Satuan Pekerjaan Persiapan

Diposkan : 31 Mei 2014


Oleh : Endang Kusman

No.

A-01

URAIAN

SATUAN

HARGA
SATUAN
(Rp)

HARGA
(Rp)

1 M' Pagar Sementara Dari Kayu Tinggi 2 m


-

Dolken Kayu 8-10 / 400


cm

Btg

12,500 28,000.00 35,000.00

Semen Portland

Kg

25,000

1,406.00

3,515.00

Pasir beton

M3

0.0050

255,400.0
0

1,277.00

Koral Beton 2/3

M3

0.0090

211,100.0
0

1,899.90

Kayu balok terentang

M3

0.0720

2,640,000 190,080.0
.00
0

Paku Biasa 2" - 5"

Kg

0.0600 23,400.00

1,404.00

Residu

Kg

0.4000

3,240.00

Pekerja

Oh

0.4000 42,000.00 16,800.00

Tukang Kayu

Oh

0.2000 65,000.00 13,000.00

Kepala Tukang

Oh

0.0200 75,000.00

1,500.00

Mandor

Oh

0.0200 80,000.00

1,600.00

8,100.00

269,315.9
0
269,316.0
0

Jumlah
Dibulatkan
A-02

VOLUME

1 M' Pagar Sementara Seng Gelombang Tinggi 2 m


-

Dolken Kayu 8-10 / 400


cm

Btg

12,500 28,000.00 35,000.00

Semen Portland

Kg

25,000

1,406.00

Seng Gelombang BJLS-30

Lbr

12,000 62,900.00 75,480.00

Pasir beton

M3

0.0050

255,400.0
0

1,277.00

Koral Beton 2/3

M3

0.0090

211,100.0
0

1,899.90

Kayu balok terentang

M3

0.0720

2,640,000 190,080.0
.00
0

Paku Biasa 2" - 5"

Kg

0.0600 23,400.00

Meni Besi

Kg

0.4500 30,400.00 13,680.00

Pekerja

Oh

0.4000 42,000.00 16,800.00

Tukang Kayu

Oh

0.2000 65,000.00 13,000.00

Kepala Tukang

Oh

0.0200 75,000.00

1,500.00

Mandor

Oh

0.0200 80,000.00

1,600.00

1,404.00

355,235.9
0
355,236.0
0

Jumlah
Dibulatkan
A-03

3,515.00

1 M' Pagar SementaraKawat Duri


Tinggi 1,80 m
-

Dolken Kayu 8-10 / 400


cm

Btg

10,000 28,000.00 28,000.00

Semen Portland

Kg

20,000

1,406.00

2,812.00

Kawat Duri

Kg

25,000 63,500.00

158,750.0
0

Pasir beton

M3

0.0050

255,400.0
0

1,277.00

Koral Beton 2/3

M3

0.0090

211,100.0
0

1,899.90

Paku Biasa 2" - 5"

Kg

0.0600 23,400.00

Pekerja

Oh

0.3000 42,000.00 12,600.00

Tukang Kayu

Oh

0.2000 65,000.00 13,000.00

Kepala Tukang

Oh

0.0200 75,000.00

1,500.00

Mandor

Oh

0.0200 80,000.00

1,600.00
222,842.9
0
222,843.0
0

Jumlah
Dibulatkan
A-04

1 M2 Pengukuran Dan Pasang


Bouwplank
1,870,500
22,446.00
.00

Kayu kaso 5/7

M3

0.0120

Paku Biasa 2" - 5"

Kg

0.0200 23,400.00

Kayu papan albasia

M3

0.0070

Pekerja

Oh

0.1000 42,000.00

4,200.00

Tukang Kayu

Oh

0.1000 65,000.00

6,500.00

Kepala Tukang

Oh

0.0100 75,000.00

750.00

Mandor

Oh

0.0050 80,000.00

400.00

Jumlah

468.00

2,071,700
14,501.90
.00

49,265.90

Dibulatkan
A-05

1,404.00

49,266.00

1 M2 Pembuatan Kantor Sementara


dgn Lantai Diplester
-

Dolken Kayu 8-10 / 400


cm

Btg

12,500 28,000.00 35,000.00

Kayu Balok terentang

M3

0.1800

Paku Biasa

Kg

0.8500 23,400.00 19,890.00

2,640,000 475,200.0
.00
0

Besi Strip

Kg

11,000 26,800.00 29,480.00

Semen Portland

Kg

350,000

Pasir Pasang

M3

0.1500

Pasir beton

M3

Koral Beton2/3

M3

Bata Merah

Bh

Seng Plat

m'

0.2500 15,815.00

Kawat harmonika

M2

20,000 35,900.00 71,800.00

Kaca Polos 3mm

M2

0.0800 87,400.00

Kunci Tanam

Bh

0.1500 94,500.00 14,175.00

Plywood 120 x 240 x 0,4


cm

Lbr

0.0600

Pekerja

Oh

20,000 42,000.00 84,000.00

Tukang Kayu

Oh

20,000 65,000.00

Tukang Batu

Oh

10,000 65,000.00 65,000.00

Kepala Tukang

Oh

0.3000 75,000.00 22,500.00

Mandor

Oh

0.0500 80,000.00

1,406.00 49,210.00

233,400.0
35,010.00
0
255,400.0
0.1000
25,540.00
0
211,100.0
0.1500
31,665.00
0
300,000

775.00 23,250.00

140,000.0
0

6,992.00

8,400.00

130,000.0
0

4,000.00
1,135,065
.75
1,135,066
.00

Jumlah
Dibulatkan
A-06

3,953.75

1 M2 Pembuatan Gudang Semen dan


Alat-alat
-

Dolken Kayu 8-10 / 400


cm

Btg

17,000 28,000.00 47,600.00

Kayu balok terentang

M3

0.2100

Paku Biasa

Kg

0.3000 23,400.00

Semen Portland

Kg

105,000

2,640,000 554,400.0
.00
0
7,020.00

1,406.00 14,763.00

255,400.0
7,662.00
0
211,100.0
0.0500
10,555.00
0

Pasir Beton

M3

0.0300

Koral Beton 2/3

M3

Seng Gelombang BJLS 30

Lbr

15,000 62,900.00 94,350.00

Pekerja

Oh

10,000 42,000.00 42,000.00

Tukang Kayu

Oh

20,000 65,000.00

Kepala Tukang

Oh

0.2000 75,000.00 15,000.00

Mandor

Oh

0.0500 80,000.00

4,000.00
927,350.0
0
927,350.0
0

Jumlah
Dibulatkan
A-07

130,000.0
0

1 M2 Pembuatan Bedeng Buruh


-

Dolken Kayu 8-10 / 400


cm

Btg

12,500 28,000.00 35,000.00

Kayu balok terentang

M3

0.1860

Paku Biasa

Kg

0.3000 23,400.00

Semen Portland

Kg

180,000

Pasir Beton

M3

0.0300

Koral Beton 2/3

M3

Seng Gelombang BJLS 30

Lbr

15,000 62,900.00 94,350.00

Pekerja

Oh

10,000 42,000.00 42,000.00

Tukang Kayu

Oh

20,000 65,000.00

Kepala Tukang

Oh

0.2000 75,000.00 15,000.00

Mandor

Oh

0.0500 80,000.00

Jumlah
Dibulatkan

2,640,000 491,040.0
.00
0
7,020.00

1,406.00 25,308.00

255,400.0
7,662.00
0
211,100.0
0.0500
10,555.00
0

130,000.0
0

4,000.00
861,935.0
0
861,935.0
0

A-08

1 M2 Membersihkan Lapangan dan Perataan


-

Pekerja

Oh

0.1000 42,000.00

4,200.00

Mandor

Oh

0.0500 80,000.00

4,000.00

Jumlah

8,200.00
8,200.00

Dibulatkan
A-09

1M2 Pembuatan Jalan Sementara


205,500.0
30,825.00
0
196,000.0
0.0900
17,640.00
0
233,400.0
0.0100
2,334.00
0

Batu Belah 15/20

M3

0.1500

Batu Pecah 5/7

M3

Pasir Pasang

M3

Pekerja

Oh

10,000 42,000.00 42,000.00

Mandor

Oh

0.0500 80,000.00

Jumlah

96,799.00

Dibulatkan
A-10

96,799.00

1 M3 Bongkaran Beton Bertulang


Pekerja

Oh

66,670 42,000.00

Mandor

Oh

0.3330 80,000.00 26,640.00


306,654.0
0
306,654.0
0

Dibulatkan
1 M3 Bongkaran Dinding Tembok Bata Merah
-

Pekerja

Oh

66,670 42,000.00

280,014.0
0

Mandor

Oh

0.0330 80,000.00

2,640.00

Jumlah
Dibulatkan
A-12

280,014.0
0

Jumlah

A-11

4,000.00

1 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm

282,654.0
0
282,654.0
0

199,200.0
0
264,000.0
0.5250
0
255,400.0
0.0740
0
211,100.0
0.1460
0
0.9860

Panel Beton Pracetak

Lbr

Kolom Beton Pracetak

Btg

Pasir Beton

M3

Koral 2/3

M3

Semen abu - abu

Kg

Pekerja

Oh

0.3750 42,000.00 15,750.00

Tukang Batu

Oh

0.1250 65,000.00

8,125.00

Kepala Tukang

Oh

0.0120 75,000.00

900.00

Mandor

Oh

0.0190 80,000.00

1,520.00

450,000

18,899.60
30,820.60

1,406.00 63,270.00

474,296.4
0
474,296.0
0

Jumlah
Dibulatkan
A-13

196,411.2
0
138,600.0
0

1 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'


-

Kawat ram ayam

Lbr

0.4340 14,900.00

6,466.60

Besi siku L 50.50.5

Kg

67,860 18,300.00

124,183.8
0

Besi pelat (1,2 x 3) mm

Kg

0.0424 18,300.00

775.92

Baut
Semen Portland

bh
Kg

40,000
25,000

Pasir beton

M3

Koral Beton 2/3

M3

Pekerja

Oh

0.3750 42,000.00 15,750.00

Tukang Batu

Oh

0.1250 65,000.00

8,125.00

Kepala Tukang

Oh

0.0120 75,000.00

900.00

Mandor

Oh

0.0190 80,000.00

1,520.00

Jumlah

600.00
1,406.00
255,400.0
0.0050
0
211,100.0
0.0090
0

2,400.00
3,515.00
1,277.00
1,899.90

166,813.2
2

166,813.0
0

Dibulatkan
A-14

1 M2 Pagar BRC lengkap dengan tiang

BRC lengkap dengan


tiang
Semen Portland

Kawat Duri

Kg

Pasir beton

M3

Koral Beton 2/3

M3

Pekerja

Oh

0.3750 42,000.00 15,750.00

Tukang Batu

Oh

0.1250 65,000.00

8,125.00

Kepala Tukang

Oh

0.0120 75,000.00

900.00

Mandor

Oh

0.0190 80,000.00

1,520.00

Lbr
Kg

171,300.0
74,344.20
0
20,000 1,406.00 2,812.00
158,750.0
25,000 63,500.00
0
255,400.0
0.0050
1,277.00
0
211,100.0
0.0090
1,899.90
0
0.4340

265,378.1
0
265,378.0
0

Jumlah
Dibulatkan
A-15

1 M2 Steiger Werk / perancah dari Bambu


-

Bambu 6 - 10 (600) cm

btng

Tali ijuk

kg

0.2500 23,400.00

Pekerja

org

0.2500 42,000.00 10,500.00

Tukang kayu

org

0.0170 65,000.00

1,105.00

Kepala tukang

org

0.0020 75,000.00

150.00

Mandor

org

0.0130 80,000.00

1,040.00

Jumlah

5,850.00

43,645.00

Dibulatkan
A-16

10,000 25,000.00 25,000.00

43,645.00

1 M' Cerucuk Bambu


-

Bambu 7 -10 (400) cm

btng

12,500 25,000.00 31,250.00

Pekerja

org

0.5000 42,000.00 21,000.00

Mandor

org

0.0250 80,000.00

Jumlah
Dibulatkan
Kembali ke Analisa AHS SNI

2,000.00
54,250.00
54,250.00

a Satuan Pekerjaan Tanah

Berkut ini adalah contoh Analisa Harga Satuan (AHS) SNI tahun 2011 untuk pekerjaan tanah yang seri
B. ANALISA HARGA SATUAN PEKERJAAN TANAH
No.

B-01

URAIAN

SATUAN

VOLUME

HARGA
HARGA
SATUAN
(Rp)
(Rp)

1 M3
Galian
Tanah
Biasa
sedalam 1
m
-

Pekerja

Oh

0.4000 42,000.00 16,800.00

Mandor

Oh

0.0400 80,000.00

Jumlah

20,000.00

Dibulatkan

B-02

20,000.00

1 M3
Galian
Tanah
Biasa
Sedalam
2m
-

Pekerja

Oh

0.5260 42,000.00 22,092.00

Mandor

Oh

0.0520 80,000.00

Jumlah

4,160.00
26,252.00

Dibulatkan

B-03

3,200.00

26,252.00

1 M3
Galian
Tanah
Biasa
Sedalam
3m
-

Pekerja

Oh

0.7350 42,000.00 30,870.00

Mandor

Oh

0.0730 80,000.00

Jumlah

36,710.00

Dibulatkan

B-04

36,710.00

1 M3
Galian
Tanah
Keras
Sedalam
1m
-

Pekerja

Oh

0.6250 42,000.00 26,250.00

Mandor

Oh

0.0620 80,000.00

Jumlah

4,960.00
31,210.00

Dibulatkan

B-05

5,840.00

31,210.00

1 M3
Galian
Tanah
Lumpur
Sedalam
1m
-

Pekerja

Oh

0.8230 42,000.00 34,566.00

Mandor

Oh

0.0830 80,000.00

Jumlah
Dibulatkan
Materi Terkait :

6,640.00
41,206.00
41,206.00

ekerjaan tanah yang sering digunakan untuk pekerjaan bangunan rumah.

Pekerjaan Pondasi (AHS SNI 2011)

Untuk menghitung biaya pekerjaan pondasi bagunan rumah Anda diperlukan Analisa Harga Satuan Pe
C. ANALISA HARGA SATUAN PEKERJAAN PONDASI
No.

C-01

URAIAN

SATUAN

VOLUME

1 M3
Pasanag
Pondasi
batu Kali
adk 1pc :
3 ps
-

Batu
Belah
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor

M3
Kg
M3

205,500.0 226,050.0
0
0
284,012.0
2,020,000 1,406.00
0
233,400.0 113,199.0
0.4850
0
0
11,000

Oh

15,000 42,000.00 63,000.00

Oh

0.6000 65,000.00 39,000.00

Oh

0.0600 75,000.00

4,500.00

Oh

0.0750 80,000.00

6,000.00
735,761.0
0
735,761.0
0

Jumlah
Dibulatkan

C-02

HARGA
HARGA
SATUAN
(Rp)
(Rp)

1 M3
Pasang
Pondasi
Batu kali
adk 1pc :
4ps
-

Batu
Belah
Semen
Portland
Pasir
Pasang

M3
Kg
M3

205,500.0 226,050.0
0
0
229,178.0
1,630,000 1,406.00
0
233,400.0 121,368.0
0.5200
0
0
11,000

Pekerja
Tukang
Batu
Kepala
Tukang
Mandor

Oh

15,000 42,000.00 63,000.00

Oh

0.6000 65,000.00 39,000.00

Oh

0.0600 75,000.00

4,500.00

Oh

0.0750 80,000.00

6,000.00
689,096.0
0
689,096.0
0

Jumlah
Dibulatkan

C-03

1 M3
Pasang
Pondasi
Batu kali
adk 1pc :
5ps
-

Batu
Belah
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor

M3
Kg
M3

205,500.0 226,050.0
0
0
191,216.0
1,360,000 1,406.00
0
233,400.0 126,969.6
0.5440
0
0
11,000

Oh

15,000 42,000.00 63,000.00

Oh

0.6000 65,000.00 39,000.00

Oh

0.0600 75,000.00

4,500.00

Oh

0.0750 80,000.00

6,000.00
656,735.6
0
656,736.0
0

Jumlah
Dibulatkan

C-04

1 M3
Pasang
Pondasi
Batu
Kosong
(aanstam
ping)
-

Batu
Belah

M3

Pasir Urug

M3

205,500.0 246,600.0
0
0
175,300.0
0.3000
52,590.00
0
12,000

Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah

Dibulatkan
Materi Terkait :

Oh

0.7800 42,000.00 32,760.00

Oh

0.3900 65,000.00 25,350.00

Oh

0.0390 75,000.00

2,925.00

Oh

0.0390 80,000.00

3,120.00
363,345.0
0
363,345.0
0

Analisa Harga Satuan Pekerjaaan Pondasi. Berikut adalah contoh analisa pekerjaan pondasi (AHS SNI tahun 201

ndasi (AHS SNI tahun 2011). Pada dasarnya yang selalu berubah setiap tahun pada analisa harga satuan, adalah

lisa harga satuan, adalah harga bahan dan upah, sedangkan koefisien (volume pek.) tetap.

a Satuan Pekerjaan Beton


NO

URAIAN

D-17r2

1 M3 Sloof
Beton
Tulang
15/20
(180 kg
besi +
bekisting)
4dia. 12
ring 8-15

SAT

VOLUME

HRG.SAT

JUMLAH

769.5

Kayu
papan
terentang

M3

0.2700 2,850,000

Paku
Biasa 2" 5"

Kg

20,000

Kg

1,800,000

Kg

30,000

27.7

83.1

Kg

3,230,000

1.2

387.6

M3

0.5200

225

117

M3

0.7800

200

156

Oh

48,500

55

266.75

Oh

0.3500

70

24.5

Oh

15,600

70

109.2

Oh

14,000

70

98

Oh

0.3310

80

26.48

Oh

0.1700

85

14.45
5,069,380

Besi
Beton
Kawat
Beton
Semen
Portland
Pasir
Beton
Koral
Beton 2/3
Pekerja
Tukang
Batu
Tukang
Kayu
Tukang
Besi
Kepala
Tukang
Mandor
Jumlah
Dibulatka
n

23.4

46.8

16.5 2,970,000

5,069,380

1 M3
Kolom
Beton
Tulang
15/20
(180 kg
besi +
bekisting)
4dia.12 815
Kayu
papan
terentang

M3

0.4000 2,850,000 1,140,000

Paku
Biasa 2" 5"

Kg

40,000

Minyak
Bekisting
Besi
Beton
Kawat
Beton
Semen
Portland
Pasir
Beton

Ltr

23.4

93.6

40.5

Kg

1,800,000

Kg

18,000

27.7

49.86

Kg

3,230,000

1.2

387.6

M3

0.5200

225

117

Koral
Beton 2/3

M3

0.7800

200

156

Kayu
Balok
Terentang

M3

0.1500 2,640,000

396

Dolken 8-10/4m
Pekerja
Tukang
Batu
Tukang
Kayu
Tukang
Besi
Kepala
Tukang
Mandor
Jumlah

16.5 2,970,000

Btg

200,000

15

300

Oh

73,000

55

401.5

Oh

0.3500

70

24.5

Oh

33,000

70

231

Oh

21,000

70

147

Oh

0.5700

80

45.6

Oh

0.2500

85

21.25
6,480,910

Dibulatka
n

6,481,000

1 M3
Balok
Beton
Tulang
15/20
sofi-sofi,
ring balk
+ balok
poratl
(180 kg
besi +
bekisting)
4dia. 12,
8-15
Kayu
papan
terentang

M3

0.3200 2,850,000

Paku
Biasa 2" 5"

Kg

32,000

Kg

1,800,000

Kg

22,500

27.7

62.325

Kg

3,230,000

1.2

387.6

M3

0.5200

225

117

Koral
Beton 2/3

M3

0.7800

200

156

Kayu
Balok
Terentang

M3

0.1400 2,640,000

369.6

Besi
Beton
Kawat
Beton
Semen
Portland
Pasir
Beton

Dolken 8-10/4m
Pekerja
Tukang
Batu
Tukang
Kayu
Tukang
Besi

23.4

912

74.88

16.5 2,970,000

Btg

160,000

15

240

Oh

59,600

55

327.8

Oh

0.3500

70

24.5

Oh

28,000

70

196

Oh

14,000

70

98

Kepala
Tukang
Mandor
Jumlah
Dibulatka
n

D-29

Oh

0.4550

80

36.4

Oh

0.2080

85

17.68
6,412,865
6,413,000

1 M3
Tangga
Beton
Tulang (90
kg besi +
bekisting)
Kayu
papan
terentang

M3

0.2500 2,850,000

Paku
Biasa 2" 5"

Kg

30,000

23.4

70.2

Ltr

12,000

40.5

48.6

Kg

900,000

Kg

30,000

27.7

83.1

Kg

3,230,000

1.2

387.6

M3

0.5200

225

117

Koral
Beton 2/3

M3

0.7800

200

156

Kayu
Balok
Terentang

M3

0.1050 2,640,000

277.2

Minyak
Bekisting
Besi
Beton
Kawat
Beton
Semen
Portland
Pasir
Beton

Dolken 8-10/4m
Pekerja
Tukang
Batu
Tukang
Kayu
Tukang
Besi
Kepala
Tukang

712.5

16.5 1,485,000

Btg

140,000

15

210

Oh

56,000

55

308

Oh

0.3500

70

24.5

Oh

23,000

70

161

Oh

14,000

70

98

Oh

0.4050

80

32.4

Mandor
Jumlah
Dibulatka
n

Oh

0.2020

85

17.17
4,188,720
4,189,000

1 M3
Membuat
Plat
Lantai Tb.
10 Cm
3 Beton
Bertulang
( 90 Kg
Besi +
Bekisting
)
Kayu
Terentang

M3

0.4000 2,850,000 1,140,000

Paku
Biasa 2" 5"

Kg

40,000

23.4

93.6

Minyak
Bekisting

Ltr

20,000

40.5

81

Besi
Beton
Polos

Kg

900,000

Kawat
Beton

Kg

30,000

27.7

83.1

Kayu
Balok
Terentang

M3

0.1050

151.1

15.866

Plywood
Tebal 9
mm

Lbr

35,000

151.1

528.85

Dolken
kayu
Galam o 8-10/4 m

Btg

600,000

15

900

Kg

3,230,000

1.2

387.6

M3

0.5200

225

117

M3

0.7800

200

156

Semen
Portland
Pasir
Beton
Koral
Beton 2/3

16.5 1,485,000

Pekerja
Tukang
Batu
Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah
Dibulatka
n
Materi Terkait :

Oh

52,000

55

286

Oh

0.3500

70

24.5

Oh

33,000

70

231

Oh

0.3650

80

29.2

Oh

10,600

85

90.1
5,648,816
5,649,000

Pekerjaan Dinding (AHS-SNI 2011)

Berikut adalah penggalan analisa harga satuan (AHS-SNI 2011) untuk pekerjaan dinding yang biasa di
E. ANALISA HARGA SATUAN PEKERJAAN DINDING
No.

