ZTE Microwave Hardware Installation Flow

ZTE Microwave NR8250 Installation Detail

ZTE Microwave NR8950 installation Detail

ZTE Microwave NR8250 Installation Flow

ZTE Microwave NR8250 Installation (IDU installation)


Installing the IDU inside a 19-inch Portal Frame

ZTE Microwave NR8250 Installation (IDU installation)


Installing a Board

Step 1

Step 3

Step 2

Step 4

ZTE Microwave NR8250 Installation(ODU installation)


ZTE Microwave
hardware Installation
Adjusting
the Polarization
Mode of an ODU

Vertical Polarization

Horizontal Polarization

ZTE Microwave NR8250 Installation(ODU installation)


Adjusting the Polarization Mode of an ODU

Step 1 remove the Guide Pin

Step 2 Adjusting the Polarization

ZTE Microwave NR8250 Installation(ODU installation)


Integrated Installation(1+0)
Step 1 remove the waveguide diagram

Step 2 put the lubricant

ZTE Microwave NR8250 Installation(ODU installation)


Step 3 installation ODU

Step 4 Securing Screws

ZTE Microwave NR8250 Installation(ODU installation)


Separate Installation(1+0 )
Step 1 Install the ODU installation bracket

Step 2 Install the ODU on the ODU install bracket

ZTE Microwave NR8250 Installation(ODU installation)


Separate Installation(1+0 )
Step 3 Install the waveguide

Step 4 Use flexible waveguide clamps

ZTE Microwave NR8250 Installation(ODU installation)


Separate Installation(2+0 Dual-Polarization )
Step 1 Install the two ODU installation bracket

Step 2 Install the ODU on the ODU install bracket

ZTE Microwave NR8250 Installation(ODU installation)


Separate Installation(2+0 Dual-Polarization )
Step 3 Install the waveguide

Step 4 Use flexible waveguide clamps

ZTE Microwave NR8250 Installation(cable installation)


Installing the IDU protective Grounding Cable

ZTE Microwave NR8250 Installation(cable installation)


Installing the ODU protective Grounding Cable
a. Cut the protective
grounding cable and
crimp the terminals.
b. Fix one terminal of the
grounding cable on the
grounding screw of the
ODU
c. Connect the other end of
the protective grounding
cable to the grounding
busbar of the metal
tower.

ZTE Microwave NR8250 Installation(cable installation)


Installing Power Cable
Step 1:Markning the terminal

Step 2:Connect Power to the IDU

ZTE Microwave NR8250 Installation(cable installation)


Installing Power Cable
Step 3:Install B1 on the DCPD4A

Step 4:Bind the power cable

Step 5:Paste the engineering


labels at the two ends of the power
cable

ZTE Microwave NR8250 Installation(cable installation)


Installing Intermediate Frequency Cable
Step 1:Making IF Cable

Step 2:Layout and route the IF Cable

ZTE Microwave NR8250 Installation(cable installation)


Routing Intermediate Frequency Cable
Routing the IF cable indoors vertically

Routing the IF cable indoors Horizontally

ZTE Microwave NR8250 Installation(cable installation)


Grounding the IF Cable
a. If the antenna is installed on the metal tower , the IF cable should be grounded
at a point about 1-2m below the ODU ,and then be grounded at a point 1.5m
before the bent part where the cable is routed downwards along the tower .
b. If the IF cable is shorten than 20m, it must be grounded at the first two
grounding points
c. If the IF cable is longer than 20m but shorter than 60m,it must be grounded at
the three grounding points
d. If the IF cable is longer than 60m, an additional grounding point must be made
for every additional 20m IF cable.

ZTE Microwave NR8950 Installation Flow

ZTE Microwave NR8950 Installation Detail


Adjusting the Polarization Mode of an ODU
Removing the guide pin

Rotate the guide pin 90deg clockwise

place the guide pin on the hole

ZTE Microwave NR8950 Installation Detail


Integrated Installation(1+0)
Remove the waveguide diaphragm

Put the lubricant

ZTE Microwave NR8950 Installation Detail


Integrated Installation(1+0)
Install AOU

Fasten screws

ZTE Microwave NR8950 Installation Detail


Separate Installation(1+0)
Step 1: Install the ODU installation bracket Step 2: Install the NR8950 on the ODU install bracket

ZTE Microwave NR8950 Installation Detail


Separate Installation(1+0)
Step 3: Installing the Flexible Waveguide

Step 4: Fix the Flexible Waveguide and result

ZTE Microwave NR8950 Installation Detail


Separate Installation(2+0)
Step 1: Install the ODU installation bracket Step 2: Install the NR8950 on the ODU install bracket

ZTE Microwave NR8950 Installation Detail


Separate Installation(2+0)
Step 3: Install the Flexible Waveguide

Step 4: Fix the Flexible Waveguide and result

ZTE Microwave NR8950 Installation Detail


Installing the Protective grounding cable

ZTE Microwave NR8950 Installation Detail


Installing the Power Cable

ZTE Microwave NR8950 Installation Detail


Installing the Ethernet Cable

ZTE Microwave NR8950 Installation Detail


Installing the Optical Fiber

ZTE Microwave NR8950 Installation Detail


Installing the XPIC Cross-Connect Cables