DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
QTY
SUB TOTAL
A SUB STRUCTURE
1(a) EARTH WORK IN EXCAVATION
14
2
2.6
2.4
2.6
2.4
2
2
189.28
23.04
212.32
ALONG GRID B1 TO B2
14
2
2.6
2.4
2.6
2.4
0.18
0.18
17.0352
2.0736
19.1088
14
2
2.6
2.4
2.6
2.4
0.1
0.1
9.464
1.152
10.616
14
2
2.6
2.4
2.6
2.4
0.075
0.075
7.098
0.864
7.962
4 FOOTING
i SHUTTERING
ATF1
ATF2
14
2
9.6
8.8
0.25
0.25
33.6
4.4
38
2.3244
2.3244
iii RCC
AT F1 (RECTANGULAR)
AT F1 (TRAPEZOIDAL)
AT F2 (RECTANGULAR)
AT F1 (TRAPEZOIDAL)
14
14
2
2
2.4
2.4
2.2
2.2
20.16
21.00
2.42
2.48
46.06
14
2
3.65
3.65
ALONG GRID B1 TO B2
1.(b) EXCAVATION BELOW 2M
ALONG GRID A1 TO A7*& C1 TO C7
-20
-4
-10
-4
-1
-1
0.25
1.5
0.25
1.24
1.8
1.46
0.23
0.23
0.3
0.23
0.23
0.23
91.98
10.658
0.3
0.45
0.6
0.45
0.6
0.3
-1.38
-0.414
-1.8
-0.414
-0.138
-0.069
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
-20
-8
-6
-2
-4
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
0.23
0.23
0.23
0.3
0.23
0.3
0.45
0.45
0.75
0.45
QTY
SUB TOTAL
-1.38
-0.828
-0.621
-0.45
-0.414
94.73
5.0391
5.0391
ii REBAR
14
2
3.65
3.65
0.4
0.23
0.5
0.5
10.22
0.84
11.06
6 GRADE BEAM
i PCC
AT GB-1
AT GB-1 Cantilever for stair
AT GB-2
AT GB-2
AT GB-3
AT GB-3 Cantilever for stair
AT GB-4
5
1
2
2
10
1
3
10.5
1.5
4.75
5.25
3.3
1.5
3.3
0.5
0.5
0.43
0.43
0.43
0.43
0.43
0.075
0.075
0.075
0.075
0.075
0.075
0.075
1.97
0.06
0.31
0.34
1.06
0.05
0.32
4.10
3.16
3.16
0.6
0.6
0.45
0.45
0.3
0.3
0.45
63
0.9
8.55
9.45
19.8
0.45
8.91
111.06
0.6
0.45
0.45
0.3
0.45
0.6
0.3
9.45
0.98
1.09
2.28
1.02
0.27
0.14
15.23
iiI REBAR
IV SHURTTERING FOR GBEAMS
AT GB-1
AT GB-1 Cantilever for stair
AT GB-2
AT GB-2
AT GB-3
AT GB-3 Cantilever for stair
AT GB-4
v RCC
AT GB-1
AT GB-2
AT GB-2
AT GB-3
AT GB-4
GB1 FOR STAIR
GB3 FOR STAIR
7 BACK FILLING STAGE 1
REFER EXCAVTION QTY
DEDUCTIONS
RIVER SAND FILLING BELOW FOOTING
PCC BELOW FOOTING
RCC FOOTING
COLUMN
GARDE BEAM PCC
1
10
1
4
4
20
1
6
10.5
1.5
4.75
5.25
3.3
1.5
3.3
5
2
2
10
3
1
1
10.5
4.75
5.25
3.3
3.3
1.5
1.5
231.43
231.43
-1
-1
-1
-1
-1
10.616
7.962
46.06
11.06
4.10
-10.616
-7.962
-46.060
-11.060
-4.102
0.3
0.23
0.23
0.23
0.23
0.3
0.3
151.629
SI NO
DESCRIPTION OF ACTIVITIES
8 PLINTH BEAM
SHUTTERING
AT PB-1
AT PB-2
AT PB-2
AT PB-3
AT PB-4
AT PB-5
AT PB-6
REBAR
RCC
AT PB-1
AT PB-2
AT PB-2
AT PB-3
AT PB-4
AT PB-5
AT PB-6
9 STAIRS FROM FGL TO +1.60M
