HARINI ENTERPRISES

MEASUREMENT SHEET JOINTLY ARRIVED BY M/S. DSWE and HARINI ENTERPRISES


PROJECT : 33/11 KVA SUB STATION WORK NORTH CHENNAI.
SITE : MADHAVARAM
CLIENT : M/S. DRAKE & SCULL WATER & ENERGY PVT LTD.
MEASUREMNT ARRIVED BY: Mr.Mohammed Nazer ( Manager Civil,DSWE) and Mr.Rajaraman (Project
Engg,Harini),Mr.Anbarasan (Site Engg)
CHECKED & RE-ARRIVED BY : Mr.Sivasubramanian(Engineer Civil,DSWE) and Mr.Anbarasan(Site Engg)
SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

QTY

SUB TOTAL

A SUB STRUCTURE
1(a) EARTH WORK IN EXCAVATION
14
2

2.6
2.4

2.6
2.4

2
2

189.28
23.04

212.32

ALONG GRID B1 TO B2

14
2

2.6
2.4

2.6
2.4

0.18
0.18

17.0352
2.0736

19.1088

2 RIVER SAND BEDDING


ALONG GRID A & C
ALONG GRID B1 TO B2

14
2

2.6
2.4

2.6
2.4

0.1
0.1

9.464
1.152

10.616

3 PCC FOR FOOTINGS


PCC ALONG GRID A & C
PCC ALONG GRID B1 TO B2

14
2

2.6
2.4

2.6
2.4

0.075
0.075

7.098
0.864

7.962

4 FOOTING
i SHUTTERING
ATF1
ATF2

14
2

9.6
8.8

0.25
0.25

33.6
4.4

38

ii REBAR (from BBS sheet )

2.3244

2.3244

iii RCC
AT F1 (RECTANGULAR)
AT F1 (TRAPEZOIDAL)
AT F2 (RECTANGULAR)
AT F1 (TRAPEZOIDAL)

14
14
2
2

2.4

2.4

2.2

2.2

20.16
21.00
2.42
2.48

46.06

14
2

3.65
3.65

ALONG GRID A1 TO A7*& C1 TO C7

ALONG GRID B1 TO B2
1.(b) EXCAVATION BELOW 2M
ALONG GRID A1 TO A7*& C1 TO C7

5 COLUMN UP TO PLINTH LVL


SHUTTERING
i AT C1
AT C2
DEDUCTIONS AT GRADE LEVEL
AT GB3 BEAM JUNCTIONS FOR C1
AT GB4 BEAM JUNCTIONS FOR C1
AT GB1 BEAM JUNCTIONS FOR C1
AT GB2 BEAM JUNCTIONS FOR C1
AT GB1 IN CANTILEVER FOR C2
AT GB3 IN CANTILEVER FOR C2

-20
-4
-10
-4
-1
-1

0.25
1.5
0.25
1.24

1.8
1.46
0.23
0.23
0.3
0.23
0.23
0.23

91.98
10.658
0.3
0.45
0.6
0.45
0.6
0.3

-1.38
-0.414
-1.8
-0.414
-0.138
-0.069

SI NO

DESCRIPTION OF ACTIVITIES

DEDUCTIONS AT PLINTH LEVEL


AT BEAM PB3 JUNCTIONS FOR C1
AT BEAM PB2 JUNCTIONS FOR C1 & C2
AT BEAM PB1 JUNCTIONS FOR C1
AT BEAM PB6 JUNCTIONS FOR C1
ATBEAM PB4 JUNCTION FOR C2

NOS

LENGTH
IN M

-20
-8
-6
-2
-4

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

0.23
0.23
0.23
0.3
0.23

0.3
0.45
0.45
0.75
0.45

QTY

SUB TOTAL

-1.38
-0.828
-0.621
-0.45
-0.414

94.73

5.0391

5.0391

ii REBAR

iii RCC COLUMN


AT C1
AT C2

14
2

3.65
3.65

0.4
0.23

0.5
0.5

10.22
0.84

11.06

6 GRADE BEAM
i PCC
AT GB-1
AT GB-1 Cantilever for stair
AT GB-2
AT GB-2
AT GB-3
AT GB-3 Cantilever for stair
AT GB-4

5
1
2
2
10
1
3

10.5
1.5
4.75
5.25
3.3
1.5
3.3

0.5
0.5
0.43
0.43
0.43
0.43
0.43

0.075
0.075
0.075
0.075
0.075
0.075
0.075

1.97
0.06
0.31
0.34
1.06
0.05
0.32

4.10

3.16

3.16

0.6
0.6
0.45
0.45
0.3
0.3
0.45

63
0.9
8.55
9.45
19.8
0.45
8.91

111.06

0.6
0.45
0.45
0.3
0.45
0.6
0.3

9.45
0.98
1.09
2.28
1.02
0.27
0.14

15.23

iiI REBAR
IV SHURTTERING FOR GBEAMS
AT GB-1
AT GB-1 Cantilever for stair
AT GB-2
AT GB-2
AT GB-3
AT GB-3 Cantilever for stair
AT GB-4
v RCC
AT GB-1
AT GB-2
AT GB-2
AT GB-3
AT GB-4
GB1 FOR STAIR
GB3 FOR STAIR
7 BACK FILLING STAGE 1
REFER EXCAVTION QTY
DEDUCTIONS
RIVER SAND FILLING BELOW FOOTING
PCC BELOW FOOTING
RCC FOOTING
COLUMN
GARDE BEAM PCC