E-01

URAIAN

1
-

SATUAN

VOLUME

HARGA
SATUAN
(Rp)

Pekerja
Tukang
Batu
Kepala
Tukang
Mandor

Oh

0.6500 42,000.00 27,300.00

Oh

0.2000 65,000.00 13,000.00

Oh

0.0200 75,000.00

1,500.00

Oh

0.0300 80,000.00

2,400.00
220,267.1
0
220,267.0
0

Dibulatka
n

(Rp)

M2 Pasang Bata Merah Tebal 1


Bata, 1pc : 3ps
Bata
108,500.0
Bh
1,400,000
775.00
Merah
0
Semen
Kg
329,500 1,406.00 46,327.70
Portland
Pasir
233,400.0
M3
0.0910
21,239.40
Pasang
0

Jumlah

E-02

HARGA

M2
Pasang
Bata
Merah
Tebal 1
Bata,
1pc : 4ps
Bata
Merah
Semen
Portland
Pasir
Pasang

775.00

108,500.0
0

Bh

1,400,000

Kg

265,500

1,406.00 37,329.30

M3

0.0930

233,400.0
21,706.20
0

Pekerja

Oh

0.6500 42,000.00 27,300.00

Tukang
Batu

Oh

0.2000 65,000.00 13,000.00

Kepala
Tukang

Oh

0.0200 75,000.00

1,500.00

Mandor

Oh

0.0300 80,000.00

2,400.00
211,735.5
0
211,736.0
0

Jumlah
Dibulatka
n

E-03

M2
Pasang
Bata
Merah
Tebal 1
Bata,
1pc : 5ps
Bata
Merah
Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor

775.00

1,400,000

Kg

222,000

1,406.00 31,213.20

M3

0.1020

233,400.0
23,806.80
0

Oh

0.6500 42,000.00 27,300.00

Oh

0.2000 65,000.00 13,000.00

Oh

0.0200 75,000.00

1,500.00

Oh

0.0300 80,000.00

2,400.00
207,720.
00
207,720.
00

Jumlah

E-04

1
-

108,500.0
0

Bh

Dibulatk
an
M2 Pasang Bata Merah Tebal
1/2 Bata, 1pc : 3ps
Bata
Bh
700,000
775.00 54,250.00
Merah
Semen
Kg
143,700 1,406.00 20,204.22
Portland
Pasir
233,400.0
M3
0.0400
9,336.00
Pasang
0
Pekerja
Tukang
Batu
Kepala
Tukang

Oh

0.3200 42,000.00 13,440.00

Oh

0.1000 65,000.00

6,500.00

Oh

0.0100 75,000.00

750.00

Mandor

Oh

0.0150 80,000.00

105,680.
22
105,680.
00

Jumlah

E-05

1
-

Dibulatk
an
M2 Pasang Bata Merah Tebal
1/2 Bata, 1pc : 4ps
Bata
Bh
700,000
775.00 54,250.00
Merah
Semen
Kg
115,000 1,406.00 16,169.00
Portland
Pasir
233,400.0
M3
0.0430
10,036.20
Pasang
0
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor

Oh

0.3200 42,000.00 13,440.00

Oh

0.1000 65,000.00

6,500.00

Oh

0.0100 75,000.00

750.00

Oh

0.0150 80,000.00

1,200.00
102,345.
20
102,345.
00

Jumlah

E-06

1
-

1,200.00

Dibulatk
an
M2 Pasang Bata Merah Tebal
1/2 Bata, 1pc : 5ps
Bata
Bh
700,000
775.00 54,250.00
Merah
Semen
Kg
96,800 1,406.00 13,610.08
Portland
Pasir
233,400.0
M3
0.0450
10,503.00
Pasang
0
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah
Dibulatk
an

Oh

0.3200 42,000.00 13,440.00

Oh

0.1000 65,000.00

6,500.00

Oh

0.0100 75,000.00

750.00

Oh

0.0150 80,000.00

1,200.00
100,253.
08
100,253.
00

Materi Terkait :

an dinding yang biasa digunakan untuk menghitung biaya pekerjaan dinding pada rumah tinggal. Keseluruhan

ah tinggal. Keseluruhan analisa pekerjaan dinding untuk berbagai ukuran ketebalan dinding dan komposisi adu

nding dan komposisi adukan pada AHS-SNI ada sekitar 40 analisa.

ekerjaan Plesteran (AHS SNI 2011)


Inilah penggalan analisa pekerjaan plesteran yang paling banyak digunakan untuk menghitung biaya
F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN
No.

URAIAN

SATUAN

VOLUME

HARGA
SATUAN
(Rp)

HARGA
(Rp)

1 M2
Plesteran
adk. 1pc :
2ps Tebal
15 mm

F-01

Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor

Kg

85,200

1,406.00 11,979.12

M3

0.0170

233,400.0
0

3,967.80

Oh

0.2000 42,000.00

8,400.00

Oh

0.1500 65,000.00

9,750.00

Oh

0.0150 75,000.00

1,125.00

Oh

0.0100 80,000.00

800.00
36,021.9
2
36,022.0
0

Jumlah
Dibulatkan
1 M2
Plesteran
adk. 1pc :
3ps Tebal
15 mm

F-02

Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang

Kg

64,800

1,406.00

9,110.88

M3

0.0190

233,400.0
0

4,434.60

Oh

0.2000 42,000.00

8,400.00

Oh

0.1500 65,000.00

9,750.00

Oh

0.0150 75,000.00

1,125.00

Mandor

Oh

0.0100 80,000.00

800.00
33,620.4
8
33,620.0
0

Jumlah
Dibulatkan
1 M2
Plesteran
adk. 1pc :
4ps Tebal
15 mm

F-03

Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor

Kg

52,000

1,406.00

7,311.20

M3

0.0200

233,400.0
0

4,668.00

Oh

0.2000 42,000.00

8,400.00

Oh

0.1500 65,000.00

9,750.00

Oh

0.0150 75,000.00

1,125.00

Oh

0.0100 80,000.00

800.00
32,054.2
0
32,054.0
0

Jumlah
Dibulatkan
1 M2
Plesteran
adk. 1pc :
3ps Tebal
20 mm

F-04

Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah

Kg

108,000

1,406.00 15,184.80

M3

0.0260

Oh

0.2500 42,000.00 10,500.00

Oh

0.2000 65,000.00 13,000.00

Oh

0.0200 75,000.00

1,500.00

Oh

0.0125 80,000.00

1,000.00

233,400.0
0

6,068.40

47,253.2
0

47,253.0
0

Dibulatkan
1 M2
Plesteran
adk. 1pc :
4ps Tebal
20 mm

F-05

Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor

Kg

86,800

1,406.00 12,204.08

M3

0.0280

Oh

0.2500 42,000.00 10,500.00

Oh

0.2000 65,000.00 13,000.00

Oh

0.0200 75,000.00

1,500.00

Oh

0.0125 80,000.00

1,000.00

233,400.0
0

6,535.20

44,739.2
8
44,739.0
0

Jumlah
Dibulatkan
1 M2
Plesteran
adk.
1pc:5ps
tebal 20
mm

F-06

Semen
Portland
Pasir
Pasang
Pekerja
Tukang
Batu
Kepala
Tukang
Mandor
Jumlah

Dibulatkan

Kg

72,900

1,406.00 10,249.74

M3

0.0260

Oh

0.2500 42,000.00 10,500.00

Oh

0.2000 65,000.00 13,000.00

Oh

0.0200 75,000.00

1,500.00

Oh

0.0125 80,000.00

1,000.00

233,400.0
0

6,068.40

42,318.1
4
42,318.0
0

1 M2
Acian
Plesteran

F-11
-

Semen
Portland

Kg

40,000

1,406.00

5,624.00

Pekerja

Oh

0.1430 42,000.00

6,006.00

Oh

0.1070 65,000.00

6,955.00

Oh

0.0105 75,000.00

787.50

Oh

0.0105 80,000.00

840.00

Tukang
batu
Kepala
Tukang
Mandor
Jumlah

Dibulatkan
Materi Terkait :

20,212.5
0
20,213.0
0

untuk menghitung biaya bangunan rumah tinggal.

Satuan Penutup Atap (AHS SNI 2011)

Untuk menghitung pekerjaan penutup atap seperti genting plentong, genting morando, genting keram
G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP
HARGA
No.
URAIAN
SATUAN
VOLUME
SATUAN
(Rp)

(Rp)

M2
Pasang
1 Atap
Genteng
Palentong

G-01

Genteng
palentong

Bh

Pekerja

Oh

0.1500 42,000.00

6,300.00

Oh

0.0750 65,000.00

4,875.00

Oh

0.0080 75,000.00

600.00

Oh

0.0080 80,000.00

640.00

Tukang
kayu
Kepala
tukang
Mandor

250,000

1,900.00 47,500.00

59,915.0
0
59,915.0
0

Jumlah
Dibulatk
an
G-02

HARGA

1 M2 Pasang
Genteng Bubung
Palentong
-

Genteng
bubung
palentong
Semen
Portland
Pasir
pasang

Bh

50,000

6,000.00 30,000.00

Kg

80,000

1,406.00 11,248.00

M3

0.0320

233,400.0
0

7,468.80

Pekerja

Oh

0.4000 42,000.00 16,800.00

Tukang
kayu

Oh

0.2000 65,000.00 13,000.00

Kepala
tukang

Oh

0.0200 75,000.00

1,500.00

Mandor

Oh

0.0020 80,000.00

160.00
80,176.8
0
80,177.0
0

Jumlah

G-03

Dibulatk
an
1 M2 Pasang Roof Light
Fibreglass ( 180 x 90 ) cm
Roof light
Lbr
fibreglass

0.6000

100,000.0
60,000.00
0

Paku
biasa " 1"

Kg

0.0500 23,800.00

1,190.00

Pekerja

Oh

0.1400 42,000.00

5,880.00

Oh

0.0670 65,000.00

4,355.00

Oh

0.0070 75,000.00

525.00

Oh

0.0070 80,000.00

560.00

Tukang
kayu
Kepala
tukang
Mandor

72,510.0
0
72,510.0
0

Jumlah
Dibulatk
an
G-04

1 M2 Pasang Atap
Asbes Gelombang
( 3,00 x 1,05 m ) x 4
mm
-

Asbes
gelomban
g

Lbr

0.3500 80,000.00 28,000.00

Paku seng

Kg

0.1200 23,800.00

2,856.00

Pekerja

Oh

0.1400 42,000.00

5,880.00

Oh

0.0700 65,000.00

4,550.00

Oh

0.0070 75,000.00

525.00

Oh

0.0070 80,000.00

560.00

Tukang
kayu
Kepala
tukang
Mandor
Jumlah

42,371.0
0

42,371.0
0

Dibulatkan
G-05

1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m )


x 4 mm
-

Asbes
gelomban
g

Lbr

0.4200 73,300.00 30,786.00

Paku seng

Kg

0.1200 23,800.00

2,856.00

Pekerja

Oh

0.1400 42,000.00

5,880.00

Oh

0.0700 65,000.00

4,550.00

Oh

0.0070 75,000.00

525.00

Oh

0.0070 80,000.00

560.00

Tukang
kayu
Kepala
tukang
Mandor

45,157.0
0
45,157.0
0

Jumlah
Dibulatk
an
G-06

1 M2 Pasang Atap
Asbes Gelombang
( 2,40 x 1,05 m ) x 4
mm
-

Asbes
gelomban
g

Lbr

0.4400 65,900.00 28,996.00

Paku seng

Kg

0.1200 23,800.00

2,856.00

Pekerja

Oh

0.1400 42,000.00

5,880.00

Oh

0.0670 65,000.00

4,355.00

Oh

0.0070 75,000.00

525.00

Oh

0.0070 80,000.00

560.00

Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatk
an

43,172.0
0
43,172.0
0

M2
Pasang
Atap
Asbes
1
Gelomban
g ( 2,10 x
1,05 m ) x
4 mm

G-07

Asbes
gelomban
g

Lbr

0.5100 58,500.00 29,835.00

Paku seng

Kg

0.1200 23,800.00

2,856.00

Pekerja

Oh

0.1400 42,000.00

5,880.00

Oh

0.0670 65,000.00

4,355.00

Oh

0.0070 75,000.00

525.00

Oh

0.0070 80,000.00

560.00

Tukang
kayu
Kepala
tukang
Mandor

44,011.0
0
44,011.0
0

Jumlah
Dibulatk
an
G-08

1 M2 Pasang Atap
Asbes Gelombang
( 1,50 x 1,05 m ) x 4
mm
-

Asbes
gelomban
g

Lbr

0.8000 42,300.00 33,840.00

Paku seng

Kg

0.1200 23,800.00

2,856.00

Pekerja

Oh

0.1400 42,000.00

5,880.00

Oh

0.0670 65,000.00

4,355.00

Oh

0.0070 75,000.00

525.00

Oh

0.0070 80,000.00

560.00

Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatk
an

48,016.0
0
48,016.0
0

G-09

1 M Pasang Nok Stel


Gelombang 1,05 m
-

Nok stel
gelomban
g

Lbr

21,000 38,100.00 80,010.00

Paku
sekrup
3,5"

Bh

60,000

800.00

4,800.00

Pekerja

Oh

0.0840 42,000.00

3,528.00

Oh

0.1250 65,000.00

8,125.00

Oh

0.0130 75,000.00

975.00

Oh

0.0040 80,000.00

320.00

Tukang
kayu
Kepala
tukang
Mandor

97,758.0
0
97,758.0
0

Jumlah

G-10

Dibulatk
an
1 M2 Pasang Atap
Genteng Beton
Genteng
beton

bh

110,000

8,500.00 93,500.00

Paku
biasa 2" 5"

Kg

0.0300 23,400.00

702.00

Pekerja

Oh

0.2000 42,000.00

8,400.00

Oh

0.1000 65,000.00

6,500.00

Oh

0.0100 75,000.00

750.00

Oh

0.0100 80,000.00

800.00

Tukang
kayu
Kepala
tukang
Mandor

110,652.
00
110,652.
00

Jumlah
Dibulatkan
G-11

1 M2 Pasang Atap
Genteng Murando
Natural
-

Genteng
murando
natural

bh

Pekerja

Oh

180,000

2,700.00 48,600.00

0.1500 42,000.00

6,300.00

Tukang
kayu
Kepala
tukang
Mandor

Oh

0.0750 65,000.00

4,875.00

Oh

0.0080 75,000.00

600.00

Oh

0.0080 80,000.00

640.00
61,015.0
0
61,015.0
0

Jumlah
Dibulatk
an
G-12

1 M2 Pasang Atap
Genteng Murando
Glazur
-

Genteng
murando
glazur

bh

Pekerja

Oh

0.1500 42,000.00

6,300.00

Oh

0.0750 65,000.00

4,875.00

Oh

0.0080 75,000.00

600.00

Oh

0.0080 80,000.00

640.00

Tukang
kayu
Kepala
tukang
Mandor
Jumlah
Dibulatk
an

Materi Terkait :

180,000

4,000.00 72,000.00

84,415.0
0
84,415.0
0

morando, genting keramik, genting beton dll. diperlukan analisa harga satuan penutup atap. Berikut adalah pe

p atap. Berikut adalah penggalan AHS SNI 2011 penutup atap yang biasa digunakan untuk menghitung RAB Rum

tuk menghitung RAB Rumah tinggal.

aan Penutup Langit-langit (AHS SNI 2011)

Berikut ini adalah penggalan Analisa Harga Satuan Pekerjaan untuk menghitung biaya pekerjaan lang
H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT
HARGA
No.
URAIAN
SATUAN
VOLUME
SATUAN
(Rp)
(Rp)
1 M2 Langit-langit
H-01
Asbes ( 1,00 x 1,00 )
m, tebal 5 mm

(Rp)
(Rp)

Pelat
asbes
tebal 4
mm

m2

11,000 22,500.00 24,750.00

Paku seng

Kg

0.0100 23,800.00

238.00

Pekerja

Oh

0.0300 42,000.00

1,260.00

Oh

0.0700 65,000.00

4,550.00

Oh

0.0070 75,000.00

525.00

Oh

0.0015 80,000.00

120.00

Tukang
kayu
Kepala
tukang
Mandor
Jumlah

31,443.00

Dibulatkan
H-02

HARGA

31,443.00

1 M2 Langit-langit
Asbes ( 1,00 x 1,00 )
m, tebal 3,5 mm
-

Pelat
asbes
tebal 3,5
mm

Lbr

11,000 19,500.00 21,450.00

Paku seng

Kg

0.0100 23,800.00

238.00

Pekerja

Oh

0.0300 42,000.00

1,260.00

Oh

0.0700 65,000.00

4,550.00

Oh

0.0070 75,000.00

525.00

Tukang
kayu
Kepala
tukang

Mandor

Oh

0.0015 80,000.00

Jumlah

28,143.00

Dibulatkan
H-03

28,143.00

1 M2 Langit-langit Akustik ( 60
x 120 ) cm
-

Akustik
600 x
1200

Lbr

15,000

Paku

Kg

0.0500 23,800.00

1,190.00

Pekerja

Oh

0.0600 42,000.00

2,520.00

Oh

0.1000 65,000.00

6,500.00

Oh

0.0100 75,000.00

750.00

Oh

0.0030 80,000.00

240.00

Tukang
kayu
Kepala
tukang
Mandor

132,800.0 199,200.0
0
0

210,400.0
0
210,400.0
0

Jumlah
Dibulatkan
H-04

120.00

1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka


Alluminium
-

Profil
Alluminiu
m "T"
Kawat f 4
mm
Ramset /
dina bolt

36,000 12,200.00 43,920.00

Kg

0.1500 28,200.00

4,230.00

Bh

10,500

7,560.00

7,200.00

Akustik
600 x
1200

Lbr

15,000

Pekerja

Oh

0.1500 42,000.00

Oh

0.5000 65,000.00 32,500.00

Oh

0.0500 75,000.00

3,750.00

Oh

0.0075 80,000.00

600.00

Tukang
kayu
Kepala
tukang
Mandor
Jumlah

132,800.0 199,200.0
0
0
6,300.00

298,060.0
0

298,060.0
0
1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka
kayu borneo super
Dibulatkan

H-05

Kayu
Balok
Borneo
Super

M3

0.0230

Paku
biasa 2" 5"

Kg

0.0600 23,400.00

Teakwood
120 cm x
240 cm x
0,4 cm

Lbr

0.3900

Pekerja

Oh

0.2700 42,000.00 11,340.00

Oh

0.4000 65,000.00 26,000.00

Oh

0.0400 75,000.00

3,000.00

Oh

0.0135 80,000.00

1,080.00

Tukang
kayu
Kepala
tukang
Mandor

2,640,000
60,720.00
.00

131,700.0
51,363.00
0

154,907.0
0
154,907.0
0

Jumlah
Dibulatkan
H-06

1,404.00

1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu


Borneo Super
-

Kayu
Balok
Borneo
Super

M3

0.0230

Paku
biasa 2" 5"

Kg

0.0600 23,400.00

Teakwood
(120 x
240x 0,3)
cm

Lbr

0.3900

Pekerja

Oh

0.2700 42,000.00 11,340.00

Oh

0.4000 65,000.00 26,000.00

Oh

0.0400 75,000.00

Tukang
kayu
Kepala
tukang

2,640,000
60,720.00
.00

1,404.00

129,100.0
50,349.00
0

3,000.00

Mandor

Oh

0.0135 80,000.00

153,893.0
0
153,893.0
0

Jumlah
Dibulatkan
H-07

1 M2 Langit-langit Triplek 4 mm + Rangka Kayu


Borneo Super
-

Kayu
Balok
Borneo
Super

M3

0.0230

Paku
biasa 2" 5"

