No.
A-01
URAIAN
SATUAN
HARGA
SATUAN
(Rp)
HARGA
(Rp)
Btg
Semen Portland
Kg
25,000
1,406.00
3,515.00
Pasir beton
M3
0.0050
255,400.0
0
1,277.00
M3
0.0090
211,100.0
0
1,899.90
M3
0.0720
2,640,000 190,080.0
.00
0
Kg
0.0600 23,400.00
1,404.00
Residu
Kg
0.4000
3,240.00
Pekerja
Oh
Tukang Kayu
Oh
Kepala Tukang
Oh
0.0200 75,000.00
1,500.00
Mandor
Oh
0.0200 80,000.00
1,600.00
8,100.00
269,315.9
0
269,316.0
0
Jumlah
Dibulatkan
A-02
VOLUME
Btg
Semen Portland
Kg
25,000
1,406.00
Lbr
Pasir beton
M3
0.0050
255,400.0
0
1,277.00
M3
0.0090
211,100.0
0
1,899.90
M3
0.0720
2,640,000 190,080.0
.00
0
Kg
0.0600 23,400.00
Meni Besi
Kg
Pekerja
Oh
Tukang Kayu
Oh
Kepala Tukang
Oh
0.0200 75,000.00
1,500.00
Mandor
Oh
0.0200 80,000.00
1,600.00
1,404.00
355,235.9
0
355,236.0
0
Jumlah
Dibulatkan
A-03
3,515.00
Btg
Semen Portland
Kg
20,000
1,406.00
2,812.00
Kawat Duri
Kg
25,000 63,500.00
158,750.0
0
Pasir beton
M3
0.0050
255,400.0
0
1,277.00
M3
0.0090
211,100.0
0
1,899.90
Kg
0.0600 23,400.00
Pekerja
Oh
Tukang Kayu
Oh
Kepala Tukang
Oh
0.0200 75,000.00
1,500.00
Mandor
Oh
0.0200 80,000.00
1,600.00
222,842.9
0
222,843.0
0
Jumlah
Dibulatkan
A-04
M3
0.0120
Kg
0.0200 23,400.00
M3
0.0070
Pekerja
Oh
0.1000 42,000.00
4,200.00
Tukang Kayu
Oh
0.1000 65,000.00
6,500.00
Kepala Tukang
Oh
0.0100 75,000.00
750.00
Mandor
Oh
0.0050 80,000.00
400.00
Jumlah
468.00
2,071,700
14,501.90
.00
49,265.90
Dibulatkan
A-05
1,404.00
49,266.00
Btg
M3
0.1800
Paku Biasa
Kg
2,640,000 475,200.0
.00
0
Besi Strip
Kg
Semen Portland
Kg
350,000
Pasir Pasang
M3
0.1500
Pasir beton
M3
Koral Beton2/3
M3
Bata Merah
Bh
Seng Plat
m'
0.2500 15,815.00
Kawat harmonika
M2
M2
0.0800 87,400.00
Kunci Tanam
Bh
Lbr
0.0600
Pekerja
Oh
Tukang Kayu
Oh
20,000 65,000.00
Tukang Batu
Oh
Kepala Tukang
Oh
Mandor
Oh
0.0500 80,000.00
1,406.00 49,210.00
233,400.0
35,010.00
0
255,400.0
0.1000
25,540.00
0
211,100.0
0.1500
31,665.00
0
300,000
775.00 23,250.00
140,000.0
0
6,992.00
8,400.00
130,000.0
0
4,000.00
1,135,065
.75
1,135,066
.00
Jumlah
Dibulatkan
A-06
3,953.75
Btg
M3
0.2100
Paku Biasa
Kg
0.3000 23,400.00
Semen Portland
Kg
105,000
2,640,000 554,400.0
.00
0
7,020.00
1,406.00 14,763.00
255,400.0
7,662.00
0
211,100.0
0.0500
10,555.00
0
Pasir Beton
M3
0.0300
M3
Lbr
Pekerja
Oh
Tukang Kayu
Oh
20,000 65,000.00
Kepala Tukang
Oh
Mandor
Oh
0.0500 80,000.00
4,000.00
927,350.0
0
927,350.0
0
Jumlah
Dibulatkan
A-07
130,000.0
0
Btg
M3
0.1860
Paku Biasa
Kg
0.3000 23,400.00
Semen Portland
Kg
180,000
Pasir Beton
M3
0.0300
M3
Lbr
Pekerja
Oh
Tukang Kayu
Oh
20,000 65,000.00
Kepala Tukang
Oh
Mandor
Oh
0.0500 80,000.00
Jumlah
Dibulatkan
2,640,000 491,040.0
.00
0
7,020.00
1,406.00 25,308.00
255,400.0
7,662.00
0
211,100.0
0.0500
10,555.00
0
130,000.0
0
4,000.00
861,935.0
0
861,935.0
0
A-08
Pekerja
Oh
0.1000 42,000.00
4,200.00
Mandor
Oh
0.0500 80,000.00
4,000.00
Jumlah
8,200.00
8,200.00
Dibulatkan
A-09
M3
0.1500
M3
Pasir Pasang
M3
Pekerja
Oh
Mandor
Oh
0.0500 80,000.00
Jumlah
96,799.00
Dibulatkan
A-10
96,799.00
Oh
66,670 42,000.00
Mandor
Oh
Dibulatkan
1 M3 Bongkaran Dinding Tembok Bata Merah
-
Pekerja
Oh
66,670 42,000.00
280,014.0
0
Mandor
Oh
0.0330 80,000.00
2,640.00
Jumlah
Dibulatkan
A-12
280,014.0
0
Jumlah
A-11
4,000.00
282,654.0
0
282,654.0
0
199,200.0
0
264,000.0
0.5250
0
255,400.0
0.0740
0
211,100.0
0.1460
0
0.9860
Lbr
Btg
Pasir Beton
M3
Koral 2/3
M3
Kg
Pekerja
Oh
Tukang Batu
Oh
0.1250 65,000.00
8,125.00
Kepala Tukang
Oh
0.0120 75,000.00
900.00
Mandor
Oh
0.0190 80,000.00
1,520.00
450,000
18,899.60
30,820.60
1,406.00 63,270.00
474,296.4
0
474,296.0
0
Jumlah
Dibulatkan
A-13
196,411.2
0
138,600.0
0
Lbr
0.4340 14,900.00
6,466.60
Kg
67,860 18,300.00
124,183.8
0
Kg
0.0424 18,300.00
775.92
Baut
Semen Portland
bh
Kg
40,000
25,000
Pasir beton
M3
M3
Pekerja
Oh
Tukang Batu
Oh
0.1250 65,000.00
8,125.00
Kepala Tukang
Oh
0.0120 75,000.00
900.00
Mandor
Oh
0.0190 80,000.00
1,520.00
Jumlah
600.00
1,406.00
255,400.0
0.0050
0
211,100.0
0.0090
0
2,400.00
3,515.00
1,277.00
1,899.90
166,813.2
2
166,813.0
0
Dibulatkan
A-14
Kawat Duri
Kg
Pasir beton
M3
M3
Pekerja
Oh
Tukang Batu
Oh
0.1250 65,000.00
8,125.00
Kepala Tukang
Oh
0.0120 75,000.00
900.00
Mandor
Oh
0.0190 80,000.00
1,520.00
Lbr
Kg
171,300.0
74,344.20
0
20,000 1,406.00 2,812.00
158,750.0
25,000 63,500.00
0
255,400.0
0.0050
1,277.00
0
211,100.0
0.0090
1,899.90
0
0.4340
265,378.1
0
265,378.0
0
Jumlah
Dibulatkan
A-15
Bambu 6 - 10 (600) cm
btng
Tali ijuk
kg
0.2500 23,400.00
Pekerja
org
Tukang kayu
org
0.0170 65,000.00
1,105.00
Kepala tukang
org
0.0020 75,000.00
150.00
Mandor
org
0.0130 80,000.00
1,040.00
Jumlah
5,850.00
43,645.00
Dibulatkan
A-16
43,645.00
btng
Pekerja
org
Mandor
org
0.0250 80,000.00
Jumlah
Dibulatkan
Kembali ke Analisa AHS SNI
2,000.00
54,250.00
54,250.00
Berkut ini adalah contoh Analisa Harga Satuan (AHS) SNI tahun 2011 untuk pekerjaan tanah yang seri
B. ANALISA HARGA SATUAN PEKERJAAN TANAH
No.
B-01
URAIAN
SATUAN
VOLUME
HARGA
HARGA
SATUAN
(Rp)
(Rp)
1 M3
Galian
Tanah
Biasa
sedalam 1
m
-
Pekerja
Oh
Mandor
Oh
0.0400 80,000.00
Jumlah
20,000.00
Dibulatkan
B-02
20,000.00
1 M3
Galian
Tanah
Biasa
Sedalam
2m
-
Pekerja
Oh
Mandor
Oh
0.0520 80,000.00
Jumlah
4,160.00
26,252.00
Dibulatkan
B-03
3,200.00
26,252.00
1 M3
Galian
Tanah
Biasa
Sedalam
3m
-
Pekerja
Oh
Mandor
Oh
0.0730 80,000.00
Jumlah
36,710.00
Dibulatkan
B-04
36,710.00
1 M3
Galian
Tanah
Keras
Sedalam
1m
-
Pekerja
Oh
Mandor
Oh
0.0620 80,000.00
Jumlah
4,960.00
31,210.00
Dibulatkan
B-05
5,840.00
31,210.00
1 M3
Galian
Tanah
Lumpur
Sedalam
1m
-
Pekerja
Oh
Mandor
Oh
0.0830 80,000.00
Jumlah
Dibulatkan
Materi Terkait :
6,640.00
41,206.00
41,206.00
Untuk menghitung biaya pekerjaan pondasi bagunan rumah Anda diperlukan Analisa Harga Satuan Pe
C. ANALISA HARGA SATUAN PEKERJAAN PONDASI
No.
C-01
URAIAN
SATUAN
VOLUME
1 M3
Pasanag
Pondasi
batu Kali
adk 1pc :
3 ps
-
Batu
Belah
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
M3
Kg
M3
205,500.0 226,050.0
0
0
284,012.0
2,020,000 1,406.00
0
233,400.0 113,199.0
0.4850
0
0
11,000
Oh
Oh
Oh
0.0600 75,000.00
4,500.00
Oh
0.0750 80,000.00
6,000.00
735,761.0
0
735,761.0
0
Jumlah
Dibulatkan
C-02
HARGA
HARGA
SATUAN
(Rp)
(Rp)
1 M3
Pasang
Pondasi
Batu kali
adk 1pc :
4ps
-
Batu
Belah
Semen
Portland
Pasir
Pasang
M3
Kg
M3
205,500.0 226,050.0
0
0
229,178.0
1,630,000 1,406.00
0
233,400.0 121,368.0
0.5200
0
0
11,000
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Oh
Oh
Oh
0.0600 75,000.00
4,500.00
Oh
0.0750 80,000.00
6,000.00
689,096.0
0
689,096.0
0
Jumlah
Dibulatkan
C-03
1 M3
Pasang
Pondasi
Batu kali
adk 1pc :
5ps
-
Batu
Belah
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
M3
Kg
M3
205,500.0 226,050.0
0
0
191,216.0
1,360,000 1,406.00
0
233,400.0 126,969.6
0.5440
0
0
11,000
Oh
Oh
Oh
0.0600 75,000.00
4,500.00
Oh
0.0750 80,000.00
6,000.00
656,735.6
0
656,736.0
0
Jumlah
Dibulatkan
C-04
1 M3
Pasang
Pondasi
Batu
Kosong
(aanstam
ping)
-
Batu
Belah
M3
Pasir Urug
M3
205,500.0 246,600.0
0
0
175,300.0
0.3000
52,590.00
0
12,000
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan
Materi Terkait :
Oh
Oh
Oh
0.0390 75,000.00
2,925.00
Oh
0.0390 80,000.00
3,120.00
363,345.0
0
363,345.0
0
Analisa Harga Satuan Pekerjaaan Pondasi. Berikut adalah contoh analisa pekerjaan pondasi (AHS SNI tahun 201
ndasi (AHS SNI tahun 2011). Pada dasarnya yang selalu berubah setiap tahun pada analisa harga satuan, adalah
lisa harga satuan, adalah harga bahan dan upah, sedangkan koefisien (volume pek.) tetap.
URAIAN
D-17r2
1 M3 Sloof
Beton
Tulang
15/20
(180 kg
besi +
bekisting)
4dia. 12
ring 8-15
SAT
VOLUME
HRG.SAT
JUMLAH
769.5
Kayu
papan
terentang
M3
0.2700 2,850,000
Paku
Biasa 2" 5"
Kg
20,000
Kg
1,800,000
Kg
30,000
27.7
83.1
Kg
3,230,000
1.2
387.6
M3
0.5200
225
117
M3
0.7800
200
156
Oh
48,500
55
266.75
Oh
0.3500
70
24.5
Oh
15,600
70
109.2
Oh
14,000
70
98
Oh
0.3310
80
26.48
Oh
0.1700
85
14.45
5,069,380
Besi
Beton
Kawat
Beton
Semen
Portland
Pasir
Beton
Koral
Beton 2/3
Pekerja
Tukang
Batu
Tukang
Kayu
Tukang
Besi
Kepala
Tukang
Mandor
Jumlah
Dibulatka
n
23.4
46.8
16.5 2,970,000
5,069,380
1 M3
Kolom
Beton
Tulang
15/20
(180 kg
besi +
bekisting)
4dia.12 815
Kayu
papan
terentang
M3
Paku
Biasa 2" 5"
Kg
40,000
Minyak
Bekisting
Besi
Beton
Kawat
Beton
Semen
Portland
Pasir
Beton
Ltr
23.4
93.6
40.5
Kg
1,800,000
Kg
18,000
27.7
49.86
Kg
3,230,000
1.2
387.6
M3
0.5200
225
117
Koral
Beton 2/3
M3
0.7800
200
156
Kayu
Balok
Terentang
M3
0.1500 2,640,000
396
Dolken 8-10/4m
Pekerja
Tukang
Batu
Tukang
Kayu
Tukang
Besi
Kepala
Tukang
Mandor
Jumlah
16.5 2,970,000
Btg
200,000
15
300
Oh
73,000
55
401.5
Oh
0.3500
70
24.5
Oh
33,000
70
231
Oh
21,000
70
147
Oh
0.5700
80
45.6
Oh
0.2500
85
21.25
6,480,910
Dibulatka
n
6,481,000
1 M3
Balok
Beton
Tulang
15/20
sofi-sofi,
ring balk
+ balok
poratl
(180 kg
besi +
bekisting)
4dia. 12,
8-15
Kayu
papan
terentang
M3
0.3200 2,850,000
Paku
Biasa 2" 5"
Kg
32,000
Kg
1,800,000
Kg
22,500
27.7
62.325
Kg
3,230,000
1.2
387.6
M3
0.5200
225
117
Koral
Beton 2/3
M3
0.7800
200
156
Kayu
Balok
Terentang
M3
0.1400 2,640,000
369.6
Besi
Beton
Kawat
Beton
Semen
Portland
Pasir
Beton
Dolken 8-10/4m
Pekerja
Tukang
Batu
Tukang
Kayu
Tukang
Besi
23.4
912
74.88
16.5 2,970,000
Btg
160,000
15
240
Oh
59,600
55
327.8
Oh
0.3500
70
24.5
Oh
28,000
70
196
Oh
14,000
70
98
Kepala
Tukang
Mandor
Jumlah
Dibulatka
n
D-29
Oh
0.4550
80
36.4
Oh
0.2080
85
17.68
6,412,865
6,413,000
1 M3
Tangga
Beton
Tulang (90
kg besi +
bekisting)
Kayu
papan
terentang
M3
0.2500 2,850,000
Paku
Biasa 2" 5"
Kg
30,000
23.4
70.2
Ltr
12,000
40.5
48.6
Kg
900,000
Kg
30,000
27.7
83.1
Kg
3,230,000
1.2
387.6
M3
0.5200
225
117
Koral
Beton 2/3
M3
0.7800
200
156
Kayu
Balok
Terentang
M3
0.1050 2,640,000
277.2
Minyak
Bekisting
Besi
Beton
Kawat
Beton
Semen
Portland
Pasir
Beton
Dolken 8-10/4m
Pekerja
Tukang
Batu
Tukang
Kayu
Tukang
Besi
Kepala
Tukang
712.5
16.5 1,485,000
Btg
140,000
15
210
Oh
56,000
55
308
Oh
0.3500
70
24.5
Oh
23,000
70
161
Oh
14,000
70
98
Oh
0.4050
80
32.4
Mandor
Jumlah
Dibulatka
n
Oh
0.2020
85
17.17
4,188,720
4,189,000
1 M3
Membuat
Plat
Lantai Tb.
10 Cm
3 Beton
Bertulang
( 90 Kg
Besi +
Bekisting
)
Kayu
Terentang
M3
Paku
Biasa 2" 5"
Kg
40,000
23.4
93.6
Minyak
Bekisting
Ltr
20,000
40.5
81
Besi
Beton
Polos
Kg
900,000
Kawat
Beton
Kg
30,000
27.7
83.1
Kayu
Balok
Terentang
M3
0.1050
151.1
15.866
Plywood
Tebal 9
mm
Lbr
35,000
151.1
528.85
Dolken
kayu
Galam o 8-10/4 m
Btg
600,000
15
900
Kg
3,230,000
1.2
387.6
M3
0.5200
225
117
M3
0.7800
200
156
Semen
Portland
Pasir
Beton
Koral
Beton 2/3
16.5 1,485,000
Pekerja
Tukang
Batu
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah
Dibulatka
n
Materi Terkait :
Oh
52,000
55
286
Oh
0.3500
70
24.5
Oh
33,000
70
231
Oh
0.3650
80
29.2
Oh
10,600
85
90.1
5,648,816
5,649,000
Berikut adalah penggalan analisa harga satuan (AHS-SNI 2011) untuk pekerjaan dinding yang biasa di
E. ANALISA HARGA SATUAN PEKERJAAN DINDING
No.
E-01
URAIAN
1
-
SATUAN
VOLUME
HARGA
SATUAN
(Rp)
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Oh
Oh
Oh
0.0200 75,000.00
1,500.00
Oh
0.0300 80,000.00
2,400.00
220,267.1
0
220,267.0
0
Dibulatka
n
(Rp)
Jumlah
E-02
HARGA
M2
Pasang
Bata
Merah
Tebal 1
Bata,
1pc : 4ps
Bata
Merah
Semen
Portland
Pasir
Pasang
775.00
108,500.0
0
Bh
1,400,000
Kg
265,500
1,406.00 37,329.30
M3
0.0930
233,400.0
21,706.20
0
Pekerja
Oh
Tukang
Batu
Oh
Kepala
Tukang
Oh
0.0200 75,000.00
1,500.00
Mandor
Oh
0.0300 80,000.00
2,400.00
211,735.5
0
211,736.0
0
Jumlah
Dibulatka
n
E-03
M2
Pasang
Bata
Merah
Tebal 1
Bata,
1pc : 5ps
Bata
Merah
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
775.00
1,400,000
Kg
222,000
1,406.00 31,213.20
M3
0.1020
233,400.0
23,806.80
0
Oh
Oh
Oh
0.0200 75,000.00
1,500.00
Oh
0.0300 80,000.00
2,400.00
207,720.