1
10
1
4
4
20
1
6

10.5
1.5
4.75
5.25
3.3
1.5
3.3

5
2
2
10
3
1
1

10.5
4.75
5.25
3.3
3.3
1.5
1.5

231.43

231.43

-1
-1
-1
-1
-1

10.616
7.962
46.06
11.06
4.10

-10.616
-7.962
-46.060
-11.060
-4.102

0.3
0.23
0.23
0.23
0.23
0.3
0.3

151.629

SI NO

DESCRIPTION OF ACTIVITIES

8 PLINTH BEAM
SHUTTERING
AT PB-1
AT PB-2
AT PB-2
AT PB-3
AT PB-4
AT PB-5
AT PB-6
REBAR
RCC
AT PB-1
AT PB-2
AT PB-2
AT PB-3
AT PB-4
AT PB-5
AT PB-6
9 STAIRS FROM FGL TO +1.60M
i SHUTTERING
FOR RISER WALL
GROUND LANDING
WAIST SLAB
EDGE SIDE
LANDING

NOS

2
4
4
18
6
4
8

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

10.5
4.75
5.25
3.3
3.3
3.35
1.23

0.75
0.45
0.45
0.3
0.45
0.45
0.45

1
2
2
9
4
2
4

10.5
4.75
5.25
3.3
3.3
3.47
1.5

4
2
2
2
2

1.5
1
3.06
4.06
3.3

0.3
0.23
0.23
0.23
0.23
0.23
0.23

10 BRICK WORK BELOW PLINTH


AT PB1
AT PB2
AT PB2
AT PB3
AT PB4
AT PB5
AT PB6
STEPS FROM 0M LVL TO +1.5 M LVL
11 CABLE TRENCH
i RIVER SAND FILLING

SUB TOTAL

15.75
8.55
9.45
17.82
8.91
6.03
4.428

70.938

2.3779

2.3779

0.75
0.45
0.45
0.3
0.45
0.45
0.45

2.36
0.98
1.09
2.05
1.37
0.72
0.62

9.19

0.2

1.20
3.50
10.71
1.22
11.55

28.18

0.588

0.588

1.75
1.75
0.15
1.75

ii REBAR
iii RCC
RAISER WALL
GROUND LANDING
WAIST SLAB
LANDING

QTY

2
2
2
2

1.5
1
3.06
3.3

0.15
1.77
1.77
1.77

0.2
0.15
0.15
0.15

0.09
0.53
1.62
1.75

4.00

1
2
2
9
4
2
2
9

10.5
4.75
5.25
3.3
3.3
3.3
1.5
1.75

0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23

1.1
1.4
1.4
1.55
1.4
1.95
1.95
0.15

2.66
3.06
3.38
10.59
4.25
2.96
1.35
0.54

28.78

2
2

18.185
6.5

2
2

0.1
0.1

7.27
2.60

SI NO

DESCRIPTION OF ACTIVITIES

ii PCC

ii SHUTTERING
SHUTTERING FOR RAFT
SHUTTERING FOR WALL

SHUTTERING FOR COVER SLAB


DEDUCTIONS
JUN OF IN COMING CABLE DUCT
WALL
Deduction of corners
JUNCTION OF CABLE DUCT FROM PLINTH
iv REBAR
v RCC
AT RAFT
AT WALL

COVER SLAB
RCC (FOR THE PLAN AREA OTHER THAN
CABLE DUCT)- SLAB ON GRADE
DEDUCTION
JUN OF IN COMING CABLE DUCT
corners
JUNCTION OF CABLE DUCT FROM PLINTH

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

QTY

SUB TOTAL

6.5

2.1

0.1

1.37

11.24

2
2
1

18.185
6.5
6.5

2
2
2.1

0.075
0.075
0.075

5.46
1.95
1.02

8.43

2
4
2
2
4
4
4
4
3
4

12.485
6.7
17.785
10.1
6.6425
6.2425
7.1
6.7
7.1
1.5

0.2
0.2
1.65
1.5
1.5
1.5
1.5
1.5

4.994
5.36
58.6905
30.3
39.855
37.455
42.6
40.2
31.95
9

-2
-4
-1

1.5
1.9
3.25

1.5
0.15
1.5

-4.5
-1.14
-4.875

289.8895

5.8872

5.8872

1.5
1.5

2
3
2
2
4
4
3
4

18.185
6.7
18.185
10.1
6.443
6.9
7.1
1.7

1.9
1.9
0.2
0.2
0.2
0.2
1.9
1.9

0.2
0.2
1.65
1.5
1.5
1.5
0.15
0.15

13.82
7.64
12.00
6.06
7.73
8.28
6.07
1.94

7.1

6.243

0.1

8.87

-2
-4
-1

1.5
1.9
3.25

1.5
0.2
1.5

0.2
0.15
0.2

-0.90
-0.23
-0.98

1
1

12.74
3.3

6.7
10.27

2.12
2.12

180.96
71.85

-4

10.50

0.3

0.6

-7.56

245.25

1
1

12.485
10.27

6.7
3.3

0.08
0.08

6.69
2.71

9.40

12.485

6.7

0.1

8.36

70.30

12 BACK FILLING STAGE 2


QTY ABOVE NGL TO CONTROL ROOM
TOILET SATIR AREA
DEDUCTIONS
GRADE BEAM GB1
i RIVER SAND FILLING

ii PCC

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

10.27

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

3.3

0.1

iii REBAR
B
1
i
ii

SUPER STRUCTURE UP TO FF
COLUMN UP TO FF
REBAR
SHUTTERING
AT C1
AT C2
DEDUCTIONS AT BEAM LEVEL
AT BEAM FB4 JUNCTIONS FOR C1
AT BEAM FB5 JUNCTIONS IN C1
AT BEAM FB8 JUNCTIONS IN C1
AT BEAM FB1 JUNCTIONS IN C1
AT BEAM FB2&FB3 JUNCTIONS IN C1
AT BEAM FB6 JUNCTIONS FOR C1
Lintel Junction
ATBEAM JUNCTION C2