i SHUTTERING
FOR RISER WALL
GROUND LANDING
WAIST SLAB
EDGE SIDE
LANDING
NOS
2
4
4
18
6
4
8
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
10.5
4.75
5.25
3.3
3.3
3.35
1.23
0.75
0.45
0.45
0.3
0.45
0.45
0.45
1
2
2
9
4
2
4
10.5
4.75
5.25
3.3
3.3
3.47
1.5
4
2
2
2
2
1.5
1
3.06
4.06
3.3
0.3
0.23
0.23
0.23
0.23
0.23
0.23
SUB TOTAL
15.75
8.55
9.45
17.82
8.91
6.03
4.428
70.938
2.3779
2.3779
0.75
0.45
0.45
0.3
0.45
0.45
0.45
2.36
0.98
1.09
2.05
1.37
0.72
0.62
9.19
0.2
1.20
3.50
10.71
1.22
11.55
28.18
0.588
0.588
1.75
1.75
0.15
1.75
ii REBAR
iii RCC
RAISER WALL
GROUND LANDING
WAIST SLAB
LANDING
QTY
2
2
2
2
1.5
1
3.06
3.3
0.15
1.77
1.77
1.77
0.2
0.15
0.15
0.15
0.09
0.53
1.62
1.75
4.00
1
2
2
9
4
2
2
9
10.5
4.75
5.25
3.3
3.3
3.3
1.5
1.75
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
1.1
1.4
1.4
1.55
1.4
1.95
1.95
0.15
2.66
3.06
3.38
10.59
4.25
2.96
1.35
0.54
28.78
2
2
18.185
6.5
2
2
0.1
0.1
7.27
2.60
SI NO
DESCRIPTION OF ACTIVITIES
ii PCC
ii SHUTTERING
SHUTTERING FOR RAFT
SHUTTERING FOR WALL
COVER SLAB
RCC (FOR THE PLAN AREA OTHER THAN
CABLE DUCT)- SLAB ON GRADE
DEDUCTION
JUN OF IN COMING CABLE DUCT
corners
JUNCTION OF CABLE DUCT FROM PLINTH
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
QTY
SUB TOTAL
6.5
2.1
0.1
1.37
11.24
2
2
1
18.185
6.5
6.5
2
2
2.1
0.075
0.075
0.075
5.46
1.95
1.02
8.43
2
4
2
2
4
4
4
4
3
4
12.485
6.7
17.785
10.1
6.6425
6.2425
7.1
6.7
7.1
1.5
0.2
0.2
1.65
1.5
1.5
1.5
1.5
1.5
4.994
5.36
58.6905
30.3
39.855
37.455
42.6
40.2
31.95
9
-2
-4
-1
1.5
1.9
3.25
1.5
0.15
1.5
-4.5
-1.14
-4.875
289.8895
5.8872
5.8872
1.5
1.5
2
3
2
2
4
4
3
4
18.185
6.7
18.185
10.1
6.443
6.9
7.1
1.7
1.9
1.9
0.2
0.2
0.2
0.2
1.9
1.9
0.2
0.2
1.65
1.5
1.5
1.5
0.15
0.15
13.82
7.64
12.00
6.06
7.73
8.28
6.07
1.94
7.1
6.243
0.1
8.87
-2
-4
-1
1.5
1.9
3.25
1.5
0.2
1.5
0.2
0.15
0.2
-0.90
-0.23
-0.98
1
1
12.74
3.3
6.7
10.27
2.12
2.12
180.96
71.85
-4
10.50
0.3
0.6
-7.56
245.25
1
1
12.485
10.27
6.7
3.3
0.08
0.08
6.69
2.71
9.40
12.485
6.7
0.1
8.36
70.30
ii PCC
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
10.27
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
3.3
0.1
iii REBAR
B
1
i
ii
SUPER STRUCTURE UP TO FF
COLUMN UP TO FF
REBAR
SHUTTERING
AT C1
AT C2
DEDUCTIONS AT BEAM LEVEL
AT BEAM FB4 JUNCTIONS FOR C1
AT BEAM FB5 JUNCTIONS IN C1
AT BEAM FB8 JUNCTIONS IN C1
