Escolar Documentos
Profissional Documentos
Cultura Documentos
Qda. RIO
TOROBAMBA
COORD. NORTE
(m)
COORD. ESTE
(m)
8,556,176.95
614,850.90
AREA DE
ELEVACION CUENCA2
( Km )
(msnm)
2,397.79
(0.28 P)/VA
0.90L x 0.385
H
531.06
123.30
34.33
26.66
LONGITUD DEL
CURSO PRINCIPAL
( Km )
COTA MAS
ALTA
(msnm )
DESNIVEL
(m)
PENDIENTE
(%)
FACTOR DE
FORMA
INDICE DE
COMPACID.
TIEMPO DE
CONCENTR.
(HORAS)
42.48
4,950.00
2,552.21
6.01%
0.78
1.50
3.56
Proyecto
: CREACIN DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL PATIBAMBA CCOLLPA APACORRAL, EN EL DISTRITO DE
SAN MIGUEL PROVINCIA LA MAR REGIN AYACUCHO.
Estacin
CCOCHA
Distrito
Provincia
San Miguel
La Mar
Altitud
Latitud
Regin
Ayacucho
Longitud
3060.00 msnm
-13
2
-73
53
17
43
ENE
25.40
FEB
84.30
MAR
150.40
ABR
48.20
MAY
27.20
JUN
0.00
JUL
3.20
AGO
2.50
SEP
19.50
OCT
35.00
NOV
19.20
DIC
71.00
1965
1966
111.80
35.10
63.00
45.50
109.60
82.70
65.90
20.00
5.10
75.20
0.00
0.00
2.30
5.30
23.20
0.10
26.70
12.00
16.40
146.90
39.90
64.10
39.90
100.90
1967
1968
98.30
194.80
178.80
138.80
222.30
164.20
60.70
51.70
8.60
1.70
10.30
0.00
13.30
0.00
18.10
59.20
40.40
18.20
64.20
0.00
31.80
18.20
89.50
30.20
1969
1970
132.90
323.60
148.60
93.10
153.90
121.40
96.50
47.00
3.20
65.10
15.10
1.20
0.90
1.20
15.10
20.20
36.30
65.80
65.60
93.80
87.20
0.00
193.80
98.60
1971
1972
183.40
55.90
184.40
63.30
98.40
131.80
192.20
129.40
0.00
0.00
22.60
0.00
0.00
0.00
0.00
0.00
73.80
18.60
80.90
24.90
0.00
80.40
76.30
241.90
1973
1974
1975
144.90
171.90
155.00
220.30
118.10
156.30
95.50
103.80
153.40
75.90
171.00
17.10
10.50
87.40
60.60
5.00
20.40
11.40
4.50
0.00
0.00
34.70
60.60
21.70
36.40
61.00
25.90
21.50
51.00
52.00
90.50
0.00
77.60
149.80
80.60
185.40
1976
1977
154.70
78.30
158.60
99.80
121.20
97.50
53.40
17.10
52.80
13.80
27.20
0.80
6.00
21.30
14.80
5.80
121.90
19.60
13.30
33.30
16.50
64.10
57.80
17.20
1978
1979
288.40
287.20
0.00
233.10
46.60
125.50
0.00
139.40
0.00
0.00
9.10
0.00
0.00
104.70
0.00
12.10
18.50
38.20
125.20
17.40
62.40
115.50
66.30
58.00
1980
1981
52.50
177.40
75.80
247.30
98.10
59.80
10.50
72.50
13.30
0.00
4.90
0.00
16.90
0.00
1.30
99.60
10.20
43.20
115.70
68.00
40.10
66.10
40.50
79.40
1982
1983
193.20
111.64
191.80
73.00
245.90
100.25
22.60
61.33
0.00
30.52
2.60
4.76
2.30
3.45
0.00
18.67
0.00
87.65
50.30
50.78
101.00
65.81
0.00
89.14
1984
1985
206.29
132.74
265.00
77.38
158.59
107.07
72.43
90.08
28.94
47.79
44.81
27.16
4.95
10.55
28.47
2.43
16.99
123.21
81.40
25.02
105.48
43.40
185.19
114.44
1986
1987
1988
181.27
194.62
201.16
266.40
96.98
133.58
211.98
80.84
116.59
95.96
45.18
219.27
33.42
33.14
18.30
0.00
12.79
0.00
10.64
12.88
0.00
64.69
27.44
0.00
74.49
24.08
16.71
48.45
51.99
46.02
40.42
69.07
38.46
112.57
114.72
112.76
1989
1990
214.88
156.07
111.55
66.27
204.33
78.41
98.48
30.34
11.67
45.83
21.19
33.79
2.99
18.67
26.14
9.33
30.24
10.45
77.94
9.33
46.58
117.61
41.54
114.25
95.40
58.06
105.67
86.62
29.40
40.98
2.99
0.00
19.14
48.82
40.79
28.19
MEDIA
P75%
1991
155.67
108.30
130.33
75.10
126.63
97.95
74.67
41.47
25.13
2.83
11.29
0.00
8.89
0.00
20.22
1.00
38.90
18.43
54.11
24.99
55.08
36.79
92.50
53.73
PE(mm)
89.54
66.08
82.60
38.72
2.81
0.00
0.00
1.00
17.88
23.99
34.63
49.11
PE(mm)
Pt ( 125 - 0.2Pt/125)
PE(mm)
125 - 0.1Pt
USDA
89.54
76.71
66.08
59.09
82.60
71.68
38.72
36.32
2.81
2.80
0.00
0.00
0.00
0.00
1.00
1.00
17.88
17.37
23.99
23.07
34.63
32.71
49.11
45.26
PP FIABLE
EMPIRICA
40.98
60.81
21.06
37.57
34.77
53.57
23.17
15.73
-7.74
-3.59
-10.00
-5.00
-10.00
-5.00
-9.20
-4.50
4.74
4.21
9.99
7.49
19.43
13.40
32.99
22.61
Millan, 2000
CUADRO N 2
CORRECCION DE LOS PERIODOS DUDOSOS DE LA SERIE HIDROLOGICA
A) DATOS SIN CORREGIR:
AO
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
