK 2013
Tanah dan Pasir
85,000.00
###
125,000.00
###
###
###
###
###
Batu,Bata & Beton Block
###
95,000.00
###
205,000.00
###
###
###
###
###
###
###
560.00
###
###
###
###
###
###
###
###
###
###
###
Per Meter isi 45
Per Meter isi 45
Per Meter isi 28
Per Meter isi 28
Per Meter isi 33
Per Meter isi 33
Semen 1325
###
###
###
###
###
###
###
Buis Beton
###
###
###
###
###
###
###
###
###
Kayu Borneo
###
###
###
###
###
Kayu Meranti
###
###
###
###
###
Kayu Kruing
###
###
###
###
###
Kayu Kamper
###
###
###
###
###
Kayu Lain-lain
###
###
###
###
###
###
###
Kayu Jati Ex Malang
###
###
###
###
###
Kayu Jati Ex Madiun/Ngawi
###
###
###
###
###
Kayu Jati Ex Bojonegoro
###
###
###
###
###
Besi dan Aluminium
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Atap Genteng
###
###
###
###
1 m2 -- 25 bh
###
###
###
###
###
###
1 m' -- 3,5 bh
###
###
###
###
###
###
###
###
###
###
###
###
###
Atap Seng / Asbes
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kayu Olahan
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Perlengkapan Kamar Mandi
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Alat-Alat Penggantung
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kaca
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Perlengkapan Lantai
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
45500/dus
###
46000/dus
###
###
###
###
###
48500/dus
###
###
###
###
###
###
###
###
###
###
###
###
###
Perpipaan
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Lain - Lain
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Wahyuningtyas, M.Si.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DAFTAR UPAH
TAHUN ANGGARAN 2013
KODE
URAIAN
SATUAN
UPAH
L01
Mandor
Org/hr
65,175.00
L02
Org/hr
55,275.00
L03
Org/hr
55,275.00
L04
Org/hr
55,275.00
L05
Org/hr
55,275.00
L06
Org/hr
55,275.00
L07
Tukang Batu
Org/hr
51,975.00
L08
Tukang Kayu
Org/hr
51,975.00
L09
Tukang Besi/Baja
Org/hr
51,975.00
L10
Tukang Cat
Org/hr
51,975.00
L11
Tukang Listrik
Org/hr
51,975.00
L12
Tukang Pipa
Org/hr
51,975.00
L13
Tukang Plitur
Org/hr
51,975.00
L14
Tukang Taman
Org/hr
51,975.00
L15
Tukang Aspal
Org/hr
51,975.00
L16
Pembantu Tukang
Org/hr
42,900.00
L17
Pekerja Biasa
Org/hr
42,900.00
L18
Penjaga Malam
Org/hr
40,700.00
L19
Sopir
Org/hr
50,875.00
L20
Operator
Org/hr
53,900.00
L21
Mekanik
Org/hr
53,900.00
L22
Pembantu Sopir
Org/hr
46,200.00
L23
Pembantu Operator
Org/hr
49,500.00
L24
Pembantu Mekanik
Org/hr
49,500.00
L25
Juru Ukur
Org/hr
155,100.00
L26
Ls
526,240.00
L27
Org/hr
654,500.00
L28
Or / hr
561,000.00
KETERANGAN
DAFTAR PERALATAN
TAHUN ANGGARAN 2013
KODE
E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36
E37
URAIAN
Sewa Mesin Bor
Sewa Kompresor (15-20 bar)
Sewa Genset (15 KVA)
Sewa Pompa Tes
Sewa Mesin Las (150A)
Sewa Alat Geolistrik
Sewa Alat Geofisikal, Elektrikal, Logging
Sewa Mud Pump
Sewa Alat Sandblasting
Sewa Excavator (Excavator 80-140 HP)
Sewa Whell Loader (Wheel Loader 1.0-1.6 M3)
Sewa Motor Grader (Motor Grader >100 HP)
Sewa Vibro Roller (Vibratory Roller 5-8 T.)
Sewa Water Tanker (Water Tanker 3000-4500 L.)
Pesawat Ukur
Meteran
Palu
Keranjang
Ganco
Alat pelancip/pisau besar
Palu Besar/bodem
Timbris
Kereta Dorong
Jack Hammer
Molen (Condrete Mixer.350)
Ember
Kotak Adukan
Cetok
Kuas
Kasut Kayu
Tang Pemotong Kawat
Vibrator (Concrete Vibrator)
Gergaji
Gunting pemotong besi
Kunci Pembengkok tulangan
Bor Besi
Stamper
SATUAN
hari
hari
hari
hari
hari
hari
hari
Jam
hari
hari
hari
hari
hari
hari
Unit/hr
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
Unit/hr
bh
bh
bh
bh
bh
bh
Unit/hr
bh
bh
bh
bh
Unit/hr
HARGA
1,485,000.00
2,640,000.00
1,100,000.00
4,400,000.00
400,000.00
1,925,000.00
1,925,000.00
63,000.00
1,210,000.00
3,574,606.49
2,520,000.00
3,366,117.80
2,551,208.67
1,853,206.12
110,000.00
100,000.00
25,000.00
10,000.00
75,000.00
25,000.00
100,000.00
30,000.00
100,000.00
122,769.00
529,827.21
5,000.00
25,000.00
10,000.00
10,000.00
10,000.00
50,000.00
233,144.80
50,000.00
50,000.00
25,000.00
100,000.00
271,954.55
E38
E39
hr
hr
2,025,215.00
250,000.00
AFTAR PERALATAN
HUN ANGGARAN 2013
KETERANGAN
NO.
:
:
:
KOMPONEN
A.001
Pagar sementara dari kayu tinggi 2 m
m
SATUAN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
1
2
3
4
5
6
7
Dolken Kayu 8 cm
Portland Cement (PC)
Pasir Cor
Stenslah/batu pecah tangan 2/3
Usuk 5/7
Paku Kayu Segala Ukuran
Residu atau Teer
PERALATAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0200
42,900.00
51,975.00
55,275.00
65,175.00
17,160.00
10,395.00
1,105.50
1,303.50
btg
kg
m
m
m
kg
Ltr
1.2500
2.5000
0.0050
0.0090
0.0720
0.0600
0.4000
27,594.00
1,350.00
130,000.00
215,000.00
4,958,415.00
21,780.00
26,829.00
34,492.50
3,375.00
650.00
1,935.00
357,005.88
1,306.80
10,731.60
JUMLAH HARGATENAGA
29,964.00
M089
M037
M004
M014
M061
M140
M425
409,496.78
439,460.78
NO.
A.
:
:
:
KOMPONEN
A.002
Pagar sementara dari seng gelombang tinggi 2 m
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
1
2
3
4
5
6
7
8
Dolken Kayu 8 cm
Portland Cement (PC)
Atap Seng Gelombang
Pasir Cor
Stenslah/batu pecah tangan 2/3
Usuk 5/7
Paku Kayu Segala Ukuran
Cat meni besi
L17
L08
L03
L01
PERALATAN
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0200
42,900.00
51,975.00
55,275.00
65,175.00
17,160.00
10,395.00
1,105.50
1,303.50
btg
kg
Ibr
m
m
m
kg
kg
1.2500
2.5000
1.2000
0.0050
0.0090
0.0720
0.0600
0.4500
27,594.00
1,350.00
81,553.50
130,000.00
215,000.00
4,958,415.00
21,780.00
35,343.00
34,492.50
3,375.00
97,864.20
650.00
1,935.00
357,005.88
1,306.80
15,904.35
JUMLAH HARGATENAGA
29,964.00
M089
M037
M178
M004
M014
M061
M140
M410
512,533.73
542,497.73
NO.
A.
:
:
:
KOMPONEN
A.003
Pagar sementara dari kawat duri tinggi 1.8 m
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.2000
0.0200
0.0200
42,900.00
51,975.00
55,275.00
65,175.00
12,870.00
10,395.00
1,105.50
1,303.50
btg
kg
kg
m
m
kg
1.0000
2.0000
25.0000
0.0050
0.0090
0.0600
27,594.00
1,350.00
21,285.00
130,000.00
215,000.00
21,780.00
27,594.00
2,700.00
532,125.00
650.00
1,935.00
1,306.80
JUMLAH HARGATENAGA
25,674.00
BAHAN
1
2
3
4
5
6
Dolken Kayu 8 cm
Portland Cement (PC)
Kawat Duri
Pasir Cor
Stenslah/batu pecah tangan 2/3
Paku Kayu Segala Ukuran
PERALATAN
M089
M037
M137
M004
M014
M140
566,310.80
591,984.80
NO.
A.
:
:
:
KOMPONEN
A.004
Pagar kawat jaring galvanis, tinggi 1,0 m
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.0420
0.0420
0.0040
0.0020
42,900.00
51,975.00
55,275.00
65,175.00
1.1000
23,364.00
JUMLAH HARGATENAGA
1,801.80
2,182.95
221.10
130.35
4,336.20
PERALATAN
M136
25,700.40
25,700.40
30,036.60
NO.
A.
:
:
:
KOMPONEN
A.005
Pengukuran dan pemasangan bouwplank
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
42,900.00
51,975.00
55,275.00
65,175.00
m
kg
m
0.0120
0.0200
0.0070
3,305,610.00
21,780.00
3,712,500.00
JUMLAH HARGATENAGA
4,290.00
5,197.50
552.75
325.88
10,366.13
1
2
3
PERALATAN
M084
M140
M085
39,667.32
435.60
25,987.50
66,090.42
76,456.55
NO.
A.
:
:
:
KOMPONEN
A.006
Pembuatan kantor sementara, dengan lantai plesteran
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
5
Pekerja Biasa
Tukang Kayu
Tukang Batu
Kepala Tukang Kayu
Mandor
BAHAN
1
2
2
3
4
5
6
7
8
9
11
12
13
Balok
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Pasang
Pasir Cor
Stenslah/batu pecah tangan 2/3
Bata Merah
Atap Seng Gelombang
Jendela Nako + accessories
Kaca Polos tebal 3 mm
Multiplek 6 mm
Grendel Pintu
Engsel Pintu
L17
L08
L07
L03
L01
PERALATAN
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
2.0000
1.0000
1.0000
0.3000
0.0500
42,900.00
51,975.00
51,975.00
55,275.00
65,175.00
85,800.00
51,975.00
51,975.00
16,582.50
3,258.75
m
kg
kg
m
m
m
bh
Ibr
m
m
lbr
bh
bh
0.1800
0.3000
35.0000
0.1500
0.1000
0.1500
30.0000
0.5000
0.0750
0.1500
1.5000
2.0000
2.0000
5,559,435.00
21,780.00
1,350.00
90,000.00
130,000.00
215,000.00
570.00
81,553.50
231,808.50
79,191.00
81,742.50
21,546.00
31,482.00
1,000,698.30
6,534.00
47,250.00
13,500.00
13,000.00
32,250.00
17,100.00
40,776.75
17,385.64
11,878.65
122,613.75
43,092.00
62,964.00
JUMLAH HARGATENAGA
209,591.25
M062
M140
M037
M002
M004
M014
M022
M178
M285
M270
M216
M262
M257
1,429,043.09
1,638,634.34
NO.
A.
:
:
:
KOMPONEN
A.007
Pembuatan gudang semen dan alat-alat
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
5
Pekerja Biasa
Tukang Kayu
Tukang Batu
Kepala Tukang Kayu
Mandor
L17
L08
L07
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
2.0000
1.0000
1.0000
0.3000
0.0500
42,900.00
51,975.00
51,975.00
55,275.00
65,175.00
85,800.00
51,975.00
51,975.00
16,582.50
3,258.75
m
kg
kg
m
m
Ibr
lbr
bh
bh
0.2100
0.3000
10.5000
0.0300
0.0500
0.5000
1.1500
2.0000
2.0000
5,559,435.00
21,780.00
1,350.00
130,000.00
215,000.00
81,553.50
81,742.50
21,546.00
31,482.00
1,167,481.35
6,534.00
14,175.00
3,900.00
10,750.00
40,776.75
94,003.88
43,092.00
62,964.00
JUMLAH HARGATENAGA
209,591.25
BAHAN
1
2
3
4
5
6
7
8
9
Balok
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Cor
Stenslah/batu pecah tangan 2/3
Atap Seng Gelombang
Multiplek 6 mm
Grendel Pintu
Engsel Pintu
PERALATAN
M062
M140
M037
M004
M014
M178
M216
M262
M257
1,443,676.98
1,653,268.23
NO.
A.
:
:
:
KOMPONEN
A.008
Pembuatan rumah jaga/konstruksi kayu
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
1
2
2
3
4
5
6
7
8
9
11
Balok
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Pasang
Pasir Cor
Stenslah/batu pecah tangan 2/3
Bata Merah
Atap Seng Gelombang
Jendela Nako + accessories
Kaca Polos tebal 3 mm
Multiplek 6 mm
L17
L08
L03
L01
PERALATAN
Org/hr
Org/hr
Org/hr
Org/hr
2.0000
1.0000
0.3000
0.0500
42,900.00
51,975.00
55,275.00
65,175.00
85,800.00
51,975.00
16,582.50
3,258.75
m
kg
kg
m
m
m
bh
Ibr
m
m
lbr
0.1800
0.3000
35.0000
0.1500
0.1000
0.1500
30.0000
0.5000
0.1500
0.3000
1.5000
5,559,435.00
21,780.00
1,350.00
90,000.00
130,000.00
215,000.00
570.00
81,553.50
231,808.50
79,191.00
81,742.50
1,000,698.30
6,534.00
47,250.00
13,500.00
13,000.00
32,250.00
17,100.00
40,776.75
34,771.28
23,757.30
122,613.75
JUMLAH HARGATENAGA
157,616.25
M062
M140
M037
M002
M004
M014
M022
M178
M285
M270
M216
1,352,251.38
1,509,867.63
NO.
A.
:
:
:
KOMPONEN
A.009
Membersihkan lapangan dan perataan
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
JUMLAH HARGATENAGA
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.0500
42,900.00
51,975.00
55,275.00
65,175.00
4,290.00
3,258.75
7,548.75
PERALATAN
7,548.75
NO.
A.
:
:
:
KOMPONEN
A.010
Pembuatan bedeng buruh
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
5
Pekerja Biasa
Tukang Kayu
Tukang Batu
Kepala Tukang Kayu
Mandor
BAHAN
1
2
3
4
5
6
7
8
9
10
Balok
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Cor
Stenslah/batu pecah tangan 2/3
Atap Seng Gelombang
Jendela Nako + accessories
Multiplek 6 mm
Grendel Pintu
Engsel Pintu
L17
L08
L07
L03
L01
PERALATAN
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
2.0000
1.0000
1.0000
0.3000
0.0500
42,900.00
51,975.00
51,975.00
55,275.00
65,175.00
85,800.00
51,975.00
51,975.00
16,582.50
3,258.75
m
kg
kg
m
m
Ibr
m
lbr
bh
bh
0.2100
0.3000
10.5000
0.0300
0.0500
0.5000
0.0750
1.1500
2.0000
2.0000
5,559,435.00
21,780.00
1,350.00
130,000.00
215,000.00
81,553.50
231,808.50
81,742.50
21,546.00
31,482.00
1,167,481.35
6,534.00
14,175.00
3,900.00
10,750.00
40,776.75
17,385.64
94,003.88
43,092.00
62,964.00
JUMLAH HARGATENAGA
209,591.25
M062
M140
M037
M004
M014
M178
M285
M216
M262
M257
1,461,062.61
1,670,653.86
NO.
A.
:
:
:
KOMPONEN
A.011
Pembuatan bak adukan ukuran (40 x 50 x 20) cm
bh
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
1
2
3
Papan (2x20) cm
Paku Kayu Segala Ukuran
Usuk 5/7
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.0015
42,900.00
51,975.00
55,275.00
65,175.00
m
kg
m
0.0360
0.0800
0.0150
6,611,220.00
21,780.00
4,958,415.00
JUMLAH HARGATENAGA
15,592.50
97.76
15,690.26
M063
M140
M061
238,003.92
1,742.40
74,376.23
314,122.55
PERALATAN
329,812.81
NO.
A.
:
:
:
KOMPONEN
A.012
Pembuatan jalan sementara
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
0.0500
42,900.00
51,975.00
55,275.00
65,175.00
m
m
m
0.1500
0.0900
0.0100
127,809.00
142,956.00
90,000.00
JUMLAH HARGATENAGA
42,900.00
3,258.75
46,158.75
1
2
3
PERALATAN
M011
M016
M002
19,171.35
12,866.04
900.00
32,937.39
79,096.14
NO.
A.
:
:
:
KOMPONEN
A.013
Bongkar pasang kayu kuda-kuda / kusen / loteng
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
PERALATAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
4.0000
6.0000
0.6000
0.0600
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH HARGATENAGA
171,600.00
311,850.00
33,165.00
3,910.50
520,525.50
520,525.50
NO.
A.
:
:
:
KOMPONEN
A.014
Bongkaran beton bertulang
m3
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
PERALATAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
6.6670
0.3330
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH HARGATENAGA
286,014.30
21,703.28
307,717.58
307,717.58
NO.
A.
:
:
:
KOMPONEN
A.015
Bongkaran tembok bata merah
m3
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
PERALATAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
6.6670
0.0330
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH HARGATENAGA
286,014.30
2,150.78
288,165.08
288,165.08
NO.
A.
:
:
:
KOMPONEN
A.016
Bongkaran atap
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
PERALATAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.1000
0.0500
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH HARGATENAGA
47,190.00
3,258.75
50,448.75
50,448.75
NO.
A.
:
:
:
KOMPONEN
A.017
Bongkaran lantai
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
PERALATAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.0100
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH HARGATENAGA
8,580.00
651.75
9,231.75
9,231.75
NO.
A.
:
:
:
KOMPONEN
A.018
Bongkaran plafon
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
PERALATAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.0600
0.0060
0.0100
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH HARGATENAGA
8,580.00
3,118.50
331.65
651.75
12,681.90
12,681.90
NO.
A.
:
:
:
KOMPONEN
A.019
Bongkaran penutup atap lama (Genteng)
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
JUMLAH HARGATENAGA
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1000
42,900.00
51,975.00
55,275.00
65,175.00
8,580.00
6,517.50
15,097.50
PERALATAN
15,097.50
1,509.75
NO.
A.
:
:
:
KOMPONEN
A.020
Bongkaran rangka penutup atap lama (Usuk+Reng)
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
PERALATAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
0.2500
0.0250
0.0500
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH HARGATENAGA
42,900.00
12,993.75
1,381.88
3,258.75
60,534.38
60,534.38
6,053.44
NO.
A.
:
:
:
KOMPONEN
A.021
Bongkaran konstruksi atap lama
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
PERALATAN
4.0000
6.0000
0.6000
0.2000
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH HARGATENAGA
171,600.00
311,850.00
33,165.00
13,035.00
529,650.00
529,650.00
52,965.00
NO.
A.
:
:
:
KOMPONEN
A.022
Bongkaran plafon
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.1000
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH HARGATENAGA
25,987.50
6,517.50
32,505.00
PERALATAN
10 m2
1 m2
32,505.00
3,250.50
NO.
A.