AT BEAM FB1 JUNCTIONS IN C1
AT BEAM FB2&FB3 JUNCTIONS IN C1
AT BEAM FB6 JUNCTIONS FOR C1
Lintel Junction
ATBEAM JUNCTION C2
iii RCC
AT C1
AT C2
8 LINTEL S.SHADE& LATH (DROP)
i SHUTTERING FOR SUN SHADE
SHUTTERING FOR LINTEL
14
2
4.42
4.42
-20
-4
-2
-10
-8
-7
-32
-2
1.8
1.46
QTY
SUB TOTAL
3.39
11.75
0.37
0.37
3.91
3.91
111.38
12.91
0.23
0.23
0.23
0.4
0.23
0.23
0.3
0.23
0.4
0.6
0.5
0.75
0.6
0.4
0.23
0.45
-1.84
-0.552
-0.23
-3
-1.104
-0.644
-2.208
-0.207
114.51
0.5
0.5
12.38
1.02
13.39
14
2
4.42
4.42
0.4
0.23
12
1.6
0.7
13.44
6
22
4
4
10.5
3.3
3.3
1.9
0.3
0.3
0.3
0.3
18.90
21.78
3.96
2.28
25.5
25.50
85.86
0.81
0.81
II REBAR
12
1
1
1
1
1
1.6
67.35
3.3
3.3
10.4
3.8
0.6
0.23
0.23
0.115
0.23
0.115
0.1
0.3
0.3
0.3
0.3
0.3
1.15
4.65
0.23
0.11
0.72
0.13
25.6
0.08
2.05
9.04
6.9092
6.91
3 FF BEAM
i REBAR
ii SHUTTEREING
AT FB-1
AT FB-2
5
2
10.5
4.75
1.62
1.15
85.05
10.93
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
1.15
0.75
1.15
0.82
0.57
0.95
0.83
12.08
24.75
7.59
8.72
11.29
3.14
2.91
166.44
0.75
0.6
0.6
0.4
0.6
0.4
0.3
0.5
0.45
15.75
1.31
1.45
3.04
1.37
1.26
1.41
0.38
0.36
26.32
10.54 3.3000
5.45 3.3000
1.45 3.3000
33.60
0.1400
173.91
17.99
28.71
9.41
AT FB-3
AT FB-4
AT FB-5
AT FB-6
AT FB-7
AT FB-8
ABOVE ROLLING SHUTTER- PB-6
2
10
2
7
6
1
2
5.25
3.3
3.3
1.52
3.3
3.3
1.75
iii RCC
AT FB-1
AT FB-2
AT FB-3
AT FB-4
AT FB-5
AT FB-6
AT FB-7
AT FB-8
ABOVE ROLLING SHUTTER- PB-6
5
2
2
10
3
7
6
1
2
10.5
4.75
5.25
3.3
3.3
1.5
3.4
3.3
1.75
4 FF SLAB
i SHUTTERING
FS 1
FS3
FS2
OUTER SIDE
ADDITIONAL SLAB ABOVE R SHUTTER
OUTER SIDE
LANDING AS LIKE GF
ii REBAR
iii RCC
FS-1
FS-1
FS-2
FB-3
SLAB ABOVE ROLLING
5 STAIR FROM +1.5M TO- 5.85M LVL
i SHUTTERING FOR STAIR UP TO FF
MID LANDING BEAM AT +3.675M
MID LANDING SLAB AT +3.675M
WAIST SLABS 1 &2
5
1
6
2
2
2
2.75
2.75
0.4
0.23
0.23
0.23
0.23
0.3
0.23
0.23
0.23
0.15
1.75
1
4
1
6
1
1
10.5
10.5
3.4
5.385
2.75
3.3
3.385
1.52
3.385
1.75
1
1
2
3.745
3.745
4.05
0.83
1.385
2.03
0.14
0.14
0.14
0.15
0.15
Ii REBAR
IiI RCC
STAIR FROM +1.5M TO- 5.85M LVL
MID LANDING BEAM AT +3.675M
MID LANDING SLAB AT +3.675M
WAIST SLABS 1 &2
1
1
2
3.3
3.385
4.06
0.23
1.385
1.6
0.45
0.2
0.2
QTY
SUB TOTAL
0.83
9.63
240.46
3.70
3.70
19.40
4.98
4.34
2.73
0.72
32.18
3.11
5.19
16.44
24.74
1.05
1.05
0.34
0.94
2.60
3.88
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
QTY