Kg

0.0600 23,800.00

Triplek
120 cm x
240 cm x
0,4 cm

Lbr

0.3900 64,400.00 25,116.00

Pekerja

Oh

0.2700 42,000.00 11,340.00

Oh

0.4000 65,000.00 26,000.00

Oh

0.0400 75,000.00

3,000.00

Oh

0.0135 80,000.00

1,080.00

Tukang
kayu
Kepala
tukang
Mandor

2,640,000
60,720.00
.00

1,428.00

128,684.0
0
128,684.0
0

Jumlah
Dibulatkan
H-08

1,080.00

1 M2 Langit-langit Gypsum Board, tebal 9 mm +


rangka besi hollow
-

Hollow
4/4
Zincromat
e
Hollow
2/4
Zincromat
e
Gypsum
board
( 120 x
240 x 9 )
mm
Paku
gypsum

Btg

0.4150 29,200.00 12,118.00

Btg

0.1500 22,600.00

Lbr

0.3640 79,800.00 29,047.20

kg

0.1100 17,500.00

3,390.00

1,925.00

Ramset /
dina bolt
Cotton
plaster

Bh

40,000

7,200.00 28,800.00

Bh

0.0720 15,000.00

1,080.00

Compoun

Zak

0.1250 75,000.00

9,375.00

Pekerja

Oh

0.1000 42,000.00

4,200.00

Oh

0.0500 65,000.00

3,250.00

Oh

0.0050 75,000.00

375.00

Oh

0.0050 80,000.00

400.00

Tukang
kayu
Kepala
tukang
Mandor
Jumlah

93,960.20

Dibulatkan
H-09

93,960.00

1 M2 Langit-langit GRC t = 4 mm + rangka


besi hollow
-

Hollow
4/4
Zincromat
e

Btg

0.4150 29,200.00 12,118.00

Hollow
2/4
Zincromat
e

Btg

0.1500 22,600.00

GRC ( 120
x 240 x
4 ) mm

Lbr

0.3640 67,500.00 24,570.00

Paku GRC

kg

0.1100 35,000.00

Bh

40,000

Bh

0.0720 15,000.00

1,080.00

Ramset /
dina bolt
Cotton
plaster

3,390.00

3,850.00

7,200.00 28,800.00

Compoun

Zak

0.1250 75,000.00

9,375.00

Pekerja

Oh

0.1000 42,000.00

4,200.00

Oh

0.0500 65,000.00

3,250.00

Oh

0.0050 75,000.00

375.00

Oh

0.0050 80,000.00

400.00

Tukang
kayu
Kepala
tukang
Mandor

Jumlah

91,408.00

Dibulatkan
H-10

91,408.00

1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu


Borneo Super
-

Kayu
Balok
Borneo
Super
Paku
biasa 2" 5"
Gypsum
board
( 120 x
240 x 9 )
mm
Paku
sekrup
Pekerja
Tukang
kayu
Kepala
tukang
Mandor

2,640,000
60,720.00
.00

M3

0.0230

Kg

0.0600 23,800.00

Lbr

0.3900 79,800.00 31,122.00

kg

0.1100 17,500.00

Oh

0.2700 42,000.00 11,340.00

Oh

0.4000 65,000.00 26,000.00

Oh

0.0400 75,000.00

3,000.00

Oh

0.0135 80,000.00

1,080.00

1,925.00

136,615.0
0
136,615.0
0

Jumlah
Dibulatkan
H-11

1,428.00

1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu


Borneo Super
-

Kayu
Balok
Borneo
Super

M3

0.0230

Paku
biasa 2" 5"

Kg

0.0600 23,800.00

GRC ( 120
x 240 x
4 ) mm

Lbr

0.3900 67,500.00 26,325.00

Paku GRC

kg

0.1100 35,000.00

Pekerja

Oh

0.2700 42,000.00 11,340.00

2,640,000
60,720.00
.00

1,428.00

3,850.00

Tukang
kayu
Kepala
tukang
Mandor

Oh

0.4000 65,000.00 26,000.00

Oh

0.0400 75,000.00

3,000.00

Oh

0.0135 80,000.00

1,080.00
133,743.0
0
133,743.0
0

Jumlah
Dibulatkan
H-12

1 M List Langitlangit Kayu Profil 10


cm
-

List Kayu
profil

10,500 29,400.00 30,870.00

Paku

Kg

0.0100 23,800.00

238.00

Pekerja

Oh

0.0500 42,000.00

2,100.00

Oh

0.0500 65,000.00

3,250.00

Oh

0.0050 75,000.00

375.00

Oh

0.0030 80,000.00

240.00

Tukang
kayu
Kepala
tukang
Mandor
Jumlah

37,073.00

Dibulatkan
H-13

37,073.00

1 M List Langitlangit Gypsum 10 cm


List
gypsum
Tepung
gypsum
-

Pekerja
Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Dibulatkan

10,500

8,500.00

8,925.00

Kg

0.1500 12,500.00

1,875.00

Oh

0.0500 42,000.00

2,100.00

Oh

0.0500 65,000.00

3,250.00

Oh

0.0050 75,000.00

375.00

Oh

0.0030 80,000.00

240.00
16,765.00
16,765.00

Materi Terkait :

2011)

ng biaya pekerjaan langit-langit: asbes, akustik, tekwood, gypsum, dan GRC.

Penutup Lantai dan Dinding (AHS SNI 2011)


Berikut adalah analisa harga satuan pekerjaan penutup landat dan dinding untuk menghitung biaaya
No.

I-01

URAIAN

SATUAN

VOLUME

HARGA
SATUAN
(Rp)

(Rp)

1 M2 Lantai Ubin
Granito ukuran 40 x
40 cm Setara
Essenza
-

Granito
40 x 40
cm

m2

10,500

345,000.0 362,250.0
0
0
1,406.00 13,778.80

Semen
portland
Pasir
pasang
Semen
warna

Kg

98,000

M3

0.0215

Kg

13,000 15,700.00 20,410.00

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor

233,400.0
0

5,018.10

421,656.9
0
421,657.0
0

Jumlah
Dibulatkan

I-02

HARGA

1 M2 Lantai Ubin
Granito ukuran 30 x
30 cm Setara
Essenza
-

Granito
30 x 30
cm
Semen
portland
Pasir
pasang
Semen
warna

m2

10,500

322,800.0 338,940.0
0
0

Kg

100,000

1,406.00 14,060.00

M3

0.0215

Kg

15,000 15,700.00 23,550.00

233,400.0
0

5,018.10

Pekerja
Tukang
batu
Kepala
tukang
Mandor

Oh

0.2600 42,000.00 10,920.00

Oh

0.1250 65,000.00

8,125.00

Oh

0.0125 75,000.00

937.50

Oh

0.0130 80,000.00

1,040.00
402,590.6
0
402,591.0
0

Jumlah
Dibulatkan

I-03

1 M Plint Ubin
Granito ukuran 10 x
40 cm Setara
Essenza
-

Plint
granito 10
x 40 cm

Bh

26,500 27,600.00 73,140.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

12,000

1,406.00

1,687.20

M3

0.0030

233,400.0
0

700.20

Kg

0.1000 15,700.00

1,570.00

Pekerja

Oh

0.0600 42,000.00

2,520.00

Oh

0.0300 65,000.00

1,950.00

Oh

0.0030 75,000.00

225.00

Oh

0.0030 80,000.00

240.00

Tukang
batu
Kepala
tukang
Mandor
Jumlah

82,032.40

Dibulatkan

I-04

82,032.00

1 M Plint Ubin
Granito ukuran 10 x
30 cm Setara
Essenza
-

Plint
granito 10
x 30 cm

Bh

33,300 25,900.00 86,247.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

16,500

1,406.00

2,319.90

M3

0.0032

233,400.0
0

746.88

Kg

0.1000 15,700.00

1,570.00

Pekerja

Oh

0.0900 42,000.00

3,780.00

Oh

0.0900 65,000.00

5,850.00

Oh

0.0090 75,000.00

675.00

Oh

0.0045 80,000.00

360.00

Tukang
batu
Kepala
tukang
Mandor

101,548.7
8
101,549.0
0

Jumlah
Dibulatkan
I-05

1 M2 Lantai Keramik Corak 10 x 20 cm


setara Mulia
-

Keramik
corak 10 x
20 cm

m2

10,000 56,000.00 56,000.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

80,000

M3

0.0215

233,400.0
0

5,018.10

Kg

0.0130 15,700.00

204.10

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor
Jumlah

92,670.20

Dibulatkan
I-06

1,406.00 11,248.00

92,670.00

1 M2 Lantai Keramik
corak 20 x 20 cm
setara Mulia
-

Keramik
corak 20 x
20 cm

m2

10,000 62,500.00 62,500.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

80,000

M3

0.0215

233,400.0
0

5,018.10

Kg

0.0130 15,700.00

204.10

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor

1,406.00 11,248.00

Jumlah

99,170.20

Dibulatkan
I-07

99,170.00

1 M2 Lantai Keramik
polos 30 x 30 cm
setara Mulia
-

Keramik
polos 30 x
30 cm

10,000 53,000.00 53,000.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

80,000

M3

0.0215

233,400.0
0

5,018.10

Kg

0.0130 15,700.00

204.10

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor
Jumlah

Dibulatkan
I-08

m2

1 M2 Lantai Keramik
corak 30 x 30 cm
Setara Mulia

1,406.00 11,248.00

89,670.20
89,670.00

Keramik
corak 30 x
30 cm

m2

10,000 58,000.00 58,000.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

80,000

M3

0.0215

233,400.0
0

5,018.10

Kg

0.0130 15,700.00

204.10

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor

1,406.00 11,248.00

Jumlah

94,670.20

Dibulatkan
I-09

94,670.00

1 M2 Lantai Keramik
polos 40 x 40 cm
Setara Mulia
-

Keramik
polos 40 x
40 cm

10,000 56,800.00 56,800.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

80,000

M3

0.0215

233,400.0
0

5,018.10

Kg

0.0130 15,700.00

204.10

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor
Jumlah

Dibulatkan

m2

1,406.00 11,248.00

93,470.20
93,470.00

I-10

1 M2 Lantai Keramik
corak 40 x 40 cm
Setara Mulia
-

Keramik
corak 40 x
40 cm

m2

10,000 65,500.00 65,500.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

80,000

M3

0.0215

233,400.0
0

5,018.10

Kg

0.0130 15,700.00

204.10

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor

1,406.00 11,248.00

102,170.2
0
102,170.0
0

Jumlah
Dibulatkan
I-11

1 M2 Lantai Keramik Corak 10 x 20 cm


setara Roman
-

Keramik
corak 10 x
20 cm

10,000 72,200.00 72,200.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

80,000

M3

0.0215

233,400.0
0

5,018.10

Kg

0.0130 15,700.00

204.10

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor
Jumlah

Dibulatkan

m2

1,406.00 11,248.00

108,870.2
0
108,870.0
0

I-12

1 M2 Lantai Keramik
corak 20 x 20 cm
setara Roman
-

Keramik
corak 20 x
20 cm

m2

10,000 75,200.00 75,200.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

80,000

M3

0.0215

233,400.0
0

5,018.10

Kg

0.0130 15,700.00

204.10

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor

1,406.00 11,248.00

111,870.2
0
111,870.0
0

Jumlah
Dibulatkan
I-13

1 M2 Lantai Keramik
polos 30 x 30 cm
setara Roman
-

Keramik
polos 30 x
30 cm

m2

10,000 68,900.00 68,900.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

80,000

M3

0.0215

233,400.0
0

5,018.10

Kg

0.0130 15,700.00

204.10

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor
Jumlah

1,406.00 11,248.00

105,570.2
0

105,570.0
0

Dibulatkan
I-14

1 M2 Lantai Keramik
corak 30 x 30 cm
Setara Roman
-

Keramik
corak 30 x
30 cm

M2

10,000 76,600.00 76,600.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

80,000

M3

0.0215

233,400.0
0

5,018.10

Kg

0.0130 15,700.00

204.10

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor

1,406.00 11,248.00

113,270.2
0
113,270.0
0

Jumlah
Dibulatkan
I-15

1 M2 Lantai Keramik
polos 40 x 40 cm
setara Roman
-

Keramik
polos 40 x
40 cm

m2

10,000 72,500.00 72,500.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

80,000

M3

0.0215

233,400.0
0

5,018.10

Kg

0.0130 15,700.00

204.10

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor

1,406.00 11,248.00

109,170.2
0
109,170.0
0

Jumlah
Dibulatkan
I-16

1 M2 Lantai Keramik
corak 40 x 40 cm
Setara Roman
-

Keramik
corak 40 x
40 cm

m2

10,000 77,000.00 77,000.00

Semen
portland
Pasir
pasang
Semen
warna

Kg

80,000

M3

0.0215

233,400.0
0

5,018.10

Kg

0.0130 15,700.00

204.10

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.1200 65,000.00

7,800.00

Oh

0.0120 75,000.00

900.00

Oh

0.0125 80,000.00

1,000.00

Tukang
batu
Kepala
tukang
Mandor

1,406.00 11,248.00

113,670.2
0
113,670.0
0

Jumlah
Dibulatkan
I-17

1 M2 Lantai Marmer
-

Marmer

m2

10,600

550,000.0 583,000.0
0
0

Semen
portland
Pasir
pasang
Semen
warna

Kg

81,900

1,406.00 11,515.14

M3

0.0450

233,400.0
10,503.00
0

Kg

0.6500 15,700.00 10,205.00

Pekerja

Oh

0.7000 42,000.00 29,400.00

Oh

0.3500 65,000.00 22,750.00

Oh

0.0350 75,000.00

2,625.00

Oh

0.0350 80,000.00

2,800.00

Tukang
batu
Kepala
tukang
Mandor
Jumlah

672,798.1
4

672,798.0
0

Dibulatkan
I-18

1 M2 Lantai Parquet
Jati
Parquet
jati

M2

10,500

375,400.0 394,170.0
0
0

Lem vinyl

Kg

0.6000 44,000.00 26,400.00

Pekerja

Oh

0.6500 42,000.00 27,300.00

Tukang

Oh

0.3500 65,000.00 22,750.00

Kepala
tukang

Oh

0.0350 75,000.00

2,625.00

Mandor

Oh

0.0325 80,000.00

2,600.00

Jumlah
Dibulatkan
Materi Terkait :

475,845.0
0
475,845.0
0

NI 2011)

ntuk menghitung biaaya penutup lantai per meter persegi, seperti lantai keramik, lantai marmer dll.

i marmer dll.

n Pekerjaan Kayu - AHS SNI 2011

Berikut adalah penggalan analisa harga satuan pekerjaan kayu, untuk menghitung harga satuan peke
J. ANALISA HARGA SATUAN PEKERJAAN KAYU
No.
J-01

URAIAN

SATUAN

VOLUME

HARGA
SATUAN

HARGA

1 M3 Kusen Pintu &


jendela kayu Kamper
Samarinda

Kayu
Balok
Kamper
Samarind
a

m3

Pekerja

Oh

Tukang
Kayu
Kepala
Tukang

Mandor

Oh
Oh
Oh

12,000

8,633,700 10,360,44
.00
0.00

252,000.0
0
1,170,000
180,000 65,000.00
.00
150,000.0
20,000 75,000.00
0
60,000 42,000.00

0.3000 80,000.00 24,000.00


11,956,44
0.00
11,956,44
0.00

Jumlah
Dibulatkan
M3 Kusen
Pintu &
jendela
1 kayu
Kamper
Medan/Kr
uing

J-02

Kayu
Balok
Kamper
Medan

M3

Pekerja

Oh

Tukang
Kayu
Kepala
Tukang

Oh
Oh

12,000

5,692,600 6,831,120
.00
.00

252,000.0
0
1,170,000
180,000 65,000.00
.00
150,000.0
20,000 75,000.00
0
60,000 42,000.00

Mandor

Oh

0.3000 80,000.00 24,000.00


8,427,120
.00
8,427,120
.00

Jumlah
Dibulatkan
M3 Kusen
Pintu &
jendela
1
kayu
Borneo
Super

J-03

Kayu
Borneo
Balok
Super

M3

Pekerja

Oh

Tukang
Kayu
Kepala
Tukang
Mandor

Oh
Oh
Oh

12,000

5,280,000 6,336,000
.00
.00

252,000.0
0
1,170,000
180,000 65,000.00
.00
150,000.0
20,000 75,000.00
0
60,000 42,000.00

0.3000 80,000.00 24,000.00


7,932,000
.00
7,932,000
.00

Jumlah
Dibulatkan
J-04

1 M2 Pintu Panel Kayu Kamper


Samarinda

Kayu
Papan
Kamper
Samarind
a

M3

0.0400

Paku
Biasa 2" 5"

Kg

0.0500 23,400.00

Pekerja

Oh

10,000 42,000.00 42,000.00

Oh

25,000 65,000.00

Oh

0.2500 75,000.00 18,750.00

Oh

0.0500 80,000.00

Tukang
Kayu
Kepala
Tukang
Mandor

8,633,700 345,348.0
.00
0

1,170.00

162,500.0
0

4,000.00

573,768.0
0
573,768.0
0

Jumlah
Dibulatkan
J-05

1 M2 Pintu Panel Kayu Kamper


Medan/Kruing
-

Kayu
Papan
Kamper
Medan

M3

0.0400

Paku
Biasa 2" 5"

Kg

0.0500 23,400.00

Pekerja

Oh

10,000 42,000.00 42,000.00

Oh

25,000 65,000.00

Oh

0.2500 75,000.00 18,750.00

Oh

0.0500 80,000.00

Tukang
Kayu
Kepala
Tukang
Mandor

5,692,600 227,704.0
.00
0

162,500.0
0

4,000.00
456,124.0
0
456,124.0
0

Jumlah
Dibulatkan
J-06

1,170.00

1 M2 Pintu & Jendela Kaca Kayu Kamper


Medan
-

Kayu
Papan
Kamper
Medan

M3

0.0350

Pekerja

Oh

0.8000 42,000.00 33,600.00

Oh

20,000 65,000.00

Oh

0.2000 75,000.00 15,000.00

Oh

0.0400 80,000.00

Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah

Dibulatkan

5,692,600 199,241.0
.00
0

130,000.0
0

3,200.00
381,041.0
0
381,041.0
0

M2 Pintu
& Jendela
1
Kaca Kayu
Borneo

J-07

Kayu
Papan
Borneo
Super

M3

0.0350

Pekerja

Oh

0.8000 42,000.00 33,600.00

Oh

20,000 65,000.00

Oh

0.2000 75,000.00 15,000.00

Oh

0.0400 80,000.00

Tukang
Kayu
Kepala
Tukang

Mandor

5,595,800 195,853.0
.00
0

130,000.0
0

3,200.00
377,653.0
0
377,653.0
0

Jumlah
Dibulatkan
M2 Pintu
& Jendela
Jalusi
1
Kayu
Kamper
Medan

J-08

Kayu
Papan
Kamper
Medan

M3

0.0640

Pekerja

Oh

10,000 42,000.00 42,000.00

Oh

30,000 65,000.00

Oh

0.3000 75,000.00 22,500.00

Oh

0.5000 80,000.00 40,000.00

Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah

Dibulatkan

5,692,600 364,326.4
.00
0

195,000.0
0

663,826.4
0
663,826.0
0

M2 Pintu
Triplek
Rangkap,
Rangka
1
Tertutup
Kayu
Kamper
Medan

J-09

Kayu
Papan
Kamper
Medan

M3

0.0196

Paku
Biasa " 1"

Kg

0.0300 23,800.00

714.00

Lem Kayu

Ltr

0.3000 23,900.00

7,170.00

Triplek
120 x 240
x 0,4 cm

Lbr

10,000 64,400.00 64,400.00

Pekerja

Oh

0.6000 42,000.00 25,200.00

Oh

20,000 65,000.00

Oh

0.2000 75,000.00 15,000.00

Oh

0.0300 80,000.00

Tukang
Kayu
Kepala
Tukang
Mandor

5,692,600 111,574.9
.00
6

2,400.00
356,458.9
6
356,459.0
0

Jumlah
Dibulatkan
J-10

130,000.0
0

1 M2 Jalusi Mati Kusen Kayu kamper


Medan
-

Kayu
Papan
Kamper
Medan

M3

0.0600

Paku
Biasa " 1"

Kg

0.1500 23,800.00

Pekerja

Oh

0.5000 42,000.00 21,000.00

Oh

20,000 65,000.00

Oh

0.2000 75,000.00 15,000.00

Tukang
Kayu
Kepala
Tukang

5,692,600 341,556.0
.00
0

3,570.00

130,000.0
0

Mandor

Oh

0.0250 80,000.00

513,126.0
0
513,126.0
0

Jumlah
Dibulatkan
J-11

2,000.00

1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo


Super
-

Kayu
Papan
Borneo
Super

M3

0.0196

Paku
Biasa " 1"

Kg

0.0300 23,800.00

714.00

Lem Kayu

Ltr

0.3000 23,900.00

7,170.00

Triplek
120 x 240
x 0,4 cm

Lbr

10,000 64,400.00 64,400.00

Pekerja

Oh

0.6000 42,000.00 25,200.00

Oh

20,000 65,000.00

Oh

0.2000 75,000.00 15,000.00

Oh

0.0300 80,000.00

Tukang
Kayu
Kepala
Tukang

Mandor

5,595,800 109,677.6
.00
8

130,000.0
0

2,400.00
354,561.6
8
354,562.0
0

Jumlah
Dibulatkan
M2 Pintu
Teakwood
Rangkap,
1 rangka
Kayu
Kamper
Medan

J-12

Kayu
Papan
Kamper
Medan

M3

0.0196

Paku
Biasa " 1"