ENE
25.4
111.8
35.1
98.3
194.8
132.9
323.6
183.4
55.9
144.9
171.9
155.0
154.7
78.3
288.4
287.2
52.5
177.4
193.2
111.6
206.3
132.7
181.3
194.6
201.2
214.9
156.1
95.4
FEB
84.3
63.0
45.5
178.8
138.8
148.6
93.1
184.4
63.3
220.3
118.1
156.3
158.6
99.8
0.0
233.1
75.8
247.3
191.8
73.0
265.0
77.4
266.4
97.0
133.6
111.5
66.3
58.1
MAR
150.4
109.6
82.7
222.3
164.2
153.9
121.4
98.4
131.8
95.5
103.8
153.4
121.2
97.5
46.6
125.5
98.1
59.8
245.9
100.3
158.6
107.1
212.0
80.8
116.6
204.3
78.4
105.7
ABR
48.2
65.9
20.0
60.7
51.7
96.5
47.0
192.2
129.4
75.9
171.0
17.1
53.4
17.1
0.0
139.4
10.5
72.5
22.6
61.3
72.4
90.1
96.0
45.2
219.3
98.5
30.3
86.6
MAY
27.2
5.1
75.2
8.6
1.7
3.2
65.1
0.0
0.0
10.5
87.4
60.6
52.8
13.8
0.0
0.0
13.3
0.0
0.0
30.5
28.9
47.8
33.4
33.1
18.3
11.7
45.8
29.4
JUN
0.0
0.0
0.0
10.3
0.0
15.1
1.2
22.6
0.0
5.0
20.4
11.4
27.2
0.8
9.1
0.0
4.9
0.0
2.6
4.8
44.8
27.2
0.0
12.8
0.0
21.2
33.8
41.0
204
n1 =
63.01
Media
65.04
D. Stand
4230.5
Var. 1 =
132
n2 =
70.91
Media
66.1830
D. Stand
Var. 2 = 4380.2
Datos Confiables
Datos Dudosos
CORRECCION:
X ' ( t )=
Xt X2
S 2( x )
S 1 ( x )+ X 1
JUL
3.2
2.3
5.3
13.3
0.0
0.9
1.2
0.0
0.0
4.5
0.0
0.0
6.0
21.3
0.0
104.7
16.9
0.0
2.3
3.5
4.9
10.5
10.6
12.9
0.0
3.0
18.7
3.0
AGO
2.5
23.2
0.1
18.1
59.2
15.1
20.2
0.0
0.0
34.7
60.6
21.7
14.8
5.8
0.0
12.1
1.3
99.6
0.0
18.7
28.5
2.4
64.7
27.4
0.0
26.1
9.3
0.0
SEP
19.5
26.7
12.0
40.4
18.2
36.3
65.8
73.8
18.6
36.4
61.0
25.9
121.9
19.6
18.5
38.2
10.2
43.2
0.0
87.7
17.0
123.2
74.5
24.1
16.7
30.2
10.5
19.1
OCT
35.0
16.4
146.9
64.2
0.0
65.6
93.8
80.9
24.9
21.5
51.0
52.0
13.3
33.3
125.2
17.4
115.7
68.0
50.3
50.8
81.4
25.0
48.4
52.0
46.0
77.9
9.3
48.8
NOV
19.2
39.9
64.1
31.8
18.2
87.2
0.0
0.0
80.4
90.5
0.0
77.6
16.5
64.1
62.4
115.5
40.1
66.1
101.0
65.8
105.5
43.4
40.4
69.1
38.5
46.6
117.6
40.8
DIC
71.0
39.9
100.9
89.5
30.2
193.8
98.6
76.3
241.9
149.8
80.6
185.4
57.8
17.2
66.3
58.0
40.5
79.4
0.0
89.1
185.2
114.4
112.6
114.7
112.8
41.5
114.3
28.2
TOTAL
485.9
503.8
587.8
836.3
677.0
949.1
931.0
912.0
746.2
889.5
925.8
916.4
798.2
468.6
616.5
1131.1
479.8
913.3
809.7
697.0
1198.5
801.3
1140.3
763.7
902.8
887.5
690.4
556.1
Donde:
X't =
Xt =
X1, X2 =
S1, S2 =
B) DATOS CORREGIDOS:
AO
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
ENE
18.3
103.2
27.8
89.9
184.8
123.9
311.3
173.6
48.3
135.7
162.3
145.7
145.4
70.3
276.8
275.6
44.9
167.7
183.2
103.0
196.1
123.8
171.5
184.6
191.0
204.5
146.7
87.1
FEB
76.2
55.2
38.0
169.0
129.7
139.4
84.8
174.5
55.5
209.8
109.4
146.9
149.2
91.4
6.7
222.4
67.8
236.4
181.8
65.1
253.8
69.4
255.1
88.6
124.6
102.9
58.5
50.4
MAR
141.1
101.0
74.6
211.8
154.7
144.6
112.6
90.0
122.9
87.2
95.3
144.1
112.4
89.1
39.1
116.7
89.7
52.1
235.0
91.8
149.2
98.5
201.7
72.8
107.9
194.1
70.4
97.2
ABR
40.7
58.1
13.0
53.0
44.1
88.2
39.5
182.2
120.5
67.9
161.4
10.1
45.8
10.1
6.7
130.3
3.6
64.6
15.5
53.6
64.5
81.8
87.6
37.7
208.8
90.1
23.1
78.5
MAY
20.1
1.7
67.2
1.8
5.0
3.5
57.3
6.7
6.7
3.6
79.2
52.9
45.2
6.9
6.7
6.7
6.4
6.7
6.7
23.3
21.8
40.3
26.2
25.9
11.3
4.8
38.4
22.2
JUN
6.7
6.7
6.7
3.4
6.7
8.2
5.5
15.5
6.7
1.8
13.4
4.5
20.1
5.9
2.3
6.7
1.9
6.7
4.1
2.0
37.4
20.0
6.7
5.9
6.7
14.1
26.5
33.6
JUL
3.5
4.4
1.5
6.4
6.7
5.8
5.5
6.7
6.7
2.3
6.7
6.7
0.8
14.3
6.7
96.2
9.9
6.7
4.4
3.3
1.8
3.7
3.8
6.0
6.7
3.7
11.7
3.7
AGO
4.2
16.1
6.6
11.1
51.5
8.2
13.2
6.7
6.7
27.4
52.9
14.6
7.9
1.0
6.7
5.2
5.4
91.2
6.7
11.7
21.3
4.3
56.9
20.3
6.7
19.0
2.5
6.7
SEP
12.5
19.6
5.1
33.0
11.2
29.0
58.0
65.9
11.6
29.1
53.3
18.8
113.1
12.6
11.5
30.9
3.3
35.8
6.7
79.5
10.0
114.4
66.5
17.0
9.7
23.0
3.6
12.1
OCT
27.7
9.4
137.7
56.4
6.7
57.8
85.5
72.8
17.8
14.5
43.4
44.4
6.4
26.0
116.4
10.4
107.0
60.2
42.8
43.2
73.3
17.9
40.9
44.4
38.5
69.9
2.5
41.3
NOV
12.2
32.5
56.3
24.6
11.2
79.0
6.7
6.7
