PEKERJAAN TAMBAH BANGUNAN

TLOGOMAS REGENCY KAV. A-04

NO
A
1
2
3
4

9
10

URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Luas bangunan
Galian tanah pondasi
Rabatan lantai kerja
Footplat 90x90x20 (8 titik)
- Beton K225
- Pembesian
Kolom struktur 15/20 (8 titik)
- Beton K225
- Bekisting
- Pembesian
Balok struktur 15/20
- Beton K225
- Bekisting
- Pembesian
Plat cor
- Beton K225
- Bekisting
- Pembesian
Dinding Bata diatas plat (t = 1 m)
- Pek. Bata merah
- Pek. Kolom praktis
- Pek. Plesteran
- Pek. Cat
Keramik Tangga
Railing tangga

VOLUME

SATUAN

HARGA SATUAN

18.00
8.00
0.32

m2
m3
m3

1,800,000.00
33,804.38
652,129.59

1.30
136.08

m3
kg

810,384.78
11,225.79

1.01
13.44
105.84

m3
m2
kg

810,384.78
202,552.65
11,225.79

0.84
15.40
88.20

m3
m2
kg

810,384.78
202,552.65
11,225.79

2.18
18.13
228.38

m3
m2
kg

810,384.78
202,552.65
11,225.79

21.25
6.00
42.50
42.50
6.40
4.00

m2
m'
m2
m2
m2
m2

78,892.88
57,314.22
33,057.00
20,721.20
127,411.50
546,067.65
Jumlah
PPn (10%)
Total
TOTAL HARGA

TAMBAH BANGUNAN
REGENCY KAV. A-04

TOTAL HARGA

32,400,000.00
270,435.00
211,289.99
1,050,258.67
1,527,605.50
816,867.85
2,722,307.62
1,188,137.61
680,723.21
3,119,310.81
990,114.68
1,762,586.89
3,671,266.78
2,563,689.79
1,676,473.59
343,885.29
1,404,922.50
880,650.79
815,433.60
2,184,270.59
60,280,230.76
6,028,023.08
66,308,253.84
66,308,000.00

PEKERJAAN TAMBAH BANGUNAN


TLOGOMAS REGENCY KAV. A-04

NO
A
1
2
3
4

9
10

URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Luas bangunan
Galian tanah pondasi
Rabatan lantai kerja
Footplat 90x90x20 (6 titik)
- Beton K225
- Pembesian
Sloof Struktur
- Beton K225
- Bekisting
- Pembesian
Kolom struktur 15/20 (6 titik)
- Beton K225
- Bekisting
- Pembesian
Balok struktur 15/20
- Beton K225
- Bekisting
- Pembesian
Plat cor
- Beton K225
- Bekisting
- Pembesian
Dinding Bata diatas plat (t = 1 m)
- Pek. Bata merah
- Pek. Kolom praktis
- Pek. Plesteran
- Pek. Cat
Pekerjaan talang datar
Pekerjaan tangga putar

VOLUME

SATUAN

HARGA SATUAN

18.00
6.00
0.24

m2
m3
m3

1,800,000.00
33,804.38
652,129.59

0.97
102.06

m3
kg

810,384.78
11,225.79

0.48
6.36
50.09

m3
m2
kg

810,384.78
202,552.65
11,225.79

0.76
13.44
79.38

m3
m2
kg

810,384.78
202,552.65
11,225.79

0.48
8.75
50.09

m3
m2
kg

810,384.78
202,552.65
11,225.79

1.35
11.25
141.75

m3
m2
kg

810,384.78
202,552.65
11,225.79

13.10
7.00
26.20
26.20
5.00
1.00

m2
m'
m2
m2
m'
unit

78,892.88
57,314.22
33,057.00
20,721.20
195,312.93
5,100,000.00

TOTAL PEKERJAAN TAMBAH BANGUNAN


B
1

PEKERJAAN PENGEMBALIAN
Pekerjaan Atap
- Rangka atap galvalum
- Genteng beton
Pekerjaan Struktur praktis
- Sloof Praktis
- Kolom Praktis
- Balok Praktis

11.25
11.25

m2
m2

160,000.00
90,635.40

11.05
16.00
11.05

m'
m'
m'

77,446.98
57,314.22
78,390.78

TOTAL PEKERJAAN KURANG BANGUNAN


Jumlah
PPn (10%)
Total
TOTAL HARGA

TAMBAH BANGUNAN
REGENCY KAV. A-04

TOTAL HARGA

32,400,000.00
202,826.25
158,467.49
787,694.00
1,145,704.13
386,553.54
1,288,234.85
562,243.69
612,650.89
2,722,307.62
891,103.21
386,553.54
1,771,322.92
562,243.69
1,094,019.45
2,278,717.31
1,591,255.73
1,033,496.66
401,199.51
866,093.40
542,895.31
976,564.65
5,100,000.00
57,762,147.85

1,800,000.00
1,019,648.25
855,789.13
917,027.45
866,218.12

5,458,682.95
52,303,464.90
5,230,346.49
57,533,811.39
57,533,000.00

PEKERJAAN TAMBAH BANGUNAN


TLOGOMAS REGENCY KAV. A-04

NO
A
1
2
3
4

URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Luas bangunan
Galian tanah pondasi
Rabatan lantai kerja
Footplat 90x90x20 (6 titik)
- Beton K225
- Pembesian
Sloof Struktur
- Beton K225
- Bekisting
- Pembesian
Kolom struktur 15/20 (6 titik)
- Beton K225
- Bekisting
- Pembesian
Balok struktur 15/20
- Beton K225
- Bekisting
- Pembesian
Plat cor
- Beton K225
- Bekisting
- Pembesian
Dinding Bata diatas plat (t = 1 m)
- Pek. Bata merah
- Pek. Kolom praktis
- Pek. Plesteran
- Pek. Cat
Pekerjaan talang datar

VOLUME

SATUAN

HARGA SATUAN

18.00
6.00
0.24

m2
m3
m3

1,800,000.00
33,804.38
652,129.59

0.97
102.06

m3
kg

810,384.78
11,225.79

0.43
5.76
45.36

m3
m2
kg

810,384.78
202,552.65
11,225.79

0.76
13.44
79.38

m3
m2
kg

810,384.78
202,552.65
11,225.79

0.43
7.92
45.36

m3
m2
kg

810,384.78
202,552.65
11,225.79

1.01
8.40
105.84

m3
m2
kg

810,384.78
202,552.65
11,225.79

11.65
4.00
23.30
23.30
5.00

m2
m'
m2
m2
m'

78,892.88
57,314.22
33,057.00
20,721.20
195,312.93

TOTAL PEKERJAAN TAMBAH BANGUNAN


B
1

PEKERJAAN PENGEMBALIAN
Pekerjaan Atap
- Rangka atap galvalum
- Genteng beton
Pekerjaan Struktur praktis
- Kolom Praktis
- Balok Praktis

8.40
8.40

m2
m2

160,000.00
90,635.40

18.00
m'
57,314.22
14.40
m'
78,390.78
TOTAL PEKERJAAN KURANG BANGUNAN
Jumlah

PPn (10%)
Total
TOTAL HARGA

TAMBAH BANGUNAN
REGENCY KAV. A-04

TOTAL HARGA

32,400,000.00
202,826.25
158,467.49
787,694.00
1,145,704.13
350,086.22
1,166,703.26
509,201.83
612,650.89
2,722,307.62
891,103.21
350,086.22
1,604,216.99
509,201.83
816,867.85
1,701,442.26
1,188,137.61
919,101.99
229,256.86
770,228.10
482,803.84
976,564.65
50,494,653.13

1,344,000.00
761,337.36
1,031,655.88
1,128,827.23
4,265,820.47
46,228,832.66

4,622,883.27
50,851,715.92
50,851,000.00

PEKERJAAN TAMBAH BANGUNAN


TLOGOMAS REGENCY KAV. D-10

NO
A
1
2

URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Luas bangunan
Dinding Pagar 3 m
- Pek. Bata merah
- Pek. Kolom praktis
- Pek. balok praktis
- Pek. Plesteran
- Pek. Cat
Dinding Pagar 1.75 m
- Pek. Bata merah
- Pek. Kolom praktis
- Pek. balok praktis
- Pek. Plesteran
- Pek. Cat

VOLUME

SATUAN

HARGA SATUAN

2.00

m2

1,800,000.00

12.00
6.00
4.00
24.00
24.00

m2
m'
m'
m2
m2

78,892.88
57,314.22
78,390.78
33,057.00
20,721.20

16.10
7.00
9.20
32.20
32.20

m2
m'
m'
m2
m2

84,268.85
57,314.22
78,390.78
33,057.00
20,721.20

TOTAL PEKERJAAN TAMBAH


Jumlah
PPn (10%)
Total
TOTAL HARGA

TAMBAH BANGUNAN
REGENCY KAV. D-10

TOTAL HARGA

3,600,000.00
946,714.50
343,885.29
313,563.12
793,368.00
497,308.68
1,356,728.40
401,199.51
721,195.18
1,064,435.40
667,222.48
10,705,620.56
10,705,620.56
1,070,562.06
11,776,182.62
11,776,000.00

PEKERJAAN TAMBAH BANGUNAN


TLOGOMAS REGENCY KAV. B-08

NO
A
1
2

URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Luas bangunan
Penambahan atap bangunan
1. Pasangan bata gewel
2. Kuda-kuda Galvalum
3. Rangka usuk reng galvalum
4. Genteng beton
5. Bubungan beton
Pembuatan pagar 3 m
1. Galian pondasi
2. Pas. Pondasi batu kali
3. Sloof praktis
4. Pas. Bata
5. Kolom Praktis
6. Balok Praktis
7. Plesteran
9. Pengecatan
Pas. Keramik Kamar mandi
1. Keramik lantai 20x20
2. Keramik dinding 20x25

VOLUME

SATUAN

HARGA SATUAN

3.00

m2

1,800,000.00

9.07
1.00
12.03
12.03
0.90

m2
unit
m2
m2
m'

78,892.88
700,000.00
165,000.00
90,635.40
72,957.85

4.04
3.23
11.55
34.65
15.00
13.05
69.30
69.30

m3
m3
m'
m2
m'
m'
m2
m2

33,804.38
499,215.00
77,446.98
78,892.88
57,314.22
78,390.78
33,057.00
20,721.20

2.25
9.28

m2
m2

123,617.26
159,403.50

TOTAL PEKERJAAN TAMBAH


Jumlah
PPn (10%)
Total
TOTAL HARGA

TAMBAH BANGUNAN
REGENCY KAV. B-08

TOTAL HARGA

5,400,000.00
715,716.16
700,000.00
1,984,950.00
1,090,343.86
65,662.07
136,654.19
1,614,461.31
894,512.62
2,733,638.12
859,713.23
1,022,999.68
2,290,850.10
1,435,978.81
278,138.84
1,478,467.46
22,702,086.45
22,702,086.45
2,270,208.64
24,972,295.09
24,972,000.00

PEKERJAAN TAMBAH BANGUNAN


TLOGOMAS REGENCY KAV. B-08

NO
A
1

URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Penambahan atap bangunan
1. Pasangan bata gewel
2. Kuda-kuda Galvalum
3. Rangka usuk reng galvalum
4. Genteng beton
5. Bubungan beton
Pembuatan pagar 3 m
1. Galian pondasi
2. Pas. Pondasi batu kali
3. Sloof praktis
4. Pas. Bata
5. Kolom Praktis
6. Balok Praktis
7. Plesteran
9. Pengecatan
10. Plesteran samping
Pas. Keramik Kamar mandi
1. Keramik lantai 20x20
2. Keramik dinding 20x25

VOLUME

SATUAN

HARGA SATUAN

3.37
1.00
12.03
12.03
0.90

m2
unit
m2
m2
m'

78,892.88
700,000.00
165,000.00
90,635.40
72,957.85

3.50
2.80
10.00
30.00
15.00
13.05
60.00
30.00
26.20

m3
m3
m'
m2
m'
m'
m2
m2
m2

33,804.38
499,215.00
77,446.98
78,892.88
57,314.22
78,390.78
33,057.00
20,721.20
33,057.00

2.25
9.28

m2
m2

123,617.26
159,403.50

TOTAL PEKERJAAN TAMBAH

TAMBAH BANGUNAN
REGENCY KAV. B-08

TOTAL HARGA

266,026.77
700,000.00
1,984,950.00
1,090,343.86
65,662.07
118,315.31
1,397,802.00
774,469.80
2,366,786.25
859,713.23
1,022,999.68
1,983,420.00
621,635.85
866,093.40
278,138.84
1,478,467.46
15,874,824.52

PEKERJAAN TAMBAH BANGUNAN


TLOGOMAS REGENCY KAV. B-08

NO
A
1
2
3

URAIAN PEKERJAAN
PEKERJAAN TAMBAH BANGUNAN
Tambah luas bangunan
Bongkar tembok lama
Talang datar

VOLUME

19.50
1.00
7.50

SATUAN

m2
ls
m'

HARGA SATUAN

1,800,000.00
2,000,000.00
195,312.93

TOTAL PEKERJAAN TAMBAH

TAMBAH BANGUNAN
REGENCY KAV. B-08

TOTAL HARGA

35,100,000.00
2,000,000.00
1,464,846.98

38,564,846.98

DAFTAR HARGA BAHAN BANGUNAN


KODE
M001
M002
M003
M004
M005
M006
M007
M008
M009
M010
M011
M012
M013
M014
M015
M016
M017
M018
M019
M020
M021
M022
M022.a
M023
M024
M025
M026
M027
M028
M029
M030
M031
M032
M033
M034
M035
M036.a
M036.b
M036.c
M037
M037.a
M038
M039

BAHAN BANGUNAN
Pasir Urug
Pasir Pasang
Pasir Hitam
Pasir Cor
Pasir Silika
Tanah Urug
Sirtu
Tanah Urug Taman/Katel
Tanah Liat
Batu Belah Gunung
Batu Belah Kali
Batu Kali
Stenslah/batu pecah tangan 1/2
Stenslah/batu pecah tangan 2/3
Stenslah/batu pecah tangan 3/5
Stenslah/batu pecah tangan 4/6 - 5/7
Batu pecah mesin 1/1
Batu pecah mesin 1/2
Batu pecah mesin 2/3
Batu pecah mesin 3/5
Batu pecah mesin 4/6 - 5/7
Bata Merah
Batu Bata Tahan Api
Bata Berongga
Batako
Rooster
Batu Granito
Batu Teraso
Batu Palimanan
Batu Tempel Hitam
Hollow Blok (HB.20)
Hollow Blok (HB.15)
Hollow Blok (HB.10)
Paving Block Segi Empat Biasa
Paving Block Segi Empat Warna
Paving Block Segi Enam Biasa
Paving Block Segi Enam Warna
Paving Block Tiga Berlian Biasa
Paving Block Tiga Berlian Warna
Portland Cement (PC)
Portland Cement (PC) Tahan Api
Portland Cement (PC) Putih
Portland Cement (PC) Warna

SATUAN

1 m
1 m
1 m
1 m
1 Kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 kg
1 kg
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 kg
1 kg
1 kg
1 kg

HARGA
77,395.50
90,000.00
124,641.00
130,000.00
9,733.50
67,518.00
109,053.00
69,003.00
51,876.00
109,890.00
127,809.00
100,000.00
205,722.00
215,000.00
159,984.00
142,956.00
229,680.00
189,387.00
189,387.00
180,279.00
166,221.00
570.00
12,969.00
990.00
5,148.00
9,603.00
3,366.00
2,574.00
79,096.50
74,646.00
4,950.00
4,356.00
3,663.00
945.00
1,125.00
1,845.00
1,935.00
1,305.00
1,485.00
1,350.00
4,257.00
2,673.00
8,118.00

M040

Portland Cement (PC) Grouting

1 kg

8,811.00

M041
M042
M043
M044
M045
M046
M047
M048
M049
M050
M051
M052
M053
M054
M055
M056
M057
M058
M059
M060
M061
M062
M063
M064
M065
M066
M067
M068
M069
M070
M071
M078
M079
M080
M081
M082
M083
M084
M085
M088
M089
M090
M091
M092
M093
M094
M095
M096

Kapur
Gamping
Semen Merah
Buis Beton 0.20 m
Buis Beton 0.30 m
Buis Beton 0.40 m
Buis Beton 0.50 m
Buis Beton 0.60 m
Buis Beton 0.80 m
Buis Beton 0.90 m
Buis Beton 1.00 m
Buis Beton U 0.20 m
Buis Beton U 0.30 m
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Balok Kayu Kelas III
Papan Kayu kelas III
Bambu 10 cm
Dolken Kayu 8 cm
List Kayu Profil
List Kayu 2/4
Gedeg (2.00 x 3.00) m
Bilik Bambu
Reng : 2/3, 3/5
Usuk : 5/7
Balok

1 m
1 kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 btg
1 btg
1 m
1 m
1 Ibr
1 m
1 m
1 m
1 m

1,402,434.00
990.00
186,921.00
36,949.50
47,322.00
62,653.50
78,151.50
104,643.00
190,323.00
207,427.50
265,450.50
32,980.50
41,481.00
8,698,441.50
8,625,865.50
8,625,865.50
10,542,609.00
11,021,818.50
11,021,818.50
4,958,415.00
4,958,415.00
5,559,435.00
6,611,220.00
6,661,305.00
6,939,900.00
5,960,115.00
5,960,115.00
6,260,625.00
6,761,475.00
6,761,475.00
6,761,475.00
9,015,300.00
9,265,725.00
9,516,150.00
11,018,700.00
11,269,125.00
11,519,550.00
3,305,610.00
3,712,500.00
23,661.00
27,594.00
7,821.00
3,636,171.00
39,402.00
78,804.00
13,226,314.50
13,226,314.50
12,757,500.00

M097
M098
M099
M100
M101
M102
M103
M104
M105
M106
M107
M108
M109
M110
M111
M112
M113
M114
M115
M116
M116.a
M116.b
M117
M118
M119
M120
M121
M122
M123
M124
M124.a
M124.b
M125
M126
M127
M128
M129
M130
M131
M132
M133
M134
M135
M136
M137
M138
M139
M140

Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng 2/3, 3/5
Usuk 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Reng : 2/3, 3/5
Usuk : 5/7
Balok
Papan (2x20) cm
Papan (3x20) cm
Papan (3x30) cm
Besi Beton Polos
Besi Beton Ulir
Besi Strip / Plat Plendes
Besi Beugel/Kawel
Baja Profil
Plat Baja
Roda Railling
Angker Bar / Dynabolt
Kabel prestressed
Pintu Besi Baja
Pintu Gulung Besi
Pintu Lipat
Rolling Door
Pagar Besi
Pintu Pagar besi
Pagar Model BRC tinggi 1 m
Pintu Pagar Model BRC tinggi 1 m
Profil Aluminium Putih
Profil Aluminium Coklat
Sunscream Aluminium
Pintu Fiber KM
Atap Aluminium
Bubung Atap Aluminium
Aluminium Foil/Sesalation
Baja Ringan
Kawat Galvanis 2 mm
Kawat Galvanis 3 mm
Kawat Beton/Bendrat RRT
Kawat Harmonika Gas
Kawat Duri
Kawat Nyamuk
Kawat Nyamuk/Kasa Plastik
Paku Kayu Segala Ukuran

1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
bh
1 kg
1 kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 Unit
1 m
1 m
1 m
1 Kg
1 Kg
1 Kg
1 Kg
1 m
1 Kg
1 m
1 m
1 Kg

14,175,000.00
14,175,000.00
15,120,000.00
16,202,439.00
16,202,439.00
16,202,439.00
15,622,267.50
15,622,267.50
15,622,267.50
19,487,884.50
19,487,884.50
19,487,884.50
19,487,884.50
19,487,884.50
19,487,884.50
9,750.00
14,157.00
9,702.00
9,702.00
15,345.00
15,345.00
15,300.00
17,127.00
29,700.00
737,946.00
2,029,203.00
1,600,924.50
1,185,880.50
614,988.00
707,157.00
322,839.00
413,127.00
81,000.00
107,019.00
307,395.00
330,561.00
100,683.00
98,941.50
30,901.50
40,095.00
42,808.50
62,748.00
17,293.50
23,364.00
21,285.00
18,513.00
19,998.00
21,780.00

M141
M142
M143
M144
M145
M146
M147
M148
M148.a
M148.b
M148.c
M148.d
M148.e
M148.f
M148.g
M149
M150
M151
M152
M153
M154
M155
M156
M157
M158
M159
M160
M161
M162
M163
M164
M165
M166
M167
M168
M169
M170
M171
M172
M173
M173.a
M174
M175
M176
M177
M178
M179
M180
M181

Paku Seng Segala Ukuran


Paku Asbes Segala Ukuran
Paku Sumbat Segala Ukuran
Paku Kait Segala Ukuran
Sekrup segala ukuran
Baut Segala Ukuran
Paku Keling
Paku Beton
Wire Mesh
Sealant
Aluminium Strip
Profil Kaca
Venetion blinds dan vertical blinds (tirai)
Atap Seng Galvalum
Bubung Atap Seng Galvalum
Genteng Biasa ex. Malang
Genteng Press ex. Trenggalek
Genteng Karang Pilang ex. Malang
Genteng Karang Pilang ex. Trenggalek
Genteng Karang Pilang ex. Surabaya
Genteng Beton biasa
Genteng Kaca
Bubung Genteng Biasa ex. Malang
Bubung Genteng Press ex. Trenggalek
Bubung Genteng Karang Pilang ex. Malang
Bubung Genteng Karang Pilang ex. Trenggalek
Bubung Genteng Karang Pilang ex. Surabaya

Bubung Genteng Beton biasa


Genteng Palentong Kecil
Genteng Kodok Glazuur
Genteng Palentong Super/Besar
Bubung Genteng Palentong Kecil
Bubung Genteng Kodok Glazuur
Bubung Genteng Palentong Super/Besar
Genteng Aspal
Genteng Metal
Atap Sirap
Bubung Genteng Aspal
Bubung Genteng Metal
Bubung Atap Sirap
Plastik Aerator
Seng plat BJLS 30 L = 0.45 M
Seng plat BJLS 30 L = 0.60 M
Seng plat BJLS 30 L = 0.90 M
Seng plat BJLS 28 (90 x 180) cm
Atap Seng Gelombang
Bubung Seng Gelombang
Roof Light Fibreglass
Atap Polycarbonat

1 Kg
1 bh
1 bh
1 bh
1 bh
1 kg
1 bh
1 kg
1 kg
1 tube
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ibr
1 lbr
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 lbr
1 Ibr
1 lbr
1 m
1 m

25,443.00
594.00
891.00
693.00
396.00
19,206.00
3,168.00
37,138.50
16,537.50
28,444.50
17,127.00
11,088.00
532,507.50
106,123.50
103,194.00
1,440.00
1,575.00
2,250.00
2,475.00
2,079.00
3,000.00
13,761.00
1,890.00
2,475.00
4,554.00
4,950.00
5,544.00
5,000.00
2,268.00
2,277.00
4,356.00
3,960.00
7,128.00
7,623.00
6,534.00
98,604.00
1,485.00
44,154.00
98,604.00
119,394.00
6,732.00
32,220.00
36,720.00
46,080.00
62,640.00
81,553.50
81,553.50
76,626.00
111,870.00

M182
M183
M184
M185
M186
M187
M188
M189
M190
M191
M192
M193
M194
M195
M196
M197
M198
M199
M200
M201
M202
M203
M204
M205
M206
M207
M208
M209
M210
M211
M212
M213
M214
M215
M216
M217
M218
M219
M220
M221
M222
M223
M224
M225
M226
M227
M228

Asbes Gelombang (3.00 x 1.05) m x 4 mm


Asbes Gelombang (2.70 x 1.05) m x 4 mm
Asbes Gelombang (2.40 x 1.05) m x 4 mm
Asbes Gelombang (2.10 x 1.05) m x 4 mm
Asbes Gelombang (1.50 x 1.05) m x 4 mm
Asbes Gelombang (2.50 x 0.92) m x 5 mm
Asbes Gelombang (2.25 x 0.92) m x 5 mm
Asbes Gelombang (2.00 x 0.92) m x 5 mm
Asbes Gelombang (1.80 x 0.92) m x 5 mm
Asbes Gelombang (3.00 x 1.08) m x 6 mm
Asbes Gelombang (2.70 x 1.08) m x 6 mm
Asbes Gelombang (2.10 x 1.08) m x 6 mm
Asbes Gelombang (1.80 x 1.08) m x 6 mm
Bubung Stel Gelombang 0.92 m
Bubung Stel Gelombang 1.05 m
Bubung Stel Gelombang 1.08 m
Bubung Paten 0.92 m
Bubung Paten 1.05 m
Bubung Paten 1.08 m
Bubung Stel Rata 0.92 m
Bubung Stel Rata 1.05 m
Asbes (1,00 x 1,00) m x 6 mm
Asbes (1,00 x 1,00) m x 5 mm
Asbes (1,00 x 1,00) m x 4 mm
Asbes (1,00 x 1,00) m x 3,5 mm
Akustik (30 x 30) cm
Akustik (30 x 60) cm
Akustik (60 x 120) cm
Harplek 4 mm
List Gypsum
Soft Board
Gypsum Board 9 mm
Triplek 3 mm
Triplek 4 mm
Multiplek 6 mm
Multiplek 9 mm
Multiplek 10 mm
Multiplek 12 mm
Multiplek 18 mm
Plywood Lapis Aluminium
Plywood (30 x 60) cm x 4 mm
Plywood (30 x 60) cm x 6 mm
Plywood (60 x 120) cm x 4 mm
Plywood (60 x 120) cm x 6 mm
Plywood (120 x 240) cm x 4 mm
Teakwood (30 x 60) cm x 4 mm
Teakwood (60 x 120) cm x 4 mm

1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Ibr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Ibr
1 lbr
1 lbr
1 Ibr
1 lbr
1 Ibr
1 Ibr
1 Ibr
1 lbr
1 m
1 m'
1 Ibr
1 Ibr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 lbr
1 Ibr
1 Ibr
1 lbr
1 Ibr
1 lbr
1 lbr

101,776.50
94,027.50
81,364.50
72,103.50
56,727.00
103,383.00
89,491.50
79,285.50
62,469.00
127,480.50
122,188.50
90,342.00
85,050.00
46,966.50
49,698.00
50,368.50
41,958.00
41,580.00
44,793.00
50,368.50
39,699.00
18,315.00
17,226.00
16,632.00
16,038.00
25,110.00
27,630.00
33,390.00
52,965.00
19,899.00
70,587.00
75,339.00
51,124.50
70,380.00
81,742.50
124,929.00
142,033.50
176,053.50
244,188.00
82,687.50
7,128.00
9,900.00
23,265.00
27,621.00
93,951.00
7,623.00
27,126.00

M229
M230
M231
M232
M233
M234
M235
M236
M237
M238
M239
M240
M241
M242
M243
M244
M245
M246
M247
M248
M249
M250
M251
M252
M253
M254
M255
M256
M257
M258
M259
M260
M261
M262
M263
M264
M265
M266
M267
M268
M269
M270
M271
M272
M273
M274
M275
M276

Teakwood (120 x 240) cm x 4 mm


Kloset Jongkok Porselin Kw. A
Kloset Duduk Porselin Kw. A
Kloset Jongkok Lux
Kloset Duduk Lux
Kloset Jongkok Teraso
Kran Air 1/2 "
Kran Air 3/4 "
Bak Mandi Teraso
Bak Mandi Fibre
Bak Mandi Plastik
Bak Mandi Porselin
Kran Bathub Panas dan dingin
Bak Cuci Firing Teraso
Bak Cuci Firing Stainless
Badkip Porselen
Urinoir Porselin
Urinoir Keramik
Wastafel Komplit (Kran + Sipon) Lux
Wastafel Komplit (Kran + Sipon) Kw. A
Tempat Sabun Keramik
Afor Stainless
Afor Plastic
Kaca Wastafel
Kunci Tanam Antik
Kunci Tanam
Kunci Pintu Kamar Mandi
Kunci Silinder
Engsel Pintu
Engsel Jendela
Hak Angin
Spring Knip
Kait Angin
Grendel Pintu
Grendel Jendela
Door Closer
Slot/Kunci Pintu
Door Holder
Door Stop
Rel Pintu Dorong
Kunci Lemari
Kaca Polos tebal 3 mm
Kaca Polos tebal 5 mm
Kaca Polos tebal 8 mm
Kaca Polos tebal 12 mm
Kaca Buram tebal 3 mm
Kaca Buram tebal 5 mm
Kaca Buram tebal 8 mm

1 Ibr
1 Unit
1 Unit
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 set
1 set
1 set
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m

91,377.00
151,011.00
1,508,598.00
313,038.00
1,603,948.50
62,667.00
39,303.00
43,956.00
141,750.00
331,978.50
209,034.00
2,112,169.50
427,896.00
219,186.00
301,077.00
938,916.00
1,056,132.00
1,086,277.50
1,327,630.50
438,669.00
31,383.00
53,262.00
15,741.00
62,667.00
93,366.00
110,943.00
91,080.00
146,286.00
31,482.00
24,192.00
19,404.00
12,573.00
9,450.00
21,546.00
12,177.00
170,761.50
134,190.00
126,621.00
36,193.50
131,638.50
11,812.50
79,191.00
120,204.00
232,470.00
334,521.00
117,274.50
175,864.50
198,450.00

M277
M278
M279
M280
M281
M282
M283
M284
M285
M286
M287
M288
M289
M290
M291
M292
M293
M294
M295
M296
M297
M298
M299
M299a
M299b
M299c
M299d
M300
M301
M302
M303
M304
M305
M306
M307
M308
M309
M310
M311
M312
M313
M314
M315
M316
M316.a
M317
M318
M319

Kaca Buram tebal 12 mm


Kaca Cermin tebal 5 mm
Kaca Cermin tebal 6 mm
Kaca Cermin tebal 8 mm
Kaca Rayben tebal 3 mm
Kaca Rayben tebal 5 mm
Kaca Rayben tebal 8 mm
Kaca Rayben tebal 12 mm
Jendela Nako + accessories
Glass Block
Painting Glass
Kaca "Wireglass" 5 mm
Kaca Patri 5 mm
Ubin pc abu-abu 40 x 40 cm
Ubin pc abu-abu 30 x 30 cm
Ubin pc abu-abu 20 x 20 cm
Ubin pc warna 40 x 40 cm
Ubin pc warna 30 x 30 cm
Ubin pc warna 20 x 20 cm
Ubin Terasso 40 x 40 cm
Ubin Terasso 30 x 30 cm
Ubin Granito 40 x 40 cm
Ubin Granito 30 x 30 cm
Ubin Teralux Kerang 40 x 40 cm
Ubin Teralux Kerang 30 x 30 cm
Ubin Teralux Kerang 60 x 60 cm
Ubin Teralux Marmer 40 x 40 cm
Plint ubin pc abu-abu 15 x 20 cm
Plint ubin pc abu-abu 10 x 30 cm
Plint ubin pc abu-abu 10 x 40 cm
Plint ubin pc warna 10 x 20 cm
Plint ubin pc warna 10 x 30 cm
Plint ubin pc warna 10 x 40 cm
Plint Ubin Terasso 10 x 30 cm
Plint Ubin Terasso 10 x 40 cm
Plint Ubin Granito 10 x 40 cm
Plint Ubin Granito 10 x 30 cm
Lantai keramik artistik 10 x 20
Lantai keramik artistik 10 x 10
Lantai keramik artistik 5 x 20
Plint keramik artistik 10 x 20
Plint keramik artistik 10 x 10
Plint keramik artistik 5 x 20
Internal cove 5 x 5 x 20 cm
Bahan Teraso Cor
Keramik Lantai 40 x 40 cm putih
Keramik Lantai 40 x 40 cm warna/motif
Keramik Lantai 30 x 30 cm putih

