DE MOLLEBAYA
FECHA: SETIEMBRE 2015
S10
2401001 MEJORAMIENTO DE POZO TUBULAR CON CASETA DE SEGURIDAD Y TANQUE ELEVADO, INSTALACION RED PARA PILETAS PUBLICAS DE AHASA Y MEJORAMIENTO DE CESPED CANCHA DE FUTBOL - MOLLEBAYA 2015
Subpresupuestos
001 MEJORAMIENTO DE POZO TUBULAR CON CASETA DE SEGURIDAD Y TANQUE ELEVADO, INSTALACION RED PARA PILETAS PUBLICAS DE AHASA Y MEJORAMIENTO DE CESPED CANCHA DE FUTBOL - MOLLEBAYA 2015
Cliente
Lugar
ITEM
DESCRIPCION
UNIDAD
METRADO
UNITARIO
PARCIAL
1 MES
TOTAL
MONTO
2 MES
%
MONTO
Costo al
08/09/2015
1/2 MES
PARCIAL
MONTO
MONTO
01.00.00
OBRAS PROVISIONALES
01.01.00
UND
1.00
600.00
600.00
600.00
100.00%
600.00
100.00%
01.02.00
UND
1.00
650.00
650.00
650.00
100.00%
650.00
100.00%
01.03.00
GLB
1.00
700.00
700.00
525.00
75.00%
700.00
100.00%
02.00.00
TRABAJOS PRELIMINARES
02.01.00
M2
2,226.68
0.32
703.92
703.92
100.00%
703.92
100.00%
02.02.00
M2
1,097.91
0.30
334.19
167.09
50.00%
334.19
100.00%
02.03.00
897.91
0.94
839.78
839.78
100.00%
839.78
100.00%
02.04.00
ACCESORIOS DE SEGURIDAD
1.00
2,250.00
2,250.00
1,687.50
75.00%
562.50
25.00%
2,250.00
100.00%
03.00.00
MOVIMIENTO DE TIERRAS
03.01.00
EXCAVACION DE ZANJAS
03.01.01
1,795.82
5.61
10,067.05
6,040.23
60.00%
4,026.82
40.00%
10,067.05
100.00%
03.01.02
3.20
9.86
31.57
9.47
30.00%
22.10
70.00%
31.57
100.00%
03.02.00
03.02.01
2,104.95
30.00%
3,508.25
50.00%
7,016.51
100.00%
03.03.00
03.03.01
1,222.45
40.00%
1,833.68
60.00%
3,056.14
100.00%
03.03.02
1.62
100.00%
1.62
100.00%
03.04.00
7,501.12
30.00%
5,000.75
20.00%
25,003.75
100.00%
7,730.15
40.00%
19,325.38
100.00%
4,500.91
100.00%
1,950.00
175.00
25.00%
83.55
25.00%
4,127.89
M
GLB
83.55
25.00%
10,098.62
M
M3
7,016.51
M
1,032.60
6.80
7,016.51
1,403.30
20.00%
51,887.79
1,795.82
1.70
3,056.14
0.15
10.52
1.62
50.00
500.07
25,003.75
03.05.00
1,288.36
19,325.38
11,595.23
60.00%
03.06.00
4,500.91
4,500.91
4,500.91
100.00%
03.07.00
03.07.01
M3
44.90
0.42
19.06
11.44
60.00%
03.07.02
M3
2.06
0.85
1.74
0.00
04.00.00
04.01.00
04.01.01
M3
19.80
133.21
2,637.62
2,637.62
04.01.02
M2
79.20
14.14
1,119.96
1,119.96
04.01.03
M3
5.94
163.20
969.43
05.00.00
05.01.00
ZAPATAS
05.01.01
M2
9.60
35.67
05.01.02
M3
2.40
05.01.03
KG
50.18
05.02.00
COLUMNAS
05.02.01
M2
1.72
28.47
05.02.02
M3
4.27
266.24
05.02.03
KG
152.12
3.44
523.38
05.03.00
VIGAS
05.03.01
M2
05.03.02
05.03.03
05.04.00
LOSA ALIGERADA
05.04.01
M2
5.12
24.33
05.04.02
M3
0.78
284.77
M3
GLB
1.00
12,501.87
50.00%
20.80
7.63
40.00%
19.06
100.00%
1.74
100.00%
1.74
100.00%
100.00%
2,637.62
100.00%
100.00%
1,119.96
100.00%
969.43
100.00%
969.43
100.00%