00
207,720.
00
Jumlah
E-04
1
-
108,500.0
0
Bh
Dibulatk
an
M2 Pasang Bata Merah Tebal
1/2 Bata, 1pc : 3ps
Bata
Bh
700,000
775.00 54,250.00
Merah
Semen
Kg
143,700 1,406.00 20,204.22
Portland
Pasir
233,400.0
M3
0.0400
9,336.00
Pasang
0
Pekerja
Tukang
Batu
Kepala
Tukang
Oh
Oh
0.1000 65,000.00
6,500.00
Oh
0.0100 75,000.00
750.00
Mandor
Oh
0.0150 80,000.00
105,680.
22
105,680.
00
Jumlah
E-05
1
-
Dibulatk
an
M2 Pasang Bata Merah Tebal
1/2 Bata, 1pc : 4ps
Bata
Bh
700,000
775.00 54,250.00
Merah
Semen
Kg
115,000 1,406.00 16,169.00
Portland
Pasir
233,400.0
M3
0.0430
10,036.20
Pasang
0
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Oh
Oh
0.1000 65,000.00
6,500.00
Oh
0.0100 75,000.00
750.00
Oh
0.0150 80,000.00
1,200.00
102,345.
20
102,345.
00
Jumlah
E-06
1
-
1,200.00
Dibulatk
an
M2 Pasang Bata Merah Tebal
1/2 Bata, 1pc : 5ps
Bata
Bh
700,000
775.00 54,250.00
Merah
Semen
Kg
96,800 1,406.00 13,610.08
Portland
Pasir
233,400.0
M3
0.0450
10,503.00
Pasang
0
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah
Dibulatk
an
Oh
Oh
0.1000 65,000.00
6,500.00
Oh
0.0100 75,000.00
750.00
Oh
0.0150 80,000.00
1,200.00
100,253.
08
100,253.
00
Materi Terkait :
an dinding yang biasa digunakan untuk menghitung biaya pekerjaan dinding pada rumah tinggal. Keseluruhan
ah tinggal. Keseluruhan analisa pekerjaan dinding untuk berbagai ukuran ketebalan dinding dan komposisi adu
URAIAN
SATUAN
VOLUME
HARGA
SATUAN
(Rp)
HARGA
(Rp)
1 M2
Plesteran
adk. 1pc :
2ps Tebal
15 mm
F-01
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Kg
85,200
1,406.00 11,979.12
M3
0.0170
233,400.0
0
3,967.80
Oh
0.2000 42,000.00
8,400.00
Oh
0.1500 65,000.00
9,750.00
Oh
0.0150 75,000.00
1,125.00
Oh
0.0100 80,000.00
800.00
36,021.9
2
36,022.0
0
Jumlah
Dibulatkan
1 M2
Plesteran
adk. 1pc :
3ps Tebal
15 mm
F-02
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Kg
64,800
1,406.00
9,110.88
M3
0.0190
233,400.0
0
4,434.60
Oh
0.2000 42,000.00
8,400.00
Oh
0.1500 65,000.00
9,750.00
Oh
0.0150 75,000.00
1,125.00
Mandor
Oh
0.0100 80,000.00
800.00
33,620.4
8
33,620.0
0
Jumlah
Dibulatkan
1 M2
Plesteran
adk. 1pc :
4ps Tebal
15 mm
F-03
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Kg
52,000
1,406.00
7,311.20
M3
0.0200
233,400.0
0
4,668.00
Oh
0.2000 42,000.00
8,400.00
Oh
0.1500 65,000.00
9,750.00
Oh
0.0150 75,000.00
1,125.00
Oh
0.0100 80,000.00
800.00
32,054.2
0
32,054.0
0
Jumlah
Dibulatkan
1 M2
Plesteran
adk. 1pc :
3ps Tebal
20 mm
F-04
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah
Kg
108,000
1,406.00 15,184.80
M3
0.0260
Oh
Oh
Oh
0.0200 75,000.00
1,500.00
Oh
0.0125 80,000.00
1,000.00
233,400.0
0
6,068.40
47,253.2
0
47,253.0
0
Dibulatkan
1 M2
Plesteran
adk. 1pc :
4ps Tebal
20 mm
F-05
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Kg
86,800
1,406.00 12,204.08
M3
0.0280
Oh
Oh
Oh
0.0200 75,000.00
1,500.00
Oh
0.0125 80,000.00
1,000.00
233,400.0
0
6,535.20
44,739.2
8
44,739.0
0
Jumlah
Dibulatkan
1 M2
Plesteran
adk.
1pc:5ps
tebal 20
mm
F-06
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan
Kg
72,900
1,406.00 10,249.74
M3
0.0260
Oh
Oh
Oh
0.0200 75,000.00
1,500.00
Oh
0.0125 80,000.00
1,000.00
233,400.0
0
6,068.40
42,318.1
4
42,318.0
0
1 M2
Acian
Plesteran
F-11
-
Semen
Portland
Kg
40,000
1,406.00
5,624.00
Pekerja
Oh
0.1430 42,000.00
6,006.00
Oh
0.1070 65,000.00
6,955.00
Oh
0.0105 75,000.00
787.50
Oh
0.0105 80,000.00
840.00
Tukang
batu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan
Materi Terkait :
20,212.5
0
20,213.0
0
Untuk menghitung pekerjaan penutup atap seperti genting plentong, genting morando, genting keram
G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP
HARGA
No.
URAIAN
SATUAN
VOLUME
SATUAN
(Rp)
(Rp)
M2
Pasang
1 Atap
Genteng
Palentong
G-01
Genteng
palentong
Bh
Pekerja
Oh
0.1500 42,000.00
6,300.00
Oh
0.0750 65,000.00
4,875.00
Oh
0.0080 75,000.00
600.00
Oh
0.0080 80,000.00
640.00
Tukang
kayu
Kepala
tukang
Mandor
250,000
1,900.00 47,500.00
59,915.0
0
59,915.0
0
Jumlah
Dibulatk
an
G-02
HARGA
1 M2 Pasang
Genteng Bubung
Palentong
-
Genteng
bubung
palentong
Semen
Portland
Pasir
pasang
Bh
50,000
6,000.00 30,000.00
Kg
80,000
1,406.00 11,248.00
M3
0.0320
233,400.0
0
7,468.80
Pekerja
Oh
Tukang
kayu
Oh
Kepala
tukang
Oh
0.0200 75,000.00
1,500.00
Mandor
Oh
0.0020 80,000.00
160.00
80,176.8
0
80,177.0
0
Jumlah
G-03
Dibulatk
an
1 M2 Pasang Roof Light
Fibreglass ( 180 x 90 ) cm
Roof light
Lbr
fibreglass
0.6000
100,000.0
60,000.00
0
Paku
biasa " 1"
Kg
0.0500 23,800.00
1,190.00
Pekerja
Oh
0.1400 42,000.00
5,880.00
Oh
0.0670 65,000.00
4,355.00
Oh
0.0070 75,000.00
525.00
Oh
0.0070 80,000.00
560.00
Tukang
kayu
Kepala
tukang
Mandor
72,510.0
0
72,510.0
0
Jumlah
Dibulatk
an
G-04
1 M2 Pasang Atap
Asbes Gelombang
( 3,00 x 1,05 m ) x 4
mm
-
Asbes
gelomban
g
Lbr
Paku seng
Kg
0.1200 23,800.00
2,856.00
Pekerja
Oh
0.1400 42,000.00
5,880.00
Oh
0.0700 65,000.00
4,550.00
Oh
0.0070 75,000.00
525.00
Oh
0.0070 80,000.00
560.00
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
42,371.0
0
42,371.0
0
Dibulatkan
G-05
Asbes
gelomban
g
Lbr
Paku seng
Kg
0.1200 23,800.00
2,856.00
Pekerja
Oh
0.1400 42,000.00
5,880.00
Oh
0.0700 65,000.00
4,550.00
Oh
0.0070 75,000.00
525.00
Oh
0.0070 80,000.00
560.00
Tukang
kayu
Kepala
tukang
Mandor
45,157.0
0
45,157.0
0
Jumlah
Dibulatk
an
G-06
1 M2 Pasang Atap
Asbes Gelombang
( 2,40 x 1,05 m ) x 4
mm
-
Asbes
gelomban
g
Lbr
Paku seng
Kg
0.1200 23,800.00
2,856.00
Pekerja
Oh
0.1400 42,000.00
5,880.00
Oh
0.0670 65,000.00
4,355.00
Oh
0.0070 75,000.00
525.00
Oh
0.0070 80,000.00
560.00
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatk
an
43,172.0
0
43,172.0
0
M2
Pasang
Atap
Asbes
1
Gelomban
g ( 2,10 x
1,05 m ) x
4 mm
G-07
Asbes
gelomban
g
Lbr
Paku seng
Kg
0.1200 23,800.00
2,856.00
Pekerja
Oh
0.1400 42,000.00
5,880.00
Oh
0.0670 65,000.00
4,355.00
Oh
0.0070 75,000.00
525.00
Oh
0.0070 80,000.00
560.00
Tukang
kayu
Kepala
tukang
Mandor
44,011.0
0
44,011.0
0
Jumlah
Dibulatk
an
G-08
1 M2 Pasang Atap
Asbes Gelombang
( 1,50 x 1,05 m ) x 4
mm
-
Asbes
gelomban
g
Lbr
Paku seng
Kg
0.1200 23,800.00
2,856.00
Pekerja
Oh
0.1400 42,000.00
5,880.00
Oh
0.0670 65,000.00
4,355.00
Oh
0.0070 75,000.00
525.00
Oh
0.0070 80,000.00
560.00
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatk
an
48,016.0
0
48,016.0
0
G-09
Nok stel
gelomban
g
Lbr
Paku
sekrup
3,5"
Bh
60,000
800.00
4,800.00
Pekerja
Oh
0.0840 42,000.00
3,528.00
Oh
0.1250 65,000.00
8,125.00
Oh
0.0130 75,000.00
975.00
Oh
0.0040 80,000.00
320.00
Tukang
kayu
Kepala
tukang
Mandor
97,758.0
0
97,758.0
0
Jumlah
G-10
Dibulatk
an
1 M2 Pasang Atap
Genteng Beton
Genteng
beton
bh
110,000
8,500.00 93,500.00
Paku
biasa 2" 5"
Kg
0.0300 23,400.00
702.00
Pekerja
Oh
0.2000 42,000.00
8,400.00
Oh
0.1000 65,000.00
6,500.00
Oh
0.0100 75,000.00
750.00
Oh
0.0100 80,000.00
800.00
Tukang
kayu
Kepala
tukang
Mandor
110,652.
00
110,652.
00
Jumlah
Dibulatkan
G-11
1 M2 Pasang Atap
Genteng Murando
Natural
-
Genteng
murando
natural
bh
Pekerja
Oh
180,000
2,700.00 48,600.00
0.1500 42,000.00
6,300.00
Tukang
kayu
Kepala
tukang
Mandor
Oh
0.0750 65,000.00
4,875.00
Oh
0.0080 75,000.00
600.00
Oh
0.0080 80,000.00
640.00
61,015.0
0
61,015.0
0
Jumlah
Dibulatk
an
G-12
1 M2 Pasang Atap
Genteng Murando
Glazur
-
Genteng
murando
glazur
bh
Pekerja
Oh
0.1500 42,000.00
6,300.00
Oh
0.0750 65,000.00
4,875.00
Oh
0.0080 75,000.00
600.00
Oh
0.0080 80,000.00
640.00
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatk
an
Materi Terkait :
180,000
4,000.00 72,000.00
84,415.0
0
84,415.0
0
morando, genting keramik, genting beton dll. diperlukan analisa harga satuan penutup atap. Berikut adalah pe
p atap. Berikut adalah penggalan AHS SNI 2011 penutup atap yang biasa digunakan untuk menghitung RAB Rum
Berikut ini adalah penggalan Analisa Harga Satuan Pekerjaan untuk menghitung biaya pekerjaan lang
H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT
HARGA
No.
URAIAN
SATUAN
VOLUME
SATUAN
(Rp)
(Rp)
1 M2 Langit-langit
H-01
Asbes ( 1,00 x 1,00 )
m, tebal 5 mm
(Rp)
(Rp)
Pelat
asbes
tebal 4
mm
m2
Paku seng
Kg
0.0100 23,800.00
238.00
Pekerja
Oh
0.0300 42,000.00
1,260.00
Oh
0.0700 65,000.00
4,550.00
Oh
0.0070 75,000.00
525.00
Oh
0.0015 80,000.00
120.00
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
31,443.00
Dibulatkan
H-02
HARGA
31,443.00
1 M2 Langit-langit
Asbes ( 1,00 x 1,00 )
m, tebal 3,5 mm
-
Pelat
asbes
tebal 3,5
mm
Lbr
Paku seng
Kg
0.0100 23,800.00
238.00
Pekerja
Oh
0.0300 42,000.00
1,260.00
Oh
0.0700 65,000.00
4,550.00
Oh
0.0070 75,000.00
525.00
Tukang
kayu
Kepala
tukang
Mandor
Oh
0.0015 80,000.00
Jumlah
28,143.00
Dibulatkan
H-03
28,143.00
1 M2 Langit-langit Akustik ( 60
x 120 ) cm
-
Akustik
600 x
1200
Lbr
15,000
Paku
Kg
0.0500 23,800.00
1,190.00
Pekerja
Oh
0.0600 42,000.00
2,520.00
Oh
0.1000 65,000.00
6,500.00
Oh
0.0100 75,000.00
750.00
Oh
0.0030 80,000.00
240.00
Tukang
kayu
Kepala
tukang
Mandor
132,800.0 199,200.0
0
0
210,400.0
0
210,400.0
0
Jumlah
Dibulatkan
H-04
120.00
Profil
Alluminiu
m "T"
Kawat f 4
mm
Ramset /
dina bolt
Kg
0.1500 28,200.00
4,230.00
Bh
10,500
7,560.00
7,200.00
Akustik
600 x
1200
Lbr
15,000
Pekerja
Oh
0.1500 42,000.00
Oh
Oh
0.0500 75,000.00
3,750.00
Oh
0.0075 80,000.00
600.00
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
132,800.0 199,200.0
0
0
6,300.00
298,060.0
0
298,060.0
0
1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka
kayu borneo super
Dibulatkan
H-05
Kayu
Balok
Borneo
Super
M3
0.0230
Paku
biasa 2" 5"
Kg
0.0600 23,400.00
Teakwood
120 cm x
240 cm x
0,4 cm
Lbr
0.3900
Pekerja
Oh
Oh
Oh
0.0400 75,000.00
3,000.00
Oh
0.0135 80,000.00
1,080.00
Tukang
kayu
Kepala
tukang
Mandor
2,640,000
60,720.00
.00
131,700.0
51,363.00
0
154,907.0
0
154,907.0
0
Jumlah
Dibulatkan
H-06
1,404.00
Kayu
Balok
Borneo
Super
M3
0.0230
Paku
biasa 2" 5"
Kg
0.0600 23,400.00
Teakwood
(120 x
240x 0,3)
cm
Lbr
0.3900
Pekerja
Oh
Oh
Oh
0.0400 75,000.00
Tukang
kayu
Kepala
tukang
2,640,000
60,720.00
.00
1,404.00
129,100.0
50,349.00
0
3,000.00
Mandor
Oh
0.0135 80,000.00
153,893.0
0
153,893.0
0
Jumlah
Dibulatkan
H-07
Kayu
Balok
Borneo
Super
M3
0.0230
Paku
biasa 2" 5"
Kg
0.0600 23,800.00
Triplek
120 cm x
240 cm x
0,4 cm
Lbr
Pekerja
Oh
Oh
Oh
0.0400 75,000.00
3,000.00
Oh
0.0135 80,000.00
1,080.00
Tukang
kayu
Kepala
tukang
Mandor
2,640,000
60,720.00
.00
1,428.00
128,684.0
0
128,684.0
0
Jumlah
Dibulatkan
H-08
1,080.00
Hollow
4/4
Zincromat
e
Hollow
2/4
Zincromat
e
Gypsum
board
( 120 x
240 x 9 )
mm
Paku
gypsum
Btg
Btg
0.1500 22,600.00
Lbr
kg
0.1100 17,500.00
3,390.00
1,925.00
Ramset /
dina bolt
Cotton
plaster
Bh
40,000
7,200.00 28,800.00
Bh
0.0720 15,000.00
1,080.00
Compoun
Zak
0.1250 75,000.00
9,375.00
Pekerja
Oh
0.1000 42,000.00
4,200.00
Oh
0.0500 65,000.00
3,250.00
Oh
0.0050 75,000.00
375.00
Oh
0.0050 80,000.00
400.00
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
93,960.20
Dibulatkan
H-09
93,960.00
Hollow
4/4
Zincromat
e
Btg
Hollow
2/4
Zincromat
e
Btg
0.1500 22,600.00
GRC ( 120
x 240 x
4 ) mm
Lbr
Paku GRC
kg
0.1100 35,000.00
Bh
40,000
Bh
0.0720 15,000.00
1,080.00
Ramset /
dina bolt
Cotton
plaster
3,390.00
3,850.00
7,200.00 28,800.00
Compoun
Zak
0.1250 75,000.00
9,375.00
Pekerja
Oh
0.1000 42,000.00
4,200.00
Oh
0.0500 65,000.00
3,250.00
Oh
0.0050 75,000.00
375.00
Oh
0.0050 80,000.00
400.00
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
91,408.00
Dibulatkan
H-10
91,408.00
Kayu
Balok
Borneo
Super
Paku
biasa 2" 5"
Gypsum
board
( 120 x
240 x 9 )
mm
Paku
sekrup
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
2,640,000
60,720.00
.00
M3
0.0230
Kg
0.0600 23,800.00
Lbr
kg
0.1100 17,500.00
Oh
Oh
Oh
0.0400 75,000.00
3,000.00
Oh
0.0135 80,000.00
1,080.00
1,925.00
136,615.0
0
136,615.0
0
Jumlah
Dibulatkan
H-11
1,428.00
Kayu
Balok
Borneo
Super
M3
0.0230
Paku
biasa 2" 5"
Kg
0.0600 23,800.00
GRC ( 120
x 240 x
4 ) mm
Lbr
Paku GRC
kg
0.1100 35,000.00
Pekerja
Oh
2,640,000
60,720.00
.00
1,428.00
3,850.00
Tukang
kayu
Kepala
tukang
Mandor
Oh
Oh
0.0400 75,000.00
3,000.00
Oh
0.0135 80,000.00
1,080.00
133,743.0
0
133,743.0
0
Jumlah
Dibulatkan
H-12
List Kayu
profil
Paku
Kg
0.0100 23,800.00
238.00
Pekerja
Oh
0.0500 42,000.00
2,100.00
Oh
0.0500 65,000.00
3,250.00
Oh
0.0050 75,000.00
375.00
Oh
0.0030 80,000.00
240.00
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
