Escolar Documentos
Profissional Documentos
Cultura Documentos
NO HEAVY LOADS
CROSS BEAMS
PRIMARY BEAMS
U
AB kv
R /11
FO 6
E 20/6
SIT R 2 N
ED PE ATIO
OS SU ST
OP UR UB
S
PR MO
A
H
M
PLE
X
BA
RW
A
G
box-out by site
600
700
700
600
box-out by site
750
250
box-out by site
250
box-out by site
Siding by site
250
750
CO
Siding by site
Handrail clamp S
EX
IS
TIN
Handrail clamp S
KEY PLAN
Supporting head DF
3 EXTERNAL RAILINGS
4400
4 BRACING CLAMP B
-LUMBER (BY SITE) CAN BE ATTACHED TO THE
FLOOR PROPS AS A DIAGONAL BRACE USING THE
BRACING CLAMP B
3382
3732
3282
3282
3732
3732
3382
Date Received:
A - APPROVED.
B - APPROVED WITH COMMENTS.
C - REVISED & RESUBMIT.
D - REJECTED.
N - NOTED.
1075
1600
1600
1125
1000
1275
1600
1600
1275
1000
1250
1600
1600
1200
1000
REFERENCE DRAWINGS
NO HEAVY LOADS
CROSS BEAMS
PRIMARY BEAMS
DRAWING NO.
TITLE
1981-ST-B17-1-001
PLAN
1981-ST-B17-1-002
PLAN
1981-ST-B17-2-001
DETAILS
1981-ST-B17-2-002
DETAILS
1
3
2
SCALE 1 : 50A1
Handrail clamp S
Siding by site
Structural
Electrical
Mechanical
Infrastructure
4 BRACING CLAMP B
Building Coordination
600
250
700
250
Sign
Architectural
750
Name
Trade
3 EXTERNAL RAILINGS
Siding by site
750
600
Date
Handrail clamp S
Co-ordination Table
SHOP DRAWING
Supporting head DF
4400
3382
3732
PROPS MODEL
minimum
maximum
(range)
3282
3382
3732
EXTENSION
RANGE
ECO 20 250
ECO 20 300
152-250 cm
172-300 cm
ECO 20 350
ECO 20 400
EUREX 20 550
197-350 cm
227-400 cm
297-550 cm
20.05.2015
AS
REV. No.
DATE
BY
RA
JL
CH'KD APP'D
CLIENT
CONSULTANT
LEGEND :
1000
1350
1500
1500
1500
325
720
440
1500
1500
1500
1350
365
1000
350
4-WAY HEAD H20
MAIN CONTRACTOR
LEIGHTON
CONTRACTING
SUBCONTRACTOR
SCALE 1 : 50A1
ALL FLOOR PROPS HAVE TO BE PLACED CENTRALLY UNDER THE MAIN BEAMS.
PROJECT
ALL FLOOR PROPS HAVE TO BE ERECTED VERTICALLY.
NOTES :
DISTANCES BETWEEN BEAMS AND DISTANCES BETWEEN FLOOR PROPS HAVE TO CORRESPOND WITH THE DRAWING.
OVERLAPPING OF THE MAIN BEAM MEASURED FROM THE CENTRE OF THE MAIN BEAM TO THE FLOOR PROPS
WITH TRIPOD MAX. 50 CM.
Drawn:
Romeo Apolinario
20.05.2015
Drawing-No.:
Rev.:
Checked:
Jerico Lanto
20.05.2015
345-001037-1011
Scale:
Revised:
MAXIMUM ALLOWABLE
LIVE LOAD:
xx
INTERMEDIATE FLOOR PROPS WITHOUT TRIPOD SHOULD BE PLACED AT EQUAL DISTANCES BETWEEN THE FLOOR
PROPS WITH TRIPOD. THE NUMBER OF INTERMEDIATE FLOOR PROPS HAS TO BE TAKEN FROM THE DRAWING.
AS SHOWN
Safety instruction:
Do not weld or heat tie rods!
USE OF INTERMEDIATE FLOOR PROPS BY COSTUMER: THE DESIGN CONSIDERS PROPS WITH A LOAD CAPACITY
OF 20kN. THE NUMBER OF PROPS HAS TO BE INCREASED IN THE RATIO OF ITS ALLOWABLE LOAD CAPACITY.
ALL INTERMEDIATE FLOOR PROPS HAVE TO BE SECURED
AGAINST TIPPING OVER.
TO AVOID RISKS REGARDING HEALTH & SAFETY OF USERS OR THIRD PERSONS, "USER INFORMATION",
"OPERATING INSTRUCTIONS" AND "FITTING INSTRUCTIONS" HAVE TO BE NOTED IN ADDITION TO THE INFORMATION
GIVEN ON THE DRAWINGS.
IF REQUIRED ASK YOUR DOKA PARTNER FOR THESE DOCUMENTS.
SCAFFOLD BOARDS FOR PLATFORMS AND RAILING ARE TO BE PROVIDED BY SITE AND MUST BE FIXED ACCORDING
TO HEALTH & SAFETY REGULATIONS AND LOCAL LAW!
TO PROTECT THE FORMWORK SHEET AGAINST DAMAGING USE VIBRATORS WITH PROTECTIVE CAPS.
CONSTRUCTION OF KAHRAMAA
CENTRAL WORKSHOP
TITLE
DRAWING No.
GTC517-17-S-S-D-501
DATE
SHT.
REV.
6/6