Você está na página 1de 6

Modul SIKIPAS

SIstem Komunal Instalasi Pengolahan Anaerobik Sampah


SIKIPAS Modul
Anaerobic Solid Waste Communal System Facility

MERUPAKAN HASIL REKAYASA RANCANG BANGUN PUTRA-PUTRI


INDONESIA DI LINGKUNGAN KEMENTERIAN PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT, DALAM TEKNOLOGI PENGOLAHAN SAMAPAH.
DIKERJAKAN DENGAN PENUH KOMPETENSI, INTEGRASI, KOMITMEN, DAN
ETOS, SEHINGGA BERHASIL MEWUJUDKAN INFRASTRUKTUR PENGOLAHAN
SAMPAH YANG MENGUNAKAN PROSES BIOLOGIS-ANAEROBIK FASE
GANDA, SEBAGAI SALAH SATUPROSES PENGOLAHAN SAMPAH YANG
TERDEPAN DAN TERBARU DI DUNIA PADA MASANYA.
MODUL SIKIPAS MERUPAKAN CIKAL BAKAL LAHIRNYA BERBAGAI INOVASI
TEKNOLOGI PENGOLAHAN SAMPAH YANG AKAN TERUS DILAHIRKAN DARI
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT.

Outcome of Committed Young Indonesian Research on Solid Waste Processing Technology in


Ministry of Housing and Public Works toward better solid waste infrastructure by applying the
most recent technology of double biological anaerobic process. The innovated facility will enact
and leverage a further innovation on solid waste processing in Indonesia

Kapasitas Operasi
Jenis Sampah
Proses
Durasi/Waktu Detensi
Potensi Produk Olahan

Spesifikasi Proses
1m3/hari ; 0,6ton/hari ; 400KK/hari ; 2.000 jiwa/hari
Sampah Organik Tercacah
Kombinasi Anaerobik dan Aerobik
20 hari (anaerobik) + 20 hari (aerobik)
Kompos Padat (300kg) , Komposisi Cair (150 liter),

Potensi Konversi Energi

Dan Gas Bio (97,5m3)


121,8 kwh (netto) = kebutuhan energi rata-rata

Potensi Penurunan

(di indonesia) untuk 1 rumah dalam 10 hari


825,6 kg CO2(eq)/hari

Emisi Gas rumah Kaca


Luas Lahan
Biaya Pengolahan

1.350m2 (termasuk untuk area daur ulang dan perkantoran)


Rp. 7.500,-/KK/bulan

Capacity
Type of Waste
Process
Duration/Detention Time
Potential Processed

Technical Specification
1m3/day ; 0,6ton/day ; 400HH/day ; 2.000 people/day
Finely Chopped Organic Solid Waste
Combined Aerobic and Anaerobic
20 days (anaerobic) + 20 days (aerobic)
Solid Organic Compost (300kg) , Liquid Organic (150 liter),

Product
Converted Energy

and Biogas (97,5m3)


121,8 kwh (netto) = average energy demand

Potential
Potential Emission

(in Indonesia) for 1 HH in 10 day


825,6 kg CO2(eq)/day

Reduction
Required Space
Operation Cost

1.350m2 (including the recycle processing and office)


Rp. 7.500,-/HH/month

Modul SIKIPAS di Kompleks Kopassus Cijantung


Installed SIKAPAS in Military Housing Comples Cijantung

(Gambar)

Kapasitas 1m3 sampah organik tercacah / hari


Capacity: 1 m3 copped solid waste/day

Modul SIKIPAS di Lapas Kelas I Cipinang


Installed SIKIPAS at Cipinang

(Gambar)

Kapasitas 1m3 sampah organik tercacah / hari


Capacity: 1 m3 copped solid waste/day

ACHIEVEMENTS
Period
September 2011

Achievements
Directorate of Sanitation of Human Settlement planned to improve
the performance of reuse, reduce, recycle (3R) temporary solid

January 2012

disposal sites, applying solid waste anaerobic processing


Named Modul SIKIPAS and the design prototype was exhibited in

February 2012

MDG Exhibition at Balai Kartini, Jakarta


Design prototype was exhibited in Gerakan Ciliwung Bersih in

May 2012

Jakarta
Design prototype was exhibited in Pameran Hari Air Sedunia di

September 2012

Kementerian Pekerjaan Umum, Jakarta


SIKIPAS physical completion and handed over to Kompleks

October 2012

Perumahan KOPASSUS Cijantung, Jakarta


Design prototype was exhibited in Asian Pacific Landfill

December 2013

Symposium (APLAS) Bali 2012


SIKIPAS physical completion and handed over to Lapas Kelas I

May 2014

Cipinang, Jakarta
Design prototype was exhibited in Pameran Hari Air Sedunia di

Agustus 2014

Kementerian Pekerjaan Umum, Jakarta


Design prototype was exhibited in 24th EAROPH (Eastern Regional
Organization for Planning and Human Settlements) World Congress,

25 September 2014

Jakarta
Memperoleh Penghargaan Juara Kedua untuk kategori Teknologi
Tepat Guna dalam Karya Konstruksi Indonesia 2014, yang
diserahkan oleh Menteri Pekerjaan Umum, Dr. (HC) Djoko
Kirmanto