37,073.00
Dibulatkan
H-13
37,073.00
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatkan
10,500
8,500.00
8,925.00
Kg
0.1500 12,500.00
1,875.00
Oh
0.0500 42,000.00
2,100.00
Oh
0.0500 65,000.00
3,250.00
Oh
0.0050 75,000.00
375.00
Oh
0.0030 80,000.00
240.00
16,765.00
16,765.00
Materi Terkait :
2011)
I-01
URAIAN
SATUAN
VOLUME
HARGA
SATUAN
(Rp)
(Rp)
1 M2 Lantai Ubin
Granito ukuran 40 x
40 cm Setara
Essenza
-
Granito
40 x 40
cm
m2
10,500
345,000.0 362,250.0
0
0
1,406.00 13,778.80
Semen
portland
Pasir
pasang
Semen
warna
Kg
98,000
M3
0.0215
Kg
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
233,400.0
0
5,018.10
421,656.9
0
421,657.0
0
Jumlah
Dibulatkan
I-02
HARGA
1 M2 Lantai Ubin
Granito ukuran 30 x
30 cm Setara
Essenza
-
Granito
30 x 30
cm
Semen
portland
Pasir
pasang
Semen
warna
m2
10,500
322,800.0 338,940.0
0
0
Kg
100,000
1,406.00 14,060.00
M3
0.0215
Kg
233,400.0
0
5,018.10
Pekerja
Tukang
batu
Kepala
tukang
Mandor
Oh
Oh
0.1250 65,000.00
8,125.00
Oh
0.0125 75,000.00
937.50
Oh
0.0130 80,000.00
1,040.00
402,590.6
0
402,591.0
0
Jumlah
Dibulatkan
I-03
1 M Plint Ubin
Granito ukuran 10 x
40 cm Setara
Essenza
-
Plint
granito 10
x 40 cm
Bh
Semen
portland
Pasir
pasang
Semen
warna
Kg
12,000
1,406.00
1,687.20
M3
0.0030
233,400.0
0
700.20
Kg
0.1000 15,700.00
1,570.00
Pekerja
Oh
0.0600 42,000.00
2,520.00
Oh
0.0300 65,000.00
1,950.00
Oh
0.0030 75,000.00
225.00
Oh
0.0030 80,000.00
240.00
Tukang
batu
Kepala
tukang
Mandor
Jumlah
82,032.40
Dibulatkan
I-04
82,032.00
1 M Plint Ubin
Granito ukuran 10 x
30 cm Setara
Essenza
-
Plint
granito 10
x 30 cm
Bh
Semen
portland
Pasir
pasang
Semen
warna
Kg
16,500
1,406.00
2,319.90
M3
0.0032
233,400.0
0
746.88
Kg
0.1000 15,700.00
1,570.00
Pekerja
Oh
0.0900 42,000.00
3,780.00
Oh
0.0900 65,000.00
5,850.00
Oh
0.0090 75,000.00
675.00
Oh
0.0045 80,000.00
360.00
Tukang
batu
Kepala
tukang
Mandor
101,548.7
8
101,549.0
0
Jumlah
Dibulatkan
I-05
Keramik
corak 10 x
20 cm
m2
Semen
portland
Pasir
pasang
Semen
warna
Kg
80,000
M3
0.0215
233,400.0
0
5,018.10
Kg
0.0130 15,700.00
204.10
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
Jumlah
92,670.20
Dibulatkan
I-06
1,406.00 11,248.00
92,670.00
1 M2 Lantai Keramik
corak 20 x 20 cm
setara Mulia
-
Keramik
corak 20 x
20 cm
m2
Semen
portland
Pasir
pasang
Semen
warna
Kg
80,000
M3
0.0215
233,400.0
0
5,018.10
Kg
0.0130 15,700.00
204.10
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
1,406.00 11,248.00
Jumlah
99,170.20
Dibulatkan
I-07
99,170.00
1 M2 Lantai Keramik
polos 30 x 30 cm
setara Mulia
-
Keramik
polos 30 x
30 cm
Semen
portland
Pasir
pasang
Semen
warna
Kg
80,000
M3
0.0215
233,400.0
0
5,018.10
Kg
0.0130 15,700.00
204.10
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
Jumlah
Dibulatkan
I-08
m2
1 M2 Lantai Keramik
corak 30 x 30 cm
Setara Mulia
1,406.00 11,248.00
89,670.20
89,670.00
Keramik
corak 30 x
30 cm
m2
Semen
portland
Pasir
pasang
Semen
warna
Kg
80,000
M3
0.0215
233,400.0
0
5,018.10
Kg
0.0130 15,700.00
204.10
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
1,406.00 11,248.00
Jumlah
94,670.20
Dibulatkan
I-09
94,670.00
1 M2 Lantai Keramik
polos 40 x 40 cm
Setara Mulia
-
Keramik
polos 40 x
40 cm
Semen
portland
Pasir
pasang
Semen
warna
Kg
80,000
M3
0.0215
233,400.0
0
5,018.10
Kg
0.0130 15,700.00
204.10
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
Jumlah
Dibulatkan
m2
1,406.00 11,248.00
93,470.20
93,470.00
I-10
1 M2 Lantai Keramik
corak 40 x 40 cm
Setara Mulia
-
Keramik
corak 40 x
40 cm
m2
Semen
portland
Pasir
pasang
Semen
warna
Kg
80,000
M3
0.0215
233,400.0
0
5,018.10
Kg
0.0130 15,700.00
204.10
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
1,406.00 11,248.00
102,170.2
0
102,170.0
0
Jumlah
Dibulatkan
I-11
Keramik
corak 10 x
20 cm
Semen
portland
Pasir
pasang
Semen
warna
Kg
80,000
M3
0.0215
233,400.0
0
5,018.10
Kg
0.0130 15,700.00
204.10
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
Jumlah
Dibulatkan
m2
1,406.00 11,248.00
108,870.2
0
108,870.0
0
I-12
1 M2 Lantai Keramik
corak 20 x 20 cm
setara Roman
-
Keramik
corak 20 x
20 cm
m2
Semen
portland
Pasir
pasang
Semen
warna
Kg
80,000
M3
0.0215
233,400.0
0
5,018.10
Kg
0.0130 15,700.00
204.10
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
1,406.00 11,248.00
111,870.2
0
111,870.0
0
Jumlah
Dibulatkan
I-13
1 M2 Lantai Keramik
polos 30 x 30 cm
setara Roman
-
Keramik
polos 30 x
30 cm
m2
Semen
portland
Pasir
pasang
Semen
warna
Kg
80,000
M3
0.0215
233,400.0
0
5,018.10
Kg
0.0130 15,700.00
204.10
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
Jumlah
1,406.00 11,248.00
105,570.2
0
105,570.0
0
Dibulatkan
I-14
1 M2 Lantai Keramik
corak 30 x 30 cm
Setara Roman
-
Keramik
corak 30 x
30 cm
M2
Semen
portland
Pasir
pasang
Semen
warna
Kg
80,000
M3
0.0215
233,400.0
0
5,018.10
Kg
0.0130 15,700.00
204.10
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
1,406.00 11,248.00
113,270.2
0
113,270.0
0
Jumlah
Dibulatkan
I-15
1 M2 Lantai Keramik
polos 40 x 40 cm
setara Roman
-
Keramik
polos 40 x
40 cm
m2
Semen
portland
Pasir
pasang
Semen
warna
Kg
80,000
M3
0.0215
233,400.0
0
5,018.10
Kg
0.0130 15,700.00
204.10
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
1,406.00 11,248.00
109,170.2
0
109,170.0
0
Jumlah
Dibulatkan
I-16
1 M2 Lantai Keramik
corak 40 x 40 cm
Setara Roman
-
Keramik
corak 40 x
40 cm
m2
Semen
portland
Pasir
pasang
Semen
warna
Kg
80,000
M3
0.0215
233,400.0
0
5,018.10
Kg
0.0130 15,700.00
204.10
Pekerja
Oh
Oh
0.1200 65,000.00
7,800.00
Oh
0.0120 75,000.00
900.00
Oh
0.0125 80,000.00
1,000.00
Tukang
batu
Kepala
tukang
Mandor
1,406.00 11,248.00
113,670.2
0
113,670.0
0
Jumlah
Dibulatkan
I-17
1 M2 Lantai Marmer
-
Marmer
m2
10,600
550,000.0 583,000.0
0
0
Semen
portland
Pasir
pasang
Semen
warna
Kg
81,900
1,406.00 11,515.14
M3
0.0450
233,400.0
10,503.00
0
Kg
Pekerja
Oh
Oh
Oh
0.0350 75,000.00
2,625.00
Oh
0.0350 80,000.00
2,800.00
Tukang
batu
Kepala
tukang
Mandor
Jumlah
672,798.1
4
672,798.0
0
Dibulatkan
I-18
1 M2 Lantai Parquet
Jati
Parquet
jati
M2
10,500
375,400.0 394,170.0
0
0
Lem vinyl
Kg
Pekerja
Oh
Tukang
Oh
Kepala
tukang
Oh
0.0350 75,000.00
2,625.00
Mandor
Oh
0.0325 80,000.00
2,600.00
Jumlah
Dibulatkan
Materi Terkait :
475,845.0
0
475,845.0
0
NI 2011)
ntuk menghitung biaaya penutup lantai per meter persegi, seperti lantai keramik, lantai marmer dll.
i marmer dll.
Berikut adalah penggalan analisa harga satuan pekerjaan kayu, untuk menghitung harga satuan peke
J. ANALISA HARGA SATUAN PEKERJAAN KAYU
No.
J-01
URAIAN
SATUAN
VOLUME
HARGA
SATUAN
HARGA
Kayu
Balok
Kamper
Samarind
a
m3
Pekerja
Oh
Tukang
Kayu
Kepala
Tukang
Mandor
Oh
Oh
Oh
12,000
8,633,700 10,360,44
.00
0.00
252,000.0
0
1,170,000
180,000 65,000.00
.00
150,000.0
20,000 75,000.00
0
60,000 42,000.00
Jumlah
Dibulatkan
M3 Kusen
Pintu &
jendela
1 kayu
Kamper
Medan/Kr
uing
J-02
Kayu
Balok
Kamper
Medan
M3
Pekerja
Oh
Tukang
Kayu
Kepala
Tukang
Oh
Oh
12,000
5,692,600 6,831,120
.00
.00
252,000.0
0
1,170,000
180,000 65,000.00
.00
150,000.0
20,000 75,000.00
0
60,000 42,000.00
Mandor
Oh
Jumlah
Dibulatkan
M3 Kusen
Pintu &
jendela
1
kayu
Borneo
Super
J-03
Kayu
Borneo
Balok
Super
M3
Pekerja
Oh
Tukang
Kayu
Kepala
Tukang
Mandor
Oh
Oh
Oh
12,000
5,280,000 6,336,000
.00
.00
252,000.0
0
1,170,000
180,000 65,000.00
.00
150,000.0
20,000 75,000.00
0
60,000 42,000.00
Jumlah
Dibulatkan
J-04
Kayu
Papan
Kamper
Samarind
a
M3
0.0400
Paku
Biasa 2" 5"
Kg
0.0500 23,400.00
Pekerja
Oh
Oh
25,000 65,000.00
Oh
Oh
0.0500 80,000.00
Tukang
Kayu
Kepala
Tukang
Mandor
8,633,700 345,348.0
.00
0
1,170.00
162,500.0
0
4,000.00
573,768.0
0
573,768.0
0
Jumlah
Dibulatkan
J-05
Kayu
Papan
Kamper
Medan
M3
0.0400
Paku
Biasa 2" 5"
Kg
0.0500 23,400.00
Pekerja
Oh
Oh
25,000 65,000.00
Oh
Oh
0.0500 80,000.00
Tukang
Kayu
Kepala
Tukang
Mandor
5,692,600 227,704.0
.00
0
162,500.0
0
4,000.00
456,124.0
0
456,124.0
0
Jumlah
Dibulatkan
J-06
1,170.00
Kayu
Papan
Kamper
Medan
M3
0.0350
Pekerja
Oh
Oh
20,000 65,000.00
Oh
Oh
0.0400 80,000.00
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan
5,692,600 199,241.0
.00
0
130,000.0
0
3,200.00
381,041.0
0
381,041.0
0
M2 Pintu
& Jendela
1
Kaca Kayu
Borneo
J-07
Kayu
Papan
Borneo
Super
M3
0.0350
Pekerja
Oh
Oh
20,000 65,000.00
Oh
Oh
0.0400 80,000.00
Tukang
Kayu
Kepala
Tukang
Mandor
5,595,800 195,853.0
.00
0
130,000.0
0
3,200.00
377,653.0
0
377,653.0
0
Jumlah
Dibulatkan
M2 Pintu
& Jendela
Jalusi
1
Kayu
Kamper
Medan
J-08
Kayu
Papan
Kamper
Medan
M3
0.0640
Pekerja
Oh
Oh
30,000 65,000.00
Oh
Oh
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan
5,692,600 364,326.4
.00
0
195,000.0
0
663,826.4
0
663,826.0
0
M2 Pintu
Triplek
Rangkap,
Rangka
1
Tertutup
Kayu
Kamper
Medan
J-09
Kayu
Papan
Kamper
Medan
M3
0.0196
Paku
Biasa " 1"
Kg
0.0300 23,800.00
714.00
Lem Kayu
Ltr
0.3000 23,900.00
7,170.00
Triplek
120 x 240
x 0,4 cm
Lbr
Pekerja
Oh
Oh
20,000 65,000.00
Oh
Oh
0.0300 80,000.00
Tukang
Kayu
Kepala
Tukang
Mandor
5,692,600 111,574.9
.00
6
2,400.00
356,458.9
6
356,459.0
0
Jumlah
Dibulatkan
J-10
130,000.0
0
Kayu
Papan
Kamper
Medan
M3
0.0600
Paku
Biasa " 1"
Kg
0.1500 23,800.00
Pekerja
Oh
Oh
20,000 65,000.00
Oh
Tukang
Kayu
Kepala
Tukang
5,692,600 341,556.0
.00
0
3,570.00
130,000.0
0
Mandor
Oh
0.0250 80,000.00
513,126.0
0
513,126.0
0
Jumlah
Dibulatkan
J-11
2,000.00
Kayu
Papan
Borneo
Super
M3
0.0196
Paku
Biasa " 1"
Kg
0.0300 23,800.00
714.00
Lem Kayu
Ltr
0.3000 23,900.00
7,170.00
Triplek
120 x 240
x 0,4 cm
Lbr
Pekerja
Oh
Oh
20,000 65,000.00
Oh
Oh
0.0300 80,000.00
Tukang
Kayu
Kepala
Tukang
Mandor
5,595,800 109,677.6
.00
8
130,000.0
0
2,400.00
354,561.6
8
354,562.0
0
Jumlah
Dibulatkan
M2 Pintu
Teakwood
Rangkap,
1 rangka
Kayu
Kamper
Medan
J-12
Kayu
Papan
Kamper
Medan
M3
0.0196
Paku
Biasa " 1"
Kg
0.3000 23,800.00
5,692,600 111,574.9
.00
6
7,140.00
Lem Kayu
Ltr
0.3000 23,900.00
Teakwood
4 mm
Lbr
10,000
Pekerja
Oh
Oh
20,000 65,000.00
Oh
Oh
0.0300 80,000.00
Tukang
Kayu
Kepala
Tukang
Mandor
7,170.00
131,700.0 131,700.0
0
0
130,000.0
0
2,400.00
430,184.9
6
430,185.0
0
Jumlah
Dibulatkan
M2 Pintu
Triplek &
Formika,
1 Rangka
Kayu
Kamper
Medan
J-13
Kayu
Papan
Kamper
Medan
M3
0.0196
Paku
Biasa " 1"
Kg
0.3000 23,800.00
Lem Kayu
Ltr
Triplek
120 x 240
x 0,4 cm
Lbr
Formica
3" x 6"
Lbr
0.5000
Pekerja
Oh
Oh
25,000 65,000.00
Oh
Oh
0.0400 80,000.00
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah
5,692,600 111,574.9
.00
6
7,140.00
132,900.0
66,450.00
0
162,500.0
0
3,200.00
486,734.9
6
486,735.0
0
Dibulatkan
M2 Pintu
Teakwood
&
Formika,
1 Rangka
Kayu
Kamper
Medan
(dipolitur)
J-14
Kayu
Papan
Kamper
Medan
M3
0.0196
Paku
Biasa " 1"
Kg
0.3000 23,800.00
Lem Kayu
Ltr
Teakwood
120 x 240
x 0,4 cm
Lbr
10,000
131,700.0 131,700.0
0
0
Formica
4" x 8"
Lbr
0.5000
238,100.0 119,050.0
0
0
Pekerja
Oh
Oh
25,000 65,000.00
Oh
Oh
0.0400 80,000.00
Tukang
Kayu
Kepala
Tukang
Mandor
5,692,600 111,574.9
.00
6
162,500.0
0
3,200.00
606,634.9
6
606,635.0
0
Jumlah
Dibulatkan
J-15
7,140.00
Kayu
Balok
Kamper
Medan
M3
Besi Strip
Kg
11,000
5,692,600 6,261,860
.00
.00
150,000 26,800.00
402,000.0
0
Paku
Biasa 2" 5"
Kg
Pekerja
Oh
Tukang
Kayu
Kepala
Tukang
Mandor
Oh
Oh
Oh
Jumlah
Dibulatkan
M3 Kudakuda Kayu
1
Borneo
Super
J-16
Kayu
balok
Borneo
super
M3
Besi Strip
Kg
Paku
Biasa 2" 5"
Kg
Pekerja
Oh
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan
Oh
11,000
5,280,000 5,808,000
.00
.00
150,000 26,800.00
402,000.0
0
Oh
Oh
M2 Kaso
+ Reng
Genteng
1 Plentong
Kayu
Borneo
Super
J-17
Kayu
balok
Borneo
super
m3
0.0120
Paku
Biasa 2" 5"
Kg
0.1500 23,800.00
3,570.00
Pekerja
Oh
0.1000 42,000.00
4,200.00
Oh
0.1000 65,000.00
6,500.00
Oh
0.0100 75,000.00
750.00
Oh
0.0050 80,000.00
400.00
Tukang
Kayu
Kepala
Tukang
Mandor
5,280,000
63,360.00
.00
Jumlah
78,780.00
Dibulatkan
78,780.00
M2 Kaso
+ Reng
Genteng
1 Beton
Kayu
Borneo
Super
J-18
Kayu
balok
Borneo
super
M3
0.0140
Paku
Biasa 2" 5"
Kg
0.1500 23,800.00
3,570.00
Pekerja
Oh
0.1000 42,000.00
4,200.00
Oh
0.1000 65,000.00
6,500.00
Oh
0.0100 75,000.00
750.00
Tukang
Kayu
Kepala
Tukang
5,280,000
73,920.00
.00
Mandor
Oh
0.0050 80,000.00
Jumlah
89,340.00
Dibulatkan
89,340.00
M'
Lisplang
uk
1 (3x20)cm,
Kayu
Kamper
Medan
J-19
Kayu
Papan
Kamper
Medan
M3
0.0072
Paku
Biasa 2" 5"
Kg
0.0500 23,800.00
1,190.00
Pekerja
Oh
0.1000 42,000.00