iii RCC
AT C1
AT C2
8 LINTEL S.SHADE& LATH (DROP)
i SHUTTERING FOR SUN SHADE
SHUTTERING FOR LINTEL

Toilet & Battery room

DROP ABOVE VARANDAH

14
2

4.42
4.42

-20
-4
-2
-10
-8
-7
-32
-2

1.8
1.46

QTY

SUB TOTAL

3.39

11.75

0.37

0.37

3.91

3.91

111.38
12.91

0.23
0.23
0.23
0.4
0.23
0.23
0.3
0.23

0.4
0.6
0.5
0.75
0.6
0.4
0.23
0.45

-1.84
-0.552
-0.23
-3
-1.104
-0.644
-2.208
-0.207

114.51

0.5
0.5

12.38
1.02

13.39

14
2

4.42
4.42

0.4
0.23

12

1.6

0.7

13.44

6
22
4
4

10.5
3.3
3.3
1.9

0.3
0.3
0.3
0.3

18.90
21.78
3.96
2.28

25.5

25.50

85.86

0.81

0.81

II REBAR

iii RCC SUN SHADE ABOVE WINDOWS


RCC LINTEL

TOILET FLOOR LVL BEAM


MID LVL 4.5"

12
1
1
1
1
1

1.6
67.35
3.3
3.3
10.4
3.8

0.6
0.23
0.23
0.115
0.23
0.115

0.1
0.3
0.3
0.3
0.3
0.3

1.15
4.65
0.23
0.11
0.72
0.13

DROP ABOVE VARANDAH

25.6

0.08

2.05

9.04

6.9092

6.91

3 FF BEAM
i REBAR
ii SHUTTEREING
AT FB-1
AT FB-2

5
2

10.5
4.75

1.62
1.15

85.05
10.93

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

1.15
0.75
1.15
0.82
0.57
0.95
0.83

12.08
24.75
7.59
8.72
11.29
3.14
2.91

166.44

0.75
0.6
0.6
0.4
0.6
0.4
0.3
0.5
0.45

15.75
1.31
1.45
3.04
1.37
1.26
1.41
0.38
0.36

26.32

10.54 3.3000
5.45 3.3000
1.45 3.3000
33.60
0.1400

173.91
17.99
28.71
9.41

AT FB-3
AT FB-4
AT FB-5
AT FB-6
AT FB-7
AT FB-8
ABOVE ROLLING SHUTTER- PB-6

2
10
2
7
6
1
2

5.25
3.3
3.3
1.52
3.3
3.3
1.75

iii RCC
AT FB-1
AT FB-2
AT FB-3
AT FB-4
AT FB-5
AT FB-6
AT FB-7
AT FB-8
ABOVE ROLLING SHUTTER- PB-6

5
2
2
10
3
7
6
1
2

10.5
4.75
5.25
3.3
3.3
1.5
3.4
3.3
1.75

4 FF SLAB
i SHUTTERING
FS 1
FS3
FS2
OUTER SIDE
ADDITIONAL SLAB ABOVE R SHUTTER
OUTER SIDE
LANDING AS LIKE GF
ii REBAR
iii RCC
FS-1
FS-1
FS-2
FB-3
SLAB ABOVE ROLLING
5 STAIR FROM +1.5M TO- 5.85M LVL
i SHUTTERING FOR STAIR UP TO FF
MID LANDING BEAM AT +3.675M
MID LANDING SLAB AT +3.675M
WAIST SLABS 1 &2

5
1
6
2
2
2

2.75
2.75

0.4
0.23
0.23
0.23
0.23
0.3
0.23
0.23
0.23

0.15
1.75

1
4
1
6
1
1

10.5
10.5
3.4
5.385
2.75

3.3
3.385
1.52
3.385
1.75

1
1
2

3.745
3.745
4.05

0.83
1.385
2.03

0.14
0.14
0.14
0.15
0.15

Ii REBAR
IiI RCC
STAIR FROM +1.5M TO- 5.85M LVL
MID LANDING BEAM AT +3.675M
MID LANDING SLAB AT +3.675M
WAIST SLABS 1 &2

1
1
2

3.3
3.385
4.06

0.23
1.385
1.6

0.45
0.2
0.2

QTY

SUB TOTAL

0.83
9.63

240.46

3.70

3.70

19.40
4.98
4.34
2.73
0.72

32.18

3.11
5.19
16.44

24.74

1.05

1.05

0.34
0.94
2.60

3.88

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

QTY

SUB TOTAL

6 9" BRICK WORKS AT GF


ALONG GRID A&C
ALONG GRID 1,2
ALONG GRID 7
WALL BETWEEN GRID B& C
STEPS FROM +1.5 TO FF
DEDUCTIONS
WINDOW -W
VENTILATORS-V
VENTILATORS-V
DOOR D1
ROLLING SHUTTER
COLLAPSABLE GATE
JOLLEY