342.42
342.42
100.00%
342.42
100.00%
263.02
631.26
631.26
100.00%
631.26
100.00%
3.38
169.79
169.79
100.00%
169.79
100.00%
48.97
48.97
100.00%
48.97
100.00%
1,137.39
1,137.39
100.00%
1,137.39
100.00%
523.38
100.00%
523.38
100.00%
4,727.02
1,143.46
1,709.75
1,076.45
0.00%
10.08
30.73
309.78
216.85
70.00%
92.93
30.00%
309.78
100.00%
M3
1.28
274.05
350.79
245.55
70.00%
105.24
30.00%
350.79
100.00%
KG
158.67
2.62
415.88
291.12
70.00%
124.77
30.00%
415.88
100.00%
124.59
87.21
70.00%
37.38
30.00%
124.59
100.00%
223.26
156.28
70.00%
66.98
30.00%
223.26
100.00%
5,257.34
Pgina 1
MUNICIPALIDAD DISTRITAL
DE MOLLEBAYA
FECHA: SETIEMBRE 2015
S10
2401001 MEJORAMIENTO DE POZO TUBULAR CON CASETA DE SEGURIDAD Y TANQUE ELEVADO, INSTALACION RED PARA PILETAS PUBLICAS DE AHASA Y MEJORAMIENTO DE CESPED CANCHA DE FUTBOL - MOLLEBAYA 2015
Subpresupuestos
001 MEJORAMIENTO DE POZO TUBULAR CON CASETA DE SEGURIDAD Y TANQUE ELEVADO, INSTALACION RED PARA PILETAS PUBLICAS DE AHASA Y MEJORAMIENTO DE CESPED CANCHA DE FUTBOL - MOLLEBAYA 2015
Cliente
Lugar
ITEM
DESCRIPCION
UNIDAD
METRADO
UNITARIO
PARCIAL
1 MES
TOTAL
MONTO
2 MES
%
MONTO
Costo al
08/09/2015
1/2 MES
PARCIAL
MONTO
MONTO
05.04.03
KG
39.76
3.41
135.61
94.93
70.00%
40.68
30.00%
135.61
100.00%
05.04.04
UND
36.00
2.61
93.89
65.72
70.00%
28.17
30.00%
93.89
100.00%
05.05.00
9.00
520.00
4,680.00
4,680.00
100.00%
0.00
4,680.00
100.00%
06.00.00
06.01.00
ALBAILERIA
06.01.01
13.98
48.07
671.95
671.95
100.00%
671.95
100.00%
06.02.00
06.02.01
M2
105.60
13.30
1,403.99
1,123.19
80.00%
280.80
20.00%
1,403.99
100.00%
06.02.02
M2
18.03
7.54
135.99
108.79
80.00%
27.20
20.00%
135.99
100.00%
07.00.00
PINTURA
07.01.00
M2
107.31
4.07
436.42
349.13
80.00%
87.28
20.00%
436.42
100.00%
07.02.00
M2
18.03
6.66
120.07
96.05
80.00%
24.01
20.00%
120.07
100.00%
08.00.00
CARPINTERIA METALICA
08.01.00
UND
1.00
285.00
285.00
285.00
100.00%
285.00
100.00%
08.02.00
PZA
1.00
775.12
775.12
775.12
100.00%
775.12
100.00%
08.03.00
M2
104.00
75.32
7,833.28
7,833.28
100.00%
7,833.28
100.00%
08.04.00
CERRADURA PUERTAS
UND
1.00
48.79
48.79
48.79
100.00%
48.79
100.00%
08.05.00
UND
1.00
295.00
295.00
295.00
100.00%
295.00
100.00%
08.06.00
BISAGRA TUBULAR
UND
9.00
9.46
85.10
85.10
100.00%
85.10
100.00%
09.00.00
09.01.00
P2
14.53
4.25
61.75
61.75
100.00%
10.00.00
INSTALACIONES SANITARIAS
10.01.00
SUMINISTRO DE TUBERIAS
10.01.01
1,795.82
5.52
9,915.62
6,940.93
70.00%
2,974.69
30.00%
9,915.62
100.00%
10.01.02
10.00
2.76
27.60
19.32
70.00%
8.28
30.00%
27.60
100.00%
10.02.00
INSTALACION DE TUBERIAS
10.02.01
769.41
70.00%
329.75
30.00%
