BILL OF ENGINEERING MEASUREMENT AND EVALUATION

1.0

Descriptio
n of work
Conversion of
critical
documents to
native format
(AutoCAD, MS
Office
application, etc)

Work Scope
Document Type
PEFS
CAUSE & EFFECT
DGMS
PSFS
PSMR

No of
Document
203
6
7

Project Cost
Man-hrs
6,208

2.0

364
0
75

te

Upgrade
documents in
accordance with
best practices
(DEPs, BS, etc)
Reconcile
revisions, update
As-Built, ESP
PSSR etc.
Technically split
generic
documents to
individual LNG
trains and
systems

Rate/hr
Estima

N1,788 per
hour.
As per HR
MPC rate for
CAD Operatormax
(allowances,
overhead +
profit
inclusive)

3.0

Total man-hrs to go
Cost
N55,000m
($367,000)

77,100Man
hours

Total Cost for the


project

Duration=1
year

N1,788 x 30,840 hr
(40% of 77,100) =
N55,000 Million
($367,000)/yr