12
2
1
1
14

3.3
10
10.5
3.3
1.72

0.23
0.23
0.23
0.23
0.25

3.7
3.65
3.65
3.5
0.145

33.70
16.79
8.81
2.66
0.87

-12
-10
-3
-3
-1
-1
-1

1.18
1.18
0.8
0.9
2.75
1.5
1.2

0.23
0.23
0.23
0.23
0.23
0.23
0.23

1.48
0.58
0.58
2.1
3.6
2.4
1.2

-4.82
-1.57
-0.32
-1.30
-2.28
-0.83
-0.33

51.38

7 4.5"HALF BRICK WALL


WALL AT GRID B
WALL AT TOILET
DEDUCTIONS
DOOR D2

1
2
2
-2

3.3
1.9
1.05
0.9

3.5
3.5
3.5
2.1

11.55
13.30
7.35
-3.78

28.42

3.18

3.18

C
1
i
ii

SUP STRUC. FROM FF TO ROOF


COLUMN UP TO ROOF
REBAR
SHUTTERING
AT C1
AT C2
DEDUCTIONS AT BEAM LEVEL
AT BEAM RB4 JUNCTIONS IN C1
AT BEAM RB7 JUNCTIONS IN C1
AT BEAM RB1 JUNCTIONS IN C1
AT BEAM RB6 JUNCTIONS IN C1
AT BEAM RB5 JUNCTIONS IN C1
ATBEAM JUNCTION C2

iii RCC
AT C1
AT C2
2 LINTEL ,SSHADE& LATH (DROP)
i SHUTTERING FOR SUN SHADE
SHUTTERING FOR LINTEL

LOFT
DROP ABOVE VARANDAH

14
2

3.5
3.5

-22
-2
-10
-4
-7
-6

1.8
1.46

88.20
10.22

0.23
0.23
0.4
0.23
0.23
0.23

0.4
0.5
0.75
0.5
0.5
0.5

-2.024
-0.23
-3
-0.46
-0.805
-0.69

91.21

0.5
0.5

9.80
0.81

10.61

8.96
23.76
6.30
12.00
24.73
12.65
25.60

114.00

14
2

3.5
3.5

0.4
0.23

8
24
1
2
2
2
1

1.6
3.3
10.5
10
18.185
9.3
25.6

0.7
0.3
0.6
0.6
0.68
0.68

II REBAR
iii RCC SUN SHADE

0.97
8

1.6

0.6

0.1

0.77

SI NO

DESCRIPTION OF ACTIVITIES

RCC LINTEL
ABOVE 4.5" WALL
LOFT
DROP ABOVE VARANDAH
3 ROOF BEAM
i SHUTTERING
AT RB1
AT RB3
AT RB4
AT RB5
AT RB6
AT RB7
ii REBAR
iii RCC
AT RB1
AT RB3
AT RB4
AT RB5
AT RB6
AT RB7

NOS

LENGTH
IN M

12
1
1
1
2
2
1

3.3
10.5
2.775
3.76
18.185
9.34
25.6

5
6
11
7
2
1

10.5
3.4
3.3
0.75
10
3.3

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

0.23
0.23
0.115
0.23
0.6
0.6
0.08

5
6
11
7
2
1

10.5
3.4
3.3
1.5
10
3.3

0.4
0.23
0.23
0.3
0.23
0.23

5
1
6
2

10.50
5.25
1.54
34.06

3.30
3.30
3.30

QTY

SUB TOTAL

0.3
0.3
0.3
0.3
0.08
0.08
1

2.73
0.72
0.10
0.26
1.75
0.90
2.05

9.27

1.62
0.69
0.8
1.27
0.72
0.95

85.05
14.08
29.04
6.67
14.40
3.14

152.37

5.13

5.13

0.75
0.3
0.4
0.5
0.5
0.5

15.75
1.41
3.34
1.58
2.30
0.38

24.75

0.15

173.25
17.33
30.49
10.22

231.29

3.21

3.21

31.27

4 ROOF SLAB
i SHUTTERING

OUTER SIDES
ii REBAR
iii RCC
RSI
RSI
RS3
RS2
5 9" BRICK WORKS AT FF
ALONG GRID A&C
ALONG GRID 1,2
ALONG GRID 1,2&7
WALL BETWEEN GRID A& C
STEPS
DEDUCTIONS
WINDOW -W
VENTILATORS-V
DOOR D1

4
1
1
6

10.50
10.50
5.39
1.52

3.30
3.39
3.39
3.40

0.14
0.14
0.14
0.14

19.40
4.98
2.55
4.34

11
2
1
2
11

3.3
10
10.5
3.3
1.73

0.23
0.23
0.23
0.23
0.25

2.8
2.75
2.45
2.6
0.145

23.38
12.65
5.92
3.95
0.69

-11
-7
-2

1.18
0.8
0.9

0.23
0.23
0.23

1.48
0.58
2.1

-4.42
-0.75
-0.87

SI NO

DESCRIPTION OF ACTIVITIES

DOOR D
JOLLY

LENGTH
IN M

NOS

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

-2
-1

0.9
1.2

2
2
1
2
-4

1.5
1.05
1.5
1.15
0.9

5(a) 9" BRICK WORKS AT VARANDAH

25

0.23

7 STAIR CASE STRUCTURE


i SHUTTERING
STAIR FROM + 5.85M TO 9.04
MID LANDING BEAM AT +7.445M
MID LANDING SLAB AT +9.04M
SMALL LANDING AT +5.85MLVL
WAIST SLAB 3 & 4

1
1
1
2

3.745
3.745
1.6
3.182

0.83
1.385
0.75
2.03

ii REBAR FOR STAIR

iii RCC FOR STAIR


STAIR FROM + 5.85M TO 9.04
MID LANDING BEAM AT +7.445M
MID LANDING SLAB AT +9.04M
SMALL LANDING AT +5.85MLVL
WAIST SLAB 3&4