Kg

0.3000 23,800.00

5,692,600 111,574.9
.00
6

7,140.00

Lem Kayu

Ltr

0.3000 23,900.00

Teakwood
4 mm

Lbr

10,000

Pekerja

Oh

0.6000 42,000.00 25,200.00

Oh

20,000 65,000.00

Oh

0.2000 75,000.00 15,000.00

Oh

0.0300 80,000.00

Tukang
Kayu
Kepala
Tukang

Mandor

7,170.00

131,700.0 131,700.0
0
0

130,000.0
0

2,400.00
430,184.9
6
430,185.0
0

Jumlah
Dibulatkan
M2 Pintu
Triplek &
Formika,
1 Rangka
Kayu
Kamper
Medan

J-13

Kayu
Papan
Kamper
Medan

M3

0.0196

Paku
Biasa " 1"

Kg

0.3000 23,800.00

Lem Kayu

Ltr

0.8000 23,900.00 19,120.00

Triplek
120 x 240
x 0,4 cm

Lbr

10,000 64,400.00 64,400.00

Formica
3" x 6"

Lbr

0.5000

Pekerja

Oh

0.8000 42,000.00 33,600.00

Oh

25,000 65,000.00

Oh

0.2500 75,000.00 18,750.00

Oh

0.0400 80,000.00

Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah

5,692,600 111,574.9
.00
6

7,140.00

132,900.0
66,450.00
0

162,500.0
0

3,200.00
486,734.9
6

486,735.0
0

Dibulatkan
M2 Pintu
Teakwood
&
Formika,
1 Rangka
Kayu
Kamper
Medan
(dipolitur)

J-14

Kayu
Papan
Kamper
Medan

M3

0.0196

Paku
Biasa " 1"

Kg

0.3000 23,800.00

Lem Kayu

Ltr

0.8000 23,900.00 19,120.00

Teakwood
120 x 240
x 0,4 cm

Lbr

10,000

131,700.0 131,700.0
0
0

Formica
4" x 8"

Lbr

0.5000

238,100.0 119,050.0
0
0

Pekerja

Oh

0.8000 42,000.00 33,600.00

Oh

25,000 65,000.00

Oh

0.2500 75,000.00 18,750.00

Oh

0.0400 80,000.00

Tukang
Kayu
Kepala
Tukang
Mandor

5,692,600 111,574.9
.00
6

162,500.0
0

3,200.00
606,634.9
6
606,635.0
0

Jumlah
Dibulatkan
J-15

7,140.00

1 M3 Kuda-kuda Kayu Kamper


Medan
-

Kayu
Balok
Kamper
Medan

M3

Besi Strip

Kg

11,000

5,692,600 6,261,860
.00
.00

150,000 26,800.00

402,000.0
0

Paku
Biasa 2" 5"

Kg

Pekerja

Oh

Tukang
Kayu
Kepala
Tukang

Mandor

Oh

0.8000 23,800.00 19,040.00


168,000.0
0
780,000.0
120,000 65,000.00
0
40,000 42,000.00

Oh

12,000 75,000.00 90,000.00

Oh

0.2000 80,000.00 16,000.00


7,736,900
.00
7,736,900
.00

Jumlah
Dibulatkan
M3 Kudakuda Kayu
1
Borneo
Super

J-16

Kayu
balok
Borneo
super

M3

Besi Strip

Kg

Paku
Biasa 2" 5"

Kg

Pekerja

Oh

Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah

Dibulatkan

Oh

11,000

5,280,000 5,808,000
.00
.00

150,000 26,800.00

402,000.0
0

0.8000 23,800.00 19,040.00


168,000.0
0
780,000.0
120,000 65,000.00
0
40,000 42,000.00

Oh

12,000 75,000.00 90,000.00

Oh

0.2000 80,000.00 16,000.00


7,283,040
.00
7,283,040
.00

M2 Kaso
+ Reng
Genteng
1 Plentong
Kayu
Borneo
Super

J-17

Kayu
balok
Borneo
super

m3

0.0120

Paku
Biasa 2" 5"

Kg

0.1500 23,800.00

3,570.00

Pekerja

Oh

0.1000 42,000.00

4,200.00

Oh

0.1000 65,000.00

6,500.00

Oh

0.0100 75,000.00

750.00

Oh

0.0050 80,000.00

400.00

Tukang
Kayu
Kepala
Tukang

Mandor

5,280,000
63,360.00
.00

Jumlah

78,780.00

Dibulatkan

78,780.00

M2 Kaso
+ Reng
Genteng
1 Beton
Kayu
Borneo
Super

J-18

Kayu
balok
Borneo
super

M3

0.0140

Paku
Biasa 2" 5"

Kg

0.1500 23,800.00

3,570.00

Pekerja

Oh

0.1000 42,000.00

4,200.00

Oh

0.1000 65,000.00

6,500.00

Oh

0.0100 75,000.00

750.00

Tukang
Kayu
Kepala
Tukang

5,280,000
73,920.00
.00

Mandor

Oh

0.0050 80,000.00

Jumlah

89,340.00

Dibulatkan

89,340.00

M'
Lisplang
uk
1 (3x20)cm,
Kayu
Kamper
Medan

J-19

Kayu
Papan
Kamper
Medan

M3

0.0072

Paku
Biasa 2" 5"

Kg

0.0500 23,800.00

1,190.00

Pekerja

Oh

0.1000 42,000.00

4,200.00

Oh

0.2000 65,000.00 13,000.00

Oh

0.0200 75,000.00

1,500.00

Oh

0.0050 80,000.00

400.00

Tukang
Kayu
Kepala
Tukang
Mandor

5,823,400
41,928.48
.00

Jumlah

62,218.48

Dibulatkan
J-20

400.00

62,218.00

1 M' Lisplang uk (3x30)cm, Kayu Kamper


Medan
-

Kayu
Papan
Kamper
Medan

M3

0.0110

Paku
Biasa 2" 5"

Kg

0.0500 23,800.00

1,190.00

Pekerja

Oh

0.1100 42,000.00

4,620.00

Oh

0.2200 65,000.00 14,300.00

Oh

0.0220 75,000.00

Tukang
Kayu
Kepala
Tukang

5,692,600
62,618.60
.00

1,650.00

Mandor

Oh

0.0050 80,000.00

Jumlah

84,778.60

Dibulatkan
J-21

400.00

84,779.00

1 M List Plafond + kayu Profil


10 cm
-

Kayu Profil
10 cm

M'

10,500 29,400.00 30,870.00

Pekerja

Oh

0.0210 42,000.00

882.00

Oh

0.0210 65,000.00

1,365.00

Oh

0.0020 75,000.00

150.00

Oh

0.0010 80,000.00

80.00

Tukang
Kayu
Kepala
Tukang
Mandor
Jumlah

Dibulatkan
Materi Terkait :

33,347.00
33,347.00

itung harga satuan pekerjaan kayu per m3, seperti pekerjaan kusen dan jendela, pekerjaan plapond, dan peker

jaan plapond, dan pekerjaan atap.

kerjaan Penutup Besi dan Aluminium


Analisa Harga Satuan Pekerjaan Penutup
Diposkan : 01 Juni 2014
Oleh : Endang Kusman
No.

K-01

URAIAN

SAT

VOLUME

HARGA
SAT
(Rp)

(Rp)

1 Kg

Besi profil

Besi profil
WF

Kg

11,000 24,000.00 26,400.00

Meni besi

Kg

0.0800 30,400.00

2,432.00

Pekerja

Oh

0.0600 42,000.00

2,520.00

Oh

0.0060 65,000.00

390.00

Oh

0.0060 75,000.00

450.00

Oh

0.0003 80,000.00

24.00

Tukang
besi
Kepala
tukang
Mandor
Jumlah

32,216.00

Dibulatkan
K-02

HARGA

32,216.00

1 Kg

Perakitan
baja

Solar

m'

0.0100

Minyak
pelumas

m'

0.0010

Sewa alat

jam

0.0080

Pekerja

Oh

0.0010

Oh

0.00001

Oh

0.00001

Oh

0.00005

Tukang
besi
Kepala
tukang
Mandor

7,150.000
0
55,000.00
00
100,000.0
000
42,000.00
00
65,000.00
00
75,000.00
00
80,000.00
00

71.50
55.00
800.00
42.00
0.65
0.75
4.00

K-03

Jumlah
Dibulatkan
1 Cm Pengelasan
dengan las listrik

973.90
974.00

kawat las

kg

0.0400 23,600.00

944.00

Solar
Minyak
pelumas

ltr

0.0300

7,150.00

214.50

ltr

0.0040 55,000.00

220.00

Sewa alat

jam

0.0170

100,000.0
0

1,700.00

Pekerja

org

0.0040 42,000.00

168.00

Tukang

org

0.0020 65,000.00

130.00

Kepala
Tukang

org

0.0002 75,000.00

15.00

Mandor

org

0.0002 80,000.00

16.00

Jumlah
K-04

Dibulatkan
1 m2 Pintu Rolling
Door
Rolling
door
-

Pekerja
Tukang
besi
Kepala
tukang
Mandor

2,463.50
2,464.00

10,000

Oh

10,500 42,000.00 44,100.00

Oh

15,000 65,000.00 97,500.00

Oh

0.1050 75,000.00

7,875.00

Oh

0.0052 80,000.00

416.00
456,491.0
0
456,491.0
0

Jumlah
Dibulatkan
K-05

306,600.0 306,600.0
0
0

M2

1 m2 Pintu
Alluminium Natural
-

Pintu
alluminiu
m natural

m2

10,000

Pekerja

Oh

10,500 42,000.00 44,100.00

Tukang
besi

Oh

10,500 65,000.00 68,250.00

211,800.0 211,800.0
0
0

Kepala
tukang

Oh

0.1050 75,000.00

7,875.00

Mandor

Oh

0.0052 80,000.00

416.00
332,441.0
0
332,441.0
0

Jumlah
Dibulatkan
K-06

1 m2 Terali Besi
Besi strip
2x3

m'

115,000

5,500.00 63,250.00

Pekerja

Oh

12,000 42,000.00 50,400.00

Tukang las

Oh

12,000 65,000.00 78,000.00

Kepala
tukang

Oh

0.0120 75,000.00

900.00

Mandor

Oh

0.0006 80,000.00

48.00
192,598.0
0
192,598.0
0

Jumlah
Dibulatkan
K-07

1 m2 Kawat
Harmonika 4 cm
-

Kawat
harmonik
a

M2

11,000 35,900.00 39,490.00

Paku
biasa " 1"

kg

0.0200 23,800.00

Papan
kayu
kamper

M2

0.0018

Pekerja

Oh

0.1000 42,000.00

4,200.00

Oh

0.1000 65,000.00

6,500.00

Oh

0.0100 75,000.00

750.00

Oh

0.0050 80,000.00

400.00

Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Dibulatkan

476.00

5,692,600
10,246.68
.00

62,062.68
62,063.00

K-08

1 m' Talang Datar,


Seng BJLS 28 lebar
90 cm
-

Seng plat
3' x 6'
BJLS 30

m'

10,500 20,801.00 21,841.05

Paku
biasa " 1"

Kg

0.0150 23,800.00

Kayu
papan
borneo
super

M3

0.0096

Flincote /
meni besi

Kg

0.2500 30,400.00

7,600.00

Pekerja

Oh

0.1500 42,000.00

6,300.00

Oh

0.4000 65,000.00 26,000.00

Oh

0.0250 75,000.00

1,875.00

Oh

0.0013 80,000.00

104.00

Tukang
kayu
Kepala
tukang
Mandor

5,595,800
53,719.68
.00

117,796.7
3
117,797.0
0

Jumlah
Dibulatkan
K-09

357.00

1 m' Talang Miring,


Seng BJLS 28 lebar
90 cm
-

Seng plat
3' x 6'
BJLS 30

m'

10,500 20,801.00 21,841.05

Paku
biasa " 1"

Kg

0.0150 23,800.00

Kayu
papan
borneo
super

M3

0.0190

Flincote /
meni besi

Kg

0.3000 30,400.00

9,120.00

Pekerja

Oh

0.2000 42,000.00

8,400.00

Tukang
kayu

Oh

0.4000 65,000.00 26,000.00

357.00

5,595,800 106,320.2
.00
0

Kepala
tukang

Oh

0.0250 75,000.00

1,875.00

Mandor

Oh

0.0013 80,000.00

100.00
174,013.2
5
174,013.0
0

Jumlah
Dibulatkan

K-10

1 m' Talang 1/2


lingkaran D-15 cm,
seng pelat BJLS 28
lebar 90 cm
-

Seng plat
3' x 6'
BJLS 30

m'

10,500 20,801.00 21,841.05

Paku
biasa " 1"

Kg

0.1000 23,800.00

Kayu
papan
borneo
super

kg

0.0190

Besi strip

Kg

0.5000 26,800.00 13,400.00

Pekerja

Oh

0.1500 42,000.00

Oh

0.3000 65,000.00 19,500.00

Oh

0.0300 75,000.00

2,250.00

Oh

0.0080 80,000.00

640.00

Tukang
kayu
Kepala
tukang
Mandor

5,595,800 106,320.2
.00
0

6,300.00

172,631.2
5
172,631.0
0

Jumlah
Dibulatkan

K-11

2,380.00

1 m' Pasang kusen


pintu/jendela
alluminium natural
4"
-

Alumuniu
m profil
natural 4"
Skrup
fixer
Sealant

151,100.0 166,210.0
0
0

m'

11,000

bh

20,000

250.00

500.00

m'

10,000

7,500.00

7,500.00

Pekerja
Tukang
kayu
Kepala
tukang
Mandor

Oh

0.0430 42,000.00

1,806.00

Oh

0.0430 65,000.00

2,795.00

Oh

0.0043 75,000.00

322.50

Oh

0.0021 80,000.00

168.00
179,301.5
0
179,302.0
0

Jumlah
Dibulatkan
K-12

1 m' Pasang kusen


pintu/jendela
alluminium warna 4"
-

Alumuniu
m profil
warna 4"

Skrup
fixer
Sealant

Pekerja

Tukang
kayu
Kepala
tukang
Mandor

163,000.0 179,300.0
0
0

m'

11,000

bh

20,000

250.00

500.00

m'

10,000

7,500.00

7,500.00

Oh

0.0430 42,000.00

1,806.00

Oh

0.0430 65,000.00

2,795.00

Oh

0.0043 75,000.00

322.50

Oh

0.0021 80,000.00

168.00
192,391.5
0
192,392.0
0

Jumlah
Dibulatkan

K-13

1 m' Pasang kusen


pintu/jendela
alluminium natural
3"
-

Alumuniu
m profil
natural 3"

Skrup
fixer
Sealant

Pekerja

m'

11,000 81,000.00 89,100.00

bh

20,000

250.00

500.00

m'

10,000

7,500.00

7,500.00

Oh

0.0430 42,000.00

1,806.00

Tukang
kayu
Kepala
tukang
Mandor

Oh

0.0430 65,000.00

2,795.00

Oh

0.0043 75,000.00

322.50

Oh

0.0021 80,000.00

168.00
102,191.5
0
102,192.0
0

Jumlah
Dibulatkan
K-14

1 m' Pasang kusen


pintu/jendela
alluminium warna 3"
-

Alumuniu
m profil
warna 3"

Skrup
fixer
Sealant

Pekerja

Tukang
kayu
Kepala
tukang
Mandor

102,000.0 112,200.0
0
0

m'

11,000

bh

20,000

250.00

500.00

m'

10,000

7,500.00

7,500.00

Oh

0.0430 42,000.00

1,806.00

Oh

0.0430 65,000.00

2,795.00

Oh

0.0043 75,000.00

322.50

Oh

0.0021 80,000.00

168.00
125,291.5
0
125,292.0
0

Jumlah
Dibulatkan
K-15

1 m2 Pintu
alluminium strip
lebar 8 cm
-

Alumuniu
m profil 4"
natural

m'

44,000

151,100.0 664,840.0
0
0

Alumuniu
m strip
6mm

m2

10,500

171,800.0 180,390.0
0
0

Pekerja

Oh

0.0850 42,000.00

3,570.00

Oh

0.0850 65,000.00

5,525.00

Oh

0.0085 75,000.00

637.50

Tukang
kayu
Kepala
tukang

Mandor

Oh

0.0042 80,000.00

855,298.5
0
855,299.0
0

Jumlah
Dibulatkan

K-16

1 m2 Pintu/jendela
kaca rangka
alluminium natural
4"
-

Alumuniu
m profil
natural 4"

Profil
alluminiu
mT
Sealant

Pekerja

Tukang
kayu
Kepala
tukang
Mandor

151,100.0 664,840.0
0
0

m'

44,000

m'

45,000 12,200.00 54,900.00

tube

0.2700

7,500.00

2,025.00

Oh

0.0850 42,000.00

3,570.00

Oh

0.0850 65,000.00

5,525.00

Oh

0.0085 75,000.00

637.50

Oh

0.0050 80,000.00

400.00
731,897.5
0
731,898.0
0

Jumlah
Dibulatkan
K-17

336.00

1 m2 Pintu/jendela
kaca rangka
alluminium warna 4"
-

Alumuniu
m profil
warna 4"

Profil
alluminiu
mT
Sealant

Pekerja

Tukang
kayu
Kepala
tukang

163,000.0 717,200.0
0
0

m'

44,000

m'

45,000 12,200.00 54,900.00

tube

0.2700

7,500.00

2,025.00

Oh

0.0850 42,000.00

3,570.00

Oh

0.0850 65,000.00

5,525.00

Oh

0.0085 75,000.00

637.50

Mandor

Oh

0.0050 80,000.00

784,257.5
0
784,258.0
0

Jumlah
Dibulatkan
K-18

1 m2 Jendela nako &


teralis (10 klips)

Jendela
nako
(rangka +
kaca 5
mm)

m2

11,000

Paku
skrup 1cm
- 2,5cm

bh

100,000

Besi strip

m'

70,000

Pekerja

Oh

0.2000 42,000.00

Oh

0.2000 65,000.00 13,000.00

Oh

0.0200 75,000.00

1,500.00

Oh

0.0010 80,000.00

80.00

Tukang
kayu
Kepala
tukang
Mandor

300,000.0 330,000.0
0
0

250.00

2,500.00

5,500.00 38,500.00
8,400.00

393,980.0
0
393,980.0
0

Jumlah
Dibulatkan
K-19

400.00

1 m2 Pintu pelat baja tebal 2mm rangkap,


rangka baja siku
Besi siku L
360,000.0
Kg 150,000 24,000.00
30.30.3
0
787,200.0
Baja pelat
Kg 328,000 24,000.00
0
-

kawat las

Kg

0.0500 23,600.00

1,180.00

Pekerja

Oh

0.2000 42,000.00

8,400.00

Oh

0.2000 65,000.00 13,000.00

Oh

0.0200 75,000.00

1,500.00

Oh

0.0010 80,000.00

80.00

Tukang
kayu
Kepala
tukang
Mandor

1,171,360
.00
1,171,360
.00

Jumlah
Dibulatkan
K-20

1 m2 Rangka jendela
besi square tube (5 x
5) cm
-

Besi
square
tube

Besi lis
kaca (1 x
1) cm

Kg

Pengelasa
n

Cm

Pekerja

Oh

0.6500 42,000.00 27,300.00

Oh

0.6500 65,000.00 42,250.00

Oh

0.0650 75,000.00

4,875.00

Oh

0.0320 80,000.00

2,560.00

Tukang
kayu
Kepala
tukang
Mandor

47,600

7,300.00 34,748.00

45,220 24,000.00
200,000

2,464.00 49,280.00

269,541.0
0
269,541.0
0

Jumlah
Dibulatkan
K-21

1 m2 Pintu lipat
(folding door) bahan
besi
501,700.0 501,700.0
0
0

Pintu lipat

M2

10,000

Pekerja

Oh

10,500 42,000.00 44,100.00

Oh

10,500 65,000.00 68,250.00

Oh

0.1050 75,000.00

7,875.00

Oh

0.0052 80,000.00

416.00

Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Dibulatkan
K-22

108,528.0
0

1 m2 Tirai (venetions
blinds and vertical
blinds)

622,341.0
0
622,341.0
0

537,300.0 537,300.0
0
0

Tirai

M2

10,000

Pekerja

Oh

0.3500 42,000.00 14,700.00

Oh

0.3500 65,000.00 22,750.00

Oh

0.0350 75,000.00

2,625.00

Oh

0.0018 80,000.00

144.00

Tukang
kayu
Kepala
tukang
Mandor
Jumlah

Dibulatkan
Kembali Ke Analisa AHS SNI

577,519.0
0
577,519.0
0

n Penutup Besi dan Aluminium

Satuan Pekerjaan Sanitasi


Diposkan : 04 Juni 2014
Oleh : Endang Kusman

No.
M-01

HARGA
HARGA
SAT
(Rp)
(Rp)
1 Buah Closet jongkok Porselen Standar
Closet
188,200.0 188,200.0
bh
1.00
jongkok
0
0
P.C (50
Kg
6.00 1,406.00 8,436.00
gk)
Pasir
233,400.0
m3
0.01
2,334.00
pasang
0
URAIAN

SAT

Pekerja

org

10,000 42,000.00 42,000.00

org

15,000 65,000.00 97,500.00

org

15,000 75,000.00

org

0.1600 80,000.00 12,800.00

Tukang
batu
Kepala
Tukang
Mandor

VOLUME

463,770.0
0
463,770.0
0

Jumlah

M-02

Dibulatka
n
1 Buah
Urinoir
Urinoir
P.C (50
gk)
Pasir
pasang
Pekerja
Tukang
batu
Kepala
Tukang
Mandor