1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 bh
1 bh
1 bh

320,544.00
136,719.00
250,668.00
341,649.00
118,314.00
173,502.00
355,225.50
567,283.50
231,808.50
22,585.50
527,971.50
592,515.00
1,292,193.00
2,277.00
1,782.00
1,089.00
2,871.00
1,881.00
1,287.00
4,059.00
2,871.00
36,234.00
19,404.00
40,446.00
34,587.00
69,363.00
51,975.00
2,871.00
3,069.00
3,366.00
1,782.00
2,268.00
3,366.00
4,059.00
5,742.00
12,474.00
8,514.00
8,514.00
8,514.00
8,514.00
15,480.00
15,480.00
15,480.00
21,924.00
178,398.00
11,340.00
13,590.00
4,100.00

M320
M321
M322
M323
M324
M325
M326
M327
M328
M329
M330
M331
M332
M333
M333.a
M333.b
M333.c
M333.d
M333.e
M333.f
M333.g
M334
M335
M336
M337
M338
M339
M340
M341
M342
M343
M344
M345
M346
M347
M348
M349
M350
M351
M352
M353
M354
M355
M356
M357
M358
M359
M360

Keramik Lantai 30 x 30 cm warna/motif


Keramik Lantai 20 x 20 cm putih
Keramik Lantai 20 x 20 cm warna/motif
Keramik Lantai KM 20 x 20 cm
Plint Keramik Lantai 10 x 20 cm
Plint Keramik Lantai 10 x 30 cm
Plint Keramik Lantai 10 x 40 cm
Keramik Dinding 20 x 25 cm
Keramik Dinding 20 x 20 cm
Porselin 15 x 15 cm putih
Porselin 15 x 15 cm warna
Porselin 10 x 20 cm warna
Porselin 20 x 20 cm warna
Gymflour
Parquet
Karpet
Lantai marmer 100x100 cm
Porselin 11 x 11 cm putih
Porselin 11 x 11 cm warna
Wall Paper
Batu Ampyangan Granit
Pipa PVC tipe AW 1/2"
Pipa PVC tipe AW 3/4"
Pipa PVC tipe AW 1"
Pipa PVC tipe AW 1.5"
Pipa PVC tipe AW 2"
Pipa PVC tipe AW 2.5"
Pipa PVC tipe AW 3 "
Pipa PVC tipe AW 4 "
Pipa PVC tipe AW 6 "
Pipa PVC tipe AW 8 "
Pipa PVC tipe D 1/2 "
Pipa PVC tipe D 3/4 "
Pipa PVC tipe D 1"
Pipa PVC tipe D 1.5 "
Pipa PVC tipe D 2 "
Pipa PVC tipe D 2.5 "
Pipa PVC tipe D 3 "
Pipa PVC tipe D 4 "
Pipa PVC tipe C 1/2 "
Pipa PVC tipe C 3/4 "
Pipa PVC tipe C 1"
Pipa PVC tipe C 1.5 "
Pipa PVC tipe C 2 "
Pipa PVC tipe C 2.5 "
Pipa PVC tipe C 3 "
Pipa PVC tipe C 4 "
Shock PVC 1/2 "

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 kg
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh

4,500.00
1,840.00
1,840.00
1,980.00
4,554.00
8,514.00
15,939.00
3,690.00
2,610.00
891.00
945.00
945.00
1,984.50
226,413.00
213,097.50
55,242.00
386,595.00
792.00
990.00
53,460.00
6,331.50
7,560.00
11,245.50
14,742.00
19,845.00
25,231.50
32,413.50
45,738.00
71,536.50
124,551.00
190,417.50
3,780.00
5,670.00
7,371.00
9,922.50
12,096.00
17,671.50
25,704.00
36,099.00
2,835.00
4,252.50
5,575.50
7,465.50
10,017.00
12,757.50
15,120.00
19,183.50
1,485.00

M361
M362
M363
M364
M365
M366
M367
M368
M369
M370
M371
M372
M373
M374
M375
M376
M377
M378
M379
M380
M381
M382
M383
M384
M385
M386
M387
M388
M389
M390
M391
M392
M393
M394
M395
M396
M397
M398
M399
M400
M400.a
M400.b
M400.c
M400.d
M400.e
M400.f
M400.g
M400.h

Shock PVC 3/4 "


Shock PVC 1 "
Shock PVC 1.5 "
Shock PVC 2 "
Shock PVC 2.5 "
Shock PVC 3 "
Shock PVC 4 "
Knee PVC 1/2 "
Knee PVC 3/4 "
Knee PVC 1 "
Knee PVC 1.5 "
Knee PVC 2 "
Knee PVC 2.5 "
Knee PVC 3 "
Knee PVC 4 "
Pipa Galvanis 1/2" tebal 1.8 mm
Pipa Galvanis 3/4" tebal 1.8 mm
Pipa Galvanis 1 ", tebal 2 mm
Pipa Galvanis 1.5 ", tebal 2 mm
Pipa Galvanis 2 ", tebal 2.3 mm
Pipa Galvanis 2.5 ", tebal 2.5 mm
Pipa Galvanis 3" tebal 2.5 mm
Pipa Galvanis 4" tebal 2.8 mm
Shock Galvanis 1/2 "
Shock Galvanis 3/4 "
Shock Galvanis 1 "
Shock Galvanis 1.5 "
Shock Galvanis 2 "
Shock Galvanis 2.5 "
Shock Galvanis 3 "
Shock Galvanis 4 "
Knee Galvanis 1/2 "
Knee Galvanis 3/4 "
Knee Galvanis 1 "
Knee Galvanis 1.5 "
Knee Galvanis 2 "
Knee Galvanis 2.5 "
Knee Galvanis 3 "
Knee Galvanis 4 "
Pipa Screen PVC tipe AW 6 "
Pipa PVC tipe AW 5 "
Pipa Screen PVC tipe AW 5 "
Pipa PVC moof 6 m S - 12,5 2"
Pipa PVC moof 6 m S - 12,5 2,5"
Pipa PVC moof 6 m S - 12,5 3"
Pipa PVC moof 6 m S - 12,5 4"
Pipa PVC moof 6 m S - 12,5 6"
Pipa PVC moof 6 m S - 12,5 8"

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m
1 m

2,277.00
2,673.00
5,742.00
7,654.50
10,962.00
12,379.50
15,025.50
2,079.00
2,574.00
3,762.00
7,425.00
10,773.00
12,379.50
13,797.00
17,293.50
33,547.50
43,470.00
59,251.50
86,940.00
124,551.00
173,974.50
195,822.00
290,587.50
3,960.00
5,148.00
7,524.00
13,266.00
21,087.00
36,099.00
54,148.50
74,844.00
4,554.00
6,237.00
8,811.00
17,523.00
27,423.00
50,557.50
78,151.50
99,693.00
144,990.00
93,600.00
119,520.00
27,180.00
37,890.00
56,520.00
82,980.00
179,280.00
290,430.00

M401
M402
M403
M404
M405
M406
M407
M408
M409
M410
M411
M412
M413
M414
M415
M415.a
M415.b
M416
M417
M418
M419
M420
M421
M422
M423
M424
M425
M426
M427
M428
M429
M430
M430.a
M430.b
M430.c
M431
M432
M433
M434
M435
M436
M437
M438
M438a
M438b
M439
M440
M440.a

Kertas Gosok
Plamir Kayu
Plamir Tembok
Plamir Besi
Dempul Jadi
Minyak Cat
Spiritus
Sirlak
Cat meni kayu
Cat meni besi
Cat Dasar Kayu
Cat Dasar Tembok
Cat Dasar Besi
Cat Kayu
Cat Tembok
Cat Tembok Interior
Cat Tembok Eksterior
Cat Besi
Cat Genting
Waterproofing
Vernis
Politur Jadi
Kuas
Lem Kayu
Lem Pipa PVC
Lem vinyl
Residu atau Teer
Teak oli
Kalkarium
Kapur Sirih
Soda api
Sabun
Vinyl (30x30)cm
Batu Apung
Alang-Alang
Tandon Air PVC V = 0.5 m3
Tandon Air PVC V = 1.0 m3
Tandon Air Stainless V = 0.5 m3
Tandon Air Stainless V = 1.0 m3
Sumur Pompa Tangan Lengkap
Pompa Air
Kabel NYA 2.5 mm
Kabel NYA 4.0 mm
Kabel NYYHY 3x4 mm
Kabel NYYHY 3x1.5 mm
Stop Kontak
Saklar Broco Tunggal
Saklar Broco Ganda

1 Lbr
1 kg
1 kg
1 Kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 Ltr
1 Ltr
1 bh
1 kg
1 kg
1 kg
1 Ltr
1 Ltr
1 kg
1 kg
1 kg
1 kg
1 bh
1 kg
1 ikat
1 bh
1 bh
1 bh
1 bh
1 Unit
1 Unit
1 m
1 m
1 m
1 m
1 bh
1 bh
1 bh

4,455.00
20,592.00
12,771.00
35,739.00
31,284.00
19,008.00
14,175.00
157,212.00
34,114.50
35,343.00
33,858.00
25,740.00
39,897.00
70,290.00
47,025.00
84,645.00
97,119.00
71,631.00
125,212.50
146,097.00
33,858.00
73,237.50
12,969.00
29,502.00
33,858.00
56,983.50
26,829.00
2,277.00
8,514.00
4,653.00
22,585.50
39,879.00
21,420.00
38,016.00
4,158.00
688,905.00
1,218,955.50
1,905,214.50
3,190,414.50
187,299.00
751,275.00
4,356.00
7,425.00
12,969.00
7,821.00
26,271.00
32,035.50
36,666.00

M441
M442
M443
M444
M445
M446
M447
M448
M449
M450
M451
M452
M453
M454
M455
M456
M457
M458
M459
M460
M460.a
M460.b
M460.c
M460.d
M461
M462
M463
M464
M464.a
M465
M466
M467
M468
M469
M470
M471
M471a
M472
M473
M474
M475
M476
M477
M478
M479
M480
M481
M482

Las doof
Isolator
T dos PVC
Pipa PVC 5/8"
Fiting Flafond
Zekering Kast Lokal 1 Group
Zekering Kast Lokal 2 Group
Zekering Kast Lokal 3 Group
Lampu TL Komplit 20 Watt
Lampu TL Komplit 40 Watt
Lampu XL (Lilin) 5 Watt
Lampu XL (Lilin) 8 Watt
Lampu XL (Lilin) 14 Watt
Lampu XL (Lilin) 18 Watt
Lampu XL (Lilin) 23 Watt
Lampu Pijar 5 - 40 Watt
Lampu Pijar 50 -100 Watt
Tambah Daya 2200 Watt
Pasang Baru PLN
Pipa Arde
Splits Dia 1
Timah
Kawat BC
Klemp
Rumput Lamur
Rumput Manila
Semak Hias
Pohon Pelindung
Gebalan rumput
Tali ijuk
ljuk
Waterstop Lebar 150 mm
Waterstop Lebar 200 mm
Waterstop Lebar 230 mm
Rumput Common Bermuda Grass
Pupuk
Obat Tanaman
Tali Plastik 0.8 cm
Elektroda
Minyak bekisting
Formika (90 x 120) cm
Strorox 100
Formtie
Batacote
Rapidrant
Puzzdith - 100 XR
Seal Tape / TBA
Bensin Industri

1 bh
1 m
1 bh
1 Ljr
1 bh
1 Unit
1 Unit
1 Unit
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 Ls
1 Ls
1 m
1 bh
1 kg
1 m
1 bh
1 m
1 m
1 m
1 btg
1 m
1 kg
1 m
1 m
1 m
1 m
1 m
1 kg
1 ltr
1 m
1 kg
1 ltr
1 lbr
1 kg
1 bh
1 kg
1 Gln
1 Ltr
1 bh
1 ltr

594.00
792.00
990.00
7,087.50
10,296.00
63,976.50
92,988.00
127,764.00
61,141.50
93,753.00
27,027.00
30,051.00
33,925.50
36,477.00
42,525.00
17,577.00
29,200.50
3,505,950.00
5,008,500.00
108,306.00
72,859.50
412,209.00
42,808.50
2,079.00
20,880.00
17,820.00
12,001.50
182,668.50
14,940.00
17,820.00
144,630.00
40,446.00
72,859.50
84,861.00
13,167.00
2,430.00
85,286.70
2,250.00
35,046.00
2,574.00
156,321.00
102,762.00
8,712.00
7,821.00
39,402.00
79,002.00
2,079.00
4,950.00

M482.a
M483
M483.a
M484
M485
M486
M487
M488
M489
M490
M491
M492
M493
M494
M495
M496
M497
M498
M499
M500
M501
M502
M503
M504
M505
M505
M506

Bensin Umum
Solar Industri
Solar Umum
Minyak Pelumas
Grease
Air Bersih
Kuas 4"
Lampu Mercury
Jaring PEDT Mesh 2,5 cm
Rumput Sintetis (30x30)cm
Kalsiboard 4.5 mm
Kalsiboard 9 mm
Eternit 100x100 tbl 3,5 mm
Metal furing
Kawat seng polos
Ramset / Dynabolt
Lapis aluminum jeruk
Pipa stainless steel 2"
Stud Track 7,6
Gypsum Board 12 mm
Usuk Canal C 75. 0.75
Reng Purlin R 36.055
Baut
Batu sisir
Coating batu alam
Engsel casement 15 "
Tempered kaca

1 Itr
1 Itr
1 Itr
1 Itr
1 kg
1 Itr
1 bh
1 bh
1 bh
1 bh
1 lbr
1 lbr
1 lbr
1 m'
1 Kg
1 Bh
1 m2
1 m'
1 m'
1 lbr
1 m1
1 m1
1 bh
1 m
1 kg
bh
m2

4,819.50
5,400.00
4,356.00
45,738.00
26,037.00
27.00
12,969.00
214,560.00
28,440.00
14,220.00
108,000.00
143,923.50
16,537.50
13,050.00
21,375.00
4,500.00
27,000.00
112,500.00
22,500.00
76,500.00
13,500.00
9,000.00
90.00
71,910.00
40,500.00
29,250.00
450,000.00

Malang, 28 Januari 2013


Kepala Dinas Pendidikan
Kota Malang

Dra. Sri Wahyuningtyas, M.Si.


Pembina Utama Muda
NIP. 19581218 198503 2 007

AN
KETERANGAN
HSPK 2013
Tanah dan Pasir
85,000.00
###
125,000.00
###
###
###
###
###
Batu,Bata & Beton Block
###
95,000.00
###
205,000.00
###
###
###
###
###
###
###
560.00
###
###
###
###
###
###
###
###
###
###
###
Per Meter isi 45
Per Meter isi 45
Per Meter isi 28
Per Meter isi 28
Per Meter isi 33
Per Meter isi 33
Semen 1325
###
###
###

###

###
###
###
Buis Beton
###
###
###
###
###
###
###
###
###
Kayu Borneo
###
###
###
###
###
Kayu Meranti
###
###
###
###
###
Kayu Kruing
###
###
###
###
###
Kayu Kamper
###
###
###
###
###
Kayu Lain-lain
###
###
###
###
###
###
###
Kayu Jati Ex Malang
###
###

###
###
###
Kayu Jati Ex Madiun/Ngawi
###
###
###
###
###
Kayu Jati Ex Bojonegoro
###
###
###
###
###
Besi dan Aluminium
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Atap Genteng
###
###
###
###
1 m2 -- 25 bh
###
###
###
###
###
###
1 m' -- 3,5 bh
###
###
###
###
###
###
###
###
###
###
###
###
###
Atap Seng / Asbes
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kayu Olahan
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
Perlengkapan Kamar Mandi
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Alat-Alat Penggantung
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kaca
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
Perlengkapan Lantai
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
45500/dus

###
46000/dus
###
###
###
###
###
48500/dus
###
###
###
###
###
###
###
###
###
###
###
###
###
Perpipaan
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Plitur & Cat


###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Peralatan Air Bersih
###
###
###
###
###
Instalasi Listrik
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Lain - Lain
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Wahyuningtyas, M.Si.

81218 198503 2 007

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

DAFTAR UPAH
TAHUN ANGGARAN 2013
KODE

URAIAN

SATUAN

UPAH

L01

Mandor

Org/hr

65,175.00

L02

Kepala Tukang Batu

Org/hr

55,275.00

L03

Kepala Tukang Kayu

Org/hr

55,275.00

L04

Kepala Tukang Besi

Org/hr

55,275.00

L05

Kepala Tukang Cat

Org/hr

55,275.00

L06

Kepala Tukang Listrik

Org/hr

55,275.00

L07

Tukang Batu

Org/hr

51,975.00

L08

Tukang Kayu

Org/hr

51,975.00

L09

Tukang Besi/Baja

Org/hr

51,975.00

L10

Tukang Cat

Org/hr

51,975.00

L11

Tukang Listrik

Org/hr

51,975.00

L12

Tukang Pipa

Org/hr

51,975.00

L13

Tukang Plitur

Org/hr

51,975.00

L14

Tukang Taman

Org/hr

51,975.00

L15

Tukang Aspal

Org/hr

51,975.00

L16

Pembantu Tukang

Org/hr

42,900.00

L17

Pekerja Biasa

Org/hr

42,900.00

L18

Penjaga Malam

Org/hr

40,700.00

L19

Sopir

Org/hr

50,875.00

L20

Operator

Org/hr

53,900.00

L21

Mekanik

Org/hr

53,900.00

L22

Pembantu Sopir

Org/hr

46,200.00

L23

Pembantu Operator

Org/hr

49,500.00

L24

Pembantu Mekanik

Org/hr

49,500.00

L25

Juru Ukur

Org/hr

155,100.00

L26

Engineer dan Crew

Ls

526,240.00

L27

Tenaga Ahli Geolistrik

Org/hr

654,500.00

L28

Tenaga Ahli Geofisika

Or / hr

561,000.00

Malang, 28 Januari 2013


Kepala Dinas Pendidikan
Kota Malang

Dra. Sri Wahyuningtyas, M.Si.


Pembina Utama Muda
NIP. 19581218 198503 2 007

KETERANGAN

DAFTAR PERALATAN
TAHUN ANGGARAN 2013
KODE
E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36
E37

URAIAN
Sewa Mesin Bor
Sewa Kompresor (15-20 bar)
Sewa Genset (15 KVA)
Sewa Pompa Tes
Sewa Mesin Las (150A)
Sewa Alat Geolistrik
Sewa Alat Geofisikal, Elektrikal, Logging
Sewa Mud Pump
Sewa Alat Sandblasting
Sewa Excavator (Excavator 80-140 HP)
Sewa Whell Loader (Wheel Loader 1.0-1.6 M3)
Sewa Motor Grader (Motor Grader >100 HP)
Sewa Vibro Roller (Vibratory Roller 5-8 T.)
Sewa Water Tanker (Water Tanker 3000-4500 L.)
Pesawat Ukur
Meteran
Palu
Keranjang
Ganco
Alat pelancip/pisau besar
Palu Besar/bodem
Timbris
Kereta Dorong
Jack Hammer
Molen (Condrete Mixer.350)
Ember
Kotak Adukan
Cetok
Kuas
Kasut Kayu
Tang Pemotong Kawat
Vibrator (Concrete Vibrator)
Gergaji
Gunting pemotong besi
Kunci Pembengkok tulangan
Bor Besi
Stamper

SATUAN
hari
hari
hari
hari
hari
hari
hari
Jam
hari
hari
hari
hari
hari
hari
Unit/hr
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
Unit/hr
bh
bh
bh
bh
bh
bh
Unit/hr
bh
bh
bh
bh
Unit/hr

HARGA
1,485,000.00
2,640,000.00
1,100,000.00
4,400,000.00
400,000.00
1,925,000.00
1,925,000.00
63,000.00
1,210,000.00
3,574,606.49
2,520,000.00
3,366,117.80
2,551,208.67
1,853,206.12
110,000.00
100,000.00
25,000.00
10,000.00
75,000.00
25,000.00
100,000.00
30,000.00
100,000.00
122,769.00
529,827.21
5,000.00
25,000.00
10,000.00
10,000.00
10,000.00
50,000.00
233,144.80
50,000.00
50,000.00
25,000.00
100,000.00
271,954.55

E38
E39

Sewa Dump Truk (Dump Truck 3.5 Ton)


Sewa Mobil Picup

hr
hr

2,025,215.00
250,000.00

AFTAR PERALATAN
HUN ANGGARAN 2013
KETERANGAN

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.001
Pagar sementara dari kayu tinggi 2 m
m

SATUAN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

1
2
3
4
5
6
7

Dolken Kayu 8 cm
Portland Cement (PC)
Pasir Cor
Stenslah/batu pecah tangan 2/3
Usuk 5/7
Paku Kayu Segala Ukuran
Residu atau Teer

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

Org/hr
Org/hr
Org/hr
Org/hr

0.4000
0.2000
0.0200
0.0200

42,900.00
51,975.00
55,275.00
65,175.00

17,160.00
10,395.00
1,105.50
1,303.50

btg
kg
m
m
m
kg
Ltr

1.2500
2.5000
0.0050
0.0090
0.0720
0.0600
0.4000

27,594.00
1,350.00
130,000.00
215,000.00
4,958,415.00
21,780.00
26,829.00

34,492.50
3,375.00
650.00
1,935.00
357,005.88
1,306.80
10,731.60

JUMLAH HARGATENAGA

29,964.00

M089
M037
M004
M014
M061
M140
M425

JUMLAH HARGA BAHAN

409,496.78

JUMLAH HARGA PERALATAN

439,460.78

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.002
Pagar sementara dari seng gelombang tinggi 2 m
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

1
2
3
4
5
6
7
8

Dolken Kayu 8 cm
Portland Cement (PC)
Atap Seng Gelombang
Pasir Cor
Stenslah/batu pecah tangan 2/3
Usuk 5/7
Paku Kayu Segala Ukuran
Cat meni besi

L17
L08
L03
L01

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Org/hr
Org/hr
Org/hr
Org/hr

0.4000
0.2000
0.0200
0.0200

42,900.00
51,975.00
55,275.00
65,175.00

17,160.00
10,395.00
1,105.50
1,303.50

btg
kg
Ibr
m
m
m
kg
kg

1.2500
2.5000
1.2000
0.0050
0.0090
0.0720
0.0600
0.4500

27,594.00
1,350.00
81,553.50
130,000.00
215,000.00
4,958,415.00
21,780.00
35,343.00

34,492.50
3,375.00
97,864.20
650.00
1,935.00
357,005.88
1,306.80
15,904.35

JUMLAH HARGATENAGA

29,964.00

M089
M037
M178
M004
M014
M061
M140
M410

JUMLAH HARGA BAHAN

512,533.73

JUMLAH HARGA PERALATAN

542,497.73

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.003
Pagar sementara dari kawat duri tinggi 1.8 m
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.3000
0.2000
0.0200
0.0200

42,900.00
51,975.00
55,275.00
65,175.00

12,870.00
10,395.00
1,105.50
1,303.50

btg
kg
kg
m
m
kg

1.0000
2.0000
25.0000
0.0050
0.0090
0.0600

27,594.00
1,350.00
21,285.00
130,000.00
215,000.00
21,780.00

27,594.00
2,700.00
532,125.00
650.00
1,935.00
1,306.80

JUMLAH HARGATENAGA

25,674.00

BAHAN

1
2
3
4
5
6

Dolken Kayu 8 cm
Portland Cement (PC)
Kawat Duri
Pasir Cor
Stenslah/batu pecah tangan 2/3
Paku Kayu Segala Ukuran

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

M089
M037
M137
M004
M014
M140

JUMLAH HARGA BAHAN

566,310.80

JUMLAH HARGA PERALATAN

591,984.80

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.004
Pagar kawat jaring galvanis, tinggi 1,0 m
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.0420
0.0420
0.0040
0.0020

42,900.00
51,975.00
55,275.00
65,175.00

1.1000

23,364.00

JUMLAH HARGATENAGA

1,801.80
2,182.95
221.10
130.35
4,336.20

Kawat Harmonika Gas

PERALATAN

M136

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

JUMLAH HARGA BAHAN

25,700.40
25,700.40

JUMLAH HARGA PERALATAN

30,036.60

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.005
Pengukuran dan pemasangan bouwplank
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.1000
0.1000
0.0100
0.0050

42,900.00
51,975.00
55,275.00
65,175.00

m
kg
m

0.0120
0.0200
0.0070

3,305,610.00
21,780.00
3,712,500.00

JUMLAH HARGATENAGA

4,290.00
5,197.50
552.75
325.88
10,366.13

1
2
3

Balok Kayu Kelas III


Paku Kayu Segala Ukuran
Papan Kayu kelas III

PERALATAN

M084
M140
M085

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

JUMLAH HARGA BAHAN

39,667.32
435.60
25,987.50
66,090.42

JUMLAH HARGA PERALATAN

76,456.55

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.006
Pembuatan kantor sementara, dengan lantai plesteran
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4
5

Pekerja Biasa
Tukang Kayu
Tukang Batu
Kepala Tukang Kayu
Mandor

BAHAN

1
2
2
3
4
5
6
7
8
9
11
12
13

Balok
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Pasang
Pasir Cor
Stenslah/batu pecah tangan 2/3
Bata Merah
Atap Seng Gelombang
Jendela Nako + accessories
Kaca Polos tebal 3 mm
Multiplek 6 mm
Grendel Pintu
Engsel Pintu

L17
L08
L07
L03
L01

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

2.0000
1.0000
1.0000
0.3000
0.0500

42,900.00
51,975.00
51,975.00
55,275.00
65,175.00

85,800.00
51,975.00
51,975.00
16,582.50
3,258.75

m
kg
kg
m
m
m
bh
Ibr
m
m
lbr
bh
bh

0.1800
0.3000
35.0000
0.1500
0.1000
0.1500
30.0000
0.5000
0.0750
0.1500
1.5000
2.0000
2.0000

5,559,435.00
21,780.00
1,350.00
90,000.00
130,000.00
215,000.00
570.00
81,553.50
231,808.50
79,191.00
81,742.50
21,546.00
31,482.00

1,000,698.30
6,534.00
47,250.00
13,500.00
13,000.00
32,250.00
17,100.00
40,776.75
17,385.64
11,878.65
122,613.75
43,092.00
62,964.00

JUMLAH HARGATENAGA

209,591.25

M062
M140
M037
M002
M004
M014
M022
M178
M285
M270
M216
M262
M257

JUMLAH HARGA BAHAN

1,429,043.09

JUMLAH HARGA PERALATAN

1,638,634.34

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.007
Pembuatan gudang semen dan alat-alat
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4
5

Pekerja Biasa
Tukang Kayu
Tukang Batu
Kepala Tukang Kayu
Mandor

L17
L08
L07
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

2.0000
1.0000
1.0000
0.3000
0.0500

42,900.00
51,975.00
51,975.00
55,275.00
65,175.00

85,800.00
51,975.00
51,975.00
16,582.50
3,258.75

m
kg
kg
m
m
Ibr
lbr
bh
bh

0.2100
0.3000
10.5000
0.0300
0.0500
0.5000
1.1500
2.0000
2.0000

5,559,435.00
21,780.00
1,350.00
130,000.00
215,000.00
81,553.50
81,742.50
21,546.00
31,482.00

1,167,481.35
6,534.00
14,175.00
3,900.00
10,750.00
40,776.75
94,003.88
43,092.00
62,964.00

JUMLAH HARGATENAGA

209,591.25

BAHAN

1
2
3
4
5
6
7
8
9

Balok
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Cor
Stenslah/batu pecah tangan 2/3
Atap Seng Gelombang
Multiplek 6 mm
Grendel Pintu
Engsel Pintu

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

M062
M140
M037
M004
M014
M178
M216
M262
M257

JUMLAH HARGA BAHAN

1,443,676.98

JUMLAH HARGA PERALATAN

1,653,268.23

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.008
Pembuatan rumah jaga/konstruksi kayu
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

1
2
2
3
4
5
6
7
8
9
11

Balok
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Pasang
Pasir Cor
Stenslah/batu pecah tangan 2/3
Bata Merah
Atap Seng Gelombang
Jendela Nako + accessories
Kaca Polos tebal 3 mm
Multiplek 6 mm

L17
L08
L03
L01

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Org/hr
Org/hr
Org/hr
Org/hr

2.0000
1.0000
0.3000
0.0500

42,900.00
51,975.00
55,275.00
65,175.00

85,800.00
51,975.00
16,582.50
3,258.75

m
kg
kg
m
m
m
bh
Ibr
m
m
lbr

0.1800
0.3000
35.0000
0.1500
0.1000
0.1500
30.0000
0.5000
0.1500
0.3000
1.5000

5,559,435.00
21,780.00
1,350.00
90,000.00
130,000.00
215,000.00
570.00
81,553.50
231,808.50
79,191.00
81,742.50

1,000,698.30
6,534.00
47,250.00
13,500.00
13,000.00
32,250.00
17,100.00
40,776.75
34,771.28
23,757.30
122,613.75

JUMLAH HARGATENAGA

157,616.25

M062
M140
M037
M002
M004
M014
M022
M178
M285
M270
M216

JUMLAH HARGA BAHAN

1,352,251.38

JUMLAH HARGA PERALATAN

1,509,867.63

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.009
Membersihkan lapangan dan perataan
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

JUMLAH HARGATENAGA

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.1000
0.0500

42,900.00
51,975.00
55,275.00
65,175.00

4,290.00
3,258.75
7,548.75

JUMLAH HARGA BAHAN

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

JUMLAH HARGA PERALATAN

7,548.75

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.010
Pembuatan bedeng buruh
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4
5

Pekerja Biasa
Tukang Kayu
Tukang Batu
Kepala Tukang Kayu
Mandor

BAHAN

1
2
3
4
5
6
7
8
9
10

Balok
Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Cor
Stenslah/batu pecah tangan 2/3
Atap Seng Gelombang
Jendela Nako + accessories
Multiplek 6 mm
Grendel Pintu
Engsel Pintu

L17
L08
L07
L03
L01

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

2.0000
1.0000
1.0000
0.3000
0.0500

42,900.00
51,975.00
51,975.00
55,275.00
65,175.00

85,800.00
51,975.00
51,975.00
16,582.50
3,258.75

m
kg
kg
m
m
Ibr
m
lbr
bh
bh

0.2100
0.3000
10.5000
0.0300
0.0500
0.5000
0.0750
1.1500
2.0000
2.0000

5,559,435.00
21,780.00
1,350.00
130,000.00
215,000.00
81,553.50
231,808.50
81,742.50
21,546.00
31,482.00

1,167,481.35
6,534.00
14,175.00
3,900.00
10,750.00
40,776.75
17,385.64
94,003.88
43,092.00
62,964.00

JUMLAH HARGATENAGA

209,591.25

M062
M140
M037
M004
M014
M178
M285
M216
M262
M257

JUMLAH HARGA BAHAN

1,461,062.61

JUMLAH HARGA PERALATAN

1,670,653.86

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.011
Pembuatan bak adukan ukuran (40 x 50 x 20) cm
bh

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

1
2
3

Papan (2x20) cm
Paku Kayu Segala Ukuran
Usuk 5/7

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.3000
0.0015

42,900.00
51,975.00
55,275.00
65,175.00

m
kg
m

0.0360
0.0800
0.0150

6,611,220.00
21,780.00
4,958,415.00

JUMLAH HARGATENAGA

15,592.50
97.76
15,690.26

M063
M140
M061

JUMLAH HARGA BAHAN

238,003.92
1,742.40
74,376.23
314,122.55

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

JUMLAH HARGA PERALATAN

329,812.81

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.012
Pembuatan jalan sementara
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