1
1
1
2

6 4.5"WALL AT FF
WALL AT GEN TOILET
WALL AT LADIES TOILET
DEDUCTIONS -DOOR D2

8 ROOF WORKS
a. ROOF LVL RCC & head room
i SHUTTEREING
HB1 Outer side
HB1 Inner side
HB2 Outer side
HB2 Inner side
HB3 Outer side
HB3 Inner side
HS1
C1
C2
ii REBAR
iii RCC
COLUMN C1 AT PARAPET
COLUMN C1
COLUMN C2
BEAM HB1
BEAM HB2
BEAM H3

3.745
3.745
1.6
3.182

1
3
2
2
1
1
1
2
2

8
2
2
2
2
1

3.930
3.470
7.115
6.425
3.930
3.470
7.115
1.800
1.460

0.90
2.40
2.40
3.30
5.87
3.3

0.23
0.23

0.23
1.385
0.75
1.6

SUB TOTAL

2.1
1.2

-0.87
-0.33

39.35

3.05
3.05
3.05
3.05
2.1

9.15
6.41
4.58
7.02
-7.56

19.59

0.9

5.18

5.18

3.11
5.19
1.20
12.92

22.41

0.87

0.87

0.45
0.2
0.2
0.2

0.39
1.04
0.24
2.04

3.70

0.500
0.360
0.500
0.360
0.300
0.160

1.965
3.748
7.115
4.626
1.179
0.555
27.962
7.920
6.424

61.494

1.19

1.19

3.930
2.200
2.200

0.40
0.40
0.23
0.23
0.23
0.23

QTY

0.50
0.50
0.50
0.50
0.50
0.3

1.44
0.96
0.55
0.76
1.35
0.23

SI NO

DESCRIPTION OF ACTIVITIES

SLAB HS1
b BRICK WORK 9"
AT PARAPET

AT HEAD ROOM
HEAD ROOM PARAPET
DEDUCTIONS
DOOR D1
WINDOW
JOLLY
c BRICK WORKS-9" IN PASSAGE
D EXTERNAL FINISHING AND YARD WORKS
STAGE 4 PAYMENT 20%
EXTERNAL WORKS & YARD
1 TRANSFORMER PLINTH
a EXCAVATION
TRANSFORMER FOUNDATION
CABLE TRENCH
b RIVER SAND FILLING
c PCC
d SHUTTERING
TRANSFORMER FOUNDATION & FIRE
WALL-BASE
STRAP BEAM
COLUMN
BEAM B1
BEAM B2
SLAB
FIRE WALL
CABLE DUCT RAFT ALONG PLINTH
CABLE DUCT RAFT ARROUND PLINTH-WALL
COVER SLAB
DEDUCTIONS
JUN OF CABLE DUCT FROM CNT. ROOM
e
f

REBAR FOR TRS. FORMER FND


RCC
TRANSFORMER FOUNDATION
STRAP BEAM
COLUMN C1
BELOW GROUND C2
ABOVE GROND C2

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

QTY

SUB TOTAL

6.425

3.47

0.14

3.12

6
1
1
1
1

3.3
10.5
5.25
16.17
20.9

0.23
0.23
0.23
0.23
0.23

0.9
0.9
0.9
1.9
0.3

4.10
2.17
1.09
7.07
1.44

-1
-1
-1

0.9
1.18
1.2

0.23
0.23
0.23

1.9
1.48
1.2

-0.39
-0.40
-0.33

14.74

25

0.23

0.9

5.18

5.18

1
2
2
1
1

3.9
1.2
3
12.5
12.5

12.9
12.9
1.2
6.2
6.2

1.5
1.5
1.5
0.1
0.075

75.47
46.44
10.80
7.75
5.81

132.71
7.75
5.81

1
2
8
2
8
4
1
2
2

25.22
19.76
1.2
1.36

0.25
0.35
2.10
2.10
0.325
0.325

35.963
35.963
20.160
5.712
35.963
35.963
11.223
35.963
35.963

2
2

72
18

-2

3.25

2.475
2.475
3.35
4.23
18

3.35
4.50
0.20
1.30

35.963
43.200

1.30

-8.450

323.58

6.0223

6.02

1.2

2
1
2
8
2
2

9.38
9.38
0.3
0.45
0.45

3.275
0.5
0.3
0.3
0.23

8.41

0.25
0.35
2.10
1.00
1.10

7.68
3.28
1.51
0.27
0.23

SI NO

DESCRIPTION OF ACTIVITIES

BEAM AT FLOOR LEVEL B1


BEAM AT FLOOR LEVEL B2
SLAB AT PLINT
FIRE WALL
CABLE DUCT AROUND PLINTH
RAFT
WALL
COVER SLAB
DEDUCTIONS
JUN OF CABLE DUCT FROM CNT. ROOM

2
i
ii
iii
iv

v
vi

CABLE DUCT FROM PLINTH TO BUILDING


EARTH WORK EXCAVATION
RIVER SAND
PCC
SHUTTEREING
CABLE DUCT FROM TRANSFORMER TO
BUILDING
RAFT
WALL
COVER SALB
REBAR
RCC
RAFT
WALL
BEAM
BEAM
COVER SLAB