:
:
:
KOMPONEN
A.023
Mengupas plesteran Lama
m
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
L17
L08
L03
L01
PERALATAN
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.0250
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH HARGATENAGA
21,450.00
1,629.38
23,079.38
23,079.38
2,307.94
:
:
:
NO.
B.001
Galian tanah biasa sedalam 1 m
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
BAHAN
PERALATAN
Org/hr
Org/hr
Org/hr
Org/hr
PERKIRAAN
KUANTITAS
0.7500
0.0250
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
32,175.00
1,629.38
33,804.38
33,804.38
:
:
:
NO.
B.008
Pembuangan tanah sejauh 30 m
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
BAHAN
PERALATAN
Org/hr
Org/hr
Org/hr
Org/hr
PERKIRAAN
KUANTITAS
0.3300
0.0100
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
14,157.00
651.75
14,808.75
14,808.75
:
:
:
NO.
B.009
Urugan kembali
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
BAHAN
PERALATAN
Org/hr
Org/hr
Org/hr
Org/hr
PERKIRAAN
KUANTITAS
0.3000
0.0150
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
12,870.00
977.63
13,847.63
13,847.63
:
:
:
NO.
B.011
Urugan pasir
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.0100
1.2000
BAHAN
Pasir Urug
M001
JUMLAH HARGA BAHAN
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
12,870.00
651.75
13,521.75
77,395.50
92,874.60
92,874.60
106,396.35
:
:
:
NO.
B.015
Urugan sirtu padat untuk peninggian lantai bangunan
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.0250
1.2000
BAHAN
Sirtu
M007
JUMLAH HARGA BAHAN
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
10,725.00
1,629.38
12,354.38
109,053.00
130,863.60
130,863.60
143,217.98
NO.
:
:
:
B.020
Pembuangan tanah sejauh > 1 km
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
PERKIRAAN
KUANTITAS
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.3300
0.0100
E38
hari
0.0095238095
BAHAN
PERALATAN
Sewa Dump Truk (Dump Truck 3.5 Ton)
JUMLAH HARGA PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
14,157.00
651.75
14,808.75
2,025,215.00
19,287.76
19,287.76
34,096.51
:
:
:
NO.
C.002
Pasang pondasi batu kali, 1 Pc : 4 Ps
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
1.5000
0.7500
0.0750
0.0750
m
kg
m
1.2000
163.0000
0.5200
BAHAN
1
2
3
Batu Kali
Portland Cement (PC)
Pasir Pasang
M012
M037
M002
PERALATAN
JUMLAH HARGA PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
64,350.00
38,981.25
4,145.63
4,888.13
112,365.00
100,000.00
1,350.00
90,000.00
120,000.00
220,050.00
46,800.00
386,850.00
499,215.00
:
:
:
NO.
C.004
Pasang pondasi batu kali, 1 Pc : 6 Ps
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
1.5000
0.7500
0.0750
0.0750
m
kg
m
1.2000
117.0000
0.5610
BAHAN
1
2
3
Batu Kali
Portland Cement (PC)
Pasir Pasang
M012
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
64,350.00
38,981.25
4,145.63
4,888.13
112,365.00
100,000.00
1,350.00
90,000.00
120,000.00
157,950.00
50,490.00
328,440.00
440,805.00
:
:
:
NO.
C.009
Pasang pondasi batu kosong
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.7800
0.3900
0.0390
0.0390
m
m
1.2000
0.4320
BAHAN
1
2
Batu Kali
Pasir Urug
M012
M001
JUMLAH HARGA BAHAN
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
33,462.00
20,270.25
2,155.73
2,541.83
58,429.80
100,000.00
77,395.50
120,000.00
33,434.86
153,434.86
211,864.66
:
:
:
NO.
D.003
Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.2000
0.0200
0.0300
bh
kg
m
140.0000
26.5500
0.0930
BAHAN
1
2
3
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
25,740.00
10,395.00
1,105.50
1,955.25
39,195.75
570.00
1,350.00
90,000.00
79,800.00
35,842.50
8,370.00
124,012.50
163,208.25
:
:
:
NO.
D.005
Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.6000
0.2000
0.0200
0.0300
bh
kg
m
140.0000
18.5000
0.1220
BAHAN
1
2
3
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
25,740.00
10,395.00
1,105.50
1,955.25
39,195.75
570.00
1,350.00
90,000.00
79,800.00
24,975.00
10,980.00
115,755.00
154,950.75
:
:
:
NO.
D.009
Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
bh
kg
m
70.0000
11.5000
0.0430
BAHAN
1
2
3
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
PERALATAN
JUMLAH HARGA PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
12,870.00
5,197.50
552.75
977.63
19,597.88
570.00
1,350.00
90,000.00
39,900.00
15,525.00
3,870.00
59,295.00
78,892.88
:
:
:
NO.
D.011
Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
bh
kg
m
70.0000
8.3200
0.0490
BAHAN
1
2
3
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
12,870.00
5,197.50
552.75
977.63
19,597.88
570.00
1,350.00
90,000.00
39,900.00
11,232.00
4,410.00
55,542.00
75,139.88
:
:
:
NO.
E.004
Plesteran 1 Pc : 4 Ps, tebal 15 mm
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1500
0.0150
0.0150
kg
m
6.2400
0.0240
BAHAN
1
2
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
12,870.00
7,796.25
829.13
977.63
22,473.00
1,350.00
90,000.00
8,424.00
2,160.00
10,584.00
33,057.00
:
:
:
NO.
E.006
Plesteran 1 Pc : 6 Ps, tebal 15 mm
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1500
0.0150
0.0150
kg
m
4.4160
0.0270
BAHAN
1
2
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
12,870.00
7,796.25
829.13
977.63
22,473.00
1,350.00
90,000.00
5,961.60
2,430.00
8,391.60
30,864.60
:
:
:
NO.
E.015
Plesteran 1 Pc : 4 Ps, tebal 20 mm
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0220
kg
m
8.3200
0.0320
BAHAN
1
2
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
17,160.00
10,395.00
1,105.50
1,433.85
30,094.35
1,350.00
90,000.00
11,232.00
2,880.00
14,112.00
44,206.35
:
:
:
NO.
E.014
Plesteran 1 Pc : 3 Ps, tebal 20 mm
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.2600
0.2000
0.0200
0.0130
kg
m
10.3680
0.0310
BAHAN
1
2
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
11,154.00
10,395.00
1,105.50
847.28
23,501.78
1,350.00
90,000.00
13,996.80
2,790.00
16,786.80
40,288.58
:
:
:
NO.
E.023
Plesteran Ciprat 1 Pc : 2 Ps,
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1000
0.0100
0.0150
kg
m
4.3200
0.0060
BAHAN
1
2
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
12,870.00
5,197.50
552.75
977.63
19,597.88
1,350.00
90,000.00
5,832.00
540.00
6,372.00
25,969.88
:
:
:
NO.
E.024
Plesteran siar pasangan batu kali adukan 1 Pc : 2 Ps
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.3000
0.1500
0.0150
0.0150
kg
m
6.3400
0.0120
BAHAN
1
2
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
12,870.00
7,796.25
829.13
977.63
22,473.00
1,350.00
90,000.00
8,559.00
1,080.00
9,639.00
32,112.00
:
:
:
NO.
E.025
Benangan
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.1200
-
kg
m
6.5000
0.0210
BAHAN
1
2
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
6,237.00
6,237.00
1,350.00
90,000.00
8,775.00
1,890.00
10,665.00
16,902.00
:
:
:
NO.
E.026
Acian
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1000
0.0100
0.0100
kg
3.2500
BAHAN
M037
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
8,580.00
5,197.50
552.75
651.75
14,982.00
1,350.00
4,387.50
4,387.50
19,369.50
:
:
:
NO.
E.027
Finishing beton expose
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0700
0.0070
0.0080
kg
m
4.3200
0.0160
BAHAN
1
2
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
6,435.00
3,638.25
386.93
521.40
10,981.58
1,350.00
90,000.00
5,832.00
1,440.00
7,272.00
18,253.58
:
:
:
NO.
E.028
Benangan Sudut
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.1200
-
kg
1.6250
BAHAN
M037
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
6,237.00
6,237.00
1,350.00
2,193.75
2,193.75
8,430.75
:
:
:
NO.
F.012a
Pasang pintu panel kayu meranti
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
Papan (3x30) cm
Lem Kayu
M065
M422
PERALATAN
m
kg
PERKIRAAN
KUANTITAS
1.0000
3.0000
0.3000
0.0500
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
42,900.00
155,925.00
16,582.50
3,258.75
218,666.25
0.0400
0.5000
6,939,900.00
29,502.00
277,596.00
14,751.00
292,347.00
1 m2
Bh (Uk 80x210 cm)
511,013.25
858,502.26
:
:
:
NO.
F.012b
Pasang pintu panel kayu meranti. Lapis alum
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
Papan (3x30) cm
Lem Kayu
Lapis aluminum jeruk
M065
M422
M497
PERALATAN
m
kg
m2
PERKIRAAN
KUANTITAS
1.0000
3.0000
0.3000
0.0500
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
42,900.00
155,925.00
16,582.50
3,258.75
218,666.25
0.0400
0.5000
1.0000
6,939,900.00
29,502.00
27,000.00
277,596.00
14,751.00
27,000.00
319,347.00
1 m2
Bh (Uk 70x210 cm)
538,013.25
790,879.48
:
:
:
NO.
F.091
Pasang lisplang ukuran (3 x 30) cm, kayu mer
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
Papan (3x30) cm
Paku Kayu Segala Ukuran
M065
M140
PERALATAN
m
kg
PERKIRAAN
KUANTITAS
0.1000
0.2000
0.0200
0.0050
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
4,290.00
10,395.00
1,105.50
325.88
16,116.38
0.0110
0.0500
6,939,900.00
21,780.00
76,338.90
1,089.00
77,427.90
93,544.28
:
:
:
NO.
F.016
Pasang pintu dan jendela kaca freme kayu m
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
Papan (3x30) cm
Kaca Polos tebal 5 mm
Lem Kayu
M065
M271
M422
PERALATAN
m
m
kg
PERKIRAAN
KUANTITAS
0.8000
2.4000
0.2400
0.0400
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
34,320.00
124,740.00
13,266.00
2,607.00
174,933.00
0.0240
0.8464
0.3000
6,939,900.00
120,204.00
29,502.00
166,557.60
101,740.67
8,850.60
277,148.87
1 m2
Daun Pintu 80 x 210 cm
Daun Jendela (Luas Rata2 0,65 m2)
Daun Jendela BV 60 x 50 cm
452,081.87
759,497.53
293,853.21
135,624.56
:
:
:
NO.
F.020
Pasang pintu dan jendela jalusi kayu meranti
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
Papan (3x30) cm
Lem Kayu
M065
M422
PERALATAN
m
kg
PERKIRAAN
KUANTITAS
1.0000
3.0000
0.3000
0.0500
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
42,900.00
155,925.00
16,582.50
3,258.75
218,666.25
0.0640
0.5000
6,939,900.00
29,502.00
444,153.60
14,751.00
458,904.60
1 m2
Uk. 50 x 110 cm
677,570.85
372,663.97
:
:
:
NO.
F.045
Pasang konstruksi kuda-kuda kayu meranti
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
Balok
Besi Strip / Plat Plendes
Paku Kayu Segala Ukuran
M062
M114
M140
PERALATAN
m
kg
kg
PERKIRAAN
KUANTITAS
4.0000
12.0000
1.2000
0.2000
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
171,600.00
623,700.00
66,330.00
13,035.00
874,665.00
1.1000
15.0000
5.6000
5,559,435.00
9,702.00
21,780.00
6,115,378.50
145,530.00
121,968.00
6,382,876.50
7,257,541.50
:
:
:
NO.
F.049
Pasang konstruksi gording kayu meranti
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
Balok
Besi Strip / Plat Plendes
Paku Kayu Segala Ukuran
M062
M114
M140
PERALATAN
m
kg
kg
PERKIRAAN
KUANTITAS
2.4000
7.2000
0.7200
0.1200
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
102,960.00
374,220.00
39,798.00
7,821.00
524,799.00
1.1000
15.0000
3.0000
5,559,435.00
9,702.00
21,780.00
6,115,378.50
145,530.00
65,340.00
6,326,248.50
6,851,047.50
:
:
:
NO.
F.067
Pasang kaso + reng genteng beton kayu mer
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
Usuk 5/7
Paku Kayu Segala Ukuran
Reng 2/3, 3/5
M061
M140
M060
PERALATAN
m
kg
m
PERKIRAAN
KUANTITAS
0.1000
0.1000
0.0100
0.0050
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
4,290.00
5,197.50
552.75
325.88
10,366.13
0.0140
0.2500
0.0090
4,958,415.00
21,780.00
4,958,415.00
69,417.81
5,445.00
44,625.74
119,488.55
129,854.67
:
:
:
NO.
F.079
Pasang Kembali rangka langit-langit (1.0 x 1.0
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
M140
PERALATAN
kg
PERKIRAAN
KUANTITAS
0.1500
0.3000
0.0300
0.0750
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
6,435.00
15,592.50
1,658.25
4,888.13
28,573.88
0.2000
21,780.00
4,356.00
4,356.00
32,929.88
:
:
:
NO.
G.001
Beton mutu fc'=7,4 Mpa (K100) slump (12
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
M037
M004
M019
M486
kg
m
m
Itr
PERALATAN
NO.
:
:
:
KOMPONEN
G.002
Beton mutu fc'=9,8 Mpa (K125) slump (12
m3
SATUAN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
M037
M004
M019
M486
kg
m
m
Itr
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
G.003
Beton mutu fc'=12,2 Mpa (K150) slump (1
m3
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
M037
M004
M019
kg
m
m
Air Bersih
M486
Itr
PERALATAN
:
:
:
NO.
G.004
Lantai kerja beton mutu fc'=7,4 Mpa (K10
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
M037
M004
M019
M486
kg
m
m
Itr
PERALATAN
G.005
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
M037
M004
M019
M486
kg
m
m
Itr
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
G.006
Beton mutu fc'=16,9 Mpa (K200) slump (1
m3
SATUAN
L17
L07
L02
Org/hr
Org/hr
Org/hr
Mandor
L01
Org/hr
BAHAN
1
2
3
4
M037
M004
M019
M486
kg
m
m
Itr
PERALATAN
:
:
:
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
G.007
Beton mutu fc'=19,3 Mpa (K225) slump (1
m3
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
PERALATAN
M037
M004
M019
M486
kg
m
m
Itr
:
:
:
NO.
G.008
Beton mutu fc'=24,0 Mpa (K275) slump (1
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
M037
M004
M019
M486
kg
m
m
Itr
PERALATAN
:
:
:
G.009
Beton mutu fc'=21,7 Mpa (K250) slump (1
m3
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
M037
M004
M019
M486
kg
m
m
Itr
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
JUMLAH HARGA TENAGA
BAHAN
G.010
Beton mutu fc'=26,4 Mpa (K300) slump (1
m3
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
1
2
3
4
M037
M004
M019
M486
kg
m
m
Itr
PERALATAN
:
:
:
NO.
G.011
Beton mutu fc'=28,8 Mpa (K325) slump (1
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
M037
M004
M019
M486
PERALATAN
kg
m
m
Itr
:
:
:
NO.
G.012
Beton mutu fc'=31,2 Mpa (K350) slump (1
m3
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
M037
M004
M019
M486
kg
m
m
Itr
PERALATAN
NO.
A.
:
:
:
KOMPONEN
TENAGA
G.013
Beton kedap air dengan strorox - 100
m3
SATUAN
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
M037
M004
M019
M476
M486
kg
m
m
kg
Itr
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
G.014
Pasang PVC Waterstop lebar 150 mm
m
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
M467
PERALATAN
:
:
:
NO.
G.015
Pasang PVC Waterstop lebar 200 mm
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
M468
PERALATAN
:
:
:
G.016
Pasang PVC Waterstop lebar 230 mm - 32
m
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
M469
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
JUMLAH HARGA TENAGA
BAHAN
G.017
Pembesian dengan besi polos
kg
SATUAN
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
1
2
M112
M135
kg
kg
PERALATAN
:
:
:
NO.
G.018
Pembesian dengan besi ulir
kg
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
M113
M135
kg
kg
PERALATAN
G.019
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
Kabel prestressed
Kawat Beton/Bendrat RRT
M118
M135
kg
kg
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
G.020
Memasang 1 kg jaring kawat baja / wire m
kg
SATUAN
L17
L09
L04
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
Wire Mesh
Kawat Beton/Bendrat RRT
M148.a
M135
kg
kg
PERALATAN
:
:
:
NO.
G.021
Pasang bekisting untuk pondasi
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
M085
M140
M474
PERALATAN
m
kg
Itr
:
:
:
NO.
G.022
Pasang bekisting untuk pondasi ( 2x pak
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
M085
M140
M474
m
kg
Itr
PERALATAN
NO.
A.
:
:
:
KOMPONEN
TENAGA
G.023
Pasang bekisting untuk sloof
m
SATUAN
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
M085
M140
M474
m
kg
Itr
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
G.024
Pasang bekisting untuk sloof ( 2x pakai )
m
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
M085
M140
M474
m
kg
Itr
PERALATAN
:
:
:
NO.
G.025
Pasang bekisting untuk kolom
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
m
kg
Itr
m
lbr
btg
PERALATAN
:
:
:
G.026
Pasang bekisting untuk kolom ( 2x pakai
m
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
m
kg
Itr
m
lbr
btg
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
G.027
Pasang bekisting untuk balok
m
SATUAN
L17
L08
L03
Org/hr
Org/hr
Org/hr
Mandor
L01
Org/hr
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
m
kg
Itr
m
lbr
btg
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
G.028
Pasang bekisting untuk balok ( 2x pakai
m
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
m
kg
Itr
m
lbr
btg
PERALATAN
:
:
:
NO.
G.029
Pasang bekisting untuk plat lantai
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
m
kg
Itr
m
lbr
btg
PERALATAN
KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
:
NO.
G.030
Pasang bekisting untuk plat lantai ( 2x pa
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
m
kg
Itr
m
lbr
btg
PERALATAN
NO.
A.
:
:
:
KOMPONEN
TENAGA
G.031
Pasang bekisting untuk dinding
m
SATUAN
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
7
M085
M140
M474
M084
M217
M089
M477
m
kg
Itr
m
lbr
btg
bh
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
G.032
Pasang bekisting untuk dinding ( 2x paka
m
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
M085
M140
m
kg
3
4
5
6
7
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
Formtie
M474
M084
M217
M089
M477
Itr
m
lbr
btg
bh
PERALATAN
:
:
:
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
G.033
Pasang bekisting untuk tangga
m
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
PERALATAN
M085
M140
M474
M084
M217
M089
m
kg
Itr
m
lbr
btg
:
:
:
NO.