4,200.00
Oh
Oh
0.0200 75,000.00
1,500.00
Oh
0.0050 80,000.00
400.00
Tukang
Kayu
Kepala
Tukang
Mandor
5,823,400
41,928.48
.00
Jumlah
62,218.48
Dibulatkan
J-20
400.00
62,218.00
Kayu
Papan
Kamper
Medan
M3
0.0110
Paku
Biasa 2" 5"
Kg
0.0500 23,800.00
1,190.00
Pekerja
Oh
0.1100 42,000.00
4,620.00
Oh
Oh
0.0220 75,000.00
Tukang
Kayu
Kepala
Tukang
5,692,600
62,618.60
.00
1,650.00
Mandor
Oh
0.0050 80,000.00
Jumlah
84,778.60
Dibulatkan
J-21
400.00
84,779.00
Kayu Profil
10 cm
M'
Pekerja
Oh
0.0210 42,000.00
882.00
Oh
0.0210 65,000.00
1,365.00
Oh
0.0020 75,000.00
150.00
Oh
0.0010 80,000.00
80.00
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah
Dibulatkan
Materi Terkait :
33,347.00
33,347.00
itung harga satuan pekerjaan kayu per m3, seperti pekerjaan kusen dan jendela, pekerjaan plapond, dan peker
K-01
URAIAN
SAT
VOLUME
HARGA
SAT
(Rp)
(Rp)
1 Kg
Besi profil
Besi profil
WF
Kg
Meni besi
Kg
0.0800 30,400.00
2,432.00
Pekerja
Oh
0.0600 42,000.00
2,520.00
Oh
0.0060 65,000.00
390.00
Oh
0.0060 75,000.00
450.00
Oh
0.0003 80,000.00
24.00
Tukang
besi
Kepala
tukang
Mandor
Jumlah
32,216.00
Dibulatkan
K-02
HARGA
32,216.00
1 Kg
Perakitan
baja
Solar
m'
0.0100
Minyak
pelumas
m'
0.0010
Sewa alat
jam
0.0080
Pekerja
Oh
0.0010
Oh
0.00001
Oh
0.00001
Oh
0.00005
Tukang
besi
Kepala
tukang
Mandor
7,150.000
0
55,000.00
00
100,000.0
000
42,000.00
00
65,000.00
00
75,000.00
00
80,000.00
00
71.50
55.00
800.00
42.00
0.65
0.75
4.00
K-03
Jumlah
Dibulatkan
1 Cm Pengelasan
dengan las listrik
973.90
974.00
kawat las
kg
0.0400 23,600.00
944.00
Solar
Minyak
pelumas
ltr
0.0300
7,150.00
214.50
ltr
0.0040 55,000.00
220.00
Sewa alat
jam
0.0170
100,000.0
0
1,700.00
Pekerja
org
0.0040 42,000.00
168.00
Tukang
org
0.0020 65,000.00
130.00
Kepala
Tukang
org
0.0002 75,000.00
15.00
Mandor
org
0.0002 80,000.00
16.00
Jumlah
K-04
Dibulatkan
1 m2 Pintu Rolling
Door
Rolling
door
-
Pekerja
Tukang
besi
Kepala
tukang
Mandor
2,463.50
2,464.00
10,000
Oh
Oh
Oh
0.1050 75,000.00
7,875.00
Oh
0.0052 80,000.00
416.00
456,491.0
0
456,491.0
0
Jumlah
Dibulatkan
K-05
306,600.0 306,600.0
0
0
M2
1 m2 Pintu
Alluminium Natural
-
Pintu
alluminiu
m natural
m2
10,000
Pekerja
Oh
Tukang
besi
Oh
211,800.0 211,800.0
0
0
Kepala
tukang
Oh
0.1050 75,000.00
7,875.00
Mandor
Oh
0.0052 80,000.00
416.00
332,441.0
0
332,441.0
0
Jumlah
Dibulatkan
K-06
1 m2 Terali Besi
Besi strip
2x3
m'
115,000
5,500.00 63,250.00
Pekerja
Oh
Tukang las
Oh
Kepala
tukang
Oh
0.0120 75,000.00
900.00
Mandor
Oh
0.0006 80,000.00
48.00
192,598.0
0
192,598.0
0
Jumlah
Dibulatkan
K-07
1 m2 Kawat
Harmonika 4 cm
-
Kawat
harmonik
a
M2
Paku
biasa " 1"
kg
0.0200 23,800.00
Papan
kayu
kamper
M2
0.0018
Pekerja
Oh
0.1000 42,000.00
4,200.00
Oh
0.1000 65,000.00
6,500.00
Oh
0.0100 75,000.00
750.00
Oh
0.0050 80,000.00
400.00
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatkan
476.00
5,692,600
10,246.68
.00
62,062.68
62,063.00
K-08
Seng plat
3' x 6'
BJLS 30
m'
Paku
biasa " 1"
Kg
0.0150 23,800.00
Kayu
papan
borneo
super
M3
0.0096
Flincote /
meni besi
Kg
0.2500 30,400.00
7,600.00
Pekerja
Oh
0.1500 42,000.00
6,300.00
Oh
Oh
0.0250 75,000.00
1,875.00
Oh
0.0013 80,000.00
104.00
Tukang
kayu
Kepala
tukang
Mandor
5,595,800
53,719.68
.00
117,796.7
3
117,797.0
0
Jumlah
Dibulatkan
K-09
357.00
Seng plat
3' x 6'
BJLS 30
m'
Paku
biasa " 1"
Kg
0.0150 23,800.00
Kayu
papan
borneo
super
M3
0.0190
Flincote /
meni besi
Kg
0.3000 30,400.00
9,120.00
Pekerja
Oh
0.2000 42,000.00
8,400.00
Tukang
kayu
Oh
357.00
5,595,800 106,320.2
.00
0
Kepala
tukang
Oh
0.0250 75,000.00
1,875.00
Mandor
Oh
0.0013 80,000.00
100.00
174,013.2
5
174,013.0
0
Jumlah
Dibulatkan
K-10
Seng plat
3' x 6'
BJLS 30
m'
Paku
biasa " 1"
Kg
0.1000 23,800.00
Kayu
papan
borneo
super
kg
0.0190
Besi strip
Kg
Pekerja
Oh
0.1500 42,000.00
Oh
Oh
0.0300 75,000.00
2,250.00
Oh
0.0080 80,000.00
640.00
Tukang
kayu
Kepala
tukang
Mandor
5,595,800 106,320.2
.00
0
6,300.00
172,631.2
5
172,631.0
0
Jumlah
Dibulatkan
K-11
2,380.00
Alumuniu
m profil
natural 4"
Skrup
fixer
Sealant
151,100.0 166,210.0
0
0
m'
11,000
bh
20,000
250.00
500.00
m'
10,000
7,500.00
7,500.00
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Oh
0.0430 42,000.00
1,806.00
Oh
0.0430 65,000.00
2,795.00
Oh
0.0043 75,000.00
322.50
Oh
0.0021 80,000.00
168.00
179,301.5
0
179,302.0
0
Jumlah
Dibulatkan
K-12
Alumuniu
m profil
warna 4"
Skrup
fixer
Sealant
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
163,000.0 179,300.0
0
0
m'
11,000
bh
20,000
250.00
500.00
m'
10,000
7,500.00
7,500.00
Oh
0.0430 42,000.00
1,806.00
Oh
0.0430 65,000.00
2,795.00
Oh
0.0043 75,000.00
322.50
Oh
0.0021 80,000.00
168.00
192,391.5
0
192,392.0
0
Jumlah
Dibulatkan
K-13
Alumuniu
m profil
natural 3"
Skrup
fixer
Sealant
Pekerja
m'
bh
20,000
250.00
500.00
m'
10,000
7,500.00
7,500.00
Oh
0.0430 42,000.00
1,806.00
Tukang
kayu
Kepala
tukang
Mandor
Oh
0.0430 65,000.00
2,795.00
Oh
0.0043 75,000.00
322.50
Oh
0.0021 80,000.00
168.00
102,191.5
0
102,192.0
0
Jumlah
Dibulatkan
K-14
Alumuniu
m profil
warna 3"
Skrup
fixer
Sealant
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
102,000.0 112,200.0
0
0
m'
11,000
bh
20,000
250.00
500.00
m'
10,000
7,500.00
7,500.00
Oh
0.0430 42,000.00
1,806.00
Oh
0.0430 65,000.00
2,795.00
Oh
0.0043 75,000.00
322.50
Oh
0.0021 80,000.00
168.00
125,291.5
0
125,292.0
0
Jumlah
Dibulatkan
K-15
1 m2 Pintu
alluminium strip
lebar 8 cm
-
Alumuniu
m profil 4"
natural
m'
44,000
151,100.0 664,840.0
0
0
Alumuniu
m strip
6mm
m2
10,500
171,800.0 180,390.0
0
0
Pekerja
Oh
0.0850 42,000.00
3,570.00
Oh
0.0850 65,000.00
5,525.00
Oh
0.0085 75,000.00
637.50
Tukang
kayu
Kepala
tukang
Mandor
Oh
0.0042 80,000.00
855,298.5
0
855,299.0
0
Jumlah
Dibulatkan
K-16
1 m2 Pintu/jendela
kaca rangka
alluminium natural
4"
-
Alumuniu
m profil
natural 4"
Profil
alluminiu
mT
Sealant
Pekerja
Tukang
kayu
Kepala
tukang
Mandor
151,100.0 664,840.0
0
0
m'
44,000
m'
tube
0.2700
7,500.00
2,025.00
Oh
0.0850 42,000.00
3,570.00
Oh
0.0850 65,000.00
5,525.00
Oh
0.0085 75,000.00
637.50
Oh
0.0050 80,000.00
400.00
731,897.5
0
731,898.0
0
Jumlah
Dibulatkan
K-17
336.00
1 m2 Pintu/jendela
kaca rangka
alluminium warna 4"
-
Alumuniu
m profil
warna 4"
Profil
alluminiu
mT
Sealant
Pekerja
Tukang
kayu
Kepala
tukang
163,000.0 717,200.0
0
0
m'
44,000
m'
tube
0.2700
7,500.00
2,025.00
Oh
0.0850 42,000.00
3,570.00
Oh
0.0850 65,000.00
5,525.00
Oh
0.0085 75,000.00
637.50
Mandor
Oh
0.0050 80,000.00
784,257.5
0
784,258.0
0
Jumlah
Dibulatkan
K-18
Jendela
nako
(rangka +
kaca 5
mm)
m2
11,000
Paku
skrup 1cm
- 2,5cm
bh
100,000
Besi strip
m'
70,000
Pekerja
Oh
0.2000 42,000.00
Oh
Oh
0.0200 75,000.00
1,500.00
Oh
0.0010 80,000.00
80.00
Tukang
kayu
Kepala
tukang
Mandor
300,000.0 330,000.0
0
0
250.00
2,500.00
5,500.00 38,500.00
8,400.00
393,980.0
0
393,980.0
0
Jumlah
Dibulatkan
K-19
400.00
kawat las
Kg
0.0500 23,600.00
1,180.00
Pekerja
Oh
0.2000 42,000.00
8,400.00
Oh
Oh
0.0200 75,000.00
1,500.00
Oh
0.0010 80,000.00
80.00
Tukang
kayu
Kepala
tukang
Mandor
1,171,360
.00
1,171,360
.00
Jumlah
Dibulatkan
K-20
1 m2 Rangka jendela
besi square tube (5 x
5) cm
-
Besi
square
tube
Besi lis
kaca (1 x
1) cm
Kg
Pengelasa
n
Cm
Pekerja
Oh
Oh
Oh
0.0650 75,000.00
4,875.00
Oh
0.0320 80,000.00
2,560.00
Tukang
kayu
Kepala
tukang
Mandor
47,600
7,300.00 34,748.00
45,220 24,000.00
200,000
2,464.00 49,280.00
269,541.0
0
269,541.0
0
Jumlah
Dibulatkan
K-21
1 m2 Pintu lipat
(folding door) bahan
besi
501,700.0 501,700.0
0
0
Pintu lipat
M2
10,000
Pekerja
Oh
Oh
Oh
0.1050 75,000.00
7,875.00
Oh
0.0052 80,000.00
416.00
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatkan
K-22
108,528.0
0
1 m2 Tirai (venetions
blinds and vertical
blinds)
622,341.0
0
622,341.0
0
537,300.0 537,300.0
0
0
Tirai
M2
10,000
Pekerja
Oh
Oh
Oh
0.0350 75,000.00
2,625.00
Oh
0.0018 80,000.00
144.00
Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatkan
Kembali Ke Analisa AHS SNI
577,519.0
0
577,519.0
0
No.
M-01
HARGA
HARGA
SAT
(Rp)
(Rp)
1 Buah Closet jongkok Porselen Standar
Closet
188,200.0 188,200.0
bh
1.00
jongkok
0
0
P.C (50
Kg
6.00 1,406.00 8,436.00
gk)
Pasir
233,400.0
m3
0.01
2,334.00
pasang
0
URAIAN
SAT
Pekerja
org
org
org
15,000 75,000.00
org
Tukang
batu
Kepala
Tukang
Mandor
VOLUME
463,770.0
0
463,770.0
0
Jumlah
M-02
Dibulatka
n
1 Buah
Urinoir
Urinoir
P.C (50
gk)
Pasir
pasang
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
112,500.0
0
1,773,400 1,773,400
.00
.00
bh
1.00
Kg
6.00
1,406.00
8,436.00
m3
0.01
233,400.0
0
2,334.00
org
org
org
0.1000 75,000.00
7,500.00
org
0.0010 80,000.00
80.00
Perlengka
pan 30 %
harga
urinoir
lot
0.3000
1,773,400 532,020.0
.00
0
2,430,770
.00
2,430,770
.00
Jumlah
M-03
Dibulatka
n
1 Buah
Wastafel
wastafel
standar
P.C (50
gk)
Pasir
pasang
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 12 %
harga
wastafel
1,012,700 1,012,700
.00
.00
unit
1.00
Kg
6.00
1,406.00
8,436.00
m3
0.01
233,400.0
0
2,334.00
org
org
org
org
0.1000 80,000.00
lot
0.1200
8,000.00
1,773,400 212,808.0
.00
0
1,400,178
.00
Dibulatka
1,400,178
n
.00
1 Buah bak Mandi Fibreglass Volume 0,30 m3
Jumlah
M-04
Bak
fibreglass
0.60m x
0.60m
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
bh
1.00
255,300.0 255,300.0
0
0
org
org
27,000 65,000.00
org
org
0.1100 80,000.00
175,500.0
0
8,800.00
Perlengka
pan 18 %
harga bak
lot
0.1800
255,300.0
45,954.00
0
601,654.0
0
Dibulatka
601,654.0
n
0
1 M' Saluran Air Limbah Buis beton d = 30 cm - 60
cm
Buis
beton
bh
1.10 61,700.00 67,870.00
30 cm
Jumlah
M-05
Bata
merah
P.C (50
gk)
Pasir
pasang
bh
25.00
775.00 19,375.00
Kg
10,300
1,406.00 14,481.80
m3
0.061
233,400.0
14,237.40
0
175,300.0
0.069
12,095.70
0
Pasir urug
m3
Pekerja
org
org
org
0.0190 75,000.00
1,425.00
org
0.0190 80,000.00
1,520.00
Tukang
batu
Kepala
Tukang
Mandor
159,314.9
0
Dibulatka
159,315.0
n
0
1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm
Bata
144,150.0
bh
186.00
775.00
merah
0
P.C (50
160,284.0
Kg 114,000 1,406.00
gk)
0
Pasir
233,400.0
m3
0.184
42,945.60
pasang
0
Jumlah
M-06
Batu
pecah 2/3
Besi
beton
Pasir
beton
Pekerja
211,100.0
0
m3
0.033
m3
m3
0.120
org
6,966.30
255,400.0
30,648.00
0
Tukang
batu
Kepala
Tukang
org
org
0.0720 75,000.00
5,400.00
Mandor
org
0.1080 80,000.00
8,640.00
Tukang
gali
org
0.1000 42,000.00
4,200.00
620,778.9
0
Dibulatka
620,779.0
n
0
1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
Bata
bh
53.00
775.00 41,075.00
merah
P.C (50
Kg
44,000 1,406.00 61,864.00
gk)
Pasir
233,400.0
m3
0.070
16,338.00
pasang
0
Jumlah
M-07
Batu
pecah 2/3
Besi
beton
Pasir
beton
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
211,100.0
14,777.00
0
m3
0.070
m3
m3
org
255,400.0
15,324.00
0
134,400.0
32,000 42,000.00
0
0.060
org
org
0.0015 75,000.00
112.50
org
0.0160 80,000.00
1,280.00
377,545.5
0
377,546.0
0
Jumlah
Dibulatka
n
M-08
1 M' Pipa
PVC
1/2" (AW)
Pipa pvc
1/2"
m'
Pekerja
org
1,512.00
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa
M-09
0.0600 65,000.00
3,900.00
org
0.0060 75,000.00
450.00
org
0.0018 80,000.00
144.00
lot
0.3500 12,030.00
4,210.50
Jumlah
22,246.50
Dibulatka
n
22,247.00
1 M' Pipa
PVC 1"
(AW)
Pipa pvc
1"
m'
Pekerja
org
0.0360 42,000.00
1,512.00
org
0.0600 65,000.00
3,900.00
org
0.0060 75,000.00
450.00
org
0.0018 80,000.00
144.00
lot
0.3500 18,960.00
6,636.00
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa
M-10
org
Jumlah
31,602.00
Dibulatka
n
31,602.00
1 M' Pipa
PVC
11/2"
(AW)
Pipa pvc
11/2"
m'
Pekerja
org
0.0360 42,000.00
1,512.00
org
0.0600 65,000.00
3,900.00
org
0.0060 75,000.00
450.00
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa
M-11
lot
0.0018 80,000.00
144.00
Jumlah
48,895.50
Dibulatka
n
48,896.00
1 M' Pipa
PVC 2"
(AW)
Pipa pvc
2"
m'
Pekerja
org
0.0360 42,000.00
1,512.00
org
0.0600 65,000.00
3,900.00
org
0.0060 75,000.00
450.00
org
0.0018 80,000.00
144.00
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa
M-12
org
lot
Jumlah
50,335.50
Dibulatka
n
50,336.00
1 M' Pipa
PVC 4"
(AW)
Pipa pvc
4"
m'
12,000 86,975.00
104,370.0
0
Pekerja
org
0.0810 42,000.00
3,402.00
org
0.1350 65,000.00
8,775.00
org
0.0135 75,000.00
1,012.50
org
0.0041 80,000.00
328.00
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa
lot
0.3500
104,370.0
36,529.50
0
154,417.0
0
154,417.0
0
Jumlah
Dibulatka
n
M-13
1 M' Pipa
PVC