SUB TOTAL
12
2
1
1
14
3.3
10
10.5
3.3
1.72
0.23
0.23
0.23
0.23
0.25
3.7
3.65
3.65
3.5
0.145
33.70
16.79
8.81
2.66
0.87
-12
-10
-3
-3
-1
-1
-1
1.18
1.18
0.8
0.9
2.75
1.5
1.2
0.23
0.23
0.23
0.23
0.23
0.23
0.23
1.48
0.58
0.58
2.1
3.6
2.4
1.2
-4.82
-1.57
-0.32
-1.30
-2.28
-0.83
-0.33
51.38
1
2
2
-2
3.3
1.9
1.05
0.9
3.5
3.5
3.5
2.1
11.55
13.30
7.35
-3.78
28.42
3.18
3.18
C
1
i
ii
iii RCC
AT C1
AT C2
2 LINTEL ,SSHADE& LATH (DROP)
i SHUTTERING FOR SUN SHADE
SHUTTERING FOR LINTEL
LOFT
DROP ABOVE VARANDAH
14
2
3.5
3.5
-22
-2
-10
-4
-7
-6
1.8
1.46
88.20
10.22
0.23
0.23
0.4
0.23
0.23
0.23
0.4
0.5
0.75
0.5
0.5
0.5
-2.024
-0.23
-3
-0.46
-0.805
-0.69
91.21
0.5
0.5
9.80
0.81
10.61
8.96
23.76
6.30
12.00
24.73
12.65
25.60
114.00
14
2
3.5
3.5
0.4
0.23
8
24
1
2
2
2
1
1.6
3.3
10.5
10
18.185
9.3
25.6
0.7
0.3
0.6
0.6
0.68
0.68
II REBAR
iii RCC SUN SHADE
0.97
8
1.6
0.6
0.1
0.77
SI NO
DESCRIPTION OF ACTIVITIES
RCC LINTEL
ABOVE 4.5" WALL
LOFT
DROP ABOVE VARANDAH
3 ROOF BEAM
i SHUTTERING
AT RB1
AT RB3
AT RB4
AT RB5
AT RB6
AT RB7
ii REBAR
iii RCC
AT RB1
AT RB3
AT RB4
AT RB5
AT RB6
AT RB7
NOS
LENGTH
IN M
12
1
1
1
2
2
1
3.3
10.5
2.775
3.76
18.185
9.34
25.6
5
6
11
7
2
1
10.5
3.4
3.3
0.75
10
3.3
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
0.23
0.23
0.115
0.23
0.6
0.6
0.08
5
6
11
7
2
1
10.5
3.4
3.3
1.5
10
3.3
0.4
0.23
0.23
0.3
0.23
0.23
5
1
6
2
10.50
5.25
1.54
34.06
3.30
3.30
3.30
QTY
SUB TOTAL
0.3
0.3
0.3
0.3
0.08
0.08
1
2.73
0.72
0.10
0.26
1.75
0.90
2.05
9.27
1.62
0.69
0.8
1.27
0.72
0.95
85.05
14.08
29.04
6.67
14.40
3.14
152.37
5.13
5.13
0.75
0.3
0.4
0.5
0.5
0.5
15.75
1.41
3.34
1.58
2.30
0.38
24.75
0.15
173.25
17.33
30.49
10.22
231.29
3.21
3.21
31.27
4 ROOF SLAB
i SHUTTERING
OUTER SIDES
ii REBAR
iii RCC
RSI
RSI
RS3
RS2
5 9" BRICK WORKS AT FF
ALONG GRID A&C
ALONG GRID 1,2
ALONG GRID 1,2&7
WALL BETWEEN GRID A& C
STEPS
DEDUCTIONS
WINDOW -W
VENTILATORS-V
DOOR D1
4
1
1
6
10.50
10.50
5.39
1.52
3.30
3.39
3.39
3.40
0.14
0.14
0.14
0.14
19.40
4.98
2.55
4.34
11
2
1
2
11
3.3
10
10.5
3.3
1.73
0.23
0.23
0.23
0.23
0.25
2.8
2.75
2.45
2.6
0.145
23.38
12.65
5.92
3.95
0.69
-11
-7
-2
1.18
0.8
0.9
0.23
0.23
0.23
1.48
0.58
2.1
-4.42
-0.75
-0.87
SI NO
DESCRIPTION OF ACTIVITIES
DOOR D
JOLLY
LENGTH
IN M
NOS
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
-2
-1
0.9
1.2
2
2
1
2
-4
1.5
1.05
1.5
1.15
0.9
25
0.23