G.034
Pasang bekisting untuk tangga ( 2x paka
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
m
kg
Itr
m
lbr
btg
PERALATAN
:
:
:
G.035
Pasang bekisting jembatan untuk pengec
m
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
M084
M140
M089
m
kg
btg
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
JUMLAH HARGA TENAGA
G.036
Pondasi beton bertulang (150 kg besi + b
m3
SATUAN
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
7
8
M084
M140
M474
M112
M135
M037
M004
M019
m
kg
Itr
kg
kg
kg
m
m
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
G.037
Sloof beton bertulang (200 kg besi + beki
m3
SATUAN
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
M085
M140
M474
M112
M135
m
kg
Itr
kg
kg
6
7
8
M037
M004
M019
kg
m
m
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
G.038
Kolom beton bertulang (150 kg besi + be
m3
SATUAN
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
7
8
9
10
11
M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089
m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg
PERALATAN
:
:
:
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
G.039
Kolom beton bertulang (300 kg besi + be
m3
SATUAN
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
7
8
9
10
11
PERALATAN
M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089
m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg
:
:
:
NO.
G.040
Balok beton bertulang (200 kg besi + bek
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
7
8
9
10
11
M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089
m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg
PERALATAN
KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
:
NO.
G.041
Dinding beton bertulang (150 kg besi + b
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
7
8
9
10
11
M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089
m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg
PERALATAN
:
:
:
G.042
Dinding beton bertulang (200 kg besi + b
m3
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
7
8
9
10
11
M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089
m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg
PERALATAN
NO.
:
:
:
KOMPONEN
G.043
Kolom penguat beton bertulang (11 x 11)
m
SATUAN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
7
M085
M140
M112
M135
M037
M004
M019
m
kg
kg
kg
kg
m
m
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
G.044
Ring balok beton bertulang (10 x 15) cm
m
SATUAN
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
6
7
M085
M140
M112
M135
M037
M004
M019
m
kg
kg
kg
kg
m
m
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
G.045
Sloof beton bertulang (10 x 15) cm
m
SATUAN
L17
L07
L08
L09
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
4
5
M085
M140
M112
M135
M037
m
kg
kg
kg
kg
6
7
Pasir Cor
Batu pecah mesin 2/3
M004
M019
PERALATAN
m
m
PERKIRAAN
KUANTITAS
1.6500
0.2750
0.0280
0.0830
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
70,785.00
14,293.13
1,547.70
5,409.53
92,035.35
247.0000
0.6207
0.7400
215.000
1,350.00
130,000.00
189,387.00
27.00
333,450.00
80,692.86
140,146.38
5,805.00
560,094.24
652,129.59
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
1.6500
0.2750
0.0280
0.0830
42,900.00
51,975.00
55,275.00
65,175.00
70,785.00
14,293.13
1,547.70
5,409.53
92,035.35
276.0000
0.5914
0.7496
215.000
1,350.00
130,000.00
189,387.00
27.00
372,600.00
76,885.71
141,970.11
5,805.00
597,260.82
689,296.17
PERKIRAAN
KUANTITAS
1.6500
0.2750
0.0280
0.0830
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
70,785.00
14,293.13
1,547.70
5,409.53
92,035.35
299.0000
0.5707
0.7533
1,350.00
130,000.00
189,387.00
403,650.00
74,192.86
142,671.54
215.000
27.00
5,805.00
626,319.40
718,354.75
PERKIRAAN
KUANTITAS
1.2000
0.2000
0.0200
0.0600
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
51,480.00
10,395.00
1,105.50
3,910.50
66,891.00
230.0000
0.6379
0.7607
215.000
1,350.00
130,000.00
189,387.00
27.00
310,500.00
82,921.43
144,074.41
5,805.00
543,300.84
610,191.84
Beton mutu fc'=14,5 Mpa (K175) slump (12 2) cm, w/c = 0,66
PERKIRAAN
KUANTITAS
1.6500
0.2750
0.0280
0.0830
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
70,785.00
14,293.13
1,547.70
5,409.53
92,035.35
326.0000
0.5429
0.7622
215.000
1,350.00
130,000.00
189,387.00
27.00
440,100.00
70,571.43
144,354.98
5,805.00
660,831.41
752,866.76
PERKIRAAN
KUANTITAS
1.6500
0.2750
0.0280
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
JUMLAH
HARGA
(Rp.)
70,785.00
14,293.13
1,547.70
0.0830
65,175.00
5,409.53
92,035.35
352.0000
0.5221
0.7637
215.000
1,350.00
130,000.00
189,387.00
27.00
475,200.00
67,878.57
144,635.55
5,805.00
693,519.12
785,554.47
PERKIRAAN
KUANTITAS
1.6500
0.2750
0.0280
0.0830
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
70,785.00
14,293.13
1,547.70
5,409.53
92,035.35
371.0000
0.4986
0.7756
215.000
1,350.00
130,000.00
189,387.00
27.00
500,850.00
64,814.29
146,880.14
5,805.00
718,349.43
810,384.78
PERKIRAAN
KUANTITAS
1.6500
0.2750
0.0280
0.0830
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
70,785.00
14,293.13
1,547.70
5,409.53
92,035.35
406.0000
0.4886
0.7600
215.000
1,350.00
130,000.00
189,387.00
27.00
548,100.00
63,514.29
143,934.12
5,805.00
761,353.41
853,388.76
PERKIRAAN
HARGA
JUMLAH
KUANTITAS
1.6500
0.2750
0.0280
0.0830
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
HARGA
(Rp.)
70,785.00
14,293.13
1,547.70
5,409.53
92,035.35
384.0000
0.4943
0.7696
215.000
1,350.00
130,000.00
189,387.00
27.00
518,400.00
64,257.14
145,757.85
5,805.00
734,219.99
826,255.34
PERKIRAAN
KUANTITAS
1.6500
0.2750
0.0280
0.0830
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
70,785.00
14,293.13
1,547.70
5,409.53
92,035.35
413.0000
0.4864
0.7563
215.000
1,350.00
130,000.00
189,387.00
27.00
557,550.00
63,235.71
143,232.69
5,805.00
769,823.40
861,858.75
PERKIRAAN
KUANTITAS
2.1000
0.3500
0.0350
0.1050
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
90,090.00
18,191.25
1,934.63
6,843.38
117,059.25
439.0000
0.4786
0.7452
215.000
1,350.00
130,000.00
189,387.00
27.00
592,650.00
62,214.29
141,128.39
5,805.00
801,797.67
918,856.92
PERKIRAAN
KUANTITAS
2.1000
0.3500
0.0350
0.1050
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
90,090.00
18,191.25
1,934.63
6,843.38
117,059.25
448.0000
0.4764
0.7407
215.000
1,350.00
130,000.00
189,387.00
27.00
604,800.00
61,935.71
140,286.67
5,805.00
812,827.38
929,886.63
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
2.1000
0.3500
0.0350
0.1050
42,900.00
51,975.00
55,275.00
65,175.00
90,090.00
18,191.25
1,934.63
6,843.38
117,059.25
400.0000
0.4800
0.8000
1.2000
210.0000
1,350.00
130,000.00
189,387.00
102,762.00
27.00
540,000.00
62,400.00
151,509.60
123,314.40
5,670.00
882,894.00
999,953.25
PERKIRAAN
KUANTITAS
0.0600
0.0300
0.0030
0.0030
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
2,574.00
1,559.25
165.83
195.53
4,494.60
1.0500
40,446.00
42,468.30
42,468.30
46,962.90
PERKIRAAN
KUANTITAS
0.0700
0.0350
0.0040
0.0040
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
3,003.00
1,819.13
221.10
260.70
5,303.93
1.0500
72,859.50
76,502.48
76,502.48
81,806.40
PERKIRAAN
KUANTITAS
0.0800
0.0400
0.0040
0.0040
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
3,432.00
2,079.00
221.10
260.70
5,992.80
1.0500
84,861.00
89,104.05
89,104.05
95,096.85
PERKIRAAN
KUANTITAS
0.0070
0.0070
0.0007
0.0004
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
300.30
363.83
38.69
26.07
728.89
1.0500
0.0150
9,750.00
17,293.50
10,237.50
259.40
10,496.90
11,225.79
PERKIRAAN
KUANTITAS
0.0070
0.0070
0.0007
0.0004
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
300.30
363.83
38.69
26.07
728.89
1.0500
0.0150
14,157.00
17,293.50
14,864.85
259.40
15,124.25
15,853.14
PERKIRAAN
KUANTITAS
0.0050
0.0050
0.0005
0.0003
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
214.50
259.88
27.64
19.55
521.57
1.0500
0.0100
29,700.00
17,293.50
31,185.00
172.94
31,357.94
31,879.50
PERKIRAAN
KUANTITAS
0.0250
0.0250
0.0020
0.0010
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
1,072.50
1,299.38
110.55
65.18
2,547.60
1.0200
0.0500
16,537.50
17,293.50
16,868.25
864.68
17,732.93
20,280.53
PERKIRAAN
KUANTITAS
0.5200
0.2600
0.0260
0.0260
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
22,308.00
13,513.50
1,437.15
1,694.55
38,953.20
0.0400
0.3000
0.1000
3,712,500.00
21,780.00
2,574.00
148,500.00
6,534.00
257.40
155,291.40
194,244.60
PERKIRAAN
KUANTITAS
0.5200
0.2600
0.0260
0.0260
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
22,308.00
13,513.50
1,437.15
1,694.55
38,953.20
0.0200
0.1500
0.0500
3,712,500.00
21,780.00
2,574.00
74,250.00
3,267.00
128.70
77,645.70
116,598.90
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
0.5200
0.2600
0.0260
0.0260
42,900.00
51,975.00
55,275.00
65,175.00
22,308.00
13,513.50
1,437.15
1,694.55
38,953.20
0.0450
0.3000
0.1000
3,712,500.00
21,780.00
2,574.00
212,807.10
PERKIRAAN
KUANTITAS
0.5200
0.2600
0.0260
0.0260
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
22,308.00
13,513.50
1,437.15
1,694.55
38,953.20
0.0225
0.1500
0.0500
3,712,500.00
21,780.00
2,574.00
125,880.15
PERKIRAAN
KUANTITAS
0.6600
0.3300
0.0330
0.0330
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
0.0400
0.4000
0.2000
0.0150
0.3500
2.0000
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
148,500.00
8,712.00
514.80
49,584.15
43,725.15
55,188.00
306,224.10
355,664.70
1.008
PERKIRAAN
KUANTITAS
0.6600
0.3300
0.0330
0.0330
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
0.0200
0.2000
0.1000
0.0075
0.1750
1.0000
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
74,250.00
4,356.00
257.40
24,792.08
21,862.58
27,594.00
153,112.05
202,552.65
PERKIRAAN
KUANTITAS
0.6600
0.3300
0.0330
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
1.008
0.0330
65,175.00
2,150.78
49,440.60
0.0400
0.4000
0.2000
0.0180
0.3500
2.0000
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
148,500.00
8,712.00
514.80
59,500.98
43,725.15
55,188.00
316,140.93
365,581.53
PERKIRAAN
KUANTITAS
0.6600
0.3300
0.0330
0.0330
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
0.0200
0.2000
0.1000
0.0090
0.1750
1.0000
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
74,250.00
4,356.00
257.40
29,750.49
21,862.58
27,594.00
158,070.47
207,511.07
PERKIRAAN
KUANTITAS
0.6600
0.3300
0.0330
0.0330
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
148,500.00
8,712.00
514.80
49,584.15
43,725.15
165,564.00
416,600.10
466,040.70
PERKIRAAN
KUANTITAS
0.6600
0.3300
0.0330
0.0330
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
0.0200
0.2000
0.1000
0.0075
0.1750
3.0000
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
74,250.00
4,356.00
257.40
24,792.08
21,862.58
82,782.00
208,300.05
257,740.65
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
0.6600
0.3300
0.0330
0.0330
42,900.00
51,975.00
55,275.00
65,175.00
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
8,712.00
111,375.00
8,712.00
514.80
66,112.20
43,725.15
82,782.00
34,848.00
348,069.15
397,509.75
PERKIRAAN
KUANTITAS
0.6600
0.3300
0.0330
0.0330
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
0.0150
0.2000
3,712,500.00
21,780.00
55,687.50
4,356.00
0.1000
0.0100
0.1750
1.5000
2.0000
2,574.00
3,305,610.00
124,929.00
27,594.00
8,712.00
257.40
33,056.10
21,862.58
41,391.00
17,424.00
174,034.58
223,475.18
PERKIRAAN
KUANTITAS
0.6600
0.3300
0.0330
0.0330
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
0.0300
0.4000
0.1500
0.0150
0.3500
2.0000
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
111,375.00
8,712.00
386.10
49,584.15
43,725.15
55,188.00
268,970.40
318,411.00
PERKIRAAN
KUANTITAS
0.6600
0.3300
0.0330
0.0330
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
0.0150
0.2000
0.0750
0.0075
0.1750
1.0000
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
55,687.50
4,356.00
193.05
24,792.08
21,862.58
27,594.00
134,485.20
183,925.80
PERKIRAAN
KUANTITAS
0.1500
0.0500
0.0050
0.0080
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
6,435.00
2,598.75
276.38
521.40
9,831.53
0.0264
0.6000
0.5000
3,305,610.00
21,780.00
27,594.00
87,268.10
13,068.00
13,797.00
114,133.10
123,964.63
PERKIRAAN
KUANTITAS
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
227,370.00
14,293.13
67,567.50
54,573.75
14,482.05
17,271.38
395,557.80
0.2000
1.5000
0.4000
157.5000
2.2500
336.0000
0.5400
0.8100
3,305,610.00
21,780.00
2,574.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
661,122.00
32,670.00
1,029.60
1,535,625.00
38,910.38
453,600.00
70,200.00
153,403.47
2,946,560.45
3,342,118.25
PERKIRAAN
KUANTITAS
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
242,385.00
14,293.13
81,081.00
72,765.00
17,853.83
18,444.53
446,822.48
0.2700
2.0000
0.6000
210.0000
3.0000
3,712,500.00
21,780.00
2,574.00
9,750.00
17,293.50
1,002,375.00
43,560.00
1,544.40
2,047,500.00
51,880.50
336.0000
0.5400
0.8100
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
3,824,063.37
4,270,885.85
PERKIRAAN
KUANTITAS
5.3000
0.2750
1.3000
1.0500
0.2650
0.2650
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
227,370.00
14,293.13
67,567.50
54,573.75
14,647.88
17,271.38
395,723.63
0.3200
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1200
2.8000
32.0000
3,712,500.00
21,780.00
2,574.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
3,305,610.00
124,929.00
27,594.00
1,188,000.00
69,696.00
4,118.40
1,535,625.00
38,910.38
453,600.00
70,200.00
153,403.47
396,673.20
349,801.20
883,008.00
5,143,035.65
5,538,759.27
PERKIRAAN
KUANTITAS
7.0500
0.2750
1.6500
2.1000
0.4030
0.3530
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
302,445.00
14,293.13
85,758.75
109,147.50
22,275.83
23,006.78
556,926.98
0.4000
4.0000
2.0000
315.0000
4.5000
336.0000
0.5400
0.8100
0.1500
3.5000
20.0000
3,712,500.00
21,780.00
2,574.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
3,305,610.00
124,929.00
27,594.00
1,485,000.00
87,120.00
5,148.00
3,071,250.00
77,820.75
453,600.00
70,200.00
153,403.47
495,841.50
437,251.50
551,880.00
6,888,515.22
7,445,442.20
PERKIRAAN
KUANTITAS
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
272,415.00
14,293.13
85,758.75
72,765.00
18,406.58
20,725.65
484,364.10
0.3200
3.2000
1.6000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1400
2.8000
16.0000
3,712,500.00
21,780.00
2,574.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
3,305,610.00
124,929.00
27,594.00
1,188,000.00
69,696.00
4,118.40
2,047,500.00
51,880.50
453,600.00
70,200.00
153,403.47
462,785.40
349,801.20
441,504.00
5,292,488.97
5,776,853.07
PERKIRAAN
KUANTITAS
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
227,370.00
14,293.13
67,567.50
54,573.75
14,482.05
17,271.38
395,557.80
0.2400
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1600
2.8000
24.0000
3,712,500.00
21,780.00
2,574.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
3,305,610.00
124,929.00
27,594.00
891,000.00
69,696.00
4,118.40
1,535,625.00
38,910.38
453,600.00
70,200.00
153,403.47
528,897.60
349,801.20
662,256.00
4,757,508.05
5,153,065.85
PERKIRAAN
KUANTITAS
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
242,385.00
14,293.13
81,081.00
72,765.00
17,853.83
18,444.53
446,822.48
0.2500
3.0000
1.2000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1050
2.5000
14.0000
3,712,500.00
21,780.00
2,574.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
3,305,610.00
124,929.00
27,594.00
928,125.00
65,340.00
3,088.80
2,047,500.00
51,880.50
453,600.00
70,200.00
153,403.47
347,089.05
312,322.50
386,316.00
4,818,865.32
5,265,687.80
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
7,722.00
1,039.50
1,039.50
1,039.50
331.65
586.58
11,758.73
0.0020
0.0100
3.0000
0.0450
4.0000
0.0060
0.0090
3,712,500.00
21,780.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
7,425.00
217.80
29,250.00
778.21
5,400.00
780.00
1,704.48
45,555.49
57,314.22
PERKIRAAN
KUANTITAS
0.297
0.033
0.033
0.033
0.010
0.015
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
12,741.30
1,715.18
1,715.18
1,715.18
552.75
977.63
19,417.20
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
3,712,500.00
21,780.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
11,137.50
435.60
35,100.00
864.68
7,425.00
1,170.00
2,840.81
58,973.58
78,390.78
PERKIRAAN
KUANTITAS
0.275
0.033
0.033
0.033
0.010
0.015
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
11,797.50
1,715.18
1,715.18
1,715.18
552.75
977.63
18,473.40
0.0030
0.0200
3.6000
0.0500
5.5000
3,712,500.00
21,780.00
9,750.00
17,293.50
1,350.00
11,137.50
435.60
35,100.00
864.68
7,425.00
0.0090
0.0150
130,000.00
189,387.00
1,170.00
2,840.81
58,973.58
77,446.98
0.9056603774
0.024
0.024
2.88
0.3541666667
10
10
7.5
7.4074074074
4,379,788.43
:
:
:
NO.
Btn.001
Strouss 30 cm
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
Pekerja Biasa
Tukang Batu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
2.6790
0.2750
1.0290
0.1309
0.1418
BAHAN
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
147.0000
2.1000
b.
3
4
5
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
336.0000
0.5400
0.8100
PERALATAN
:
:
:
NO.
Btn. 002
Pondasi Footplat beton bertulang (150 kg besi polos + b
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
BAHAN
Bekisting dipakai 2 x
Balok Kayu Kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
M084
M140
M474
m
kg
Itr
0.1000
0.7500
0.4000
b.
4
5
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
157.5000
2.2500
c.
6
7
8
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
336.0000
0.5400
0.8100
PERALATAN
:
:
:
NO.
Btn. 003
Pondasi Footplat beton bertulang (150 kg besi ulir + bek
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
BAHAN
Bekisting dipakai 2 x
Balok Kayu Kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
M084
M140
M474
m
kg
Itr
0.1000
0.7500
0.4000
b.
4
5
Besi Tulangan
Besi Beton Ulir
Kawat Beton/Bendrat RRT
M113
M135
kg
kg
157.5000
2.2500
c.