1,099.15
100.00%
10.03.00
ACCESORIOS
10.03.01
UND
1.00
25.77
25.77
18.04
70.00%
7.73
30.00%
25.77
100.00%
10.03.02
UND
1.00
31.79
31.79
22.25
70.00%
9.54
30.00%
31.79
100.00%
10.04.00
PZA
4.00
17.70
70.80
70.80
100.00%
70.80
100.00%
10.05.00
GRIFO DE RIEGO
PZA
6.00
26.83
160.99
160.99
100.00%
160.99
100.00%
10.06.00
INSTALACION DE APARATOS
PZA
1.00
9.22
9.22
6.45
70.00%
2.77
30.00%
9.22
100.00%
10.07.00
UND
2.00
25.00
50.00
50.00
100.00%
50.00
100.00%
10.08.00
UND
1.00
76.00
76.00
76.00
100.00%
76.00
100.00%
10.09.00
UND
4.00
44.00
176.00
176.00
100.00%
176.00
100.00%
10.10.00
UND
4.00
38.00
152.00
152.00
100.00%
152.00
100.00%
10.11.00
UND
2.00
79.00
158.00
158.00
100.00%
158.00
100.00%
10.12.00
UND
1.00
95.00
95.00
95.00
100.00%
95.00
100.00%
10.13.00
1.00
245.00
245.00
245.00
100.00%
245.00
100.00%
10.14.00
UND
1.00
26.00
26.00
26.00
100.00%
26.00
100.00%
10.15.00
UND
2.00
32.00
64.00
64.00
100.00%
64.00
100.00%
10.16.00
UND
3.00
98.00
294.00
294.00
100.00%
294.00
100.00%
10.17.00
UND
1.00
295.00
295.00
295.00
100.00%
295.00
100.00%
671.95
M2
1,539.98
556.48
9,322.29
61.75
61.75
100.00%
9,943.22
1,099.15
M
1,795.82
0.61
1,099.15
8,648.57
Pgina 2
MUNICIPALIDAD DISTRITAL
DE MOLLEBAYA
FECHA: SETIEMBRE 2015
S10
2401001 MEJORAMIENTO DE POZO TUBULAR CON CASETA DE SEGURIDAD Y TANQUE ELEVADO, INSTALACION RED PARA PILETAS PUBLICAS DE AHASA Y MEJORAMIENTO DE CESPED CANCHA DE FUTBOL - MOLLEBAYA 2015
Subpresupuestos
001 MEJORAMIENTO DE POZO TUBULAR CON CASETA DE SEGURIDAD Y TANQUE ELEVADO, INSTALACION RED PARA PILETAS PUBLICAS DE AHASA Y MEJORAMIENTO DE CESPED CANCHA DE FUTBOL - MOLLEBAYA 2015
Cliente
Lugar
ITEM
DESCRIPCION
UNIDAD
METRADO
UNITARIO
PARCIAL
TOTAL
1 MES
MONTO
2 MES
%
MONTO
Costo al
08/09/2015
1/2 MES
PARCIAL
MONTO
MONTO
10.18.00
UND
1.00
35.00
35.00
35.00
100.00%
35.00
100.00%
10.19.00
UND
100.00
25.10
2,510.00
2,510.00
100.00%
2,510.00
100.00%
10.20.00
160.00
4.50
720.00
720.00
100.00%
720.00
100.00%
10.21.00
UND
100.00
7.50
750.00
750.00
100.00%
750.00
100.00%
10.22.00
TE PE 90MMX90MM C-12
UND
2.00
112.00
224.00
224.00
100.00%
224.00
100.00%
10.23.00
GLB
1.00
230.00
230.00
230.00
100.00%
230.00
100.00%
10.24.00
UND
1.00
1,800.00
1,800.00
1,800.00
100.00%
1,800.00
100.00%
10.25.00
UND
1.00
450.00
450.00
450.00
100.00%
450.00
100.00%
11.00.00
INSTALACIONES ELECTRICAS
11.01.00
UND
1.00
5,250.00
5,250.00
5,250.00
100.00%
5,250.00
100.00%
11.02.00
UND
1.00
3,190.00
3,190.00
3,190.00
100.00%
3,190.00
100.00%
11.03.00
80.00
17.50
1,400.00
1,400.00
100.00%
1,400.00
100.00%
11.04.00
80.00
7.90
632.00
632.00