3/4" (AW)
Pipa pvc
3/4"
m'
Pekerja
org
0.0810 42,000.00
3,402.00
org
0.1350 65,000.00
8,775.00
org
0.0135 75,000.00
1,012.50
org
0.0041 80,000.00
328.00
lot
0.3500 15,660.00
5,481.00
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa
Jumlah
M-14
34,658.50
Dibulatka
n
1 Buah Bak Cuci piring Stainless steel
Bak cuci
stainless
steel +
asesoris
lengkap
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Jumlah
bh
10,000
34,659.00
397,800.0 397,800.0
0
0
org
0.0300 42,000.00
1,260.00
org
org
0.0300 75,000.00
2,250.00
org
0.0015 80,000.00
120.00
420,930.0
0
Dibulatka
n
M-15
1 Buah
Kran
1/2" - 3/4"
Kran air
bh
Seal tape
bh
0.0250
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
M-16
4,200.00
105.00
org
0.0100 42,000.00
420.00
org
0.1000 65,000.00
6,500.00
org
0.0100 75,000.00
750.00
org
0.0050 80,000.00
400.00
Jumlah
49,075.00
Dibulatka
n
49,075.00
1 Buah
Floor
Drain
Floor
drain
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Jumlah
M-17
420,930.0
0
bh
org
0.0100 42,000.00
420.00
org
0.1000 65,000.00
6,500.00
org
0.0100 75,000.00
750.00
org
0.0050 80,000.00
400.00
74,670.00
Dibulatka
74,670.00
n
1 M' Grafel beton U 20 cm -60
cm
Pipa
bh
11,000 44,300.00 48,730.00
beton U
Bata
bh 120,000
775.00 9,300.00
merah
P.C (50
zak
0.1030 1,406.00
144.82
gk)
Pasir
pasang
m3
Pasir urug
m3
Pekerja
org
0.0100 42,000.00
420.00
org
0.1000 65,000.00
6,500.00
org
0.0100 75,000.00
750.00
org
0.0050 80,000.00
400.00
Tukang
batu
Kepala
Tukang
Mandor
233,400.0
0
175,300.0
0.0345
0
0.0305
Jumlah
M-18
6,047.85
79,411.37
Dibulatka
79,411.00
n
1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang
plastik
m' 105,000 60,000.00 63,000.00
PVC
Perlengka
pan 35 %
harga
talang
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
lot
org
0.1500 42,000.00
org
org
0.0250 75,000.00
1,875.00
org
0.0013 80,000.00
100.00
Dibulatka
n
1 M' Saluran Air Limbah Buis
Beton 60 cm
Buis
beton
60 cm
Bata
merah
P.C (50
gk)
Pasir
pasang
6,300.00
119,325.0
0
119,325.0
0
Jumlah
M-19
7,118.70
bh
1.10
130,900.0 143,990.0
0
0
bh
25.00
775.00 19,375.00
zak
0.206
m3
0.061
1,406.00
289.64
233,400.0
14,237.40
0
m3
Pekerja
org
org
org
0.0190 75,000.00
1,425.00
org
0.0190 80,000.00
1,520.00
Tukang
batu
Kepala
Tukang
Mandor
0.069
175,300.0
12,095.70
0
Pasir urug
221,242.7
4
221,243.0
0
Jumlah
Dibulatka
n
M-20
1 M'
Pasang
Talang
Seng
Datar
Seng
pelat 3" x
6"
lbr
Paku
kg
0.01500 23,400.00
Kayu
kelas II
Meni besi
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
M-21
m3
0.00960
351.00
2,850,000
27,360.00
.00
kg
0.2500 30,400.00
7,600.00
org
0.1500 42,000.00
6,300.00
org
org
0.0250 75,000.00
1,875.00
org
0.0013 80,000.00
100.00
Jumlah
79,986.50
Dibulatka
n
79,987.00
1 Buah
Closet
Duduk
Closet
duduk
bh
Pekerja
org
1,724,700 1,724,700
.00
.00
138,600.0
33,000 42,000.00
0
1.00
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 6 %
harga
closet
org
org
0.0010 75,000.00
org
lot
0.0600
1,724,700 103,482.0
.00
0
Jumlah
M-22
Dibulatka
n
1 Buah Tangki Air fibreglass Volume 1 m3
Bak
fibreglass
kapasitas
1 m3
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 6 %
harga bak
bh
1.00
75.00
2,051,157
.00
2,051,157
.00
1,316,400 1,316,400
.00
.00
138,600.0
0
org
33,000 42,000.00
org
org
0.0010 75,000.00
org
lot
0.0600
75.00
1,316,400
78,984.00
.00
1,618,359
.00
Dibulatka
1,618,359
n
.00
1 Unit Septictank 2x1,50x1,50 m + Rembesan
Galian
118,134.0
m3
4,500 26,252.00
tanah
0
175,300.0
Pasir urug
m3
0.214
37,514.20
0
lantai
716,798.0 1,612,795
m3
2,250
kerja
0
.50
Jumlah
M-23
Pas bata
adk 1pc :
3ps
m2
15,000
220,267.1 3,304,006
0
.50
Pelat
beton K225
m3
0.300
6,438,864 1,931,659
.00
.20
Plesteran
adk 1pc :
3ps
m2
Pipa PVC
4" jenis
AW
m'
5,400
Pipa GIP 1
1/2"
m'
5,000 46,750.00
Galian
tanah
untuk
rembesan
m3
Pas ijuk
kg
Urugan
kerikil 3/5
m3
Pipa PVC
4"
berlubang
jenis AW
m'
Urugan
dan
perataan
tanah
m3
15,000 41,301.82
619,527.3
0
256,800.0 1,386,720
0
.00
233,750.0
0
5,400 23,400.00
1,050
126,360.0
0
205,000.0 215,250.0
0
0
9,000 36,700.00
330,300.0
0
10,022,42
3.70
Dibulatka
10,022,42
n
4.00
1 Unit Septictank 1x1,50x1,50 m + Rembesan
Galian
m3
2,250 20,000.00 45,000.00
tanah
175,300.0
Pasir urug
m3
0.107
18,757.10
0
lantai
716,798.0 806,397.7
m3
1,125
kerja
0
5
Jumlah
M-24
Pas bata
adk 1pc :
3ps
m2
7,500
220,267.1 1,652,003
0
.25
Pelat
beton K225
m3
0.150
6,438,864 965,829.6
.00
0
Plesteran
adk 1pc :
3ps
m2
7,500 41,301.82
309,763.6
5
Pipa PVC
4" jenis
AW
m'
9,000
Pipa GIP 1
1/2"
m'
2,500 46,750.00
Galian
tanah
untuk
rembesan
m3
kg
Pas ijuk
Urugan
kerikil 3/5
m3
Pipa PVC
4"
berlubang
jenis AW
m'
Urugan
dan
perataan
tanah
m3
Jumlah
Dibulatka
n
Kembali ke Analisa SNI
0.525
256,800.0 2,311,200
0
.00
116,875.0
0
205,000.0 107,625.0
0
0
9,000 36,700.00
330,300.0
0
No.
N-01
URAIAN
SAT
VOLUME
HARGA
SAT
Soda api
Kg
0.0500 35,600.00
1,780.00
Pekerja
Oh
0.1500 42,000.00
6,300.00
Mandor
Oh
0.0025 80,000.00
200.00
Jumlah
N-02
Dibulatkan
1 M2 Mendempul Dan Menggosok Kayu
-
Dempul
Minyak
cat
Batu
apung
Pekerja
Tukang
cat
Kepala
tukang
Mandor
8,280.00
8,280.00
Kg
0.0800 35,800.00
2,864.00
Kg
0.0200 38,400.00
768.00
Kg
0.0100 29,600.00
296.00
Oh
0.0400 42,000.00
1,680.00
Oh
0.0400 65,000.00
2,600.00
Oh
0.0040 75,000.00
300.00
Oh
0.0025 80,000.00
200.00
Jumlah
N-03
HARGA
Dibulatkan
1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
8,708.00
8,708.00
Plamir
Kg
0.1500 25,000.00
3,750.00
Cat dasar
Kg
0.1700 30,000.00
5,100.00
Cat
penutup
setara
sieve 2x
Kg
0.1700 41,700.00
7,089.00
Pekerja
Tukang
cat
Kepala
tukang
Mandor
Oh
0.0700 42,000.00
2,940.00
Oh
0.0750 65,000.00
4,875.00
Oh
0.0075 75,000.00
562.50
Oh
0.0025 80,000.00
200.00
Jumlah
24,516.50
Dibulatkan
N-04
24,517.00
Cat meni
Kg
0.2000 30,400.00
6,080.00
Plamir
Kg
0.1500 25,000.00
3,750.00
Cat dasar
Kg
0.1700 30,000.00
5,100.00
Cat
penutup
3x setara
sieve
Kg
Pekerja
Oh
0.0700 42,000.00
2,940.00
Oh
0.1050 65,000.00
6,825.00
Oh
0.0040 75,000.00
300.00
Oh
0.0025 80,000.00
200.00
Tukang
cat
Kepala
tukang
Mandor
Jumlah
39,790.00
Dibulatkan
N-05
39,790.00
Politur
Ltr
0.1500 48,000.00
Politur
jadi
Ltr
0.3720
112,700.0
41,924.40
0
Ampelas
Lbr
20,000
5,000.00 10,000.00
Oh
0.0600 65,000.00
3,900.00
Oh
0.0160 75,000.00
1,200.00
Tukang
cat
Kepala
tukang
7,200.00
Mandor
Oh
0.0025 80,000.00
Jumlah
64,424.40
Dibulatkan
N-06
N-07
64,424.00
Pekerja
Oh
0.1000 42,000.00
4,200.00
Mandor
Oh
0.0060 80,000.00
480.00
Jumlah
Dibulatkan
1 M2 Pengecatan Tembok Baru
Setara ICI
Plamir
Kg
tembok
7,515.00
7,515.00
0.1000 25,000.00
2,500.00
3,000.00
Cat dasar
Kg
0.1000 30,000.00
Cat
penutup
2x setara
ICI
Kg
Pekerja
Oh
0.0200 42,000.00
840.00
Oh
0.0630 65,000.00
4,095.00
Oh
0.0063 75,000.00
472.50
Oh
0.0025 80,000.00
200.00
Tukang
cat
Kepala
tukang
Mandor
Jumlah
30,607.50
Dibulatkan
N-08
200.00
30,608.00
Cat dasar
Kg
0.1200 30,000.00
3,600.00
Cat
penutup 2
x
Kg
Pekerja
Oh
0.0280 42,000.00
1,176.00
Tukang
cat
Oh
0.0420 65,000.00
2,730.00
Kepala
tukang
Oh
0.0042 75,000.00
315.00
Mandor
Oh
0.0025 80,000.00
200.00
Jumlah
21,521.00
Dibulatkan
N-09
21,521.00
Plamir
tembok
Kg
0.1600 25,000.00
4,000.00
Rol cat
Bh
0.0100 32,500.00
325.00
Ls
10,000
1,000.00
1,000.00
Steger
werk
Ampelas
Lbr
0.5000
5,000.00
2,500.00
Pekerja
Oh
0.2000 42,000.00
8,400.00
Oh
Oh
0.0300 75,000.00
2,250.00
Oh
0.0100 80,000.00
800.00
Tukang
cat
Kepala
tukang
Mandor
Jumlah
53,775.00
Dibulatkan
N-10
53,775.00
Cat
tembok
setara
Vinilex
Kg
0.2000 25,000.00
5,000.00
Plamir
tembok
Kg
0.1600 25,000.00
4,000.00
Rol cat
Bh
0.0100 32,500.00
325.00
Ls
10,000
1,000.00
1,000.00
Steger
werk
Ampelas
Lbr
0.5000
5,000.00
2,500.00
Pekerja
Oh
0.2000 42,000.00
8,400.00
Tukang
cat
Oh
Kepala
tukang
Oh
0.0300 75,000.00
2,250.00
Mandor
Oh
0.0100 80,000.00
800.00
Jumlah
43,775.00
Dibulatkan
N-10-r'
43,775.00
Cat
tembok
setara
Vinilex
Kg
0.1300 25,000.00
3,250.00
Plamir
tembok
Kg
0.1100 25,000.00
2,750.00
Rol cat
Bh
0.1000 32,500.00
3,250.00
Ls
0.6700
1,000.00
670.00
Steger
werk
Ampelas
Lbr
0.3300
5,000.00
1,650.00
Pekerja
Oh
0.1300 42,000.00
5,460.00
Oh
Oh
0.0200 75,000.00
1,500.00
Oh
0.0100 80,000.00
800.00
Tukang
cat
Kepala
tukang
Mandor
Jumlah
32,330.00
Dibulatkan
N-11
32,330.00
1 M2 Memasang Wallpaper
-
Wallpaper
Lem
Perekat
Kg
0.2500 35,700.00
Pekerja
Oh
Oh
Oh
0.0170 75,000.00
1,275.00
Oh
0.0017 80,000.00
136.00
Tukang
cat
Kepala
tukang
Mandor
Jumlah
m2
103,251.0
0
103,251.0
0
Dibulatkan
N-12
Meni besi
Kg
0.1000 30,400.00
3,040.00
Kuas 3"
Bh
0.0100 16,000.00
160.00
Pekerja
Oh
0.0200 42,000.00
840.00
Oh
Oh
0.0200 75,000.00
1,500.00
Oh
0.0100 80,000.00
800.00
Tukang
cat
Kepala
tukang
Mandor
Jumlah
19,340.00
Dibulatkan
N-13
19,340.00
Meni besi
Kg
0.1000 30,400.00
3,040.00
Kuas 3"
Bh
0.0100 16,000.00
160.00
Kayu
perancah
m3
0.0020
2,069,800
.00
4,139.60
Pekerja
Oh
Oh
Oh
0.0225 75,000.00
1,687.50
Oh
0.0075 80,000.00
600.00
Tukang
cat
Kepala
tukang
Mandor
Jumlah
34,752.10
Dibulatkan
N-14
34,752.00
Pekerja
Oh
0.0060 42,000.00
252.00
Tukang
cat
Oh
0.0600 65,000.00
3,900.00
Kepala
tukang
Oh
0.0120 75,000.00
900.00
Mandor
Oh
0.0060 80,000.00
480.00
Jumlah
25,842.00
Dibulatkan
N-15
25,842.00
Cat dasar
Kg
0.1000 30,000.00
3,000.00
Cat
penutup
2x setara
vinilex
Kg
0.2600 25,000.00
6,500.00
Pekerja
Oh
0.0200 42,000.00
840.00
Oh
0.0630 65,000.00
4,095.00
Oh
0.0063 75,000.00
472.50
Oh
0.0025 80,000.00
200.00
Tukang
cat
Kepala
tukang
Mandor
Jumlah
17,607.50
Dibulatkan
N-15r'
17,608.00
Cat dasar
Kg
0.1000 30,000.00
3,000.00
Cat
penutup
3x setara
vinilex
Kg
0.3900 25,000.00
9,750.00
Pekerja
Oh
0.0300 42,000.00
1,260.00
Oh
0.0945 65,000.00
6,142.50
Oh
0.0095 75,000.00
712.50
Oh
0.0038 80,000.00
304.00
Tukang
cat
Kepala
tukang
Mandor
Jumlah
23,669.00
Dibulatkan
N-16
23,669.00
Cat dasar
Kg
0.1200 30,000.00
3,600.00
Cat
penutup 2
x
Kg
0.1800 25,000.00
4,500.00
Pekerja
Oh
0.0280 42,000.00
1,176.00
Oh
0.0420 65,000.00
2,730.00
Oh
0.0042 75,000.00
315.00
Oh
0.0025 80,000.00
200.00
Tukang
cat
Kepala
tukang
Mandor
Jumlah
Dibulatkan
Kembali ke AHS-SNI
12,521.00
12,521.00
NO.
O-01
O-02
O-03
HARGA
SAT. (Rp)
1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
URAIAN
KOEF
SAT.
HARGA
(Rp)
Pupuk kandang
0.0800
krg 25,000.00
2,000.00
Furadan
0.0010
kg 24,000.00
24.00
Pohon pelindung
10,000
Pekerja
0.0250
org 42,000.00
1,050.00
Mandor
0.0025
org 80,000.00
200.00
Jumlah
28,274.00
Dibulatkan
28,274.00
0.0800
krg 25,000.00
2,000.00
Furadan
0.0010
kg 24,000.00
24.00
Bambu krisik/jepang
10,000
Pekerja
0.0250
org 42,000.00
1,050.00
Mandor
0.0025
org 80,000.00
200.00
Jumlah
53,274.00
Dibulatkan
53,274.00
0.0400
krg 25,000.00
1,000.00
Furadan
0.0010
kg 24,000.00
24.00
Pohon perdu
10,000
O-04
Pekerja
0.0200
org 42,000.00
840.00
Mandor
0.0020
org 80,000.00
160.00
Jumlah
12,024.00
Dibulatkan
12,024.00
0.0400
krg 25,000.00
1,000.00
0.5000
m2 15,000.00
7,500.00
Pekerja
0.0400
org 42,000.00
1,680.00
Mandor
0.0040
org 80,000.00
320.00
Jumlah
10,500.00
Dibulatkan
10,500.00
Kembali ke AHA-SNI
UPAH
(Rp.)
NO
URAIAN
SATUAN
Mandor
Org/hr
Rp
80,000.00
Kepala
Tukang
Batu
Org/hr
Rp
75,000.00
Kepala
Tukang
Kayu
Org/hr
Rp
75,000.00
Kepala
Tukang
Besi
Org/hr
Rp
75,000.00
Kepala
Tukang
Cat
Org/hr
Rp
75,000.00
Kepala
Tukang
Listrik
Org/hr
Rp
75,000.00
Kepala
Tukang
Org/hr
Rp
75,000.00
Tukang
Batu
Org/hr
Rp
65,000.00
Tukang
Kayu
Org/hr
Rp
65,000.00
10
Tukang
Besi/Baja
Org/hr
Rp
65,000.00
11
Tukang
Cat
Org/hr
Rp
65,000.00
12
Tukang
Listrik
Org/hr
Rp
65,000.00
13
Tukang
Pipa
Org/hr
Rp
65,000.00
14
Tukang
Plitur
Org/hr
Rp
65,000.00
15
Tukang
Taman
Org/hr
Rp
65,000.00
16
Tukang
Org/hr
Rp
65,000.00
17
Pembantu
Tukang
Org/hr
Rp
42,000.00
18
Pekerja
Biasa
Org/hr
Rp
42,000.00
19
Penjaga
Malam
Org/hr
Rp
42,000.00
20
Sopir
Org/hr
Rp
65,000.00
21
Operator
Org/hr
Rp
75,000.00
22
Mekanik
Org/hr
Rp
65,000.00
23
Pembantu
Sopir
Org/hr
Rp
42,000.00
24
Pembantu
Operator
Org/hr
Rp
50,000.00
25
Pembantu
Mekanik
Org/hr
Rp
42,000.00
harga sudah
termasuk PPN dan
keuntungan
HARGA
(Rp)
Pasir Urug
m3
175,300.0
0
Tanah
Urug
Pilihan
m3
89,200.00
Sirtu
m3
Pasir
Teras
m3
Pasir
Pasang
Kali
m3
Pasir
Beton
m3
Abu Batu
m3
Batu
Gosok
( Apung )
kg
29,600.00
Batu
Pecah
Mesin 1/2
m3
223,600.0
0
10
Batu
Pecah
Mesin 2/3
m3
211,100.0
0
11
Batu
Pecah
Mesin 3/5
m3
205,000.0
0
NO
MATERIAL
A.