1.0000
0.0500

42,900.00
51,975.00
55,275.00
65,175.00

m
m
m

0.1500
0.0900
0.0100

127,809.00
142,956.00
90,000.00

JUMLAH HARGATENAGA

42,900.00
3,258.75
46,158.75

1
2
3

Batu Belah Kali


Stenslah/batu pecah tangan 4/6 - 5/7
Pasir Pasang

PERALATAN

M011
M016
M002

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

JUMLAH HARGA BAHAN

19,171.35
12,866.04
900.00
32,937.39

JUMLAH HARGA PERALATAN

79,096.14

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.013
Bongkar pasang kayu kuda-kuda / kusen / loteng
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

PERALATAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

4.0000
6.0000
0.6000
0.0600

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH HARGATENAGA

171,600.00
311,850.00
33,165.00
3,910.50
520,525.50

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

520,525.50

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.014
Bongkaran beton bertulang
m3

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

PERALATAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

6.6670
0.3330

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH HARGATENAGA

286,014.30
21,703.28
307,717.58

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

307,717.58

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.015
Bongkaran tembok bata merah
m3

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

6.6670
0.0330

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH HARGATENAGA

286,014.30
2,150.78
288,165.08

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

288,165.08

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.016
Bongkaran atap
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

PERALATAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

1.1000
0.0500

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH HARGATENAGA

47,190.00
3,258.75
50,448.75

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

50,448.75

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.017
Bongkaran lantai
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

PERALATAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

0.2000
0.0100

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH HARGATENAGA

8,580.00
651.75
9,231.75

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

9,231.75

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.018
Bongkaran plafon
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

PERALATAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.2000
0.0600
0.0060
0.0100

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH HARGATENAGA

8,580.00
3,118.50
331.65
651.75
12,681.90

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

12,681.90

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.019
Bongkaran penutup atap lama (Genteng)
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

JUMLAH HARGATENAGA

JUMLAH HARGA BAHAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.2000
0.1000

42,900.00
51,975.00
55,275.00
65,175.00

8,580.00
6,517.50
15,097.50

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

JUMLAH HARGA PERALATAN


10 m2
1 m2

15,097.50
1,509.75

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.020
Bongkaran rangka penutup atap lama (Usuk+Reng)
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

PERALATAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

1.0000
0.2500
0.0250
0.0500

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH HARGATENAGA

42,900.00
12,993.75
1,381.88
3,258.75
60,534.38

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN


10 m2
1 m2

60,534.38
6,053.44

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.021
Bongkaran konstruksi atap lama
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

4.0000
6.0000
0.6000
0.2000

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH HARGATENAGA

171,600.00
311,850.00
33,165.00
13,035.00
529,650.00

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN


10 m2
1 m2

529,650.00
52,965.00

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.022
Bongkaran plafon
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.5000
0.1000

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH HARGATENAGA

25,987.50
6,517.50
32,505.00

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

10 m2
1 m2

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

32,505.00
3,250.50

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

A.023
Mengupas plesteran Lama
m

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

BAHAN

L17
L08
L03
L01

PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Org/hr
Org/hr
Org/hr
Org/hr

0.5000
0.0250

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH HARGATENAGA

21,450.00
1,629.38
23,079.38

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN


10 m2
1 m2

23,079.38
2,307.94

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

B.001
Galian tanah biasa sedalam 1 m
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

JUMLAH HARGA TENAGA


B

BAHAN

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Org/hr
Org/hr
Org/hr
Org/hr

PERKIRAAN
KUANTITAS

0.7500
0.0250

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

32,175.00
1,629.38
33,804.38

33,804.38

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

B.008
Pembuangan tanah sejauh 30 m
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

JUMLAH HARGA TENAGA


B

BAHAN

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Org/hr
Org/hr
Org/hr
Org/hr

PERKIRAAN
KUANTITAS

0.3300
0.0100

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

14,157.00
651.75
14,808.75

14,808.75

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

B.009
Urugan kembali
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

JUMLAH HARGA TENAGA


B

BAHAN

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Org/hr
Org/hr
Org/hr
Org/hr

PERKIRAAN
KUANTITAS

0.3000
0.0150

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

12,870.00
977.63
13,847.63

13,847.63

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

B.011
Urugan pasir
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.3000
0.0100

1.2000

JUMLAH HARGA TENAGA


B

BAHAN

Pasir Urug

M001
JUMLAH HARGA BAHAN

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

12,870.00
651.75
13,521.75

77,395.50

92,874.60
92,874.60

106,396.35

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

B.015
Urugan sirtu padat untuk peninggian lantai bangunan
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.2500
0.0250

1.2000

JUMLAH HARGA TENAGA


B

BAHAN

Sirtu

M007
JUMLAH HARGA BAHAN

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Urugan sirtu padat untuk peninggian lantai bangunan

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

10,725.00
1,629.38
12,354.38

109,053.00

130,863.60
130,863.60

143,217.98

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

B.020
Pembuangan tanah sejauh > 1 km
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

PERKIRAAN
KUANTITAS

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.3300
0.0100

E38

hari

0.0095238095

JUMLAH HARGA TENAGA


B

BAHAN

JUMLAH HARGA BAHAN


C
1

PERALATAN
Sewa Dump Truk (Dump Truck 3.5 Ton)
JUMLAH HARGA PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

14,157.00
651.75
14,808.75

2,025,215.00

19,287.76
19,287.76
34,096.51

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

C.002
Pasang pondasi batu kali, 1 Pc : 4 Ps
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

1.5000
0.7500
0.0750
0.0750

m
kg
m

1.2000
163.0000
0.5200

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Batu Kali
Portland Cement (PC)
Pasir Pasang

M012
M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN
JUMLAH HARGA PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

64,350.00
38,981.25
4,145.63
4,888.13
112,365.00

100,000.00
1,350.00
90,000.00

120,000.00
220,050.00
46,800.00
386,850.00

499,215.00

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

C.004
Pasang pondasi batu kali, 1 Pc : 6 Ps
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

1.5000
0.7500
0.0750
0.0750

m
kg
m

1.2000
117.0000
0.5610

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Batu Kali
Portland Cement (PC)
Pasir Pasang

M012
M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

64,350.00
38,981.25
4,145.63
4,888.13
112,365.00

100,000.00
1,350.00
90,000.00

120,000.00
157,950.00
50,490.00
328,440.00

440,805.00

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

C.009
Pasang pondasi batu kosong
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.7800
0.3900
0.0390
0.0390

m
m

1.2000
0.4320

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Batu Kali
Pasir Urug

M012
M001
JUMLAH HARGA BAHAN

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

33,462.00
20,270.25
2,155.73
2,541.83
58,429.80

100,000.00
77,395.50

120,000.00
33,434.86
153,434.86

211,864.66

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

D.003
Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.6000
0.2000
0.0200
0.0300

bh
kg
m

140.0000
26.5500
0.0930

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Bata Merah
Portland Cement (PC)
Pasir Pasang

M022
M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

25,740.00
10,395.00
1,105.50
1,955.25
39,195.75

570.00
1,350.00
90,000.00

79,800.00
35,842.50
8,370.00
124,012.50

163,208.25

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

D.005
Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.6000
0.2000
0.0200
0.0300

bh
kg
m

140.0000
18.5000
0.1220

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Bata Merah
Portland Cement (PC)
Pasir Pasang

M022
M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

25,740.00
10,395.00
1,105.50
1,955.25
39,195.75

570.00
1,350.00
90,000.00

79,800.00
24,975.00
10,980.00
115,755.00

154,950.75

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

D.009
Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.3000
0.1000
0.0100
0.0150

bh
kg
m

70.0000
11.5000
0.0430

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Bata Merah
Portland Cement (PC)
Pasir Pasang

M022
M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN
JUMLAH HARGA PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

12,870.00
5,197.50
552.75
977.63
19,597.88

570.00
1,350.00
90,000.00

39,900.00
15,525.00
3,870.00
59,295.00

78,892.88

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

D.011
Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.3000
0.1000
0.0100
0.0150

bh
kg
m

70.0000
8.3200
0.0490

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Bata Merah
Portland Cement (PC)
Pasir Pasang

M022
M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

12,870.00
5,197.50
552.75
977.63
19,597.88

570.00
1,350.00
90,000.00

39,900.00
11,232.00
4,410.00
55,542.00

75,139.88

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

E.004
Plesteran 1 Pc : 4 Ps, tebal 15 mm
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.3000
0.1500
0.0150
0.0150

kg
m

6.2400
0.0240

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Portland Cement (PC)


Pasir Pasang

M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

12,870.00
7,796.25
829.13
977.63
22,473.00

1,350.00
90,000.00

8,424.00
2,160.00
10,584.00

33,057.00

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

E.006
Plesteran 1 Pc : 6 Ps, tebal 15 mm
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.3000
0.1500
0.0150
0.0150

kg
m

4.4160
0.0270

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Portland Cement (PC)


Pasir Pasang

M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

12,870.00
7,796.25
829.13
977.63
22,473.00

1,350.00
90,000.00

5,961.60
2,430.00
8,391.60

30,864.60

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

E.015
Plesteran 1 Pc : 4 Ps, tebal 20 mm
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.4000
0.2000
0.0200
0.0220

kg
m

8.3200
0.0320

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Portland Cement (PC)


Pasir Pasang

M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

17,160.00
10,395.00
1,105.50
1,433.85
30,094.35

1,350.00
90,000.00

11,232.00
2,880.00
14,112.00

44,206.35

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

E.014
Plesteran 1 Pc : 3 Ps, tebal 20 mm
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.2600
0.2000
0.0200
0.0130

kg
m

10.3680
0.0310

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Portland Cement (PC)


Pasir Pasang

M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

11,154.00
10,395.00
1,105.50
847.28
23,501.78

1,350.00
90,000.00

13,996.80
2,790.00
16,786.80

40,288.58

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

E.023
Plesteran Ciprat 1 Pc : 2 Ps,
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.3000
0.1000
0.0100
0.0150

kg
m

4.3200
0.0060

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Portland Cement (PC)


Pasir Pasang

M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

12,870.00
5,197.50
552.75
977.63
19,597.88

1,350.00
90,000.00

5,832.00
540.00
6,372.00

25,969.88

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

E.024
Plesteran siar pasangan batu kali adukan 1 Pc : 2 Ps
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.3000
0.1500
0.0150
0.0150

kg
m

6.3400
0.0120

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Portland Cement (PC)


Pasir Pasang

M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Plesteran siar pasangan batu kali adukan 1 Pc : 2 Ps

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

12,870.00
7,796.25
829.13
977.63
22,473.00

1,350.00
90,000.00

8,559.00
1,080.00
9,639.00

32,112.00

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

E.025
Benangan
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.1200
-

kg
m

6.5000
0.0210

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Portland Cement (PC)


Pasir Pasang

M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

6,237.00
6,237.00

1,350.00
90,000.00

8,775.00
1,890.00
10,665.00

16,902.00

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

E.026
Acian
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.2000
0.1000
0.0100
0.0100

kg

3.2500

JUMLAH HARGA TENAGA


B

BAHAN

Portland Cement (PC)

M037

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

8,580.00
5,197.50
552.75
651.75
14,982.00

1,350.00

4,387.50
4,387.50

19,369.50

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

E.027
Finishing beton expose
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.1500
0.0700
0.0070
0.0080

kg
m

4.3200
0.0160

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Portland Cement (PC)


Pasir Pasang

M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

6,435.00
3,638.25
386.93
521.40
10,981.58

1,350.00
90,000.00

5,832.00
1,440.00
7,272.00

18,253.58

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

E.028
Benangan Sudut
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.1200
-

kg

1.6250

JUMLAH HARGA TENAGA


B

BAHAN

Portland Cement (PC)

M037

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

6,237.00
6,237.00

1,350.00

2,193.75

2,193.75

8,430.75

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

F.012a
Pasang pintu panel kayu meranti
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Papan (3x30) cm
Lem Kayu

M065
M422

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

m
kg

ANALISA HARGA SATUAN


Pasang pintu panel kayu meranti

PERKIRAAN
KUANTITAS

1.0000
3.0000
0.3000
0.0500

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

42,900.00
155,925.00
16,582.50
3,258.75
218,666.25

0.0400
0.5000

6,939,900.00
29,502.00

277,596.00
14,751.00
292,347.00

1 m2
Bh (Uk 80x210 cm)

511,013.25
858,502.26

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

F.012b
Pasang pintu panel kayu meranti. Lapis alum
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Papan (3x30) cm
Lem Kayu
Lapis aluminum jeruk

M065
M422
M497

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

m
kg
m2

ANALISA HARGA SATUAN


Pasang pintu panel kayu meranti. Lapis alumi jeruk

PERKIRAAN
KUANTITAS

1.0000
3.0000
0.3000
0.0500

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

42,900.00
155,925.00
16,582.50
3,258.75
218,666.25

0.0400
0.5000
1.0000

6,939,900.00
29,502.00
27,000.00

277,596.00
14,751.00
27,000.00
319,347.00

1 m2
Bh (Uk 70x210 cm)

538,013.25
790,879.48

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

F.091
Pasang lisplang ukuran (3 x 30) cm, kayu mer
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Papan (3x30) cm
Paku Kayu Segala Ukuran

M065
M140

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

m
kg

ANALISA HARGA SATUAN


Pasang lisplang ukuran (3 x 30) cm, kayu meranti

PERKIRAAN
KUANTITAS

0.1000
0.2000
0.0200
0.0050

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

4,290.00
10,395.00
1,105.50
325.88
16,116.38

0.0110
0.0500

6,939,900.00
21,780.00

76,338.90
1,089.00

77,427.90

93,544.28

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

F.016
Pasang pintu dan jendela kaca freme kayu m
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Papan (3x30) cm
Kaca Polos tebal 5 mm
Lem Kayu

M065
M271
M422

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

m
m
kg

ANALISA HARGA SATUAN


Pasang pintu dan jendela kaca freme kayu meranti

PERKIRAAN
KUANTITAS

0.8000
2.4000
0.2400
0.0400

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

34,320.00
124,740.00
13,266.00
2,607.00
174,933.00

0.0240
0.8464
0.3000

6,939,900.00
120,204.00
29,502.00

166,557.60
101,740.67
8,850.60
277,148.87

1 m2
Daun Pintu 80 x 210 cm
Daun Jendela (Luas Rata2 0,65 m2)
Daun Jendela BV 60 x 50 cm

452,081.87
759,497.53
293,853.21
135,624.56

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

F.020
Pasang pintu dan jendela jalusi kayu meranti
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Papan (3x30) cm
Lem Kayu

M065
M422

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

m
kg

ANALISA HARGA SATUAN


Pasang pintu dan jendela jalusi kayu meranti

PERKIRAAN
KUANTITAS

1.0000
3.0000
0.3000
0.0500

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

42,900.00
155,925.00
16,582.50
3,258.75
218,666.25

0.0640
0.5000

6,939,900.00
29,502.00

444,153.60
14,751.00
458,904.60

1 m2
Uk. 50 x 110 cm

677,570.85
372,663.97

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

F.045
Pasang konstruksi kuda-kuda kayu meranti
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Balok
Besi Strip / Plat Plendes
Paku Kayu Segala Ukuran

M062
M114
M140

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

m
kg
kg

ANALISA HARGA SATUAN


Pasang konstruksi kuda-kuda kayu meranti

PERKIRAAN
KUANTITAS

4.0000
12.0000
1.2000
0.2000

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

171,600.00
623,700.00
66,330.00
13,035.00
874,665.00

1.1000
15.0000
5.6000

5,559,435.00
9,702.00
21,780.00

6,115,378.50
145,530.00
121,968.00
6,382,876.50

7,257,541.50

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

F.049
Pasang konstruksi gording kayu meranti
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Balok
Besi Strip / Plat Plendes
Paku Kayu Segala Ukuran

M062
M114
M140

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

m
kg
kg

ANALISA HARGA SATUAN


Pasang konstruksi gording kayu meranti

PERKIRAAN
KUANTITAS

2.4000
7.2000
0.7200
0.1200

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

102,960.00
374,220.00
39,798.00
7,821.00
524,799.00

1.1000
15.0000
3.0000

5,559,435.00
9,702.00
21,780.00

6,115,378.50
145,530.00
65,340.00
6,326,248.50

6,851,047.50

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

F.067
Pasang kaso + reng genteng beton kayu mer
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Usuk 5/7
Paku Kayu Segala Ukuran
Reng 2/3, 3/5

M061
M140
M060

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

m
kg
m

ANALISA HARGA SATUAN


Pasang kaso + reng genteng beton kayu meranti

PERKIRAAN
KUANTITAS

0.1000
0.1000
0.0100
0.0050

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

4,290.00
5,197.50
552.75
325.88
10,366.13

0.0140
0.2500
0.0090

4,958,415.00
21,780.00
4,958,415.00

69,417.81
5,445.00
44,625.74
119,488.55

129,854.67

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

F.079
Pasang Kembali rangka langit-langit (1.0 x 1.0
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

Paku Kayu Segala Ukuran

M140

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

kg

ANALISA HARGA SATUAN


Pasang Kembali rangka langit-langit (1.0 x 1.0) m, kayu meranti

PERKIRAAN
KUANTITAS

0.1500
0.3000
0.0300
0.0750

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

6,435.00
15,592.50
1,658.25
4,888.13
28,573.88

0.2000

21,780.00

4,356.00

4,356.00

32,929.88

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.001
Beton mutu fc'=7,4 Mpa (K100) slump (12
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3
Air Bersih

M037
M004
M019
M486

kg
m
m
Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

G.002
Beton mutu fc'=9,8 Mpa (K125) slump (12
m3

SATUAN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3
Air Bersih

M037
M004
M019
M486

kg
m
m
Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

G.003
Beton mutu fc'=12,2 Mpa (K150) slump (1
m3

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

Air Bersih

M486

Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.004
Lantai kerja beton mutu fc'=7,4 Mpa (K10
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3
Air Bersih

M037
M004
M019
M486

kg
m
m
Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA

G.005

JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:

NO.

Beton mutu fc'=14,5 Mpa (K175) slump (1


m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3
Air Bersih

M037
M004
M019
M486

kg
m
m
Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu

G.006
Beton mutu fc'=16,9 Mpa (K200) slump (1
m3

SATUAN

L17
L07
L02

Org/hr
Org/hr
Org/hr

Mandor

L01

Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3
Air Bersih

M037
M004
M019
M486

kg
m
m
Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

G.007
Beton mutu fc'=19,3 Mpa (K225) slump (1
m3

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3
Air Bersih
JUMLAH HARGA BAHAN

PERALATAN

M037
M004
M019
M486

kg
m
m
Itr

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.008
Beton mutu fc'=24,0 Mpa (K275) slump (1
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3
Air Bersih

M037
M004
M019
M486

kg
m
m
Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

G.009
Beton mutu fc'=21,7 Mpa (K250) slump (1
m3

NO.

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3
Air Bersih

M037
M004
M019
M486

kg
m
m
Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
JUMLAH HARGA TENAGA

BAHAN

G.010
Beton mutu fc'=26,4 Mpa (K300) slump (1
m3

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

1
2
3
4

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3
Air Bersih

M037
M004
M019
M486

kg
m
m
Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.011
Beton mutu fc'=28,8 Mpa (K325) slump (1
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3
Air Bersih

M037
M004
M019
M486

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

kg
m
m
Itr

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.012
Beton mutu fc'=31,2 Mpa (K350) slump (1
m3

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3
Air Bersih

M037
M004
M019
M486

kg
m
m
Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

TENAGA

G.013
Beton kedap air dengan strorox - 100
m3

SATUAN

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3
Strorox 100
Air Bersih

M037
M004
M019
M476
M486

kg
m
m
kg
Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

G.014
Pasang PVC Waterstop lebar 150 mm
m

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

Waterstop Lebar 150 mm

M467

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.015
Pasang PVC Waterstop lebar 200 mm
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

Waterstop Lebar 200 mm

M468

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

G.016
Pasang PVC Waterstop lebar 230 mm - 32
m

NO.

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

Waterstop Lebar 230 mm

M469

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor
JUMLAH HARGA TENAGA

BAHAN

G.017
Pembesian dengan besi polos
kg

SATUAN

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

1
2

Besi Beton Polos


Kawat Beton/Bendrat RRT

M112
M135

kg
kg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.018
Pembesian dengan besi ulir
kg

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Besi Beton Ulir


Kawat Beton/Bendrat RRT

M113
M135

kg
kg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA

G.019

JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:

NO.

Kabel prestressed polos/strands


kg

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Kabel prestressed
Kawat Beton/Bendrat RRT

M118
M135

kg
kg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

G.020
Memasang 1 kg jaring kawat baja / wire m
kg

SATUAN

L17
L09
L04
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Wire Mesh
Kawat Beton/Bendrat RRT

M148.a
M135

kg
kg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.021
Pasang bekisting untuk pondasi
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting

M085
M140
M474

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

m
kg
Itr

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.022
Pasang bekisting untuk pondasi ( 2x pak
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting

M085
M140
M474

m
kg
Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

TENAGA

G.023
Pasang bekisting untuk sloof
m

SATUAN

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting

M085
M140
M474

m
kg
Itr

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

G.024
Pasang bekisting untuk sloof ( 2x pakai )
m

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
JUMLAH HARGA BAHAN

M085
M140
M474

m
kg
Itr

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.025
Pasang bekisting untuk kolom
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

m
kg
Itr
m
lbr
btg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

G.026
Pasang bekisting untuk kolom ( 2x pakai
m

NO.

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

m
kg
Itr
m
lbr
btg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu

G.027
Pasang bekisting untuk balok
m

SATUAN

L17
L08
L03

Org/hr
Org/hr
Org/hr

Mandor

L01

Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

m
kg
Itr
m
lbr
btg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

G.028
Pasang bekisting untuk balok ( 2x pakai
m

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

m
kg
Itr
m
lbr
btg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.029
Pasang bekisting untuk plat lantai
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

m
kg
Itr
m
lbr
btg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN

KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.030
Pasang bekisting untuk plat lantai ( 2x pa
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

m
kg
Itr
m
lbr
btg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

A.

:
:
:

KOMPONEN

TENAGA

G.031
Pasang bekisting untuk dinding
m

SATUAN

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6
7

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
Formtie

M085
M140
M474
M084
M217
M089
M477

m
kg
Itr
m
lbr
btg
bh

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

G.032
Pasang bekisting untuk dinding ( 2x paka
m

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Papan Kayu kelas III


Paku Kayu Segala Ukuran

M085
M140

m
kg

3
4
5
6
7

Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
Formtie

M474
M084
M217
M089
M477

Itr
m
lbr
btg
bh

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

G.033
Pasang bekisting untuk tangga
m

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

JUMLAH HARGA BAHAN


C

PERALATAN

M085
M140
M474
M084
M217
M089

m
kg
Itr
m
lbr
btg

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.034
Pasang bekisting untuk tangga ( 2x paka
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

m
kg
Itr
m
lbr
btg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

G.035
Pasang bekisting jembatan untuk pengec
m

NO.

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Balok Kayu Kelas III


Paku Kayu Segala Ukuran
Dolken Kayu 8 cm

M084
M140
M089

m
kg
btg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor
JUMLAH HARGA TENAGA

G.036
Pondasi beton bertulang (150 kg besi + b
m3

SATUAN

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

BAHAN

1
2
3
4
5
6
7
8

Balok Kayu Kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M084
M140
M474
M112
M135
M037
M004
M019

m
kg
Itr
kg
kg
kg
m
m

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

G.037
Sloof beton bertulang (200 kg besi + beki
m3

SATUAN

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT

M085
M140
M474
M112
M135

m
kg
Itr
kg
kg

6
7
8

Portland Cement (PC)


Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

G.038
Kolom beton bertulang (150 kg besi + be
m3

SATUAN

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6
7
8
9
10
11

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
JUMLAH HARGA BAHAN

M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089

m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

G.039
Kolom beton bertulang (300 kg besi + be
m3

SATUAN

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6
7
8
9
10
11

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
JUMLAH HARGA BAHAN

PERALATAN

JUMLAH HARGA PERALATAN

M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089

m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.040
Balok beton bertulang (200 kg besi + bek
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6
7
8
9
10
11

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089

m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN

KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.041
Dinding beton bertulang (150 kg besi + b
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6
7
8
9
10
11

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089

m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

G.042
Dinding beton bertulang (200 kg besi + b
m3

NO.

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6
7
8
9
10
11

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M112
M135
M037
M004
M019
M084
M217
M089

m
kg
Itr
kg
kg
kg
m
m
m
lbr
btg

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

G.043
Kolom penguat beton bertulang (11 x 11)
m

SATUAN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6
7

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M085
M140
M112
M135
M037
M004
M019

m
kg
kg
kg
kg
m
m

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

G.044
Ring balok beton bertulang (10 x 15) cm
m

SATUAN

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6
7

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M085
M140
M112
M135
M037
M004
M019

m
kg
kg
kg
kg
m
m

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

G.045
Sloof beton bertulang (10 x 15) cm
m

SATUAN

L17
L07
L08
L09
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Besi Beton Polos
Kawat Beton/Bendrat RRT
Portland Cement (PC)

M085
M140
M112
M135
M037

m
kg
kg
kg
kg

6
7

Pasir Cor
Batu pecah mesin 2/3

M004
M019

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

m
m

ANALISA HARGA SATUAN


Beton mutu fc'=7,4 Mpa (K100) slump (12 2) cm, w/c = 0,87

PERKIRAAN
KUANTITAS

1.6500
0.2750
0.0280
0.0830

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

70,785.00
14,293.13
1,547.70
5,409.53
92,035.35

247.0000
0.6207
0.7400
215.000

1,350.00
130,000.00
189,387.00
27.00

333,450.00
80,692.86
140,146.38
5,805.00
560,094.24

652,129.59

ANALISA HARGA SATUAN


Beton mutu fc'=9,8 Mpa (K125) slump (12 2) cm, w/c = 0,78

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

1.6500
0.2750
0.0280
0.0830

42,900.00
51,975.00
55,275.00
65,175.00

70,785.00
14,293.13
1,547.70
5,409.53
92,035.35

276.0000
0.5914
0.7496
215.000

1,350.00
130,000.00
189,387.00
27.00

372,600.00
76,885.71
141,970.11
5,805.00
597,260.82

689,296.17

ANALISA HARGA SATUAN


Beton mutu fc'=12,2 Mpa (K150) slump (12 2) cm, w/c = 0,72

PERKIRAAN
KUANTITAS

1.6500
0.2750
0.0280
0.0830

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

70,785.00
14,293.13
1,547.70
5,409.53
92,035.35

299.0000
0.5707
0.7533

1,350.00
130,000.00
189,387.00

403,650.00
74,192.86
142,671.54

215.000

27.00

5,805.00
626,319.40

718,354.75

ANALISA HARGA SATUAN


Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87

PERKIRAAN
KUANTITAS

1.2000
0.2000
0.0200
0.0600

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

51,480.00
10,395.00
1,105.50
3,910.50
66,891.00

230.0000
0.6379
0.7607
215.000

1,350.00
130,000.00
189,387.00
27.00

310,500.00
82,921.43
144,074.41
5,805.00
543,300.84

610,191.84

ANALISA HARGA SATUAN

Beton mutu fc'=14,5 Mpa (K175) slump (12 2) cm, w/c = 0,66

PERKIRAAN
KUANTITAS

1.6500
0.2750
0.0280
0.0830

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

70,785.00
14,293.13
1,547.70
5,409.53
92,035.35

326.0000
0.5429
0.7622
215.000

1,350.00
130,000.00
189,387.00
27.00

440,100.00
70,571.43
144,354.98
5,805.00
660,831.41

752,866.76

ANALISA HARGA SATUAN


Beton mutu fc'=16,9 Mpa (K200) slump (12 2) cm, w/c = 0,61

PERKIRAAN
KUANTITAS

1.6500
0.2750
0.0280

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00

JUMLAH
HARGA
(Rp.)

70,785.00
14,293.13
1,547.70

0.0830

65,175.00

5,409.53
92,035.35

352.0000
0.5221
0.7637
215.000

1,350.00
130,000.00
189,387.00
27.00

475,200.00
67,878.57
144,635.55
5,805.00
693,519.12

785,554.47

ANALISA HARGA SATUAN


Beton mutu fc'=19,3 Mpa (K225) slump (12 2) cm, w/c = 0,58

PERKIRAAN
KUANTITAS

1.6500
0.2750
0.0280
0.0830

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

70,785.00
14,293.13
1,547.70
5,409.53
92,035.35

371.0000
0.4986
0.7756
215.000

1,350.00
130,000.00
189,387.00
27.00

500,850.00
64,814.29
146,880.14
5,805.00
718,349.43

810,384.78

ANALISA HARGA SATUAN


Beton mutu fc'=24,0 Mpa (K275) slump (12 2) cm, w/c = 0,53

PERKIRAAN
KUANTITAS

1.6500
0.2750
0.0280
0.0830

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

70,785.00
14,293.13
1,547.70
5,409.53
92,035.35

406.0000
0.4886
0.7600
215.000

1,350.00
130,000.00
189,387.00
27.00

548,100.00
63,514.29
143,934.12
5,805.00
761,353.41

853,388.76

ANALISA HARGA SATUAN


Beton mutu fc'=21,7 Mpa (K250) slump (12 2) cm, w/c = 0,56

PERKIRAAN

HARGA

JUMLAH

KUANTITAS

1.6500
0.2750
0.0280
0.0830

SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

HARGA
(Rp.)