100.00%
632.00
100.00%
11.05.00
1.00
395.00
395.00
395.00
100.00%
395.00
100.00%
11.06.00
UND
2.00
81.00
162.00
162.00
100.00%
162.00
100.00%
11.07.00
UND
1.00
233.00
233.00
233.00
100.00%
233.00
100.00%
11.08.00
UND
1.00
4,300.00
4,300.00
4,300.00
100.00%
4,300.00
100.00%
11.09.00
PTO
1.00
36.85
36.85
0.00
36.85
100.00%
11.10.00
INTERUPTOR SIMPLE
PTO
1.00
37.14
37.14
37.14
100.00%
37.14
100.00%
11.11.00
TOMACORRIENTE DOBLE
PTO
1.00
42.60
42.60
42.60
100.00%
42.60
100.00%
11.12.00
7.50
7.69
57.66
57.66
100.00%
57.66
100.00%
11.13.00
EQUIPOS DE BOMBEO
UND
1.00
4,000.00
4,000.00
4,000.00
100.00%
4,000.00
100.00%
11.14.00
UND
1.00
1,200.00
1,200.00
1,200.00
100.00%
1,200.00
100.00%
11.15.00
UND
1.00
850.00
850.00
850.00
100.00%
850.00
100.00%
11.16.00
UND
1.00
1,300.00
1,300.00
1,300.00
100.00%
1,300.00
100.00%
11.17.00
UND
1.00
850.00
850.00
850.00
100.00%
850.00
100.00%
11.18.00
UND
1.00
1,200.00
1,200.00
1,200.00
100.00%
1,200.00
100.00%
12.00.00
AREAS VERDES
12.01.00
M3
71.11
10.94
777.68
622.15
80.00%
155.54
20.00%
777.68
100.00%
12.02.00
SEMBRADO DE GRASS
M2
3,555.45
5.96
21,178.06
16,942.45
80.00%
4,235.61
20.00%
21,178.06
100.00%
13.00.00
PRUEBAS Y ENSAYOS
13.01.00
1,795.82
0.39
692.60
692.60
100.00%
692.60
100.00%
14.00.00
VARIOS
14.01.00
M3
0.15
128.62
19.29
19.29
100.00%
14.02.00
GLB
1.00
1,200.00
1,200.00
960.00
80.00%
14.03.00
GLB
1.00
48.47
48.47
25,136.25
36.85
100.00%
0.00
21,955.74
692.60
1,267.77
Costo Directo
38.81%
1,200.00
100.00%
48.47
100.00%
48.47
100.00%
22,388.66
13.18%
169,911.40
100.00%
169,911.40
65,948.35
5%
8,495.57
3,297.42
4,078.72
1,119.43
8,495.57
UTILIDAD
5%
8,495.57
3,297.42
4,078.72
1,119.43
8,495.57
186,902.54
72,543.18
89,731.83
24,627.52
186,902.54
33,642.46
13,057.77
16,151.73
4,432.95
33,642.46
220,544.99
85,600.95
IMPUESTO IGV
PRESUPUESTO TOTAL
18%
38.81%
105,883.56
48.01%
100.00%
20.00%
GASTOS GENERALES
SUB TOTAL
81,574.40
19.29
240.00
48.01%
29,060.48
13.18%
220,544.99
100.00%
Pgina 3
MUNICIPALIDAD DISTRITAL
DE MOLLEBAYA
FECHA: SETIEMBRE 2015
S10
2401001 MEJORAMIENTO DE POZO TUBULAR CON CASETA DE SEGURIDAD Y TANQUE ELEVADO, INSTALACION RED PARA PILETAS PUBLICAS DE AHASA Y MEJORAMIENTO DE CESPED CANCHA DE FUTBOL - MOLLEBAYA 2015
Subpresupuestos
001 MEJORAMIENTO DE POZO TUBULAR CON CASETA DE SEGURIDAD Y TANQUE ELEVADO, INSTALACION RED PARA PILETAS PUBLICAS DE AHASA Y MEJORAMIENTO DE CESPED CANCHA DE FUTBOL - MOLLEBAYA 2015
Cliente
Lugar
ITEM
DESCRIPCION
UNIDAD
METRADO
UNITARIO
PARCIAL
TOTAL
1 MES
MONTO
2 MES
%
MONTO
Costo al
08/09/2015
1/2 MES
PARCIAL
MONTO
MONTO
Pgina 4