1
1
1
2
3.745
3.745
1.6
3.182
0.83
1.385
0.75
2.03
1
1
1
2
6 4.5"WALL AT FF
WALL AT GEN TOILET
WALL AT LADIES TOILET
DEDUCTIONS -DOOR D2
8 ROOF WORKS
a. ROOF LVL RCC & head room
i SHUTTEREING
HB1 Outer side
HB1 Inner side
HB2 Outer side
HB2 Inner side
HB3 Outer side
HB3 Inner side
HS1
C1
C2
ii REBAR
iii RCC
COLUMN C1 AT PARAPET
COLUMN C1
COLUMN C2
BEAM HB1
BEAM HB2
BEAM H3
3.745
3.745
1.6
3.182
1
3
2
2
1
1
1
2
2
8
2
2
2
2
1
3.930
3.470
7.115
6.425
3.930
3.470
7.115
1.800
1.460
0.90
2.40
2.40
3.30
5.87
3.3
0.23
0.23
0.23
1.385
0.75
1.6
SUB TOTAL
2.1
1.2
-0.87
-0.33
39.35
3.05
3.05
3.05
3.05
2.1
9.15
6.41
4.58
7.02
-7.56
19.59
0.9
5.18
5.18
3.11
5.19
1.20
12.92
22.41
0.87
0.87
0.45
0.2
0.2
0.2
0.39
1.04
0.24
2.04
3.70
0.500
0.360
0.500
0.360
0.300
0.160
1.965
3.748
7.115
4.626
1.179
0.555
27.962
7.920
6.424
61.494
1.19
1.19
3.930
2.200
2.200
0.40
0.40
0.23
0.23
0.23
0.23
QTY
0.50
0.50
0.50
0.50
0.50
0.3
1.44
0.96
0.55
0.76
1.35
0.23
SI NO
DESCRIPTION OF ACTIVITIES
SLAB HS1
b BRICK WORK 9"
AT PARAPET
AT HEAD ROOM
HEAD ROOM PARAPET
DEDUCTIONS
DOOR D1
WINDOW
JOLLY
c BRICK WORKS-9" IN PASSAGE
D EXTERNAL FINISHING AND YARD WORKS
STAGE 4 PAYMENT 20%
EXTERNAL WORKS & YARD
1 TRANSFORMER PLINTH
a EXCAVATION
TRANSFORMER FOUNDATION
CABLE TRENCH
b RIVER SAND FILLING
c PCC
d SHUTTERING
TRANSFORMER FOUNDATION & FIRE
WALL-BASE
STRAP BEAM
COLUMN
BEAM B1
BEAM B2
SLAB
FIRE WALL
CABLE DUCT RAFT ALONG PLINTH
CABLE DUCT RAFT ARROUND PLINTH-WALL
COVER SLAB
DEDUCTIONS
JUN OF CABLE DUCT FROM CNT. ROOM
e
f
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
QTY
SUB TOTAL
6.425
3.47
0.14
3.12
6
1
1
1
1
3.3
10.5
5.25
16.17
20.9
0.23
0.23
0.23
0.23
0.23
0.9
0.9
0.9
1.9
0.3
4.10
2.17
1.09
7.07
1.44
-1
-1
-1
0.9
1.18
1.2
0.23
0.23
0.23
1.9
1.48
1.2
-0.39
-0.40
-0.33
14.74
25
0.23
0.9
5.18
5.18
1
2
2
1
1
3.9
1.2
3
12.5
12.5
12.9
12.9
1.2
6.2
6.2
1.5
1.5
1.5
0.1
0.075
75.47
46.44
10.80
7.75
5.81
132.71
7.75
5.81
1
2
8
2
8
4
1
2
2
25.22
19.76
1.2
1.36
0.25
0.35
2.10
2.10
0.325
0.325
35.963
35.963
20.160
5.712
35.963
35.963
11.223
35.963
35.963
2
2
72
18
-2
3.25
2.475
2.475
3.35
4.23
18
3.35
4.50
0.20
1.30
35.963
43.200
1.30
-8.450
323.58
6.0223
6.02
1.2
2
1
2
8
2
2
9.38
9.38
0.3
0.45
0.45
3.275
0.5
0.3
0.3
0.23
8.41
0.25
0.35
2.10
1.00
1.10
7.68
3.28
1.51
0.27
0.23
SI NO
DESCRIPTION OF ACTIVITIES
2
