Escolar Documentos
Profissional Documentos
Cultura Documentos
Sampling Dates:
1. First Batch: 12th September, 2015
2. Second Batch: 14th October, 2015
3. Third Batch: 12th December, 2015
4. Fourth Batch: 18th January, 2016
Sampling Points:
1. Behind Sonargaon Hotel
2. Gulshan lake (Badda-Gulshan link Road)
3. Bonani lake
4. Overflow structure (Upstream)
pH
Sample
1
2
3
4
First
7.06
7.42
7.62
7.07
Second
Third
6.92
7.18
7.36
6.91
7.69
7.68
7.72
Fourth
8.15
7.56
7.79
7.85
First
0.15
0.10
0.31
0.13
Second
First
44.8
44.2
27.2
65.0
Second
Third
0.30
1.03
3.35
0.30
0.70
0.20
1.30
Fourth
6.14
4.56
3.41
3.25
Turbidity ()
Sample
1
2
3
4
Third
41.3
48.4
30.7
29.6
27.4
26.7
22.0
Fourth
7.91
35.8
57.6
40.9
Ammonia ()
Sample
1
2
3
4
First
21.125
12.875
10.000
23.375
Second
17.875
18.500
13.625
16.750
Third
22.250
21.500
20.250
Fourth
12.000
14.250
19.250
18.250
Phosphate ()
Sample
1
2
3
4
First
11.1
5.4
3.7
9.0
Second
First
Second
Third
5.1
4.7
3.7
4.9
Fourth
5.7
2.3
2.6
4.6
3.2
3.4
4.3
Nitrate ()
Sample
1
2
3
4
0.5
0.4
0.4
0.6
Third
0.5
0.5
0.5
0.9
Fourth
0.4
0.3
0.3
0.4
0.2
0.2
0.3
COD ()
Sample
1
2
3
4
First
159
90
71
285
Second
First
Second
Third
125
96
64
130
Fourth
86
78
72
58
65
69
67
BOD ()
Sample
1
2
3
4
90
30
16
88
Third
4
32.5
24
20
32.5
30
37.5
Fourth
30
34.5
36
48.5