Preparation of DPR, tender document & periodic supervision of the work of Sewerage Project in Khachrod. The Consultant is required to provide services as per following, Stage 1 Conceptual planning stage a) Carryout detailed survey and determine the drainage zones along with the locations of STPs. b) Consultant shall prepare the preliminary report and shall discuss with officials of Nagar Parishad Khachrod in regard to land availability for STPs, Coverage of Municipal area and other necessary information for preparation of DPR. Stage 2 DPR stage a) On finalization of conceptual report, preparation of Detail project report incorporating detailed designs and drawings of Sewer network and STPs along with detailed estimates and O&M cost. b) DPR shall have Soil investigation of the STP location and waste water characterization from MPPCB. c) Estimates should be prepared on schedule of items mentioned in UADD ISSOR by enforced from 10-05-2012 or latest with amendments. d) Necessary additional alteration will be done as & when required without any charges. e) Consultant shall identify the NOCs from various departments for successful execution of work. f) Submission of DPR in 5 Hard copies along with soft copy in CD. Stage 3 & 4 Tender stage a) On approval of DPR, tender document to be prepared along with preliminary Drawings sufficient to understand scope of work to the Consultant. b) Assisting Client in uploading the Tender, Replaying of Pre-Bid queries along with deciding the most responsive bid. c) Assist Client in speedy approval of Tender and appointment of Consultant along with award of work to successful bidder.
19 | P a g e
Stage 5, 6, 7 & 8 Execution stage
a) Assisting in checking design and drawings submitted by Bidder, layout, explaining detailed scope of work to the Contractor etc. b) Periodic visit the site of work, at intervals mutually agreed upon, to inspect and evaluate the construction works, and where necessary clarify and decision, offer interpretation of the drawings/specifications, attend conferences and meeting to ensure that the project proceeds generally in accordance with the conditions of contract and keep the client informed and render advise on actions, if required. Stage 9 After 6 months of completion and commissioning of the project. Starting from preparation of DPR up to successful completion of project Consultant shall render necessary assistance to Nagar Parishad Khachrod.