72.3
82.3
6.7
69.6
9.5
56.3
54.6
106.8
32.7
58.3
92.6
58.0
97.0
36.0
33.0
61.2
31.1
39.1
108.9
33.4
DIC
63.1
32.5
92.5
81.3
23.0
183.8
90.2
68.3
231.1
140.5
72.5
175.5
50.1
10.2
58.5
50.3
33.1
71.4
6.7
80.9
175.3
105.8
104.0
106.1
104.1
34.1
105.6
21.0
MEDIA
P75%
146.31
99.76
121.88
67.13
117.77
89.59
67.18
34.08
21.61
6.61
10.22
5.25
8.79
3.73
17.59
6.65
32.03
11.43
46.98
17.88
48.88
29.48
84.70
46.13
PE(mm)
83.84
59.92
76.74
32.22
6.54
5.21
3.71
6.58
11.22
17.37
28.09
42.73
USDA
PP FIABLE
EMPIRICA
PE(mm)
Pt ( 125 - 0.2Pt/125)
PE(mm)
125 - 0.1Pt
83.84
59.92
76.74
32.22
72.59
54.17
67.32
30.56
35.86
54.83
43.70
31.99
29.75
47.71
17.26
12.04
6.54
6.47
5.21
5.17
3.71
3.68
-4.72
-1.70
-5.80
-2.37
-7.02
-3.14
6.58
11.22
17.37
28.09
42.73
6.51
11.02
16.89
26.83
39.81
-4.68
-1.67
-0.86
0.72
4.30
3.94
13.59
9.74
26.91
18.07
TOTAL
426.3
440.5
527.0
741.8
635.3
871.3
870.2
869.6
706.6
802.1
856.4
833.8
705.9
394.1
592.5
1058.2
405.9
857.5
786.1
615.4
1101.4
715.9
1053.9
670.5
847.2
799.6
598.4
487.2
Proyecto
: CREACIN DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL PATIBAMBA CCOLLPA APACORRAL, EN EL DISTRITO DE SAN MIGUEL PROVINCIA LA MAR REGIN
AYACUCHO.
Estacin
Distrito
Provincia
Regin
CCOCHA
San Miguel
La Mar
Ayacucho
Altitud
Latitud
Longitud
3060.0
-13
-73
msnm
2
53
17
43
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC
ANUAL
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
10.67
11.28
10.85
11.05
12.62
11.59
11.27
11.15
11.77
11.95
11.99
11.72
11.25
10.67
11.28
10.85
11.05
12.62
11.59
11.27
11.15
11.77
11.95
11.99
11.72
11.25
10.85
10.76
10.79
10.58
10.51
12.69
10.99
11.02
11.31
10.81
11.32
11.24
12.26
11.37
10.76
10.79
10.58
10.51
12.69
10.99
11.02
11.31
10.81
11.32
11.24
12.26
11.37
10.58
10.45
10.55
10.99
10.65
12.24
11.04
10.69
11.12
11.04
10.95
7.22
11.52
12.70
10.45
10.55
10.99
10.79
10.58
10.51
12.69
10.99
10.79
10.58
10.51
12.69
10.99
11.02
10.29
10.36
10.32
9.69
11.38
10.52
9.90
9.71
10.61
1.72
10.66
11.08
11.10
10.29
10.36
10.32
10.55
10.99
10.65
12.24
11.04
10.55
10.99
10.65
12.24
11.04
10.69
9.33
8.15
8.76
8.63
8.97
9.21
9.18
9.18
9.37
1.32
9.13
6.03
10.42
9.33
8.15
8.76
10.36
10.32
9.69
11.38
10.52
10.36
10.32
9.69
11.38
10.52
9.90
7.18
7.84
6.68
6.53
8.19
7.30
8.36
7.93
8.79
8.17
7.51
-0.58
7.30
8.36
7.93
8.79
8.15
8.76
8.63
8.97
9.21
8.15
8.76
8.63
8.97
9.21
9.18
S/D
8.20
7.27
7.19
7.66
7.13
7.66
7.88
7.75
7.93
7.85
8.37
7.13
7.66
7.88
7.75
7.84
6.68
6.53
8.19
7.30
7.84
6.68
6.53
8.19
7.30
8.36
9.37
8.85
9.07
7.99
9.35
7.80
9.13
7.73
9.06
16.10
8.55
9.37
7.80
9.13
7.73
9.06
8.20
7.27
7.19
7.66
7.13
8.20
7.27
7.19
7.66
7.13
7.66
10.48
9.07
9.12
10.07
9.86
9.78
10.32
9.89
10.01
10.40
10.42
10.48
9.78
10.32
9.89
10.01
8.85
9.07
7.99
9.35
7.80
8.85
9.07
7.99
9.35
7.80
9.13
14.02
11.05
10.52
11.26
11.09
10.18
10.66
11.33
11.84
10.96
12.27
14.02
10.18
10.66
11.33
11.84
9.07
9.12
10.07
9.86
9.78
9.07
9.12
10.07
9.86
9.78
10.32
12.75
11.21
10.87
11.51
11.19
10.99
10.78
11.50
11.91
12.81
12.72
12.75
10.99
10.78
11.50
11.91
11.05
10.52
11.26
11.09
10.18
11.05
10.52
11.26
11.09
10.18
10.66
11.55
10.36
10.79
12.41
11.37
10.95
10.91
11.64
12.06
10.97
11.43
11.55
10.95
10.91
11.64
12.06
11.21
10.87
11.51
11.19
10.99
11.21
10.87
11.51
11.19
10.99
10.78
10.62
9.81
9.65
9.79
10.55
9.79
9.99
10.03
10.42
9.55
10.08
9.88
10.08
9.94
9.92
10.24
9.80
9.96
9.72
10.41
9.78
9.89
9.79
9.77
10.55
9.80
9.93
1991
12.70
11.90
11.31
11.12
9.71
9.18
7.93
7.88
7.73
9.89
11.33
11.50
10.18
MEDIA
11.5
11.2
10.9
10.4
9.2
7.9
7.6
8.4
9.4
10.7
11.3
11.3
10.0
Proyecto
: CREACIN DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL PATIBAMBA CCOLLPA APACORRAL, EN EL DISTRITO DE SAN MIGUEL PROVINCIA LA MAR
REGIN AYACUCHO.