112,500.0
0

1,773,400 1,773,400
.00
.00

bh

1.00

Kg

6.00

1,406.00

8,436.00

m3

0.01

233,400.0
0

2,334.00

org

10,000 42,000.00 42,000.00

org

10,000 65,000.00 65,000.00

org

0.1000 75,000.00

7,500.00

org

0.0010 80,000.00

80.00

Perlengka
pan 30 %
harga
urinoir

lot

0.3000

1,773,400 532,020.0
.00
0
2,430,770
.00
2,430,770
.00

Jumlah

M-03

Dibulatka
n
1 Buah
Wastafel
wastafel
standar
P.C (50
gk)
Pasir
pasang
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 12 %
harga
wastafel

1,012,700 1,012,700
.00
.00

unit

1.00

Kg

6.00

1,406.00

8,436.00

m3

0.01

233,400.0
0

2,334.00

org

12,000 42,000.00 50,400.00

org

14,500 65,000.00 94,250.00

org

0.1500 75,000.00 11,250.00

org

0.1000 80,000.00

lot

0.1200

8,000.00

1,773,400 212,808.0
.00
0

1,400,178
.00
Dibulatka
1,400,178
n
.00
1 Buah bak Mandi Fibreglass Volume 0,30 m3
Jumlah

M-04

Bak
fibreglass
0.60m x
0.60m
Pekerja
Tukang
batu
Kepala
Tukang
Mandor

bh

1.00

255,300.0 255,300.0
0
0

org

18,000 42,000.00 75,600.00

org

27,000 65,000.00

org

0.5400 75,000.00 40,500.00

org

0.1100 80,000.00

175,500.0
0

8,800.00

Perlengka
pan 18 %
harga bak

lot

0.1800

255,300.0
45,954.00
0

601,654.0
0
Dibulatka
601,654.0
n
0
1 M' Saluran Air Limbah Buis beton d = 30 cm - 60
cm
Buis
beton
bh
1.10 61,700.00 67,870.00
30 cm
Jumlah

M-05

Bata
merah
P.C (50
gk)
Pasir
pasang

bh

25.00

775.00 19,375.00

Kg

10,300

1,406.00 14,481.80

m3

0.061

233,400.0
14,237.40
0
175,300.0
0.069
12,095.70
0

Pasir urug

m3

Pekerja

org

0.3800 42,000.00 15,960.00

org

0.1900 65,000.00 12,350.00

org

0.0190 75,000.00

1,425.00

org

0.0190 80,000.00

1,520.00

Tukang
batu
Kepala
Tukang
Mandor

159,314.9
0
Dibulatka
159,315.0
n
0
1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm
Bata
144,150.0
bh
186.00
775.00
merah
0
P.C (50
160,284.0
Kg 114,000 1,406.00
gk)
0
Pasir
233,400.0
m3
0.184
42,945.60
pasang
0
Jumlah

M-06

Batu
pecah 2/3
Besi
beton
Pasir
beton
Pekerja

211,100.0
0

m3

0.033

m3

4,850 16,500.00 80,025.00

m3

0.120

org

6,966.30

255,400.0
30,648.00
0

21,600 42,000.00 90,720.00

Tukang
batu
Kepala
Tukang

org

0.7200 65,000.00 46,800.00

org

0.0720 75,000.00

5,400.00

Mandor

org

0.1080 80,000.00

8,640.00

Tukang
gali

org

0.1000 42,000.00

4,200.00

620,778.9
0
Dibulatka
620,779.0
n
0
1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
Bata
bh
53.00
775.00 41,075.00
merah
P.C (50
Kg
44,000 1,406.00 61,864.00
gk)
Pasir
233,400.0
m3
0.070
16,338.00
pasang
0
Jumlah

M-07

Batu
pecah 2/3
Besi
beton
Pasir
beton
Pekerja
Tukang
batu
Kepala
Tukang
Mandor

211,100.0
14,777.00
0

m3

0.070

m3

1,600 16,500.00 26,400.00

m3
org

255,400.0
15,324.00
0
134,400.0
32,000 42,000.00
0
0.060

org

10,150 65,000.00 65,975.00

org

0.0015 75,000.00

112.50

org

0.0160 80,000.00

1,280.00
377,545.5
0
377,546.0
0

Jumlah
Dibulatka
n
M-08

1 M' Pipa
PVC
1/2" (AW)
Pipa pvc
1/2"

m'

Pekerja

org

12,000 10,025.00 12,030.00


0.0360 42,000.00

1,512.00

Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa

M-09

0.0600 65,000.00

3,900.00

org

0.0060 75,000.00

450.00

org

0.0018 80,000.00

144.00

lot

0.3500 12,030.00

4,210.50

Jumlah

22,246.50

Dibulatka
n

22,247.00

1 M' Pipa
PVC 1"
(AW)
Pipa pvc
1"

m'

Pekerja

org

0.0360 42,000.00

1,512.00

org

0.0600 65,000.00

3,900.00

org

0.0060 75,000.00

450.00

org

0.0018 80,000.00

144.00

lot

0.3500 18,960.00

6,636.00

Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa

M-10

org

12,000 15,800.00 18,960.00

Jumlah

31,602.00

Dibulatka
n

31,602.00

1 M' Pipa
PVC
11/2"
(AW)
Pipa pvc
11/2"

m'

Pekerja

org

0.0360 42,000.00

1,512.00

org

0.0600 65,000.00

3,900.00

org

0.0060 75,000.00

450.00

Tukang
batu
Kepala
Tukang

12,000 26,475.00 31,770.00

Mandor
Perlengka
pan 35 %
harga
pipa

M-11

lot

0.0018 80,000.00

144.00

0.3500 31,770.00 11,119.50

Jumlah

48,895.50

Dibulatka
n

48,896.00

1 M' Pipa
PVC 2"
(AW)
Pipa pvc
2"

m'

Pekerja

org

0.0360 42,000.00

1,512.00

org

0.0600 65,000.00

3,900.00

org

0.0060 75,000.00

450.00

org

0.0018 80,000.00

144.00

Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa

M-12

org

lot

12,000 27,675.00 33,210.00

0.3500 31,770.00 11,119.50

Jumlah

50,335.50

Dibulatka
n

50,336.00

1 M' Pipa
PVC 4"
(AW)
Pipa pvc
4"

m'

12,000 86,975.00

104,370.0
0

Pekerja

org

0.0810 42,000.00

3,402.00

org

0.1350 65,000.00

8,775.00

org

0.0135 75,000.00

1,012.50

org

0.0041 80,000.00

328.00

Tukang
batu
Kepala
Tukang
Mandor

Perlengka
pan 35 %
harga
pipa

lot

0.3500

104,370.0
36,529.50
0
154,417.0
0
154,417.0
0

Jumlah
Dibulatka
n
M-13

1 M' Pipa
PVC
3/4" (AW)
Pipa pvc
3/4"

m'

Pekerja

org

0.0810 42,000.00

3,402.00

org

0.1350 65,000.00

8,775.00

org

0.0135 75,000.00

1,012.50

org

0.0041 80,000.00

328.00

lot

0.3500 15,660.00

5,481.00

Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 35 %
harga
pipa

12,000 13,050.00 15,660.00

Jumlah

M-14

34,658.50

Dibulatka
n
1 Buah Bak Cuci piring Stainless steel
Bak cuci
stainless
steel +
asesoris
lengkap
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Jumlah

bh

10,000

34,659.00

397,800.0 397,800.0
0
0

org

0.0300 42,000.00

1,260.00

org

0.3000 65,000.00 19,500.00

org

0.0300 75,000.00

2,250.00

org

0.0015 80,000.00

120.00
420,930.0
0

Dibulatka
n
M-15

1 Buah
Kran
1/2" - 3/4"
Kran air

bh

10,000 40,900.00 40,900.00

Seal tape

bh

0.0250

Pekerja
Tukang
batu
Kepala
Tukang
Mandor

M-16

4,200.00

105.00

org

0.0100 42,000.00

420.00

org

0.1000 65,000.00

6,500.00

org

0.0100 75,000.00

750.00

org

0.0050 80,000.00

400.00

Jumlah

49,075.00

Dibulatka
n

49,075.00

1 Buah
Floor
Drain
Floor
drain
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Jumlah

M-17

420,930.0
0

bh

10,000 66,600.00 66,600.00

org

0.0100 42,000.00

420.00

org

0.1000 65,000.00

6,500.00

org

0.0100 75,000.00

750.00

org

0.0050 80,000.00

400.00
74,670.00

Dibulatka
74,670.00
n
1 M' Grafel beton U 20 cm -60
cm
Pipa
bh
11,000 44,300.00 48,730.00
beton U
Bata
bh 120,000
775.00 9,300.00
merah
P.C (50
zak
0.1030 1,406.00
144.82
gk)

Pasir
pasang

m3

Pasir urug

m3

Pekerja

org

0.0100 42,000.00

420.00

org

0.1000 65,000.00

6,500.00

org

0.0100 75,000.00

750.00

org

0.0050 80,000.00

400.00

Tukang
batu
Kepala
Tukang
Mandor

233,400.0
0
175,300.0
0.0345
0
0.0305

Jumlah

M-18

6,047.85

79,411.37

Dibulatka
79,411.00
n
1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang
plastik
m' 105,000 60,000.00 63,000.00
PVC
Perlengka
pan 35 %
harga
talang
Pekerja
Tukang
batu
Kepala
Tukang
Mandor

lot

0.3500 63,000.00 22,050.00

org

0.1500 42,000.00

org

0.4000 65,000.00 26,000.00

org

0.0250 75,000.00

1,875.00

org

0.0013 80,000.00

100.00

Dibulatka
n
1 M' Saluran Air Limbah Buis
Beton 60 cm
Buis
beton
60 cm
Bata
merah
P.C (50
gk)
Pasir
pasang

6,300.00

119,325.0
0
119,325.0
0

Jumlah

M-19

7,118.70

bh

1.10

130,900.0 143,990.0
0
0

bh

25.00

775.00 19,375.00

zak

0.206

m3

0.061

1,406.00

289.64

233,400.0
14,237.40
0

m3

Pekerja

org

0.3800 42,000.00 15,960.00

org

0.1900 65,000.00 12,350.00

org

0.0190 75,000.00

1,425.00

org

0.0190 80,000.00

1,520.00

Tukang
batu
Kepala
Tukang
Mandor

0.069

175,300.0
12,095.70
0

Pasir urug

221,242.7
4
221,243.0
0

Jumlah
Dibulatka
n

M-20

1 M'
Pasang
Talang
Seng
Datar
Seng
pelat 3" x
6"

lbr

0.50000 20,801.00 10,400.50

Paku

kg

0.01500 23,400.00

Kayu
kelas II
Meni besi
Pekerja
Tukang
batu
Kepala
Tukang
Mandor

M-21

m3

0.00960

351.00

2,850,000
27,360.00
.00

kg

0.2500 30,400.00

7,600.00

org

0.1500 42,000.00

6,300.00

org

0.4000 65,000.00 26,000.00

org

0.0250 75,000.00

1,875.00

org

0.0013 80,000.00

100.00

Jumlah

79,986.50

Dibulatka
n

79,987.00

1 Buah
Closet
Duduk
Closet
duduk

bh

Pekerja

org

1,724,700 1,724,700
.00
.00
138,600.0
33,000 42,000.00
0
1.00

Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 6 %
harga
closet

org

11,000 65,000.00 71,500.00

org

0.0010 75,000.00

org

0.1600 80,000.00 12,800.00

lot

0.0600

1,724,700 103,482.0
.00
0

Jumlah

M-22

Dibulatka
n
1 Buah Tangki Air fibreglass Volume 1 m3
Bak
fibreglass
kapasitas
1 m3
Pekerja
Tukang
batu
Kepala
Tukang
Mandor
Perlengka
pan 6 %
harga bak

bh

1.00

75.00

2,051,157
.00
2,051,157
.00

1,316,400 1,316,400
.00
.00
138,600.0
0

org

33,000 42,000.00

org

11,000 65,000.00 71,500.00

org

0.0010 75,000.00

org

0.1600 80,000.00 12,800.00

lot

0.0600

75.00

1,316,400
78,984.00
.00

1,618,359
.00
Dibulatka
1,618,359
n
.00
1 Unit Septictank 2x1,50x1,50 m + Rembesan
Galian
118,134.0
m3
4,500 26,252.00
tanah
0
175,300.0
Pasir urug
m3
0.214
37,514.20
0
lantai
716,798.0 1,612,795
m3
2,250
kerja
0
.50
Jumlah

M-23

Pas bata
adk 1pc :
3ps

m2

15,000

220,267.1 3,304,006
0
.50

Pelat
beton K225

m3

0.300

6,438,864 1,931,659
.00
.20

Plesteran
adk 1pc :
3ps

m2

Pipa PVC
4" jenis
AW

m'

5,400

Pipa GIP 1
1/2"

m'

5,000 46,750.00

Galian
tanah
untuk
rembesan

m3

Pas ijuk

kg

Urugan
kerikil 3/5

m3

Pipa PVC
4"
berlubang
jenis AW

m'

Urugan
dan
perataan
tanah

m3

15,000 41,301.82

619,527.3
0

256,800.0 1,386,720
0
.00
233,750.0
0

3,375 20,000.00 67,500.00

5,400 23,400.00
1,050

126,360.0
0

205,000.0 215,250.0
0
0

9,000 36,700.00

330,300.0
0

1,125 34,584.00 38,907.00

10,022,42
3.70
Dibulatka
10,022,42
n
4.00
1 Unit Septictank 1x1,50x1,50 m + Rembesan
Galian
m3
2,250 20,000.00 45,000.00
tanah
175,300.0
Pasir urug
m3
0.107
18,757.10
0
lantai
716,798.0 806,397.7
m3
1,125
kerja
0
5
Jumlah

M-24

Pas bata
adk 1pc :
3ps

m2

7,500

220,267.1 1,652,003
0
.25

Pelat
beton K225

m3

0.150

6,438,864 965,829.6
.00
0

Plesteran
adk 1pc :
3ps

m2

7,500 41,301.82

309,763.6
5

Pipa PVC
4" jenis
AW

m'

9,000

Pipa GIP 1
1/2"

m'

2,500 46,750.00

Galian
tanah
untuk
rembesan

m3

1,688 20,000.00 33,760.00

kg

2,700 23,400.00 63,180.00

Pas ijuk
Urugan
kerikil 3/5

m3

Pipa PVC
4"
berlubang
jenis AW

m'

Urugan
dan
perataan
tanah

m3

Jumlah
Dibulatka
n
Kembali ke Analisa SNI

0.525

256,800.0 2,311,200
0
.00
116,875.0
0

205,000.0 107,625.0
0
0

9,000 36,700.00

330,300.0
0

0.563 34,584.00 19,470.79


6,780,162
.14
6,780,162
.00

atuan Pekerjaan Pengecatan


Diposkan : 05 Juni 2014
Oleh : Endang Kusman

No.
N-01

URAIAN

SAT

VOLUME

HARGA
SAT

1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama


-

Soda api

Kg

0.0500 35,600.00

1,780.00

Pekerja

Oh

0.1500 42,000.00

6,300.00

Mandor

Oh

0.0025 80,000.00

200.00

Jumlah
N-02

Dibulatkan
1 M2 Mendempul Dan Menggosok Kayu
-

Dempul
Minyak
cat
Batu
apung
Pekerja
Tukang
cat
Kepala
tukang
Mandor

8,280.00
8,280.00

Kg

0.0800 35,800.00

2,864.00

Kg

0.0200 38,400.00

768.00

Kg

0.0100 29,600.00

296.00

Oh

0.0400 42,000.00

1,680.00

Oh

0.0400 65,000.00

2,600.00

Oh

0.0040 75,000.00

300.00

Oh

0.0025 80,000.00

200.00

Jumlah
N-03

HARGA

Dibulatkan
1 M2 Pengecatan Bidang Kayu Lama Setara Sieve

8,708.00
8,708.00

Plamir

Kg

0.1500 25,000.00

3,750.00

Cat dasar

Kg

0.1700 30,000.00

5,100.00

Cat
penutup
setara
sieve 2x

Kg

0.1700 41,700.00

7,089.00

Pekerja
Tukang
cat
Kepala
tukang
Mandor

Oh

0.0700 42,000.00

2,940.00

Oh

0.0750 65,000.00

4,875.00

Oh

0.0075 75,000.00

562.50

Oh

0.0025 80,000.00

200.00

Jumlah

24,516.50

Dibulatkan
N-04

24,517.00

1 M2 Pengecatan Bidang Kayu Baru Setara Sieve


-

Cat meni

Kg

0.2000 30,400.00

6,080.00

Plamir

Kg

0.1500 25,000.00

3,750.00

Cat dasar

Kg

0.1700 30,000.00

5,100.00

Cat
penutup
3x setara
sieve

Kg

0.3500 41,700.00 14,595.00

Pekerja

Oh

0.0700 42,000.00

2,940.00

Oh

0.1050 65,000.00

6,825.00

Oh

0.0040 75,000.00

300.00

Oh

0.0025 80,000.00

200.00

Tukang
cat
Kepala
tukang
Mandor
Jumlah

39,790.00

Dibulatkan
N-05

39,790.00

1 M2 Pelaburan Bidang Kayu dengan


Politur
-

Politur

Ltr

0.1500 48,000.00

Politur
jadi

Ltr

0.3720

112,700.0
41,924.40
0

Ampelas

Lbr

20,000

5,000.00 10,000.00

Oh

0.0600 65,000.00

3,900.00

Oh

0.0160 75,000.00

1,200.00

Tukang
cat
Kepala
tukang

7,200.00

Mandor

Oh

0.0025 80,000.00

Jumlah

64,424.40

Dibulatkan
N-06

N-07

64,424.00

1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter


Residu
Ltr
0.3500 8,100.00 2,835.00
atau ter
-

Pekerja

Oh

0.1000 42,000.00

4,200.00

Mandor

Oh

0.0060 80,000.00

480.00

Jumlah
Dibulatkan
1 M2 Pengecatan Tembok Baru
Setara ICI
Plamir
Kg
tembok

7,515.00
7,515.00

0.1000 25,000.00

2,500.00
3,000.00

Cat dasar

Kg

0.1000 30,000.00

Cat
penutup
2x setara
ICI

Kg

0.2600 75,000.00 19,500.00

Pekerja

Oh

0.0200 42,000.00

840.00

Oh

0.0630 65,000.00

4,095.00

Oh

0.0063 75,000.00

472.50

Oh

0.0025 80,000.00

200.00

Tukang
cat
Kepala
tukang
Mandor
Jumlah

30,607.50

Dibulatkan
N-08

200.00

30,608.00

1 M2 Pengecatan Tembok Lama Setara ICI


-

Cat dasar

Kg

0.1200 30,000.00

3,600.00

Cat
penutup 2
x

Kg

0.1800 75,000.00 13,500.00

Pekerja

Oh

0.0280 42,000.00

1,176.00

Tukang
cat

Oh

0.0420 65,000.00

2,730.00

Kepala
tukang

Oh

0.0042 75,000.00

315.00

Mandor

Oh

0.0025 80,000.00

200.00

Jumlah

21,521.00

Dibulatkan
N-09

21,521.00

1 M2 Pengecatan Plafond ( 3x ) Setara ICI


Cat
tembok
Kg
0.2000 75,000.00 15,000.00
setara ICI
-

Plamir
tembok

Kg

0.1600 25,000.00

4,000.00

Rol cat

Bh

0.0100 32,500.00

325.00

Ls

10,000

1,000.00

1,000.00

Steger
werk
Ampelas

Lbr

0.5000

5,000.00

2,500.00

Pekerja

Oh

0.2000 42,000.00

8,400.00

Oh

0.3000 65,000.00 19,500.00

Oh

0.0300 75,000.00

2,250.00

Oh

0.0100 80,000.00

800.00

Tukang
cat
Kepala
tukang
Mandor
Jumlah

53,775.00

Dibulatkan
N-10

53,775.00

1 M2 Pengecatan Plafond ( 3x ) Setara Vinilex


-

Cat
tembok
setara
Vinilex

Kg

0.2000 25,000.00

5,000.00

Plamir
tembok

Kg

0.1600 25,000.00

4,000.00

Rol cat

Bh

0.0100 32,500.00

325.00

Ls

10,000

1,000.00

1,000.00

Steger
werk
Ampelas

Lbr

0.5000

5,000.00

2,500.00

Pekerja

Oh

0.2000 42,000.00

8,400.00

Tukang
cat

Oh

0.3000 65,000.00 19,500.00

Kepala
tukang

Oh

0.0300 75,000.00

2,250.00

Mandor

Oh

0.0100 80,000.00

800.00

Jumlah

43,775.00

Dibulatkan
N-10-r'

43,775.00

1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex


-

Cat
tembok
setara
Vinilex

Kg

0.1300 25,000.00

3,250.00

Plamir
tembok

Kg

0.1100 25,000.00

2,750.00

Rol cat

Bh

0.1000 32,500.00

3,250.00

Ls

0.6700

1,000.00

670.00

Steger
werk
Ampelas

Lbr

0.3300

5,000.00

1,650.00

Pekerja

Oh

0.1300 42,000.00

5,460.00

Oh

0.2000 65,000.00 13,000.00

Oh

0.0200 75,000.00

1,500.00

Oh

0.0100 80,000.00

800.00

Tukang
cat
Kepala
tukang
Mandor
Jumlah

32,330.00

Dibulatkan
N-11

32,330.00

1 M2 Memasang Wallpaper
-

Wallpaper

Lem
Perekat

Kg

0.2500 35,700.00

Pekerja

Oh

0.3500 42,000.00 14,700.00

Oh

0.1750 65,000.00 11,375.00

Oh

0.0170 75,000.00

1,275.00

Oh

0.0017 80,000.00

136.00

Tukang
cat
Kepala
tukang
Mandor
Jumlah

m2

12,000 55,700.00 66,840.00


8,925.00

103,251.0
0

103,251.0
0

Dibulatkan
N-12

1 M2 Pengecatan Permukaan Baja dengan Meni Besi


-

Meni besi

Kg

0.1000 30,400.00

3,040.00

Kuas 3"