3
i
ii
iii
iv

INCOMING CABLE TRENCH


EXCAVATION
SAND FILLING
PCC
SHUTTERING
RAFT
WALLL
COVER

v
vi

REBAR
RCC
RAFT
WALL
COVER
BACK FILLING 3RD STAGE

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

QTY

SUB TOTAL

4
8
2
1

2.175
2.175
3
4.5

0.3
0.3
3
0.23

0.33
0.33
0.18
4.95

0.85
1.70
3.15
5.12

2
4
1
8
2
4

12.07
3
46.94
2.175
12.07
3

1.5
1.5
0.15
0.15
1.2
1.2

0.20
0.20
1.55
1.55
0.15
0.15

7.24
3.60
10.91
4.05
4.35
2.16

-2

3.25

1.3

0.15

-1.268

54.83

1
1
1

2.5
2.5
2.5

4.2
3.8
3.8

1.50
0.08
0.10

15.75
0.76
0.95

15.75

2
2
2

12
24
6

0.20
1.50
1.5

35.963
35.963
18.000
0.454

89.93
0.45

1
2
1
2
1
1

2.5
2.5
2.5
3.65
3.65
2.5

3.65
0.2
0.25
0.3
0.35
3.6

0.20
1.20
1.20
0.30
0.20
0.20

1.83
1.20
0.75
0.66
0.26
1.80

6.49

2
2
2

3.7
3.7
3.7

2.5
2.1
2.1

1.50
0.08
0.10

27.75
1.24
1.55

2
4
4
2

9.3
3.7
3.7
3.7

0.20
1.30
1.15

3.72
19.24
17.02
11.10

51.08

0.37

0.37

2.81
3.55
2.11

8.47

2
4
2

3.7
3.7
3.7

1.5

1.9
1.2
1.9

0.20
0.20
0.15

27.75

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

REFER QTY OF EXCAVATION


DEDUCTION
R SAND FILLING OF TRANS FDN
PCC OF TRANS FDN
RCC OF TRANS FDN
5 PAVING
6 ROAD
ROAD BASE (METAL & GRAVEL)
PCC BY 40MM M5-1:4:8
RCC BY 20MM M15
TOPING BY 3TO 10MM M15
REBAR 8 @275 MM C/C-(3.03 KG/SQM)
ROAD/ SQM
7
a
b
c
d

UG SUMP (LUMPSUM)
EXCAVATION
RIVER SAND FILLING
PCC
SHUTTERING
FLOOR
WALL
COVER SLAB

e REBAR 22KG/SQM OF SURFACE AREA


f RCC
RCC FLOOR
RCC WALL
RCC COVER SLAB
g PLASTERING
FLOOR
WALL
CEILING
h MANHOLE COVER
8 WEATHERING COURSE & TILING
9 YARD OPEN AREA FILLING 4TH STAGE
SIZE OF THE PLTOT
DEDUCTION FOR BLG AREA
TRANSFORMER YARD
CABLE TRENCE AREA
INCOMING TRENCH AREA
WATER TANK
STAIR AREA
E FINISHING WORKS
1 PLASTERING INTERNAL
a GF
WALL-CONTROL ROOM
DEDUCTIONS

QTY

SUB TOTAL

132.71

66.40

1
1
1
1
1
1

15.00
15.00
15.00
15.00

0.3
0.15
0.15
0.05

4.50
4.10
4.10

2.7
2.3
2.3

1
1
1

12.00
22.80
3.90

44.70

1
1
1

3.90
11.40
3.90

2.1
2.1
2.1

1
1
1
1
1

3.00
9.60
3.00

1.8

21.7

10.5

1
-1
-1
-1
-2
-1
-2

42.735
22.2
12.30
2.50
3.70
3.40
7.40

16.21
11
6
3.6
1.9
2.2
1.75

57.31

64.31

66.40

66.40

6
6
6
6

27.00
13.50
13.50
4.50

90.00

90.00

1.5
0.1
0.1

18.23
0.94
0.94

18.23
0.94
0.94

0.2
2.1

2.40
47.88
8.19

58.47

22

0.98

0.98

0.2
0.15
0.15

1.64
3.59
1.23

6.46

15.00

1
1
1

-7.75
-5.81
-54.83

2.1

5.40
21.12
5.40
1.00
227.85

227.85

0.7
0.7
0.7
0.7
0.7
0.7
0.7

484.91
-170.94
-51.66
-6.30
-9.84
-5.24
-18.13

222.81

4.25

243.57

2.2
1.8

31.92

SI NO

DESCRIPTION OF ACTIVITIES

W
V
RS
D1
D1
Beam Surface on Wall
BATTERY ROOM
GENTS TOILET
DEDUCTIONS
Bath & Toilet walls
D1 & D2
URINAL ENTRY
VENTILATOR
D1 BATTERY ROOM
STAIR ROOM
DEDUCTION FOR CG
DEDUCTION FOR JOLLEY

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

-12
-9
-1
-2
-1
-8
1
1

1.18
1.18
2.75
0.9
1.2
0.4
11.25
27.17

1.48
0.58
4.1
2.1
2.1
0.61
3.8
3.8

-20.96
-6.16
-11.28
-3.78
-2.52
-1.95
42.75
103.25

-4
-5
-2
-3
-1
1
-1
-1

0.115
0.9
1.05
0.8
1.2
17.27
1.5
1.2

3.8
2.1
3.8
0.6
2.1
4.25
2.1
1.2

-1.75
-9.45
-7.98
-1.44
-2.52
73.40
-3.15
-1.44

QTY

b PLASTERING INTERNAL FF
WALL OFFICE
DEDUCTIONS
W
D1
D
GENTS TOILET/BATH
WALL URINAL/PASSAGE
DEDUCTION FOR DOORS-D2& D1
VENTILATORS
LADIES TOILET
DEDUCTION FOR DOORS-D1
PASSAGE
DEDUCTIONS D1 & D2
VENTILATORS
STAIR ROOM AT FIRST FLOOR
DEDUCTION AT ENTRANCE
JOLLY