6
7
8
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
336.0000
0.5400
0.8100
PERALATAN
:
:
:
NO.
Btn. 004
Sloof beton bertulang 20/30 + bekisting
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
7.8300
0.2750
2.6000
0.9800
0.3860
0.3990
BAHAN
Bekisting dipakai 2 x
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
M085
M140
M474
m
kg
Itr
0.2250
1.5000
1.0000
b.
4
5
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
147.0000
2.1000
c.
6
7
8
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
336.0000
0.5400
0.8100
PERALATAN
:
:
:
NO.
Btn. 005
Sloof beton bertulang 15/25 + bekisting
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
9.2833
0.2750
3.4667
0.7000
0.4447
0.4697
BAHAN
Bekisting dipakai 2 x
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
M085
M140
M474
m
kg
Itr
0.3000
2.0000
1.3333
b.
4
5
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
105.0000
1.5000
c.
6
7
8
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
336.0000
0.5400
0.8100
PERALATAN
:
:
:
NO.
Btn. 006
Kolom beton bertulang 20x20 + bekisting
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
15.8300
0.2750
6.6000
0.9800
0.7860
0.7990
BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
M140
M474
M084
M217
M089
kg
Itr
m
lbr
btg
4.0000
4.0000
0.1500
3.5000
20.0000
b.
6
7
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
147.0000
2.1000
c.
8
9
10
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
336.0000
0.5400
0.8100
PERALATAN
:
:
:
NO.
Btn. 007
Kolom beton bertulang 30x30 + bekisting
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
11.2550
0.2750
4.4000
0.8050
0.5485
0.5690
BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
M140
M474
M084
M217
M089
kg
Itr
m
lbr
btg
2.6667
2.6667
0.1000
2.3333
13.3333
b.
6
7
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
120.7500
1.7250
c.
8
9
10
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
336.0000
0.5400
0.8100
PERALATAN
:
:
:
NO.
Btn. 008
Balok beton bertulang 15/25 + bekisting
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
17.5818
0.2750
6.9385
2.0549
0.9273
0.8943
BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
M140
M474
M084
M217
M089
kg
Itr
m
lbr
btg
4.2051
4.2051
0.1892
3.6795
21.0256
b.
6
7
8
Besi Tulangan
Besi Beton Ulir
Besi Beton Polos
Kawat Beton/Bendrat RRT
M113
M112
M135
kg
kg
kg
199.3385
108.8985
4.4034
c.
9
10
11
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
336.0000
0.5400
0.8100
PERALATAN
:
:
:
NO.
Btn. 009
Balok beton bertulang 30/60 + bekisting
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
17.5818
0.2750
6.9385
2.0549
0.9273
0.8943
BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
M140
M474
M084
M217
M089
kg
Itr
m
lbr
btg
1.7500
1.7500
0.0788
1.5313
8.7500
b.
6
7
8
Besi Tulangan
Besi Beton Ulir
Besi Beton Polos
Kawat Beton/Bendrat RRT
M113
M112
M135
kg
kg
kg
115.5000
52.5000
2.4000
c.
9
10
11
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
336.0000
0.5400
0.8100
PERALATAN
:
:
:
NO.
Btn. 010
Plat Lantai Beton Bertulang + Bekisting
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
17.5818
0.2750
6.9385
2.0549
0.9273
0.8943
BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
M140
M474
M084
M217
M089
kg
Itr
m
lbr
btg
1.6667
1.6667
0.0625
1.4583
25.0000
b.
6
7
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
63.0000
0.9000
c.
8
9
10
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
336.0000
0.5400
0.8100
PERALATAN
:
:
:
NO.
Btn. 011
Plat Atap Beton Bertulang + Bekisting
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
10.3900
0.2750
4.1250
0.4900
0.4895
0.5235
BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
M140
M474
M084
M217
M089
kg
Itr
m
lbr
btg
2.5000
1.2500
0.1875
2.1875
37.5000
b.
6
7
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
73.5000
1.0500
c.
8
9
10
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
336.0000
0.5400
0.8100
PERALATAN
:
:
:
NO.
Btn. 012
Plat Tangga Beton Bertulang + Bekisting
m3
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
6.6800
0.2750
2.2000
0.6300
0.3110
0.3390
BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
M140
M474
M084
M217
M089
kg
Itr
m
lbr
btg
1.3333
1.0000
0.0500
1.1667
6.6667
b.
6
7
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
94.5000
1.3500
c.
8
9
10
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
336.0000
0.5400
0.8100
PERALATAN
:
:
:
NO.
Btn. 013
Sloof Praktis Beton bertulang 11/20 + bekisting
m'
KOMPONEN
A.
TENAGA
1
2
3
4
5
6
Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L08
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
0.2679
0.0061
0.1040
0.0236
0.0134
0.0136
BAHAN
Bekisting dipakai 2 x
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting
M085
M140
M474
m
kg
Itr
0.0090
0.0600
0.0200
b.
4
5
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
3.5453
0.0506
c.
6
7
8
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
6.4548
0.0119
0.0168
PERALATAN
:
:
:
NO.
Btn. 014
Sloof Praktis Beton bertulang 11/25
m'
KOMPONEN
A.
TENAGA
1
2
3
4
5
Pekerja Biasa
Tukang Batu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L09
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
0.0613
0.0061
0.0250
0.0031
0.0033
BAHAN
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT
M112
M135
kg
kg
3.7527
0.0536
b.
3
4
5
Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
M037
M004
M019
kg
m
m
8.0685
0.0149
0.0210
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
114,929.10
14,293.13
53,482.28
7,235.50
9,241.82
199,181.81
9,750.00
17,293.50
1,433,250.00
36,316.35
1,469,566.35
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
677,203.47
2,146,769.82
2,345,951.63
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
227,370.00
14,293.13
67,567.50
54,573.75
14,482.05
17,271.38
395,557.80
3,305,610.00
21,780.00
2,574.00
330,561.00
16,335.00
1,029.60
347,925.60
9,750.00
17,293.50
1,535,625.00
38,910.38
1,574,535.38
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
677,203.47
2,599,664.45
2,995,222.25
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
227,370.00
14,293.13
67,567.50
54,573.75
14,482.05
17,271.38
395,557.80
3,305,610.00
21,780.00
2,574.00
330,561.00
16,335.00
1,029.60
347,925.60
14,157.00
17,293.50
2,229,727.50
38,910.38
2,268,637.88
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
677,203.47
3,293,766.95
3,689,324.75
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
335,907.00
14,293.13
135,135.00
50,935.50
21,336.15
26,004.83
583,611.60
3,712,500.00
21,780.00
2,574.00
835,312.50
32,670.00
2,574.00
870,556.50
9,750.00
17,293.50
1,433,250.00
36,316.35
1,469,566.35
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
677,203.47
3,017,326.32
3,600,937.92
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
398,255.00
14,293.13
180,180.00
36,382.50
24,578.95
30,610.53
684,300.10
3,712,500.00
21,780.00
2,574.00
1,113,750.00
43,560.00
3,432.00
1,160,742.00
9,750.00
17,293.50
1,023,750.00
25,940.25
1,049,690.25
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
677,203.47
2,887,635.72
3,571,935.82
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
679,107.00
14,293.13
343,035.00
50,935.50
43,446.15
52,074.83
1,182,891.60
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
87,120.00
10,296.00
495,841.50
437,251.50
551,880.00
1,582,389.00
9,750.00
17,293.50
1,433,250.00
36,316.35
1,469,566.35
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
677,203.47
3,729,158.82
4,912,050.42
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
482,839.50
14,293.13
228,690.00
41,839.88
30,318.34
37,084.58
835,065.41
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
58,080.00
6,864.00
330,561.00
291,501.00
367,920.00
1,054,926.00
9,750.00
17,293.50
1,177,312.50
29,831.29
1,207,143.79
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
677,203.47
2,939,273.26
3,774,338.67
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
754,260.76
14,293.13
360,626.54
106,804.09
51,258.58
58,284.03
1,345,527.12
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
91,587.69
10,824.00
625,523.12
459,674.65
580,181.54
1,767,791.01
14,157.00
9,750.00
17,293.50
2,822,034.60
1,061,760.00
76,149.93
3,959,944.53
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
677,203.47
6,404,939.01
7,750,466.13
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
754,260.76
14,293.13
360,626.54
106,804.09
51,258.58
58,284.03
1,345,527.12
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
38,115.00
4,504.50
260,316.79
191,297.53
241,447.50
735,681.32
14,157.00
9,750.00
17,293.50
1,635,133.50
511,875.00
41,504.40
2,188,512.90
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
677,203.47
3,601,397.69
4,946,924.81
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
754,260.76
14,293.13
360,626.54
106,804.09
51,258.58
58,284.03
1,345,527.12
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
36,300.00
4,290.00
206,600.63
182,188.13
689,850.00
1,119,228.75
9,750.00
17,293.50
614,250.00
15,564.15
629,814.15
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
677,203.47
2,426,246.37
3,771,773.49
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
445,731.00
14,293.13
214,396.88
25,467.75
27,057.11
34,119.11
761,064.98
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
54,450.00
3,217.50
619,801.88
273,282.19
1,034,775.00
1,985,526.56
9,750.00
17,293.50
716,625.00
18,158.18
734,783.18
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
677,203.47
3,397,513.21
4,158,578.18
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
286,572.00
14,293.13
114,345.00
32,744.25
17,190.53
22,094.33
487,239.23
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
29,040.00
2,574.00
165,280.50
145,750.50
183,960.00
526,605.00
9,750.00
17,293.50
921,375.00
23,346.23
944,721.23
1,350.00
130,000.00
189,387.00
453,600.00
70,200.00
153,403.47
677,203.47
2,148,529.70
2,635,768.92
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
11,494.43
314.45
5,405.40
1,228.46
739.55
884.85
20,067.15
3,712,500.00
21,780.00
2,574.00
33,412.50
1,306.80
51.48
34,770.78
9,750.00
17,293.50
34,566.92
875.87
35,442.79
1,350.00
130,000.00
189,387.00
8,713.98
1,552.57
3,175.81
13,442.36
83,655.93
103,723.08
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
2,630.54
314.45
1,300.31
172.34
212.18
4,629.82
9,750.00
17,293.50
36,588.83
927.10
37,515.93
1,350.00
130,000.00
189,387.00
10,892.48
1,940.71
3,969.76
16,802.95
54,318.88
58,948.70
:
:
:
NO.
G.021
Pasang bekisting untuk pondasi
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.5200
0.2600
0.0260
0.0260
m
kg
Itr
0.0400
0.3000
0.1000
BAHAN
1
2
3
M085
M140
M474
PERALATAN
NO.
:
:
:
KOMPONEN
G.022
Pasang bekisting untuk pondasi ( 2x pakai )
m
SATUAN
PERKIRAAN
KUANTITAS
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.5200
0.2600
0.0260
0.0260
m
kg
Itr
0.0200
0.3000
0.1000
BAHAN
1
2
3
M085
M140
M474
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
G.023
Pasang bekisting untuk sloof
m
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.5200
0.2600
0.0260
0.0260
m
kg
Itr
0.0450
0.3000
0.1000
BAHAN
1
2
3
M085
M140
M474
PERALATAN
:
:
:
NO.
G.024
Pasang bekisting untuk sloof ( 2x pakai )
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.5200
0.2600
0.0260
0.0260
m
kg
Itr
0.0225
0.1500
0.0500
BAHAN
1
2
3
M085
M140
M474
PERALATAN
:
:
:
G.025
Pasang bekisting untuk kolom
m
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
m
kg
Itr
m
lbr
btg
0.4000
0.2000
0.0150
0.3500
2.0000
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
G.026
Pasang bekisting untuk kolom ( 2x pakai )
m
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
PERKIRAAN
KUANTITAS
0.6600
0.3300
0.0330
0.0330
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
m
kg
Itr
m
lbr
btg
0.2000
0.1000
0.0075
0.1750
1.0000
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
G.027
Pasang bekisting untuk balok
m
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
m
kg
Itr
m
lbr
btg
0.4000
0.2000
0.0180
0.3500
2.0000
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
PERALATAN
:
:
:
NO.
G.028
Pasang bekisting untuk balok ( 2x pakai )
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
m
kg
Itr
m
lbr
btg
0.2000
0.1000
0.0090
0.1750
1.0000
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
PERALATAN
G.029
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
m
kg
Itr
m
lbr
btg
0.4000
0.2000
0.0150
0.3500
6.0000
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
Pekerja Biasa
G.030
Pasang bekisting untuk plat lantai ( 2x pakai )
m
SATUAN
L17
Org/hr
PERKIRAAN
KUANTITAS
0.6600
2
3
4
Tukang Kayu
Kepala Tukang Kayu
Mandor
L08
L03
L01
Org/hr
Org/hr
Org/hr
0.3300
0.0330
0.0330
m
kg
Itr
m
lbr
btg
0.2000
0.1000
0.0075
0.1750
3.0000
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
G.031
Pasang bekisting untuk dinding
m
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
m
kg
Itr
m
0.4000
0.2000
0.0200
BAHAN
1
2
3
4
M085
M140
M474
M084
5
6
7
Multiplek 9 mm
Dolken Kayu 8 cm
Formtie
M217
M089
M477
lbr
btg
bh
0.3500
3.0000
4.0000
PERALATAN
:
:
:
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
G.032
Pasang bekisting untuk dinding ( 2x pakai )
m
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
m
kg
Itr
m
lbr
btg
bh
0.2000
0.1000
0.0100
0.1750
1.5000
2.0000
BAHAN
1
2
3
4
5
6
7
PERALATAN
M085
M140
M474
M084
M217
M089
M477
:
:
:
NO.
G.033
Pasang bekisting untuk tangga
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
m
kg
Itr
m
lbr
btg
0.4000
0.1500
0.0150
0.3500
2.0000
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
PERALATAN
NO.
:
:
:
KOMPONEN
G.034
Pasang bekisting untuk tangga ( 2x pakai )
m
SATUAN
PERKIRAAN
KUANTITAS
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.6600
0.3300
0.0330
0.0330
m
kg
Itr
m
lbr
btg
0.2000
0.0750
0.0075
0.1750
1.0000
BAHAN
1
2
3
4
5
6
M085
M140
M474
M084
M217
M089
PERALATAN
NO.
:
:
:
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
JUMLAH HARGA TENAGA
G.035
Pasang bekisting jembatan untuk pengecoran
m
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
PERKIRAAN
KUANTITAS
0.1500
0.0500
0.0050
0.0080
BAHAN
1
2
3
M084
M140
M089
PERALATAN
m
kg
btg
0.0264
0.6000
0.5000
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
22,308.00
13,513.50
1,437.15
1,694.55
38,953.20
3,712,500.00
21,780.00
2,574.00
148,500.00
6,534.00
257.40
155,291.40
194,244.60
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
22,308.00
13,513.50
1,437.15
1,694.55
38,953.20
3,712,500.00
21,780.00
2,574.00
74,250.00
6,534.00
257.40
81,041.40
119,994.60
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
22,308.00
13,513.50
1,437.15
1,694.55
38,953.20
3,712,500.00
21,780.00
2,574.00
167,062.50
6,534.00
257.40
173,853.90
212,807.10
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
22,308.00
13,513.50
1,437.15
1,694.55
38,953.20
3,712,500.00
21,780.00
2,574.00
83,531.25
3,267.00
128.70
86,926.95
125,880.15
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
8,712.00
514.80
49,584.15
43,725.15
55,188.00
157,724.10
207,164.70
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
4,356.00
257.40
24,792.08
21,862.58
27,594.00
78,862.05
128,302.65
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
8,712.00
514.80
59,500.98
43,725.15
55,188.00
167,640.93
217,081.53
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
4,356.00
257.40
29,750.49
21,862.58
27,594.00
83,820.47
133,261.07
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
8,712.00
514.80
49,584.15
43,725.15
165,564.00
268,100.10
317,540.70
HARGA
SATUAN
(Rp.)
42,900.00
JUMLAH
HARGA
(Rp.)
28,314.00
51,975.00
55,275.00
65,175.00
17,151.75
1,824.08
2,150.78
49,440.60
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
4,356.00
257.40
24,792.08
21,862.58
82,782.00
134,050.05
183,490.65
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
3,712,500.00
21,780.00
2,574.00
3,305,610.00
8,712.00
514.80
66,112.20
124,929.00
27,594.00
8,712.00
43,725.15
82,782.00
34,848.00
236,694.15
286,134.75
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
8,712.00
4,356.00
257.40
33,056.10
21,862.58
41,391.00
17,424.00
118,347.08
167,787.68
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
8,712.00
386.10
49,584.15
43,725.15
55,188.00
157,595.40
207,036.00
HARGA
SATUAN
JUMLAH
HARGA
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
(Rp.)