Bh

0.0100 16,000.00

160.00

Pekerja

Oh

0.0200 42,000.00

840.00

Oh

0.2000 65,000.00 13,000.00

Oh

0.0200 75,000.00

1,500.00

Oh

0.0100 80,000.00

800.00

Tukang
cat
Kepala
tukang
Mandor
Jumlah

19,340.00

Dibulatkan
N-13

19,340.00

1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan


Perancah
-

Meni besi

Kg

0.1000 30,400.00

3,040.00

Kuas 3"

Bh

0.0100 16,000.00

160.00

Kayu
perancah

m3

0.0020

2,069,800
.00

4,139.60

Pekerja

Oh

0.2500 42,000.00 10,500.00

Oh

0.2250 65,000.00 14,625.00

Oh

0.0225 75,000.00

1,687.50

Oh

0.0075 80,000.00

600.00

Tukang
cat
Kepala
tukang
Mandor
Jumlah

34,752.10

Dibulatkan
N-14

34,752.00

1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara


manual 1 lps cat 2 um
Cat besi
Kg
0.3000 67,700.00 20,310.00
setara ICI
-

Pekerja

Oh

0.0060 42,000.00

252.00

Tukang
cat

Oh

0.0600 65,000.00

3,900.00

Kepala
tukang

Oh

0.0120 75,000.00

900.00

Mandor

Oh

0.0060 80,000.00

480.00

Jumlah

25,842.00

Dibulatkan
N-15

25,842.00

1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)


Plamir
Kg
0.1000 25,000.00 2,500.00
tembok
-

Cat dasar

Kg

0.1000 30,000.00

3,000.00

Cat
penutup
2x setara
vinilex

Kg

0.2600 25,000.00

6,500.00

Pekerja

Oh

0.0200 42,000.00

840.00

Oh

0.0630 65,000.00

4,095.00

Oh

0.0063 75,000.00

472.50

Oh

0.0025 80,000.00

200.00

Tukang
cat
Kepala
tukang
Mandor
Jumlah

17,607.50

Dibulatkan
N-15r'

17,608.00

1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)


Plamir
Kg
0.1000 25,000.00 2,500.00
tembok
-

Cat dasar

Kg

0.1000 30,000.00

3,000.00

Cat
penutup
3x setara
vinilex

Kg

0.3900 25,000.00

9,750.00

Pekerja

Oh

0.0300 42,000.00

1,260.00

Oh

0.0945 65,000.00

6,142.50

Oh

0.0095 75,000.00

712.50

Oh

0.0038 80,000.00

304.00

Tukang
cat
Kepala
tukang
Mandor

Jumlah

23,669.00

Dibulatkan
N-16

23,669.00

1 M2 Pengecatan Tembok Lama Setara Vinilex


-

Cat dasar

Kg

0.1200 30,000.00

3,600.00

Cat
penutup 2
x

Kg

0.1800 25,000.00

4,500.00

Pekerja

Oh

0.0280 42,000.00

1,176.00

Oh

0.0420 65,000.00

2,730.00

Oh

0.0042 75,000.00

315.00

Oh

0.0025 80,000.00

200.00

Tukang
cat
Kepala
tukang
Mandor
Jumlah

Dibulatkan
Kembali ke AHS-SNI

12,521.00
12,521.00

an Pekerjaan Penanaman Pohon


Diposkan : o6 Juni2014
Oleh : Endang Kusman

NO.
O-01

O-02

O-03

HARGA
SAT. (Rp)
1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
URAIAN

KOEF

SAT.

HARGA
(Rp)

Pupuk kandang

0.0800

krg 25,000.00

2,000.00

Furadan

0.0010

kg 24,000.00

24.00

Pohon pelindung

10,000

Pekerja

0.0250

org 42,000.00

1,050.00

Mandor

0.0025

org 80,000.00

200.00

btng 25,000.00 25,000.00

Jumlah

28,274.00

Dibulatkan

28,274.00

1 Lubang (70x70x70) cm, tanam bambu krisik/jepang


Pupuk kandang

0.0800

krg 25,000.00

2,000.00

Furadan

0.0010

kg 24,000.00

24.00

Bambu krisik/jepang

10,000

Pekerja

0.0250

org 42,000.00

1,050.00

Mandor

0.0025

org 80,000.00

200.00

btng 50,000.00 50,000.00

Jumlah

53,274.00

Dibulatkan

53,274.00

1 Lubang (40x40x40) cm, tanam pohon perdu (polibag)


Pupuk kandang

0.0400

krg 25,000.00

1,000.00

Furadan

0.0010

kg 24,000.00

24.00

Pohon perdu

10,000

btng 10,000.00 10,000.00

O-04

Pekerja

0.0200

org 42,000.00

840.00

Mandor

0.0020

org 80,000.00

160.00

Jumlah

12,024.00

Dibulatkan

12,024.00

1 M2 Tanam rumput gajah (silang papan catur)


Pupuk kandang

0.0400

krg 25,000.00

1,000.00

Rumput gajah mini

0.5000

m2 15,000.00

7,500.00

Pekerja

0.0400

org 42,000.00

1,680.00

Mandor

0.0040

org 80,000.00

320.00

Jumlah

10,500.00

Dibulatkan

10,500.00

Kembali ke AHA-SNI

h Kerja Bangunan - AHS 2011

UPAH
(Rp.)

NO

URAIAN

SATUAN

Mandor

Org/hr

Rp
80,000.00

Kepala
Tukang
Batu

Org/hr

Rp
75,000.00

Kepala
Tukang
Kayu

Org/hr

Rp
75,000.00

Kepala
Tukang
Besi

Org/hr

Rp
75,000.00

Kepala
Tukang
Cat

Org/hr

Rp
75,000.00

Kepala
Tukang
Listrik

Org/hr

Rp
75,000.00

Kepala
Tukang

Org/hr

Rp
75,000.00

Tukang
Batu

Org/hr

Rp
65,000.00

Tukang
Kayu

Org/hr

Rp
65,000.00

10

Tukang
Besi/Baja

Org/hr

Rp
65,000.00

11

Tukang
Cat

Org/hr

Rp
65,000.00

12

Tukang
Listrik

Org/hr

Rp
65,000.00

13

Tukang
Pipa

Org/hr

Rp
65,000.00

14

Tukang
Plitur

Org/hr

Rp
65,000.00

15

Tukang
Taman

Org/hr

Rp
65,000.00

16

Tukang

Org/hr

Rp
65,000.00

17

Pembantu
Tukang

Org/hr

Rp
42,000.00

18

Pekerja
Biasa

Org/hr

Rp
42,000.00

19

Penjaga
Malam

Org/hr

Rp
42,000.00

20

Sopir

Org/hr

Rp
65,000.00

21

Operator

Org/hr

Rp
75,000.00

22

Mekanik

Org/hr

Rp
65,000.00

23

Pembantu
Sopir

Org/hr

Rp
42,000.00

24

Pembantu
Operator

Org/hr

Rp
50,000.00

25

Pembantu
Mekanik

Org/hr

Rp
42,000.00

harga sudah
termasuk PPN dan
keuntungan

Bahan Bangunan - AHS 2011


SAT

HARGA
(Rp)

Pasir Urug

m3

175,300.0
0

Tanah
Urug
Pilihan

m3

89,200.00

Sirtu

m3

Pasir
Teras

m3

Pasir
Pasang
Kali

m3

Pasir
Beton

m3

Abu Batu

m3

Batu
Gosok
( Apung )

kg

29,600.00

Batu
Pecah
Mesin 1/2

m3

223,600.0
0

10

Batu
Pecah
Mesin 2/3

m3

211,100.0
0

11

Batu
Pecah
Mesin 3/5

m3

205,000.0
0

NO

MATERIAL

A.

AGREGAT
KASAR,BA
HAN
PEREKAT
& BAHAN
JADINYA

203,500.0
0
174,200.0
0
233,400.0
0
255,400.0
0
259,000.0
0

12

Batu
Pecah
Mesin 5/7

m3

196,000.0
0

13

Batu
Belah
Pondasi

m3

205,500.0
0

14

Batu
Bronjol
( Untuk
Bronjong )

m3

180,800.0
0

15

Batu Koral
Beton Kali

m3

172,600.0
0

16

Batu
Tempel
Hitam

m3

96,600.00

17

Batu
Pinggir
Beton 10
x 20 x 35

bh

14,100.00

18

Batu
Pinggir
Beton 15
x 35 x 50
( K-225 )

bh

73,700.00

19

Batu Telor

m3

97,800.00

20

Batako
Kecil 8 x
10 x 20

bh

2,000.00

21

Batako
Besar 8 x
20 x 30

bh

2,400.00

22

Con Blok
8 x 20 x
40

bh

5,400.00

23

Bata
Merah
Bakar
kelas I

bh

775.00

24

Bata
Merah
Bakar
kelas II

bh

675.00

25

Bata
Merah
Oven
( Klingker
)
Roster
Beton 20
x 20

bh

1,800.00

bh

14,800.00

27

Roster
Beton 30
x 30

bh

15,500.00

28

Grass
Blok 20 x
20

bh

9,700.00

29

Grass
Blok 30 x
30

bh

22,500.00

30

Paving
Blok
Natural 8
cm

m2

81,100.00

31

Paving
Blok
Warna 8
cm

m2

108,600.0
0

32

Paving
Blok
Natural 6
cm

m2

76,000.00

33

Paving
Blok
Warna 6
cm

m2

86,000.00

34

Canstin
Paving
Blok

m1

34,900.00

35

Semen PC
/50 kg

zak

70,300.00

26

1,406.00
36

Semen
Putih

zak

92,700.00

37

Kanstin
Jalan
Ukuran
Besar
( Bina
Marga )
1bh
=60cm

bh

58,900.00

38

Readymix
Beton
K500,
Tanpa
Pompa
( Selang )

m3

1,105,000
.00

39

Readymix
Beton
K400,
Tanpa
Pompa
( Selang )

m3

903,500.0
0

40

Readymix
Beton
K350,
Tanpa
Pompa
( Selang )

m3

877,500.0
0

41

Readymix
Beton
K300,
Tanpa
Pompa
( Selang )

m3

925,000.0
0

42

Readymix
Beton
K225,
Tanpa
Pompa
( Selang )

m3

850,000.0
0

43

Readymix
Beton
K175,
Tanpa
Pompa
( Selang )

m3

825,000.0
0

44

45
46

Kapur
Pasang /
Kapur
Tembok
Kapur
Sirih
Semen
Warna

m3

353,300.0
0

kg

18,300.00

kg

15,700.00

47

Tanah liat

m3

31,300.00

48

Air
Formite/s
pacer

ltr

3.00

bh

2,500.00

49
50

Hollow/Co
n Blok 8 x
20 x 40

bh

5,000.00

51

Hollow/Co
n Blok 8 x
15 x 40

bh

4,000.00

52

Hollow/Co
n Blok 8 x
10 x 40

bh

3,000.00

LABURAN,
PENGISI
DAN
ALATNYA

Plamir
Tembok

kg

25,000.00

Cat
Tembok
ICI
Eksterior (
Beton )

lt

120,000.0
0

Cat
Tembok
ICI Interior
( Plafon
Dan
Dinding )

lt

75,000.00

Cat
Tembok
Vinilex

kg

25,000.00

Cat Dasar
ICI untuk
Interior
( 2 Pelapis
)

lt

75,000.00

Cat
Tembok
Sanlek

kg

20,000.00

Cat Dasar

kg

30,000.00

Cat Tahan
Asam

lt

40,000.00

Pelapis
Alkali ICI (
Cat Dasar
Beton
Ekterior )

kg

90,000.00

10

Cat Marka
/ Spotlight

kg

185,000.0
0

11

Water
Profing
Emulsion

ml

70,000.00

12

Water
Profing
Membran
ce

bh

62,500.00

bh

32,500.00

bh

8,500.00

5 lt

10,000.00

kg

25,000.00

m3

29,000.00

13
14
15
16
17
18
19

Rool Cat
Tembok
Kape
Tembok
Kape
Kayu
Soligneu
m 1 Blek
Plincote
Penaweta
n Kayu
Pegopena
n Kayu

m3
bh

382,600.0
0
370,000.0
0

20

Kwas 3"

bh

16,000.00

21

Oker

bks

22,000.00

22

Oyan
Oten
( Pewarna
Plitur )

bks

5,200.00

lt

5,500.00

24

Spirtus

kg

15,000.00

25

Bahan
Pelitur
Kripik
( Sirlak
India )

kg

110,000.0
0

kg

34,200.00

kg

37,700.00

28

Dempul
Halus /
Imfra
( Wood
Filler )

lt

37,700.00

29

Dempul
Jadi

kg

35,800.00

30

Politur

lt

48,000.00

31

Politur
Jadi

lt

112,700.0
0

32

Terpentin

kg

19,500.00

33

Tiner A

kg

23,900.00

34

Tiner B

kg

21,400.00

35

Kumpon

lbr

30,800.00

36

Melamik

kg

52,500.00

kg

39,200.00

kg

35,800.00

lbr

5,000.00

kg

24,400.00

kg

30,400.00

23

26
27

37
38
39
40

41

Dempul
Lilin
Dempul
Plitur

Dempul
Plastik
Dempul
Duco
Ampelas
Dempul
Kayu Cap
Kucing
Meni Kayu
/ Besi

42

Sincromat

kg

40,900.00

43

Cat Kayu
Sieve

lt

41,700.00

44

Cat Besi

lt

44,000.00

45

Cat Besi
Duco
Danaglos
/ ICI

bh

76,300.00

46

Cat Bron

kg

67,700.00

47

Karet lis
Minyak
cat
Glass
beet
Residu

bh

3,300.00

kg

38,400.00

kg

50,100.00

lt

8,100.00

bt

17,700.00

bt

25,000.00

bt

37,200.00

Kayu
Kamper
Singkil /
Kapur
( Kayu
Samarind
a kls II )

m3

7,094,450
.00

Kayu
Balok
Borneo
Super

m3

5,280,000
.00

Kayu
Papan
Borneo
Super

m3

5,595,800
.00

48
49
50

1
2
3

BAHAN
KAYU
BERIKUT
BAHAN
JADINYA
Bambu 5
s.d 7
Bambu 7
s.d 10
Bambu
Gombong

Kayu
Balok
Kamper
Medan
(Kruing )

m3

5,692,600
.00

Kayu
Papan
Kamper
Medan
(Kruing )

m3

5,823,400
.00

Kayu
Balok
Kamper
Banjar

m3

6,363,600
.00

10

Kayu
Papan
Kamper
Banjar

m3

6,645,300
.00

11

Kayu
Balok
Kamper
Samarind
a

m3

8,633,700
.00

12

Kayu
Papan
Kamper
Samarind
a

m3

8,724,300
.00

13

Kayu
Balok
Rasamala

m3

2,658,000
.00

14

Kayu Jati
Jatim Tua
dia. 40 cm

m3

20,772,00
0.00

15

Kayu Jati
Jateng Tua
dia. 40 cm

m3

22,188,40
0.00

16

Kayu Jati
Jabar Tua
dia. 40 cm

m3

13,625,40
0.00

17

Kayu Jati
Jabar Tua
dia. 40 cm
kebawah

m3

12,736,10
0.00

18

Kayu
Hutan
Kelas I
( Segeng,
Mahoni,
Laban )

m3

2,069,800
.00

19

Kayu
Balok
Albasia

m3

1,870,500
.00

20

Kayu
Papan
Albasia

m3

2,071,700
.00

bt

22,600.00

bt

28,000.00

21
22

Dolken 5
s/d 7
Dolken 7
s/d 10

23

List Profil
Kamper 1
cm

m1

8,900.00

24

List Profil
Kamper 2
cm

m1

10,000.00

25

List Profil
Kamper 4
cm

m1

14,300.00

26

List Profil
Kamper 5
cm

m1

17,200.00

27

List Profil
Kamper
10 cm

m1

29,400.00

28

Pegangan
Tangga
Profil Jati

m1

160,100.0
0

29

Pegangan
Tangga
Profil
Kamper

m1

122,500.0
0

30

Kayu Kaso
4/6

m3

2,772,000
.00

31

Kayu Kaso
5/7
Kamper
Medan

m3

3,356,800
.00

32

Kayu
Reng 2/3
Borneo
Super

m1

2,500.00

33

Kayu
Reng 2/3
Kamper
Banjar

m1

3,300.00

34

Kayu
Reng 3/4
Kamper
Medan

m3

4,000.00

35

Kayu
Papan
Terentang

m3

2,850,000
.00

36

Kayu
Balok
Terentang

m3

2,640,000
.00

37

Batang
Kelapa

bt

139,500.0
0

38

Tali Ijuk

kg

23,400.00

39

lapisan
Ijuk tebal
10 cm

m2

22,000.00

40
41

Venetion
Blind
Vertikal
Blind

BAHAN
PENUTUP
RANGKA
PLAFOND

Plafond
Enternit 4
mm

m2
m2

m2

537,300.0
0
351,200.0
0

17,400.00

Plafond
hardpleks
5 mm 120
x 240

lbr

62,400.00

Plafond
Asbes
Semen 5
mm

m2

22,500.00

Plafond
Asbes
Semen
3,5 mm

m2

19,500.00

Gypsum
120 x 240
t= 9 mm
ex DN

lbr

79,800.00

Gypsum
120 x 240
t= 9 mm
ex Luar

lbr

83,800.00

Tepung
gypsum

kg

12,500.00

Acustik
Amstrong
60 x 120

lbr

132,800.0
0

Cotton
Plester

bh

15,000.00

10

GRC (120
x 240)
cm, t = 4
mm

lbr

67,500.00

11

Cornice
Coumpou
nd

zak

75,000.00

12

List
gypsum

m'