57.3

3.3

189.09

-11
-2
-2
2
1
-5
-5
2
-2
1
-5
-2
1
-1
-1

1.18
0.9
1.1
5.1
12.4
0.8
0.8
5.5
0.8
8.32
0.8
0.8
17.27
3.3
1.2

1.48
2.1
2.1
3.3
3.3
2.1
0.6
3.3
2
3.3
2.1
0.6
3.3
3.1
1.2

-19.21
-3.78
-4.62
33.66
40.92
-8.40
-2.40
36.30
-3.20
27.46
-8.40
-0.96
56.99
-10.23
-1.44

c HEAD ROOM
WALL
DEDUCTION DOOR
WINDOW
JOLLY

1
-1
-1
-1

16.58
0.9
1.18
1.2

2.25
1.9
1.48
1.2

37.31
-1.71
-1.75
-1.44

2 CEILING PLASTERING
Gf
CEILING
FB1 BEAM DROP
WET AREAS
BATTERY ROOM
STAIR MID LANDING

1
4
1
1
1

18.185
10.5
3.385
3.385
3.385

10.5
1.2
3.015
2.24
1.4

190.94
50.40
10.21
7.58
4.74

SUB TOTAL

388.59

354.19

SI NO

DESCRIPTION OF ACTIVITIES

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

QTY

WAIST 1 &2

1.87

4.06

VARANDAH
FB6 BEAM DROP
FB7 BEAM DROP

1
7
6

22
1.5
3.3

1.75

SRAIR AT 00 LVL
WAIST
SOFFIT
BEAM PP 5 &6 DROP

2
2
2

3.1385
3.385
6.47

1.5
1.5

1
1
1
1
4
6
6

18.18
55
3.385
22.2
10.5
1.5
3.3

10.5
1.2
5
1.75

1
1
2

3.745
1.6
3.182

1.385
0.75
2.03

5.19
1.20
12.92

1
1
2

6.885
3.38
1.5

3.38

23.27
0.51
1.05

b CEILING PLASTERING FF
OFFICE
LOFT
WEWT AREA
VARANDAH
RB1 BEAM DROP
RB5 BEAM DROP
RB3 BEAM DROP
STAIR AREA
MID LANDING
SMALL LANDING
WAIST SLAB 3 & 4
C HEAD ROOM
CEILING
BEAM DROP HB3
BEAM DROP HB2

GENTS TOILET-FLOORING
BATTERY ROOM
ACCESS STEPS & STAIR

0.52
0.16

38.50
5.46
3.17

0.25

9.42
10.16
3.24

1.2
0.72
0.39

190.89
65.96
16.93
38.85
50.40
6.48
7.72

348.99

421.37

354.19
-132.36
326.18

b FF
WALL REF QTY FROM PLASTER
DEDUCT WALL TILING FF
CEILING
4 FLOORING
a GROUND FLOOR
CERAMIC FLOORING
DEDUCTION FOR CABLE TRENCH

15.18

0.15
0.35

3 PAINTING INTERNAL
a GF
WALL RFEFER QTY FROM PLASTER
DEDUCT WALL TILING GF
CEILING

SUB TOTAL

354.19
-75.89
421.37

18.185

10.5

190.94

-1
-1

14.385
12.585

1.9
1.9

-27.33
-23.91

1
1

3.155
3.385

2.9
2.24

9.15
7.58

1247.67

SI NO

DESCRIPTION OF ACTIVITIES

FLOOR LANDING SLAB AT +0.00M LVL


STEPS
STAIR PASSAGE AT ENTRANCE
b FLOOR TILING GF STAIR
MID LANDING AT +3.675M LVL
STEPS
c FLOOR TILING FF
FF-FLOORING
GENTS TOILET-FLOORING
LADIES TOILET
PASSAGE AT VARANDAH
STAIR
STEPS FROM FF TO ROOF
SMALL LANDING AT +5.85MLVL
MID LANDING SLAB
LANDING AT +9.04MLVL
2 WALL DADO
a GROUND FLOOR
WALL TOILET/BATH
WALL URINAL
BATH PASSAGE
DEDUCTION FOR DOORS-D2
VENTILATORS
DEDUCTION FOR DOORS-D1
WALL SKIRTING
STAIR AREA
DEDUCTION FO CG
CONTROLL ROOM WALL TILING
DEDUCTION
WINDOW
DOORS
DOORS
ROLLING SHUTTER
b FF
GENTS TOILET/BATH
WALL URINAL/PASSAGE
DEDUCTION FOR DOORS-D2& D1
VENTILATORS
LADIES TOILET
DEDUCTION FOR DOORS-D1
PASSAGE
DEDUCTIONS D1 & D2
VENTILATORS
SKIRTING
OFFICE
DEDUCTION DOOR D