28,314.00
17,151.75
1,824.08
2,150.78
49,440.60
3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
4,356.00
193.05
24,792.08
21,862.58
27,594.00
78,797.70
128,238.30
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
6,435.00
2,598.75
276.38
521.40
9,831.53
3,305,610.00
21,780.00
27,594.00
87,268.10
13,068.00
13,797.00
114,133.10
123,964.63
P E K E R JAAN
G.005
Beton mutu fc'=14,5 Mpa (K175) slump (12 2) cm, w/c = 0,66
G.007
Beton mutu fc'=19,3 Mpa (K225) slump (12 2) cm, w/c = 0,58
G.017
G.018
G.022
G.024
G.026
G.028
G.030
G.032
G.034
G.035
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
1.000
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
1.000
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
1.000
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
m2
ls
m3
kg
kg
1.000
m2
ls
1.000
1.000
m3
kg
kg
m2
ls
0.15
E K E R JAAN
PER
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu
HARGA SATUAN
m3
Rp
752,866.76
m3
Rp
810,384.78
kg
Rp
11,225.79
kg
Rp
15,853.14
Rp
116,598.90
Rp
125,880.15
Rp
202,552.65
Rp
207,511.07
Rp
257,740.65
Rp
223,475.18
Rp
183,925.80
Rp
123,964.63
m3
Rp
Kode
G.007
G.018
G.017
G.022
Kode
G.007
G.018
G.017
G.022
Kode
G.007
G.018
G.017
G.022
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Harga Satuan
810,384.78
15,853.14
11,225.79
116,598.90
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
116,598.90
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
116,598.90
Jumlah
Pembulatan
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Begisting 9 mm
Alat bantu
Mengecor
Pembesian Ulir
Kode
G.007
G.018
G.017
G.022
Kode
G.007
G.018
G.017
G.022
Kode
G.007
G.018
G.017
G.024
Kode
G.005
G.018
G.017
G.024
Kode
G.007
G.018
G.017
G.026
Kode
G.007
G.018
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Harga Satuan
810,384.78
15,853.14
11,225.79
116,598.90
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
116,598.90
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
125,880.15
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
11,225.79
125,880.15
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
202,552.65
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
Pembesian Polos
Begisting 9 mm
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Begisting 9 mm
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Begisting 9 mm
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu
Mengecor
G.017
G.026
Kode
G.007
G.018
G.017
G.026
Kode
G.007
G.018
G.017
G.026
Kode
G.005
G.018
G.017
G.026
Kode
G.007
G.018
G.017
G.028
Kode
G.007
G.018
G.017
G.028
Kode
G.007
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
11,225.79
202,552.65
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
202,552.65
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
202,552.65
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
11,225.79
202,552.65
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
810,384.78
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu
Mengecor
Pembesian Ulir
G.018
G.017
G.028
Kode
G.007
G.018
G.017
G.028
Kode
G.007
G.018
G.017
G.028
Kode
G.005
G.018
G.017
G.028
Kode
G.005
G.018
G.017
G.028
Kode
G.005
G.018
G.017
G.028
Kode
G.005
G.018
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
Pembesian Polos
Bekisting (9 mm)
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu
Mengecor
Pembesian Ulir
Pembesian Polos (Konvensional)
Bekisting (12 mm)
Alat bantu
G.017
G.028
Kode
G.005
G.018
G.017
G.028
Kode
G.007
G.018
G.017
G.030
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
257,740.65
Jumlah
Pembulatan
Mengecor
Pembesian Ulir
Pembesian Polos (Konvensional)
Bekisting
Alat bantu
G.007
G.018
G.017
G.030
Rp
Rp
Rp
Rp
Rp
810,384.78
15,853.14
11,225.79
257,740.65
Jumlah
Pembulatan
Mengecor
Pembesian Ulir
Pembesian Polos (Konvensional)
Bekisting
Alat bantu
G.007
G.018
G.017
G.030
Rp
Rp
Rp
Rp
Rp
810,384.78
15,853.14
11,225.79
257,740.65
Jumlah
Pembulatan
Mengecor
Pembesian Ulir
Pembesian Polos (Konvensional)
Bekisting
Alat bantu
G.005
G.018
G.017
G.030
Rp
Rp
Rp
Rp
Rp
752,866.76
15,853.14
11,225.79
257,740.65
Jumlah
Pembulatan
Mengecor
Pembesian Ulir
Pembesian Polos (Konvensional)
G.005
G.018
G.017
Rp
Rp
Rp
752,866.76
15,853.14
11,225.79
Bekisting
Alat bantu
G.030
Rp
Rp
257,740.65
Jumlah
Pembulatan
Mengecor
Pembesian Ulir
Pembesian Polos (Konvensional)
Bekisting
Alat bantu
G.007
G.018
G.017
G.034
Rp
Rp
Rp
Rp
Rp
810,384.78
15,853.14
11,225.79
183,925.80
Jumlah
Pembulatan
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
752,866.76
752,866.76
752,800.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
Rp
810,384.78
-
Rp
Rp
Rp
Rp
Rp
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
752,866.76
752,866.76
752,800.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
810,384.78
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
752,866.76
752,866.76
752,800.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
752,866.76
752,866.76
752,800.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
752,866.76
752,866.76
752,800.00
Jumlah
Rp
Rp
752,866.76
-
Rp
Rp
Rp
Rp
Rp
752,866.76
752,800.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
752,866.76
752,866.76
752,800.00
Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
752,866.76
752,866.76
752,800.00
Rp
Rp
Rp
752,866.76
-
Rp
Rp
Rp
Rp
752,866.76
752,800.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
810,384.78
810,384.78
810,300.00
:
:
:
NO.
H.003
Pasang atap genteng karangpilang ex. Malang
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
PERKIRAAN
KUANTITAS
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0750
0.0080
0.0080
bh
25.0000
BAHAN
M151
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
6,435.00
3,898.13
442.20
521.40
11,296.73
2,250.00
56,250.00
56,250.00
67,546.73
:
:
:
NO.
H.014
Pasang atap genteng beton biasa
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
PERKIRAAN
KUANTITAS
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.2000
0.1000
0.0100
0.0100
bh
kg
25.0000
0.0300
BAHAN
1
2
M154
M140
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
8,580.00
5,197.50
552.75
651.75
14,982.00
3,000.00
21,780.00
75,000.00
653.40
75,653.40
90,635.40
:
:
:
NO.
H.021
Pasang bubung genteng beton Monier
m1
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
PERKIRAAN
KUANTITAS
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.4000
0.2000
0.0200
0.0020
bh
kg
kg
m
kg
3.5000
0.0500
10.8000
0.0320
1.0000
BAHAN
1
2
3
4
5
M161
M140
M037
M002
M039
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
17,160.00
10,395.00
1,105.50
130.35
28,790.85
5,000.00
21,780.00
1,350.00
90,000.00
8,118.00
17,500.00
1,089.00
14,580.00
2,880.00
8,118.00
44,167.00
72,957.85
:
:
:
NO.
H.050
Pasang lapisan aluminium foil / sesalation
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
PERKIRAAN
KUANTITAS
SATUAN
L17
L08
L03
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.0500
0.0050
0.0080
1.0500
BAHAN
Aluminium Foil/Sesalation
M131
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
6,435.00
2,598.75
276.38
521.40
9,831.53
30,901.50
32,446.58
32,446.58
42,278.10
:
:
:
NO.
I.046
Langit-langit tripleks (120x240) cm, tebal 4 mm
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
lbr
kg
0.3750
0.0300
BAHAN
1
2
Triplek 4 mm
Paku Tripleks
M215
M140
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
4,290.00
5,197.50
552.75
325.88
10,366.13
70,380.00
21,780.00
26,392.50
653.40
27,045.90
37,412.03
:
:
:
NO.
I.049
List langit-langit kayu profil
m1
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0500
0.0500
0.0050
0.0030
m
kg
1.0500
0.0100
BAHAN
1
2
M090
M140
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
2,145.00
2,598.75
276.38
195.53
5,215.65
7,821.00
21,780.00
8,212.05
217.80
8,429.85
13,645.50
:
:
:
NO.
I.050
List langit-langit gypsum
m1
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0500
0.0500
0.0050
0.0030
m'
kg
1.1000
0.0500
BAHAN
1
2
List Gypsum
Lem Kayu
M211
M422
JUMLAH HARGA BAHAN
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
2,145.00
2,598.75
276.38
195.53
5,215.65
19,899.00
29,502.00
21,888.90
1,475.10
23,364.00
28,579.65
:
:
:
NO.
I.054
Langit-langit Kalsiboard 9mm + Rangka galvalum
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.2000
0.0450
0.0750
m'
kg
bh
lbr
3.6000
0.1500
1.0000
0.3500
BAHAN
1
2
3
4
Metal furing
Kawat seng polos
Ramset / Dynabolt
Kalsiboard 9 mm
M494
M495
M496
M492
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
6,435.00
10,395.00
2,487.38
4,888.13
24,205.50
13,050.00
21,375.00
4,500.00
143,923.50
46,980.00
3,206.25
4,500.00
50,373.23
105,059.48
129,264.98
:
:
:
NO.
I.055
Dinding partisi gypsum 2 x 12 mm, rangka galvalum
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.1500
0.2000
0.0450
0.0750
m'
Bh
lbr
3.6000
1.0000
0.7000
BAHAN
1
2
3
M499
M496
M500
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
6,435.00
10,395.00
2,487.38
4,888.13
24,205.50
22,500.00
4,500.00
76,500.00
81,000.00
4,500.00
53,550.00
139,050.00
163,255.50
:
:
:
NO.
I.056
Plafond Papan Grill 3/30 cm (Uk.25x25 cm) + Politur
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0700
0.1000
0.0100
0.0035
m3
kg
ltr
lbr
0.0400
0.0200
0.6720
2.0000
BAHAN
1
2
3
4
Papan (3x30) cm
Paku Kayu Segala Ukuran
Politur Jadi
Kertas Gosok
M083
M140
M420
M401
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
3,003.00
5,197.50
552.75
228.11
8,981.36
11,519,550.00
21,780.00
73,237.50
4,455.00
460,782.00
435.60
49,215.60
8,910.00
519,343.20
528,324.56
:
:
:
NO.
I.025
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka ka
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.1800
0.3200
0.0320
0.0090
m
kg
lbr
0.0120
0.0600
1.1000
BAHAN
1
2
3
Usuk 5/7
Paku Kayu Segala Ukuran
Asbes (1,00 x 1,00) m x 3,5 mm
M061
M140
M206
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
7,722.00
16,632.00
1,768.80
586.58
26,709.38
4,958,415.00
21,780.00
16,038.00
59,500.98
1,306.80
17,641.80
78,449.58
105,158.96
:
:
:
NO.
I.057
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka ka
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.1800
0.3200
0.0320
0.0090
kg
lbr
0.0600
1.1000
BAHAN
1
2
M140
M206
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
7,722.00
16,632.00
1,768.80
586.58
26,709.38
21,780.00
16,038.00
1,306.80
17,641.80
18,948.60
45,657.98
:
:
:
NO.
J.003
Pasang kloset jongkok lux
bh
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
1.0000
1.5000
1.5000
0.1600
Unit
kg
m
1.0000
6.0000
0.0100
BAHAN
1
2
3
M232
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
42,900.00
77,962.50
82,912.50
10,428.00
214,203.00
313,038.00
1,350.00
90,000.00
313,038.00
8,100.00
900.00
322,038.00
536,241.00
:
:
:
NO.
J.008
Pasang wastafel lux
bh
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
1.2000
1.4500
0.1500
0.1000
M247
Unit
M037
M002
kg
m
1.0000
12.00%
6.0000
0.0100
BAHAN
1
2
3
4
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
51,480.00
75,363.75
8,291.25
6,517.50
141,652.50
1,327,630.50
1,327,630.50
1,350.00
90,000.00
1,327,630.50
159,315.66
8,100.00
900.00
1,495,946.16
1,637,598.66
:
:
:
NO.
J.009
Pasang tempat sabun keramik
bh
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0050
bh
1.0000
BAHAN
M249
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
429.00
5,197.50
552.75
325.88
6,505.13
31,383.00
31,383.00
31,383.00
37,888.13
:
:
SATUAN PEMBAYARAN
NO.
J.028
Pasang bak kontrol pasangan batu bata
ukuran (45 x 45) tinggi 50 cm
bh
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
1.4200
0.4730
0.0470
0.0710
bh
kg
m
m
kg
m
112.5000
77.0000
0.1300
0.0200
2.6000
0.0900
BAHAN
1
2
3
4
5
6
Bata Merah
Portland Cement (PC)
Pasir Pasang
Stenslah/batu pecah tangan 2/3
Besi Beton Polos
Pasir Cor
M022
M037
M002
M014
M112
M004
PERALATAN
JUMLAH HARGA PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
60,918.00
24,584.18
2,597.93
4,627.43
92,727.53
570.00
1,350.00
90,000.00
215,000.00
9,750.00
130,000.00
64,125.00
103,950.00
11,700.00
4,300.00
25,350.00
11,700.00
221,125.00
313,852.53
:
:
:
NO.
J.030
Pasang pipa galvanis, diameter 1/2"
m1
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0270
1.2000
35.00%
BAHAN
1
2
M376
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
2,316.60
4,677.75
497.48
1,759.73
9,251.55
33,547.50
33,547.50
40,257.00
11,741.63
51,998.63
61,250.18
:
:
:
NO.
J.031
Pasang pipa galvanis, diameter 3/4"
m1
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0270
1.200
35.00%
BAHAN
1
2
M377
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
2,316.60
4,677.75
497.48
1,759.73
9,251.55
43,470.00
43,470.00
52,164.00
15,214.50
67,378.50
76,630.05
:
:
:
NO.
J.042
Pasang pipa PVC tipe AW, diameter 2"
m1
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0540
0.0900
0.0090
0.0027
1.2000
35.00%
BAHAN
1
2
M338
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
2,316.60
4,677.75
497.48
175.97
7,667.80
25,231.50
25,231.50
30,277.80
8,831.03
39,108.83
46,776.62
:
:
:
NO.
J.045
Pasang pipa PVC tipe AW, diameter 4"
m1
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0810
0.1350
0.0135
0.0041
1.2000
35.00%
BAHAN
1
2
M341
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
3,474.90
7,016.63
746.21
267.22
11,504.96
71,536.50
71,536.50
85,843.80
25,037.78
110,881.58
122,386.53
:
:
:
NO.
J.046
Pasang pipa PVC tipe AW, diameter 6"
m1
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.1215
0.2025
0.0203
0.0062
1.2000
35.00%
BAHAN
1
2
M342
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
5,212.35
10,524.94
1,122.08
400.83
17,260.20
124,551.00
124,551.00
149,461.20
43,592.85
193,054.05
210,314.25
:
:
:
NO.
J.066
Pasang kran diameter 1/2"
bh
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0050
bh
bh
1.0000
0.0250
BAHAN
1
2
M235
M481
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
429.00
5,197.50
552.75
325.88
6,505.13
39,303.00
2,079.00
39,303.00
51.98
39,354.98
45,860.10
:
:
:
NO.
J.068
Pasang Afor Stainless Steel
bh
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0050
bh
1.0000
BAHAN
Afor Stainless
M250
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
429.00
5,197.50
552.75
325.88
6,505.13
53,262.00
53,262.00
53,262.00
59,767.13
:
:
:
NO.
J.073
Pasang pipa Staenless steel, diameter 2"
m1
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
PERKIRAAN
KUANTITAS
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
0.1080
0.1800
0.0180
0.0054
BAHAN
1
2
M498
PERALATAN
1.2000
35.00%
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
4,633.20
9,355.50
994.95
351.95
15,335.60
112,500.00
112,500.00
135,000.00
39,375.00
174,375.00
189,710.60
:
:
:
NO.
J.005
Pasang kloset duduk lux
bh
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
3.3000
1.1000
0.0010
0.1600
Unit
1.0000
6.00%
BAHAN
1
2
M233
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
141,570.00
57,172.50
55.28
10,428.00
209,225.78
1,603,948.50
1,603,948.50
1,603,948.50
96,236.91
1,700,185.41
1,909,411.19
:
:
:
NO.
K.001
Pasang besi profil
kg
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0610
0.0061
0.0061
0.0003
M116
M483
M484
M473
kg
Itr
Itr
kg
1.1500
0.0100
0.0010
0.0200
E05
hari
0.0160
BAHAN
1
2
3
4
Baja Profil
Solar Industri
Minyak Pelumas
Elektroda
JUMLAH HARGA BAHAN
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
2,616.90
317.05
337.18
19.55
3,290.68
15,345.00
5,400.00
45,738.00
35,046.00
17,646.75
54.00
45.74
700.92
18,447.41
400,000.00
6,400.00
6,400.00
28,138.09
:
:
:
NO.
K.002
Pasang rangka kuda-kuda baja WF
kg
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0610
0.0061
0.0061
0.0003
M116
M483
M484
M473
kg
Itr
Itr
kg
1.1500
0.0100
0.0010
0.0200
E05
hari
0.0160
BAHAN
1
2
3
4
Baja Profil
Solar Industri
Minyak Pelumas
Elektroda
JUMLAH HARGA BAHAN
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
2,616.90
317.05
337.18
19.55
3,290.68
15,345.00
5,400.00
45,738.00
35,046.00
17,646.75
54.00
45.74
700.92
18,447.41
400,000.00
6,400.00
6,400.00
28,138.09
:
:
:
NO.
K.003
Pemasangan baut anker baja
kg
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0300
kg
1.0500
BAHAN
M117
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
858.00
1,559.25
2,417.25
17,127.00
17,983.35
17,983.35
20,400.60
:
:
:
NO.
K.004
Ikatan angin/Trekstang
kg
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0610
0.0061
0.0061
0.0003
M112
M483
M484
M473
kg
Itr
Itr
kg
1.0500
0.0100
0.0010
0.0200
E05
hari
0.0160
BAHAN
1
2
3
4
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
2,616.90
317.05
337.18
19.55
3,290.68
9,750.00
5,400.00
45,738.00
35,046.00
10,237.50
54.00
45.74
700.92
11,038.16
400,000.00
6,400.00
6,400.00
20,728.84
:
:
:
NO.
K.005
Plendes
kg
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0610
0.0061
0.0061
0.0003
M116
M483
M484
M473
kg
Itr
Itr
kg
1.1500
0.0100
0.0010
0.0200
E05
hari
0.0160
BAHAN
1
2
3
4
Baja Profil
Solar Industri
Minyak Pelumas
Elektroda
JUMLAH HARGA BAHAN
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
2,616.90
317.05
337.18
19.55
3,290.68
15,345.00
5,400.00
45,738.00
35,046.00
17,646.75
54.00
45.74
700.92
18,447.41
400,000.00
6,400.00
6,400.00
28,138.09
:
:
:
NO.
K.012
Pasang Kusen Alluminium Coklat
m1
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0430
0.0430
0.0043
0.0021
m
bh
tube
1.1000
2.0000
0.0600
BAHAN
1
2
3
M126
M145
M148.b
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
1,844.70
2,234.93
237.68
136.87
4,454.18
107,019.00
396.00
28,444.50
117,720.90
792.00
1,706.67
120,219.57
124,673.75
:
:
:
NO.
K.014
Pasang Pintu Kaca Rangka Aluminium Coklat
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0850
0.0850
0.0090
0.0050
m
m
tube
4.4000
4.5000
0.2700
BAHAN
1
2
3
M126
M148.d
M148.b
PERALATAN
Daun Pintu 80
Daun Jendela
Daun Jendela BV 60
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
3,646.50
4,417.88
497.48
325.88
8,887.73
107,019.00
11,088.00
28,444.50
470,883.60
49,896.00
7,680.02
528,459.62
1 m2
Daun Pintu 80 x 210 cm
Daun Jendela (0,65 m2)
Daun Jendela BV 60 x 50 cm
537,347.34
902,743.53
349,275.77
161,204.20
:
:
:
NO.
K.032
Pasang Atap Baja Ringan untuk Penutup Atap Genteng
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.7500
0.5000
0.0500
0.0500
kg
kg
kg
kg
5.4912
0.4212
0.2521
0.1411
BAHAN
1
2
3
4
Baja Ringan
Besi Strip / Plat Plendes
Baut Segala Ukuran
Angker Bar / Dynabolt
M132
M114
M146
M117
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
32,175.00
25,987.50
2,763.75
3,258.75
64,185.00
40,095.00
9,702.00
19,206.00
17,127.00
220,169.66
4,086.48
4,840.91
2,416.17
231,513.23
295,698.23
:
:
:
NO.
K.033
Pasang Atap Baja Ringan untuk Penutup Atap Asbes Ge
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.7500
0.5000
0.0500
0.0500
kg
kg
kg
kg
4.7303
0.4212
0.2521
0.1411
BAHAN
1
2
3
4
Baja Ringan
Besi Strip / Plat Plendes
Baut Segala Ukuran
Angker Bar / Dynabolt
M132
M114
M146
M117
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
32,175.00
25,987.50
2,763.75
3,258.75
64,185.00
40,095.00
9,702.00
19,206.00
17,127.00
189,662.82
4,086.48
4,840.91
2,416.17
201,006.39
265,191.39
NO.
:
:
:
K.034
Pasang rangka Plafon Metal Furing
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0800
0.8000
0.0800
0.0040
BAHAN
1
2
3
Baja Ringan
Baja Profil
Baja Clips & Adjustable
M132
M116
M116
kg
kg
kg
11.5374
1.1092
1.2000
Gypsum Board 9 mm
M213
lbr
0.3500
TOTAL
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
3,432.00
41,580.00
4,422.00
260.70
49,694.70
40,095.00
15,345.00
15,345.00
9.50
75,339.00
462,593.02
17,020.74
18,414.00
498,027.76
52,423.97
26,368.65
78,792.62
128,487.32
:
:
:
NO.