Estacin
Distrito
Provincia
Regin
CCOCHA
San Miguel
La Mar
Ayacucho
Altitud
Latitud
Longitud
3060.0
-13
-73
msnm
2
53
17
43
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
20.00
22.00
19.60
21.10
19.20
23.60
22.20
21.80
22.40
21.00
22.00
19.60
22.00
19.60
21.10
19.20
23.60
22.20
21.80
22.40
21.00
18.60
23.60
22.20
21.80
22.40
21.00
19.80
19.80
21.00
20.50
19.70
20.00
19.10
19.70
21.30
20.60
19.80
21.00
19.80
21.00
20.50
19.70
20.00
19.10
19.70
21.30
20.60
19.20
20.00
19.10
19.70
21.30
20.60
20.90
19.60
20.80
19.40
17.80
19.60
19.20
20.00
20.20
20.00
19.60
20.80
19.60
20.80
19.40
17.80
19.60
19.20
20.00
20.20
20.00
17.80
19.60
19.20
20.00
20.20
20.00
19.00
20.20
21.80
18.40
19.00
19.10
19.00
20.60
20.40
20.20
20.20
21.80
20.20
21.80
18.40
19.00
19.10
19.00
20.60
20.40
20.20
19.00
19.10
19.00
20.60
20.40
20.20
19.20
19.00
21.60
18.70
19.20
18.80
20.10
20.40
22.40
20.00
19.00
21.60
19.00
21.60
18.70
19.20
18.80
20.10
20.40
22.40
20.00
19.40
18.80
20.10
20.40
22.40
20.00
18.80
20.20
19.40
19.90
18.00
19.50
20.20
19.20
20.60
19.60
20.20
19.40
20.20
19.40
19.90
18.00
19.50
20.20
19.20
20.60
19.60
18.80
19.50
20.20
19.20
20.60
19.60
20.00
19.80
19.80
18.20
17.70
18.70
21.60
19.50
21.40
18.60
19.80
19.80
19.80
19.80
18.20
17.70
18.70
21.60
19.50
21.40
18.60
19.00
18.70
21.60
19.50
21.40
18.60
19.20
19.00
21.20
19.60
21.00
18.80
18.80
19.60
22.40
20.60
19.00
21.20
19.00
21.20
19.60
21.00
18.80
18.80
19.60
22.40
20.60
20.00
18.80
18.80
19.60
22.40
20.60
21.80
22.40
22.40
21.50
21.60
22.40
22.00
21.30
22.20
21.80
22.40
22.40
22.40
22.40
21.50
21.60
22.40
22.00
21.30
22.20
21.80
20.70
22.40
22.00
21.30
22.20
21.80
22.20
23.00
24.00
19.70
21.20
22.00
23.40
22.00
23.00
22.20
23.00
24.00
23.00
24.00
19.70
21.20
22.00
23.40
22.00
23.00
22.20
24.20
22.00
23.40
22.00
23.00
22.20
22.90
22.40
24.40
23.00
23.50
22.20
23.20
22.40
23.60
21.60
22.40
24.40
22.40
24.40
23.00
23.50
22.20
23.20
22.40
23.60
21.60
23.00
22.20
23.20
22.40
23.60
21.60
21.60
24.00
23.00
21.00
22.80
22.80
22.00
20.70
23.60
22.00
24.00
23.00
24.00
23.00
21.00
22.80
22.80
22.00
20.70
23.60
22.00
S/D
22.80
22.00
20.70
23.60
22.00
1991
21.60
20.80
20.00
18.80
19.60
19.60
20.20
22.40
19.40
22.00
23.80
24.40
MEDIA
21.4
20.2
19.7
19.8
20.0
19.6
19.6
20.1
21.8
22.5
22.9
22.5
Proyecto
: CREACIN DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL PATIBAMBA CCOLLPA APACORRAL, EN EL DISTRITO DE SAN MIGUEL PROVINCIA LA MAR
REGIN AYACUCHO.