8,500.00

BAHAN
KAYU
LAPIS

Triplek 3
mm 120 x
240

lbr

61,700.00

Triplek 4
mm 120 x
240

lbr

64,400.00

Triplek 4
mm
ukuran
Pintu

lbr

56,200.00

Triplek 6
mm 120 x
240

lbr

92,000.00

Triplek 9
mm 120 x
240

lbr

166,600.0
0

Jabar
Wood 4
mm

lbr

119,000.0
0

Bilik
Bambu
( tanpa
kulit )

m2

19,800.00

Bilik
Bambu
( dengan
kulit )

m2

22,700.00

Bilik
Bambu
Hitam
Variasi

m2

34,200.00

10

Wall
paper

m2

55,700.00

11

MultiPlek
9 mm 120
x 240

lbr

151,100.0
0

12

MultiPlek
12 mm
120 x 240

lbr

195,000.0
0

13

MultiPlek
18 mm
120 x 240

lbr

255,400.0
0

14

Ply Wood
18 mm
120 x 240

lbr

323,900.0
0

15

Ply Wood
9 mm 120
x 240

lbr

235,000.0
0

16

Ply Wood
4 mm 120
x 240

lbr

140,000.0
0

17

Teak
Wood 3
mm 120 x
240

lbr

129,100.0
0

18

Teak
Wood 4
mm 120 x
240

lbr

131,700.0
0

19

Teak
Wood 3
mm 120 x
240
ukuran
Pintu

lbr

127,200.0
0

20

Teak
Wood
ukuran
Pintu 4
mm

lbr

114,700.0
0

21

Tacon
( Tahan
Bakar )

m2

128,200.0
0

22

Supercon

m2

57,900.00

23

Melamin 4
mm 120 x
240

lbr

89,200.00

24

Melamin
TOK 4 mm

lbr

133,400.0
0

25

Formika
120 x 240

lbr

170,000.0
0

26

Formika
ukuran
Pintu

lbr

132,900.0
0

27

Formika
Warna 4"
x 8"

lbr

238,100.0
0

BAHAN
LANTAI
DAN
PELAPIS
DINDING

Tegel PC
20 x 20

bh

3,400.00

Plin Tegel
PC 10 x
20

bh

2,400.00

Tegel PC
30 x 30

bh

3,400.00

Plin Tegel
PC 15 x
30

bh

2,800.00

Tegel
Warna 20
x 20

bh

3,600.00

Plin Tegel
Warna 10
x 20

bh

3,400.00

Tegel
Warna 30
x 30

bh

5,700.00

Plin Tegel
Warna 15
x 30

bh

6,300.00

Tegel
Wafel PC
20 x 20

bh

3,200.00

10

Tegel
Wafel
Warna 20
x 20

bh

2,500.00

11

Tegel
Badak PC
30 x 30

bh

4,100.00

12

Poslin 11
x 11
Warna
Standar
DN

m2

63,300.00

13

Poslin 11
x 11
Warna
khusus
DN

m2

67,300.00

14

Keramik
10 x 20
dan 20 x
20 KW I
DN Putih /
Polos
Mulia

m2

54,500.00

15

Keramik
10 x 20
KW I DN
Corak/War
na/Anti
Slip Mulia

m2

56,000.00

16

Keramik
20 x 20
(KM) KW I
DN
Corak/War
na /Anti
Slip Mulia

m2

62,500.00

17

Keramik
20 x 20
(KM) KW I
DN Putih
Polos
Mulia

m2

54,500.00

18

Keramik
20 x 25
Dinding
KM KW I
DN Corak
Mulia

m2

62,500.00

19

Keramik
30 x 30
KWI DN
Putih
Polos
Mulia

m2

53,000.00

20

Keramik
30 x 30
KWI DN
Warna/Cor
ak (ANTI
SLIP)
Mulia

m2

58,000.00

21

Keramik
40 x 40
KWI DN
Putih
Polos
Mulia

m2

56,800.00

22

Keramik
40 x 40
KWI DN
Warna/Cor
ak (ANTI
SLIP)
Mulia

m2

65,500.00

23

Keramik
10 x 20
dan 20 x
20 KW I
DN Putih /
Polos
Roman

m2

64,400.00

24

Keramik
10 x 20
KW I DN
Corak/War
na/Anti
Slip
Roman

m2

72,200.00

25

Keramik
20 x 20
(KM) KW I
DN
Corak/War
na/Anti
Slip
Roman

m2

75,200.00

26

Keramik
20 x 20
(KM) KW I
DN Putih
Polos
Roman

m2

72,900.00

27

Keramik
20 x 25
Dinding
KM KW I
DN Corak
Roman

m2

75,200.00

28

Keramik
20 x 25
KW I DN
Putih
Polos
Roman

m2

72,900.00

29

Keramik
30 x 30
KW I DN
Polos
Roman

m2

68,900.00

30

Keramik
30 x 30
KW I DN
Warna/Cor
ak (ANTI
SLIP)
Roman

m2

76,600.00

31

Keramik
40 x 40
KW I DN
Polos
Roman

m2

72,500.00

32

Keramik
40 x 40
KW I DN
Warna/Cor
ak (ANTI
SLIP)
Roman

m2

77,000.00

33

Vinyl
Lantai
Standar

m2

56,000.00

34

Karpet
Kelas Baik
LN

m2

1,025,500
.00

35

Karpet
Kelas
Sedang
LN

m2

353,500.0
0

36

Parquet
Jati

m2

375,400.0
0

37

Stairnosin
g Keramik
10/20

bh

13,700.00

38

Stairnosin
g Fiber

25,000.00

39

Taraso
Kerang 30
x 30

m2

31,800.00

40

Plin
Taraso 10
x 30

bh

13,500.00

41

Granit
Alam LN
Ukuran
Besar

m2

1,848,400
.00

42

Granit
Alam LN
Ukuran
Kecil

m2

1,612,900
.00

43

Granit
Alam DN
Ukuran
Besar

m2

1,331,100
.00

44

Granit
Alam DN
Ukuran
Kecil

m2

1,299,400
.00

45

Granito
Tile
Essenza
Ukuran 40
x 40 Polis

m2

345,000.0
0

46

Granito
Tile
Essenza
Ukuran 30
x 30

m2

322,800.0
0

47

Granito
Tile
Essenza
Ukuran 40
x 40
UnPolis

m2

204,900.0
0

48

Marmer

m2

550,000.0
0

49

Marmer
Alam
Lampung
Ukuran
Besar

m2

550,200.0
0

50

Marmer
Alam
Lampung
Ukuran
kecil

m2

345,700.0
0

51

Marmer
Alam
Citatah
Ukuran
Besar

m2

340,800.0
0

52

Marmer
Alam
Citatah
Ukuran
Kecil

m2

237,600.0
0

53

Marmer
Sintetis

m2

157,900.0
0

54

Granito
Tile
Essenza
60 x 60
Polis

m2

358,100.0
0

55

Granito
Tile
Essenza
60 x 60
UnPolis

m2

231,800.0
0

56

Batu
Tempel
Hitam

m2

96,500.00

57

Bata
Karawang

bh

600.00

58

Campuran
untuk
Kedap Air
( AM )

ltr

37,600.00

59

Plint
keramik
10 x 20

bh

3,000.00

60

Plint
keramik
10 x 25

bh

3,250.00

61

Plint
keramik
10 x 30

bh

3,500.00

62

Plint
keramik
10 x 40

bh

4,000.00

63

Plint
keramik
15 x 30

bh

4,500.00

64

Plint
keramik
15 x 40

bh

5,250.00

65

Plint
granito 10
x 30

bh

25,900.00

66

Plint
granito 10
x 40

bh

27,600.00

67

Plint
granito 15
x 30

bh

31,100.00

68

Plint
granito 15
x 40

bh

41,300.00

BAHAN
SALURAN
AIR
KOTOR /
BERSIH
m1

44,300.00

m1

56,400.00

m1

74,200.00

Buis
Beton 20
cm ( 1
M' )

m1

49,200.00

Buis
Beton 30
cm ( 1
M' )

m1

61,700.00

1
2
3

Grafel U
20 cm'
Grafel U
30 cm'
Grafel U
40 cm'

Buis
Beton 40
cm ( 1
M' )

m1

80,900.00

Buis
Beton 50
cm ( 1
M' )

stk

94,300.00

Buis
Beton 60
cm ( 1
M' )

stk

130,900.0
0

Buis
Beton 100
cm ( 0.50
M' )

stk

299,800.0
0

10

Buis
Beton 80
cm ( 0.50
M' )

stk

298,500.0
0

11

BuisTanah
10 cm
( 0.50 M' )

stk

9,600.00

12

BuisTanah
15 cm
( 0.50 M' )

stk

12,700.00

13

BuisTanah
20 cm
( 0.50 M' )

stk

16,800.00

14

BuisTanah
25 cm
( 0.50 M' )

stk

22,800.00

15

Injuk

kg

17,400.00

BAHAN
LOGAM
DAN
BAHAN
JADINYA

Besi
Beton U24 Ratarata

kg

16,500.00

Besi
Beton U39 / U-32
Rata-rata

kg

20,700.00

Pagar BRC
lengkap
tiang
( Tanpa
Pondasi )

m2

171,300.0
0

Bondek

m2

185,000.0
0

kg

24,000.00

kg

23,900.00

5
6

Besi WF
Ex DN SII
Besi WF
Ex Jepang

Besi Profil
DN SII

kg

18,300.00

Besi Profil
Ex LN

kg

21,600.00

Besi C Lip
Chanel

kg

19,200.00

Ongkos
Galfanis
Besi

kg

10,600.00

kg

27,700.00

kg

63,500.00

m1

1,000.00

10
11
12
13

Kawat
Beton
Kawat
Duri
Kawat
Pengikat

14

Kawat
Bronjong
4 mm

kg

28,200.00

15

Kawat
Tembaga

kg

41,400.00

16

Ram
Nyamuk
Hijau

m2

13,400.00

17

Ram
Kawat 1 x
1 cm

m2

15,300.00

18

Ram
Ayam

m2

14,900.00

19

Kawat
Kasa 1 x 1
( Putih )

m2

32,100.00

20

Kawat
Harmonik
a 4 cm

m2

35,900.00

21

Kawat
Harmonik
a 2 cm

m2

28,600.00

Kawat Las
Listrik
Wiremesh
M8
Wiremesh
M6

kg

23,600.00

m2

51,900.00

m2

38,700.00

25

Timah

kg

46,300.00

26

Timah
Hitam

kg

43,300.00

27

Ram
nyamuk
Alumuniu
m

m2

32,400.00

28

Plat Srip
2 x 30
mm ( 6
m1 )

bt

33,000.00

29

Plat Srip
3 x 30
mm ( 6
m1 )

bt

33,100.00

30

Plat Strip

bt

18,200.00

31

Besi Strip

kg

26,800.00

32

Plat
Alumuniu
m 0.2 mm

m2

89,800.00

33

Plat
Alumuniu
m 0.3 mm

m2

110,500.0
0

34

Plat
Alumuniu
m 0.4 mm

m2

141,400.0
0

22
23
24

35

Plat
Alumuniu
m 0.5 mm

m2

143,100.0
0

36

Plat
Alumuniu
m 0.6 mm

m2

171,800.0
0

37

Plat
Alumuniu
m 0.1 mm

m2

56,300.00

38

Kusen
Alumuniu
m Natural
1.3 mm
t= 1,3
mm ( 4 " )

m1

151,100.0
0

39

Kusen
Alumuniu
m Warna
1.3 mm
t= 1,3
mm ( 4 " )

m1

163,000.0
0

40

Kusen
Alumuniu
m Natural
1.3 mm
t= 1,3
mm ( 3 " )

m1

81,000.00

41

Kusen
Alumuniu
m Warna
1.3 mm
t= 1,3
mm ( 3 " )

m1

102,000.0
0

42

Daun
Jendela
Alumuniu
m Natural
( tanpa
kaca dan
accessorie
s)

m2

98,800.00

43

Daun
Jendela
Alumuniu
m Warna (
tanpa
kaca dan
accessorie
s)

m2

148,800.0
0

44

Daun
Pintu
Alumuniu
m Natural
( tanpa
kaca dan
accessorie
s)

m2

211,800.0
0

45

Daun
Pintu
Alumuniu
m Warna (
tanpa
kaca dan
accessorie
s)

m2

207,500.0
0

46

Handle
Alumuniu
m
( Tarikan
Pintu
Alumuniu
m)

bh

345,200.0
0

47

Kait Angin
Alumuniu
m

ps

104,500.0
0

48

Karet
Asisoris
Kusen /
Pintu
Alumuniu
m

m1

7,500.00

49

Jalusi
Alluminiu
m

m'

35,000.00

50

Sunscreen
Almunium

m2

380,200.0
0

51

Seng Plat
BJLS 30
60 cm
( 100 m1 )

roll

1,581,500
.00

52

Seng Plat
BJLS 30
90 cm
( 100 m1 )

roll

2,080,100
.00

53

Plat Besi
Tipis 1
mm

kg

16,800.00

54

Plat Besi
Tipis 0.5
mm

kg

17,700.00

55

Plat Besi 2
mm s/d 5
mm

kg

14,100.00

56

Plat Besi 6
mms/d 10
mm

kg

14,100.00

57

Plat Besi
10 mm
keatas

kg

14,700.00

58

Kabel
presstress
ed polos

kg

26,700.00

59

Jaring
Kawat
Baja

kg

28,900.00

60

Lem
Kuning
( Aibond )

kg

35,700.00

61

Lem Fox

kg

23,900.00

62

Lem Vinyl

kg

44,000.00

63

Besi Strip
Kaca Nako

kg

11,000.00

64

Profil
alumuniu
m "T"

m1

12,200.00

65

Besi
Hallow ( 2
x 4 x 4)
cm
(400cm)

btg

22,600.00

66

Besi
Hallow ( 4
x 4) cm
(400 cm)

btg

29,200.00

67

Besi Rail
Pengama
nan

kg

459,300.0
0

68

Jendela
Besi

m2

390,200.0
0

69

Jendela
Besi
tahan api

m2

501,700.0
0

70

Pintu
gulung
besi

m2

501,700.0
0

71

Pintu
Roliing
Door

m2

306,600.0
0

72

Jendela
nako kaca
ryben +
tralis 6
klips

set

170,000.0
0

73

Jendela
nako kaca
ryben +
tralis 7
klips

set

200,000.0
0

74

Jendela
nako kaca
ryben +
tralis 8
klips

set

230,000.0
0

75

Jendela
nako kaca
ryben +
tralis 10
klips

set

290,000.0
0

76

Jendela
nako kaca
bening +
tralis 4
klips

set

120,000.0
0

77

Jendela
nako kaca
bening +
tralis 5
klips

set

140,000.0
0

78

Jendela
nako kaca
bening +
tralis 6
klips

set

170,000.0
0

79

Jendela
nako kaca
bening +
tralis 7
klips

set

210,000.0
0

80

Jendela
nako kaca
bening +
tralis 8
klips

set

230,000.0
0

81

Jendela
nako kaca
bening +
tralis 10
klips

set

300,000.0
0

BAHAN
KACA

Kaca
Polos 2
mm
( ASAHI )

m2

69,000.00

Kaca
Polos 3
mm
( ASAHI )

m2

87,400.00

Kaca
Polos 5
mm
( ASAHI )

m2

111,000.0
0

Kaca
Polos 8
mm
( ASAHI )

m2

183,100.0
0

Kaca
Rayband
5 mm
( ASAHI )

m2

148,700.0
0

Kaca
Rayband
8 mm
( ASAHI )

m2

323,400.0
0

Kaca
Rayband
12 mm
( ASAHI )

m2

627,000.0
0

Kaca
cermin 5
mm

m2

150,500.0
0

Kaca
cermin 6
mm

m2

186,400.0
0

10

Kaca
cermin 8
mm

m2

234,300.0
0

11

Kaca Patri
Lokal
Terpasang
( ASAHI )

m2

1,621,100
.00

12

Kaca Patri
Ex Luar
Negeri
Terpasang

m2

3,425,700
.00

13

Kaca 6
mm
Gravver

m2

1,263,900
.00

14

Glass
Block DN
20 x 20
( Kedawun
g)

bh

22,000.00

15

Glass
Block DN
20 x 20
Ex LN

bh

125,700.0
0

16

Sealant

kg

17

Jendela
Nako

bh

1
2

211,800.0
0
109,200.0
0

BAHAN
PAKU DAN
MUR
BAUT
Paku 1/2"
s/d 2"
Paku 2"
s/d 5"

kg

23,800.00

kg

23,400.00

Paku 8 cm
s/d 15 cm

kg

20,000.00

Paku
Beton 2
cm s/d 5
cm

bh

1,600.00

bh

900.00

kg

57,100.00

Besi
Beugel
Kuda Kuda

kg

21,700.00

Duk
Angker

bh

7,500.00

Angker
Mur Baut
dia. 19 /
Panjang
60 cm

bh

71,800.00

5
6

Paku Kait
Lengkap
Paku
Cacing

10

Mur Baut
HTB dia.
19 s/d 16
( 5 cm )

bh

15,900.00

11

Mur Baut
Biasa dia.
19 s/d 16
( 5 cm )

bh

9,300.00

12

Piser
dia.12 s/d
20 cm

bh

5,300.00

bh

800.00

bh

7,200.00

bh

600.00

13
14
15

Paku
skrup 3"
Ramset /
Dinabolt
Baut
Besar

16

Baut Kecil

bh

300.00

17

Paku GRC

kg

35,000.00

kg

17,500.00

bh

250.00

18
19

Paku
gypsum
Sekrup
fixer

BAHAN
PERPIPAA
N

Besi Pipa
Untuk
Hydrant
BSP 1"

bt

166,700.0
0

Besi Pipa
Untuk
Hydrant
BSP 1.25"

bt

210,200.0
0

Besi Pipa
Untuk
Hydrant
BSP 1.5"

bt

298,000.0
0

Besi Pipa
Untuk
Hydrant
BSP 2"

bt

351,800.0
0

Besi Pipa
Untuk
Hydrant
BSP 2.5"

bt

439,300.0
0

Besi Pipa
Untuk
Hydrant
BSP 3"

bt

595,000.0
0

Besi Pipa
Untuk
Hydrant
BSP 4"

bt

869,600.0
0

Besi Pipa
Untuk
Hydrant
BSP 6"

bt

1,423,400
.00

Besi Pipa
Hitam 1" t
= 2 mm

bt

172,300.0
0

10

Besi Pipa
Hitam 2" t
= 2 mm

bt

227,900.0
0

11

Besi Pipa
Hitam 3" t
= 2mm

bt

365,800.0
0

12

Besi Pipa
Hitam 4" t
= 2 mm

bt

573,100.0
0

13

Besi Pipa
Hitam 6" t
= 2 mm

bt

772,400.0
0

14

Pipa GIP
Medium A
1/2" ( 6
m1 )

bt

109,100.0
0

15

Pipa GIP
Medium A
3/4" ( 6
m1 )

bt

159,400.0
0

16

Pipa GIP
Medium A
1" ( 6
m1 )

bt

181,500.0
0

17

Pipa GIP
Medium A
1 1/4" ( 6
m1 )

bt

259,300.0
0

18

Pipa GIP
Medium A
1 1/2" ( 6
m1 )

bt

280,500.0
0

19

Pipa GIP
Medium A
1 3/4" ( 6
m1 )

bt

326,400.0
0

20

Pipa GIP
Medium A
2" ( 6
m1 )

bt

467,400.0
0

21

Pipa GIP
Medium A
2 1/2" ( 6
m1 )

bt

672,100.0
0

22

Pipa GIP
Medium A
3" ( 6
m1 )

bt

849,900.0
0

23

Pipa GIP
Medium A
4" ( 6
m1 )

bt

920,300.0
0

24

Macam2
Sambung
an GIP
1/2"

bh

6,300.00

25

Macam2
Sambung
an GIP
3/4"

bh

8,600.00

26

Macam2
Sambung
an GIP 1"

bh

16,700.00

27

Macam2
Sambung
an GIP 1
1/4"

bh

19,800.00

28

Macam2
Sambung
an GIP 1
1/2"

bh

20,700.00

29

Macam2
Sambung
an GIP 1
3/4"

bh

22,700.00

30

Macam2
Sambung
an GIP 2"

bh

51,200.00

31

Macam2
Sambung
an GIP 2
1/2"

bh

60,400.00

32

Macam2
Sambung
an GIP 3"

bh

75,900.00

33

Macam2
Sambung
an GIP 4"

bh

118,600.0
0

34

Pipa PVC
RUCIKA
type AW
1/2"

bt

40,100.00

35

Pipa PVC
RUCIKA
type AW
3/4"

bt

52,200.00

36

Pipa PVC
RUCIKA
type AW
1"

bt

63,200.00

37

Pipa PVC
RUCIKA
type AW 1
1/4"

bt

79,900.00

38

Pipa PVC
RUCIKA
type AW 1
1/2"

bt

105,900.0
0

39

Pipa PVC
RUCIKA
type AW
2"

bt

110,700.0
0

40

Pipa PVC
RUCIKA
type AW 2
1/2"

bt

167,100.0
0

41

Pipa PVC
RUCIKA
type AW
3"

bt

205,100.0
0

42

Pipa PVC
RUCIKA
type AW
4"

bt

347,900.0
0

43

Pipa PVC
RUCIKA
type AW
6"

bt

640,000.0
0

bt

818,300.0
0

bt

22,500.00

bt

27,800.00

bt

40,500.00

bt

58,500.00

bt

60,200.00

bt

75,800.00

bt

126,300.0
0

bt

145,700.0
0

44

45

46

47

48

49

50

51

52

Pipa PVC
RUCIKA
type AW
8"
Pipa PVC
MASPION
ABU
( AW )
1/2"
Pipa PVC
MASPION
ABU
( AW )
3/4"
Pipa PVC
MASPION
ABU
( AW ) 1"
Pipa PVC
MASPION
ABU
( AW ) 1
1/4"
Pipa PVC
MASPION
ABU
( AW ) 1
1/2"
Pipa PVC
MASPION
ABU
( AW ) 2"
Pipa PVC
MASPION
ABU
( AW ) 2
1/2"
Pipa PVC
MASPION
ABU
( AW ) 3"

53

Pipa PVC
MASPION
ABU
( AW ) 4"

bt

256,800.0
0

54

Macam2
Sambung
an Paralon
1/2"

bh

4,400.00

55

Macam2
Sambung
an Paralon
3/4"

bh

4,700.00

56

Macam2
Sambung
an Paralon
1"

bh

4,900.00

57

Macam2
Sambung
an Paralon
1 1/4"

bh

7,200.00

58

Macam2
Sambung
an Paralon
1 1/2"

bh

9,500.00

59

Macam2
Sambung
an Paralon
1 3/4"

bh

13,500.00

60

Macam2
Sambung
an Paralon
2"

bh

15,800.00

61

Macam2
Sambung
an Paralon
2 1/2"

bh

26,400.00

62

Macam2
Sambung
an Paralon
3"

bh

29,700.00

63

Macam2
Sambung
an Paralon
4"

bh

34,000.00

64

Sambung
an Pipa
PVC Jenis
AW 4" TY

bh

89,900.00

tb

10,100.00

gl

4,200.00

65
66

Lem
Paralon
Solatip
Ledeng

67

Pipa PVC
4"
Berlobang
Jenis AW

m1

36,700.00

68

PVC
Waterstop
lebar 150

m1

53,500.00

69

PVC
Waterstop
lebar 200

m1

57,900.00

70

PVC
Waterstop
lebar 230

m1

65,700.00

71

PVC
Waterstop
lebar 250

m1

74,700.00

72

PVC
Waterstop
lebar 300

m1

83,600.00

73

PVC
Waterstop
lebar 320

m1

92,500.00

BAHAN
SANITAIR
Stop Kran
3/4" KIT
Stop Kran
1" KIT

bh

Stop Kran
1 1/2" KIT

bh

208,000.0
0

Stop Kran
2" KIT

bh

267,900.0
0

Stop Kran
2 1/2" KIT

bh

713,200.0
0

Stop Kran
3" KIT

bh

830,300.0
0

Check
Valve 1/2"

bh

86,400.00

Double
Neple
1/2"

bh

32,400.00

Water Mur
1/2"

bh

40,200.00

10

Gate
walve
1/2"

bh

55,500.00

11

Saringan
Air Lt. KM
Stainless
Steel

bh

66,600.00

12

Apooer
Bath Tube

bh

267,800.0
0

13

Kran
Stainless
Lokal Kait

bh

46,100.00

14

Shower
Dengan
Tiang

bh

221,000.0
0

15

Shower
Tanpa
Tiang

bh

134,800.0
0

L
1
2

bh

103,900.0
0
124,200.0
0

16

Kran
Tembok
Sun Eui
dia. 1/2"

bh

86,900.00

17

Kran
Tembok
ITAP dia.
1/2"

bh

40,900.00

18

Kran
Bebek
Sun Eui
1/2"

bh

144,600.0
0

19

Kran
Bebek
ITAP 1/2"

bh

51,500.00

20

Kran
Panas
Dingin
San Eui
Standard

bh

228,400.0
0

21

Bath Cape
Washtere
n

unit

2,098,700
.00

22

Tempat
Sabun
Poslin

bh

46,300.00

23

Wastafel
Lengkap
TOTO LW
230

unit

1,012,700
.00

24

Wastafel
Lengkap
INA

unit

699,900.0
0

25

Closet
Jongkok
Poslin
Warna
TOTO

unit

205,600.0
0

26

Closet
Jongkok
Standard
Putih
Poslin
TOTO

unit

188,200.0
0

27

Closet
Jongkok
Lengkap
Sistem Jet
TOTO

unit

2,032,900
.00

28

Closet
Duduk
Warna
Standard
TOTO C
240
Lengkap

unit

1,724,700
.00

29

Wastafel
Bulat
Warna
Standard
Lengkap

unit

910,800.0
0

30

Closet
Duduk
Warna
Standard
INA
Lengkap

bh

1,272,100
.00

31

Urinoir
Lengkap
TOTO
Warna
Standard
Lengkap

unit

1,773,400
.00

32

Penyekat
Poslin
Urinoar
TOTO

lbr

495,900.0
0

33

Kitchen
Zink
Stainless
Standard
Lokal ( 1
Lubang )

bh

397,800.0
0

34

Kitchen
Zink
Stainless
Non
Standard
Franke ( 1
Lubang )

bh

1,272,300
.00

35

Kitchen
Zink
Stainless
Non
Standard
Franke ( 2
Lubang )