K.038
1 m2 Pasang Rangka atap (Usuk+reng Zincalume)
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
SATUAN
L17
L09
L04
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.1000
0.1000
0.0100
0.0050
m
m
m
3.0000
5.0000
30.0000
BAHAN
1
2
3
M501
M502
M503
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
4,290.00
5,197.50
552.75
325.88
10,366.13
13,500.00
9,000.00
90.00
40,500.00
45,000.00
2,700.00
88,200.00
98,566.13
:
:
:
NO.
L.002
Pasang kunci tanam biasa
bh
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.5000
0.0100
0.0050
bh
1.0000
BAHAN
Kunci Tanam
M254
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
429.00
25,987.50
552.75
325.88
27,295.13
110,943.00
110,943.00
110,943.00
138,238.13
:
:
:
NO.
L.003
Pasang kunci tanam kamar mandi
bh
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0050
0.5000
0.0050
0.0025
bh
1.0000
BAHAN
M255
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
214.50
25,987.50
276.38
162.94
26,641.31
91,080.00
91,080.00
91,080.00
117,721.31
:
:
:
NO.
L.007
Pasang engsel pintu
bh
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
bh
1.0000
BAHAN
Engsel Pintu
M257
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
643.50
7,796.25
829.13
48.88
9,317.76
31,482.00
31,482.00
31,482.00
1 Pasang
1 Buah
40,799.76
20,399.88
:
:
:
NO.
L.010
Pasang grendel jendela
bh
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0100
0.1000
0.0100
0.0005
bh
1.0000
BAHAN
Grendel Jendela
M263
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
429.00
5,197.50
552.75
32.59
6,211.84
12,177.00
12,177.00
12,177.00
18,388.84
:
:
:
NO.
L.019
Pasang kaca polos, tebal 5 mm
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
1.1000
BAHAN
M271
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
643.50
7,796.25
829.13
48.88
9,317.76
120,204.00
132,224.40
132,224.40
141,542.16
:
:
:
NO.
L.027
Pasang kaca cermin, tebal 6 mm
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
1.1000
BAHAN
M279
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
643.50
7,796.25
829.13
48.88
9,317.76
250,668.00
275,734.80
275,734.80
285,052.56
:
:
:
NO.
L.037
Pasang casement
bh
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.2000
0.0200
0.0100
1.00
1.1000
BAHAN
M505
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
858.00
10,395.00
1,105.50
651.75
13,010.25
29,250.00
32,175.00
32,175.00
45,185.25
:
:
:
NO.
L.038
Pasang kaca polos, tebal 12 mm termpered
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor
SATUAN
L17
L08
L03
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0150
0.1500
0.0150
0.0008
m
m2
1.1000
1.0000
BAHAN
1
2
M273
M506
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
643.50
7,796.25
829.13
48.88
9,317.76
334,521.00
450,000.00
367,973.10
450,000.00
817,973.10
827,290.86
:
:
:
NO.
M.032
Pasang plint keramik artistik 10 x 20 cm
m1
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0900
0.0900
0.0090
0.0050
bh
kg
m
kg
5.3000
1.1400
0.0030
0.0250
BAHAN
1
2
3
4
M313
M037
M002
M038
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
3,861.00
4,677.75
497.48
325.88
9,362.10
15,480.00
1,350.00
90,000.00
2,673.00
82,044.00
1,539.00
270.00
66.83
83,919.83
93,281.93
:
:
:
NO.
M.040
Pasang lantai keramik ukuran 20 x 20 cm warna/motif
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.7000
0.3500
0.0350
0.0350
bh
kg
m
kg
26.5000
10.4000
0.0450
1.6200
BAHAN
1
2
3
4
M322
M037
M002
M038
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
30,030.00
18,191.25
1,934.63
2,281.13
52,437.00
1,840.00
1,350.00
90,000.00
2,673.00
48,760.00
14,040.00
4,050.00
4,330.26
71,180.26
123,617.26
:
:
:
NO.
M.045
Pasang lantai keramik ukuran 40 x 40 cm warna/motif
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.7000
0.3500
0.0350
0.0350
bh
kg
m
kg
6.9300
9.8000
0.0215
1.3000
BAHAN
1
2
3
4
M318
M037
M002
M038
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
30,030.00
18,191.25
1,934.63
2,281.13
52,437.00
13,590.00
1,350.00
90,000.00
2,673.00
94,178.70
13,230.00
1,935.00
3,474.90
112,818.60
165,255.60
:
:
:
NO.
M.049
Pasang plint keramik lantai ukuran 10 x 40 cm
m1
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.9000
0.0900
0.0090
0.0050
bh
kg
m
kg
2.6500
1.2400
0.0030
0.1000
BAHAN
1
2
3
4
M326
M037
M002
M038
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
38,610.00
4,677.75
497.48
325.88
44,111.10
15,939.00
1,350.00
90,000.00
2,673.00
42,238.35
1,674.00
270.00
267.30
44,449.65
88,560.75
:
:
:
NO.
M.057
Pasang dinding keramik ukuran 20 x 25 cm
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.9000
0.4500
0.0450
0.0450
bh
kg
m
kg
20.0000
9.3000
0.0180
1.5000
BAHAN
1
2
3
4
Keramik Dinding 20 x 25 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Putih
M327
M037
M002
M038
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
38,610.00
23,388.75
2,487.38
2,932.88
67,419.00
3,690.00
1,350.00
90,000.00
2,673.00
73,800.00
12,555.00
1,620.00
4,009.50
91,984.50
159,403.50
:
:
:
NO.
M.073
Pasang dinding batu sisir
m2
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.7000
0.3500
0.0350
0.0350
m2
kg
m
1.0500
11.7500
0.0350
BAHAN
1
2
3
Batu sisir
Portland Cement (PC)
Pasir Pasang
M504
M037
M002
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
30,030.00
18,191.25
1,934.63
2,281.13
52,437.00
71,910.00
1,350.00
90,000.00
75,505.50
15,862.50
3,150.00
94,518.00
146,955.00
:
:
SATUAN PEMBAYARAN
NO.
N.008
Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar,
2 lapis cat penutup)
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
SATUAN
L17
L10
L05
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0700
0.0090
0.0060
0.0025
kg
kg
kg
kg
0.2000
0.1500
0.1700
0.2600
BAHAN
1
2
3
4
M409
M402
M411
M414
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
3,003.00
467.78
331.65
162.94
3,965.36
34,114.50
20,592.00
33,858.00
70,290.00
6,822.90
3,088.80
5,755.86
18,275.40
33,942.96
37,908.32
:
:
:
NO.
N.011
Pelaburan kayu dengan politur
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
SATUAN
L17
L10
L05
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0600
0.0160
0.0025
Ltr
Lbr
0.5500
2.0000
BAHAN
1
2
Politur Jadi
Kertas Gosok
M420
M401
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
3,118.50
884.40
162.94
4,165.84
73,237.50
4,455.00
40,280.63
8,910.00
49,190.63
53,356.46
:
:
SATUAN PEMBAYARAN
NO.
N.014
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasa
2 lapis cat penutup)
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
SATUAN
L17
L10
L05
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0630
0.0063
0.0025
kg
kg
kg
0.1000
0.1000
0.2600
BAHAN
1
2
3
Plamir Tembok
Cat Dasar Tembok
Cat Tembok
M403
M412
M415
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
858.00
3,274.43
348.23
162.94
4,643.60
12,771.00
25,740.00
47,025.00
1,277.10
2,574.00
12,226.50
16,077.60
20,721.20
:
:
SATUAN PEMBAYARAN
NO.
N.016
Pengecatan tembok baru eksterior
(1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
SATUAN
L17
L10
L05
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0630
0.0063
0.0025
kg
kg
kg
0.1000
0.1000
0.2600
BAHAN
1
2
3
Plamir Tembok
Cat Dasar Tembok
Cat Tembok Eksterior
M403
M412
M415.b
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
858.00
3,274.43
348.23
162.94
4,643.60
12,771.00
25,740.00
97,119.00
1,277.10
2,574.00
25,250.94
29,102.04
33,745.64
:
:
SATUAN PEMBAYARAN
NO.
N.021
Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar,
2 lapis cat penutup)
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
SATUAN
L17
L10
L05
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0630
0.0063
0.0025
kg
kg
kg
0.1000
0.1000
0.2600
BAHAN
1
2
3
Plamir Tembok
Cat Dasar Tembok
Cat Tembok
M403
M412
M415
PERALATAN
JUMLAH HARGA PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
858.00
3,274.43
348.23
162.94
4,643.60
12,771.00
25,740.00
47,025.00
1,277.10
2,574.00
12,226.50
16,077.60
20,721.20
:
:
:
NO.
N.029
Pekerjaan waterproofing
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
SATUAN
L17
L10
L05
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0200
0.0630
0.0063
0.0025
kg
0.3600
BAHAN
Waterproofing
M418
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
858.00
3,274.43
348.23
162.94
4,643.60
146,097.00
52,594.92
52,594.92
57,238.52
:
:
:
NO.
N.030
Pengecatan tembok LAMA eksterior (1 lapis cat dasar, 2
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
SATUAN
L17
L10
L05
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0280
0.0420
0.0042
0.0025
kg
kg
0.1200
0.1800
BAHAN
1
2
M412
M415.b
PERALATAN
Pengecatan tembok LAMA eksterior (1 lapis cat dasar, 2 lapis cat penutup)
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
1,201.20
2,182.95
232.16
162.94
3,779.24
25,740.00
97,119.00
3,088.80
17,481.42
20,570.22
24,349.46
:
:
:
NO.
N.033
Coating batu alam / Batu hias
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor
SATUAN
L17
L10
L05
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.0700
0.0090
0.0060
0.0025
kg
kg
0.1700
0.2600
BAHAN
1
2
M505
M505
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
3,003.00
467.78
331.65
162.94
3,965.36
29,250.00
29,250.00
4,972.50
7,605.00
12,577.50
16,542.86
:
:
:
NO.
P.001
Pemasangan stop kontak
Titik
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
SATUAN
L17
L11
L06
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.5000
0.0500
0.0500
m
bh
bh
Ljr
bh
10.0000
1.0000
1.0000
0.6500
3.0000
BAHAN
1
2
3
4
5
M437
M439
M443
M444
M441
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
21,450.00
25,987.50
2,763.75
3,258.75
53,460.00
4,356.00
26,271.00
990.00
7,087.50
594.00
43,560.00
26,271.00
990.00
4,606.88
1,782.00
77,209.88
130,669.88
:
:
:
NO.
P.002
Pemasangan saklar tunggal
Titik
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
SATUAN
L17
L11
L06
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.5000
0.0500
0.0500
m
bh
bh
Ljr
bh
6.0000
1.0000
1.0000
0.6500
2.0000
BAHAN
1
2
3
4
5
M437
M440
M443
M444
M441
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
21,450.00
25,987.50
2,763.75
3,258.75
53,460.00
4,356.00
32,035.50
990.00
7,087.50
594.00
26,136.00
32,035.50
990.00
4,606.88
1,188.00
64,956.38
118,416.38
:
:
:
NO.
P.003
Pemasangan saklar ganda
Titik
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
SATUAN
L17
L11
L06
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.5000
0.5000
0.0500
0.0500
m
bh
bh
Ljr
bh
10.0000
1.0000
1.0000
0.6500
3.0000
BAHAN
1
2
3
4
5
M437
M440.a
M443
M444
M441
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
21,450.00
25,987.50
2,763.75
3,258.75
53,460.00
4,356.00
36,666.00
990.00
7,087.50
594.00
43,560.00
36,666.00
990.00
4,606.88
1,782.00
87,604.88
141,064.88
:
:
:
NO.
P.007
Pemasangan titik lampu TL 40 Watt (komplit)
Titik
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
SATUAN
L17
L11
L06
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2500
0.0250
0.0250
bh
m
m
bh
1.0000
10.0000
4.0000
2.0000
BAHAN
1
2
3
4
M450
M437
M442
M441
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
10,725.00
12,993.75
1,381.88
1,629.38
26,730.00
93,753.00
4,356.00
792.00
594.00
93,753.00
43,560.00
3,168.00
1,188.00
141,669.00
168,399.00
:
:
:
NO.
P.011
Pemasangan titik lampu XL 18 Watt
Titik
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor
SATUAN
L17
L11
L06
L01
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
Org/hr
Org/hr
0.2500
0.2500
0.0250
0.0250
bh
m
m
bh
bh
1.0000
10.0000
4.0000
1.0000
2.0000
BAHAN
1
2
3
4
5
M454
M437
M442
M445
M441
PERALATAN
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
55,275.00
65,175.00
JUMLAH
HARGA
(Rp.)
10,725.00
12,993.75
1,381.88
1,629.38
26,730.00
36,477.00
4,356.00
792.00
10,296.00
594.00
36,477.00
43,560.00
3,168.00
10,296.00
1,188.00
94,689.00
121,419.00
:
:
:
Q.001
Penyetelan mesin bor dan buat bak sirkulasi
Unit
NO.
A.
KOMPONEN
SATUAN
TENAGA
BAHAN
Kayu untuk landasan
Kayu untuk dinding spul bak sirkulasi
JUMLAH HARGA BAHAN
PERALATAN
Ls
Ls
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
1.0000
1.0000
1,210,000.00
385,000.00
1,210,000.00
385,000.00
1,595,000.00
1,595,000.00
:
:
:
NO.
R.001
Pengukuran bendung untuk MC
bh
KOMPONEN
A.
TENAGA
1
2
Juru Ukur
Pekerja Biasa
SATUAN
L25
L17
PERKIRAAN
KUANTITAS
Org/hr
Org/hr
1.5000
4.5000
kg
kg
m
0.1200
0.0500
0.0120
Unit/hr
bh
bh
1.0000
0.0450
0.0900
BAHAN
1
2
3
M409
M140
M061
PERALATAN
1
2
3
Pesawat Ukur
Meteran
Palu
E15
E16
E17
HARGA
SATUAN
(Rp.)
155,100.00
42,900.00
JUMLAH
HARGA
(Rp.)
232,650.00
193,050.00
425,700.00
34,114.50
21,780.00
4,958,415.00
4,093.74
1,089.00
59,500.98
64,683.72
110,000.00
100,000.00
25,000.00
110,000.00
4,500.00
2,250.00
116,750.00
607,133.72
:
:
:
NO.
S.001
Menanam rumput lamur
m
KOMPONEN
A.
TENAGA
1
2
3
Pekerja Biasa
Tukang Taman
Mandor
SATUAN
L17
L14
L01
Org/hr
Org/hr
Org/hr
BAHAN
Rumput Lamur
M461
PERALATAN
PERKIRAAN
KUANTITAS
0.1500
0.0100
HARGA
SATUAN
(Rp.)
42,900.00
51,975.00
65,175.00
JUMLAH
HARGA
(Rp.)
7,796.25
651.75
8,448.00
1.0000
20,880.00
20,880.00
20,880.00
29,328.00
JENIS PEKERJAAN
2
I.
A.001
A.002
A.003
A.004
A.005
A.006
A.007
A.008
A.009
A.010
A.011
A.012
A.013
A.014
A.015
A.016
A.017
A.018
A.019
A.020
A.021
A.022
A.023
PEKERJAAN PERSIAPAN
Pagar sementara dari kayu tinggi 2 m
Pagar sementara dari seng gelombang tinggi 2 m
Pagar sementara dari kawat duri tinggi 1.8 m
Pagar kawat jaring galvanis, tinggi 1,0 m
Pengukuran dan pemasangan bouwplank
Pembuatan kantor sementara, dengan lantai plesteran
Pembuatan gudang semen dan alat-alat
Pembuatan rumah jaga/konstruksi kayu
Membersihkan lapangan dan perataan
Pembuatan bedeng buruh
Pembuatan bak adukan ukuran (40 x 50 x 20) cm
Pembuatan jalan sementara
Bongkar pasang kayu kuda-kuda / kusen / loteng
Bongkaran beton bertulang
Bongkaran tembok bata merah
Bongkaran atap
Bongkaran lantai
Bongkaran plafon
Bongkaran penutup atap lama (Genteng)
Bongkaran rangka penutup atap lama (Usuk+Reng)
Bongkaran konstruksi atap lama
Bongkaran plafon
Mengupas plesteran Lama
II.
B.001
B.002
B.003
B.004
B.005
B.006
B.007
B.008
B.009
B.010
B.011
B.012
B.013
B.014
B.015
B.016
B.017
B.018
B.019
B.020
B.021
PEKERJAAN TANAH
Galian tanah biasa sedalam 1 m
Galian tanah biasa sedalam 2 m
Galian tanah biasa sedalam 3 m
Galian tanah keras sedalam 1 m
Galian tanah cadas sedalam 1 m
Galian tanah lumpur sedalam 1 m
Pekerjaan stripping setinggi 1 m
Pembuangan tanah sejauh 30 m
Urugan kembali
Pemadatan tanah (per 20 cm)
Urugan pasir
Lapisan Pudel Campuran 1 Kp : 3 Ps : 7 TL
Lapisan Pudel Campuran 1 Kp : 5 TL
Pemasangan lapisan ijuk (tebal 10 cm)
Urugan sirtu padat untuk peninggian lantai bangunan
Urugan Tanah
Cut and fill
Galian tanah keras sedalam > 5 m
Galian tanah keras sedalam > 10 m
Pembuangan tanah sejauh > 1 km
Perataan Lahan (Dengan alat)
III.
C.001
C.002
C.003
C.004
C.005
C.006
C.007
C.008
C.009
C.010
C.011
PEKERJAAN PONDASI
Pasang pondasi batu kali, 1 Pc : 3 Ps
Pasang pondasi batu kali, 1 Pc : 4 Ps
Pasang pondasi batu kali, 1 Pc : 5 Ps
Pasang pondasi batu kali, 1 Pc : 6 Ps
Pasang pondasi batu kali, 1 Pc : 8 Ps
Pasang pondasi batu kali, 1 Kp : 1 Sm : 2 Ps
Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps
Pasang pondasi batu kali, 1/4 Pc : 1 Kp : 4 Ps
Pasang pondasi batu kosong
Pasang pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu kali
Pasang pondasi sumuran diameter 100 cm
IV.
D.001
D.002
D.003
D.004
D.005
D.006
D.007
D.008
D.009
D.010
D.011
D.012
D.013
D.014
D.015
D.016
D.017
D.018
D.019
D.020
D.021
D.022
D.023
D.024
D.025
PEKERJAAN DINDING
Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps
Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps
Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps
Pasangan dinding hollowblock (HB. 20), Spesi 1 PC : 3 Ps
Pasangan dinding hollowblock (HB. 20), Spesi 1 PC : 4 Ps
Pasangan dinding hollowblock (HB. 15), spesi 1 PC : 3 Ps
Pasangan dinding hollowblock (HB. 15), spesi 1 PC : 4 Ps
Pasangan dinding hollowblock (HB. 10), Spesi 1 PC : 3 Ps
Pasangan dinding hollowblock (HB. 10), Spesi 1 PC : 4 Ps
Pasangan dinding roster/terawang (12 x 11 x 24) cm, Spesi 1 PC : 3 Ps
Pasangan dinding roster/terawang (12 x 11 x 24) cm, Spesi 1 PC : 4 Ps
Pasang bata berongga (5 x 11 x 24) cm, Spesi 1PC:3Ps
Pasang Batu Bata Tahan Api
V.