70,785.00
14,293.13
1,547.70
5,409.53
92,035.35

384.0000
0.4943
0.7696
215.000

1,350.00
130,000.00
189,387.00
27.00

518,400.00
64,257.14
145,757.85
5,805.00
734,219.99

826,255.34

ANALISA HARGA SATUAN


Beton mutu fc'=26,4 Mpa (K300) slump (12 2) cm, w/c = 0,52

PERKIRAAN
KUANTITAS

1.6500
0.2750
0.0280
0.0830

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

70,785.00
14,293.13
1,547.70
5,409.53
92,035.35

413.0000
0.4864
0.7563
215.000

1,350.00
130,000.00
189,387.00
27.00

557,550.00
63,235.71
143,232.69
5,805.00
769,823.40

861,858.75

ANALISA HARGA SATUAN


Beton mutu fc'=28,8 Mpa (K325) slump (12 2) cm, w/c = 0,49

PERKIRAAN
KUANTITAS

2.1000
0.3500
0.0350
0.1050

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

90,090.00
18,191.25
1,934.63
6,843.38
117,059.25

439.0000
0.4786
0.7452
215.000

1,350.00
130,000.00
189,387.00
27.00

592,650.00
62,214.29
141,128.39
5,805.00
801,797.67

918,856.92

ANALISA HARGA SATUAN


Beton mutu fc'=31,2 Mpa (K350) slump (12 2) cm, w/c = 0,48

PERKIRAAN
KUANTITAS

2.1000
0.3500
0.0350
0.1050

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

90,090.00
18,191.25
1,934.63
6,843.38
117,059.25

448.0000
0.4764
0.7407
215.000

1,350.00
130,000.00
189,387.00
27.00

604,800.00
61,935.71
140,286.67
5,805.00
812,827.38

929,886.63

ANALISA HARGA SATUAN


Beton kedap air dengan strorox - 100

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

2.1000
0.3500
0.0350
0.1050

42,900.00
51,975.00
55,275.00
65,175.00

90,090.00
18,191.25
1,934.63
6,843.38
117,059.25

400.0000
0.4800
0.8000
1.2000
210.0000

1,350.00
130,000.00
189,387.00
102,762.00
27.00

540,000.00
62,400.00
151,509.60
123,314.40
5,670.00
882,894.00

999,953.25

ANALISA HARGA SATUAN


Pasang PVC Waterstop lebar 150 mm

PERKIRAAN
KUANTITAS

0.0600
0.0300
0.0030
0.0030

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

2,574.00
1,559.25
165.83
195.53
4,494.60

1.0500

40,446.00

42,468.30

42,468.30

46,962.90

ANALISA HARGA SATUAN


Pasang PVC Waterstop lebar 200 mm

PERKIRAAN
KUANTITAS

0.0700
0.0350
0.0040
0.0040

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

3,003.00
1,819.13
221.10
260.70
5,303.93

1.0500

72,859.50

76,502.48

76,502.48

81,806.40

ANALISA HARGA SATUAN


Pasang PVC Waterstop lebar 230 mm - 320 mm

PERKIRAAN
KUANTITAS

0.0800
0.0400
0.0040
0.0040

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

3,432.00
2,079.00
221.10
260.70
5,992.80

1.0500

84,861.00

89,104.05

89,104.05

95,096.85

ANALISA HARGA SATUAN


Pembesian dengan besi polos

PERKIRAAN
KUANTITAS

0.0070
0.0070
0.0007
0.0004

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

300.30
363.83
38.69
26.07
728.89

1.0500
0.0150

9,750.00
17,293.50

10,237.50
259.40
10,496.90

11,225.79

ANALISA HARGA SATUAN


Pembesian dengan besi ulir

PERKIRAAN
KUANTITAS

0.0070
0.0070
0.0007
0.0004

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

300.30
363.83
38.69
26.07
728.89

1.0500
0.0150

14,157.00
17,293.50

14,864.85
259.40

15,124.25

15,853.14

ANALISA HARGA SATUAN

Kabel prestressed polos/strands

PERKIRAAN
KUANTITAS

0.0050
0.0050
0.0005
0.0003

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

214.50
259.88
27.64
19.55
521.57

1.0500
0.0100

29,700.00
17,293.50

31,185.00
172.94
31,357.94

31,879.50

ANALISA HARGA SATUAN


Memasang 1 kg jaring kawat baja / wire mesh

PERKIRAAN
KUANTITAS

0.0250
0.0250
0.0020
0.0010

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

1,072.50
1,299.38
110.55
65.18

2,547.60

1.0200
0.0500

16,537.50
17,293.50

16,868.25
864.68
17,732.93

20,280.53

ANALISA HARGA SATUAN


Pasang bekisting untuk pondasi

PERKIRAAN
KUANTITAS

0.5200
0.2600
0.0260
0.0260

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

22,308.00
13,513.50
1,437.15
1,694.55
38,953.20

0.0400
0.3000
0.1000

3,712,500.00
21,780.00
2,574.00

148,500.00
6,534.00
257.40
155,291.40

194,244.60

ANALISA HARGA SATUAN


Pasang bekisting untuk pondasi ( 2x pakai )

PERKIRAAN
KUANTITAS

0.5200
0.2600
0.0260
0.0260

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

22,308.00
13,513.50
1,437.15
1,694.55
38,953.20

0.0200
0.1500
0.0500

3,712,500.00
21,780.00
2,574.00

74,250.00
3,267.00
128.70
77,645.70

116,598.90

ANALISA HARGA SATUAN


Pasang bekisting untuk sloof

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

0.5200
0.2600
0.0260
0.0260

42,900.00
51,975.00
55,275.00
65,175.00

22,308.00
13,513.50
1,437.15
1,694.55
38,953.20

0.0450
0.3000
0.1000

3,712,500.00
21,780.00
2,574.00

167,062.50 kayu klas III


6,534.00
257.40
173,853.90

212,807.10

ANALISA HARGA SATUAN


Pasang bekisting untuk sloof ( 2x pakai )

PERKIRAAN
KUANTITAS

0.5200
0.2600
0.0260
0.0260

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

22,308.00
13,513.50
1,437.15
1,694.55
38,953.20

0.0225
0.1500
0.0500

3,712,500.00
21,780.00
2,574.00

83,531.25 kayu klas III


3,267.00
128.70
86,926.95

125,880.15

ANALISA HARGA SATUAN


Pasang bekisting untuk kolom

PERKIRAAN
KUANTITAS

0.6600
0.3300
0.0330
0.0330

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

0.0400
0.4000
0.2000
0.0150
0.3500
2.0000

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

148,500.00
8,712.00
514.80
49,584.15
43,725.15
55,188.00
306,224.10

355,664.70

ANALISA HARGA SATUAN


Pasang bekisting untuk kolom ( 2x pakai )

1.008

PERKIRAAN
KUANTITAS

0.6600
0.3300
0.0330
0.0330

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

0.0200
0.2000
0.1000
0.0075
0.1750
1.0000

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

74,250.00
4,356.00
257.40
24,792.08
21,862.58
27,594.00
153,112.05

202,552.65

ANALISA HARGA SATUAN


Pasang bekisting untuk balok

PERKIRAAN
KUANTITAS

0.6600
0.3300
0.0330

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08

1.008

0.0330

65,175.00

2,150.78
49,440.60

0.0400
0.4000
0.2000
0.0180
0.3500
2.0000

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

148,500.00
8,712.00
514.80
59,500.98
43,725.15
55,188.00
316,140.93

365,581.53

ANALISA HARGA SATUAN


Pasang bekisting untuk balok ( 2x pakai )

PERKIRAAN
KUANTITAS

0.6600
0.3300
0.0330
0.0330

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

0.0200
0.2000
0.1000
0.0090
0.1750
1.0000

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

74,250.00
4,356.00
257.40
29,750.49
21,862.58
27,594.00

158,070.47

207,511.07

ANALISA HARGA SATUAN


Pasang bekisting untuk plat lantai

PERKIRAAN
KUANTITAS

0.6600
0.3300
0.0330
0.0330

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

0.0400
0.4000
0.2000
0.0150
0.3500
6.0000

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

148,500.00
8,712.00
514.80
49,584.15
43,725.15
165,564.00
416,600.10

466,040.70

ANALISA HARGA SATUAN

Pasang bekisting untuk plat lantai ( 2x pakai )

PERKIRAAN
KUANTITAS

0.6600
0.3300
0.0330
0.0330

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

0.0200
0.2000
0.1000
0.0075
0.1750
3.0000

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

74,250.00
4,356.00
257.40
24,792.08
21,862.58
82,782.00
208,300.05

257,740.65

ANALISA HARGA SATUAN


Pasang bekisting untuk dinding

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

0.6600
0.3300
0.0330
0.0330

42,900.00
51,975.00
55,275.00
65,175.00

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
8,712.00

111,375.00
8,712.00
514.80
66,112.20
43,725.15
82,782.00
34,848.00
348,069.15

397,509.75

ANALISA HARGA SATUAN


Pasang bekisting untuk dinding ( 2x pakai )

PERKIRAAN
KUANTITAS

0.6600
0.3300
0.0330
0.0330

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

0.0150
0.2000

3,712,500.00
21,780.00

55,687.50
4,356.00

0.1000
0.0100
0.1750
1.5000
2.0000

2,574.00
3,305,610.00
124,929.00
27,594.00
8,712.00

257.40
33,056.10
21,862.58
41,391.00
17,424.00
174,034.58

223,475.18

ANALISA HARGA SATUAN


Pasang bekisting untuk tangga

PERKIRAAN
KUANTITAS

0.6600
0.3300
0.0330
0.0330

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

0.0300
0.4000
0.1500
0.0150
0.3500
2.0000

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

111,375.00
8,712.00
386.10
49,584.15
43,725.15
55,188.00

268,970.40

318,411.00

ANALISA HARGA SATUAN


Pasang bekisting untuk tangga ( 2x pakai )

PERKIRAAN
KUANTITAS

0.6600
0.3300
0.0330
0.0330

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

0.0150
0.2000
0.0750
0.0075
0.1750
1.0000

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

55,687.50
4,356.00
193.05
24,792.08
21,862.58
27,594.00

134,485.20

183,925.80

ANALISA HARGA SATUAN


Pasang bekisting jembatan untuk pengecoran

PERKIRAAN
KUANTITAS

0.1500
0.0500
0.0050
0.0080

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

6,435.00
2,598.75
276.38
521.40
9,831.53

0.0264
0.6000
0.5000

3,305,610.00
21,780.00
27,594.00

87,268.10
13,068.00
13,797.00
114,133.10

123,964.63

ANALISA HARGA SATUAN


Pondasi beton bertulang (150 kg besi + bekisting)

PERKIRAAN
KUANTITAS

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

227,370.00
14,293.13
67,567.50
54,573.75
14,482.05
17,271.38
395,557.80

0.2000
1.5000
0.4000
157.5000
2.2500
336.0000
0.5400
0.8100

3,305,610.00
21,780.00
2,574.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00

661,122.00
32,670.00
1,029.60
1,535,625.00
38,910.38
453,600.00
70,200.00
153,403.47
2,946,560.45

3,342,118.25

ANALISA HARGA SATUAN


Sloof beton bertulang (200 kg besi + bekisting)

PERKIRAAN
KUANTITAS

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

242,385.00
14,293.13
81,081.00
72,765.00
17,853.83
18,444.53
446,822.48

0.2700
2.0000
0.6000
210.0000
3.0000

3,712,500.00
21,780.00
2,574.00
9,750.00
17,293.50

1,002,375.00
43,560.00
1,544.40
2,047,500.00
51,880.50

336.0000
0.5400
0.8100

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
3,824,063.37

4,270,885.85

ANALISA HARGA SATUAN


Kolom beton bertulang (150 kg besi + bekisting)

PERKIRAAN
KUANTITAS

5.3000
0.2750
1.3000
1.0500
0.2650
0.2650

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

227,370.00
14,293.13
67,567.50
54,573.75
14,647.88
17,271.38
395,723.63

0.3200
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1200
2.8000
32.0000

3,712,500.00
21,780.00
2,574.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
3,305,610.00
124,929.00
27,594.00

1,188,000.00
69,696.00
4,118.40
1,535,625.00
38,910.38
453,600.00
70,200.00
153,403.47
396,673.20
349,801.20
883,008.00
5,143,035.65

5,538,759.27

ANALISA HARGA SATUAN


Kolom beton bertulang (300 kg besi + bekisting)

PERKIRAAN
KUANTITAS

7.0500
0.2750
1.6500
2.1000
0.4030
0.3530

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

302,445.00
14,293.13
85,758.75
109,147.50
22,275.83
23,006.78
556,926.98

0.4000
4.0000
2.0000
315.0000
4.5000
336.0000
0.5400
0.8100
0.1500
3.5000
20.0000

3,712,500.00
21,780.00
2,574.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
3,305,610.00
124,929.00
27,594.00

1,485,000.00
87,120.00
5,148.00
3,071,250.00
77,820.75
453,600.00
70,200.00
153,403.47
495,841.50
437,251.50
551,880.00
6,888,515.22

7,445,442.20

ANALISA HARGA SATUAN


Balok beton bertulang (200 kg besi + bekisting)

PERKIRAAN
KUANTITAS

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

272,415.00
14,293.13
85,758.75
72,765.00
18,406.58
20,725.65
484,364.10

0.3200
3.2000
1.6000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1400
2.8000
16.0000

3,712,500.00
21,780.00
2,574.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
3,305,610.00
124,929.00
27,594.00

1,188,000.00
69,696.00
4,118.40
2,047,500.00
51,880.50
453,600.00
70,200.00
153,403.47
462,785.40
349,801.20
441,504.00
5,292,488.97

5,776,853.07

ANALISA HARGA SATUAN

Dinding beton bertulang (150 kg besi + bekisting)

PERKIRAAN
KUANTITAS

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

227,370.00
14,293.13
67,567.50
54,573.75
14,482.05
17,271.38
395,557.80

0.2400
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1600
2.8000
24.0000

3,712,500.00
21,780.00
2,574.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
3,305,610.00
124,929.00
27,594.00

891,000.00
69,696.00
4,118.40
1,535,625.00
38,910.38
453,600.00
70,200.00
153,403.47
528,897.60
349,801.20
662,256.00
4,757,508.05

5,153,065.85

ANALISA HARGA SATUAN


Dinding beton bertulang (200 kg besi + bekisting)

PERKIRAAN
KUANTITAS

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

242,385.00
14,293.13
81,081.00
72,765.00
17,853.83
18,444.53
446,822.48

0.2500
3.0000
1.2000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1050
2.5000
14.0000

3,712,500.00
21,780.00
2,574.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00
3,305,610.00
124,929.00
27,594.00

928,125.00
65,340.00
3,088.80
2,047,500.00
51,880.50
453,600.00
70,200.00
153,403.47
347,089.05
312,322.50
386,316.00
4,818,865.32

5,265,687.80

ANALISA HARGA SATUAN


Kolom penguat beton bertulang (11 x 11) cm

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

7,722.00
1,039.50
1,039.50
1,039.50
331.65
586.58
11,758.73

0.0020
0.0100
3.0000
0.0450
4.0000
0.0060
0.0090

3,712,500.00
21,780.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00

7,425.00
217.80
29,250.00
778.21
5,400.00
780.00
1,704.48
45,555.49

57,314.22

ANALISA HARGA SATUAN


Ring balok beton bertulang (10 x 15) cm

PERKIRAAN
KUANTITAS

0.297
0.033
0.033
0.033
0.010
0.015

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

12,741.30
1,715.18
1,715.18
1,715.18
552.75
977.63

19,417.20

0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150

3,712,500.00
21,780.00
9,750.00
17,293.50
1,350.00
130,000.00
189,387.00

11,137.50
435.60
35,100.00
864.68
7,425.00
1,170.00
2,840.81
58,973.58

78,390.78

ANALISA HARGA SATUAN


Sloof beton bertulang (10 x 15) cm

PERKIRAAN
KUANTITAS

0.275
0.033
0.033
0.033
0.010
0.015

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

11,797.50
1,715.18
1,715.18
1,715.18
552.75
977.63
18,473.40

0.0030
0.0200
3.6000
0.0500
5.5000

3,712,500.00
21,780.00
9,750.00
17,293.50
1,350.00

11,137.50
435.60
35,100.00
864.68
7,425.00

0.0090
0.0150

130,000.00
189,387.00

1,170.00
2,840.81
58,973.58

77,446.98

0.9056603774

0.024

0.024
2.88
0.3541666667

10

10

7.5

7.4074074074

4,379,788.43

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn.001
Strouss 30 cm
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5

Pekerja Biasa
Tukang Batu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

2.6790
0.2750
1.0290
0.1309
0.1418

JUMLAH HARGA TENAGA


B
a.
1
2

BAHAN
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT

M112
M135

kg
kg

147.0000
2.1000

b.
3
4
5

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

336.0000
0.5400
0.8100

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 002
Pondasi Footplat beton bertulang (150 kg besi polos + b
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

JUMLAH HARGA TENAGA


B
a.
1
2
3

BAHAN
Bekisting dipakai 2 x
Balok Kayu Kelas III
Paku Kayu Segala Ukuran
Minyak bekisting

M084
M140
M474

m
kg
Itr

0.1000
0.7500
0.4000

b.
4
5

Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT

M112
M135

kg
kg

157.5000
2.2500

c.
6
7
8

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

336.0000
0.5400
0.8100

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 003
Pondasi Footplat beton bertulang (150 kg besi ulir + bek
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

JUMLAH HARGA TENAGA


B
a.
1
2
3

BAHAN
Bekisting dipakai 2 x
Balok Kayu Kelas III
Paku Kayu Segala Ukuran
Minyak bekisting

M084
M140
M474

m
kg
Itr

0.1000
0.7500
0.4000

b.
4
5

Besi Tulangan
Besi Beton Ulir
Kawat Beton/Bendrat RRT

M113
M135

kg
kg

157.5000
2.2500

c.
6
7
8

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

336.0000
0.5400
0.8100

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 004
Sloof beton bertulang 20/30 + bekisting
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

7.8300
0.2750
2.6000
0.9800
0.3860
0.3990

JUMLAH HARGA TENAGA


B
a.
1
2
3

BAHAN
Bekisting dipakai 2 x
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting

M085
M140
M474

m
kg
Itr

0.2250
1.5000
1.0000

b.
4
5

Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT

M112
M135

kg
kg

147.0000
2.1000

c.
6
7
8

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

336.0000
0.5400
0.8100

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 005
Sloof beton bertulang 15/25 + bekisting
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

9.2833
0.2750
3.4667
0.7000
0.4447
0.4697

JUMLAH HARGA TENAGA


B
a.
1
2
3

BAHAN
Bekisting dipakai 2 x
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting

M085
M140
M474

m
kg
Itr

0.3000
2.0000
1.3333

b.
4
5

Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT

M112
M135

kg
kg

105.0000
1.5000

c.
6
7
8

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

336.0000
0.5400
0.8100

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 006
Kolom beton bertulang 20x20 + bekisting
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

15.8300
0.2750
6.6000
0.9800
0.7860
0.7990

JUMLAH HARGA TENAGA


B
a.
1
2
3
4
5

BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M140
M474
M084
M217
M089

kg
Itr
m
lbr
btg

4.0000
4.0000
0.1500
3.5000
20.0000

b.
6
7

Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT

M112
M135

kg
kg

147.0000
2.1000

c.
8
9
10

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

336.0000
0.5400
0.8100

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 007
Kolom beton bertulang 30x30 + bekisting
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

11.2550
0.2750
4.4000
0.8050
0.5485
0.5690

JUMLAH HARGA TENAGA


B
a.
1
2
3
4
5

BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M140
M474
M084
M217
M089

kg
Itr
m
lbr
btg

2.6667
2.6667
0.1000
2.3333
13.3333

b.
6
7

Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT

M112
M135

kg
kg

120.7500
1.7250

c.
8
9
10

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

336.0000
0.5400
0.8100

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 008
Balok beton bertulang 15/25 + bekisting
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

17.5818
0.2750
6.9385
2.0549
0.9273
0.8943

JUMLAH HARGA TENAGA


B
a.
1
2
3
4
5

BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M140
M474
M084
M217
M089

kg
Itr
m
lbr
btg

4.2051
4.2051
0.1892
3.6795
21.0256

b.
6
7
8

Besi Tulangan
Besi Beton Ulir
Besi Beton Polos
Kawat Beton/Bendrat RRT

M113
M112
M135

kg
kg
kg

199.3385
108.8985
4.4034

c.
9
10
11

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

336.0000
0.5400
0.8100

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 009
Balok beton bertulang 30/60 + bekisting
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

17.5818
0.2750
6.9385
2.0549
0.9273
0.8943

JUMLAH HARGA TENAGA


B
a.
1
2
3
4
5

BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M140
M474
M084
M217
M089

kg
Itr
m
lbr
btg

1.7500
1.7500
0.0788
1.5313
8.7500

b.
6
7
8

Besi Tulangan
Besi Beton Ulir
Besi Beton Polos
Kawat Beton/Bendrat RRT

M113
M112
M135

kg
kg
kg

115.5000
52.5000
2.4000

c.
9
10
11

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

336.0000
0.5400
0.8100

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 010
Plat Lantai Beton Bertulang + Bekisting
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

17.5818
0.2750
6.9385
2.0549
0.9273
0.8943

JUMLAH HARGA TENAGA


B
a.
1
2
3
4
5

BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M140
M474
M084
M217
M089

kg
Itr
m
lbr
btg

1.6667
1.6667
0.0625
1.4583
25.0000

b.
6
7

Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT

M112
M135

kg
kg

63.0000
0.9000

c.
8
9
10

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

336.0000
0.5400
0.8100

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 011
Plat Atap Beton Bertulang + Bekisting
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

10.3900
0.2750
4.1250
0.4900
0.4895
0.5235

JUMLAH HARGA TENAGA


B
a.
1
2
3
4
5

BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M140
M474
M084
M217
M089

kg
Itr
m
lbr
btg

2.5000
1.2500
0.1875
2.1875
37.5000

b.
6
7

Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT

M112
M135

kg
kg

73.5000
1.0500

c.
8
9
10

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

336.0000
0.5400
0.8100

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 012
Plat Tangga Beton Bertulang + Bekisting
m3

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

6.6800
0.2750
2.2000
0.6300
0.3110
0.3390

JUMLAH HARGA TENAGA


B
a.
1
2
3
4
5

BAHAN
Bekisting dipakai 2 x
Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M140
M474
M084
M217
M089

kg
Itr
m
lbr
btg

1.3333
1.0000
0.0500
1.1667
6.6667

b.
6
7

Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT

M112
M135

kg
kg

94.5000
1.3500

c.
8
9
10

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

336.0000
0.5400
0.8100

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 013
Sloof Praktis Beton bertulang 11/20 + bekisting
m'

KOMPONEN

A.

TENAGA

1
2
3
4
5
6

Pekerja Biasa
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L08
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

0.2679
0.0061
0.1040
0.0236
0.0134
0.0136

JUMLAH HARGA TENAGA


B
a.
1
2
3

BAHAN
Bekisting dipakai 2 x
Papan Kayu kelas III
Paku Kayu Segala Ukuran
Minyak bekisting

M085
M140
M474

m
kg
Itr

0.0090
0.0600
0.0200

b.
4
5

Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT

M112
M135

kg
kg

3.5453
0.0506

c.
6
7
8

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

6.4548
0.0119
0.0168

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

Btn. 014
Sloof Praktis Beton bertulang 11/25
m'

KOMPONEN

A.

TENAGA

1
2
3
4
5

Pekerja Biasa
Tukang Batu
Tukang Besi/Baja
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L09
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

0.0613
0.0061
0.0250
0.0031
0.0033

JUMLAH HARGA TENAGA


B
a.
1
2

BAHAN
Besi Tulangan
Besi Beton Polos
Kawat Beton/Bendrat RRT

M112
M135

kg
kg

3.7527
0.0536

b.
3
4
5

Bahan Beton
Portland Cement (PC)
Pasir Cor
Batu pecah mesin 2/3

M037
M004
M019

kg
m
m

8.0685
0.0149
0.0210

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

114,929.10
14,293.13
53,482.28
7,235.50
9,241.82
199,181.81

9,750.00
17,293.50

1,433,250.00
36,316.35
1,469,566.35

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
677,203.47
2,146,769.82

2,345,951.63

Pondasi Footplat beton bertulang (150 kg besi polos + bekisting)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

227,370.00
14,293.13
67,567.50
54,573.75
14,482.05
17,271.38
395,557.80

3,305,610.00
21,780.00
2,574.00

330,561.00
16,335.00
1,029.60
347,925.60

9,750.00
17,293.50

1,535,625.00
38,910.38
1,574,535.38

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
677,203.47
2,599,664.45

2,995,222.25

Pondasi Footplat beton bertulang (150 kg besi ulir + bekisting)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

227,370.00
14,293.13
67,567.50
54,573.75
14,482.05
17,271.38
395,557.80

3,305,610.00
21,780.00
2,574.00

330,561.00
16,335.00
1,029.60
347,925.60

14,157.00
17,293.50

2,229,727.50
38,910.38
2,268,637.88

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
677,203.47
3,293,766.95

3,689,324.75

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

335,907.00
14,293.13
135,135.00
50,935.50
21,336.15
26,004.83
583,611.60

3,712,500.00
21,780.00
2,574.00

835,312.50
32,670.00
2,574.00
870,556.50

9,750.00
17,293.50

1,433,250.00
36,316.35
1,469,566.35

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
677,203.47
3,017,326.32

3,600,937.92

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

398,255.00
14,293.13
180,180.00
36,382.50
24,578.95
30,610.53
684,300.10

3,712,500.00
21,780.00
2,574.00

1,113,750.00
43,560.00
3,432.00
1,160,742.00

9,750.00
17,293.50

1,023,750.00
25,940.25
1,049,690.25

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
677,203.47
2,887,635.72

3,571,935.82

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

679,107.00
14,293.13
343,035.00
50,935.50
43,446.15
52,074.83
1,182,891.60

21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

87,120.00
10,296.00
495,841.50
437,251.50
551,880.00
1,582,389.00

9,750.00
17,293.50

1,433,250.00
36,316.35
1,469,566.35

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
677,203.47
3,729,158.82

4,912,050.42

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

482,839.50
14,293.13
228,690.00
41,839.88
30,318.34
37,084.58
835,065.41

21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

58,080.00
6,864.00
330,561.00
291,501.00
367,920.00
1,054,926.00

9,750.00
17,293.50

1,177,312.50
29,831.29
1,207,143.79

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
677,203.47
2,939,273.26

3,774,338.67

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

754,260.76
14,293.13
360,626.54
106,804.09
51,258.58
58,284.03
1,345,527.12

21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

91,587.69
10,824.00
625,523.12
459,674.65
580,181.54
1,767,791.01

14,157.00
9,750.00
17,293.50

2,822,034.60
1,061,760.00
76,149.93
3,959,944.53

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
677,203.47
6,404,939.01

7,750,466.13

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

754,260.76
14,293.13
360,626.54
106,804.09
51,258.58
58,284.03
1,345,527.12

21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

38,115.00
4,504.50
260,316.79
191,297.53
241,447.50
735,681.32

14,157.00
9,750.00
17,293.50

1,635,133.50
511,875.00
41,504.40
2,188,512.90

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
677,203.47
3,601,397.69

4,946,924.81

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

754,260.76
14,293.13
360,626.54
106,804.09
51,258.58
58,284.03
1,345,527.12

21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

36,300.00
4,290.00
206,600.63
182,188.13
689,850.00
1,119,228.75

9,750.00
17,293.50

614,250.00
15,564.15
629,814.15

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
677,203.47
2,426,246.37

3,771,773.49

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

445,731.00
14,293.13
214,396.88
25,467.75
27,057.11
34,119.11
761,064.98

21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

54,450.00
3,217.50
619,801.88
273,282.19
1,034,775.00
1,985,526.56

9,750.00
17,293.50

716,625.00
18,158.18
734,783.18

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
677,203.47
3,397,513.21

4,158,578.18

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

286,572.00
14,293.13
114,345.00
32,744.25
17,190.53
22,094.33
487,239.23

21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

29,040.00
2,574.00
165,280.50
145,750.50
183,960.00
526,605.00

9,750.00
17,293.50

921,375.00
23,346.23
944,721.23

1,350.00
130,000.00
189,387.00

453,600.00
70,200.00
153,403.47
677,203.47
2,148,529.70

2,635,768.92

Sloof Praktis Beton bertulang 11/20 + bekisting

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

11,494.43
314.45
5,405.40
1,228.46
739.55
884.85
20,067.15

3,712,500.00
21,780.00
2,574.00

33,412.50
1,306.80
51.48
34,770.78

9,750.00
17,293.50

34,566.92
875.87
35,442.79

1,350.00
130,000.00
189,387.00

8,713.98
1,552.57
3,175.81
13,442.36
83,655.93

103,723.08

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

2,630.54
314.45
1,300.31
172.34
212.18
4,629.82

9,750.00
17,293.50

36,588.83
927.10
37,515.93

1,350.00
130,000.00
189,387.00

10,892.48
1,940.71
3,969.76
16,802.95
54,318.88

58,948.70

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.021
Pasang bekisting untuk pondasi
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.5200
0.2600
0.0260
0.0260

m
kg
Itr

0.0400
0.3000
0.1000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting

M085
M140
M474

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

G.022
Pasang bekisting untuk pondasi ( 2x pakai )
m

SATUAN

PERKIRAAN
KUANTITAS

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.5200
0.2600
0.0260
0.0260

m
kg
Itr

0.0200
0.3000
0.1000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting

M085
M140
M474

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

G.023
Pasang bekisting untuk sloof
m

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.5200
0.2600
0.0260
0.0260

m
kg
Itr

0.0450
0.3000
0.1000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting

M085
M140
M474

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.024
Pasang bekisting untuk sloof ( 2x pakai )
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.5200
0.2600
0.0260
0.0260

m
kg
Itr

0.0225
0.1500
0.0500

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting

M085
M140
M474

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

G.025
Pasang bekisting untuk kolom
m

NO.

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.6600
0.3300
0.0330
0.0330

m
kg
Itr
m
lbr
btg

0.4000
0.2000
0.0150
0.3500
2.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

G.026
Pasang bekisting untuk kolom ( 2x pakai )
m

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

PERKIRAAN
KUANTITAS

0.6600
0.3300
0.0330
0.0330

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

m
kg
Itr
m
lbr
btg

0.2000
0.1000
0.0075
0.1750
1.0000

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

G.027
Pasang bekisting untuk balok
m

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.6600
0.3300
0.0330
0.0330

m
kg
Itr
m
lbr
btg

0.4000
0.2000
0.0180
0.3500
2.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.028
Pasang bekisting untuk balok ( 2x pakai )
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.6600
0.3300
0.0330
0.0330

m
kg
Itr
m
lbr
btg

0.2000
0.1000
0.0090
0.1750
1.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA

G.029

JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:

NO.

Pasang bekisting untuk plat lantai


m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.6600
0.3300
0.0330
0.0330

m
kg
Itr
m
lbr
btg

0.4000
0.2000
0.0150
0.3500
6.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

Pekerja Biasa

G.030
Pasang bekisting untuk plat lantai ( 2x pakai )
m

SATUAN

L17

Org/hr

PERKIRAAN
KUANTITAS

0.6600

2
3
4

Tukang Kayu
Kepala Tukang Kayu
Mandor

L08
L03
L01

Org/hr
Org/hr
Org/hr

0.3300
0.0330
0.0330

m
kg
Itr
m
lbr
btg

0.2000
0.1000
0.0075
0.1750
3.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

G.031
Pasang bekisting untuk dinding
m

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.6600
0.3300
0.0330
0.0330

m
kg
Itr
m

0.4000
0.2000
0.0200

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III

M085
M140
M474
M084

5
6
7

Multiplek 9 mm
Dolken Kayu 8 cm
Formtie

M217
M089
M477

lbr
btg
bh

0.3500
3.0000
4.0000

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

G.032
Pasang bekisting untuk dinding ( 2x pakai )
m

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.6600
0.3300
0.0330
0.0330

m
kg
Itr
m
lbr
btg
bh

0.2000
0.1000
0.0100
0.1750
1.5000
2.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6
7

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm
Formtie
JUMLAH HARGA BAHAN

PERALATAN

JUMLAH HARGA PERALATAN

M085
M140
M474
M084
M217
M089
M477

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

G.033
Pasang bekisting untuk tangga
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.6600
0.3300
0.0330
0.0330

m
kg
Itr
m
lbr
btg

0.4000
0.1500
0.0150
0.3500
2.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

G.034
Pasang bekisting untuk tangga ( 2x pakai )
m

SATUAN

PERKIRAAN
KUANTITAS

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.6600
0.3300
0.0330
0.0330

m
kg
Itr
m
lbr
btg

0.2000
0.0750
0.0075
0.1750
1.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Papan Kayu kelas III


Paku Kayu Segala Ukuran
Minyak bekisting
Balok Kayu Kelas III
Multiplek 9 mm
Dolken Kayu 8 cm

M085
M140
M474
M084
M217
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
JUMLAH HARGA TENAGA

G.035
Pasang bekisting jembatan untuk pengecoran
m

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

PERKIRAAN
KUANTITAS

0.1500
0.0500
0.0050
0.0080

BAHAN

1
2
3

Balok Kayu Kelas III


Paku Kayu Segala Ukuran
Dolken Kayu 8 cm

M084
M140
M089

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

m
kg
btg

0.0264
0.6000
0.5000

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

22,308.00
13,513.50
1,437.15
1,694.55
38,953.20

3,712,500.00
21,780.00
2,574.00

148,500.00
6,534.00
257.40
155,291.40

194,244.60

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

22,308.00
13,513.50
1,437.15
1,694.55
38,953.20

3,712,500.00
21,780.00
2,574.00

74,250.00
6,534.00
257.40
81,041.40

119,994.60

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

22,308.00
13,513.50
1,437.15
1,694.55
38,953.20

3,712,500.00
21,780.00
2,574.00

167,062.50
6,534.00
257.40

173,853.90

212,807.10

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

22,308.00
13,513.50
1,437.15
1,694.55
38,953.20

3,712,500.00
21,780.00
2,574.00

83,531.25
3,267.00
128.70
86,926.95

125,880.15

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

8,712.00
514.80
49,584.15
43,725.15
55,188.00
157,724.10

207,164.70

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78

49,440.60

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

4,356.00
257.40
24,792.08
21,862.58
27,594.00
78,862.05

128,302.65

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

8,712.00
514.80
59,500.98
43,725.15
55,188.00

167,640.93

217,081.53

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

4,356.00
257.40
29,750.49
21,862.58
27,594.00
83,820.47

133,261.07

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

8,712.00
514.80
49,584.15
43,725.15
165,564.00
268,100.10

317,540.70

Pasang bekisting untuk plat lantai ( 2x pakai )

HARGA
SATUAN
(Rp.)