i
ii
iii
iv
v
vi
3
i
ii
iii
iv
v
vi
REBAR
RCC
RAFT
WALL
COVER
BACK FILLING 3RD STAGE
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
QTY
SUB TOTAL
4
8
2
1
2.175
2.175
3
4.5
0.3
0.3
3
0.23
0.33
0.33
0.18
4.95
0.85
1.70
3.15
5.12
2
4
1
8
2
4
12.07
3
46.94
2.175
12.07
3
1.5
1.5
0.15
0.15
1.2
1.2
0.20
0.20
1.55
1.55
0.15
0.15
7.24
3.60
10.91
4.05
4.35
2.16
-2
3.25
1.3
0.15
-1.268
54.83
1
1
1
2.5
2.5
2.5
4.2
3.8
3.8
1.50
0.08
0.10
15.75
0.76
0.95
15.75
2
2
2
12
24
6
0.20
1.50
1.5
35.963
35.963
18.000
0.454
89.93
0.45
1
2
1
2
1
1
2.5
2.5
2.5
3.65
3.65
2.5
3.65
0.2
0.25
0.3
0.35
3.6
0.20
1.20
1.20
0.30
0.20
0.20
1.83
1.20
0.75
0.66
0.26
1.80
6.49
2
2
2
3.7
3.7
3.7
2.5
2.1
2.1
1.50
0.08
0.10
27.75
1.24
1.55
2
4
4
2
9.3
3.7
3.7
3.7
0.20
1.30
1.15
3.72
19.24
17.02
11.10
51.08
0.37
0.37
2.81
3.55
2.11
8.47
2
4
2
3.7
3.7
3.7
1.5
1.9
1.2
1.9
0.20
0.20
0.15
27.75
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
UG SUMP (LUMPSUM)
EXCAVATION
RIVER SAND FILLING
PCC
SHUTTERING
FLOOR
WALL
COVER SLAB
QTY
SUB TOTAL
132.71
66.40
1
1
1
1
1
1
15.00
15.00
15.00
15.00
0.3
0.15
0.15
0.05
4.50
4.10
4.10
2.7
2.3
2.3
1
1
1
12.00
22.80
3.90
44.70
1
1
1
3.90
11.40
3.90
2.1
2.1
2.1
1
1
1
1
1
3.00
9.60
3.00
1.8
21.7
10.5
1
-1
-1
-1
-2
-1
-2
42.735
22.2
12.30
2.50
3.70
3.40
7.40
16.21
11
6
3.6
1.9
2.2
1.75
57.31
64.31
66.40
66.40
6
6
6
6
27.00
13.50
13.50
4.50
90.00
90.00
1.5
0.1
0.1
18.23
0.94
0.94
18.23
0.94
0.94
0.2
2.1
2.40
47.88
8.19
58.47
22
0.98
0.98
0.2
0.15
0.15
1.64
3.59
1.23
6.46
15.00
1
1
1
-7.75
-5.81
-54.83
2.1
5.40
21.12
5.40
1.00
227.85
227.85
0.7
0.7
0.7
0.7
0.7
0.7
0.7
484.91
-170.94
-51.66
-6.30
-9.84
-5.24
-18.13
222.81
4.25
243.57
2.2
1.8
31.92
SI NO
DESCRIPTION OF ACTIVITIES
W
V
RS
D1
D1
Beam Surface on Wall
BATTERY ROOM
GENTS TOILET
DEDUCTIONS
Bath & Toilet walls
D1 & D2
URINAL ENTRY
VENTILATOR
D1 BATTERY ROOM
STAIR ROOM
DEDUCTION FOR CG
DEDUCTION FOR JOLLEY
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
-12
-9
-1
-2
-1
-8
1
1
1.18
1.18
2.75
0.9
1.2
0.4
11.25
27.17
1.48
0.58
4.1
2.1
2.1
0.61
3.8
3.8
-20.96
-6.16
-11.28
-3.78
-2.52
-1.95
42.75
103.25
-4
-5
-2
-3
-1
1
-1
-1
0.115
0.9
1.05
0.8
1.2
17.27
1.5
1.2
3.8
2.1
3.8
0.6
2.1
4.25
2.1
1.2
-1.75
-9.45
-7.98
-1.44
-2.52
73.40
-3.15
-1.44
QTY
b PLASTERING INTERNAL FF
WALL OFFICE
DEDUCTIONS
W
D1
D
GENTS TOILET/BATH