Estacin
CCOCHA
Distrito
Provincia
San Miguel
La Mar
Altitud
Latitud
-13
17
Regin
Ayacucho
Longitud
-73
53
43
3060 msnm
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC
1964
1.40
1.80
1.70
-3.30
-5.60
-10.60
-7.80
-3.20
-3.60
-3.80
-2.40
0.00
1965
1966
-0.40
1.80
-1.40
3.00
-0.20
2.00
-0.80
0.20
-5.20
-4.00
-8.40
-4.00
-8.20
-5.40
-3.40
-3.80
-5.00
-6.00
-3.20
-0.40
-2.20
-4.40
1.20
-2.00
1967
1968
2.00
3.00
1.00
2.70
1.80
2.00
0.60
0.50
-3.40
-2.20
-6.80
-4.10
-5.50
-4.20
-4.80
-3.60
-5.40
-3.00
-1.40
0.20
-3.20
-4.30
1.00
1.50
1969
1970
3.50
-2.60
3.00
3.40
4.20
1.20
-3.10
-0.60
-4.50
-1.60
-3.80
-4.00
-2.90
-4.20
-7.00
-4.80
-1.80
-0.80
-2.30
-0.60
-0.80
1.60
0.00
2.20
1971
1972
1.00
0.00
4.40
1.00
2.80
1.80
-2.00
-1.00
-3.20
-5.00
-4.20
-6.30
-6.20
-6.60
-4.20
-6.60
-4.50
-2.20
-3.90
-0.20
-2.80
-0.60
1.90
2.60
1973
1974
1975
1.00
-0.60
1.20
1.60
1.20
-6.40
2.80
3.00
3.80
-3.40
0.00
S/D
-6.20
0.00
S/D
-8.00
-7.00
S/D
-4.20
-8.40
S/D
-5.20
-5.80
S/D
-3.20
-5.00
S/D
-2.00
-4.80
S/D
-4.80
-5.20
S/D
0.40
-1.00
1.10
1976
1977
1.40
-0.40
1.80
-1.40
1.70
-0.20
-3.30
-0.80
-5.60
-5.20
-10.60
-8.40
-7.80
-8.20
-3.20
-3.40
-3.60
-5.00
-3.80
-3.20
-2.40
-2.20
0.00
1.20
1978
1979
1.00
-0.60
1.60
1.20
2.80
3.00
-3.40
0.00
-6.20
0.00
-8.00
-7.00
-4.20
-8.40
-5.20
-5.80
-3.20
-5.00
-2.00
-4.80
-4.80
-5.20
0.40
-1.00
1980
1981
1.20
1.40
-6.40
1.80
3.80
1.70
S/D
-3.30
S/D
-5.60
S/D
-10.60
S/D
-7.80
S/D
-3.20
S/D
-3.60
S/D
-3.80
S/D
-2.40
-1.00
0.00
1982
1983
-0.40
1.80
-1.40
3.00
-0.20
2.00
-0.80
0.20
-5.20
-4.00
-8.40
-4.00
-8.20
-5.40
-3.40
-3.80
-5.00
-6.00
-3.20
-0.40
-2.20
-4.40
1.20
-2.00
1984
1985
2.00
3.00
1.00
2.70
1.80
2.00
0.60
0.50
-3.40
-2.20
-6.80
-4.10
-5.50
-4.20
-4.80
-3.60
-5.40
-3.00
-1.40
0.20
-3.20
-4.30
1.00
-1.50
1986
1987
2.00
3.00
1.00
2.70
1.80
2.00
0.60
0.50
-3.40
-2.20
-6.80
-4.10
-5.50
-4.20
-4.80
-3.60
-5.40
-3.00
-1.40
0.20
-3.20
-4.30
1.00
-1.20
1988
1989
1990
0.00
1.00
-0.60
1.00
1.60
1.20
1.80
2.80
3.00
-1.00
-3.40
0.00
-5.00
-6.20
0.00
-6.30
-8.00
-7.00
-6.60
-4.20
-8.40
-6.60
-5.20
-5.80
-2.20
-3.20
-5.00
-0.20
-2.00
-4.80
-0.60
-4.80
-5.20
2.60
0.40
-1.00
1991
1.20
-6.40
3.80
-3.10
-4.50
-3.80
-2.90
-7.00
-1.80
-2.30
-0.80
-1.40
MEDIA
1.01
0.73
2.16
-1.14
-3.83
-6.58
-5.97
-4.68
-3.88
-2.13
-3.04
0.27
: CCOCHAS
: 13 02' 17" S
: 73 53' 43" W
: 3060.0 msnm
: REGISTROS DE 1961 A 1991
: DIRECCION REGIONAL AGRARIA - AYACUCHO
VARIABLE METEOROLOGICA
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SET
OCT
NOV
DIC
ANUAL
1.01
0.73
2.16
-1.14
-3.83
-6.58
-5.97
-4.68
-3.88
-2.13
-3.04
0.27
-2.26
21.38
20.17
19.69
19.84
20.03
19.61
19.61
20.14
21.84
22.46
22.93
22.51
20.85
11.50
11.21
10.95
10.39
9.22
7.93
7.58
8.45
9.39
10.69
11.30
11.26
9.99
146.31
121.88
117.77
67.18
21.61
10.22
8.79
17.59
32.03
46.98
48.88
84.70
60.33
PRECIPITACION EFECTIVA
83.84
59.92
76.74
32.22
6.54
5.21
3.71
6.58
11.22
17.37
28.09
42.73
31.18
: Torobamba
: Ayacucho
: Huamanga
: San Miguel
: Patibmaba
AO
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
ENE
150.58
849.83
229.08
740.57
1,521.56
1,020.59
2,563.95
1,429.29
397.42
1,117.71
1,336.22
1,199.45
1,197.02
578.71
2,279.07
2,269.36
369.90
1,380.73
1,508.61
848.53
1,614.55
1,019.26
1,412.09
1,520.12
1,573.00
1,684.05
1,208.12
717.08
FEB
627.27
454.88
313.25
1,392.07
1,068.34
1,147.65
698.48
1,437.39
457.31
1,727.93
900.81
1,209.97
1,228.58
752.71
54.99
1,831.52
558.47
1,946.44
1,497.28
535.77
2,089.72
571.28
2,101.05
729.92
1,026.06
847.77
481.38
414.90
MAR
1,162.22
832.02
614.32
1,744.12
1,273.91
1,190.55
927.52
741.38
1,011.69
717.91
785.08
1,186.50
925.90
734.09
322.15
960.70
738.95
428.98
1,935.11
756.36
1,228.52
811.51
1,660.63
599.23
888.57
1,598.68
579.59
800.18
ABR
335.10
478.35
106.88
436.27
363.43
726.00
325.39
1,500.51
992.26
559.28
1,328.94
83.41
377.19
83.41
54.99
1,073.20
29.99
531.77
127.92
441.34
531.24
674.02
721.61
310.65
1,719.55
742.01
190.53
646.07
MAY
165.15
13.71
553.62
14.62
41.23
29.09
471.88
54.99
54.99
29.99
652.35
435.46
372.33
56.70
54.99
54.99
52.65
54.99
54.99
192.05
179.20
331.80
215.46