E.001
E.002
E.003
E.004
E.005
E.006
E.007
E.008
E.009
E.010
E.011
E.012
E.013
PEKERJAAN PLESTERAN
Plesteran 1 Pc : 1 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Ps, tebal 15 mm
Plesteran 1 Pc : 3 Ps, tebal 15 mm
Plesteran 1 Pc : 4 Ps, tebal 15 mm
Plesteran 1 Pc : 5 Ps, tebal 15 mm
Plesteran 1 Pc : 6 Ps, tebal 15 mm
Plesteran 1 Pc : 7 Ps, tebal 15 mm
Plesteran 1 Pc : 8 Ps, tebal 15 mm
Plesteran 1 Pc : 0.5 Kp : 3 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Kp : 8 Ps, tebal 15 mm
Plesteran 1 Kp : 1 Sm : 1 Ps, tebal 15 mm
Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Ps, tebal 20 mm
E.014
E.015
E.016
E.017
E.018
E.019
E.020
E.021
E.022
E.023
E.024
E.025
E.026
E.027
E.028
VI.
F.001
F.002
F.003
F.004
F.005
F.006
F.007
F.008
F.009
F.010
F.011
F.012a
PEKERJAAN KAYU
Pasang kusen pintu dan jendela kayu jati (kelas I)
Pasang kusen pintu dan jendela kayu kamper
Pasang kusen pintu dan jendela kayu borneo
Pasang kusen pintu dan jendela kayu meranti
Pasang pintu klamp kayu jati
Pasang pintu klamp kayu kamper
Pasang pintu klamp kayu borneo
Pasang pintu klamp kayu meranti
Pasang pintu panel kayu jati
Pasang pintu panel kayu kamper
Pasang pintu panel kayu borneo
Pasang pintu panel kayu meranti
Bh (Uk 80x210 cm)
F.012b
F.013
F.014
F.015
F.016
F.017
F.018
F.019
F.020
F.021
F.022
F.023
F.024
F.025
F.026
F.027
F.028
F.029
F.030
F.031
F.032
F.033
F.034
F.035
F.036
F.037
F.038
F.039
F.040
F.041
F.042
F.043
F.044
F.045
F.046
F.047
F.048
F.049
F.050
F.051
F.052
F.053
F.054
F.055
F.056
F.057
F.058
F.059
F.060
F.061
F.062
F.063
F.064
F.065
F.066
F.067
F.068
F.069
F.070
F.071
F.072
F.073
F.074
F.075
F.076
F.077
F.078
F.079
F.080
F.081
F.082
F.083
F.084
F.085
F.086
F.087
F.088
F.089
F.090
F.091
F.092
F.093
F.094
F.095
F.096
F.097
F.098
F.099
F.100
F.101
F.102
F.103
F.104
F.105
F.106
F.107
F.108
VII.
G.001
G.002
G.003
G.004
G.005
G.006
G.007
G.008
G.009
G.010
G.011
G.012
G.013
G.014
G.015
G.016
G.017
G.018
G.019
G.020
G.021
G.022
G.023
G.024
G.025
G.026
G.027
G.028
G.029
G.030
G.031
G.032
G.033
PEKERJAAN BETON
Beton mutu fc'=7,4 Mpa (K100) slump (12 2) cm, w/c = 0,87
Beton mutu fc'=9,8 Mpa (K125) slump (12 2) cm, w/c = 0,78
Beton mutu fc'=12,2 Mpa (K150) slump (12 2) cm, w/c = 0,72
Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
Beton mutu fc'=14,5 Mpa (K175) slump (12 2) cm, w/c = 0,66
Beton mutu fc'=16,9 Mpa (K200) slump (12 2) cm, w/c = 0,61
Beton mutu fc'=19,3 Mpa (K225) slump (12 2) cm, w/c = 0,58
Beton mutu fc'=24,0 Mpa (K275) slump (12 2) cm, w/c = 0,53
Beton mutu fc'=21,7 Mpa (K250) slump (12 2) cm, w/c = 0,56
Beton mutu fc'=26,4 Mpa (K300) slump (12 2) cm, w/c = 0,52
Beton mutu fc'=28,8 Mpa (K325) slump (12 2) cm, w/c = 0,49
Beton mutu fc'=31,2 Mpa (K350) slump (12 2) cm, w/c = 0,48
Beton kedap air dengan strorox - 100
Pasang PVC Waterstop lebar 150 mm
Pasang PVC Waterstop lebar 200 mm
Pasang PVC Waterstop lebar 230 mm - 320 mm
Pembesian dengan besi polos
Pembesian dengan besi ulir
Kabel prestressed polos/strands
Memasang 1 kg jaring kawat baja / wire mesh
Pasang bekisting untuk pondasi
Pasang bekisting untuk pondasi ( 2x pakai )
Pasang bekisting untuk sloof
Pasang bekisting untuk sloof ( 2x pakai )
Pasang bekisting untuk kolom
Pasang bekisting untuk kolom ( 2x pakai )
Pasang bekisting untuk balok
Pasang bekisting untuk balok ( 2x pakai )
Pasang bekisting untuk plat lantai
Pasang bekisting untuk plat lantai ( 2x pakai )
Pasang bekisting untuk dinding
Pasang bekisting untuk dinding ( 2x pakai )
Pasang bekisting untuk tangga
G.034
G.035
G.036
G.037
G.038
G.039
G.040
G.041
G.042
G.043
G.044
G.045
Btn.001
Btn. 002
Btn. 003
Btn. 004
Btn. 005
Btn. 006
Btn. 007
Btn. 008
Btn. 009
Btn. 010
Btn. 011
Btn. 012
Btn. 013
Btn. 014
VIII.
H.001
H.002
H.003
H.004
H.005
H.006
H.007
H.008
H.009
H.010
H.011
H.012
H.013
H.014
H.015
H.016
H.017
H.018
H.019
H.020
H.021
H.022
H.023
H.024
H.025
H.026
H.027
H.028
H.029
H.030
H.031
H.032
H.033
H.034
H.035
H.036
H.037
H.038
H.039
H.040
H.041
H.042
H.043
H.044
H.045
H.046
H.047
H.048
H.049
H.050
H.051
H.052
H.053
H.054
H.055
IX.
I.001
I.002
I.003
I.004
I.005
I.006
I.007
I.008
I.009
I.010
I.011
I.012
I.013
I.014
I.015
I.016
I.017
I.018
I.019
I.020
I.021
I.022
I.023
I.024
I.025
I.026
I.027
I.028
I.029
I.030
I.031
I.032
I.033
I.034
I.035
I.036
I.037
I.038
I.039
I.040
I.041
I.042
I.043
I.044
I.045
I.046
I.047
I.048
I.049
I.050
I.051
I.052
I.053
I.054
I.055
I.056
I.057
X.
J.001
J.002
J.003
J.004
J.005
J.006
J.007
PEKERJAAN SANITASI
Pasang kloset jongkok teraso
Pasang kloset jongkok porselin kw. A
Pasang kloset jongkok lux
Pasang kloset duduk porselin kw. A
Pasang kloset duduk lux
Pasang urinoir
Pasang wastafel kw. A
J.008
J.009
J.010
J.011
J.012
J.013
J.014
J.015
J.016
J.017
J.018
J.019
J.020
J.021
J.022
J.023
J.024
J.025
J.026
J.027
J.028
J.029
J.030
J.031
J.032
J.033
J.034
J.035
J.036
J.037
J.038
J.039
J.040
J.041
J.042
J.043
J.044
J.045
J.046
J.047
J.048
J.049
J.050
J.051
J.052
J.053
J.054
J.055
J.056
J.057
J.058
J.059
J.060
: J.061
J.062
J.063
J.064
J.065
J.066
J.067
J.068
J.069
J.070
J.071
J.072
J.073
XI.
K.001
K.002
K.003
K.004
K.005
K.006
K.007
K.008
K.009
K.010
K.011
K.012
K.013
K.014
K.015
K.016
K.017
K.018
K.019
K.020
K.021
K.022
K.023
K.024
K.025
K.026
K.027
K.028
K.029
K.030
K.031
K.032
K.033
K.034
K.035
K.036
K.037
K.038
XII.
L.001
L.002
L.003
L.004
L.005
L.006
L.007
L.008
L.009
L.010
L.011
L.012
L.013
L.014
L.015
L.016
L.017
L.018
L.019
L.020
L.021
L.022
L.023
L.024
L.025
L.026
L.027
L.028
L.029
L.030
L.031
L.032
L.033
L.034
L.035
L.036
L.037
L.038
XIII.
M.001
M.002
M.003
M.004
M.005
M.006
M.007
M.008
M.009
M.010
M.011
M.012
M.013
M.014
M.015
M.016
M.017
M.018
M.019
M.020
M.021
M.022
M.023
M.024
M.025
M.026
M.027
M.028
M.029
M.030
M.031
M.032
M.033
M.034
M.035
M.036
M.037
M.038
M.039
M.040
M.041
M.042
M.043
M.044
M.045
M.046
M.047
M.048
M.049
M.050
M.051
M.052
M.053
M.054
M.055
M.056
M.057
M.058
M.059
M.060
M.061
M.062
M.063
M.064
M.065
M.066
M.067
M.068
M.069
M.070
M.071
M.072
M.073
XIV.
N.001
N.002
N.003
N.004
N.005
N.006
N.007
N.008
N.009
N.010
N.011
N.012
N.013
N.014
N.015
N.016
N.017
N.018
N.019
N.020
N.021
N.022
N.023
N.024
N.025
N.026
N.027
N.028
N.029
N.030
N.031
N.032
N.033
PEKERJAAN PENGECATAN
Mengikis/mengerok permukaan cat lama
Mencuci bidang permukaan cat tembok lama
mengerok karat cat lama permukaan baja dengan cara manual
menyabun permukaan tembok lama
XVI.
P.001
P.002
P.003
P.004
P.005
P.006
P.007
P.008
P.009
P.010
P.011
P.012
P.013
P.014
Pekerjaan waterproofing
Pengecatan tembok LAMA eksterior (1 lapis cat dasar, 2 lapis cat penutup)
2 lapis cat penutup)_CAT MINYAK
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar
dengan CAT MINYAK
Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat p
Coating batu alam / Batu hias
P.015
P.016
P.017
XVII.
Q.001
Q.002
Q.003
Q.004
Q.005
Q.006
Q.007
Q.008
Q.009
Q.010
Q.011
Q.012
Q.013
Q.014
Q.015
Q.016
Q.017
Q.018
Q.019
Q.020
Q.021
Q.022
Q.023
Q.024
Q.025
Q.026
Q.027
Q.028
Q.029
Q.030
Q.031
Q.032
Q.033
Q.034
Q.035
Q.036
Q.037
Q.038
Q.039
Q.040
Q.041
Q.042
Q.043
Q.044
Q.045
Q.046
XVIII.
R.001
R.002
R.003
R.004
R.005
R.006
R.007
R.008
R.009
R.010
R.011
R.012
R.013
R.014
R.015
R.016
R.017
R.018
R.019
R.020
R.021
R.022
R.023
R.024
R.025
R.026
R.027
R.028
R.029
R.030
R.031
R.032
XIX.
S.001
S.002
S.003
S.004
S.005
S.006
S.007
S.008
S.009
S.010
S.011
S.012
S.013
S.014
S.015
S.016
S.017
S.018
S.019
S.020
S.021
S.022
S.023
S.024
S.025
S.026
S.027
S.028
S.029
S.030
S.031
S.032
S.033
S.034
S.035
S.036
S.037
S.038
S.039
S.040
S.041
S.042
S.043
S.044
S.045
S.046
S.047
S.048
S.049
S.050
S.051
S.052
Catatan :
UKSI (HSPK)
SATUAN
3
HARGA
( Rp )
4
m
m
m
m
m
m
m
m
m
m
bh
m
m
m3
m3
m
m
m
m
m
m
m
m
439,460.78
542,497.73
591,984.80
30,036.60
76,456.55
1,638,634.34
1,653,268.23
1,509,867.63
7,548.75
1,670,653.86
329,812.81
79,096.14
520,525.50
307,717.58
288,165.08
50,448.75
9,231.75
12,681.90
1,509.75
6,053.44
52,965.00
3,250.50
2,307.94
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3
m3
33,804.38
41,542.88
49,411.73
44,985.60
68,260.50
54,412.88
2,470.88
14,808.75
13,847.63
24,708.75
106,396.35
332,000.24
474,664.87
114,332.63
143,217.98
95,157.98
103,809.88
86,431.52
215,069.27
34,096.51
32,729.46
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
548,715.00
499,215.00
464,925.00
440,805.00
407,775.00
533,155.35
565,152.80
518,503.85
211,864.66
1,904,538.29
591,952.94
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
184,920.75
171,668.25
163,208.25
158,145.75
154,950.75
179,495.69
88,500.38
82,497.38
78,892.88
76,615.88
75,139.88
72,772.88
91,109.39
89,726.27
84,268.85
195,870.53
191,649.53
159,050.10
155,801.10
121,341.38
119,410.88
329,467.88
325,687.88
113,553.00
980,253.38
m
m
m
m
m
m
m
m
m
m
m
m
m
44,843.40
38,075.40
35,040.60
33,057.00
31,811.40
30,864.60
30,306.60
29,748.60
36,670.75
36,379.62
38,631.65
35,992.94
50,927.55
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
40,288.58
44,206.35
42,575.55
41,283.15
48,884.60
20,635.13
28,538.70
165,439.73
153,559.73
25,969.88
32,112.00
16,902.00
19,369.50
18,253.58
8,430.75
m3
m3
m3
m3
m
m
m
m
m
m
m
m2
bh
m2
bh
m
m
m
m
bh
bh
bh
m
m
m
m
bh
m
m
m
m
m
m
m
m
m
m
m
m
15,620,640.75
12,788,104.50
11,719,763.10
8,040,046.50
682,454.78
538,436.78
518,527.52
355,250.78
838,217.25
694,199.25
674,289.99
511,013.25
858,502.26
538,013.25
790,879.48
546,663.60
460,252.80
448,307.24
452,081.87
759,497.53
293,853.21
135,624.56
1,201,097.25
970,668.45
938,813.63
677,570.85
372,663.97
640,421.78
550,410.53
537,967.24
435,919.28
1,076,048.63
860,021.63
830,157.74
585,242.63
653,814.00
563,802.75
551,359.46
449,311.50
m
m
m
m
m
m
m
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
760,265.40
670,254.15
657,810.86
555,762.90
757,691.40
672,165.86
570,117.90
15,175,413.00
11,609,928.00
10,630,615.05
8,579,785.50
8,028,850.50
7,257,541.50
17,041,561.88
13,151,941.88
11,203,434.00
6,851,047.50
296,208.99
210,441.44
199,202.02
159,154.40
142,165.56
120,929.52
296,208.99
210,441.44
199,202.02
159,154.40
142,165.56
120,929.52
320,016.36
226,668.98
214,859.22
171,325.05
152,893.77
129,854.67
235,029.54
169,679.81
159,122.13
128,359.69
115,137.25
98,609.20
236,615.12
175,622.04
165,768.20
137,056.59
124,715.65
109,289.47
171,384.38
140,000.93
137,330.01
91,318.31
91,318.31
90,236.47
183,525.38
143,920.43
138,445.38
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m3
m3
m
91,581.60
91,581.60
93,544.28
393,309.53
302,551.73
277,623.76
191,763.71
488,414.87
397,657.07
372,729.10
286,869.05
501,529.23
410,771.43
385,843.46
299,983.41
242,098.65
216,895.50
1,142,163.00
735,669.00
190,157.01
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m
m
m
kg
kg
kg
kg
m
m
m
m
m
m
m
m
m
m
m
m
m
652,129.59
689,296.17
718,354.75
610,191.84
752,866.76
785,554.47
810,384.78
853,388.76
826,255.34
861,858.75
918,856.92
929,886.63
999,953.25
46,962.90
81,806.40
95,096.85
11,225.79
15,853.14
31,879.50
20,280.53
194,244.60
116,598.90
212,807.10
125,880.15
355,664.70
202,552.65
365,581.53
207,511.07
466,040.70
257,740.65
397,509.75
223,475.18
318,411.00
m
m
m3
m3
m3
m3
m3
m3
m3
m
m
m
183,925.80
123,964.63
3,342,118.25
4,270,885.85
5,538,759.27
7,445,442.20
5,776,853.07
5,153,065.85
5,265,687.80
57,314.22
78,390.78
77,446.98
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m'
m'
2,345,951.63
2,995,222.25
3,689,324.75
3,600,937.92
3,571,935.82
4,912,050.42
3,774,338.67
7,750,466.13
4,946,924.81
3,771,773.49
4,158,578.18
2,635,768.92
103,723.08
58,948.70
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m2
47,296.73
50,671.73
67,546.73
73,171.73
63,271.73
51,920.85
54,845.85
65,240.85
67,220.85
70,190.85
67,996.73
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
m2
m1
m2
m2
m2
m2
m2
m2
m2
m2
68,221.73
62,548.20
90,635.40
102,703.95
119,327.51
115,474.43
62,270.85
78,110.85
72,962.85
72,957.85
139,716.70
129,751.05
75,340.58
49,162.34
53,032.11
49,185.02
50,157.42
50,257.19
65,612.39
67,615.79
61,111.86
60,392.31
102,620.99
59,816.27
57,652.22
61,863.14
126,175.35
117,821.55
116,711.18
63,805.35
63,351.75
67,207.35
68,861.10
57,124.65
66,585.51
36,390.27
152,475.51
177,217.02
42,278.10
95,892.23
142,298.48
158,188.04
182,320.02
11,296.73
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
25,937.18
24,739.28
24,085.88
23,432.48
314,848.35
171,709.13
61,540.13
52,797.53
68,875.13
46,352.63
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m
m
m
m
m1
m1
m2
m2
m2
m2
m2
m2
m2
52,886.63
55,668.53
52,144.13
388,903.05
137,803.05
313,151.85
58,809.30
40,854.40
248,851.65
204,373.75
156,846.68
149,168.36
126,795.68
117,179.36
105,158.96
376,207.52
285,113.96
270,397.19
228,925.48
209,084.93
186,045.83
500,768.31
409,674.75
394,957.98
352,077.00
333,645.72
310,606.62
688,517.68
581,581.76
564,305.56
513,967.01
492,330.29