WALL URINAL/PASSAGE
DEDUCTION FOR DOORS-D2& D1
VENTILATORS
LADIES TOILET
DEDUCTION FOR DOORS-D1
PASSAGE
DEDUCTIONS D1 & D2
VENTILATORS
STAIR ROOM AT FIRST FLOOR
DEDUCTION AT ENTRANCE
JOLLY
57.3
3.3
189.09
-11
-2
-2
2
1
-5
-5
2
-2
1
-5
-2
1
-1
-1
1.18
0.9
1.1
5.1
12.4
0.8
0.8
5.5
0.8
8.32
0.8
0.8
17.27
3.3
1.2
1.48
2.1
2.1
3.3
3.3
2.1
0.6
3.3
2
3.3
2.1
0.6
3.3
3.1
1.2
-19.21
-3.78
-4.62
33.66
40.92
-8.40
-2.40
36.30
-3.20
27.46
-8.40
-0.96
56.99
-10.23
-1.44
c HEAD ROOM
WALL
DEDUCTION DOOR
WINDOW
JOLLY
1
-1
-1
-1
16.58
0.9
1.18
1.2
2.25
1.9
1.48
1.2
37.31
-1.71
-1.75
-1.44
2 CEILING PLASTERING
Gf
CEILING
FB1 BEAM DROP
WET AREAS
BATTERY ROOM
STAIR MID LANDING
1
4
1
1
1
18.185
10.5
3.385
3.385
3.385
10.5
1.2
3.015
2.24
1.4
190.94
50.40
10.21
7.58
4.74
SUB TOTAL
388.59
354.19
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
QTY
WAIST 1 &2
1.87
4.06
VARANDAH
FB6 BEAM DROP
FB7 BEAM DROP
1
7
6
22
1.5
3.3
1.75
SRAIR AT 00 LVL
WAIST
SOFFIT
BEAM PP 5 &6 DROP
2
2
2
3.1385
3.385
6.47
1.5
1.5
1
1
1
1
4
6
6
18.18
55
3.385
22.2
10.5
1.5
3.3
10.5
1.2
5
1.75
1
1
2
3.745
1.6
3.182
1.385
0.75
2.03
5.19
1.20
12.92
1
1
2
6.885
3.38
1.5
3.38
23.27
0.51
1.05
b CEILING PLASTERING FF
OFFICE
LOFT
WEWT AREA
VARANDAH
RB1 BEAM DROP
RB5 BEAM DROP
RB3 BEAM DROP
STAIR AREA
MID LANDING
SMALL LANDING
WAIST SLAB 3 & 4
C HEAD ROOM
CEILING
BEAM DROP HB3
BEAM DROP HB2
GENTS TOILET-FLOORING
BATTERY ROOM
ACCESS STEPS & STAIR
0.52
0.16
38.50
5.46
3.17
0.25
9.42
10.16
3.24
1.2
0.72
0.39
190.89
65.96
16.93
38.85
50.40
6.48
7.72
348.99
421.37
354.19
-132.36
326.18
b FF
WALL REF QTY FROM PLASTER
DEDUCT WALL TILING FF
CEILING
4 FLOORING
a GROUND FLOOR
CERAMIC FLOORING
DEDUCTION FOR CABLE TRENCH
15.18
0.15
0.35
3 PAINTING INTERNAL
a GF
WALL RFEFER QTY FROM PLASTER
DEDUCT WALL TILING GF
CEILING
SUB TOTAL
354.19
-75.89
421.37
18.185
10.5
190.94
-1
-1
14.385
12.585
1.9
1.9
-27.33
-23.91
1
1
3.155
3.385
2.9
2.24
9.15
7.58
1247.67
SI NO
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
1.75
QTY
2
20
1
3.7
1.75
5.25
1
29
3.385
1.6
1.25
1
1
1
1
18.185
3.385
3.385
22.2
10.5
3.015
2.24
1.63
20
1
1
1
1.6
3.385
3.385
3.385
2
1
1
-4
-3
-1
5.9
4.755
8.77
0.8
0.8
0.8
2.1
2.1
2.1
2.1
0.6
2.1
24.78
9.99
18.42
-6.72
-1.44
-1.68
1
-1
2
2
17.27
1.5
18.185
10.5
0.1
0.1
2.1
2.1
1.73
-0.15
76.38
44.10
-12
-2
-1
-1
1.18
0.9