36

Talang
PVC U 15 cm

BAHAN
PENUTUP
ATAP

bh

1,650,200
.00

btng

60,000.00

Atap
Plastik
Gelomban
g 80 x
180

lbr

33,100.00

Atap Fiber
Glass
Tipis 80 x
180
( Gelomba
ng )

lbr

47,100.00

Atap Fiber
Glass
Tebal 80 x
180
( Gelomba
ng )

lbr

100,000.0
0

Atap
Alumuniu
m Natural
USR 26
( JAINDO )

m2

140,600.0
0

Atap
Alumuniu
m Warna
USR 26
( JAINDO )

m2

164,700.0
0

Atap
Asbes
Gel. Kecil
80 x 180
x 4 mm

lbr

77,200.00

Atap
Asbes
Gel. Besar
80 x 180
x 5 mm

lbr

111,100.0
0

Atap Seng
Gelomban
g 80 cm x
180 cm x
3 mm

lbr

62,900.00

Atap Seng
Gelomban
g 80 cm x
180 cm x
5 mm

lbr

83,100.00

10

Atap Seng
Gelomban
g 270 cm
x 105 cm
x 4mm

lbr

73,300.00

11

Atap Seng
Gelomban
g 240 cm
x 105 cm
x 4mm

lbr

65,900.00

12

Atap Seng
Gelomban
g 210 cm
x 105 cm
x 4mm

lbr

58,500.00

13

Atap Seng
Gelomban
g 150 cm
x 105 cm
x 4mm

lbr

42,300.00

14

Atap Seng
Gelomban
g 150 cm
x 102 cm
x 5mm

lbr

78,500.00

15

Atap Seng
Gelomban
g 180 cm
x 102 cm
x 5mm

lbr

97,200.00

16

Atap
Asbes
Gelomban
g 300 cm
x 105 cm
x 4 mm

lbr

80,000.00

17

Atap
Tegola
Kubota,
lengkap

m2

487,100.0
0

18

Atap
Tegola
Kwalitas
Sedang

m2

283,600.0
0

19

Alumuniu
m Foile

m2

19,600.00

20

Atap
Genteng
Plentong
pres
Bakar KW
I

bh

1,900.00

21

Atap
Genteng
Plentong
pres
Molen
Oven KW I

bh

2,700.00

22

Atap
Genteng
Flam pres
Molen
Oven
Jatiwangi

bh

2,300.00

23

Bubung
Genteng
pres Bulat
Ex
Jatiwangi

bh

7,500.00

24

Genteng
Bubungan
Ex
Jatiwangi
Segi Tiga

bh

4,800.00

25

Genteng
Bubungan
Beton

bh

10,500.00

26

Genteng
Metal
( Rainbow
Roof )

m2

203,100.0
0

27

Genteng
Metal
Hana

m2

172,700.0
0

28

Nok Atas
Metal
( Rainbow
Roof )

lbr

138,500.0
0

29

Nok Atas
Metal
Hana

lbr

80,900.00

30

Nok Pingir
Metal
( Rainbow
Roof )

lbr

105,300.0
0

31

Nok Pingir
Metal
Hana

lbr

100,800.0
0

32

Wall
Flasing
( Rainbow
Roof )

lbr

83,900.00

33

Wall
Flasing
Hana

lbr

88,700.00

34

Atap
Genteng
Beton
Warna
14.5/m2

m2

96,700.00

35

Genteng
Beton
Natural

bh

8,500.00

36

Sirap
Kelas I
( 80 / m2 )

m2

26,400.00

37

Genteng
Keramik
Natural
Intan 14.5
/ m2

m2

112,400.0
0

38

Genteng
Keramik
Glasur
Standard
14.5 /m2

m2

142,200.0
0

39

Genteng
Keramik
Glasur
Special
14.5 /m2

m2

139,300.0
0

40

Genteng
Keramik
Glasur
Premium
14.5 /m2

m2

145,100.0
0

41

Genteng
Murando
Natural
1m2 = 18
bh

bh

2,700.00

42

Genteng
Murando
Glasur
1m2 = 18
bh

bh

4,000.00

43

Bubung
Murando
Natural

bh

7,500.00

44

Bubung
Murando
Glasur

bh

10,700.00

45

Bubungan
Genteng
Keramik

bh

10,000.00

46

Atap
Genteng
Kodok

bh

3,000.00

47

Bubungan
Genteng
Kodok

bh

4,500.00

48

Bubungan
Genteng
Plentong

bh

6,000.00

49

Bubungan
Stel
Gelomban
g

bh

7,500.00

50

Nok Stel
Gelomban
g

lbr

38,100.00

51

Nok Atap
Seng

lbr

37,500.00

52

Nok
standar
40 cm 18,
SWG 22

m2

75,000.00

53

Pelat
Asbes
tebal 4
mm

lbr

21,000.00

54

Pelat
Asbes
tebal 3.5
mm

lbr

16,400.00

55

Trusses
ZAM-75
t=0.8
Rangka
Utama

m1

34,500.00

56

Trusses
ZAM-75
t=0.5
Rangka
Utama

m1

22,000.00

57

Reng 16DB Roof


Battens
t=0.48
mm

m1

11,000.00

58

Foot Plate
t= 1.22
mm

m1

7,200.00

59

PLD Diafragma
Plate

bh

2,200.00

60

WIND
Bracing

m1

1,700.00

61

Tensioner
( Pengaku
Tali
angin )

bh

7,200.00

BAHAN
MEKANIKA
L
Jockey
Pump kap.
80
gln/menit
100 m1
( 18.6
kW )
Electrical
Pump kap.
750
gln/menit
120 m1
( 90 kW )

unit

71,396,40
0.00

unit

216,358,9
00.00

Diesel
Pump kap.
750
gln/menit
120 m1
( 105 kW )

unit

591,647,1
00.00

unit

36,997,30
0.00

unit

6,854,400
.00

Fire House
1.5 x 30
m + nose

unit

4,866,100
.00

Exhose
Fan H 360
W 60 x 60
cm

unit

6,862,900
.00

Exhose
Fan H 380
W CFM 55
x 55 cm

unit

5,491,100
.00

Exhose
Fan H 100
W 40 x 40
cm

unit

1,092,600
.00

10

AC Split 3
PK Setara
TOSHIBA

unit

30,791,80
0.00

11

AC Split 2
PK Setara
TOSHIBA

unit

21,926,50
0.00

12

AC Split 1
PK Setara
TOSHIBA

unit

5,174,100
.00

13

Mesin AC
Split
DAIKIN
( Indoor /
Outdoor
Unit )

1 BTU

4,200,000
.00

Presure
Tank kap.
500 liter
lengkap
Hydran
Box dlm
Gedung
( Lengkap
)

BAHAN
ELEKTRIK
AL

Kabel NYA
1 x 1.5
Prima ( 1
rol = 50
m' )

ROLL

102,700.0
0

Kabel NYA
1 x 2.5
Prima ( 1
rol = 50
m' )

ROLL

151,700.0
0

Kabel
NYM 2 x
1.5 Prima
( 1 rol =
50 m' )

m'

6,600.00

Kabel
NYM 3 x
1.5 Prima
( 1 rol =
50 m' )

m'

7,600.00

Kabel
NYM 2 x
2.5 Prima
( 1 rol =
50 m' )

m'

4,900.00

Kabel
NYM 3 x
2.5 Prima
( 1 rol =
50 m' )

m'

10,900.00

Kabel
NYM 4 x
2.5 Prima
( 1 rol =
50 m' )

m'

7,600.00

Kabel
NYM 2 x 4
Prima ( 1
rol = 50
m' )

m'

6,300.00

Kabel
NYM 3 x 4
Prima ( 1
rol = 50
m' )

m'

15,400.00

10

Kabel
NYM 4 x 4
Prima ( 1
rol = 50
m' )

m'

20,700.00

11

Kabel
NYM 2 x 6
Supreme (
1 rol = 50
m' )

m'

11,800.00

12

Kabel
NYM 3 x 6
Supreme (
1 rol = 50
m' )

m'

13,700.00

13

Kabel
NYM 4 x 6
Supreme (
1 rol = 50
m' )

m'

18,600.00

14

Kabel
NYM 2 x
10
Supreme (
1 rol = 50
m' )

m'

17,600.00

15

Kabel
NYM 3 x
10
Supreme (
1 rol = 50
m' )

m'

119,700.0
0

16

Kabel
NYM 4 x
10
Supreme (
1 rol = 50
m' )

m'

26,500.00

17

Kabel
NYM 4 x
16
Supreme (
1 rol = 50
m' )

m'

29,700.00

18

Kabel NYY
2x4
Supreme (
1 rol = 50
m' )

m'

12,000.00

19

Kabel NYY
3x4
Supreme (
1 rol = 50
m' )

m'

19,300.00

20

Kabel NYY
4x4
Supreme (
1 rol = 50
m' )

m'

23,800.00

21

Kabel NYY
2x6
Supreme (
1 rol = 50
m' )

m'

14,500.00

22

Kabel NYY
3x6
Supreme (
1 rol = 50
m' )

m'

19,200.00

23

Kabel NYY
4x6
Supreme (
1 rol = 50
m' )

m'

18,500.00

24

Kabel NYY
2 x 10
Supreme (
1 rol = 50
m' )

m'

20,400.00

25

Kabel NYY
3 x 10
Supreme (
1 rol = 50
m' )

m'

25,800.00

26

Kabel NYY
4 x 10
Supreme (
1 rol = 50
m' )

m'

35,500.00

27

Kabel NYY
4 x 16
Supreme (
1 rol = 50
m' )

m'

41,900.00

28

NSFB FUJI
EA - 100 A

bh

841,900.0
0

29

NSFB FUJI
EA - 150 A

bh

2,182,600
.00

30

Rumah
Panel 30 x
60 cm
( Kosong )

unt

153,500.0
0

31

Skring Kas
2 grop
Biasa

unt

204,800.0
0

32

Skring Kas
3 grop
Biasa

unt

222,600.0
0

33

Skring Kas
5 grop
Biasa

unt

468,800.0
0

bh

55,100.00

bh

106,000.0
0

bh

521,100.0
0

34
35
36

MCB 1
PAS
MCB 3
PAS
Tahanan
50 A Merk
Fuji

37

Saklar
Broko
Tunggal
Standard (
1 Phase )

bh

23,800.00

38

Saklar
Broko Seri
Standard (
1 Phase )

bh

26,300.00

39

Stop
Kontak
Broko
Standard (
1 Phase )

bh

23,800.00

40

Stop
Kontak
Broko 3
Phase
(Out Bow)

bh

87,700.00

41

Stop
Kontak
Broko 3
Phase ( In
Bow)

bh

144,900.0
0

42

Stop
Kontak
Handle 3
Phase

bh

87,800.00

43

Instalas
Titik
Lampu /
Stop
Kontak
(Upah dan
Alat)

ttk

179,600.0
0

44

Lampu
pijar 25
Watt s/d
100 Watt

bh

61,200.00

45

Lampu
Neon
Phillips 20
Watt

bh

29,700.00

46

Lampu
Neon
Phillips 40
Watt

bh

35,200.00

47

Trapo TL
20 W
(Phillips)

bh

41,800.00

48

Trapo TL
40 W
(Phillips)

bh

37,900.00

49

Trapo TL
20 W
(Sinar)

bh

40,600.00

50

Trapo TL
40 W
(sinar)

bh

41,300.00

51

Stater
Neon
Phillips

bh

8,300.00

52

Stater
Neon
Biasa

bh

6,500.00

53

Rumah TL
In Bow /
Out Bow 2
x 20 W
(kosongan
)

bh

144,000.0
0

54

Down
Light + SL
25 W

bh

306,900.0
0

55

Lampu SL
Philip 25
W

bh

306,900.0
0

56

Lampu
Sirkel TL
20 W
Lengkap

bh

67,900.00

57

Lampu
Mercuri
80 W

bh

147,400.0
0

58

Lampu
Taman +
Tiang +
Lampu 1
Buah

bh

307,600.0
0

59

Lampu
Baret 30
cm +
Neon

bh

221,700.0
0

60

Lampu
Neon
Arcrilik 2
x 40 W
Lengkap

bh

738,000.0
0

61

Jarum
Penangkal
Petir 16

bh

101,500.0
0

62

Kawat BC
( Tembaga
)

kg

65,100.00

63

Pentanah
an
Penangkal
Petir

ttk

423,700.0
0

64

Pentanah
an Panel

ttk

296,100.0
0

BAHAN
ALAT
PENGANT
UNG DAN
KUNCI

Kunci
Silinder
ALFA
untuk
Pintu
Alumuniu
m

bh

410,900.0
0

Tarikan
Pintu
Alumuniu
m

bh

408,600.0
0

Kunci 2
Slaag
ROYAL

bh

126,500.0
0

Rel
Henderso
n Lengkap

bh

864,300.0
0

Rel
maraton I
Pintu

unt

193,100.0
0

Kunci 2
Slaag
Silinder
SEIS Asli
type 210
s/d type
226

bh

335,900.0
0

Kunci 2
Slaag
Ancor Asli

bh

165,300.0
0

Kunci 2
Slaag ISO

bh

207,300.0
0

Kunci KM
Bulat
Kualitas
Biasa

bh

54,400.00

10

Kunci kM
Bulat
ALFA

bh

102,700.0
0

11

Kunci 2
Slaag
Silinder
Utama
Standard

bh

586,600.0
0

12

Kunci
Gembok
Besar

bh

85,200.00

13

Kunci 2
Slaag
Kuda
Terbang

bh

94,500.00

bh

46,800.00

ps

51,600.00

14
15

Kunci
Lemari
Espangole
t

16

Grendel
15 cm
Grendel 5
cm

bh

49,800.00

bh

5,500.00

18

Hak Angin
Kait
Jendela
Biasa

ps

7,100.00

19

Hak Angin
Jendela
Antik

ps

29,000.00

20

Hak Angin
Sendok
Stainless /
Kuningan

bh

32,200.00

21

Sloot
Pintu
Berikut
Rantai

bh

31,500.00

22

Sloot
Jendela
Tunggal

bh

33,000.00

23

Engsel
Pintu
Unilon
Standard

ps

21,000.00

24

Engsel
Jendela
Unilon

ps

15,000.00

25

Engsel
Patrun

ps

13,700.00

26

Engsel
Harmonik
a

m1

9,100.00

27

Door
Closer
Kelas
Standard (
Kelas
Sedang )

unt

420,000.0
0

17

28

Door
Closer
Kelas
Standard (
Kelas Baik
)

unt

597,500.0
0

29

Door
Closer
Kelas
Rendah

unt

200,000.0
0

30
31

Door
Holder
Door
Stoper

unt
unt

205,400.0
0
255,500.0
0

32

Tarikan
Almari
Rata-rata

bh

19,500.00

33

Seng BJLS
30 Lebar
60 cm ( 1
rol 50 m' )

m1

43,500.00

34

Seng BJLS
30 Lebar
90 cm ( 1
rol 50 m' )

m1

53,500.00

35

Seng BJLS
30 / 3 x
0.3 mm

lbr

86,900.00

36

Seng Plat

lbr

50,100.00

37

Waterstop
Lebar 200
mm

m1

57,900.00

BAHAN
PENGIKAT
UNTUK
KONSTRU
KSI JALAN
kg

12,459.00

kg

12,459.00

1
2

Aspal
Bitumen
Aspal
Emulsi

Aspal
Curah

kg

10,890.00

Aspal
Concrete /
Laston( A
C -WC)

ton

1,348,300
.00

Aspal
Threated
Base
( ATB )

ton

1,200,200
.00

Lataston /
Hot Rolls
Sheet
( HRS )

ton

1,666,900
.00

BAHAN
PENGISAP
AIR
SUMUR
DALAM

Pompa
Kodok

unit

172,600.0
0

Pompa
Dragon
Tegal

unit

243,800.0
0

Pompa
Dragon
Asli

unit

718,500.0
0

Mesin
Pompa Air
100 W Sanyo

unit

1,100,200
.00

Mesin
Pompa Air
150 W Sanyo

unit

1,890,700
.00

Pompa
Zet Pump
250 W Sanyo

unit

4,961,500
.00

Pompa
Zet Pump
450 W Sanyo

unit

7,878,000
.00

Pompa
Submersi
ble kap.
150 liter /
menit 3
KW

unit

27,151,20
0.00

Gear
Pump
Kap. 60
liter /
menit

unit

15,702,70
0.00

10

Deep Well
dengan
kelengkap
annya
kap. 150
liter /
menit

unit

172,052,5
00.00

11

Hand Oil
Pump

unit

5,195,300
.00

BAHAN
PENAMPU
NG AIR

Tangki Air
Fiber
Glass 0.5
m3
( Excel )

bh

1,172,500
.00

Tangki Air
Fiber
Glass 1
m3
( Excel )

bh

1,316,400
.00

Tangki Air
Fiber
Glass 2
m3
( Excel )

bh

1,954,200
.00

Bak KM
Fiber 60 x
60

bh

255,300.0
0

Bak
Taraso WC
40 x 40

bh

118,500.0
0

T
1

Bak KM
Taraso 60
x 60
ALAT
TUKANG
Palu 0.5
kg

bh

161,100.0
0

bh

39,300.00

Cangkul

bh

24,500.00

Singkup

bh

41,400.00

Sekrop

bh

50,100.00

Pengki

bh

12,300.00

Linggis

bh

41,700.00

Rool
Meter 30
meter
( Bahan
Plastik )

bh

101,000.0
0

Rool
Meter 5
meter
( Bahan
Besi )

bh

37,800.00

Selang
Plastik
untuk
Water Pas
dia. 0.5
cm

1,600.00

10

Water Pas
Alumuniu
m 60 cm

bh

88,200.00

BAHAN
BAKAR
DAN
PELUMAS

Minyak
Tanah

lt

18,000.00

Kayu
Bakar dari
Kayu
Karet

Bahan
Bakar
Residu

4
5
6
7
8
9

Minyak
Solar
Bensin
Premium
Plus Oil
Oil
Mesran 40
SAE
Elpiji /
botol
Asitilin /
Botol

m3

151,100.0
0

lt

28,435.00

lt

7,150.00

lt

7,800.00

lt

3,300.00

lt

55,000.00

15 kg

104,600.0
0

15.1 kg
btl

88,900.00

10

Angin
( O2 ) /
botol

btl

66,400.00

11

Karbit

kg

19,400.00

12

Minyak
Bekisting

ltr

40,500.00

13

Rapidrant

Gln

15,700.00

14

Soda Api

kg

35,600.00

15

Sabun
Arang
Kayu

kg

2,400.00

kg

11,100.00

17

Kawat Las

bh

1,400.00

BAHAN
PAGAR

Panel
Beton
Pracetak

lbr

199,200.0
0

Kolom
Beton
Pracetak

btg

264,000.0
0

16

B.

BIDANG
PERTAMA
NAN

Aglonema

batang

50,000.00

Bambu
krisik/jepa
ng

batang

50,000.00

Furadan

kg

24,000.00

Kompos/p
upuk
kandang

karung

25,000.00

M atoa (2
m)

batang

40,000.00

Palm
(botol,
ekor
tupai,
putri, dll)
tinggi 2 m

batang

100,000.0
0

Philo

batang

75,000.00

Pohon
pelindung
(angsana,
mahoni,
kamboja
dll) tinggi
2m

batang

25,000.00

Pohon
perdu
(kaca
piring,
puring,
mawar,
melati,
dll)

batang

10,000.00

m2

15,000.00

10

Rumput
gajah mini

harga sudah
termasuk PPN dan
keuntungan

Você também pode gostar