213.20
93.08
39.45
315.94
182.98
JUN
54.99
54.99
54.99
28.37
54.99
67.22
45.27
127.92
54.99
14.52
110.11
37.28
165.15
48.51
18.66
54.99
15.33
54.99
33.94
16.46
307.63
164.85
54.99
48.51
54.99
116.50
218.49
276.66
JUL
29.09
36.37
12.09
52.65
54.99
47.70
45.27
54.99
54.99
18.57
54.99
54.99
6.43
117.40
54.99
792.36
81.79
54.99
36.37
27.03
14.95
30.38
31.14
49.27
54.99
30.81
96.10
30.81
AGO
34.75
132.78
54.18
91.50
424.13
67.22
108.50
54.99
54.99
225.85
435.46
120.64
64.79
8.05
54.99
42.94
44.46
751.09
54.99
96.10
175.43
35.34
468.54
167.12
54.99
156.54
20.56
54.99
SET
102.83
161.10
42.13
271.98
92.31
238.80
477.54
542.29
95.55
239.60
438.70
154.63
931.57
103.64
94.74
254.17
27.56
294.64
54.99
654.38
82.51
942.20
547.86
139.92
80.24
189.78
29.62
99.88
OCT
228.27
77.74
1,133.89
464.59
54.99
475.92
704.15
599.75
146.53
119.02
357.76
365.86
52.65
214.52
958.27
85.84
881.39
495.35
352.10
355.98
603.76
147.47
337.09
365.80
317.45
575.81
20.56
340.11
NOV
100.40
267.93
463.78
202.38
92.31
650.74
54.99
54.99
595.70
677.44
54.99
573.04
78.55
463.78
450.03
879.77
269.55
479.97
762.42
477.60
798.67
296.30
272.12
504.04
256.26
321.98
896.88
275.14
DIC
519.63
267.93
761.61
669.35
189.43
1,513.46
743.00
562.52
1,902.74
1,157.36
597.32
1,445.48
412.80
84.22
481.59
414.42
272.79
587.61
54.99
666.46
1,443.82
871.19
856.08
873.46
857.59
281.19
869.68
173.16
ANUAL
3,510.28
3,627.63
4,339.82
6,108.46
5,231.59
7,174.94
7,165.94
7,160.99
5,819.15
6,605.18
7,052.73
6,866.69
5,812.96
3,245.73
4,879.44
8,714.25
3,342.84
7,061.54
6,473.69
5,068.07
9,069.98
5,895.60
8,678.66
5,521.23
6,976.75
6,584.57
4,927.45
4,011.95
PROM
1,204.87
1,003.69
969.87
553.26
177.92
84.15
72.37
144.85
263.76
386.88
402.56
697.53
5,961.72
Y = 2.4464 X + 2458.55
Altura Promedio de la cuanca
Factor de Correccin
X=
FC=
496.81
3673.90
8.24
CALCULO DE AFORO DEL RIO TOROBAMBA EN EL PUNTO DEL PROYECTO DE DEFENSA RIBEREA Y PUENTE
FECHA : AGOSTO, 2015
PRUEBA
N
TIRANTE MEDIO DE
AGUA (n)
ANCHO
(m)
AREA MOJADA
(m2)
DISTANCIA
(m)
V media
(m/s)
CAUDAL
(m3/s)
0.40
12.00
6.20
27.45
30
1.09
6.78
0.40
12.00
6.20
27.86
30
1.08
6.68
0.40
12.00
6.20
29.56
30
1.01
6.29
0.40
12.00
6.20
29.26
30
1.03
6.36
0.40
12.00
6.20
29.18
1.03
= 6.50 m3/s
6.37
30
Caudal promedio
TEMPERATURA
PRECIPITACION
MEDIA ANUAL (C) ANUAL
(ml)
EVAPOTRANS.
ANUAL
(ml)
ESCORRENTIA
ANUAL
(ml)
COEFICIEN. DE
ESCORRENTIA
RENDIMIENTO
(Lps/Km2)
CAUDAL MEDIO
ANUAL
(m3/s)
1964
10.62
3,510.3
616.74
2,893.54
0.82
91.73
48.712
1965
10.62
3,627.6
617.28
3,010.34
0.83
95.43
50.678
1966
10.62
4,339.8
619.72
3,720.10
0.86
117.93
62.626
1967
9.81
6,108.5
589.91
5,518.54
0.90
174.94
92.902
1968
9.65
5,231.6
582.98
4,648.60
0.89
147.36
78.257
1969
9.79
7,174.9
589.88
6,585.05
0.92
208.75
110.857
1970
10.55
7,165.9
620.39
6,545.55
0.91
207.49
110.192
1971
9.79
7,161.0
589.81
6,571.18
0.92
208.31
110.623
1972
9.99
5,819.1
596.77
5,222.37
0.90
165.55
87.917
1973
10.03
6,605.2
599.03
6,006.15
0.91
190.39
101.111
1974
10.42
7,052.7
614.89
6,437.85
0.91
204.08
108.379
1975
9.55
6,866.7
580.42
6,286.27
0.92
199.27
105.827
1976
10.08
5,813.0
600.41
5,212.55
0.90
165.24
87.751
1977
9.88
3,245.7
586.43
2,659.30
0.82
84.30
44.768
1978
10.08
4,879.4
599.16
4,280.28
0.88
135.68
72.057
1979
9.94
8,714.3
596.48
8,117.77
0.93
257.33
136.659
1980
9.92
3,342.8
588.42
2,754.42
0.82
87.32
46.370
1981
10.24
7,061.5
607.81
6,453.73
0.91
204.58
108.646
1982
9.80
6,473.7
589.90
5,883.79
0.91
186.52
99.051
1983
9.96
5,068.1
594.58
4,473.49
0.88
141.81
75.309
1984
9.72
9,070.0
587.69
8,482.29
0.94
268.89
142.796
1985
10.41
5,895.6
613.59
5,282.02
0.90
167.44
88.921
1986
9.78
8,678.7
590.11
8,088.55
0.93
256.41
136.167
1987
9.89
5,521.2
592.39
4,928.84
0.89
156.24
82.975
1988
9.79
6,976.8
589.68
6,387.07
0.92
202.47
107.524
1989
9.88
6,584.6
593.06
5,991.51
0.91
189.93
100.865
1990
10.08
4,927.4
599.24
4,328.21
0.88
137.20
72.864
1991
10.18
4,012.0
601.15
3,410.80
0.85
108.12
57.419
CUADRO N 10
REGISTRO HIDROMETRICO GENERADO
DEL RIO TOROBAMBA
RIO
:
DEPARTAMENTO :
PROVINCIA
:
DISTRITO
:
LUGAR
:
AO