42,900.00

JUMLAH
HARGA
(Rp.)

28,314.00

51,975.00
55,275.00
65,175.00

17,151.75
1,824.08
2,150.78
49,440.60

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

4,356.00
257.40
24,792.08
21,862.58
82,782.00
134,050.05

183,490.65

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

3,712,500.00
21,780.00
2,574.00
3,305,610.00

8,712.00
514.80
66,112.20

124,929.00
27,594.00
8,712.00

43,725.15
82,782.00
34,848.00
236,694.15

286,134.75

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00
8,712.00

4,356.00
257.40
33,056.10
21,862.58
41,391.00
17,424.00
118,347.08

167,787.68

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

8,712.00
386.10
49,584.15
43,725.15
55,188.00

157,595.40

207,036.00

HARGA
SATUAN

JUMLAH
HARGA

(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

(Rp.)

28,314.00
17,151.75
1,824.08
2,150.78
49,440.60

3,712,500.00
21,780.00
2,574.00
3,305,610.00
124,929.00
27,594.00

4,356.00
193.05
24,792.08
21,862.58
27,594.00

78,797.70

128,238.30

Pasang bekisting jembatan untuk pengecoran

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

6,435.00
2,598.75
276.38
521.40
9,831.53

3,305,610.00
21,780.00
27,594.00

87,268.10
13,068.00
13,797.00
114,133.10

123,964.63

ANALISA BETON DALAM 1 M3


KODE

P E K E R JAAN

G.005

Beton mutu fc'=14,5 Mpa (K175) slump (12 2) cm, w/c = 0,66

G.007

Beton mutu fc'=19,3 Mpa (K225) slump (12 2) cm, w/c = 0,58

G.017

Pembesian dengan besi polos

G.018

Pembesian dengan besi ulir

G.022

Pasang bekisting untuk pondasi ( 2x pakai )

G.024

Pasang bekisting untuk sloof ( 2x pakai )

G.026

Pasang bekisting untuk kolom ( 2x pakai )

G.028

Pasang bekisting untuk balok ( 2x pakai )

G.030

Pasang bekisting untuk plat lantai ( 2x pakai )

G.032

Pasang bekisting untuk dinding ( 2x pakai )

G.034

Pasang bekisting untuk tangga ( 2x pakai )

G.035

Pasang bekisting jembatan untuk pengecoran


Alat bantu pengecoran

1 1 m3 Beton STROUS 20 cm, mutu K.225


1.000
1.000

m3
kg
kg
m2
ls

2 1 m3 Beton PONDASI FOOT PLAT (Type K1), mutu K.225


1.000
1.000

m3
kg
kg
m2
ls

3 1 m3 Beton PONDASI FOOT PLAT (Type K2), mutu K.225


1.000
1.000

m3
kg
kg
m2
ls

4 1 m3 Beton PONDASI FOOT PLAT (Type K3), mutu K.225


1.000
1.000

m3
kg
kg
m2
ls

5 1 m3 Beton PONDASI TANGGA, mutu K.225


1.000
1.000

m3
kg
kg
m2
ls

6 1 m3 Beton SLOOF Struktur 15/25 cm, mutu K.225


1.000
1.000

m3
kg
kg
m2
ls

7 1 m3 Beton SLOOF Praktis 15/20 cm, mutu K.175


1.000
1.000

m3
kg
kg
m2
ls

8 1 m3 Beton KOLOM 30/50 cm (K1), mutu K.225


1.000
1.000

m3
kg
kg
m2
ls

9 1 m3 Beton KOLOM 30/30 cm (K2), mutu K.225


1.000
-

m3
kg

1.000

kg
m2
ls

10 1 m3 Beton KOLOM 30/30 cm (K3), mutu K.225


1.000
1.000

m3
kg
kg
m2
ls

11 1 m3 Beton KOLOM 25/25 cm (K4), mutu K.225


1.000
1.000

m3
kg
kg
m2
ls

12 1 m3 Beton Kolom PRAKTIS 15/15 cm, mutu K.175


1.000
1.000

m3
kg
kg
m2
ls

13 1 m3 Beton Balok INDUK 30/60 cm, mutu K.225


1.000
1.000

m3
kg
kg
m2
ls

14 1 m3 Beton Balok ANAK 20/30 cm, mutu K.225


1.000
1.000

m3
kg
kg
m2
ls

15 1 m3 Beton Balok KONSOL 30/40 - 30/30 cm, mutu K.225


1.000
m3

1.000

kg
kg
m2
ls

16 1 m3 Beton Balok TEPI / LISPLANK 20/30 cm, mutu K.225


1.000
m3
kg
kg
m2
1.000
ls

17 1 m3 Beton Balok BORDES 15/30 cm, mutu K.225


1.000
1.000

m3
kg
kg
m2
ls

18 1 m3 Beton RING BALK + GEWEL 15/20 cm, mutu K.175


1.000
1.000

m3
kg
kg
m2
ls

19 1 m3 Beton RING 15/15 cm, mutu K.175_Kantin


1.000
1.000

m3
kg
kg
m2
ls

20 1 m3 Beton Balok RING LEUNENG 10/15 cm, mutu K.175


1.000
1.000

m3
kg
kg
m2
ls

21 1 m3 Beton BALOK LEUFEL 15/40 cm, mutu K.175


1.000
-

m3
kg

1.000

kg
m2
ls

22 1 m3 Beton BALOK LATEI 15/20 cm, mutu K.175


1.000
1.000

m3
kg
kg
m2
ls

23 1 m3 Beton PLAT LANTAI Tbl 12 cm, mutu K.225


Tebal plat
1.000
0.12
1.000

m3
kg
kg
m2
ls

24 1 m3 Beton PLAT ATAP Tbl 10 cm, mutu K.225


Tebal plat
1.000
0.10
1.000

m3
kg
kg
m2
ls

25 1 m3 Beton PLAT LISPLANK Tbl 10 cm, mutu K.225


Tebal plat
1.000
0.10
1.000

m3
kg
kg
m2
ls

26 1 m3 Beton CANOPI Tbl 10 cm, mutu K.175_Induk


Tebal plat
1.000
0.10
1.000

m3
kg
kg
m2
ls

27 1 m3 PLAT MEJA Beton Tbl 10 cm, mutu K.175


Tebal plat
1.000
0.10
-

m3
kg
kg

1.000

m2
ls

1.000
1.000

m3
kg
kg
m2
ls

28 1 m3 PLAT TANGGA Tbl 15 cm, mutu K.225


Tebal plat

0.15

ANALISA BETON DALAM 1 M3

E K E R JAAN

PER

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu

HARGA SATUAN

m3

Rp

752,866.76

m3

Rp

810,384.78

kg

Rp

11,225.79

kg

Rp

15,853.14

Rp

116,598.90

Rp

125,880.15

Rp

202,552.65

Rp

207,511.07

Rp

257,740.65

Rp

223,475.18

Rp

183,925.80

Rp

123,964.63

m3

Rp

Kode
G.007
G.018
G.017
G.022

Kode
G.007
G.018
G.017
G.022

Kode
G.007
G.018
G.017
G.022

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Harga Satuan
810,384.78
15,853.14
11,225.79
116,598.90
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
116,598.90
Jumlah
Pembulatan

Harga Satuan
810,384.78
15,853.14
11,225.79
116,598.90
Jumlah
Pembulatan

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Begisting 9 mm
Alat bantu

Mengecor
Pembesian Ulir

Kode
G.007
G.018
G.017
G.022

Kode
G.007
G.018
G.017
G.022

Kode
G.007
G.018
G.017
G.024

Kode
G.005
G.018
G.017
G.024

Kode
G.007
G.018
G.017
G.026

Kode
G.007
G.018

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp

Harga Satuan
810,384.78
15,853.14
11,225.79
116,598.90
Jumlah
Pembulatan

Harga Satuan
810,384.78
15,853.14
11,225.79
116,598.90
Jumlah
Pembulatan

Harga Satuan
810,384.78
15,853.14
11,225.79
125,880.15
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
11,225.79
125,880.15
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
202,552.65
Jumlah
Pembulatan

Harga Satuan
810,384.78
15,853.14

Pembesian Polos
Begisting 9 mm
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Begisting 9 mm
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Begisting 9 mm
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu

Mengecor

G.017
G.026

Kode
G.007
G.018
G.017
G.026

Kode
G.007
G.018
G.017
G.026

Kode
G.005
G.018
G.017
G.026

Kode
G.007
G.018
G.017
G.028

Kode
G.007
G.018
G.017
G.028

Kode
G.007

Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp

11,225.79
202,552.65
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
202,552.65
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
202,552.65
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
11,225.79
202,552.65
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan

Harga Satuan
810,384.78
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
810,384.78

Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu

Mengecor
Pembesian Ulir

G.018
G.017
G.028

Kode
G.007
G.018
G.017
G.028

Kode
G.007
G.018
G.017
G.028

Kode
G.005
G.018
G.017
G.028

Kode
G.005
G.018
G.017
G.028

Kode
G.005
G.018
G.017
G.028

Kode
G.005
G.018

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp

15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14

Pembesian Polos
Bekisting (9 mm)
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos
Bekisting (9 mm)
Alat bantu

Mengecor
Pembesian Ulir
Pembesian Polos (Konvensional)
Bekisting (12 mm)
Alat bantu

G.017
G.028

Kode
G.005
G.018
G.017
G.028

Kode
G.007
G.018
G.017
G.030

Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
752,866.76
15,853.14
11,225.79
207,511.07
Jumlah
Pembulatan
Harga Satuan
810,384.78
15,853.14
11,225.79
257,740.65
Jumlah
Pembulatan

Mengecor
Pembesian Ulir
Pembesian Polos (Konvensional)
Bekisting
Alat bantu

G.007
G.018
G.017
G.030

Rp
Rp
Rp
Rp
Rp

810,384.78
15,853.14
11,225.79
257,740.65
Jumlah
Pembulatan

Mengecor
Pembesian Ulir
Pembesian Polos (Konvensional)
Bekisting
Alat bantu

G.007
G.018
G.017
G.030

Rp
Rp
Rp
Rp
Rp

810,384.78
15,853.14
11,225.79
257,740.65
Jumlah
Pembulatan

Mengecor
Pembesian Ulir
Pembesian Polos (Konvensional)
Bekisting
Alat bantu

G.005
G.018
G.017
G.030

Rp
Rp
Rp
Rp
Rp

752,866.76
15,853.14
11,225.79
257,740.65
Jumlah
Pembulatan

Mengecor
Pembesian Ulir
Pembesian Polos (Konvensional)

G.005
G.018
G.017

Rp
Rp
Rp

752,866.76
15,853.14
11,225.79

Bekisting
Alat bantu

G.030

Rp
Rp

257,740.65
Jumlah
Pembulatan

Mengecor
Pembesian Ulir
Pembesian Polos (Konvensional)
Bekisting
Alat bantu

G.007
G.018
G.017
G.034

Rp
Rp
Rp
Rp
Rp

810,384.78
15,853.14
11,225.79
183,925.80
Jumlah
Pembulatan

Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00

Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00

Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00

Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00

Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

752,866.76
752,866.76
752,800.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00

Jumlah
Rp
Rp

810,384.78
-

Rp
Rp
Rp
Rp
Rp

810,384.78
810,300.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

752,866.76
752,866.76
752,800.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00

Jumlah
Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00
Jumlah

Rp

810,384.78

Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,300.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

752,866.76
752,866.76
752,800.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

752,866.76
752,866.76
752,800.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

752,866.76
752,866.76
752,800.00
Jumlah

Rp
Rp

752,866.76
-

Rp
Rp
Rp
Rp
Rp

752,866.76
752,800.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

752,866.76
752,866.76
752,800.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

752,866.76
752,866.76
752,800.00

Rp
Rp
Rp

752,866.76
-

Rp
Rp
Rp
Rp

752,866.76
752,800.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

810,384.78
810,384.78
810,300.00

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

H.003
Pasang atap genteng karangpilang ex. Malang
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

PERKIRAAN
KUANTITAS

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.1500
0.0750
0.0080
0.0080

bh

25.0000

JUMLAH HARGA TENAGA


B

BAHAN

Genteng Karang Pilang ex. Malang

M151

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pasang atap genteng karangpilang ex. Malang

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

6,435.00
3,898.13
442.20
521.40
11,296.73

2,250.00

56,250.00
56,250.00

67,546.73

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

H.014
Pasang atap genteng beton biasa
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

PERKIRAAN
KUANTITAS

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.2000
0.1000
0.0100
0.0100

bh
kg

25.0000
0.0300

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Genteng Beton biasa


Paku Kayu Segala Ukuran

M154
M140

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

8,580.00
5,197.50
552.75
651.75
14,982.00

3,000.00
21,780.00

75,000.00
653.40
75,653.40

90,635.40

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

H.021
Pasang bubung genteng beton Monier
m1

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

PERKIRAAN
KUANTITAS

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.4000
0.2000
0.0200
0.0020

bh
kg
kg
m
kg

3.5000
0.0500
10.8000
0.0320
1.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5

Bubung Genteng Beton biasa


Paku Kayu Segala Ukuran
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Warna

M161
M140
M037
M002
M039

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

17,160.00
10,395.00
1,105.50
130.35
28,790.85

5,000.00
21,780.00
1,350.00
90,000.00
8,118.00

17,500.00
1,089.00
14,580.00
2,880.00
8,118.00
44,167.00

72,957.85

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

H.050
Pasang lapisan aluminium foil / sesalation
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

PERKIRAAN
KUANTITAS

SATUAN

L17
L08
L03
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.1500
0.0500
0.0050
0.0080

1.0500

JUMLAH HARGA TENAGA


B

BAHAN

Aluminium Foil/Sesalation

M131

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

6,435.00
2,598.75
276.38
521.40
9,831.53

30,901.50

32,446.58
32,446.58

42,278.10

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

I.046
Langit-langit tripleks (120x240) cm, tebal 4 mm
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.1000
0.1000
0.0100
0.0050

lbr
kg

0.3750
0.0300

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Triplek 4 mm
Paku Tripleks

M215
M140

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Langit-langit tripleks (120x240) cm, tebal 4 mm

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

4,290.00
5,197.50
552.75
325.88
10,366.13

70,380.00
21,780.00

26,392.50
653.40
27,045.90

37,412.03

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

I.049
List langit-langit kayu profil
m1

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0500
0.0500
0.0050
0.0030

m
kg

1.0500
0.0100

JUMLAH HARGA TENAGA


B

BAHAN

1
2

List Kayu Profil


Paku Kayu Segala Ukuran

M090
M140

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

2,145.00
2,598.75
276.38
195.53
5,215.65

7,821.00
21,780.00

8,212.05
217.80
8,429.85

13,645.50

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

I.050
List langit-langit gypsum
m1

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0500
0.0500
0.0050
0.0030

m'
kg

1.1000
0.0500

JUMLAH HARGA TENAGA


B

BAHAN

1
2

List Gypsum
Lem Kayu

M211
M422
JUMLAH HARGA BAHAN

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

2,145.00
2,598.75
276.38
195.53
5,215.65

19,899.00
29,502.00

21,888.90
1,475.10
23,364.00

28,579.65

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

I.054
Langit-langit Kalsiboard 9mm + Rangka galvalum
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.1500
0.2000
0.0450
0.0750

m'
kg
bh
lbr

3.6000
0.1500
1.0000
0.3500

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Metal furing
Kawat seng polos
Ramset / Dynabolt
Kalsiboard 9 mm

M494
M495
M496
M492

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Langit-langit Kalsiboard 9mm + Rangka galvalum

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

6,435.00
10,395.00
2,487.38
4,888.13
24,205.50

13,050.00
21,375.00
4,500.00
143,923.50

46,980.00
3,206.25
4,500.00
50,373.23
105,059.48

129,264.98

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

I.055
Dinding partisi gypsum 2 x 12 mm, rangka galvalum
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.1500
0.2000
0.0450
0.0750

m'
Bh
lbr

3.6000
1.0000
0.7000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Stud Track 7,6


Ramset / Dynabolt
Gypsum Board 12 mm

M499
M496
M500

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Dinding partisi gypsum 2 x 12 mm, rangka galvalum

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

6,435.00
10,395.00
2,487.38
4,888.13
24,205.50

22,500.00
4,500.00
76,500.00

81,000.00
4,500.00
53,550.00
139,050.00

163,255.50

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

I.056
Plafond Papan Grill 3/30 cm (Uk.25x25 cm) + Politur
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0700
0.1000
0.0100
0.0035

m3
kg
ltr
lbr

0.0400
0.0200
0.6720
2.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Papan (3x30) cm
Paku Kayu Segala Ukuran
Politur Jadi
Kertas Gosok

M083
M140
M420
M401

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Plafond Papan Grill 3/30 cm (Uk.25x25 cm) + Politur

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

3,003.00
5,197.50
552.75
228.11
8,981.36

11,519,550.00
21,780.00
73,237.50
4,455.00

460,782.00
435.60
49,215.60
8,910.00
519,343.20

528,324.56

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

I.025
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka ka
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.1800
0.3200
0.0320
0.0090

m
kg
lbr

0.0120
0.0600
1.1000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Usuk 5/7
Paku Kayu Segala Ukuran
Asbes (1,00 x 1,00) m x 3,5 mm

M061
M140
M206

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu meranti

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

7,722.00
16,632.00
1,768.80
586.58
26,709.38

4,958,415.00
21,780.00
16,038.00

59,500.98
1,306.80
17,641.80
78,449.58

105,158.96

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

I.057
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka ka
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.1800
0.3200
0.0320
0.0090

kg
lbr

0.0600
1.1000

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Paku Kayu Segala Ukuran


Asbes (1,00 x 1,00) m x 3,5 mm

M140
M206

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu lama

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

7,722.00
16,632.00
1,768.80
586.58
26,709.38

21,780.00
16,038.00

1,306.80
17,641.80
18,948.60

45,657.98

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

J.003
Pasang kloset jongkok lux
bh

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

1.0000
1.5000
1.5000
0.1600

Unit
kg
m

1.0000
6.0000
0.0100

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Kloset Jongkok Lux


Portland Cement (PC)
Pasir Pasang

M232
M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

42,900.00
77,962.50
82,912.50
10,428.00
214,203.00

313,038.00
1,350.00
90,000.00

313,038.00
8,100.00
900.00
322,038.00

536,241.00

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

J.008
Pasang wastafel lux
bh

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

1.2000
1.4500
0.1500
0.1000

M247

Unit

M037
M002

kg
m

1.0000
12.00%
6.0000
0.0100

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Wastafel Komplit (Kran + Sipon) Lux


Perlengkapan
Portland Cement (PC)
Pasir Pasang
JUMLAH HARGA BAHAN

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

51,480.00
75,363.75
8,291.25
6,517.50
141,652.50

1,327,630.50
1,327,630.50
1,350.00
90,000.00

1,327,630.50
159,315.66
8,100.00
900.00
1,495,946.16

1,637,598.66

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

J.009
Pasang tempat sabun keramik
bh

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0100
0.1000
0.0100
0.0050

bh

1.0000

JUMLAH HARGA TENAGA


B

BAHAN

Tempat Sabun Keramik

M249

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

429.00
5,197.50
552.75
325.88
6,505.13

31,383.00

31,383.00
31,383.00

37,888.13

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN

:
:

SATUAN PEMBAYARAN

NO.

J.028
Pasang bak kontrol pasangan batu bata
ukuran (45 x 45) tinggi 50 cm
bh

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

1.4200
0.4730
0.0470
0.0710

bh
kg
m
m
kg
m

112.5000
77.0000
0.1300
0.0200
2.6000
0.0900

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5
6

Bata Merah
Portland Cement (PC)
Pasir Pasang
Stenslah/batu pecah tangan 2/3
Besi Beton Polos
Pasir Cor

M022
M037
M002
M014
M112
M004

JUMLAH HARGA BAHAN


C

PERALATAN
JUMLAH HARGA PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

60,918.00
24,584.18
2,597.93
4,627.43
92,727.53

570.00
1,350.00
90,000.00
215,000.00
9,750.00
130,000.00

64,125.00
103,950.00
11,700.00
4,300.00
25,350.00
11,700.00
221,125.00

313,852.53

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

J.030
Pasang pipa galvanis, diameter 1/2"
m1

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0540
0.0900
0.0090
0.0270

1.2000
35.00%

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Pipa Galvanis 1/2" tebal 1.8 mm


Perlengkapan

M376

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

2,316.60
4,677.75
497.48
1,759.73
9,251.55

33,547.50
33,547.50

40,257.00
11,741.63
51,998.63

61,250.18

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

J.031
Pasang pipa galvanis, diameter 3/4"
m1

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0540
0.0900
0.0090
0.0270

1.200
35.00%

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Pipa Galvanis 3/4" tebal 1.8 mm


Perlengkapan

M377

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

2,316.60
4,677.75
497.48
1,759.73
9,251.55

43,470.00
43,470.00

52,164.00
15,214.50
67,378.50

76,630.05

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

J.042
Pasang pipa PVC tipe AW, diameter 2"
m1

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0540
0.0900
0.0090
0.0027

1.2000
35.00%

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Pipa PVC tipe AW 2"


Perlengkapan

M338

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

2,316.60
4,677.75
497.48
175.97
7,667.80

25,231.50
25,231.50

30,277.80
8,831.03
39,108.83

46,776.62

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

J.045
Pasang pipa PVC tipe AW, diameter 4"
m1

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0810
0.1350
0.0135
0.0041

1.2000
35.00%

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Pipa PVC tipe AW 4 "


Perlengkapan

M341

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

3,474.90
7,016.63
746.21
267.22
11,504.96

71,536.50
71,536.50

85,843.80
25,037.78
110,881.58

122,386.53

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

J.046
Pasang pipa PVC tipe AW, diameter 6"
m1

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.1215
0.2025
0.0203
0.0062

1.2000
35.00%

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Pipa PVC tipe AW 6 "


Perlengkapan

M342

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

5,212.35
10,524.94
1,122.08
400.83
17,260.20

124,551.00
124,551.00

149,461.20
43,592.85
193,054.05

210,314.25

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

J.066
Pasang kran diameter 1/2"
bh

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0100
0.1000
0.0100
0.0050

bh
bh

1.0000
0.0250

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Kran Air 1/2 "


Seal Tape / TBA

M235
M481

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

429.00
5,197.50
552.75
325.88
6,505.13

39,303.00
2,079.00

39,303.00
51.98
39,354.98

45,860.10

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

J.068
Pasang Afor Stainless Steel
bh

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0100
0.1000
0.0100
0.0050

bh

1.0000

JUMLAH HARGA TENAGA


B

BAHAN

Afor Stainless

M250

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

429.00
5,197.50
552.75
325.88
6,505.13

53,262.00

53,262.00
53,262.00

59,767.13

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

J.073
Pasang pipa Staenless steel, diameter 2"
m1

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

PERKIRAAN
KUANTITAS

SATUAN

L17
L07
L02
L01

Org/hr
Org/hr
Org/hr
Org/hr

0.1080
0.1800
0.0180
0.0054

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Pipa stainless steel 2"


Perlengkapan

M498

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

1.2000
35.00%

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

4,633.20
9,355.50
994.95
351.95
15,335.60

112,500.00
112,500.00

135,000.00
39,375.00
174,375.00

189,710.60

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

J.005
Pasang kloset duduk lux
bh

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

3.3000
1.1000
0.0010
0.1600

Unit

1.0000
6.00%

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Kloset Duduk Lux


Perlengkapan

M233

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

141,570.00
57,172.50
55.28
10,428.00
209,225.78

1,603,948.50
1,603,948.50

1,603,948.50
96,236.91
1,700,185.41

1,909,411.19

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

K.001
Pasang besi profil
kg

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0610
0.0061
0.0061
0.0003

M116
M483
M484
M473

kg
Itr
Itr
kg

1.1500
0.0100
0.0010
0.0200

E05

hari

0.0160

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Baja Profil
Solar Industri
Minyak Pelumas
Elektroda
JUMLAH HARGA BAHAN

PERALATAN

Sewa Mesin Las (150A)


JUMLAH HARGA PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

2,616.90
317.05
337.18
19.55
3,290.68

15,345.00
5,400.00
45,738.00
35,046.00

17,646.75
54.00
45.74
700.92
18,447.41

400,000.00

6,400.00
6,400.00
28,138.09

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

K.002
Pasang rangka kuda-kuda baja WF
kg

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0610
0.0061
0.0061
0.0003

M116
M483
M484
M473

kg
Itr
Itr
kg

1.1500
0.0100
0.0010
0.0200

E05

hari

0.0160

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Baja Profil
Solar Industri
Minyak Pelumas
Elektroda
JUMLAH HARGA BAHAN

PERALATAN

Sewa Mesin Las (150A)


JUMLAH HARGA PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

2,616.90
317.05
337.18
19.55
3,290.68

15,345.00
5,400.00
45,738.00
35,046.00

17,646.75
54.00
45.74
700.92
18,447.41

400,000.00

6,400.00
6,400.00
28,138.09

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

K.003
Pemasangan baut anker baja
kg

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0200
0.0300

kg

1.0500

JUMLAH HARGA TENAGA


B

BAHAN

Angker Bar / Dynabolt

M117

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

858.00
1,559.25
2,417.25

17,127.00

17,983.35
17,983.35

20,400.60

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

K.004
Ikatan angin/Trekstang
kg

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0610
0.0061
0.0061
0.0003

M112
M483
M484
M473

kg
Itr
Itr
kg

1.0500
0.0100
0.0010
0.0200

E05

hari

0.0160

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Besi Beton Polos


Solar Industri
Minyak Pelumas
Elektroda
JUMLAH HARGA BAHAN

PERALATAN

Sewa Mesin Las (150A)


JUMLAH HARGA PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

2,616.90
317.05
337.18
19.55
3,290.68

9,750.00
5,400.00
45,738.00
35,046.00

10,237.50
54.00
45.74
700.92
11,038.16

400,000.00

6,400.00
6,400.00
20,728.84

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

K.005
Plendes
kg

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0610
0.0061
0.0061
0.0003

M116
M483
M484
M473

kg
Itr
Itr
kg

1.1500
0.0100
0.0010
0.0200

E05

hari

0.0160

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Baja Profil
Solar Industri
Minyak Pelumas
Elektroda
JUMLAH HARGA BAHAN

PERALATAN

Sewa Mesin Las (150A)


JUMLAH HARGA PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

2,616.90
317.05
337.18
19.55
3,290.68

15,345.00
5,400.00
45,738.00
35,046.00

17,646.75
54.00
45.74
700.92
18,447.41

400,000.00

6,400.00
6,400.00
28,138.09

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

K.012
Pasang Kusen Alluminium Coklat
m1

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0430
0.0430
0.0043
0.0021

m
bh
tube

1.1000
2.0000
0.0600

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Profil Aluminium Coklat


Sekrup segala ukuran
Sealant

M126
M145
M148.b

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

1,844.70
2,234.93
237.68
136.87
4,454.18

107,019.00
396.00
28,444.50

117,720.90
792.00
1,706.67
120,219.57

124,673.75

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

K.014
Pasang Pintu Kaca Rangka Aluminium Coklat
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0850
0.0850
0.0090
0.0050

m
m
tube

4.4000
4.5000
0.2700

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Profil Aluminium Coklat


Profil Kaca
Sealant

M126
M148.d
M148.b

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Daun Pintu 80
Daun Jendela
Daun Jendela BV 60

Pasang Pintu Kaca Rangka Aluminium Coklat

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

3,646.50
4,417.88
497.48
325.88
8,887.73

107,019.00
11,088.00
28,444.50

470,883.60
49,896.00
7,680.02
528,459.62

1 m2
Daun Pintu 80 x 210 cm
Daun Jendela (0,65 m2)
Daun Jendela BV 60 x 50 cm

537,347.34
902,743.53
349,275.77
161,204.20

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

K.032
Pasang Atap Baja Ringan untuk Penutup Atap Genteng
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.7500
0.5000
0.0500
0.0500

kg
kg
kg
kg

5.4912
0.4212
0.2521
0.1411

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Baja Ringan
Besi Strip / Plat Plendes
Baut Segala Ukuran
Angker Bar / Dynabolt

M132
M114
M146
M117

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pasang Atap Baja Ringan untuk Penutup Atap Genteng

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

32,175.00
25,987.50
2,763.75
3,258.75
64,185.00

40,095.00
9,702.00
19,206.00
17,127.00

220,169.66
4,086.48
4,840.91
2,416.17
231,513.23

295,698.23

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

K.033
Pasang Atap Baja Ringan untuk Penutup Atap Asbes Ge
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.7500
0.5000
0.0500
0.0500

kg
kg
kg
kg

4.7303
0.4212
0.2521
0.1411

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Baja Ringan
Besi Strip / Plat Plendes
Baut Segala Ukuran
Angker Bar / Dynabolt

M132
M114
M146
M117

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pasang Atap Baja Ringan untuk Penutup Atap Asbes Gelombang

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

32,175.00
25,987.50
2,763.75
3,258.75
64,185.00

40,095.00
9,702.00
19,206.00
17,127.00

189,662.82
4,086.48
4,840.91
2,416.17
201,006.39

265,191.39

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:

K.034
Pasang rangka Plafon Metal Furing
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0800
0.8000
0.0800
0.0040

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Baja Ringan
Baja Profil
Baja Clips & Adjustable

M132
M116
M116

kg
kg
kg

11.5374
1.1092
1.2000

Gypsum Board 9 mm

M213

lbr

0.3500

JUMLAH HARGA BAHAN


C

TOTAL

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

3,432.00
41,580.00
4,422.00
260.70
49,694.70

40,095.00
15,345.00
15,345.00
9.50
75,339.00

462,593.02
17,020.74
18,414.00
498,027.76
52,423.97
26,368.65
78,792.62

128,487.32

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

K.038
1 m2 Pasang Rangka atap (Usuk+reng Zincalume)
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Besi/Baja
Kepala Tukang Besi
Mandor

SATUAN

L17
L09
L04
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.1000
0.1000
0.0100
0.0050

m
m
m

3.0000
5.0000
30.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Usuk Canal C 75. 0.75


Reng Purlin R 36.055
Baut

M501
M502
M503

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

1 m2 Pasang Rangka atap (Usuk+reng Zincalume)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