AGREGAT
KASAR,BA
HAN
PEREKAT
& BAHAN
JADINYA
203,500.0
0
174,200.0
0
233,400.0
0
255,400.0
0
259,000.0
0
12
Batu
Pecah
Mesin 5/7
m3
196,000.0
0
13
Batu
Belah
Pondasi
m3
205,500.0
0
14
Batu
Bronjol
( Untuk
Bronjong )
m3
180,800.0
0
15
Batu Koral
Beton Kali
m3
172,600.0
0
16
Batu
Tempel
Hitam
m3
96,600.00
17
Batu
Pinggir
Beton 10
x 20 x 35
bh
14,100.00
18
Batu
Pinggir
Beton 15
x 35 x 50
( K-225 )
bh
73,700.00
19
Batu Telor
m3
97,800.00
20
Batako
Kecil 8 x
10 x 20
bh
2,000.00
21
Batako
Besar 8 x
20 x 30
bh
2,400.00
22
Con Blok
8 x 20 x
40
bh
5,400.00
23
Bata
Merah
Bakar
kelas I
bh
775.00
24
Bata
Merah
Bakar
kelas II
bh
675.00
25
Bata
Merah
Oven
( Klingker
)
Roster
Beton 20
x 20
bh
1,800.00
bh
14,800.00
27
Roster
Beton 30
x 30
bh
15,500.00
28
Grass
Blok 20 x
20
bh
9,700.00
29
Grass
Blok 30 x
30
bh
22,500.00
30
Paving
Blok
Natural 8
cm
m2
81,100.00
31
Paving
Blok
Warna 8
cm
m2
108,600.0
0
32
Paving
Blok
Natural 6
cm
m2
76,000.00
33
Paving
Blok
Warna 6
cm
m2
86,000.00
34
Canstin
Paving
Blok
m1
34,900.00
35
Semen PC
/50 kg
zak
70,300.00
26
1,406.00
36
Semen
Putih
zak
92,700.00
37
Kanstin
Jalan
Ukuran
Besar
( Bina
Marga )
1bh
=60cm
bh
58,900.00
38
Readymix
Beton
K500,
Tanpa
Pompa
( Selang )
m3
1,105,000
.00
39
Readymix
Beton
K400,
Tanpa
Pompa
( Selang )
m3
903,500.0
0
40
Readymix
Beton
K350,
Tanpa
Pompa
( Selang )
m3
877,500.0
0
41
Readymix
Beton
K300,
Tanpa
Pompa
( Selang )
m3
925,000.0
0
42
Readymix
Beton
K225,
Tanpa
Pompa
( Selang )
m3
850,000.0
0
43
Readymix
Beton
K175,
Tanpa
Pompa
( Selang )
m3
825,000.0
0
44
45
46
Kapur
Pasang /
Kapur
Tembok
Kapur
Sirih
Semen
Warna
m3
353,300.0
0
kg
18,300.00
kg
15,700.00
47
Tanah liat
m3
31,300.00
48
Air
Formite/s
pacer
ltr
3.00
bh
2,500.00
49
50
Hollow/Co
n Blok 8 x
20 x 40
bh
5,000.00
51
Hollow/Co
n Blok 8 x
15 x 40
bh
4,000.00
52
Hollow/Co
n Blok 8 x
10 x 40
bh
3,000.00
LABURAN,
PENGISI
DAN
ALATNYA
Plamir
Tembok
kg
25,000.00
Cat
Tembok
ICI
Eksterior (
Beton )
lt
120,000.0
0
Cat
Tembok
ICI Interior
( Plafon
Dan
Dinding )
lt
75,000.00
Cat
Tembok
Vinilex
kg
25,000.00
Cat Dasar
ICI untuk
Interior
( 2 Pelapis
)
lt
75,000.00
Cat
Tembok
Sanlek
kg
20,000.00
Cat Dasar
kg
30,000.00
Cat Tahan
Asam
lt
40,000.00
Pelapis
Alkali ICI (
Cat Dasar
Beton
Ekterior )
kg
90,000.00
10
Cat Marka
/ Spotlight
kg
185,000.0
0
11
Water
Profing
Emulsion
ml
70,000.00
12
Water
Profing
Membran
ce
bh
62,500.00
bh
32,500.00
bh
8,500.00
5 lt
10,000.00
kg
25,000.00
m3
29,000.00
13
14
15
16
17
18
19
Rool Cat
Tembok
Kape
Tembok
Kape
Kayu
Soligneu
m 1 Blek
Plincote
Penaweta
n Kayu
Pegopena
n Kayu
m3
bh
382,600.0
0
370,000.0
0
20
Kwas 3"
bh
16,000.00
21
Oker
bks
22,000.00
22
Oyan
Oten
( Pewarna
Plitur )
bks
5,200.00
lt
5,500.00
24
Spirtus
kg
15,000.00
25
Bahan
Pelitur
Kripik
( Sirlak
India )
kg
110,000.0
0
kg
34,200.00
kg
37,700.00
28
Dempul
Halus /
Imfra
( Wood
Filler )
lt
37,700.00
29
Dempul
Jadi
kg
35,800.00
30
Politur
lt
48,000.00
31
Politur
Jadi
lt
112,700.0
0
32
Terpentin
kg
19,500.00
33
Tiner A
kg
23,900.00
34
Tiner B
kg
21,400.00
35
Kumpon
lbr
30,800.00
36
Melamik
kg
52,500.00
kg
39,200.00
kg
35,800.00
lbr
5,000.00
kg
24,400.00
kg
30,400.00
23
26
27
37
38
39
40
41
Dempul
Lilin
Dempul
Plitur
Dempul
Plastik
Dempul
Duco
Ampelas
Dempul
Kayu Cap
Kucing
Meni Kayu
/ Besi
42
Sincromat
kg
40,900.00
43
Cat Kayu
Sieve
lt
41,700.00
44
Cat Besi
lt
44,000.00
45
Cat Besi
Duco
Danaglos
/ ICI
bh
76,300.00
46
Cat Bron
kg
67,700.00
47
Karet lis
Minyak
cat
Glass
beet
Residu
bh
3,300.00
kg
38,400.00
kg
50,100.00
lt
8,100.00
bt
17,700.00
bt
25,000.00
bt
37,200.00
Kayu
Kamper
Singkil /
Kapur
( Kayu
Samarind
a kls II )
m3
7,094,450
.00
Kayu
Balok
Borneo
Super
m3
5,280,000
.00
Kayu
Papan
Borneo
Super
m3
5,595,800
.00
48
49
50
1
2
3
BAHAN
KAYU
BERIKUT
BAHAN
JADINYA
Bambu 5
s.d 7
Bambu 7
s.d 10
Bambu
Gombong
Kayu
Balok
Kamper
Medan
(Kruing )
m3
5,692,600
.00
Kayu
Papan
Kamper
Medan
(Kruing )
m3
5,823,400
.00
Kayu
Balok
Kamper
Banjar
m3
6,363,600
.00
10
Kayu
Papan
Kamper
Banjar
m3
6,645,300
.00
11
Kayu
Balok
Kamper
Samarind
a
m3
8,633,700
.00
12
Kayu
Papan
Kamper
Samarind
a
m3
8,724,300
.00
13
Kayu
Balok
Rasamala
m3
2,658,000
.00
14
Kayu Jati
Jatim Tua
dia. 40 cm
m3
20,772,00
0.00
15
Kayu Jati
Jateng Tua
dia. 40 cm
m3
22,188,40
0.00
16
Kayu Jati
Jabar Tua
dia. 40 cm
m3
13,625,40
0.00
17
Kayu Jati
Jabar Tua
dia. 40 cm
kebawah
m3
12,736,10
0.00
18
Kayu
Hutan
Kelas I
( Segeng,
Mahoni,
Laban )
m3
2,069,800
.00
19
Kayu
Balok
Albasia
m3
1,870,500
.00
20
Kayu
Papan
Albasia
m3
2,071,700
.00
bt
22,600.00
bt
28,000.00
21
22
Dolken 5
s/d 7
Dolken 7
s/d 10
23
List Profil
Kamper 1
cm
m1
8,900.00
24
List Profil
Kamper 2
cm
m1
10,000.00
25
List Profil
Kamper 4
cm
m1
14,300.00
26
List Profil
Kamper 5
cm
m1
17,200.00
27
List Profil
Kamper
10 cm
m1
29,400.00
28
Pegangan
Tangga
Profil Jati
m1
160,100.0
0
29
Pegangan
Tangga
Profil
Kamper
m1
122,500.0
0
30
Kayu Kaso
4/6
m3
2,772,000
.00
31
Kayu Kaso
5/7
Kamper
Medan
m3
3,356,800
.00
32
Kayu
Reng 2/3
Borneo
Super
m1
2,500.00
33
Kayu
Reng 2/3
Kamper
Banjar
m1
3,300.00
34
Kayu
Reng 3/4
Kamper
Medan
m3
4,000.00
35
Kayu
Papan
Terentang
m3
2,850,000
.00
36
Kayu
Balok
Terentang
m3
2,640,000
.00
37
Batang
Kelapa
bt
139,500.0
0
38
Tali Ijuk
kg
23,400.00
39
lapisan
Ijuk tebal
10 cm
m2
22,000.00
40
41
Venetion
Blind
Vertikal
Blind
BAHAN
PENUTUP
RANGKA
PLAFOND
Plafond
Enternit 4
mm
m2
m2
m2
537,300.0
0
351,200.0
0
17,400.00
Plafond
hardpleks
5 mm 120
x 240
lbr
62,400.00
Plafond
Asbes
Semen 5
mm
m2
22,500.00
Plafond
Asbes
Semen
3,5 mm
m2
19,500.00
Gypsum
120 x 240
t= 9 mm
ex DN
lbr
79,800.00
Gypsum
120 x 240
t= 9 mm
ex Luar
lbr
83,800.00
Tepung
gypsum
kg
12,500.00
Acustik
Amstrong
60 x 120
lbr
132,800.0
0
Cotton
Plester
bh
15,000.00
10
GRC (120
x 240)
cm, t = 4
mm
lbr
67,500.00
11
Cornice
Coumpou
nd
zak
75,000.00
12
List
gypsum
m'
8,500.00
BAHAN
KAYU
LAPIS
Triplek 3
mm 120 x
240
lbr
61,700.00
Triplek 4
mm 120 x
240
lbr
64,400.00
Triplek 4
mm
ukuran
Pintu
lbr
56,200.00
Triplek 6
mm 120 x
240
lbr
92,000.00
Triplek 9
mm 120 x
240
lbr
166,600.0
0
Jabar
Wood 4
mm
lbr
119,000.0
0
Bilik
Bambu
( tanpa
kulit )
m2
19,800.00
Bilik
Bambu
( dengan
kulit )
m2
22,700.00
Bilik
Bambu
Hitam
Variasi
m2
34,200.00
10
Wall
paper
m2
55,700.00
11
MultiPlek
9 mm 120
x 240
lbr
151,100.0
0
12
MultiPlek
12 mm
120 x 240
lbr
195,000.0
0
13
MultiPlek
18 mm
120 x 240
lbr
255,400.0
0
14
Ply Wood
18 mm
120 x 240
lbr
323,900.0
0
15
Ply Wood
9 mm 120
x 240
lbr
235,000.0
0
16
Ply Wood
4 mm 120
x 240
lbr
140,000.0
0
17
Teak
Wood 3
mm 120 x
240
lbr
129,100.0
0
18
Teak
Wood 4
mm 120 x
240
lbr
131,700.0
0
19
Teak
Wood 3
mm 120 x
240
ukuran
Pintu
lbr
127,200.0
0
20
Teak
Wood
ukuran
Pintu 4
mm
lbr
114,700.0
0
21
Tacon
( Tahan
Bakar )
m2
128,200.0
0
22
Supercon
m2
57,900.00
23
Melamin 4
mm 120 x
240
lbr
89,200.00
24
Melamin
TOK 4 mm
lbr
133,400.0
0
25
Formika
120 x 240
lbr
170,000.0
0
26
Formika
ukuran
Pintu
lbr
132,900.0
0
27
Formika
Warna 4"
x 8"
lbr
238,100.0
0
BAHAN
LANTAI
DAN
PELAPIS
DINDING
Tegel PC
20 x 20
bh
3,400.00
Plin Tegel
PC 10 x
20
bh
2,400.00
Tegel PC
30 x 30
bh
3,400.00
Plin Tegel
PC 15 x
30
bh
2,800.00
Tegel
Warna 20
x 20
bh
3,600.00
Plin Tegel
Warna 10
x 20
bh
3,400.00
Tegel
Warna 30
x 30
bh
5,700.00
Plin Tegel
Warna 15
x 30
bh
6,300.00
Tegel
Wafel PC
20 x 20
bh
3,200.00
10
Tegel
Wafel
Warna 20
x 20
bh
2,500.00
11
Tegel
Badak PC
30 x 30
bh
4,100.00
12
Poslin 11
x 11
Warna
Standar
DN
m2
63,300.00
13
Poslin 11
x 11
Warna
khusus
DN
m2
67,300.00
14
Keramik
10 x 20
dan 20 x
20 KW I
DN Putih /
Polos
Mulia
m2
54,500.00
15
Keramik
10 x 20
KW I DN
Corak/War
na/Anti
Slip Mulia
m2
56,000.00
16
Keramik
20 x 20
(KM) KW I
DN
Corak/War
na /Anti
Slip Mulia
m2
62,500.00
17
Keramik
20 x 20
(KM) KW I
DN Putih
Polos
Mulia
m2
54,500.00
18
Keramik
20 x 25
Dinding
KM KW I
DN Corak
Mulia
m2
62,500.00
19
Keramik
30 x 30
KWI DN
Putih
Polos
Mulia
m2
53,000.00
20
Keramik
30 x 30
KWI DN
Warna/Cor
ak (ANTI
SLIP)
Mulia
m2
58,000.00
21
Keramik
40 x 40
KWI DN
Putih
Polos
Mulia
m2
56,800.00
22
Keramik
40 x 40
KWI DN
Warna/Cor
ak (ANTI
SLIP)
Mulia
m2
65,500.00
23
Keramik
10 x 20
dan 20 x
20 KW I
DN Putih /
Polos
Roman
m2
64,400.00
24
Keramik
10 x 20
KW I DN
Corak/War
na/Anti
Slip
Roman
m2
72,200.00
25
Keramik
20 x 20
(KM) KW I
DN
Corak/War
na/Anti
Slip
Roman
m2
75,200.00
26
Keramik
20 x 20
(KM) KW I
DN Putih
Polos
Roman
m2
72,900.00
27
Keramik
20 x 25
Dinding
KM KW I
DN Corak
Roman
m2
75,200.00
28
Keramik
20 x 25
KW I DN
Putih
Polos
Roman
m2
72,900.00
29
Keramik
30 x 30
KW I DN
Polos
Roman
m2
68,900.00
30
Keramik
30 x 30
KW I DN
Warna/Cor
ak (ANTI
SLIP)
Roman
m2
76,600.00
31
Keramik
40 x 40
KW I DN
Polos
Roman
m2
72,500.00
32
Keramik
40 x 40
KW I DN
Warna/Cor
ak (ANTI
SLIP)
Roman
m2
77,000.00
33
Vinyl
Lantai
Standar
m2
56,000.00
34
Karpet
Kelas Baik
LN
m2
1,025,500
.00
35
Karpet
Kelas
Sedang
LN
m2
353,500.0
0
36
Parquet
Jati
m2
375,400.0
0
37
Stairnosin
g Keramik
10/20
bh
13,700.00
38
Stairnosin
g Fiber
25,000.00
39
Taraso
Kerang 30
x 30
m2
31,800.00
40
Plin
Taraso 10
x 30
bh
13,500.00
41
Granit
Alam LN
Ukuran
Besar
m2
1,848,400
.00
42
Granit
Alam LN
Ukuran
Kecil
m2
1,612,900
.00
43
Granit
Alam DN
Ukuran
Besar
m2
1,331,100
.00
44
Granit
Alam DN
Ukuran
Kecil
m2
1,299,400
.00
45
Granito
Tile
Essenza
Ukuran 40
x 40 Polis
m2
345,000.0
0
46
Granito
Tile
Essenza
Ukuran 30
x 30
m2
322,800.0
0
47
Granito
Tile
Essenza
Ukuran 40
x 40
UnPolis
m2
204,900.0
0
48
Marmer
m2
550,000.0
0
49
Marmer
Alam
Lampung
Ukuran
Besar
m2
550,200.0
0
50
Marmer
Alam
Lampung
Ukuran
kecil
m2
345,700.0
0
51
Marmer
Alam
Citatah
Ukuran
Besar
m2
340,800.0
0
52
Marmer
Alam
Citatah
Ukuran
Kecil
m2
237,600.0
0
53
Marmer
Sintetis
m2
157,900.0
0
54
Granito
Tile
Essenza
60 x 60
Polis
m2
358,100.0
0
55
Granito
Tile
Essenza
60 x 60
UnPolis
m2
231,800.0
0
56
Batu
Tempel
Hitam
m2
96,500.00
57
Bata
Karawang
bh
600.00
58
Campuran
untuk
Kedap Air
( AM )
ltr
37,600.00
59
Plint
keramik
10 x 20
bh
3,000.00
60
Plint
keramik
10 x 25
bh
3,250.00
61
Plint
