PROYECTO

AMPLIACION Y MEJORAMIENTO DEL SANIAMIENTO BASICO INTEGRAL CC. SONCCOMA

DEPTO.

CUSCO

PROVINCIA

QUISPICANCHI

DISTRITO

CCATCCA

COMINIDAD

SONCCOMARCA

ITENS

DESCRIPCION

1.07 LINEA DE CONDUCCION


01.07.02 EXCAVACION EN MATERIAL SUELTO DE ZANJA EN REDES
01.07.03 EXCAVACION EM ROCA SUELTA DE ZANJAS EN REDES
01.07.05 REFINE, NIVELELACION Y FONDOS ZANJA EN REDES
01.07.06 CAMA DE APOYO PARA TUBERIAS MENORES A 8"
01.07.07 RELLENO COMPACTADO DE ZANJA EN REDES (0.50X0.70)
1.08 RESERVORIO DE 4 M3
01.08.02 EXCAVACION EN MATERIAL SUELTO
1.09 CAJA DE VALVULAS 4 M3
01.09.02 EXCAVACION EN MATERIAL SUELTO
1.10 TRABAJOS DE PROTECCION EN RESERVORIOS 4 M3
01.10.01 EXCAVACION DE ZANJAS DRENAJE Y CORONACION
01.10.02 EXCAVACION DE ZANJAS DRENAJE Y CORONACION
01.10.03 RELLENO APIZONADO DE ZANJA
1.11 RESERVORIO 3 M3
01.11.02 EXCAVACION EN ROCA FIJA A MANO
1.12 CAJA DE VALVULAS 3 M3
01.12.02 EXCAVACION EN ROCA FIJA A MANO
1.13 TRABAJOS DE PROTECCION EN RESERVORIOS 3 M3
01.13.01 EXCAVACION DE ZANJAS DRENAJE Y CORONACION
01.13.02 EXCAVACION MANUAL DE ZANJA
01.13.03 RELLENO APIZONADO DE ZANJA
1.14 CAMARA DE DISTRIBUCION (02 UN)
01.14.02 EXCAVACION EN ROCA SUELTA
01.14.03 ELIMINACION DE MATERIAL EXCEDENTE
1.15 CAMARA DE DISTRIBUCION RESERVORIO (02 UN)
01.15.02 EXCAVACION EN ROCA SUELTA
01.15.03 ELIMINACION DE MATERIAL EXCEDENTE
1.16 REDES DE DISTRIBUCION
01.16.02 EXCAVACION EN MATERIAL SUELTO DE ZANJA EN REDES (REDES
01.16.03 DISTRIBUCION)
EXCAVACION EM ROCA SUELTA DE ZANJAS EN REDES (REDES DE
01.16.04 DISTYRIBUCION)
REFINE, NIVELELACION Y FONDOS ZANJA EN REDES (REDES DE
01.16.05 DISTRIBUCION)
CAMA DE APOYO PARA TUBERIAS MENORES A 8" (REDES DE
01.16.06 DISTRIBUCION)
RELLENO COMPACTADO DE ZANJA EN REDES (0.50X0.70)
1.21 PILETAS A NIVEL DOMICILIARIO
01.21.02 EXCAVACION EN MATERIAL SUELTO ( CIMENTACION DE CASETA DE
SS.HH.)
2.01 REDES COLECTORES
02.01.02 EXCAVACION EN MATERIAL SUELTO PARA REDES DE ALCANTARILLADO
( RED COLECTOR)
02.01.03 EXCAVACION EN ROCA SUELTA PARA REDES DE ALCANATARILLADO
02.01.03 REFINE, NIVELELACION Y FONDOS ZANJA EN REDES

PROYECTO

AMPLIACION Y MEJORAMIENTO DEL SANIAMIENTO BASICO INTEGRAL CC. SONCCOMA

DEPTO.