4,290.00
5,197.50
552.75
325.88
10,366.13

13,500.00
9,000.00
90.00

40,500.00
45,000.00
2,700.00
88,200.00

98,566.13

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

L.002
Pasang kunci tanam biasa
bh

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0100
0.5000
0.0100
0.0050

bh

1.0000

JUMLAH HARGA TENAGA


B

BAHAN

Kunci Tanam

M254

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

429.00
25,987.50
552.75
325.88
27,295.13

110,943.00

110,943.00

110,943.00

138,238.13

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

L.003
Pasang kunci tanam kamar mandi
bh

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0050
0.5000
0.0050
0.0025

bh

1.0000

JUMLAH HARGA TENAGA


B

BAHAN

Kunci Pintu Kamar Mandi

M255

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

214.50
25,987.50
276.38
162.94
26,641.31

91,080.00

91,080.00

91,080.00

117,721.31

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

L.007
Pasang engsel pintu
bh

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0150
0.1500
0.0150
0.0008

bh

1.0000

JUMLAH HARGA TENAGA


B

BAHAN

Engsel Pintu

M257

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

643.50
7,796.25
829.13
48.88
9,317.76

31,482.00

31,482.00

31,482.00

1 Pasang
1 Buah

40,799.76
20,399.88

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

L.010
Pasang grendel jendela
bh

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0100
0.1000
0.0100
0.0005

bh

1.0000

JUMLAH HARGA TENAGA


B

BAHAN

Grendel Jendela

M263

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

429.00
5,197.50
552.75
32.59
6,211.84

12,177.00

12,177.00

12,177.00

18,388.84

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

L.019
Pasang kaca polos, tebal 5 mm
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0150
0.1500
0.0150
0.0008

1.1000

JUMLAH HARGA TENAGA


B

BAHAN

Kaca Polos tebal 5 mm

M271

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

643.50
7,796.25
829.13
48.88
9,317.76

120,204.00

132,224.40

132,224.40

141,542.16

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

L.027
Pasang kaca cermin, tebal 6 mm
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0150
0.1500
0.0150
0.0008

1.1000

JUMLAH HARGA TENAGA


B

BAHAN

Kaca Cermin tebal 6 mm

M279

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

643.50
7,796.25
829.13
48.88
9,317.76

250,668.00

275,734.80

275,734.80

285,052.56

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

L.037
Pasang casement
bh

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0200
0.2000
0.0200
0.0100

1.00

1.1000

JUMLAH HARGA TENAGA


B

BAHAN

Engsel casement 15 "

M505

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

858.00
10,395.00
1,105.50
651.75
13,010.25

29,250.00

32,175.00

32,175.00

45,185.25

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

L.038
Pasang kaca polos, tebal 12 mm termpered
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Kayu
Kepala Tukang Kayu
Mandor

SATUAN

L17
L08
L03
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0150
0.1500
0.0150
0.0008

m
m2

1.1000
1.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Kaca Polos tebal 12 mm


Tempered kaca

M273
M506

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

643.50
7,796.25
829.13
48.88
9,317.76

334,521.00
450,000.00

367,973.10
450,000.00
817,973.10

827,290.86

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

M.032
Pasang plint keramik artistik 10 x 20 cm
m1

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0900
0.0900
0.0090
0.0050

bh
kg
m
kg

5.3000
1.1400
0.0030
0.0250

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Plint keramik artistik 10 x 20


Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Putih

M313
M037
M002
M038

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

3,861.00
4,677.75
497.48
325.88
9,362.10

15,480.00
1,350.00
90,000.00
2,673.00

82,044.00
1,539.00
270.00
66.83
83,919.83

93,281.93

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

M.040
Pasang lantai keramik ukuran 20 x 20 cm warna/motif
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.7000
0.3500
0.0350
0.0350

bh
kg
m
kg

26.5000
10.4000
0.0450
1.6200

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Keramik Lantai 20 x 20 cm warna/motif


Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Putih

M322
M037
M002
M038

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pasang lantai keramik ukuran 20 x 20 cm warna/motif

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

30,030.00
18,191.25
1,934.63
2,281.13
52,437.00

1,840.00
1,350.00
90,000.00
2,673.00

48,760.00
14,040.00
4,050.00
4,330.26
71,180.26

123,617.26

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

M.045
Pasang lantai keramik ukuran 40 x 40 cm warna/motif
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.7000
0.3500
0.0350
0.0350

bh
kg
m
kg

6.9300
9.8000
0.0215
1.3000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Keramik Lantai 40 x 40 cm warna/motif


Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Putih

M318
M037
M002
M038

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pasang lantai keramik ukuran 40 x 40 cm warna/motif

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

30,030.00
18,191.25
1,934.63
2,281.13
52,437.00

13,590.00
1,350.00
90,000.00
2,673.00

94,178.70
13,230.00
1,935.00
3,474.90
112,818.60

165,255.60

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

M.049
Pasang plint keramik lantai ukuran 10 x 40 cm
m1

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.9000
0.0900
0.0090
0.0050

bh
kg
m
kg

2.6500
1.2400
0.0030
0.1000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Plint Keramik Lantai 10 x 40 cm


Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Putih

M326
M037
M002
M038

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pasang plint keramik lantai ukuran 10 x 40 cm

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

38,610.00
4,677.75
497.48
325.88
44,111.10

15,939.00
1,350.00
90,000.00
2,673.00

42,238.35
1,674.00
270.00
267.30
44,449.65

88,560.75

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

M.057
Pasang dinding keramik ukuran 20 x 25 cm
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.9000
0.4500
0.0450
0.0450

bh
kg
m
kg

20.0000
9.3000
0.0180
1.5000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Keramik Dinding 20 x 25 cm
Portland Cement (PC)
Pasir Pasang
Portland Cement (PC) Putih

M327
M037
M002
M038

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

38,610.00
23,388.75
2,487.38
2,932.88
67,419.00

3,690.00
1,350.00
90,000.00
2,673.00

73,800.00
12,555.00
1,620.00
4,009.50
91,984.50

159,403.50

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

M.073
Pasang dinding batu sisir
m2

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor

SATUAN

L17
L07
L02
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.7000
0.3500
0.0350
0.0350

m2
kg
m

1.0500
11.7500
0.0350

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Batu sisir
Portland Cement (PC)
Pasir Pasang

M504
M037
M002

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

30,030.00
18,191.25
1,934.63
2,281.13
52,437.00

71,910.00
1,350.00
90,000.00

75,505.50
15,862.50
3,150.00
94,518.00

146,955.00

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN

:
:

SATUAN PEMBAYARAN

NO.

N.008
Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar,
2 lapis cat penutup)
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor

SATUAN

L17
L10
L05
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0700
0.0090
0.0060
0.0025

kg
kg
kg
kg

0.2000
0.1500
0.1700
0.2600

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Cat meni kayu


Plamir Kayu
Cat Dasar Kayu
Cat Kayu

M409
M402
M411
M414

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar,

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

3,003.00
467.78
331.65
162.94
3,965.36

34,114.50
20,592.00
33,858.00
70,290.00

6,822.90
3,088.80
5,755.86
18,275.40
33,942.96

37,908.32

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

N.011
Pelaburan kayu dengan politur
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor

SATUAN

L17
L10
L05
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0600
0.0160
0.0025

Ltr
Lbr

0.5500
2.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Politur Jadi
Kertas Gosok

M420
M401

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

3,118.50
884.40
162.94
4,165.84

73,237.50
4,455.00

40,280.63
8,910.00
49,190.63

53,356.46

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN

:
:

SATUAN PEMBAYARAN

NO.

N.014
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasa
2 lapis cat penutup)
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor

SATUAN

L17
L10
L05
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0200
0.0630
0.0063
0.0025

kg
kg
kg

0.1000
0.1000
0.2600

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Plamir Tembok
Cat Dasar Tembok
Cat Tembok

M403
M412
M415

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar,

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

858.00
3,274.43
348.23
162.94
4,643.60

12,771.00
25,740.00
47,025.00

1,277.10
2,574.00
12,226.50
16,077.60

20,721.20

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN

:
:

SATUAN PEMBAYARAN

NO.

N.016
Pengecatan tembok baru eksterior
(1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor

SATUAN

L17
L10
L05
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0200
0.0630
0.0063
0.0025

kg
kg
kg

0.1000
0.1000
0.2600

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Plamir Tembok
Cat Dasar Tembok
Cat Tembok Eksterior

M403
M412
M415.b

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

(1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

858.00
3,274.43
348.23
162.94
4,643.60

12,771.00
25,740.00
97,119.00

1,277.10
2,574.00
25,250.94
29,102.04

33,745.64

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN

:
:

SATUAN PEMBAYARAN

NO.

N.021
Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar,
2 lapis cat penutup)
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor

SATUAN

L17
L10
L05
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0200
0.0630
0.0063
0.0025

kg
kg
kg

0.1000
0.1000
0.2600

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Plamir Tembok
Cat Dasar Tembok
Cat Tembok

M403
M412
M415

JUMLAH HARGA BAHAN


C

PERALATAN
JUMLAH HARGA PERALATAN

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar,

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

858.00
3,274.43
348.23
162.94
4,643.60

12,771.00
25,740.00
47,025.00

1,277.10
2,574.00
12,226.50
16,077.60

20,721.20

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

N.029
Pekerjaan waterproofing
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor

SATUAN

L17
L10
L05
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0200
0.0630
0.0063
0.0025

kg

0.3600

JUMLAH HARGA TENAGA


B

BAHAN

Waterproofing

M418

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

858.00
3,274.43
348.23
162.94
4,643.60

146,097.00

52,594.92
52,594.92

57,238.52

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

N.030
Pengecatan tembok LAMA eksterior (1 lapis cat dasar, 2
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor

SATUAN

L17
L10
L05
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0280
0.0420
0.0042
0.0025

kg
kg

0.1200
0.1800

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Cat Dasar Tembok


Cat Tembok Eksterior

M412
M415.b

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pengecatan tembok LAMA eksterior (1 lapis cat dasar, 2 lapis cat penutup)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

1,201.20
2,182.95
232.16
162.94
3,779.24

25,740.00
97,119.00

3,088.80
17,481.42
20,570.22

24,349.46

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

N.033
Coating batu alam / Batu hias
m

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Cat
Kepala Tukang Cat
Mandor

SATUAN

L17
L10
L05
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.0700
0.0090
0.0060
0.0025

kg
kg

0.1700
0.2600

JUMLAH HARGA TENAGA


B

BAHAN

1
2

Engsel casement 15 "


Engsel casement 15 "

M505
M505

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

3,003.00
467.78
331.65
162.94
3,965.36

29,250.00
29,250.00

4,972.50
7,605.00

12,577.50

16,542.86

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

P.001
Pemasangan stop kontak
Titik

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor

SATUAN

L17
L11
L06
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.5000
0.5000
0.0500
0.0500

m
bh
bh
Ljr
bh

10.0000
1.0000
1.0000
0.6500
3.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5

Kabel NYA 2.5 mm


Stop Kontak
T dos PVC
Pipa PVC 5/8"
Las doof

M437
M439
M443
M444
M441

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

21,450.00
25,987.50
2,763.75
3,258.75
53,460.00

4,356.00
26,271.00
990.00
7,087.50
594.00

43,560.00
26,271.00
990.00
4,606.88
1,782.00
77,209.88

130,669.88

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

P.002
Pemasangan saklar tunggal
Titik

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor

SATUAN

L17
L11
L06
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.5000
0.5000
0.0500
0.0500

m
bh
bh
Ljr
bh

6.0000
1.0000
1.0000
0.6500
2.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5

Kabel NYA 2.5 mm


Saklar Broco Tunggal
T dos PVC
Pipa PVC 5/8"
Las doof

M437
M440
M443
M444
M441

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

21,450.00
25,987.50
2,763.75
3,258.75
53,460.00

4,356.00
32,035.50
990.00
7,087.50
594.00

26,136.00
32,035.50
990.00
4,606.88
1,188.00
64,956.38

118,416.38

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

P.003
Pemasangan saklar ganda
Titik

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor

SATUAN

L17
L11
L06
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.5000
0.5000
0.0500
0.0500

m
bh
bh
Ljr
bh

10.0000
1.0000
1.0000
0.6500
3.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5

Kabel NYA 2.5 mm


Saklar Broco Ganda
T dos PVC
Pipa PVC 5/8"
Las doof

M437
M440.a
M443
M444
M441

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

21,450.00
25,987.50
2,763.75
3,258.75
53,460.00

4,356.00
36,666.00
990.00
7,087.50
594.00

43,560.00
36,666.00
990.00
4,606.88
1,782.00
87,604.88

141,064.88

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

P.007
Pemasangan titik lampu TL 40 Watt (komplit)
Titik

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor

SATUAN

L17
L11
L06
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.2500
0.2500
0.0250
0.0250

bh
m
m
bh

1.0000
10.0000
4.0000
2.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4

Lampu TL Komplit 40 Watt


Kabel NYA 2.5 mm
Isolator
Las doof

M450
M437
M442
M441

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Pemasangan titik lampu TL 40 Watt (komplit)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

10,725.00
12,993.75
1,381.88
1,629.38
26,730.00

93,753.00
4,356.00
792.00
594.00

93,753.00
43,560.00
3,168.00
1,188.00
141,669.00

168,399.00

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

P.011
Pemasangan titik lampu XL 18 Watt
Titik

KOMPONEN

A.

TENAGA

1
2
3
4

Pekerja Biasa
Tukang Listrik
Kepala Tukang Listrik
Mandor

SATUAN

L17
L11
L06
L01

PERKIRAAN
KUANTITAS

Org/hr
Org/hr
Org/hr
Org/hr

0.2500
0.2500
0.0250
0.0250

bh
m
m
bh
bh

1.0000
10.0000
4.0000
1.0000
2.0000

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3
4
5

Lampu XL (Lilin) 18 Watt


Kabel NYA 2.5 mm
Isolator
Fiting Flafond
Las doof

M454
M437
M442
M445
M441

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
55,275.00
65,175.00

JUMLAH
HARGA
(Rp.)

10,725.00
12,993.75
1,381.88
1,629.38
26,730.00

36,477.00
4,356.00
792.00
10,296.00
594.00

36,477.00
43,560.00
3,168.00
10,296.00
1,188.00
94,689.00

121,419.00

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

Q.001
Penyetelan mesin bor dan buat bak sirkulasi
Unit

A. Biaya Pemasangan Balok Landasan

NO.

A.

KOMPONEN

SATUAN

TENAGA

JUMLAH HARGA TENAGA


B
1
2

BAHAN
Kayu untuk landasan
Kayu untuk dinding spul bak sirkulasi
JUMLAH HARGA BAHAN

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

Ls
Ls

ANALISA HARGA SATUAN


Penyetelan mesin bor dan buat bak sirkulasi

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

1.0000
1.0000

1,210,000.00
385,000.00

1,210,000.00
385,000.00
1,595,000.00

1,595,000.00

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

R.001
Pengukuran bendung untuk MC
bh

KOMPONEN

A.

TENAGA

1
2

Juru Ukur
Pekerja Biasa

SATUAN

L25
L17

PERKIRAAN
KUANTITAS

Org/hr
Org/hr

1.5000
4.5000

kg
kg
m

0.1200
0.0500
0.0120

Unit/hr
bh
bh

1.0000
0.0450
0.0900

JUMLAH HARGA TENAGA


B

BAHAN

1
2
3

Cat meni kayu


Paku Kayu Segala Ukuran
Usuk 5/7

M409
M140
M061

JUMLAH HARGA BAHAN


C

PERALATAN

1
2
3

Pesawat Ukur
Meteran
Palu

E15
E16
E17

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

HARGA
SATUAN
(Rp.)

155,100.00
42,900.00

JUMLAH
HARGA
(Rp.)

232,650.00
193,050.00
425,700.00

34,114.50
21,780.00
4,958,415.00

4,093.74
1,089.00
59,500.98
64,683.72

110,000.00
100,000.00
25,000.00

110,000.00
4,500.00
2,250.00
116,750.00
607,133.72

ANALISA HARGA SATUAN


KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

S.001
Menanam rumput lamur
m

KOMPONEN

A.

TENAGA

1
2
3

Pekerja Biasa
Tukang Taman
Mandor

SATUAN

L17
L14
L01

Org/hr
Org/hr
Org/hr

JUMLAH HARGA TENAGA


B

BAHAN

Rumput Lamur

M461

JUMLAH HARGA BAHAN


C

PERALATAN

JUMLAH HARGA PERALATAN


D

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)

ANALISA HARGA SATUAN

PERKIRAAN
KUANTITAS

0.1500
0.0100

HARGA
SATUAN
(Rp.)

42,900.00
51,975.00
65,175.00

JUMLAH
HARGA
(Rp.)

7,796.25
651.75
8,448.00

1.0000

20,880.00

20,880.00
20,880.00

29,328.00

DAFTAR HARGA SATUAN PEKERJAAN KONSTRUKSI (HSPK)


DINAS PENDIDIKAN KOTA MALANG
TAHUN ANGGARAN 2013
KODE
ANALISA
1

JENIS PEKERJAAN
2

I.
A.001
A.002
A.003
A.004
A.005
A.006
A.007
A.008
A.009
A.010
A.011
A.012
A.013
A.014
A.015
A.016
A.017
A.018
A.019
A.020
A.021
A.022
A.023

PEKERJAAN PERSIAPAN
Pagar sementara dari kayu tinggi 2 m
Pagar sementara dari seng gelombang tinggi 2 m
Pagar sementara dari kawat duri tinggi 1.8 m
Pagar kawat jaring galvanis, tinggi 1,0 m
Pengukuran dan pemasangan bouwplank
Pembuatan kantor sementara, dengan lantai plesteran
Pembuatan gudang semen dan alat-alat
Pembuatan rumah jaga/konstruksi kayu
Membersihkan lapangan dan perataan
Pembuatan bedeng buruh
Pembuatan bak adukan ukuran (40 x 50 x 20) cm
Pembuatan jalan sementara
Bongkar pasang kayu kuda-kuda / kusen / loteng
Bongkaran beton bertulang
Bongkaran tembok bata merah
Bongkaran atap
Bongkaran lantai
Bongkaran plafon
Bongkaran penutup atap lama (Genteng)
Bongkaran rangka penutup atap lama (Usuk+Reng)
Bongkaran konstruksi atap lama
Bongkaran plafon
Mengupas plesteran Lama

II.
B.001
B.002
B.003
B.004
B.005
B.006
B.007
B.008
B.009
B.010
B.011
B.012
B.013
B.014
B.015
B.016
B.017
B.018
B.019
B.020
B.021

PEKERJAAN TANAH
Galian tanah biasa sedalam 1 m
Galian tanah biasa sedalam 2 m
Galian tanah biasa sedalam 3 m
Galian tanah keras sedalam 1 m
Galian tanah cadas sedalam 1 m
Galian tanah lumpur sedalam 1 m
Pekerjaan stripping setinggi 1 m
Pembuangan tanah sejauh 30 m
Urugan kembali
Pemadatan tanah (per 20 cm)
Urugan pasir
Lapisan Pudel Campuran 1 Kp : 3 Ps : 7 TL
Lapisan Pudel Campuran 1 Kp : 5 TL
Pemasangan lapisan ijuk (tebal 10 cm)
Urugan sirtu padat untuk peninggian lantai bangunan
Urugan Tanah
Cut and fill
Galian tanah keras sedalam > 5 m
Galian tanah keras sedalam > 10 m
Pembuangan tanah sejauh > 1 km
Perataan Lahan (Dengan alat)

III.
C.001
C.002
C.003
C.004
C.005
C.006
C.007
C.008
C.009
C.010
C.011

PEKERJAAN PONDASI
Pasang pondasi batu kali, 1 Pc : 3 Ps
Pasang pondasi batu kali, 1 Pc : 4 Ps
Pasang pondasi batu kali, 1 Pc : 5 Ps
Pasang pondasi batu kali, 1 Pc : 6 Ps
Pasang pondasi batu kali, 1 Pc : 8 Ps
Pasang pondasi batu kali, 1 Kp : 1 Sm : 2 Ps
Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps
Pasang pondasi batu kali, 1/4 Pc : 1 Kp : 4 Ps
Pasang pondasi batu kosong
Pasang pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu kali
Pasang pondasi sumuran diameter 100 cm

IV.
D.001
D.002
D.003
D.004
D.005
D.006
D.007
D.008
D.009
D.010
D.011
D.012
D.013
D.014
D.015
D.016
D.017
D.018
D.019
D.020
D.021
D.022
D.023
D.024
D.025

PEKERJAAN DINDING
Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps
Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps
Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps
Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps
Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps
Pasangan dinding hollowblock (HB. 20), Spesi 1 PC : 3 Ps
Pasangan dinding hollowblock (HB. 20), Spesi 1 PC : 4 Ps
Pasangan dinding hollowblock (HB. 15), spesi 1 PC : 3 Ps
Pasangan dinding hollowblock (HB. 15), spesi 1 PC : 4 Ps
Pasangan dinding hollowblock (HB. 10), Spesi 1 PC : 3 Ps
Pasangan dinding hollowblock (HB. 10), Spesi 1 PC : 4 Ps
Pasangan dinding roster/terawang (12 x 11 x 24) cm, Spesi 1 PC : 3 Ps
Pasangan dinding roster/terawang (12 x 11 x 24) cm, Spesi 1 PC : 4 Ps
Pasang bata berongga (5 x 11 x 24) cm, Spesi 1PC:3Ps
Pasang Batu Bata Tahan Api

V.
E.001
E.002
E.003
E.004
E.005
E.006
E.007
E.008
E.009
E.010
E.011
E.012
E.013

PEKERJAAN PLESTERAN
Plesteran 1 Pc : 1 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Ps, tebal 15 mm
Plesteran 1 Pc : 3 Ps, tebal 15 mm
Plesteran 1 Pc : 4 Ps, tebal 15 mm
Plesteran 1 Pc : 5 Ps, tebal 15 mm
Plesteran 1 Pc : 6 Ps, tebal 15 mm
Plesteran 1 Pc : 7 Ps, tebal 15 mm
Plesteran 1 Pc : 8 Ps, tebal 15 mm
Plesteran 1 Pc : 0.5 Kp : 3 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Kp : 8 Ps, tebal 15 mm
Plesteran 1 Kp : 1 Sm : 1 Ps, tebal 15 mm
Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm
Plesteran 1 Pc : 2 Ps, tebal 20 mm

E.014
E.015
E.016
E.017
E.018
E.019
E.020
E.021
E.022
E.023
E.024
E.025
E.026
E.027
E.028

Plesteran 1 Pc : 3 Ps, tebal 20 mm


Plesteran 1 Pc : 4 Ps, tebal 20 mm
Plesteran 1 Pc : 5 Ps, tebal 20 mm
Plesteran 1 Pc : 6 Ps, tebal 20 mm
Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 20 mm
Berapen 1 Pc : 5 Ps, tebal 15 mm
Plesteran skoning 1 Pc : 2 Ps, Lebar 10 mm
Plesteran granito 1 Pc warna : 2 granito, tebal 10 mm
Plesteran Teraso, 1 Pc Warna : 2 Batu Teraso, tebal 10 mm
Plesteran Ciprat 1 Pc : 2 Ps,
Plesteran siar pasangan batu kali adukan 1 Pc : 2 Ps
Benangan
Acian
Finishing beton expose
Benangan Sudut

VI.
F.001
F.002
F.003
F.004
F.005
F.006
F.007
F.008
F.009
F.010
F.011
F.012a

PEKERJAAN KAYU
Pasang kusen pintu dan jendela kayu jati (kelas I)
Pasang kusen pintu dan jendela kayu kamper
Pasang kusen pintu dan jendela kayu borneo
Pasang kusen pintu dan jendela kayu meranti
Pasang pintu klamp kayu jati
Pasang pintu klamp kayu kamper
Pasang pintu klamp kayu borneo
Pasang pintu klamp kayu meranti
Pasang pintu panel kayu jati
Pasang pintu panel kayu kamper
Pasang pintu panel kayu borneo
Pasang pintu panel kayu meranti
Bh (Uk 80x210 cm)

F.012b

Pasang pintu panel kayu meranti. Lapis alumi jeruk


Bh (Uk 70x210 cm)

F.013
F.014
F.015
F.016

Pasang pintu dan jendela kaca kayu jati


Pasang pintu dan jendela kaca kayu kamper
Pasang pintu dan jendela kaca kayu borneo
Pasang pintu dan jendela kaca freme kayu meranti
Daun Pintu 80 x 210 cm
Daun Jendela (Luas Rata2 0,65 m2)
Daun Jendela BV 60 x 50 cm

F.017
F.018
F.019
F.020

Pasang pintu dan jendela jalusi kayu jati


Pasang pintu dan jendela jalusi kayu kamper
Pasang pintu dan jendela jalusi kayu borneo
Pasang pintu dan jendela jalusi kayu meranti
Uk. 50 x 110 cm

F.021
F.022
F.023
F.024
F.025
F.026
F.027
F.028
F.029
F.030
F.031
F.032

Pasang pintu plywood rangkap, rangka kayu jati


Pasang pintu plywood rangkap, rangka kayu kamper
Pasang pintu plywood rangkap, rangka kayu borneo
Pasang pintu plywood rangkap, rangka kayu meranti
Pasang jalusi mati kusen kayu jati
Pasang jalusi mati kusen kayu kamper
Pasang jalusi mati kusen kayu borneo
Pasang jalusi mati kusen kayu meranti
Pasang pintu teakwood rangkap, rangka kayu jati
Pasang pintu teakwood rangkap, rangka kayu kamper
Pasang pintu teakwood rangkap, rangka kayu borneo
Pasang pintu teakwood rangkap, rangka kayu meranti

F.033
F.034
F.035
F.036
F.037
F.038
F.039
F.040
F.041
F.042
F.043
F.044
F.045
F.046
F.047
F.048
F.049
F.050
F.051
F.052
F.053
F.054
F.055
F.056
F.057
F.058
F.059
F.060
F.061
F.062
F.063
F.064
F.065
F.066
F.067
F.068
F.069
F.070
F.071
F.072
F.073
F.074
F.075
F.076
F.077
F.078
F.079
F.080
F.081
F.082
F.083
F.084
F.085
F.086
F.087
F.088

Pasang pintu plywood & formika, rangka kayu jati


Pasang pintu plywood & formika, rangka kayu kamper
Pasang pintu plywood & formika, rangka kayu borneo
Pasang pintu plywood & formika, rangka kayu meranti
Pasang pintu teakwood & formika, rangka kayu jati
Pasang pintu teakwood & formika, rangka kayu borneo (divernis)
Pasang pintu teakwood & formika, rangka kayu meranti (divernis)
Pasang konstruksi kuda-kuda kayu jati
Pasang konstruksi kuda-kuda kayu kamper
Pasang konstruksi kuda-kuda kayu borneo
Pasang konstruksi kuda-kuda kayu bengkirai
Pasang konstruksi kuda-kuda kayu kruing
Pasang konstruksi kuda-kuda kayu meranti
Pasang konstruksi kuda-kuda ekspose kayu jati
Pasang konstruksi kuda-kuda ekspose kayu kamper
Pasang konstruksi gording kayu kamper
Pasang konstruksi gording kayu meranti
Pasang kaso + reng genteng biasa kayu jati
Pasang kaso + reng genteng biasa kayu kamper
Pasang kaso + reng genteng biasa kayu borneo
Pasang kaso + reng genteng biasa kayu bengkirai
Pasang kaso + reng genteng biasa kayu kruing
Pasang kaso + reng genteng biasa kayu meranti
Pasang kaso + reng genteng karangpilang kayu jati
Pasang kaso + reng genteng karangpilang kayu kamper
Pasang kaso + reng genteng karangpilang kayu borneo
Pasang kaso + reng genteng karangpilang kayu bengkirai
Pasang kaso + reng genteng karangpilang kayu kruing
Pasang kaso + reng genteng karangpilang kayu meranti
Pasang kaso + reng genteng beton kayu jati
Pasang kaso + reng genteng beton kayu kamper
Pasang kaso + reng genteng beton kayu borneo
Pasang kaso + reng genteng beton kayu bengkirai
Pasang kaso + reng genteng beton kayu kruing
Pasang kaso + reng genteng beton kayu meranti
Pasang kaso + reng atap sirap kayu jati
Pasang kaso + reng atap sirap kayu kamper
Pasang kaso + reng atap sirap kayu borneo
Pasang kaso + reng atap sirap kayu bengkirai
Pasang kaso + reng atap sirap kayu kruing
Pasang kaso + reng atap sirap kayu meranti
Pasang rangka langit-langit (0.5 x 1.0) m, kayu jati
Pasang rangka langit-langit (0.5 x 1.0) m, kayu kamper
Pasang rangka langit-langit (0.5 x 1.0) m, kayu borneo
Pasang rangka langit-langit (0.5 x 1.0) m, kayu bengkirai
Pasang rangka langit-langit (0.5 x 1.0) m, kayu kruing
Pasang rangka langit-langit (0.5 x 1.0) m, kayu meranti
Pasang lisplang ukuran (3 x 20) cm, kayu jati
Pasang lisplang ukuran (3 x 20) cm, kayu kamper
Pasang lisplang ukuran (3 x 20) cm, kayu borneo
Pasang lisplang ukuran (3 x 20) cm, kayu bengkirai
Pasang lisplang ukuran (3 x 20) cm, kayu kruing
Pasang lisplang ukuran (3 x 20) cm, kayu meranti
Pasang lisplang ukuran (3 x 30) cm, kayu jati
Pasang lisplang ukuran (3 x 30) cm, kayu kamper
Pasang lisplang ukuran (3 x 30) cm, kayu borneo

F.089
F.090
F.091
F.092
F.093
F.094
F.095
F.096
F.097
F.098
F.099
F.100
F.101
F.102
F.103
F.104
F.105
F.106
F.107
F.108

Pasang lisplang ukuran (3 x 30) cm, kayu bengkirai


Pasang lisplang ukuran (3 x 30) cm, kayu kruing
Pasang lisplang ukuran (3 x 30) cm, kayu meranti
Pasang rangka dinding pemisah kayu jati
Pasang rangka dinding pemisah kayu kamper
Pasang rangka dinding pemisah kayu borneo
Pasang rangka dinding pemisah kayu meranti
Pasang rangka dinding pemisah teakwood rangkap, rangka kayu jati
Pasang rangka dinding pemisah teakwood rangkap, rangka kayu kamper
Pasang rangka dinding pemisah teakwood rangkap, rangka kayu borneo
Pasang rangka dinding pemisah teakwood rangkap, rangka kayu meranti
Pasang rangka dinding pemisah plywood rangkap, rangka kayu jati
Pasang rangka dinding pemisah plywood rangkap, rangka kayu kamper
Pasang rangka dinding pemisah plywood rangkap, rangka kayu borneo
Pasang rangka dinding pemisah plywood rangkap, rangka kayu meranti
Pasang dinding lambriziring dari papan jati
Pasang dinding lambriziring dari papan kamper
Pasang kembali konstruksi kuda-kuda lama
Pasang konstruksi gording lama
Pasang kaso (Kamper)+ reng (Meranti) genteng beton

VII.
G.001
G.002
G.003
G.004
G.005
G.006
G.007
G.008
G.009
G.010
G.011
G.012
G.013
G.014
G.015
G.016
G.017
G.018
G.019
G.020
G.021
G.022
G.023
G.024
G.025
G.026
G.027
G.028
G.029
G.030
G.031
G.032
G.033