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

1.75

QTY

2
20
1

3.7
1.75
5.25

1
29

3.385
1.6

1.25

1
1
1
1

18.185
3.385
3.385
22.2

10.5
3.015
2.24
1.63

20
1
1
1

1.6
3.385
3.385
3.385

2
1
1
-4
-3
-1

5.9
4.755
8.77
0.8
0.8
0.8

2.1
2.1
2.1
2.1
0.6
2.1

24.78
9.99
18.42
-6.72
-1.44
-1.68

1
-1
2
2

17.27
1.5
18.185
10.5

0.1
0.1
2.1
2.1

1.73
-0.15
76.38
44.10

-12
-2
-1
-1

1.18
0.9
1.2
2.75

1.48
2.1
2.1
2.1

-20.96
-3.78
-2.52
-5.78

2
1
-5
-5
2
-2
1
-5
-2

5.1
12.4
0.8
0.8
5.5
0.8
8.32
0.8
0.8

2.1
2.1
2.1
0.6
2.1
2
2.1
2.1
0.6

21.42
26.04
-8.40
-2.40
23.10
-3.20
17.47
-8.40
-0.96

1
-2

57.37
1.1

0.1
0.1

5.74
-0.22

0.46
3.385

0.395

SUB TOTAL

12.95
16.10
17.77

203.25

4.23
18.33

22.56

190.94
10.21
7.58
36.19
0.395

0.75
1.25
1.12

12.64
2.54
4.23
3.79

268.12

132.36

SI NO

DESCRIPTION OF ACTIVITIES

DOOR D1
STAIR AREA
DEDUCTION FOR ENTRANCE
PASSAGE
DEDUCTIONS FOR D
3 EXTERNAL FINISHING WORKS
a PLASTERING EXTERENAL WALL
CORNICHE AT PARAPET LVL
AT HEAD ROOM ROOF
COLUMN PEOJECTIONS @ SOUTH
COLUMN PEOJECTIONS @ EAST/WEST
WARANDAH PARAPET WALL AT FF
SLAB ABOVE ROLLING SHUTTER
DROPS AT FIRST FLOOR LVL
COLUMN AT NORTH
ROOF LEVEL DROP ABOVE VARANDAH
SUNSHADES ABOVE WINDOWS AT GF
SUNSHADES AT FF
HEAD ROOM PLASTERING EXTERNAL
HEAD ROOM PARAPET
COLUMN FACES
PARAPET IN PASSAGE AT ROOF
DEDUCTIONS
WINDOWS
CG
RS
DOORS D AT FF
DEDUCTION FOR STAIR ENTRY @FF
DOOD D AT ROOF D1
JOLLY
FIRE WALL

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

-2
1
-1
2
-2

0.9
17.27
3.3
23.5
1.1

0.1
0.1
0.1
0.1
0.1

-0.18
1.73
-0.33
4.70
-0.22

1
1
1
12
3
1
1
1
12
1

68.2
66.4
22.2
0.25
0.17
25
5.17
25
0.25
25.7

11.14

10.75
10.75
1.8
2.73
2.1
9.3
2.1

759.75
66.40
22.20
32.25
5.48
45.00
14.11
52.50
27.90
53.97

7
8
1
1
1
2

3.4
3.4
18.13
22.2
1.81
1.5

2.4
0.6
2.7
1.9

28.56
32.64
43.51
13.32
4.89
5.70

-24
-1
-1
-2
-1
-1
-3
1

0.72
1.04
2.29
0.64
3.3
0.44
0.74
9.25

1.02
1.87
3.87
1.87
3.87
1.87
0.74
9.5

-17.63
-1.94
-8.86
-2.39
-12.77
-0.82
-1.64
87.88

1250.00

1250.00

1250.00

NOS

1.2
1.2

4 EXTERNAL PAINTING
EXTERNAL WALL
5 SS HAND RAILS
HANDRAIL AT O TO 1.5M
HANDRAIL AT STAIR
WAIST SLABS 1 &2
WAIST SLAB 3&4
6
7
8
9
10
11
12

WATER TANK 1000 LITER


BATERY ROOM WALL ACID RESISTANT
ELECTRICAL WORKS WITH FITTINGS
PLUMPING & SANITARYWERES
SEWAGE/ DRAINAGE WORKS
SEPTIC TANK& SOAKWAY WITH COVERS
RAIN WATER LINE & HARVESTING

QTY

16.00

2
2

4.05
3.182

8.10
6.36

2
1
1
1
30
1
1

10.25

2.1

21.53

SUB TOTAL

75.89

30.46
2
21.53
1
1
30
1
1

SI NO

13
14
15
16
a

DESCRIPTION OF ACTIVITIES

ENTRANCE GATE 6m wide+ 2M WICKED


GATE
INSPECTION CHAMBER
GULLY TRAP
JOINERIES
DOOR D (CW H C FLUSH DOOR)
DOOR D1 (CW HC FLUSH DOOR)

NOS

LENGTH
IN M

HEIGHT
WIDTH
/ DEPTH
IN M
IN M

QTY

1
3
2

SUB TOTAL

1
3
2

2
6

1.1
0.9

2.1
2.1

2
6.00

b DOOR D2 (PVC DOOR)


c ROLLING SHUTTER
d COLLAPSIBLE GATE(MS)

6
1
1

0.9
2.75
1.5

2.1
3.6
2.1

9.90
3.15

11.34
9.90
3.15

e WINDOW(ALUMINIUM)
VENTILATOR IN CONTROL ROOM
VENTILATOR IN TOILETS
WINDOW IN THE PLACE OF JOLLY

23
10
9
1

1.18
1.18
0.8
1.2

1.48
0.58
0.58
1.2

40.17
6.84
4.18
1.44

52.63

VENTILATOR IN CONTROL ROOM


VENTILATOR IN TOILETS

9
10

1.18
0.8

0.58
0.58

23
1

1.18
1.2

1.48
1.2

f GRILL WITH PAINTING W1 25kg/sqm


WINDOW IN THE PLACE OF JOLLY
20 NAME BOARD AT ROOF
21 BOREWELL
22 ACCESS LADDER MS- 4M AT ROOF

1
1
1

9.00
10.00
40.17
1.44

1165.00

1.00
1.00
1.00

1
1
1

Você também pode gostar