Você está na página 1de 1

ANALISA - AIR

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NO. PAKET KONTRAK

#REF!

NAMA PAKET
KABUPATEN
SATUAN PEMBAYARAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:
:
:

3.11
Gorontalo
3.16
Pintu Bendung 100 Cm
Bh

KOMPONEN

A.

TENAGA

1.
2.
3.

Pekerja
Tukang
Mandor

(L01)
(L02)
(L03)

SATUAN

Jam
Jam
Jam

PERKIRAAN KUANTITAS
:
TOTAL HARGA (Rp.) :
% THD. BIAYA PROYEK
:

PERKIRAAN
KUANTITAS

784.0000
196.0000

HARGA
SATUAN
(Rp.)

11,428.57
15,714.29

JUMLAH HARGA TENAGA


B.

BAHAN

1
2
3
4
5

Besi
Besi Plat
Besi Siku
Bout
Cat

Kg
Kg
Kg
Bh
Kg

37.7071
21.7000
72.5760
12.0000
1.0000

16,500.00
17,600.00
3,300.00
63,525.00

JUMLAH HARGA BAHAN


C.

PERALATAN

1.

Alat Bantu

D.
E.
F.

Ls

1.0000

363.00

#REF!
#REF!
#REF!

JUMLAH
HARGA
(Rp.)

8,960,000.00
3,080,000.00

12,040,000.00

358,050.00
1,277,337.60
39,600.00
63,525.00

1,738,512.60

363.00

JUMLAH HARGA PERALATAN

363.00

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


OVERHEAD dan PROFIT 15.0 % x D
HARGA SATUAN PEKERJAAN ( D + E )

13,778,875.60
2,066,831.34
15,845,706.94