1.2
2.75
1.48
2.1
2.1
2.1
-20.96
-3.78
-2.52
-5.78
2
1
-5
-5
2
-2
1
-5
-2
5.1
12.4
0.8
0.8
5.5
0.8
8.32
0.8
0.8
2.1
2.1
2.1
0.6
2.1
2
2.1
2.1
0.6
21.42
26.04
-8.40
-2.40
23.10
-3.20
17.47
-8.40
-0.96
1
-2
57.37
1.1
0.1
0.1
5.74
-0.22
0.46
3.385
0.395
SUB TOTAL
12.95
16.10
17.77
203.25
4.23
18.33
22.56
190.94
10.21
7.58
36.19
0.395
0.75
1.25
1.12
12.64
2.54
4.23
3.79
268.12
132.36
SI NO
DESCRIPTION OF ACTIVITIES
DOOR D1
STAIR AREA
DEDUCTION FOR ENTRANCE
PASSAGE
DEDUCTIONS FOR D
3 EXTERNAL FINISHING WORKS
a PLASTERING EXTERENAL WALL
CORNICHE AT PARAPET LVL
AT HEAD ROOM ROOF
COLUMN PEOJECTIONS @ SOUTH
COLUMN PEOJECTIONS @ EAST/WEST
WARANDAH PARAPET WALL AT FF
SLAB ABOVE ROLLING SHUTTER
DROPS AT FIRST FLOOR LVL
COLUMN AT NORTH
ROOF LEVEL DROP ABOVE VARANDAH
SUNSHADES ABOVE WINDOWS AT GF
SUNSHADES AT FF
HEAD ROOM PLASTERING EXTERNAL
HEAD ROOM PARAPET
COLUMN FACES
PARAPET IN PASSAGE AT ROOF
DEDUCTIONS
WINDOWS
CG
RS
DOORS D AT FF
DEDUCTION FOR STAIR ENTRY @FF
DOOD D AT ROOF D1
JOLLY
FIRE WALL
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
-2
1
-1
2
-2
0.9
17.27
3.3
23.5
1.1
0.1
0.1
0.1
0.1
0.1
-0.18
1.73
-0.33
4.70
-0.22
1
1
1
12
3
1
1
1
12
1
68.2
66.4
22.2
0.25
0.17
25
5.17
25
0.25
25.7
11.14
10.75
10.75
1.8
2.73
2.1
9.3
2.1
759.75
66.40
22.20
32.25
5.48
45.00
14.11
52.50
27.90
53.97
7
8
1
1
1
2
3.4
3.4
18.13
22.2
1.81
1.5
2.4
0.6
2.7
1.9
28.56
32.64
43.51
13.32
4.89
5.70
-24
-1
-1
-2
-1
-1
-3
1
0.72
1.04
2.29
0.64
3.3
0.44
0.74
9.25
1.02
1.87
3.87
1.87
3.87
1.87
0.74
9.5
-17.63
-1.94
-8.86
-2.39
-12.77
-0.82
-1.64
87.88
1250.00
1250.00
1250.00
NOS
1.2
1.2
4 EXTERNAL PAINTING
EXTERNAL WALL
5 SS HAND RAILS
HANDRAIL AT O TO 1.5M
HANDRAIL AT STAIR
WAIST SLABS 1 &2
WAIST SLAB 3&4
6
7
8
9
10
11
12
QTY
16.00
2
2
4.05
3.182
8.10
6.36
2
1
1
1
30
1
1
10.25
2.1
21.53
SUB TOTAL
75.89
30.46
2
21.53
1
1
30
1
1
SI NO
13
14
15
16
a
DESCRIPTION OF ACTIVITIES
NOS
LENGTH
IN M
HEIGHT
WIDTH
/ DEPTH
IN M
IN M
QTY
1
3
2
SUB TOTAL
1
3
2
2
6
1.1
0.9
2.1
2.1
2
6.00
6
1
1
0.9
2.75
1.5
2.1
3.6
2.1
9.90
3.15
11.34
9.90
3.15
e WINDOW(ALUMINIUM)
VENTILATOR IN CONTROL ROOM
VENTILATOR IN TOILETS
WINDOW IN THE PLACE OF JOLLY
23
10
9
1
1.18
1.18
0.8
1.2
1.48
0.58
0.58
1.2
40.17
6.84
4.18
1.44
52.63
9
10
1.18
0.8
0.58
0.58
23
1
1.18
1.2
1.48
1.2
1
1
1
9.00
10.00
40.17
1.44
1165.00
1.00
1.00
1.00
1
1
1