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
PROM
ENE
25.075
142.465
39.670
135.158
273.123
189.225
473.116
264.957
72.052
205.316
246.404
221.826
216.839
95.785
403.874
427.064
61.573
254.921
276.990
151.304
305.029
184.477
265.866
274.138
290.912
309.563
214.379
123.154
237.482
Matarayocc
Ayacucho
Huamanga
Vinchos
Rosaspata
FEB
104.454
76.256
54.245
254.059
191.770
212.783
128.889
266.457
82.910
317.410
166.113
223.772
222.557
124.584
9.744
344.668
92.962
359.367
274.910
95.536
394.802
103.396
395.583
131.634
189.760
155.838
85.420
71.257
195.847
MAR
193.537
139.480
106.379
318.310
228.670
220.736
171.152
137.434
183.418
131.875
144.772
219.431
167.726
121.504
57.089
180.792
123.003
79.202
355.300
134.870
232.098
146.876
312.661
108.065
164.332
293.871
102.847
137.426
178.938
ABR
55.803
80.191
18.508
79.621
65.237
134.606
60.043
278.159
179.896
102.737
245.061
15.425
68.327
13.805
9.744
201.961
4.992
98.179
23.487
78.698
100.365
121.991
135.864
56.023
318.016
136.397
33.810
110.958
106.936
MAY
27.501
2.298
95.868
2.667
7.400
5.393
87.074
10.193
9.969
5.509
120.296
80.534
67.448
9.385
9.744
10.348
8.765
10.152
10.096
34.244
33.856
60.053
40.567
38.448
17.215
7.251
56.063
31.426
30.964
JUN
9.156
9.218
9.522
5.178
9.870
12.463
8.354
23.713
9.969
2.667
20.305
6.894
29.916
8.029
3.307
10.348
2.552
10.152
6.232
2.935
58.119
29.836
10.353
8.748
10.169
21.415
38.770
47.514
15.912
JUL
4.844
6.097
2.094
9.609
9.870
8.844
8.354
10.193
9.969
3.410
10.139
10.169
1.164
19.431
9.744
149.113
13.614
10.152
6.678
4.821
2.824
5.499
5.862
8.885
10.169
5.664
17.053
5.292
14.261
AGO
5.787
22.258
9.381
16.699
76.132
12.463
20.020
10.193
9.969
41.487
80.300
22.310
11.737
1.332
9.744
8.081
7.401
138.672
10.096
17.137
33.142
6.397
88.216
30.138
10.169
28.775
3.648
9.443
28.148
SET
17.124
27.007
7.296
49.637
16.570
44.274
88.119
100.527
17.323
44.014
80.897
28.597
168.752
17.154
16.788
47.832
4.588
54.398
10.096
116.685
15.587
170.530
103.150
25.233
14.840
34.885
5.257
17.154
51.715
OCT
38.013
13.033
196.353
84.791
9.870
88.240
129.934
111.179
26.566
21.863
65.973
67.662
9.538
35.506
169.815
16.153
146.713
91.455
64.648
63.476
114.066
26.691
63.467
65.968
58.709
105.846
3.648
58.412
68.008
NOV
16.719
44.916
80.312
36.935
16.570
120.651
10.146
10.193
108.000
124.442
10.139
105.978
14.229
76.763
79.749
165.561
44.868
88.616
139.985
85.163
150.889
53.627
51.235
90.899
47.393
59.187
159.149
47.254
75.905
DIC
86.530
44.916
131.886
122.160
34.003
280.607
137.102
104.278
344.965
212.601
110.148
267.327
74.778
13.939
85.342
77.988
45.407
108.489
10.096
118.840
272.774
157.678
161.182
157.519
158.604
51.688
154.323
29.739
131.663
ANUAL
48.712
50.678
62.626
92.902
78.257
110.857
110.192
110.623
87.917
101.111
108.379
105.827
87.751
44.768
72.057
136.659
46.370
108.646
99.051
75.309
142.796
88.921
136.167
82.975
107.524
100.865
72.864
57.419
90.294
CAUDAL MAXIMO
MENSUAL
1964
48.71
193.54
1965
50.68
142.47
1966
62.63
196.35
1967
92.90
318.31
1968
78.26
273.12
1969
110.86
280.61
1970
110.19
473.12
1971
110.62
278.16
1972
87.92
344.96
1973
101.11
317.41
1974
108.38
246.40
1975
105.83
267.33
1976
87.75
222.56
1977
44.77
124.58
1978
72.06
403.87
1979
136.66
427.06
1980
46.37
146.71
1981
108.65
359.37
1982
99.05
355.30
1983
75.31
151.30
1984
142.80
394.80
1985
88.92
184.48
1986
136.17
395.58
1987
82.98
274.14
1988
107.52
318.02
1989
100.87
309.56
1990
72.86
214.38
1991
57.42
137.43
PERIODO DE RETORNO
(aos)
17.00
395.58
593.37
8.50
309.56
464.34
5.67
184.48
276.72
4.25
318.02
477.03
3.40
137.43
206.15
2.83
355.30
532.95
2.43
151.30
226.95
2.13
214.38
321.57
1.89
274.14
411.21
10
1.70
142.47
213.71
11
1.55
196.35
294.53
12
1.42
193.54
290.31
13
1.31
273.12
409.68
14
1.21
318.31
477.47
15
1.13
359.37
539.06
16
1.06
394.80
592.20
* CAUDAL DE DISEO
Promedio
Mximo
Desviacin Estndar
395.45
593.37
130.87
TIRANTE RIO
(m)
COTA FONDO
(msnm)
COTA NIVEL DE
AGUA (msnm)
PERIMETRO
(m)
AREA
(m2)
RADIO
HIDRAULICO
(m)
ANCHO
VELOCIDAD (m/s)
SUPERIOR
(m)
NUMERO DE
FROUDE
708.90
1.050
2397.79
2398.84
52.000
6.200
0.119
40.000
114.34