keramik
10 x 30
bh
3,500.00
62
Plint
keramik
10 x 40
bh
4,000.00
63
Plint
keramik
15 x 30
bh
4,500.00
64
Plint
keramik
15 x 40
bh
5,250.00
65
Plint
granito 10
x 30
bh
25,900.00
66
Plint
granito 10
x 40
bh
27,600.00
67
Plint
granito 15
x 30
bh
31,100.00
68
Plint
granito 15
x 40
bh
41,300.00
BAHAN
SALURAN
AIR
KOTOR /
BERSIH
m1
44,300.00
m1
56,400.00
m1
74,200.00
Buis
Beton 20
cm ( 1
M' )
m1
49,200.00
Buis
Beton 30
cm ( 1
M' )
m1
61,700.00
1
2
3
Grafel U
20 cm'
Grafel U
30 cm'
Grafel U
40 cm'
Buis
Beton 40
cm ( 1
M' )
m1
80,900.00
Buis
Beton 50
cm ( 1
M' )
stk
94,300.00
Buis
Beton 60
cm ( 1
M' )
stk
130,900.0
0
Buis
Beton 100
cm ( 0.50
M' )
stk
299,800.0
0
10
Buis
Beton 80
cm ( 0.50
M' )
stk
298,500.0
0
11
BuisTanah
10 cm
( 0.50 M' )
stk
9,600.00
12
BuisTanah
15 cm
( 0.50 M' )
stk
12,700.00
13
BuisTanah
20 cm
( 0.50 M' )
stk
16,800.00
14
BuisTanah
25 cm
( 0.50 M' )
stk
22,800.00
15
Injuk
kg
17,400.00
BAHAN
LOGAM
DAN
BAHAN
JADINYA
Besi
Beton U24 Ratarata
kg
16,500.00
Besi
Beton U39 / U-32
Rata-rata
kg
20,700.00
Pagar BRC
lengkap
tiang
( Tanpa
Pondasi )
m2
171,300.0
0
Bondek
m2
185,000.0
0
kg
24,000.00
kg
23,900.00
5
6
Besi WF
Ex DN SII
Besi WF
Ex Jepang
Besi Profil
DN SII
kg
18,300.00
Besi Profil
Ex LN
kg
21,600.00
Besi C Lip
Chanel
kg
19,200.00
Ongkos
Galfanis
Besi
kg
10,600.00
kg
27,700.00
kg
63,500.00
m1
1,000.00
10
11
12
13
Kawat
Beton
Kawat
Duri
Kawat
Pengikat
14
Kawat
Bronjong
4 mm
kg
28,200.00
15
Kawat
Tembaga
kg
41,400.00
16
Ram
Nyamuk
Hijau
m2
13,400.00
17
Ram
Kawat 1 x
1 cm
m2
15,300.00
18
Ram
Ayam
m2
14,900.00
19
Kawat
Kasa 1 x 1
( Putih )
m2
32,100.00
20
Kawat
Harmonik
a 4 cm
m2
35,900.00
21
Kawat
Harmonik
a 2 cm
m2
28,600.00
Kawat Las
Listrik
Wiremesh
M8
Wiremesh
M6
kg
23,600.00
m2
51,900.00
m2
38,700.00
25
Timah
kg
46,300.00
26
Timah
Hitam
kg
43,300.00
27
Ram
nyamuk
Alumuniu
m
m2
32,400.00
28
Plat Srip
2 x 30
mm ( 6
m1 )
bt
33,000.00
29
Plat Srip
3 x 30
mm ( 6
m1 )
bt
33,100.00
30
Plat Strip
bt
18,200.00
31
Besi Strip
kg
26,800.00
32
Plat
Alumuniu
m 0.2 mm
m2
89,800.00
33
Plat
Alumuniu
m 0.3 mm
m2
110,500.0
0
34
Plat
Alumuniu
m 0.4 mm
m2
141,400.0
0
22
23
24
35
Plat
Alumuniu
m 0.5 mm
m2
143,100.0
0
36
Plat
Alumuniu
m 0.6 mm
m2
171,800.0
0
37
Plat
Alumuniu
m 0.1 mm
m2
56,300.00
38
Kusen
Alumuniu
m Natural
1.3 mm
t= 1,3
mm ( 4 " )
m1
151,100.0
0
39
Kusen
Alumuniu
m Warna
1.3 mm
t= 1,3
mm ( 4 " )
m1
163,000.0
0
40
Kusen
Alumuniu
m Natural
1.3 mm
t= 1,3
mm ( 3 " )
m1
81,000.00
41
Kusen
Alumuniu
m Warna
1.3 mm
t= 1,3
mm ( 3 " )
m1
102,000.0
0
42
Daun
Jendela
Alumuniu
m Natural
( tanpa
kaca dan
accessorie
s)
m2
98,800.00
43
Daun
Jendela
Alumuniu
m Warna (
tanpa
kaca dan
accessorie
s)
m2
148,800.0
0
44
Daun
Pintu
Alumuniu
m Natural
( tanpa
kaca dan
accessorie
s)
m2
211,800.0
0
45
Daun
Pintu
Alumuniu
m Warna (
tanpa
kaca dan
accessorie
s)
m2
207,500.0
0
46
Handle
Alumuniu
m
( Tarikan
Pintu
Alumuniu
m)
bh
345,200.0
0
47
Kait Angin
Alumuniu
m
ps
104,500.0
0
48
Karet
Asisoris
Kusen /
Pintu
Alumuniu
m
m1
7,500.00
49
Jalusi
Alluminiu
m
m'
35,000.00
50
Sunscreen
Almunium
m2
380,200.0
0
51
Seng Plat
BJLS 30
60 cm
( 100 m1 )
roll
1,581,500
.00
52
Seng Plat
BJLS 30
90 cm
( 100 m1 )
roll
2,080,100
.00
53
Plat Besi
Tipis 1
mm
kg
16,800.00
54
Plat Besi
Tipis 0.5
mm
kg
17,700.00
55
Plat Besi 2
mm s/d 5
mm
kg
14,100.00
56
Plat Besi 6
mms/d 10
mm
kg
14,100.00
57
Plat Besi
10 mm
keatas
kg
14,700.00
58
Kabel
presstress
ed polos
kg
26,700.00
59
Jaring
Kawat
Baja
kg
28,900.00
60
Lem
Kuning
( Aibond )
kg
35,700.00
61
Lem Fox
kg
23,900.00
62
Lem Vinyl
kg
44,000.00
63
Besi Strip
Kaca Nako
kg
11,000.00
64
Profil
alumuniu
m "T"
m1
12,200.00
65
Besi
Hallow ( 2
x 4 x 4)
cm
(400cm)
btg
22,600.00
66
Besi
Hallow ( 4
x 4) cm
(400 cm)
btg
29,200.00
67
Besi Rail
Pengama
nan
kg
459,300.0
0
68
Jendela
Besi
m2
390,200.0
0
69
Jendela
Besi
tahan api
m2
501,700.0
0
70
Pintu
gulung
besi
m2
501,700.0
0
71
Pintu
Roliing
Door
m2
306,600.0
0
72
Jendela
nako kaca
ryben +
tralis 6
klips
set
170,000.0
0
73
Jendela
nako kaca
ryben +
tralis 7
klips
set
200,000.0
0
74
Jendela
nako kaca
ryben +
tralis 8
klips
set
230,000.0
0
75
Jendela
nako kaca
ryben +
tralis 10
klips
set
290,000.0
0
76
Jendela
nako kaca
bening +
tralis 4
klips
set
120,000.0
0
77
Jendela
nako kaca
bening +
tralis 5
klips
set
140,000.0
0
78
Jendela
nako kaca
bening +
tralis 6
klips
set
170,000.0
0
79
Jendela
nako kaca
bening +
tralis 7
klips
set
210,000.0
0
80
Jendela
nako kaca
bening +
tralis 8
klips
set
230,000.0
0
81
Jendela
nako kaca
bening +
tralis 10
klips
set
300,000.0
0
BAHAN
KACA
Kaca
Polos 2
mm
( ASAHI )
m2
69,000.00
Kaca
Polos 3
mm
( ASAHI )
m2
87,400.00
Kaca
Polos 5
mm
( ASAHI )
m2
111,000.0
0
Kaca
Polos 8
mm
( ASAHI )
m2
183,100.0
0
Kaca
Rayband
5 mm
( ASAHI )
m2
148,700.0
0
Kaca
Rayband
8 mm
( ASAHI )
m2
323,400.0
0
Kaca
Rayband
12 mm
( ASAHI )
m2
627,000.0
0
Kaca
cermin 5
mm
m2
150,500.0
0
Kaca
cermin 6
mm
m2
186,400.0
0
10
Kaca
cermin 8
mm
m2
234,300.0
0
11
Kaca Patri
Lokal
Terpasang
( ASAHI )
m2
1,621,100
.00
12
Kaca Patri
Ex Luar
Negeri
Terpasang
m2
3,425,700
.00
13
Kaca 6
mm
Gravver
m2
1,263,900
.00
14
Glass
Block DN
20 x 20
( Kedawun
g)
bh
22,000.00
15
Glass
Block DN
20 x 20
Ex LN
bh
125,700.0
0
16
Sealant
kg
17
Jendela
Nako
bh
1
2
211,800.0
0
109,200.0
0
BAHAN
PAKU DAN
MUR
BAUT
Paku 1/2"
s/d 2"
Paku 2"
s/d 5"
kg
23,800.00
kg
23,400.00
Paku 8 cm
s/d 15 cm
kg
20,000.00
Paku
Beton 2
cm s/d 5
cm
bh
1,600.00
bh
900.00
kg
57,100.00
Besi
Beugel
Kuda Kuda
kg
21,700.00
Duk
Angker
bh
7,500.00
Angker
Mur Baut
dia. 19 /
Panjang
60 cm
bh
71,800.00
5
6
Paku Kait
Lengkap
Paku
Cacing
10
Mur Baut
HTB dia.
19 s/d 16
( 5 cm )
bh
15,900.00
11
Mur Baut
Biasa dia.
19 s/d 16
( 5 cm )
bh
9,300.00
12
Piser
dia.12 s/d
20 cm
bh
5,300.00
bh
800.00
bh
7,200.00
bh
600.00
13
14
15
Paku
skrup 3"
Ramset /
Dinabolt
Baut
Besar
16
Baut Kecil
bh
300.00
17
Paku GRC
kg
35,000.00
kg
17,500.00
bh
250.00
18
19
Paku
gypsum
Sekrup
fixer
BAHAN
PERPIPAA
N
Besi Pipa
Untuk
Hydrant
BSP 1"
bt
166,700.0
0
Besi Pipa
Untuk
Hydrant
BSP 1.25"
bt
210,200.0
0
Besi Pipa
Untuk
Hydrant
BSP 1.5"
bt
298,000.0
0
Besi Pipa
Untuk
Hydrant
BSP 2"
bt
351,800.0
0
Besi Pipa
Untuk
Hydrant
BSP 2.5"
bt
439,300.0
0
Besi Pipa
Untuk
Hydrant
BSP 3"
bt
595,000.0
0
Besi Pipa
Untuk
Hydrant
BSP 4"
bt
869,600.0
0
Besi Pipa
Untuk
Hydrant
BSP 6"
bt
1,423,400
.00
Besi Pipa
Hitam 1" t
= 2 mm
bt
172,300.0
0
10
Besi Pipa
Hitam 2" t
= 2 mm
bt
227,900.0
0
11
Besi Pipa
Hitam 3" t
= 2mm
bt
365,800.0
0
12
Besi Pipa
Hitam 4" t
= 2 mm
bt
573,100.0
0
13
Besi Pipa
Hitam 6" t
= 2 mm
bt
772,400.0
0
14
Pipa GIP
Medium A
1/2" ( 6
m1 )
bt
109,100.0
0
15
Pipa GIP
Medium A
3/4" ( 6
m1 )
bt
159,400.0
0
16
Pipa GIP
Medium A
1" ( 6
m1 )
bt
181,500.0
0
17
Pipa GIP
Medium A
1 1/4" ( 6
m1 )
bt
259,300.0
0
18
Pipa GIP
Medium A
1 1/2" ( 6
m1 )
bt
280,500.0
0
19
Pipa GIP
Medium A
1 3/4" ( 6
m1 )
bt
326,400.0
0
20
Pipa GIP
Medium A
2" ( 6
m1 )
bt
467,400.0
0
21
Pipa GIP
Medium A
2 1/2" ( 6
m1 )
bt
672,100.0
0
22
Pipa GIP
Medium A
3" ( 6
m1 )
bt
849,900.0
0
23
Pipa GIP
Medium A
4" ( 6
m1 )
bt
920,300.0
0
24
Macam2
Sambung
an GIP
1/2"
bh
6,300.00
25
Macam2
Sambung
an GIP
3/4"
bh
8,600.00
26
Macam2
Sambung
an GIP 1"
bh
16,700.00
27
Macam2
Sambung
an GIP 1
1/4"
bh
19,800.00
28
Macam2
Sambung
an GIP 1
1/2"
bh
20,700.00
29
Macam2
Sambung
an GIP 1
3/4"
bh
22,700.00
30
Macam2
Sambung
an GIP 2"
bh
51,200.00
31
Macam2
Sambung
an GIP 2
1/2"
bh
60,400.00
32
Macam2
Sambung
an GIP 3"
bh
75,900.00
33
Macam2
Sambung
an GIP 4"
bh
118,600.0
0
34
Pipa PVC
RUCIKA
type AW
1/2"
bt
40,100.00
35
Pipa PVC
RUCIKA
type AW
3/4"
bt
52,200.00
36
Pipa PVC
RUCIKA
type AW
1"
bt
63,200.00
37
Pipa PVC
RUCIKA
type AW 1
1/4"
bt
79,900.00
38
Pipa PVC
RUCIKA
type AW 1
1/2"
bt
105,900.0
0
39
Pipa PVC
RUCIKA
type AW
2"
bt
110,700.0
0
40
Pipa PVC
RUCIKA
type AW 2
1/2"
bt
167,100.0
0
41
Pipa PVC
RUCIKA
type AW
3"
bt
205,100.0
0
42
Pipa PVC
RUCIKA
type AW
4"
bt
347,900.0
0
43
Pipa PVC
RUCIKA
type AW
6"
bt
640,000.0
0
bt
818,300.0
0
bt
22,500.00
bt
27,800.00
bt
40,500.00
bt
58,500.00
bt
60,200.00
bt
75,800.00
bt
126,300.0
0
bt
145,700.0
0
44
45
46
47
48
49
50
51
52
Pipa PVC
RUCIKA
type AW
8"
Pipa PVC
MASPION
ABU
( AW )
1/2"
Pipa PVC
MASPION
ABU
( AW )
3/4"
Pipa PVC
MASPION
ABU
( AW ) 1"
Pipa PVC
MASPION
ABU
( AW ) 1
1/4"
Pipa PVC
MASPION
ABU
( AW ) 1
1/2"
Pipa PVC
MASPION
ABU
( AW ) 2"
Pipa PVC
MASPION
ABU
( AW ) 2
1/2"
Pipa PVC
MASPION
ABU
( AW ) 3"
53
Pipa PVC
MASPION
ABU
( AW ) 4"
bt
256,800.0
0
54
Macam2
Sambung
an Paralon
1/2"
bh
4,400.00
55
Macam2
Sambung
an Paralon
3/4"
bh
4,700.00
56
Macam2
Sambung
an Paralon
1"
bh
4,900.00
57
Macam2
Sambung
an Paralon
1 1/4"
bh
7,200.00
58
Macam2
Sambung
an Paralon
1 1/2"
bh
9,500.00
59
Macam2
Sambung
an Paralon
1 3/4"
bh
13,500.00
60
Macam2
Sambung
an Paralon
2"
bh
15,800.00
61
Macam2
Sambung
an Paralon
2 1/2"
bh
26,400.00
62
Macam2
Sambung
an Paralon
3"
bh
29,700.00
63
Macam2
Sambung
an Paralon
4"
bh
34,000.00
64
Sambung
an Pipa
PVC Jenis
AW 4" TY
bh
89,900.00
tb
10,100.00
gl
4,200.00
65
66
Lem
Paralon
Solatip
Ledeng
67
Pipa PVC
4"
Berlobang
Jenis AW
m1
36,700.00
68
PVC
Waterstop
lebar 150
m1
53,500.00
69
PVC
Waterstop
lebar 200
m1
57,900.00
70
PVC
Waterstop
lebar 230
m1
65,700.00
71
PVC
Waterstop
lebar 250
m1
74,700.00
72
PVC
Waterstop
lebar 300
m1
83,600.00
73
PVC
Waterstop
lebar 320
m1
92,500.00
BAHAN
SANITAIR
Stop Kran
3/4" KIT
Stop Kran
1" KIT
bh
Stop Kran
1 1/2" KIT
bh
208,000.0
0
Stop Kran
2" KIT
bh
267,900.0
0
Stop Kran
2 1/2" KIT
bh
713,200.0
0
Stop Kran
3" KIT
bh
830,300.0
0
Check
Valve 1/2"
bh
86,400.00
Double
Neple
1/2"
bh
32,400.00
Water Mur
1/2"
bh
40,200.00
10
Gate
walve
1/2"
bh
55,500.00
11
Saringan
Air Lt. KM
Stainless
Steel
bh
66,600.00
12
Apooer
Bath Tube
bh
267,800.0
0
13
Kran
Stainless
Lokal Kait
bh
46,100.00
14
Shower
Dengan
Tiang
bh
221,000.0
0
15
Shower
Tanpa
Tiang
bh
134,800.0
0
L
1
2
bh
103,900.0
0
124,200.0
0
16
Kran
Tembok
Sun Eui
dia. 1/2"
bh
86,900.00
17
Kran
Tembok
ITAP dia.