564,305.56
38,478.40
30,191.21
37,412.03
295,771.80
248,427.30
13,645.50
28,579.65
125,317.16
105,708.41
105,260.40
129,264.98
163,255.50
528,324.56
45,657.98
bh
bh
bh
bh
bh
bh
bh
220,271.25
374,214.00
536,241.00
1,808,339.66
1,909,411.19
1,528,080.75
641,961.78
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m
m
bh
bh
bh
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
1,637,598.66
37,888.13
290,859.75
646,304.88
895,296.00
1,000,564.13
9,261,115.34
156,862.56
238,207.36
70,246.84
130,263.09
163,708.77
197,337.59
243,059.27
370,469.33
405,865.31
486,271.64
65,880.94
157,000.04
212,001.69
313,852.53
476,708.70
61,250.18
76,630.05
101,091.38
150,092.60
208,389.65
284,996.07
318,859.70
469,583.38
16,829.87
22,542.39
27,961.97
35,871.62
46,776.62
57,908.72
82,398.86
122,386.53
210,314.25
321,034.66
10,970.87
13,900.37
16,536.92
20,491.74
26,416.60
35,058.62
51,346.16
67,458.41
9,506.12
11,703.24
13,753.89
16,683.39
23,194.15
27,441.92
34,940.96
41,239.38
bh
bh
bh
bh
bh
bh
m2
m1
m1
m1
319,712.51
250,245.19
45,860.10
50,513.10
59,767.13
22,246.13
159,708.66
89,568.62
129,556.30
189,710.60
kg
kg
kg
kg
kg
m
cm
m2
m2
m2
m2
m1
m2
m2
bh
bh
bh
m2
m2
m2
m2
Unit
m1
m1
m1
m1
m1
m1
m1
m
bh
m
m
m
m
m
m
m
m
m
m
28,138.09
28,138.09
20,400.60
20,728.84
28,138.09
844,055.03
5,053.00
2,150,077.05
1,646,535.45
357,089.70
1,289,541.75
124,673.75
729,745.75
902,743.53
902,743.53
349,275.77
161,204.20
568,821.53
443,524.75
101,632.96
347,009.03
384,966.86
195,312.93
205,140.93
195,312.93
205,140.93
52,347.60
64,278.23
63,106.95
337,597.26
201,584.76
550,249.92
570,022.49
709,410.37
295,698.23
265,191.39
128,487.32
546,067.65
579,763.77
634,844.14
98,566.13
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
bh
m
bh
m2
130,637.03
138,238.13
117,721.31
172,780.67
146,613.68
27,342.09
20,399.88
15,201.92
30,863.76
18,388.84
32,414.25
21,890.76
15,661.84
201,820.69
157,680.19
42,405.34
168,909.53
96,427.86
141,542.16
265,034.76
377,290.86
144,531.54
208,980.54
234,761.26
369,064.66
159,708.66
285,052.56
386,061.80
139,463.16
200,169.96
400,995.95
634,259.75
661,084.26
1,430,730.06
34,161.81
590,086.41
45,185.25
827,290.86
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
51,136.60
58,178.94
67,234.43
58,577.36
63,363.57
76,811.69
66,453.80
75,114.87
279,774.05
271,361.58
307,699.61
451,583.79
254,023.20
383,866.88
m2
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
657,979.35
27,165.90
22,139.67
20,226.00
20,883.00
19,444.44
20,358.30
25,766.67
26,654.70
44,494.50
41,492.82
33,389.93
526,136.25
978,581.10
978,581.10
540,186.75
991,829.70
93,281.93
175,392.75
92,345.35
196,052.03
324,360.75
310,379.48
95,603.33
123,617.26
123,617.26
127,327.26
122,663.50
127,411.50
149,663.10
165,255.60
479,071.65
35,374.13
76,241.82
88,560.75
133,189.50
161,206.50
178,234.50
135,619.50
139,029.75
139,368.87
155,944.62
159,403.50
153,560.10
289,781.40
157,038.53
154,500.83
91,823.70
526,217.70
74,464.05
83,130.00
91,230.00
92,265.00
94,785.00
83,670.00
89,610.00
m2
m2
m2
139,784.06
146,732.00
146,955.00
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
7,727.21
8,591.89
8,591.89
8,591.89
680,416.50
7,442.08
28,272.59
37,908.32
49,113.47
9,618.35
53,356.46
14,071.20
23,445.43
20,721.20
30,502.40
33,745.64
15,332.54
4,630.64
16,610.22
13,479.18
20,721.20
16,674.24
20,303.04
20,303.04
45,067.60
25,919.55
109,048.20
89,601.60
57,238.52
24,349.46
27,581.90
20,494.40
16,542.86
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Unit
Unit
130,669.88
118,416.38
141,064.88
102,519.00
114,142.50
135,787.50
168,399.00
111,969.00
114,993.00
118,867.50
121,419.00
127,467.00
131,307.15
213,399.90
Unit
Unit
Titik
301,196.93
3,124,561.50
219,566.25
Unit
Ls
m
m
m
m
m
m
m
m
m
Ls
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m3
m3
Titik
Titik
Jam
m1
m1
m1
m1
m1
m1
m1
m1
m1
Unit
Unit
Unit
Unit
Unit
3,630,000.00
3,875,740.00
324,731.13
405,913.92
487,096.70
608,870.88
811,827.83
1,217,741.75
1,623,655.67
2,435,483.50
17,960.00
7,980,716.00
240,053.72
288,064.47
360,080.58
480,107.44
617,281.00
864,193.40
1,440,322.33
305,226.00
305,226.00
325,665.00
255,300.00
255,300.00
281,220.00
46,191.00
28,519.50
388,154.25
789,599.96
9,223,343.00
14,424,206.00
340,785.44
49,796.80
66,397.30
99,110.96
140,123.96
295,144.20
476,054.03
122,599.24
168,076.24
209,089.24
870,471.38
812,420.25
1,432,068.08
2,216,221.05
3,709,335.68
bh
km1
bh
m
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m
m
m3
m3
m3
m
kg
kg
m
Buah
Buah
Buah
Buah
Buah
Buah
607,133.72
859,033.72
112,016.92
65,861.18
132,016.34
43,536.13
53,103.55
81,451.65
81,418.65
75,019.78
81,327.73
32,952.20
14,648.48
35,129.23
106,746.20
103,050.08
490,589.63
31,536.98
30,424.73
1,066,517.85
689,296.17
752,866.76
262,340.10
15,853.14
11,225.79
535,137.91
59,585,000.00
10,279,000.00
6,825,000.00
7,272,000.00
8,838,000.00
8,838,000.00
m
m
m
btg
m3
m3
m3
m
m2
m2
m2
m2
m2
m1
m2
m2
m1
kg
m1
29,328.00
26,268.00
29,805.00
204,762.00
225,121.10
24,823.50
13,709,124.00
15,637.88
68.26
435.52
224.32
110.17
262.63
356,253.75
76,679.63
12,148.95
119,663.60
10,966.39
208,389.65
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
m1
m1
bh
bh
bh
63,456,291.25
293,960.45
327,128.38
574,127.75
370,716.50
81,730.83
74,030.83
65,123.85
103,623.85
120,123.85
661,509.20
1,030,821.11
318,087.55
255,387.55
149,132.64
193,132.64
138,132.64
182,132.64
69,698.96
91,698.96
1,195,821.11
392,818.25
1,266,509.20
1,981,509.20
196,381.90
10,219.48
12,419.48
2,076,230.00
15,216.30
9,790.48
5,644,375.00
486,640.00
75,328.00
NO.
URAIAN PEKERJAAN
Panjang
A
1
PEKERJAAN TANAH
Galian tanah biasa sedalam 1 m
Bangunan utama
Pagar
Footplat
Urugan Kembali
(+) Galian pondasi
(-) Aanstampeng
(-) Urugan pasir
(-) Pondasi batu kali
Urugan Pasir
Pasir bawah pondasi
Pasir bawah lantai
B
1
PEKERJAAN PONDASI
Pasangan batu Kosong
C
1
Rollag bata
PEKERJAAN PASANGAN
Pasangan bata 1 Pc : 5 Ps
Bangunan utama
(-) Luas Jendela + Pintu
Gewel
Pagar
Plesteran 1 Pc : 5 Ps
Bangunan utama
Pagar
Gewel
40.00
22.50
0.80
0.60
0.40
0.80
40.00
22.50
34.91
0.60
0.40
40.00
22.50
0.45
0.35
5.00
0.30
40.00
6.00
5.00
18.02
4.48
141.20
5.38
13.63
Benangan
Pagar
Sudutan luar
PARAMETER
Lebar
22.50
3.70
2.40
3.15
1.50
Acian
2.55
2.55
1.38
0.30
0.15
0.40
Kamprotan
2.30
0.77
D
1
PEKERJAAN KERAMIK
Keramik utama 40 x 40
R tidur Utama
R tidur
R. keluarga
R. tamu
2.85
2.85
2.85
2.85
2.85
2.35
2.85
2.35
2
3
4
Keramik teras 30 x 30
Keramik lantai KM 20 x 20
Keramik dinding KM 20 x 25
1.15
1.35
4.60
3.00
1.35
2.00
E
1
PEKERJAAN BETON
Pekerjaan Rabat & Lantai Kerja
Carport
Lantai kerja
3.55
0.80
3.00
0.80
3.70
1.49
1.65
2.00
3.50
40.00
18.02
19.92
0.80
1.65
0.11
0.11
0.11
0.11
0.15
0.11
0.11
0.11
0.80
3.50
Pekerjaan bekisting
Panjang
3.90
1.49
1.65
2.00
10.50
0.49
0.90
77.94
0.52
1.20
0.90
1.65
3.50
Jumlah
40.00
4.00
8.00
20.00
6.00
268.95
52.50
4.00
389.70
20.00
20.00
35.00
16.50
Kolom praktis
Kolom praktis 15/30
Ringbalk 10/15
Plat
F
1
PEKERJAAN ATAP
Pekerjaan Rangka Galvalum
3
4
5
47.00
0.90
77.94
7.88
0.30
10.50
0.30
3.98
3.61
3.67
4.35
2.98
2.38
19.96
0.60
10.10
19.70
G
1
Vol. kusen
5.10
5.00
8.10
6.00
44.50
0.15
0.80
2.04
0.80
2.04
Daun jendela
1.78
1.08
0.60
0.60
1.62
0.92
0.44
0.44
5
6
7
8
9
10
Selot pintu
Engsel pintu
Engsel jendela
Grendel jendela
Hak angin
Kaca polos
G
1
2
3
PEKERJAAN FINISHING
Pengecatan dinding interior
Pengecatan plafon
Pengecatan kayu
Cat lisplank
Cat daun pintu
Cat daun jendela
Pengecatan genteng
H
1
PEKERJAAN LAIN-LAIN
Tanaman/rumput
19.70
6.53
0.36
0.24
PARAMETER
Tinggi
SUBVOLUME
VOLUME
SATUAN
16.80
4.50
1.02
21.30
21.30
m3
21.30
0.00
-1.65
-16.54
3.11
3.11
m3
1.20
0.45
1.75
3.40
3.40
m3
0.00
0.00
12.60
3.94
16.54
0.35
16.54
156.00
-14.80
9.90
3.73
36.04
5.38
196.24
196.24
m2
2.00
2.00
1.00
282.40
10.75
13.63
306.78
306.78
m2
2.00
5.00
45.00
18.50
95.00
m'
Jumlah
0.70
0.50
0.80
2.00
0.05
0.05
0.05
0.70
0.50
0.23
3.90
1.65
1.49
2.00
1.20
2.00
1.00
m3
8.00
2.00
4.00
19.20
6.30
6.00
95.00
306.78
306.78
m2
2.00
2.00
1.00
1.53
0.77
0.55
2.85
2.85
m2
2.00
3.54
3.54
m2
1.00
1.00
1.00
1.00
8.12
6.70
8.12
6.70
29.64
29.64
m2
3.45
1.82
9.20
m2
m2
m2
0.05
0.05
1.00
2.00
0.53
0.06
0.60
0.60
m3
0.11
0.11
0.11
0.11
0.30
0.15
0.15
0.15
0.20
0.10
10.00
1.00
2.00
5.00
3.00
1.00
1.00
1.00
2.00
1.00
0.45
0.02
0.04
0.12
0.47
0.66
0.30
0.33
0.26
0.58
3.22
3.22
m3
berat total
96.21
3.68
8.14
24.67
38.85
29.26
10.49
192.26
44.99
14.80
11.10
35.61
35.61
545.67
14.10
9.45
23.38
7.88
54.81
2.00
1.00
1.00
54.81
34.63
10.76
8.73
54.12
54.12
31.46
11.98
43.44
43.44
10.10
19.70
54.12
10.10
19.70
m2
m2
0.40
m3
1.00
1.63
m2
3.00
4.90
m2
5.57
m2
4.00
6.00
6.00
6.00
6.00
3.66
bh
set
set
bh
set
m2
306.78
43.44
22.78
m2
m2
m2
54.12
m2
4.00
2.00
1.00
1.00
0.06
20.40
10.00
8.10
6.00
44.50
0.40
4.00
2.00
4.27
1.30
5.57
4.00
6.00
6.00
4.00
2.00
0.30
2.00
2.00
2.00
4.00
2.00
2.85
0.81
3.66
5.91
13.06
2.84
0.97
22.78
NO
URAIAN PEKERJAAN
VOLUME
SATUAN
KODE
HARGA SATUAN
TOTAL HARGA
A
1
2
PEKERJAAN PERSIAPAN
Pembersihan
Pasang bowplank
75.00
23.10
m2
m'
A.009
A.005
7,548.75
76,456.55
566,156.25
1,766,146.19
2,332,302.44
B
1
2
3
PEKERJAAN TANAH
Galian tanah biasa sedalam 1 m
Urugan Kembali
Urugan Pasir (t = 5 cm)
21.30
3.11
3.40
m3
m3
m3
B.001
B.009
B.011
33,804.38
13,847.63
106,396.35
720,033.19
43,100.73
361,282.11
1,124,416.03
C
1
2
PEKERJAAN PONDASI
Pondasi batu kali 1 PC : 6 PS
Rollag bata
16.54
0.35
m3
m3
C.004
D.002
440,805.00
171,668.25
7,289,812.69
59,225.55
7,349,038.23
D
1
2
3
4
5
6
PEKERJAAN PASANGAN
Pasangan bata 1 Pc : 5 Ps
Plesteran 1 Pc : 4 Ps
Benangan
Acian
Pasangan beton alur
Kamprotan
196.24
306.78
95.00
306.78
2.85
3.54
m2
m2
m'
m2
m2
m2
D.004
E.004
E.025
E.026
M.058
E.023
158,145.75
33,057.00
16,902.00
19,369.50
153,560.10
25,969.88
31,034,996.42
10,141,259.52
1,605,690.00
5,942,194.58
437,185.60
91,985.30
49,253,311.42
E
1
2
3
4
PEKERJAAN KERAMIK
Keramik utama 40 x 40
Keramik teras 30 x 30
Keramik lantai KM 20 x 20
Keramik dinding KM 20 x 25
29.64
3.45
1.82
9.20
m2
m2
m2
m2
M.045
M.043
M.040
M.057
165,255.60
127,411.50
123,617.26
159,403.50
4,898,175.98
439,569.68
225,292.46
1,466,512.20
7,029,550.32
F
1
2
3
4
PEKERJAAN BETON
Pekerjaan Rabat & Lantai Kerja
Pengecoran beton K-175
Pembesian dengan besi polos
Pekerjaan bekisting
0.60
3.22
545.67
54.81
m2
m3
kg
m2
G.004
G.005
G.017
G.022
610,191.84
752,866.76
11,225.79
116,598.90
363,979.43
2,423,228.90
6,125,540.49
6,390,435.91
15,303,184.73
G
1
2
3
4
5
PEKERJAAN ATAP
Pekerjaan Rangka Galvalum
Pekerjaan plafon eternit rangka meranti
Pekerjaan atap genteng beton
Pekerjaan bubungan beton
Pekerjaan lisplank 3/20 kamper
54.12
43.44
54.12
10.10
19.70
m2
m2
m2
m'
m'
K.032
I.052
H.014
H.021
F.081
295,698.23
105,708.41
90,635.40
72,957.85
140,000.93
16,002,715.17
4,591,814.55
4,905,042.83
736,874.29
2,758,018.22
28,994,465.06
H
1
2
3
4
5
6
7
8
9
10
0.40
1.63
4.90
5.57
3.66
4.00
6.00
6.00
6.00
6.00
m3
m2
m2
m2
m2
bh
set
set
bh
set
F.002
F.010
F.022
F.014
L.019
L.005
L.007
L.008
L.010
L.011
12,788,104.50
694,199.25
550,410.53
460,252.80
141,542.16
146,613.68
20,399.88
15,201.92
18,388.84
32,414.25
5,121,635.85
1,132,933.18
2,694,809.93
2,562,687.59
518,157.53
586,454.70
122,399.27
91,211.51
110,333.03
194,485.50
13,135,108.08
I
1
2
3
4
PEKERJAAN FINISHING
Pengecatan tembok baru
Pengecatan plafon
Pengecatan kayu
Pengecatan genteng
306.78
43.44
22.78
54.12
m2
m2
m2
m2
N.014
N.021
N.009
N.022
20,721.20
20,721.20
49,113.47
16,674.24
6,356,868.92
900,097.63
1,118,824.55
902,383.19
9,278,174.29
J
1
PEKERJAAN LAIN-LAIN
Tanaman/rumput
24.35
m2
S.008
15,637.88
380,782.26
380,782.26
TOTAL HARGA
134,180,332.85
NO
1
2
3
URAIAN PEKERJAAN
Galian tanah pondasi
Rabatan lantai kerja
Footplat 90x90x20 (9 titik)
- Beton K175
- Pembesian
Kolom struktur 15/20 (9 titik)
- Beton K175
- Bekisting
- Pembesian
VOLUME
SATUAN
HARGA SATUAN
9.00
0.36
m3
m3
33,804.38
652,129.59
1.46
124.68
m3
kg
752,866.76
11,225.79
1.13
15.12
271.02
m3
m2
kg
752,866.76
202,552.65
11,225.79
Jumlah
PPn (10%)
Total
TOTAL HARGA
TAMBAH BANGUNAN
MAS REGENCY
TOTAL HARGA
304,239.38
237,701.23
1,097,679.73
1,399,577.61
853,750.90
3,062,596.07
3,042,452.67
9,997,997.60
999,799.76
10,997,797.36
10,997,000.00
Item Bahan
Pasir pasang
Pasir cor
Batu belah
Bata merah
Besi 6 (5,8)
Besi 6 (5,1)
Besi 8 (7,2)
besi 10 (8,2)
Keramik 30 x 30
Keramik 20 x 25
Keramik 20 x 20
Genteng beton (25/m2)
Genteng bubung (3.5/m')
Semen gresik 40 kg
Galvalum C-75
Reng galvalum
Batu alur
Cat maxilite 5 kg
Cat avitex 5 kg
Lem rajawali
Harga
85,000.00
125,000.00
95,000.00
560.00
24,000.00
18,500.00
34,000.00
50,500.00
45,500.00
48,500.00
46,000.00
3,000.00
5,000.00
53,000.00
70,000.00
30,000.00
35,000.00
46,000.00
80,000.00
10,000.00
Satuan
m3
m3
m3
bh
lonjor
lonjor
lonjor
lonjor
dus
dus
dus
bh
bh
zak
lonjor
lonjor
m2
galon
galon
kg