PEKERJAAN BETON
Beton mutu fc'=7,4 Mpa (K100) slump (12 2) cm, w/c = 0,87
Beton mutu fc'=9,8 Mpa (K125) slump (12 2) cm, w/c = 0,78
Beton mutu fc'=12,2 Mpa (K150) slump (12 2) cm, w/c = 0,72
Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87
Beton mutu fc'=14,5 Mpa (K175) slump (12 2) cm, w/c = 0,66
Beton mutu fc'=16,9 Mpa (K200) slump (12 2) cm, w/c = 0,61
Beton mutu fc'=19,3 Mpa (K225) slump (12 2) cm, w/c = 0,58
Beton mutu fc'=24,0 Mpa (K275) slump (12 2) cm, w/c = 0,53
Beton mutu fc'=21,7 Mpa (K250) slump (12 2) cm, w/c = 0,56
Beton mutu fc'=26,4 Mpa (K300) slump (12 2) cm, w/c = 0,52
Beton mutu fc'=28,8 Mpa (K325) slump (12 2) cm, w/c = 0,49
Beton mutu fc'=31,2 Mpa (K350) slump (12 2) cm, w/c = 0,48
Beton kedap air dengan strorox - 100
Pasang PVC Waterstop lebar 150 mm
Pasang PVC Waterstop lebar 200 mm
Pasang PVC Waterstop lebar 230 mm - 320 mm
Pembesian dengan besi polos
Pembesian dengan besi ulir
Kabel prestressed polos/strands
Memasang 1 kg jaring kawat baja / wire mesh
Pasang bekisting untuk pondasi
Pasang bekisting untuk pondasi ( 2x pakai )
Pasang bekisting untuk sloof
Pasang bekisting untuk sloof ( 2x pakai )
Pasang bekisting untuk kolom
Pasang bekisting untuk kolom ( 2x pakai )
Pasang bekisting untuk balok
Pasang bekisting untuk balok ( 2x pakai )
Pasang bekisting untuk plat lantai
Pasang bekisting untuk plat lantai ( 2x pakai )
Pasang bekisting untuk dinding
Pasang bekisting untuk dinding ( 2x pakai )
Pasang bekisting untuk tangga

G.034
G.035
G.036
G.037
G.038
G.039
G.040
G.041
G.042
G.043
G.044
G.045

Btn.001
Btn. 002
Btn. 003
Btn. 004
Btn. 005
Btn. 006
Btn. 007
Btn. 008
Btn. 009
Btn. 010
Btn. 011
Btn. 012
Btn. 013
Btn. 014
VIII.
H.001
H.002
H.003
H.004
H.005
H.006
H.007
H.008
H.009
H.010
H.011

Pasang bekisting untuk tangga ( 2x pakai )


Pasang bekisting jembatan untuk pengecoran
Pondasi beton bertulang (150 kg besi + bekisting)
Sloof beton bertulang (200 kg besi + bekisting)
Kolom beton bertulang (150 kg besi + bekisting)
Kolom beton bertulang (300 kg besi + bekisting)
Balok beton bertulang (200 kg besi + bekisting)
Dinding beton bertulang (150 kg besi + bekisting)
Dinding beton bertulang (200 kg besi + bekisting)
Kolom penguat beton bertulang (11 x 11) cm
Ring balok beton bertulang (10 x 15) cm
Sloof beton bertulang (10 x 15) cm
ANALISA BETON DALAM 1 M3
Strouss 30 cm
Pondasi Footplat beton bertulang (150 kg besi polos + bekisting)
Pondasi Footplat beton bertulang (150 kg besi ulir + bekisting)
Sloof beton bertulang 20/30 + bekisting
Sloof beton bertulang 15/25 + bekisting
Kolom beton bertulang 20x20 + bekisting
Kolom beton bertulang 30x30 + bekisting
Balok beton bertulang 15/25 + bekisting
Balok beton bertulang 30/60 + bekisting
Plat Lantai Beton Bertulang + Bekisting
Plat Atap Beton Bertulang + Bekisting
Plat Tangga Beton Bertulang + Bekisting
Sloof Praktis Beton bertulang 11/20 + bekisting
Sloof Praktis Beton bertulang 11/25
PEKERJAAN PENUTUP ATAP
Pasang atap genteng biasa ex. Malang
Pasang atap genteng press ex.Trenggalek
Pasang atap genteng karangpilang ex. Malang
Pasang atap genteng karangpilang ex. Trenggalek
Pasang atap genteng karangpilang ex. Surabaya
Pasang bubung genteng biasa ex. Malang
Pasang bubung genteng press ex. Trenggalek
Pasang bubung genteng karangpilang ex. Malang
Pasang bubung genteng karangpilang ex. Trenggalek
Pasang bubung genteng karangpilang ex. Surabaya
Pasang atap genteng palentong kecil

H.012
H.013
H.014
H.015
H.016
H.017
H.018
H.019
H.020
H.021
H.022
H.023
H.024
H.025
H.026
H.027
H.028
H.029
H.030
H.031
H.032
H.033
H.034
H.035
H.036
H.037
H.038
H.039
H.040
H.041
H.042
H.043
H.044
H.045
H.046
H.047
H.048
H.049
H.050
H.051
H.052
H.053
H.054
H.055

Pasang atap genteng kodok glazuur


Pasang atap genteng palentong super / besar
Pasang atap genteng beton biasa
Pasang atap genteng aspal
Pasang atap genteng metal
Pasang atap sirap
Pasang bubung genteng palentong kecil
Pasang bubung genteng kodok / glazuur
Pasang bubung genteng palentong super / besar
Pasang bubung genteng beton Monier
Pasang bubung genteng aspal
Pasang bubung genteng metal
Pasang bubung atap sirap
Pasang atap asbes gelombang (3,00 x 1,05) m x 4 mm
Pasang atap asbes gelombang (2,70 x 1,05) m x 4 mm
Pasang atap asbes gelombang (2,40 x 1,05) m x 4 mm
Pasang atap asbes gelombang (2,10 x 1,05) m x 4 mm
Pasang atap asbes gelombang (1,50 x 1,05) m x 4 mm
Pasang atap asbes gelombang (2,50 x 0,92) m x 5 mm
Pasang atap asbes gelombang (2,25 x 0,92) m x 5 mm
Pasang atap asbes gelombang (2,00 x 0,92) m x 5 mm
Pasang atap asbes gelombang (1,80 x 0,92) m x 5 mm
Pasang atap asbes gelombang (3,00 x 1,08) m x 6 mm
Pasang atap asbes gelombang (2,70 x 1,08) m x 6 mm
Pasang atap asbes gelombang (2,10 x 1,08) m x 6 mm
Pasang atap asbes gelombang (1.80 x 1,08) m x 6 mm
Pasang bubung stel gelombang 0,92 m
Pasang bubung stel gelombang 1,05 m
Pasang bubung stel gelombang 1,08 m
Pasang nok paten 0,92 m
Pasang nok paten 1,05 m
Pasang nok paten 1,08 m
Pasang nok stel rata 0,92 m
Pasang nok stel rata 1,05 m
Pasang atap seng gelombang
Pasang bubung seng gelombang
Pasang atap aluminium
Pasang bubung atap aluminium
Pasang lapisan aluminium foil / sesalation
Pasang roof light fibreglass
Pasang atap polycarbonat
Pasang atap seng galvalum
Pasang bubung atap seng galvalum
Pasang kembali atap genteng LAMA (karangpilang ex. Malang)

IX.
I.001
I.002
I.003
I.004
I.005
I.006
I.007
I.008
I.009
I.010

PEKERJAAN LANGIT - LANGIT


Langit-langit asbes (1,0 x 1,0) m, tebal 6 mm
Langit-langit asbes (1,0 x 1,0) m, tebal 5 mm
Langit-langit asbes (1,0 x 1,0) m, tebal 4 mm
Langit-langit asbes (1,0 x 1,0) m, tebal 3,50 mm
Langit-langit akustik (30 x 30) cm
Langit-langit akustik (30 x 60) cm
Langit-langit akustik (60 x 120) cm
Langit-langit plywood (30 x 60) cm, tebal 4 mm
Langit-langit plywood (30 x 60) cm, tebal 6 mm
Langit-langit plywood (60 x 120) cm, tebal 4 mm

I.011
I.012
I.013
I.014
I.015
I.016
I.017
I.018
I.019
I.020
I.021
I.022
I.023
I.024
I.025
I.026
I.027
I.028
I.029
I.030
I.031
I.032
I.033
I.034
I.035
I.036
I.037
I.038
I.039
I.040
I.041
I.042
I.043
I.044
I.045
I.046
I.047
I.048
I.049
I.050
I.051
I.052
I.053
I.054
I.055
I.056
I.057

Langit-langit plywood (60 x 120) cm, tebal 6 mm


Langit-langit teakwood (30 x 60) cm, tebal 4 mm
Langit-langit teakwood (60 x 120) cm, tebal 4 mm
Langit-langit lat kayu jati
Langit-langit lat kayu ramin
Langit-langit lat kayu kamper
Langit-langit soft board
Langit-langit gypsum board ukuran (120x240x9)mm, tebal 9 mm
Langit-langit akustik (60 x 120) cm + rangka aluminium
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu jati
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kamper
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu borneo
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu bengkirai
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kruing
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu meranti
Langit-langit plywood 4 mm + rangka kayu jati
Langit-langit plywood 4 mm + rangka kayu kamper
Langit-langit plywood 4 mm + rangka kayu borneo
Langit-langit plywood 4 mm + rangka kayu bengkirai
Langit-langit plywood 4 mm + rangka kayu kruing
Langit-langit plywood 4 mm + rangka kayu meranti
Langit-langit akustik (30 x 60) cm + rangka kayu jati
Langit-langit akustik (30 x 60) cm + rangka kayu kamper
Langit-langit akustik (30 x 60) cm + rangka kayu borneo
Langit-langit akustik (30 x 60) cm + rangka kayu bengkirai
Langit-langit akustik (30 x 60) cm + rangka kayu kruing
Langit-langit akustik (30 x 60) cm + rangka kayu meranti
Langit-langit akustik (30 x 30) cm + rangka kayu jati
Langit-langit akustik (30 x 30) cm + rangka kayu kamper
Langit-langit akustik (30 x 30) cm + rangka kayu borneo
Langit-langit akustik (30 x 30) cm + rangka kayu bengkirai
Langit-langit akustik (30 x 30) cm + rangka kayu kruing
Langit-langit akustik (30 x 30) cm + rangka kayu meranti
Langit-langit gypsum board (120x240x9) mm, tebal 9 mm
Langit-langit tripleks (120x240) cm, tebal 3 mm
Langit-langit tripleks (120x240) cm, tebal 4 mm
Langit-langit lambriziring kayu jati, tebal 9 mm
Langit-langit lambriziring kayu kamper, tebal 9 mm
List langit-langit kayu profil
List langit-langit gypsum
Langit-langit Kalsiboard 6 mm + rangka kayu meranti
Langit-langit eternit (1,00 x 1,00) m x 3,5 mm + rangka kayu meranti
Langit-langit Gypsum board 9mm + Rangka aluminium
Langit-langit Kalsiboard 9mm + Rangka galvalum
Dinding partisi gypsum 2 x 12 mm, rangka galvalum
Plafond Papan Grill 3/30 cm (Uk.25x25 cm) + Politur
Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu lama

X.
J.001
J.002
J.003
J.004
J.005
J.006
J.007

PEKERJAAN SANITASI
Pasang kloset jongkok teraso
Pasang kloset jongkok porselin kw. A
Pasang kloset jongkok lux
Pasang kloset duduk porselin kw. A
Pasang kloset duduk lux
Pasang urinoir
Pasang wastafel kw. A

J.008
J.009
J.010
J.011
J.012
J.013
J.014
J.015
J.016
J.017
J.018
J.019
J.020
J.021
J.022
J.023
J.024
J.025
J.026
J.027
J.028
J.029
J.030
J.031
J.032
J.033
J.034
J.035
J.036
J.037
J.038
J.039
J.040
J.041
J.042
J.043
J.044
J.045
J.046
J.047
J.048
J.049
J.050
J.051
J.052
J.053
J.054
J.055
J.056
J.057
J.058
J.059
J.060
: J.061
J.062
J.063

Pasang wastafel lux


Pasang tempat sabun keramik
Pasang bak mandi teraso volume 0.3 m3
Pasang bak mandi fibreglass volume 0.3 m3
Pasang bak mandi batu bata volume 0.3 m3
Pasang badkip porselen
Pasang bak beton volume 1.0 m3, head 2.5 m
Pasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm
Pasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm
Pasang pipa beton, diameter 20 cm
Pasang pipa beton, diameter 30 cm
Pasang pipa beton, diameter 40 cm
Pasang pipa beton, diameter 50 cm
Pasang pipa beton, diameter 60 cm
Pasang pipa beton, diameter 80 cm
Pasang pipa beton, diameter 90 cm
Pasang pipa beton, diameter 100 cm
Pasang pipa beton U, diameter 20
Pasang pipa beton U, diameter 30
Pasang bak kontrol pasangan batu bata
Pasang bak kontrol pasangan batu bata
Pasang bak kontrol pasangan batu bata
Pasang pipa galvanis, diameter 1/2"
Pasang pipa galvanis, diameter 3/4"
Pasang pipa galvanis, diameter 1"
Pasang pipa galvanis, diameter 1 1/2"
Pasang pipa galvanis, diameter 2"
Pasang pipa galvanis, diameter 2 1/2"
Pasang pipa galvanis, diameter 3"
Pasang pipa galvanis, diameter 4"
Pasang pipa PVC tipe AW, diameter 1/2"
Pasang pipa PVC tipe AW, diameter 3/4"
Pasang pipa PVC tipe AW, diameter 1"
Pasang pipa PVC tipe AW, diameter 1 1/2"
Pasang pipa PVC tipe AW, diameter 2"
Pasang pipa PVC tipe AW, diameter 2.5"
Pasang pipa PVC tipe AW, diameter 3"
Pasang pipa PVC tipe AW, diameter 4"
Pasang pipa PVC tipe AW, diameter 6"
Pasang pipa PVC tipe AW, diameter 8"
Pasang pipa PVC tipe D, diameter 1/2"
Pasang pipa PVC tipe D, diameter 3/4"
Pasang pipa PVC tipe D, diameter 1"
Pasang pipa PVC tipe D, diameter 1 1/2"
Pasang pipa PVC tipe D, diameter 2"
Pasang pipa PVC tipe D, diameter 2.5"
Pasang pipa PVC tipe D, diameter 3"
Pasang pipa PVC tipe D, diameter 4"
Pasang pipa PVC tipe C, diameter 1/2"
Pasang pipa PVC tipe C, diameter 3/4"
Pasang pipa PVC tipe C, diameter 1"
Pasang pipa PVC tipe C, diameter 1 1/2"
Pasang pipa PVC tipe C, diameter 2"
Pasang pipa PVC tipe C, diameter 2.5"
Pasang pipa PVC tipe C, diameter 3"
Pasang pipa PVC tipe C, diameter 4"

ukuran (30 x 30) tinggi 35 cm


ukuran (45 x 45) tinggi 50 cm
ukuran (60 x 60) tinggi 65 cm

J.064
J.065
J.066
J.067
J.068
J.069
J.070
J.071
J.072
J.073

Pasang bak cuci piring stainles steel


Pasang bak cuci piring teraso
Pasang kran diameter 1/2"
Pasang kran diameter 3/4"
Pasang Afor Stainless Steel
Pasang Afor Plastik
Pasang kaca wastafel
Pasang pipa screen PVC tipe AW, diameter 3"
Pasang pipa screen PVC tipe AW, diameter 4"
Pasang pipa Staenless steel, diameter 2"

XI.
K.001
K.002
K.003
K.004
K.005
K.006
K.007
K.008
K.009
K.010
K.011
K.012
K.013
K.014

PEKERJAAN BESI DAN ALUMINIUM


Pasang besi profil
Pasang rangka kuda-kuda baja WF
Pemasangan baut anker baja
Ikatan angin/Trekstang
Plendes
Pasang pintu plat baja tebal 2 mm rangkap, rangka baja siku
pengelasan dengan las listrik
Pasang pintu gulung besi (rolling door)
Pasang pintu lipat (folding door)
Pasang sunscream alluminium
Pasang Rolling door Aluminium
Pasang Kusen Alluminium Coklat
Pasang pintu Alluminium coklat strip lebar 8 cm
Pasang Pintu Kaca Rangka Aluminium Coklat
Daun Pintu 80 x 210 cm
Daun Jendela (0,65 m2)
Daun Jendela BV 60 x 50 cm

K.015
K.016
K.017
K.018
K.019
K.020
K.021
K.022
K.023
K.024
K.025
K.026
K.027
K.028
K.029
K.030
K.031
K.032
K.033
K.034
K.035
K.036
K.037
K.038

Pasang venetion blinds dan vertical blinds (tirai)


Pasang teralis besi (2 x 3) mm
Pasang kawat nyamuk
Pasang jendela nako & trails
Pasang pintu fiber KM
Pasang talang datar, seng bjls 30 L = 0.60 m
Pasang talang datar, seng bjls 30 L = 0.90 m
Pasang talang miring, seng bjls 30 L = 0.60 m
Pasang talang miring, seng bjls 30 L = 0.90 m
Pasang talang tegak pipa PVC f 3"
Pasang talang tegak pipa PVC f 4"
Pasang talang 1/2 lingkaran D-15 cm bjls 30, L = 45 cm
Pasang pagar BRC tinggi 1 m
Pasang tiang pagar BRC Dia 2" tinggi 1 m
Pasang pintu pagar BRC tinggi 1 m
Pasang pagar besi
Pasang pintu pagar besi
Pasang Atap Baja Ringan untuk Penutup Atap Genteng
Pasang Atap Baja Ringan untuk Penutup Atap Asbes Gelombang
Pasang rangka Plafon Metal Furing
Pasang pagar besi hollow
Pasang pagar besi hollow
Pasang pintu pagar besi hollow
1 m2 Pasang Rangka atap (Usuk+reng Zincalume)

XII.
L.001
L.002
L.003
L.004
L.005
L.006
L.007
L.008
L.009
L.010
L.011
L.012
L.013
L.014
L.015
L.016
L.017
L.018
L.019
L.020
L.021
L.022
L.023
L.024
L.025
L.026
L.027
L.028
L.029
L.030
L.031
L.032
L.033
L.034
L.035
L.036
L.037
L.038

PEKERJAAN KUNCI DAN KACA


Pasang kunci tanam antik
Pasang kunci tanam biasa
Pasang kunci tanam kamar mandi
Pasang kunci silinder
Pasang kunci selot
Pasang kunci lemari
Pasang engsel pintu
Pasang engsel jendela
Pasang grendel pintu
Pasang grendel jendela
Pasang hak angin
Pasang spring knip
Pasang kait angin
Pasang door closer
Pasang pegangan pintu/door holder
Pasang door stop
Pasang rel pintu dorong
Pasang kaca polos, tebal 3 mm
Pasang kaca polos, tebal 5 mm
Pasang kaca polos, tebal 8 mm
Pasang kaca polos, tebal 12 mm
Pasang kaca buram, tebal 3 mm
Pasang kaca buram, tebal 5 mm
Pasang kaca buram, tebal 8 mm
Pasang kaca buram, tebal 12 mm
Pasang kaca cermin, tebal 5 mm
Pasang kaca cermin, tebal 6 mm
Pasang kaca cermin, tebal 8 mm
Pasang kaca rayben, tebal 3 mm
Pasang kaca rayben, tebal 5 mm
Pasang kaca rayben, tebal 8 mm
Pasang kaca rayben, tebal 12 mm
Pasang kaca " wireglass", tebal 5 mm
Pasang kaca patri, tebal 5 mm
Pasang glass block
Pasang kaca painting glass
Pasang casement
Pasang kaca polos, tebal 12 mm termpered

XIII.
M.001
M.002
M.003
M.004
M.005
M.006
M.007
M.008
M.009
M.010
M.011
M.012
M.013
M.014

PEKERJAAN LANTAI DAN DINDING


Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm
Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm
Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm
Pasang lantai ubin pc warna ukuran 40 x 40 cm
Pasang lantai ubin pc warna ukuran 30 x 30 cm
Pasang lantai ubin pc warna ukuran 20 x 20 cm
Pasang lantai ubin teraso ukuran 40 x 40 cm
Pasang lantai ubin teraso ukuran 30 x 30 cm
Pasang lantai ubin granito ukuran 40 x 40 cm
Pasang lantai ubin granito ukuran 30 x 30 cm
Pasang lantai ubin teralux kerang ukuran 40 x 40 cm
Pasang lantai ubin teralux kerang ukuran 30 x 30 cm
Pasang lantai ubin teralux marmer ukuran 60 x 60 cm
Pasang lantai ubin teralux marmer ukuran 40 x 40 cm

M.015
M.016
M.017
M.018
M.019
M.020
M.021
M.022
M.023
M.024
M.025
M.026
M.027
M.028
M.029
M.030
M.031
M.032
M.033
M.034
M.035
M.036
M.037
M.038
M.039
M.040
M.041
M.042
M.043
M.044
M.045
M.046
M.047
M.048
M.049
M.050
M.051
M.052
M.053
M.054
M.055
M.056
M.057
M.058
M.059
M.060
M.061
M.062
M.063
M.064
M.065
M.066
M.067
M.068
M.069
M.070

Pasang lantai ubin teralux marmer ukuran 30 x 30 cm


Pasang plint ubin pc abu-abu ukuran 15 x 20 cm
Pasang plint ubin pc abu-abu ukuran 10 x 30 cm
Pasang plint ubin pc abu-abu ukuran 10 x 40 cm
Pasang plint ubin pc warna ukuran 10 x 20 cm
Pasang plint ubin pc warna ukuran 10 x 30 cm
Pasang plint ubin pc warna ukuran 10 x 40 cm
Pasang plint ubin teraso ukuran 10 x 30 cm
Pasang plint ubin teraso ukuran 10 x 40 cm
Pasang plint ubin granito ukuran 10 x 40 cm
Pasang plint ubin granito ukuran 10 x 30 cm
Pasang teraso cor di tempat, tebal 3 cm
Pasang lantai keramik artistik 10 x 20 cm
Pasang lantai keramik artistik 10 x 10 cm
Pasang lantai keramik artistik 5 x 20 cm
Pasang dinding keramik artistik 10 x 20 cm
Pasang dinding keramik artistik 5 x 20 cm
Pasang plint keramik artistik 10 x 20 cm
Pasang plint keramik artistik 10 x 10 cm
Pasang plint keramik artistik 5 x 20 cm
Pasang internal cove artistik (5 x 5 x 20) cm
Pasang gymflour
Pasang lantai parquet
Pasang lantai karpet
Pasang lantai keramik ukuran 20 x 20 cm putih
Pasang lantai keramik ukuran 20 x 20 cm warna/motif
Pasang lantai keramik KM ukuran 20 x 20 cm
Pasang lantai keramik ukuran 30 x 30 cm putih
Pasang lantai keramik ukuran 30 x 30 cm warna/motif
Pasang lantai keramik ukuran 40 x 40 cm putih
Pasang lantai keramik ukuran 40 x 40 cm warna/motif
Pasang lantai marmer ukuran 100 x 100 cm
Pasang plint keramik lantai ukuran 10 x 20 cm
Pasang plint keramik lantai ukuran 10 x 30 cm
Pasang plint keramik lantai ukuran 10 x 40 cm
Pasang dinding porselin ukuran 15 x 15 cm, putih
Pasang dinding porselin ukuran 11 x 11 cm, putih
Pasang dinding porselin ukuran 11 x 11 cm, warna
Pasang dinding porselin ukuran 15 x 15 cm, warna
Pasang dinding porselin ukuran 10 x 20 cm, warna
Pasang dinding porselin ukuran 20 x 20 cm, warna
Pasang dinding keramik ukuran 20 x 20 cm
Pasang dinding keramik ukuran 20 x 25 cm
Pasang dinding batu tempel hitam
Pasang lantai vinyl ukuran (30x30)cm KL I
Pasang wallpaper, lebar 50 cm
Pasang dinding batu palimanan
Pasang dinding granito
Pasang dinding marmer ukuran 100 x 100 cm
Pasang dinding teraso
Pasang paving stone (blok) segi empat biasa
Pasang paving stone (blok) segi empat warna
Pasang paving stone (blok) Segi Enam biasa
Pasang paving stone (blok) Segi Enam Warna
Pasang paving stone (blok) Tiga Berlian biasa
Pasang paving stone (blok) Tiga Berlian warna

M.071
M.072
M.073

Pasang Batu Ampyangan Granit


Pasang dinding keramik ukuran 10 x 20 cm, Warna / Motif
Pasang dinding batu sisir

XIV.
N.001
N.002
N.003
N.004
N.005
N.006
N.007
N.008
N.009
N.010
N.011
N.012
N.013
N.014
N.015
N.016
N.017
N.018
N.019
N.020
N.021
N.022
N.023
N.024
N.025
N.026
N.027
N.028
N.029
N.030
N.031
N.032
N.033

PEKERJAAN PENGECATAN
Mengikis/mengerok permukaan cat lama
Mencuci bidang permukaan cat tembok lama
mengerok karat cat lama permukaan baja dengan cara manual
menyabun permukaan tembok lama

XVI.
P.001
P.002
P.003
P.004
P.005
P.006
P.007
P.008
P.009
P.010
P.011
P.012
P.013
P.014

mengerok karat/cat lama permukaan baja dengan pancar pasir

(sandblasting) dengan tingkat kebersihan Sa 2,5

Mendempul dan menggosok kayu


Pengecatan kayu lama
2 lapis cat penutup)
3 lapis cat penutup)

Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar,


Pengecatan kayu baru (1 lapis plamir, 1 lapis cat dasar,

Pelaburan kayu dengan teak oil


Pelaburan kayu dengan politur
Pelaburan kayu dengan cat residu dan ter
Pelaburan kayu dengan vernis
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar,

2 lapis cat penutup)


1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)

Pengecatan tembok baru interior


Pengecatan tembok baru eksterior
Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Melabur tembok dengan kalkarium
Melabur tembok dengan kapur sirih
Melabur tembok lama dengan kapur sirih (untuk pemeliharaan)

2 lapis cat penutup)

Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar,

Pengecatan permukaan baja dengan meni besi


Pengecatan permukaan baja dengan cat besi
Pengecatan permukaan baja
Pengecatan permukaan baja dengan meni besi dan perancah
Pengecatan permukaan baja lapis seng (galbani) secara manual
Pengecatan permukaan baja lapis seng (galbani) secara manual
Pengecatan permukaan baja lapis seng (galbani) secara semprot

sistem 1 lapis cat mutakhir tebal 0.20 mm


sistem 3 lapis cat konvensional tebal 0.20 mm
less spray) sistem 1 lapis cat mutakhir tebal 0.20 mm

Pekerjaan waterproofing
Pengecatan tembok LAMA eksterior (1 lapis cat dasar, 2 lapis cat penutup)
2 lapis cat penutup)_CAT MINYAK
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar
dengan CAT MINYAK
Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat p
Coating batu alam / Batu hias

PEKERJAAN INSTALASI LISTRIK


Pemasangan stop kontak
Pemasangan saklar tunggal
Pemasangan saklar ganda
Pemasangan titik lampu pijar 5 - 40 watt
Pemasangan titik lampu pijar 50 - 100 watt
Pemasangan titik lampu TL 20 Watt (komplit)
Pemasangan titik lampu TL 40 Watt (komplit)
Pemasangan titik lampu XL 5 Watt
Pemasangan titik lampu XL 8 Watt
Pemasangan titik lampu XL 14 Watt
Pemasangan titik lampu XL 18 Watt
Pemasangan titik lampu XL 23 Watt
Pemasangan sekering 1 group
Pemasangan sekering 2 group

P.015
P.016
P.017

Pemasangan sekering 3 group


Pemasangan penangkal petir
Pemasangan titik Instalasi

XVII.
Q.001
Q.002
Q.003
Q.004
Q.005
Q.006
Q.007
Q.008
Q.009
Q.010
Q.011
Q.012
Q.013
Q.014
Q.015
Q.016
Q.017
Q.018
Q.019
Q.020
Q.021
Q.022
Q.023
Q.024
Q.025
Q.026
Q.027
Q.028
Q.029
Q.030
Q.031
Q.032
Q.033
Q.034
Q.035
Q.036
Q.037
Q.038
Q.039
Q.040
Q.041
Q.042
Q.043
Q.044
Q.045
Q.046

PEKERJAAN AIR BERSIH


Penyetelan mesin bor dan buat bak sirkulasi
Geolistrik
kecepatan pemboran 15 m'/hr
kecepatan pemboran 12 m'/hr
kecepatan pemboran 10 m'/hr
kecepatan pemboran 8 m'/hr
kecepatan pemboran 6 m'/hr
kecepatan pemboran 4 m'/hr
kecepatan pemboran 3 m'/hr
kecepatan pemboran 2 m'/hr

Pemboran pilot hole 8 3/4" kedalaman 0 - 25 m


Pemboran pilot hole 8 3/4" kedalaman 25 - 50 m
Pemboran pilot hole 8 3/4" kedalaman 50 - 75 m
Pemboran pilot hole 8 3/4" kedalaman 75 - 100 m
Pemboran pilot hole 8 3/4" kedalaman 100 - 125 m
Pemboran pilot hole 8 3/4" kedalaman 125 - 175 m
Pemboran pilot hole 8 3/4" kedalaman 175 - 225 m
Pemboran pilot hole 8 3/4" kedalaman 225 - 275 m

Geofisikal, Elektrikal, Logging


Pumping test open hole
Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"
Pembesaran lubang (Reaming) lubang bor 8 3/4" - 12"

kedalaman 0 - 25 m kecepatan pemboran 18 m'/hr


kedalaman 25 - 50 m kecepatan pemboran 15 m'/hr
kedalaman 50 - 75 m kecepatan pemboran 12 m'/hr
kedalaman 75 - 100 m kecepatan pemboran 9 m'/hr
edalaman 100 - 125 m kecepatan pemboran 7 m'/hr
edalaman 125 - 175 m kecepatan pemboran 5 m'/hr
edalaman 175 - 225 m kecepatan pemboran 3 m'/hr

Pengadaan dan pemasangan pipa jambang PVC-AW 150 mm


Pengadaan dan pemasangan pipa buta PVC-AW 150 mm
Pengadaan dan pemasangan pipa screen PVC-AW 150 mm
Pengadaan dan pemasangan pipa jambang PVC-AW 125 mm
Pengadaan dan pemasangan pipa buta PVC-AW 125 mm
Pengadaan dan pemasangan pipa screen PVC-AW 125 mm
Pengadaan dan pemasangan pipa sounding PVC-AW 2.50"
Pengadaan dan pemasangan pipa sounding SWL PVC-AW 1"
Pengisian gravel pack Dia 5 mm - 10 mm
Beton Mortar 1 pc 1 ps
Pencucian sumur bor dengan kedalaman < 200 m
Pencucian sumur bor dengan kedalaman > 200 m
Pumping test dan test nonstop 24 jam
Pasang pipa PVC Moof 6 m S-12.5 2"
Pasang pipa PVC Moof 6 m S-12.5 2.5"
Pasang pipa PVC Moof 6 m S-12.5 3"
Pasang pipa PVC Moof 6 m S-12.5 4"
Pasang pipa PVC Moof 6 m S-12.5 6"
Pasang pipa PVC Moof 6 m S-12.5 8"
Pasang pipa Moof S-12.5 2" lintas jalan
Pasang pipa Moof S-12.5 3" lintas jalan
Pasang pipa PVC Moof S-12.5 4" lintas jalan
Pasang pompa air
Pasang tandon air PVC V = 0.50 m3
Pasang tandon air PVC V = 1.0 m3
Pasang tandon air stainless V = 0.5 m3
Pasang tandon air stainless V = 1.0 m3

XVIII.
R.001
R.002
R.003
R.004
R.005
R.006
R.007
R.008
R.009
R.010
R.011
R.012
R.013
R.014
R.015
R.016
R.017
R.018
R.019
R.020
R.021
R.022
R.023
R.024
R.025
R.026
R.027
R.028
R.029
R.030
R.031
R.032