1/2"
bh
40,900.00
18
Kran
Bebek
Sun Eui
1/2"
bh
144,600.0
0
19
Kran
Bebek
ITAP 1/2"
bh
51,500.00
20
Kran
Panas
Dingin
San Eui
Standard
bh
228,400.0
0
21
Bath Cape
Washtere
n
unit
2,098,700
.00
22
Tempat
Sabun
Poslin
bh
46,300.00
23
Wastafel
Lengkap
TOTO LW
230
unit
1,012,700
.00
24
Wastafel
Lengkap
INA
unit
699,900.0
0
25
Closet
Jongkok
Poslin
Warna
TOTO
unit
205,600.0
0
26
Closet
Jongkok
Standard
Putih
Poslin
TOTO
unit
188,200.0
0
27
Closet
Jongkok
Lengkap
Sistem Jet
TOTO
unit
2,032,900
.00
28
Closet
Duduk
Warna
Standard
TOTO C
240
Lengkap
unit
1,724,700
.00
29
Wastafel
Bulat
Warna
Standard
Lengkap
unit
910,800.0
0
30
Closet
Duduk
Warna
Standard
INA
Lengkap
bh
1,272,100
.00
31
Urinoir
Lengkap
TOTO
Warna
Standard
Lengkap
unit
1,773,400
.00
32
Penyekat
Poslin
Urinoar
TOTO
lbr
495,900.0
0
33
Kitchen
Zink
Stainless
Standard
Lokal ( 1
Lubang )
bh
397,800.0
0
34
Kitchen
Zink
Stainless
Non
Standard
Franke ( 1
Lubang )
bh
1,272,300
.00
35
Kitchen
Zink
Stainless
Non
Standard
Franke ( 2
Lubang )
36
Talang
PVC U 15 cm
BAHAN
PENUTUP
ATAP
bh
1,650,200
.00
btng
60,000.00
Atap
Plastik
Gelomban
g 80 x
180
lbr
33,100.00
Atap Fiber
Glass
Tipis 80 x
180
( Gelomba
ng )
lbr
47,100.00
Atap Fiber
Glass
Tebal 80 x
180
( Gelomba
ng )
lbr
100,000.0
0
Atap
Alumuniu
m Natural
USR 26
( JAINDO )
m2
140,600.0
0
Atap
Alumuniu
m Warna
USR 26
( JAINDO )
m2
164,700.0
0
Atap
Asbes
Gel. Kecil
80 x 180
x 4 mm
lbr
77,200.00
Atap
Asbes
Gel. Besar
80 x 180
x 5 mm
lbr
111,100.0
0
Atap Seng
Gelomban
g 80 cm x
180 cm x
3 mm
lbr
62,900.00
Atap Seng
Gelomban
g 80 cm x
180 cm x
5 mm
lbr
83,100.00
10
Atap Seng
Gelomban
g 270 cm
x 105 cm
x 4mm
lbr
73,300.00
11
Atap Seng
Gelomban
g 240 cm
x 105 cm
x 4mm
lbr
65,900.00
12
Atap Seng
Gelomban
g 210 cm
x 105 cm
x 4mm
lbr
58,500.00
13
Atap Seng
Gelomban
g 150 cm
x 105 cm
x 4mm
lbr
42,300.00
14
Atap Seng
Gelomban
g 150 cm
x 102 cm
x 5mm
lbr
78,500.00
15
Atap Seng
Gelomban
g 180 cm
x 102 cm
x 5mm
lbr
97,200.00
16
Atap
Asbes
Gelomban
g 300 cm
x 105 cm
x 4 mm
lbr
80,000.00
17
Atap
Tegola
Kubota,
lengkap
m2
487,100.0
0
18
Atap
Tegola
Kwalitas
Sedang
m2
283,600.0
0
19
Alumuniu
m Foile
m2
19,600.00
20
Atap
Genteng
Plentong
pres
Bakar KW
I
bh
1,900.00
21
Atap
Genteng
Plentong
pres
Molen
Oven KW I
bh
2,700.00
22
Atap
Genteng
Flam pres
Molen
Oven
Jatiwangi
bh
2,300.00
23
Bubung
Genteng
pres Bulat
Ex
Jatiwangi
bh
7,500.00
24
Genteng
Bubungan
Ex
Jatiwangi
Segi Tiga
bh
4,800.00
25
Genteng
Bubungan
Beton
bh
10,500.00
26
Genteng
Metal
( Rainbow
Roof )
m2
203,100.0
0
27
Genteng
Metal
Hana
m2
172,700.0
0
28
Nok Atas
Metal
( Rainbow
Roof )
lbr
138,500.0
0
29
Nok Atas
Metal
Hana
lbr
80,900.00
30
Nok Pingir
Metal
( Rainbow
Roof )
lbr
105,300.0
0
31
Nok Pingir
Metal
Hana
lbr
100,800.0
0
32
Wall
Flasing
( Rainbow
Roof )
lbr
83,900.00
33
Wall
Flasing
Hana
lbr
88,700.00
34
Atap
Genteng
Beton
Warna
14.5/m2
m2
96,700.00
35
Genteng
Beton
Natural
bh
8,500.00
36
Sirap
Kelas I
( 80 / m2 )
m2
26,400.00
37
Genteng
Keramik
Natural
Intan 14.5
/ m2
m2
112,400.0
0
38
Genteng
Keramik
Glasur
Standard
14.5 /m2
m2
142,200.0
0
39
Genteng
Keramik
Glasur
Special
14.5 /m2
m2
139,300.0
0
40
Genteng
Keramik
Glasur
Premium
14.5 /m2
m2
145,100.0
0
41
Genteng
Murando
Natural
1m2 = 18
bh
bh
2,700.00
42
Genteng
Murando
Glasur
1m2 = 18
bh
bh
4,000.00
43
Bubung
Murando
Natural
bh
7,500.00
44
Bubung
Murando
Glasur
bh
10,700.00
45
Bubungan
Genteng
Keramik
bh
10,000.00
46
Atap
Genteng
Kodok
bh
3,000.00
47
Bubungan
Genteng
Kodok
bh
4,500.00
48
Bubungan
Genteng
Plentong
bh
6,000.00
49
Bubungan
Stel
Gelomban
g
bh
7,500.00
50
Nok Stel
Gelomban
g
lbr
38,100.00
51
Nok Atap
Seng
lbr
37,500.00
52
Nok
standar
40 cm 18,
SWG 22
m2
75,000.00
53
Pelat
Asbes
tebal 4
mm
lbr
21,000.00
54
Pelat
Asbes
tebal 3.5
mm
lbr
16,400.00
55
Trusses
ZAM-75
t=0.8
Rangka
Utama
m1
34,500.00
56
Trusses
ZAM-75
t=0.5
Rangka
Utama
m1
22,000.00
57
m1
11,000.00
58
Foot Plate
t= 1.22
mm
m1
7,200.00
59
PLD Diafragma
Plate
bh
2,200.00
60
WIND
Bracing
m1
1,700.00
61
Tensioner
( Pengaku
Tali
angin )
bh
7,200.00
BAHAN
MEKANIKA
L
Jockey
Pump kap.
80
gln/menit
100 m1
( 18.6
kW )
Electrical
Pump kap.
750
gln/menit
120 m1
( 90 kW )
unit
71,396,40
0.00
unit
216,358,9
00.00
Diesel
Pump kap.
750
gln/menit
120 m1
( 105 kW )
unit
591,647,1
00.00
unit
36,997,30
0.00
unit
6,854,400
.00
Fire House
1.5 x 30
m + nose
unit
4,866,100
.00
Exhose
Fan H 360
W 60 x 60
cm
unit
6,862,900
.00
Exhose
Fan H 380
W CFM 55
x 55 cm
unit
5,491,100
.00
Exhose
Fan H 100
W 40 x 40
cm
unit
1,092,600
.00
10
AC Split 3
PK Setara
TOSHIBA
unit
30,791,80
0.00
11
AC Split 2
PK Setara
TOSHIBA
unit
21,926,50
0.00
12
AC Split 1
PK Setara
TOSHIBA
unit
5,174,100
.00
13
Mesin AC
Split
DAIKIN
( Indoor /
Outdoor
Unit )
1 BTU
4,200,000
.00
Presure
Tank kap.
500 liter
lengkap
Hydran
Box dlm
Gedung
( Lengkap
)
BAHAN
ELEKTRIK
AL
Kabel NYA
1 x 1.5
Prima ( 1
rol = 50
m' )
ROLL
102,700.0
0
Kabel NYA
1 x 2.5
Prima ( 1
rol = 50
m' )
ROLL
151,700.0
0
Kabel
NYM 2 x
1.5 Prima
( 1 rol =
50 m' )
m'
6,600.00
Kabel
NYM 3 x
1.5 Prima
( 1 rol =
50 m' )
m'
7,600.00
Kabel
NYM 2 x
2.5 Prima
( 1 rol =
50 m' )
m'
4,900.00
Kabel
NYM 3 x
2.5 Prima
( 1 rol =
50 m' )
m'
10,900.00
Kabel
NYM 4 x
2.5 Prima
( 1 rol =
50 m' )
m'
7,600.00
Kabel
NYM 2 x 4
Prima ( 1
rol = 50
m' )
m'
6,300.00
Kabel
NYM 3 x 4
Prima ( 1
rol = 50
m' )
m'
15,400.00
10
Kabel
NYM 4 x 4
Prima ( 1
rol = 50
m' )
m'
20,700.00
11
Kabel
NYM 2 x 6
Supreme (
1 rol = 50
m' )
m'
11,800.00
12
Kabel
NYM 3 x 6
Supreme (
1 rol = 50
m' )
m'
13,700.00
13
Kabel
NYM 4 x 6
Supreme (
1 rol = 50
m' )
m'
18,600.00
14
Kabel
NYM 2 x
10
Supreme (
1 rol = 50
m' )
m'
17,600.00
15
Kabel
NYM 3 x
10
Supreme (
1 rol = 50
m' )
m'
119,700.0
0
16
Kabel
NYM 4 x
10
Supreme (
1 rol = 50
m' )
m'
26,500.00
17
Kabel
NYM 4 x
16
Supreme (
1 rol = 50
m' )
m'
29,700.00
18
Kabel NYY
2x4
Supreme (
1 rol = 50
m' )
m'
12,000.00
19
Kabel NYY
3x4
Supreme (
1 rol = 50
m' )
m'
19,300.00
20
Kabel NYY
4x4
Supreme (
1 rol = 50
m' )
m'
23,800.00
21
Kabel NYY
2x6
Supreme (
1 rol = 50
m' )
m'
14,500.00
22
Kabel NYY
3x6
Supreme (
1 rol = 50
m' )
m'
19,200.00
23
Kabel NYY
4x6
Supreme (
1 rol = 50
m' )
m'
18,500.00
24
Kabel NYY
2 x 10
Supreme (
1 rol = 50
m' )
m'
20,400.00
25
Kabel NYY
3 x 10
Supreme (
1 rol = 50
m' )
m'
25,800.00
26
Kabel NYY
4 x 10
Supreme (
1 rol = 50
m' )
m'
35,500.00
27
Kabel NYY
4 x 16
Supreme (
1 rol = 50
m' )
m'
41,900.00
28
NSFB FUJI
EA - 100 A
bh
841,900.0
0
29
NSFB FUJI
EA - 150 A
bh
2,182,600
.00
30
Rumah
Panel 30 x
60 cm
( Kosong )
unt
153,500.0
0
31
Skring Kas
2 grop
Biasa
unt
204,800.0
0
32
Skring Kas
3 grop
Biasa
unt
222,600.0
0
33
Skring Kas
5 grop
Biasa
unt
468,800.0
0
bh
55,100.00
bh
106,000.0
0
bh
521,100.0
0
34
35
36
MCB 1
PAS
MCB 3
PAS
Tahanan
50 A Merk
Fuji
37
Saklar
Broko
Tunggal
Standard (
1 Phase )
bh
23,800.00
38
Saklar
Broko Seri
Standard (
1 Phase )
bh
26,300.00
39
Stop
Kontak
Broko
Standard (
1 Phase )
bh
23,800.00
40
Stop
Kontak
Broko 3
Phase
(Out Bow)
bh
87,700.00
41
Stop
Kontak
Broko 3
Phase ( In
Bow)
bh
144,900.0
0
42
Stop
Kontak
Handle 3
Phase
bh
87,800.00
43
Instalas
Titik
Lampu /
Stop
Kontak
(Upah dan
Alat)
ttk
179,600.0
0
44
Lampu
pijar 25
Watt s/d
100 Watt
bh
61,200.00
45
Lampu
Neon
Phillips 20
Watt
bh
29,700.00
46
Lampu
Neon
Phillips 40
Watt
bh
35,200.00
47
Trapo TL
20 W
(Phillips)
bh
41,800.00
48
Trapo TL
40 W
(Phillips)
bh
37,900.00
49
Trapo TL
20 W
(Sinar)
bh
40,600.00
50
Trapo TL
40 W
(sinar)
bh
41,300.00
51
Stater
Neon
Phillips
bh
8,300.00
52
Stater
Neon
Biasa
bh
6,500.00
53
Rumah TL
In Bow /
Out Bow 2
x 20 W
(kosongan
)
bh
144,000.0
0
54
Down
Light + SL
25 W
bh
306,900.0
0
55
Lampu SL
Philip 25
W
bh
306,900.0
0
56
Lampu
Sirkel TL
20 W
Lengkap
bh
67,900.00
57
Lampu
Mercuri
80 W
bh
147,400.0
0
58
Lampu
Taman +
Tiang +
Lampu 1
Buah
bh
307,600.0
0
59
Lampu
Baret 30
cm +
Neon
bh
221,700.0
0
60
Lampu
Neon
Arcrilik 2
x 40 W
Lengkap
bh
738,000.0
0
61
Jarum
Penangkal
Petir 16
bh
101,500.0
0
62
Kawat BC
( Tembaga
)
kg
65,100.00
63
Pentanah
an
Penangkal
Petir
ttk
423,700.0
0
64
Pentanah
an Panel
ttk
296,100.0
0
BAHAN
ALAT
PENGANT
UNG DAN
KUNCI
Kunci
Silinder
ALFA
untuk
Pintu
Alumuniu
m
bh
410,900.0
0
Tarikan
Pintu
Alumuniu
m
bh
408,600.0
0
Kunci 2
Slaag
ROYAL
bh
126,500.0
0
Rel
Henderso
n Lengkap
bh
864,300.0
0
Rel
maraton I
Pintu
unt
193,100.0
0
Kunci 2
Slaag
Silinder
SEIS Asli
type 210
s/d type
226
bh
335,900.0
0
Kunci 2
Slaag
Ancor Asli
bh
165,300.0
0
Kunci 2
Slaag ISO
bh
207,300.0
0
Kunci KM
Bulat
Kualitas
Biasa
bh
54,400.00
10
Kunci kM
Bulat
ALFA
bh
102,700.0
0
11
Kunci 2
Slaag
Silinder
Utama
Standard
bh
586,600.0
0
12
Kunci
Gembok
Besar
bh
85,200.00
13
Kunci 2
Slaag
Kuda
Terbang
bh
94,500.00
bh
46,800.00
ps
51,600.00
14
15
Kunci
Lemari
Espangole
t
16
Grendel
15 cm
Grendel 5
cm
bh
49,800.00
bh
5,500.00
18
Hak Angin
Kait
Jendela
Biasa
ps
7,100.00
19
Hak Angin
Jendela
Antik
ps
29,000.00
20
Hak Angin
Sendok
Stainless /
Kuningan
bh
32,200.00
21
Sloot
Pintu
Berikut
Rantai
bh
31,500.00
22
Sloot
Jendela
Tunggal
bh
33,000.00
23
Engsel
Pintu
Unilon
Standard
ps
21,000.00
24
Engsel
Jendela
Unilon
ps
15,000.00
25
Engsel
Patrun
ps
13,700.00
26
Engsel
Harmonik
a
m1
9,100.00
27
Door
Closer
Kelas
Standard (
Kelas
Sedang )
unt
420,000.0
0
17
28
Door
Closer
Kelas
Standard (
Kelas Baik
)
unt
597,500.0
0
29
Door
Closer
Kelas
Rendah
unt
200,000.0
0
30
31
Door
Holder
Door
Stoper
unt
unt
205,400.0
0
255,500.0
0
32
Tarikan
Almari
Rata-rata
bh
19,500.00
33
Seng BJLS
30 Lebar
60 cm ( 1
rol 50 m' )
m1
43,500.00
34
Seng BJLS
30 Lebar
90 cm ( 1
rol 50 m' )
m1
53,500.00
35
Seng BJLS
30 / 3 x
0.3 mm
lbr
86,900.00
36
Seng Plat
lbr
50,100.00
37
Waterstop
Lebar 200
mm
m1
57,900.00
BAHAN
PENGIKAT
UNTUK
KONSTRU
KSI JALAN
kg
12,459.00
kg
12,459.00
1
2
Aspal
Bitumen
Aspal
Emulsi
Aspal
Curah
kg
10,890.00
Aspal
Concrete /
Laston( A
C -WC)
ton
1,348,300
.00
Aspal
Threated
Base
( ATB )
ton
1,200,200
.00
Lataston /
Hot Rolls
Sheet
( HRS )
ton
1,666,900
.00
BAHAN
PENGISAP
AIR
SUMUR
DALAM
Pompa
Kodok
unit
172,600.0
0
Pompa
Dragon
Tegal
unit
243,800.0
0
Pompa
Dragon
Asli
unit
718,500.0
0
Mesin
Pompa Air
100 W Sanyo
unit
1,100,200
.00
Mesin
Pompa Air
150 W Sanyo
unit
1,890,700
.00
Pompa
Zet Pump
250 W Sanyo
unit
4,961,500
.00
Pompa
Zet Pump
450 W Sanyo
unit
7,878,000
.00
Pompa
Submersi
ble kap.
150 liter /
menit 3
KW
unit
27,151,20
0.00
Gear
Pump
Kap. 60
liter /
menit
unit
15,702,70
0.00
10
Deep Well
dengan
kelengkap
annya
kap. 150
liter /
menit
unit
172,052,5
00.00
11
Hand Oil
Pump
unit
5,195,300
.00
BAHAN
PENAMPU
NG AIR
Tangki Air
Fiber
Glass 0.5
m3
( Excel )
bh
1,172,500
.00
Tangki Air
Fiber
Glass 1
m3
( Excel )
bh
1,316,400
.00
Tangki Air
Fiber
Glass 2
m3
( Excel )
bh
1,954,200
.00
Bak KM
Fiber 60 x
60
bh
255,300.0
0
Bak
Taraso WC
40 x 40
bh
118,500.0
0
T
1
Bak KM
Taraso 60
x 60
ALAT
TUKANG
Palu 0.5
kg
bh
161,100.0
0
bh
39,300.00
Cangkul
bh
24,500.00
Singkup
bh
41,400.00
Sekrop
bh
50,100.00
Pengki
bh
12,300.00
Linggis
bh
41,700.00
Rool
Meter 30
meter
( Bahan
Plastik )
bh
101,000.0
0
Rool
Meter 5
meter
( Bahan
Besi )
bh
37,800.00
Selang
Plastik
untuk
Water Pas
dia. 0.5
cm
1,600.00
10
Water Pas
Alumuniu
m 60 cm
bh
88,200.00
BAHAN
BAKAR
DAN
PELUMAS
Minyak
Tanah
lt
18,000.00
Kayu
Bakar dari
Kayu
Karet
Bahan
Bakar
Residu
4
5
6
7
8
9
Minyak
Solar
Bensin
Premium
Plus Oil
Oil
Mesran 40
SAE
Elpiji /
botol
Asitilin /
Botol
m3
151,100.0
0
lt
28,435.00
lt
7,150.00
lt
7,800.00
lt
3,300.00
lt
55,000.00
15 kg
104,600.0
0
15.1 kg
btl
88,900.00
10
Angin
( O2 ) /
botol
btl
66,400.00
11
Karbit
kg
19,400.00
12
Minyak
Bekisting
ltr
40,500.00
13
Rapidrant
Gln
15,700.00
14
Soda Api
kg
35,600.00
15
Sabun
Arang
Kayu
kg
2,400.00
kg
11,100.00
17
Kawat Las
bh
1,400.00
BAHAN
PAGAR
Panel
Beton
Pracetak
lbr
199,200.0
0
Kolom
Beton
Pracetak
btg
264,000.0
0
16
B.
BIDANG
PERTAMA
NAN
Aglonema
batang
50,000.00
Bambu
krisik/jepa
ng
batang
50,000.00
Furadan
kg
24,000.00
Kompos/p
upuk
kandang
karung
25,000.00
M atoa (2
m)
batang
40,000.00
Palm
(botol,
ekor
tupai,
putri, dll)
tinggi 2 m
batang
100,000.0
0
Philo
batang
75,000.00
Pohon
pelindung
(angsana,
mahoni,
kamboja
dll) tinggi
2m
batang
25,000.00
Pohon
perdu
(kaca
piring,
puring,
mawar,
melati,
dll)
batang
10,000.00
m2
15,000.00
10
Rumput
gajah mini
harga sudah
termasuk PPN dan
keuntungan