92.72
791.84
1.050
2397.79
2398.84
52.000
6.200
0.119
40.000
127.72
103.57
874.16
1.050
2397.79
2398.84
52.000
6.200
0.119
40.000
140.99
114.34
956.18
1.050
2397.79
2398.84
52.000
6.200
0.119
40.000
154.22
125.07
1004.08
1.050
2397.79
2398.84
52.000
6.200
0.119
40.000
161.95
131.33
MALLA
PUENTE TOROBAMBA
Lecho del ro Torobamba
Sector Patibamba
11,996
gramos
11,612.7
gramos
MATERIAL RETENIDO
ABERTURA
PORCENTAJE ACUMULADOS
(mm)
GRAMOS
RETENIDO
% QUE PASA
7"
6"
137.800
112.400
2,840.00
23.67
23.67
100.00
76.33
5"
3 1/2"
3"
2 1/2"
2"
87.000
78.900
76.200
63.500
50.800
2,873.00
530.00
108.00
287.00
354.00
23.95
4.42
0.90
2.39
2.95
47.62
52.04
52.94
55.34
58.29
52.38
47.96
47.06
44.66
41.71
3/2"
1"
3/4"
1/2"
3/8"
1/4"
N 4
N 6
38.100
25.400
19.050
12.700
9.250
6.350
4.750
3.350
468.20
513.90
144.40
263.20
141.50
3.90
4.28
1.20
2.19
1.18
0.00
2.07
0.00
62.19
66.47
67.68
69.87
71.05
71.05
73.12
73.12
37.81
33.53
32.32
30.13
28.95
28.95
26.88
26.88
N 8
N 10
N 16
N 20
N 30
N 40
N 50
N 80
N 100
N 200
2.360
2.000
1.180
8.500
0.600
0.425
0.300
0.180
0.150
0.075
246.80
71.50
0.00
1.69
0.00
1.81
0.00
1.57
0.00
0.00
2.06
0.60
73.12
74.81
74.81
76.62
76.62
78.19
78.19
78.19
80.24
80.84
26.88
25.19
25.19
23.38
23.38
21.81
21.81
21.81
19.76
19.16
FONDO
0.010
15.20
0.13
80.97
19.03
LAVADO
0.010
383.30
3.20
84.16
15.84
247.80
203.20
216.90
188.10
Dm (mm) :
asumido
65.3
66.00
CUADRO N 20
CALCULO DE LA ZOCAVACION GENERAL DEL RIO TOROBAMBA (METODO DE LISCHTVAN LEBEDIEV)
Coef. Rugosidad (n)
Pendiente del ro (S)
Coef.contraccion (u)
CAUDAL
0.035
0.04
1.00
Ho
88.00
5.714
0.27
0.79
ZOCAVACION GENERAL
(m /s)
PERIODO DE RETORNO
(aos)
Beta
708.90
25
0.92
1.050
2.266
1.216
791.84
50
0.95
1.050
2.210
1.160
874.16
100
0.98
1.050
2.156
1.106
956.18
200
1.02
1.050
2.102
1.052
1,004.08
300
1.03
1.050
2.072
1.022
Hs
(m)
(m)
(m)
Zg
CUADRO N 21
CALCULO DE LA SECCION DE EQUILIBRIO DEL RIO
TOROBAMBA (METODO DE LACEY)
LUGAR:
PATIBAMBA
PERIODO DE
RETORNO
ANCHO DE LA SECCION DE
EQUILIBRIO
(m)
25
48
791.84
50
51
874.16
100
53
956.18
200
56
1004.08
300
57
: CREACIN DEL SERVICIO DE TRANSITABILIDAD DEL CAMINO VECINAL PATIBAMBA CCOLLPA APACORRAL, EN EL DISTRITO DE SAN
MIGUEL PROVINCIA LA MAR REGIN AYACUCHO.
OBRA
UBICACIN
ESTRUCTURA
Qmax=
593.37 m3/s
Luego con el caudal mximo adoptado se ingresara en la formula de Manning y se hallara el nuevo valor de la altura
de agua de mximas avenidas.
Qmax. = A * (A/P)^(2/3) * S^(1/2) / n
N
1
2
3
Q
3.25
6.50
593.37
D (m)
30.00
30.00
30.00
A
18.40
6.20
232.40
S (m/m)
0.04
0.04
0.04
n
0.04
0.04
0.04
Y
0.22
0.45
1.62
MARGEN DERECHA
COTA (m.s.n.m.)
2,398.01
2,398.24
2,399.41
MARGEN IZQUIERDA
Ba + &H
N.A.M.E. FINAL 3,324.75
REA DE RIESGO
&H
Ba
N.A.M.E. 3,323.25 m.s.n.m.
Ba
Ha+&H
Ha
h
OBSERVACIONES:
1.- Le caudal mximo que alcanzar el ro en un periodo de retorno de 100 aos es de 593.37 m3/seg.
2.- El caudal actual (Agosto 2,015) es de 6.50 m3/seg. Con un tirante medido de H=0.45m. (el agua del rio abastece gran cantidad de canales de Riego).
3.- El tirante mximo que se alcanza con el caudal mximo es de 1.62 adicionales al tirante actual, por lo que el muro de defensa riberea tendr
una altura mxima de 2.50m. Con 1.00m. De borde libre o de seguridad.
4.- la altura mxima de cimentacin es de 1.00 mts. Debido a la poca pendiente del terreno y la recomendacin del estudio geotcnico respectivo.
Pgina 20
CUADRO N 01
CURVA DE CALIBRACION DEL RIO TOROBAMBA
3000.00
2500.00
2000.00
1500.00
1000.00
500.00
0.00
650.00
700.00
750.00
800.00
850.00
900.00
950.00
1000.00
1050.00
DIAMETRO DE ARRASTRE ( cm )
GRAFICO N 02
CURVA DE CAPACIDAD DE ARRAS TRE DEL TOROBAMBA
12
10
0
0
6
C AUDAL DEL RIO ( m 3/s )
10
12
0.035
0.040
7
10
d50 (mm) =
66.00
1004
4.86
4.15
.
ANCHO BARRAJE (m)
7
10
709
4.07
3.58
791.84
4.51
3.96
114.339
1.050
127.716
1.050
709
3.499
3.409
709
-609.267
-586.900
RESIDUO = Qe - Qo
Caudales en m3/s
791.84
874.16
-679.140
-748.393
-653.840
-720.160
956.18
5.36
4.71
1004.08
5.91
5.20
154.223
1.050
161.948
1.050
956.18
3.702
3.606
1004.08
3.776
3.678
956.18
-817.347
-786.180
1004.08
-847.980
-812.937