CUSCO

PROVINCIA

QUISPICANCHI

DISTRITO

CCATCCA

COMINIDAD

SONCCOMARCA

ITENS

DESCRIPCION

02.01.05 CAMA DE APOYO PARA TUBERIAS MENORES A 8"


02.01.06 RELLENO COMPACTADO DE ZANJA EN REDES (0.50X0.70)
2.02 BUZONES
02.02.02 EXCAVACION EN MATERIAL SUELTO BUZONES
02.02.03 EXCAVACION EN ROCA SUELTA BUZONES
02.02.04 ELIMINACION DE MATERIAL EXCEDENTE BUZONES
2.03 CASETA PARA SS HH. EN CADA VIVIENDA
02.03.02 EXCAVACION EN MATERIAL SUELTO (CASETA SS.HH. 82 VIVIENDA)
2.04 SISTEMA DE TRATAMIENTO EN VIVIENDA INDIVIDUAL POZA DE
PERCOLACION (23 UN)
02.04.02 EXCAVACION EN MATERIAL SUELTO (SISTEMA TRATAMIENTO FAMILIAR)
2.05 CAMARA DE REJAS
02.05.02 EXCAVACION EN MATERIAL SUELTO (CAMARA DE REJAS)
2.06 CAMARA DISTRIBUIDORA A TANQUE SEPTICO
02.06.02 EXCAVACION EN MATERIAL SUELTO
2.07 TANQUE SEPTICO SISTEMA N 1
02.07.02 EXCAVACION EN ROCA SUELTA (TANQUE SEPTICO SISTEMA 1)
02.07.03 ELIMINACION DE MATERIAL EXCEDENTE (TANQUE SEPTICO SISTEMA 1)
2.08 TANQUE SEPTICO SISTEMA N 2 Y 4
02.08.02 EXCAVACION EN ROCA SUELTA (TANQUE SEPTICO SISTEMA 2 Y 4)
02.08.03 ELIMINACION DE MATERIAL EXCEDENTE (TANQUE SEPTICO SISTEMA 2
Y 4)
2.09 TANQUE SEPTICO SISTEMA N 3
02.09.02 EXCAVACION EN ROCA SUELTA
02.09.03 ELIMINACION DE MATERIAL EXCEDENTE
2.10 CAMARA DE REGISTRO CAMBIO DE DIRECCION (07 un)
02.10.02 EXCAVACION EN ROCA SUELTA
2.11 CAMARA DE DISTRIBUCION A POSOS PERCOLADORES (04 UND)
02.11.02 EXCAVACION EN MATERIAL SUELTO
2.12 POZO PERDOLADOR SISTEMA N 1
02.12.02 EXCAVACION EN ROCA SUELTA POZO PERCOLADOR SISTEMA N 1
02.12.03 ELIMINACION DE MATERIAL EXCEDENTE POSO PERCOLADOR SISTEMA
N 1
2.13 POZO PERDOLADOR SISTEMA N 2 Y 4
02.13.02 EXCAVACION EN ROCA SUELTA POZO PERCOLADOR SISTEMA N 2 Y 4
02.13.03 ELIMINACION DE MATERIAL EXCEDENTE POSO PERCOLADOR SISTEMA
N 2 Y 4
2.14 POZO PERDOLADOR SISTEMA N 3
02.14.02 EXCAVACION EN ROCA SUELTA POZO PERCOLADOR SISTEMA N 3

PROYECTO

AMPLIACION Y MEJORAMIENTO DEL SANIAMIENTO BASICO INTEGRAL CC. SONCCOMA

DEPTO.

CUSCO

PROVINCIA

QUISPICANCHI

DISTRITO

CCATCCA

COMINIDAD

SONCCOMARCA

ITENS

DESCRIPCION

02.14.03 ELIMINACION DE MATERIAL EXCEDENTE POSO PERCOLADOR SISTEMA


N 3

TOTAL APORTE COMUNAL

ICO INTEGRAL CC. SONCCOMARCA

COSTO TOTAL

APORTE %

COSTO APORTE

56,459.20
42,866.82
11,555.76
8,115.00
80,111.28

25%
0%
1%
1%
0%

14,114.80
0.00
115.56
81.85
0.00

467.81

100%

467.81

108.67

100%

108.67

765.00
426.40
300.20

100%
100%
100%

765.00
426.40
300.20

109.28

100%

109.28

165.01

100%

165.01

382.50
213.20
150.10

100%
100%
100%

382.50
213.20
150.10

260.31
107.76

100%
100%

260.31
107.76

425.76
176.25

100%
100%

425.76
176.25

57,659.10
40,817.50
10,453.94
7,341.25
72,472.82

100%
100%
100%
100%
0%

57,659.10
40,817.50
10,453.94
7,341.25
0.00

6,550.71

100%

6,550.71

25,191.90

100%

25,191.90

12,613.02
3,072.28

100%
100%

12,613.02
3,072.28

ICO INTEGRAL CC. SONCCOMARCA

COSTO TOTAL

APORTE %

COSTO APORTE

2,157.50
21,298.84

100%
100%

2,157.50
21,298.84

3,241.53
1,974.10
1,713.62

100%
100%
100%

3,241.53
1,974.10
1,713.62

10,271.56

100%

10,271.56

7,534.54

100%

7,534.54

2,090.73

100%

2,090.73

182.80

100%

182.80

1,274.14
553.09

100%
100%

1,274.14
553.09

946.73
410.94

100%
100%

946.73
410.94

338.37
152.81

100%
100%

338.37
152.81

211.26

100%

211.26

186.40

100%

186.40

7,284.11

100%

7,284.11

3,035.32

100%

3,035.32

4,461.46

100%

4,461.46

1,859.12

100%

1,859.12

515.00

100%

515.00

ICO INTEGRAL CC. SONCCOMARCA

COSTO TOTAL
324.19

APORTE %
100%

COSTO APORTE
324.19
254,088.32

PROYECTO

AMPLIACION Y MEJORAMIENTO DEL SANIAMIENTO BASICO INTEGRAL CC. SONCCOMA

DEPTO.