PEKERJAAN PENUNJANG IRIGASI


Pengukuran bendung untuk MC
Pengukuran saluran untuk MC
Pengukuran bangunan untuk MC
Pendongkelan rumpun bambu
Pembuatan dan pembongkaran kisdam > 1 m
Galian tanah biasa diangkut > 1 m dibuang
Galian tanah biasa diangkut > 50 m dibuang
Galian tanah berbatu diangkut > 1 m dibuang
Galian tanah berbatu diangkut > 50 m dibuang
Galian tanah keras/cadas diangkut > 1 m dibuang
Galian tanah keras/cadas diangkut > 50 m dibuang
Galian tanah biasa langsung untuk timbunan / dibuang
Pemadatan tanah timbunan & dirapikan
Timbunan tanah kembali dipadatkan dan dirapikan (manual)
Timbunan tanah dari luar dipadatkan dan dirapikan (manual)
Bongkaran pasangan batu kali
Pasangan batu kali dengan spesi 1 pc ; 4 ps
Siaran dengan spesi 1 pc ; 2 ps
Plesteran tebal 1,5 cm dengan spesi 1 pc ; 3 ps
Bronjong kawat galvanis d = 4 mm (0.50 x 1.00 x 2.00)
Beton K-125
Beton K-175
Bekisting kayu termasuk pembongkaran
Besi Tulangan Ulir
Besi Tulangan Polos
Kisi-Kisi
Pintu Air Type A Plat
Pintu Air Type C - 2
Pintu Air Type C - 3
Pintu Air Type C - 3
Pintu Air Type C - 3
Pintu Air Type C - 5

XIX.
S.001
S.002
S.003
S.004
S.005
S.006
S.007
S.008
S.009
S.010
S.011
S.012
S.013
S.014
S.015
S.016
S.017
S.018
S.019

PEKERJAAN LAIN - LAIN


Menanam rumput lamur
Menanam rumput manila
Menanam semak hias
Menanam pohon pelindung
Pengisian koral sumur resapan
Menanam gebalan rumput
Pasang papan kayu jembatan gantung, kayu kamper
Menanam Rumput Common Bermuda Grass
Penyiraman Rumput
Penyiangan / Pematunan Rumput
Pemotongan Rumput
Pemupukan
Pemberian Obat Tanaman
Pasang Mistar Gawang
Pasang Jala Gawang
Pembuatan Garis Lapangan
Pasang pipa besi 1.5" untuk tangga dan pagar
Pasang besi polos untuk tangga
Pasang Pipa Udara GI 2"

S.020
S.021
S.022
S.023
S.024
S.025
S.026
S.027
S.028
S.029
S.030
S.031
S.032
S.033
S.034
S.035
S.036
S.037
S.038
S.039
S.040
S.041
S.042
S.043
S.044
S.045
S.046
S.047
S.048
S.049
S.050
S.051
S.052

Catatan :

Pasang Pompa submersible Q = 3,5 l/det, H = 150 m


Pasang Flange Pipe 3" - 0.35 m
Pasang Flange Pipe 4" - 0.35 m
Pasang Flange Pipe 4" - 1 m
Pasang All Flange Wall Pipe 4" - 0.5 m
Pasang Bend Socket PVC 2" 90
Pasang Bend Socket PVC 2" x 45
Pasang Tee All Socket PVC 2" x 2"
Pasang Tee All Socket PVC 3" x 2"
Pasang Tee All Socket PVC 3" x 3"
Pasang Flange Gate Valve 2"
Pasang Flange Gate Valve 3"
Pasang Bend All Flange GI 3" x 90
Pasang Bend All Flange GI 3" x 45
Pasang Flange Socket 2"
Pasang Flange Socket 3"
Pasang Flange Spigot 2"
Pasang Flange Spigot 3"
Pasang Straatport 2"
Pasang Straatport 3"
Pasang Flange Check Valve 3"
Pasang Flange Air Valve 1"
Pasang Flange Air Valve 2"
Pasang Flange Water Meter 3"
Pasang Manometer 10 bar
Pasang Dop PVC 2"
Pasang Dop PVC 3"
Uji Coba Instalasi Pipa
Pasang Kabel Pompa NYYHY 3 x 4 mm
Pasang Kabel Elektrode NYYHY 3 x 1.5 mm
Pasang Panel Pompa
Pasang Junction Box
Pasang Elektrode Pompa

Harga belum termasuk PPn 10 %

UKSI (HSPK)

SATUAN
3

HARGA
( Rp )
4

m
m
m
m
m
m
m
m
m
m
bh
m
m
m3
m3
m
m
m
m
m
m
m
m

439,460.78
542,497.73
591,984.80
30,036.60
76,456.55
1,638,634.34
1,653,268.23
1,509,867.63
7,548.75
1,670,653.86
329,812.81
79,096.14
520,525.50
307,717.58
288,165.08
50,448.75
9,231.75
12,681.90
1,509.75
6,053.44
52,965.00
3,250.50
2,307.94

m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3
m3

33,804.38
41,542.88
49,411.73
44,985.60
68,260.50
54,412.88
2,470.88
14,808.75
13,847.63
24,708.75
106,396.35
332,000.24
474,664.87
114,332.63
143,217.98
95,157.98
103,809.88
86,431.52
215,069.27
34,096.51
32,729.46

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

548,715.00
499,215.00
464,925.00
440,805.00
407,775.00
533,155.35
565,152.80
518,503.85
211,864.66
1,904,538.29
591,952.94

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

184,920.75
171,668.25
163,208.25
158,145.75
154,950.75
179,495.69
88,500.38
82,497.38
78,892.88
76,615.88
75,139.88
72,772.88
91,109.39
89,726.27
84,268.85
195,870.53
191,649.53
159,050.10
155,801.10
121,341.38
119,410.88
329,467.88
325,687.88
113,553.00
980,253.38

m
m
m
m
m
m
m
m
m
m
m
m
m

44,843.40
38,075.40
35,040.60
33,057.00
31,811.40
30,864.60
30,306.60
29,748.60
36,670.75
36,379.62
38,631.65
35,992.94
50,927.55

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

40,288.58
44,206.35
42,575.55
41,283.15
48,884.60
20,635.13
28,538.70
165,439.73
153,559.73
25,969.88
32,112.00
16,902.00
19,369.50
18,253.58
8,430.75

m3
m3
m3
m3
m
m
m
m
m
m
m
m2
bh
m2
bh
m
m
m
m
bh
bh
bh
m
m
m
m
bh
m
m
m
m
m
m
m
m
m
m
m
m

15,620,640.75
12,788,104.50
11,719,763.10
8,040,046.50
682,454.78
538,436.78
518,527.52
355,250.78
838,217.25
694,199.25
674,289.99
511,013.25
858,502.26
538,013.25
790,879.48
546,663.60
460,252.80
448,307.24
452,081.87
759,497.53
293,853.21
135,624.56
1,201,097.25
970,668.45
938,813.63
677,570.85
372,663.97
640,421.78
550,410.53
537,967.24
435,919.28
1,076,048.63
860,021.63
830,157.74
585,242.63
653,814.00
563,802.75
551,359.46
449,311.50

m
m
m
m
m
m
m
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

760,265.40
670,254.15
657,810.86
555,762.90
757,691.40
672,165.86
570,117.90
15,175,413.00
11,609,928.00
10,630,615.05
8,579,785.50
8,028,850.50
7,257,541.50
17,041,561.88
13,151,941.88
11,203,434.00
6,851,047.50
296,208.99
210,441.44
199,202.02
159,154.40
142,165.56
120,929.52
296,208.99
210,441.44
199,202.02
159,154.40
142,165.56
120,929.52
320,016.36
226,668.98
214,859.22
171,325.05
152,893.77
129,854.67
235,029.54
169,679.81
159,122.13
128,359.69
115,137.25
98,609.20
236,615.12
175,622.04
165,768.20
137,056.59
124,715.65
109,289.47
171,384.38
140,000.93
137,330.01
91,318.31
91,318.31
90,236.47
183,525.38
143,920.43
138,445.38

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m3
m3
m

91,581.60
91,581.60
93,544.28
393,309.53
302,551.73
277,623.76
191,763.71
488,414.87
397,657.07
372,729.10
286,869.05
501,529.23
410,771.43
385,843.46
299,983.41
242,098.65
216,895.50
1,142,163.00
735,669.00
190,157.01

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m
m
m
kg
kg
kg
kg
m
m
m
m
m
m
m
m
m
m
m
m
m

652,129.59
689,296.17
718,354.75
610,191.84
752,866.76
785,554.47
810,384.78
853,388.76
826,255.34
861,858.75
918,856.92
929,886.63
999,953.25
46,962.90
81,806.40
95,096.85
11,225.79
15,853.14
31,879.50
20,280.53
194,244.60
116,598.90
212,807.10
125,880.15
355,664.70
202,552.65
365,581.53
207,511.07
466,040.70
257,740.65
397,509.75
223,475.18
318,411.00

m
m
m3
m3
m3
m3
m3
m3
m3
m
m
m

183,925.80
123,964.63
3,342,118.25
4,270,885.85
5,538,759.27
7,445,442.20
5,776,853.07
5,153,065.85
5,265,687.80
57,314.22
78,390.78
77,446.98

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m'
m'

2,345,951.63
2,995,222.25
3,689,324.75
3,600,937.92
3,571,935.82
4,912,050.42
3,774,338.67
7,750,466.13
4,946,924.81
3,771,773.49
4,158,578.18
2,635,768.92
103,723.08
58,948.70

m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m2

47,296.73
50,671.73
67,546.73
73,171.73
63,271.73
51,920.85
54,845.85
65,240.85
67,220.85
70,190.85
67,996.73

m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
m1
m2
m1
m2
m2
m2
m2
m2
m2
m2
m2

68,221.73
62,548.20
90,635.40
102,703.95
119,327.51
115,474.43
62,270.85
78,110.85
72,962.85
72,957.85
139,716.70
129,751.05
75,340.58
49,162.34
53,032.11
49,185.02
50,157.42
50,257.19
65,612.39
67,615.79
61,111.86
60,392.31
102,620.99
59,816.27
57,652.22
61,863.14
126,175.35
117,821.55
116,711.18
63,805.35
63,351.75
67,207.35
68,861.10
57,124.65
66,585.51
36,390.27
152,475.51
177,217.02
42,278.10
95,892.23
142,298.48
158,188.04
182,320.02
11,296.73

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

25,937.18
24,739.28
24,085.88
23,432.48
314,848.35
171,709.13
61,540.13
52,797.53
68,875.13
46,352.63

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m
m
m
m
m1
m1
m2
m2
m2
m2
m2
m2
m2

52,886.63
55,668.53
52,144.13
388,903.05
137,803.05
313,151.85
58,809.30
40,854.40
248,851.65
204,373.75
156,846.68
149,168.36
126,795.68
117,179.36
105,158.96
376,207.52
285,113.96
270,397.19
228,925.48
209,084.93
186,045.83
500,768.31
409,674.75
394,957.98
352,077.00
333,645.72
310,606.62
688,517.68
581,581.76
564,305.56
513,967.01
492,330.29
564,305.56
38,478.40
30,191.21
37,412.03
295,771.80
248,427.30
13,645.50
28,579.65
125,317.16
105,708.41
105,260.40
129,264.98
163,255.50
528,324.56
45,657.98

bh
bh
bh
bh
bh
bh
bh

220,271.25
374,214.00
536,241.00
1,808,339.66
1,909,411.19
1,528,080.75
641,961.78

bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m
m
bh
bh
bh
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1

1,637,598.66
37,888.13
290,859.75
646,304.88
895,296.00
1,000,564.13
9,261,115.34
156,862.56
238,207.36
70,246.84
130,263.09
163,708.77
197,337.59
243,059.27
370,469.33
405,865.31
486,271.64
65,880.94
157,000.04
212,001.69
313,852.53
476,708.70
61,250.18
76,630.05
101,091.38
150,092.60
208,389.65
284,996.07
318,859.70
469,583.38
16,829.87
22,542.39
27,961.97
35,871.62
46,776.62
57,908.72
82,398.86
122,386.53
210,314.25
321,034.66
10,970.87
13,900.37
16,536.92
20,491.74
26,416.60
35,058.62
51,346.16
67,458.41
9,506.12
11,703.24
13,753.89
16,683.39
23,194.15
27,441.92
34,940.96
41,239.38

bh
bh
bh
bh
bh
bh
m2
m1
m1
m1

319,712.51
250,245.19
45,860.10
50,513.10
59,767.13
22,246.13
159,708.66
89,568.62
129,556.30
189,710.60

kg
kg
kg
kg
kg
m
cm
m2
m2
m2
m2
m1
m2
m2
bh
bh
bh
m2
m2
m2
m2
Unit
m1
m1
m1
m1
m1
m1
m1
m
bh
m
m
m
m
m
m
m
m
m
m

28,138.09
28,138.09
20,400.60
20,728.84
28,138.09
844,055.03
5,053.00
2,150,077.05
1,646,535.45
357,089.70
1,289,541.75
124,673.75
729,745.75
902,743.53
902,743.53
349,275.77
161,204.20
568,821.53
443,524.75
101,632.96
347,009.03
384,966.86
195,312.93
205,140.93
195,312.93
205,140.93
52,347.60
64,278.23
63,106.95
337,597.26
201,584.76
550,249.92
570,022.49
709,410.37
295,698.23
265,191.39
128,487.32
546,067.65
579,763.77
634,844.14
98,566.13

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
bh
m
bh
m2

130,637.03
138,238.13
117,721.31
172,780.67
146,613.68
27,342.09
20,399.88
15,201.92
30,863.76
18,388.84
32,414.25
21,890.76
15,661.84
201,820.69
157,680.19
42,405.34
168,909.53
96,427.86
141,542.16
265,034.76
377,290.86
144,531.54
208,980.54
234,761.26
369,064.66
159,708.66
285,052.56
386,061.80
139,463.16
200,169.96
400,995.95
634,259.75
661,084.26
1,430,730.06
34,161.81
590,086.41
45,185.25
827,290.86

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

51,136.60
58,178.94
67,234.43
58,577.36
63,363.57
76,811.69
66,453.80
75,114.87
279,774.05
271,361.58
307,699.61
451,583.79
254,023.20
383,866.88

m2
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

657,979.35
27,165.90
22,139.67
20,226.00
20,883.00
19,444.44
20,358.30
25,766.67
26,654.70
44,494.50
41,492.82
33,389.93
526,136.25
978,581.10
978,581.10
540,186.75
991,829.70
93,281.93
175,392.75
92,345.35
196,052.03
324,360.75
310,379.48
95,603.33
123,617.26
123,617.26
127,327.26
122,663.50
127,411.50
149,663.10
165,255.60
479,071.65
35,374.13
76,241.82
88,560.75
133,189.50
161,206.50
178,234.50
135,619.50
139,029.75
139,368.87
155,944.62
159,403.50
153,560.10
289,781.40
157,038.53
154,500.83
91,823.70
526,217.70
74,464.05
83,130.00
91,230.00
92,265.00
94,785.00
83,670.00
89,610.00

m2
m2
m2

139,784.06
146,732.00
146,955.00

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

7,727.21
8,591.89
8,591.89
8,591.89
680,416.50
7,442.08
28,272.59
37,908.32
49,113.47
9,618.35
53,356.46
14,071.20
23,445.43
20,721.20
30,502.40
33,745.64
15,332.54
4,630.64
16,610.22
13,479.18
20,721.20
16,674.24
20,303.04
20,303.04
45,067.60
25,919.55
109,048.20
89,601.60
57,238.52
24,349.46
27,581.90
20,494.40
16,542.86

Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Unit
Unit

130,669.88
118,416.38
141,064.88
102,519.00
114,142.50
135,787.50
168,399.00
111,969.00
114,993.00
118,867.50
121,419.00
127,467.00
131,307.15
213,399.90

Unit
Unit
Titik

301,196.93
3,124,561.50
219,566.25

Unit
Ls
m
m
m
m
m
m
m
m
m
Ls
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m3
m3
Titik
Titik
Jam
m1
m1
m1
m1
m1
m1
m1
m1
m1
Unit
Unit
Unit
Unit
Unit

3,630,000.00
3,875,740.00
324,731.13
405,913.92
487,096.70
608,870.88
811,827.83
1,217,741.75
1,623,655.67
2,435,483.50
17,960.00
7,980,716.00
240,053.72
288,064.47
360,080.58
480,107.44
617,281.00
864,193.40
1,440,322.33
305,226.00
305,226.00
325,665.00
255,300.00
255,300.00
281,220.00
46,191.00
28,519.50
388,154.25
789,599.96
9,223,343.00
14,424,206.00
340,785.44
49,796.80
66,397.30
99,110.96
140,123.96
295,144.20
476,054.03
122,599.24
168,076.24
209,089.24
870,471.38
812,420.25
1,432,068.08
2,216,221.05
3,709,335.68

bh
km1
bh
m
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m
m
m3
m3
m3
m
kg
kg
m
Buah
Buah
Buah
Buah
Buah
Buah

607,133.72
859,033.72
112,016.92
65,861.18
132,016.34
43,536.13
53,103.55
81,451.65
81,418.65
75,019.78
81,327.73
32,952.20
14,648.48
35,129.23
106,746.20
103,050.08
490,589.63
31,536.98
30,424.73
1,066,517.85
689,296.17
752,866.76
262,340.10
15,853.14
11,225.79
535,137.91
59,585,000.00
10,279,000.00
6,825,000.00
7,272,000.00
8,838,000.00
8,838,000.00

m
m
m
btg
m3
m3
m3
m
m2
m2
m2
m2
m2
m1
m2
m2
m1
kg
m1

29,328.00
26,268.00
29,805.00
204,762.00
225,121.10
24,823.50
13,709,124.00
15,637.88
68.26
435.52
224.32
110.17
262.63
356,253.75
76,679.63
12,148.95
119,663.60
10,966.39
208,389.65

Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
m1
m1
bh
bh
bh

Malang, 28 Januari 2013


Kepala Dinas Pendidikan
Kota Malang

Dra. Sri Wahyuningtyas, M.Si.


Pembina Utama Muda
NIP. 19581218 198503 2 007

63,456,291.25
293,960.45
327,128.38
574,127.75
370,716.50
81,730.83
74,030.83
65,123.85
103,623.85
120,123.85
661,509.20
1,030,821.11
318,087.55
255,387.55
149,132.64
193,132.64
138,132.64
182,132.64
69,698.96
91,698.96
1,195,821.11
392,818.25
1,266,509.20
1,981,509.20
196,381.90
10,219.48
12,419.48
2,076,230.00
15,216.30
9,790.48
5,644,375.00
486,640.00
75,328.00

NO.

URAIAN PEKERJAAN
Panjang

A
1

PEKERJAAN TANAH
Galian tanah biasa sedalam 1 m
Bangunan utama
Pagar
Footplat

Urugan Kembali
(+) Galian pondasi
(-) Aanstampeng
(-) Urugan pasir
(-) Pondasi batu kali

Urugan Pasir
Pasir bawah pondasi
Pasir bawah lantai

B
1

PEKERJAAN PONDASI
Pasangan batu Kosong

Pondasi batu kali 1 PC : 5 PS

C
1

Rollag bata
PEKERJAAN PASANGAN
Pasangan bata 1 Pc : 5 Ps
Bangunan utama
(-) Luas Jendela + Pintu
Gewel
Pagar

Plesteran 1 Pc : 5 Ps
Bangunan utama
Pagar
Gewel

40.00
22.50
0.80

0.60
0.40
0.80

40.00
22.50
34.91

0.60
0.40

40.00
22.50

0.45
0.35

5.00

0.30

40.00
6.00
5.00
18.02
4.48

141.20
5.38
13.63

Benangan
Pagar
Sudutan luar

PARAMETER
Lebar

22.50
3.70

2.40
3.15
1.50

Acian

Pasangan beton alur

2.55
2.55
1.38

0.30
0.15
0.40

Kamprotan

2.30

0.77

D
1

PEKERJAAN KERAMIK
Keramik utama 40 x 40
R tidur Utama
R tidur
R. keluarga
R. tamu

2.85
2.85
2.85
2.85

2.85
2.35
2.85
2.35

2
3
4

Keramik teras 30 x 30
Keramik lantai KM 20 x 20
Keramik dinding KM 20 x 25

1.15
1.35
4.60

3.00
1.35
2.00

E
1

PEKERJAAN BETON
Pekerjaan Rabat & Lantai Kerja
Carport
Lantai kerja

3.55
0.80

3.00
0.80

3.70
1.49
1.65
2.00
3.50
40.00
18.02
19.92
0.80
1.65

0.11
0.11
0.11
0.11
0.15
0.11
0.11
0.11
0.80
3.50

Pengecoran beton K-175


Kolom praktis 11/11
Kolom gewel 11/11
Kolom pagar 11/11
Kolom teras 15/30
Balok ring 11/15
Balok gewel 11/15
Footplat 80x80x15
Plat teras

Pembesian dengan besi polos


Kolom praktis 410

Kolom teras 610


Sengkang 6_200
Ringbalk 410
Sengkang 6_200
Footplat 12_200
plat teras 8_200

Pekerjaan bekisting

Panjang
3.90
1.49
1.65
2.00
10.50
0.49
0.90
77.94
0.52
1.20
0.90
1.65
3.50

Jumlah
40.00
4.00
8.00
20.00
6.00
268.95
52.50
4.00
389.70
20.00
20.00
35.00
16.50

Kolom praktis
Kolom praktis 15/30
Ringbalk 10/15
Plat

F
1

PEKERJAAN ATAP
Pekerjaan Rangka Galvalum

3
4
5

47.00
0.90
77.94
7.88

0.30
10.50
0.30

3.98
3.61
3.67

4.35
2.98
2.38

Pekerjaan plafon + rangka


Ruang dalam
Overstek

19.96

0.60

Pekerjaan atap beton


Pekerjaan bubungan beton
Pekerjaan lisplank 3/20

10.10
19.70

G
1

PEKERJAAN KUSEN & PENGGANTUNG


Kusen kayu
Pintu
Jendela 1
Jendela 2
Jendela 3

Vol. kusen

5.10
5.00
8.10
6.00

44.50

0.15

Daun pintu panil

0.80

2.04

Daun pintu double triplek

0.80

2.04

Daun jendela

1.78
1.08

0.60
0.60

1.62
0.92

0.44
0.44

5
6
7
8
9
10

Selot pintu
Engsel pintu
Engsel jendela
Grendel jendela
Hak angin
Kaca polos

G
1
2
3

PEKERJAAN FINISHING
Pengecatan dinding interior
Pengecatan plafon
Pengecatan kayu
Cat lisplank
Cat daun pintu
Cat daun jendela

Pengecatan genteng

H
1

PEKERJAAN LAIN-LAIN
Tanaman/rumput

19.70
6.53
0.36
0.24

PARAMETER
Tinggi

SUBVOLUME

VOLUME

SATUAN

16.80
4.50
1.02
21.30

21.30

m3

21.30
0.00
-1.65
-16.54
3.11

3.11

m3

1.20
0.45
1.75
3.40

3.40

m3

0.00

0.00

12.60
3.94
16.54
0.35

16.54

156.00
-14.80
9.90
3.73
36.04
5.38
196.24

196.24

m2

2.00
2.00
1.00

282.40
10.75
13.63
306.78

306.78

m2

2.00
5.00

45.00
18.50

95.00

m'

Jumlah

0.70
0.50
0.80

2.00

0.05
0.05
0.05

0.70
0.50
0.23

3.90
1.65
1.49
2.00
1.20

2.00
1.00

m3

8.00
2.00
4.00

19.20
6.30
6.00
95.00
306.78

306.78

m2

2.00
2.00
1.00

1.53
0.77
0.55
2.85

2.85

m2

2.00

3.54

3.54

m2

1.00
1.00
1.00
1.00

8.12
6.70
8.12
6.70
29.64

29.64

m2

3.45
1.82
9.20

m2
m2
m2

0.05
0.05

1.00
2.00

0.53
0.06
0.60

0.60

m3

0.11
0.11
0.11
0.11
0.30
0.15
0.15
0.15
0.20
0.10

10.00
1.00
2.00
5.00
3.00
1.00
1.00
1.00
2.00
1.00

0.45
0.02
0.04
0.12
0.47
0.66
0.30
0.33
0.26
0.58
3.22

3.22

m3

Panjang total berat besi


156.00
0.62
5.96
0.62
13.20
0.62
40.00
0.62
63.00
0.62
131.79
0.22
47.25
0.22
311.76
0.62
202.64
0.22
24.00
0.62
18.00
0.62
57.75
0.62
57.75
0.62

berat total
96.21
3.68
8.14
24.67
38.85
29.26
10.49
192.26
44.99
14.80
11.10
35.61
35.61
545.67

14.10
9.45
23.38
7.88
54.81

2.00
1.00
1.00

54.81

34.63
10.76
8.73
54.12

54.12

31.46
11.98
43.44

43.44

10.10
19.70

54.12
10.10
19.70

m2

m2

0.40

m3

1.00

1.63

m2

3.00

4.90

m2

5.57

m2

4.00
6.00
6.00
6.00
6.00
3.66

bh
set
set
bh
set
m2

306.78
43.44
22.78

m2
m2
m2

54.12

m2

4.00
2.00
1.00
1.00

0.06

20.40
10.00
8.10
6.00
44.50
0.40

4.00
2.00

4.27
1.30
5.57

4.00
6.00
6.00

4.00
2.00

0.30
2.00
2.00

2.00
4.00
2.00

2.85
0.81
3.66

5.91
13.06
2.84
0.97
22.78

RENCANA ANGGARAN BIAYA


UNIT RUMAH PERUM TLOGOMAS

NO

URAIAN PEKERJAAN

VOLUME

SATUAN

KODE

HARGA SATUAN

TOTAL HARGA

A
1
2

PEKERJAAN PERSIAPAN
Pembersihan
Pasang bowplank

75.00
23.10

m2
m'

A.009
A.005

7,548.75
76,456.55

566,156.25
1,766,146.19
2,332,302.44

B
1
2
3

PEKERJAAN TANAH
Galian tanah biasa sedalam 1 m
Urugan Kembali
Urugan Pasir (t = 5 cm)

21.30
3.11
3.40

m3
m3
m3

B.001
B.009
B.011

33,804.38
13,847.63
106,396.35

720,033.19
43,100.73
361,282.11
1,124,416.03

C
1
2

PEKERJAAN PONDASI
Pondasi batu kali 1 PC : 6 PS
Rollag bata

16.54
0.35

m3
m3

C.004
D.002

440,805.00
171,668.25

7,289,812.69
59,225.55
7,349,038.23

D
1
2
3
4
5
6

PEKERJAAN PASANGAN
Pasangan bata 1 Pc : 5 Ps
Plesteran 1 Pc : 4 Ps
Benangan
Acian
Pasangan beton alur
Kamprotan

196.24
306.78
95.00
306.78
2.85
3.54

m2
m2
m'
m2
m2
m2

D.004
E.004
E.025
E.026
M.058
E.023

158,145.75
33,057.00
16,902.00
19,369.50
153,560.10
25,969.88

31,034,996.42
10,141,259.52
1,605,690.00
5,942,194.58
437,185.60
91,985.30
49,253,311.42

E
1
2
3
4

PEKERJAAN KERAMIK
Keramik utama 40 x 40
Keramik teras 30 x 30
Keramik lantai KM 20 x 20
Keramik dinding KM 20 x 25

29.64
3.45
1.82
9.20

m2
m2
m2
m2

M.045
M.043
M.040
M.057

165,255.60
127,411.50
123,617.26
159,403.50

4,898,175.98
439,569.68
225,292.46
1,466,512.20
7,029,550.32

F
1
2
3
4

PEKERJAAN BETON
Pekerjaan Rabat & Lantai Kerja
Pengecoran beton K-175
Pembesian dengan besi polos
Pekerjaan bekisting

0.60
3.22
545.67
54.81

m2
m3
kg
m2

G.004
G.005
G.017
G.022

610,191.84
752,866.76
11,225.79
116,598.90

363,979.43
2,423,228.90
6,125,540.49
6,390,435.91
15,303,184.73

G
1
2
3
4
5

PEKERJAAN ATAP
Pekerjaan Rangka Galvalum
Pekerjaan plafon eternit rangka meranti
Pekerjaan atap genteng beton
Pekerjaan bubungan beton
Pekerjaan lisplank 3/20 kamper

54.12
43.44
54.12
10.10
19.70

m2
m2
m2
m'
m'

K.032
I.052
H.014
H.021
F.081

295,698.23
105,708.41
90,635.40
72,957.85
140,000.93

16,002,715.17
4,591,814.55
4,905,042.83
736,874.29
2,758,018.22
28,994,465.06

H
1
2
3
4
5
6
7
8
9
10

PEKERJAAN PINTU & JENDELA


Pasang kusen kayu kamper
Pasang Pintu Panil kayu kamper
Pasang Pintu double triplek
Pasang jendela kaca kamper
Kaca polos 5 mm
Selot pintu
Engsel pintu
Engsel Jendela
Grendel Jendela
Hak angin

0.40
1.63
4.90
5.57
3.66
4.00
6.00
6.00
6.00
6.00

m3
m2
m2
m2
m2
bh
set
set
bh
set

F.002
F.010
F.022
F.014
L.019
L.005
L.007
L.008
L.010
L.011

12,788,104.50
694,199.25
550,410.53
460,252.80
141,542.16
146,613.68
20,399.88
15,201.92
18,388.84
32,414.25

5,121,635.85
1,132,933.18
2,694,809.93
2,562,687.59
518,157.53
586,454.70
122,399.27
91,211.51
110,333.03
194,485.50
13,135,108.08

I
1
2
3
4

PEKERJAAN FINISHING
Pengecatan tembok baru
Pengecatan plafon
Pengecatan kayu
Pengecatan genteng

306.78
43.44
22.78
54.12

m2
m2
m2
m2

N.014
N.021
N.009
N.022

20,721.20
20,721.20
49,113.47
16,674.24

6,356,868.92
900,097.63
1,118,824.55
902,383.19
9,278,174.29

J
1

PEKERJAAN LAIN-LAIN
Tanaman/rumput

24.35

m2

S.008

15,637.88

380,782.26
380,782.26

TOTAL HARGA

134,180,332.85

PEKERJAAN TAMBAH BANGUNAN


TLOGOMAS REGENCY

NO
1
2
3

URAIAN PEKERJAAN
Galian tanah pondasi
Rabatan lantai kerja
Footplat 90x90x20 (9 titik)
- Beton K175
- Pembesian
Kolom struktur 15/20 (9 titik)
- Beton K175
- Bekisting
- Pembesian

VOLUME

SATUAN

HARGA SATUAN

9.00
0.36

m3
m3

33,804.38
652,129.59

1.46
124.68

m3
kg

752,866.76
11,225.79

1.13
15.12
271.02

m3
m2
kg

752,866.76
202,552.65
11,225.79

Jumlah
PPn (10%)
Total
TOTAL HARGA

TAMBAH BANGUNAN
MAS REGENCY

TOTAL HARGA
304,239.38
237,701.23
1,097,679.73
1,399,577.61
853,750.90
3,062,596.07
3,042,452.67

9,997,997.60
999,799.76
10,997,797.36
10,997,000.00

Update tanggl 28 Februari


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
19
20
21

Item Bahan
Pasir pasang
Pasir cor
Batu belah
Bata merah
Besi 6 (5,8)
Besi 6 (5,1)
Besi 8 (7,2)
besi 10 (8,2)
Keramik 30 x 30
Keramik 20 x 25
Keramik 20 x 20
Genteng beton (25/m2)
Genteng bubung (3.5/m')
Semen gresik 40 kg
Galvalum C-75
Reng galvalum
Batu alur
Cat maxilite 5 kg
Cat avitex 5 kg
Lem rajawali

Harga
85,000.00
125,000.00
95,000.00
560.00
24,000.00
18,500.00
34,000.00
50,500.00
45,500.00
48,500.00
46,000.00
3,000.00
5,000.00
53,000.00
70,000.00
30,000.00
35,000.00
46,000.00
80,000.00
10,000.00

Satuan
m3
m3
m3
bh
lonjor
lonjor
lonjor
lonjor
dus
dus
dus
bh
bh
zak
lonjor
lonjor
m2
galon
galon
kg