CUSCO

PROVINCIA

QUISPICANCHI

DISTRITO

CCATCCA

COMINIDAD

SONCCOMARCA

ITENS

DESCRIPCION

1.07 LINEA DE CONSUCCION


01.07.07 RELLENO COMPACTADO DE ZANJA EN REDES (0.50X0.70)
1.16 REDES DE DISTRIBUCION
01.16.02 EXCAVACION EN MATERIAL SUELTO PARA REDES DISTRIBUCION
01.16.04 REFINE, NIVELELACION Y FONDOS ZANJA EN REDES (REDES DE
01.16.05 DISTRIBUCION)
CAMA DE APOYO PARA TUBERIAS MENORES A 8" (REDES DE
01.16.06 DISTRIBUCION)
RELLENO COMPACTADO DE ZANJA EN REDES (0.50X0.70)
1.21 PILETAS A NIVEL DOMICILIARIO
01.21.02 EXCAVACION EN MATERIAL SUELTO ( CIMENTACION DE CASETA
SS.HH.)
2.01 DE
REDES
COLECTORES
02.01.03 REFINE, NIVELELACION Y FONDOS ZANJA EN REDES
02.01.05 CAMA DE APOYO PARA TUBERIAS MENORES A 8"
02.01.06 RELLENO COMPACTADO DE ZANJA EN REDES (0.50X0.70)
2.02 BUZONES
02.02.04 ELIMINACION DE MATERIAL EXCEDENTE BUZONES
2.03 CASETA PARA SS HH. EN CADA VIVIENDA
02.03.02 EXCAVACION EN MATERIAL SUELTO (CASETA SS.HH. 82
2.04 VIVIENDA)
SISTEMA DE TRATAMIENTO EN VIVIENDA INDIVIDUAL
DE PERCOLACION
UN) (SISTEMA TRATAMIENTO
02.04.02 POZA
EXCAVACION
EN MATERIAL (23
SUELTO
2.06 FAMILIAR)
CAMARA DISTRIBUIDORA A TANQUE SEPTICO
02.06.02 EXCAVACION EN MATERIAL SUELTO
2.07 TANQUE SEPTICO SISTEMA N 1
02.07.03 ELIMINACION DE MATERIAL EXCEDENTE (TANQUE SEPTICO
2.08 SISTEMA
TANQUE 1)
SEPTICO SISTEMA N 2 Y 4
02.08.03 ELIMINACION DE MATERIAL EXCEDENTE (TANQUE SEPTICO
2 Y 4) SISTEMA N 3
2.09 SISTEMA
TANQUE SEPTICO
02.09.03 ELIMINACION DE MATERIAL EXCEDENTE
2.10 CAMARA DE REGISTRO CAMBIO DE DIRECCION (07 un)
02.10.02 EXCAVACION EN ROCA SUELTA
2.11 CAMARA DE DISTRIBUCION A POSOS PERCOLADORES (04
02.11.02 UND)
EXCAVACION EN MATERIAL SUELTO
2.12 POZO PERDOLADOR SISTEMA N 1
02.12.03 ELIMINACION DE MATERIAL EXCEDENTE POSO PERCOLADOR
N 1
2.13 SISTEMA
POZO PERDOLADOR
SISTEMA N 2 Y 4
02.13.03 ELIMINACION DE MATERIAL EXCEDENTE POSO PERCOLADOR
N 2 Y 4
2.14 SISTEMA
POZO PERDOLADOR
SISTEMA N 3
02.14.03 ELIMINACION DE MATERIAL EXCEDENTE POSO PERCOLADOR
SISTEMA
3
TOTAL N
APORTE
COMUNAL

COSTO TOTAL
80,111.28
57,659.10
10,453.94
7,341.25
72,472.82
6,550.71
3,072.28
2,157.50
21,298.84
1,713.62
10,271.56
7,534.54
182.80
553.09
410.94
152.81
211.26
186.40
3,035.32
1,859.12
324.19

NTEGRAL CC. SONCCOMARCA

APORTE %

COSTO APORTE

100%

80,111.28

42%
100%
100%
100%

24,194.05
10,453.94
7,341.25
72,472.82

100%

6,550.71

100%
100%
100%

3,072.28
2,157.50
21,298.84

100%

1,713.62

100%

10,271.56

100%

7,534.54

100%

182.80

100%

553.09

100%

410.94

100%

152.81

100%

211.26

100%

186.40

100%

3,035.32

100%

1,859.12

100%

324.19
254,088.32