Você está na página 1de 1

Safety Advice

NO HEAVY LOADS

CROSS BEAMS

PRIMARY BEAMS

U
AB kv
R /11
FO 6
E 20/6
SIT R 2 N
ED PE ATIO
OS SU ST
OP UR UB
S
PR MO
A
H

M
PLE
X
BA
RW
A
G

box-out by site

1 BRACING CHAIN OR CABLE WIRE


-PROVIDE BRACING CHAIN OR CABLE WIRE FOR
ALL CROSS BEAMS (@2.40m MAX.)
AND TO BE FIXED TO THE EXISTING CONCRETE
SLAB. [BY THE CLIENT]

600

700

700

600

box-out by site

750

250

box-out by site
250

box-out by site

Siding by site

250

750

CO

18mm thk. plywood


by site

Siding by site

Handrail clamp S

EX
IS
TIN

Handrail clamp S

KEY PLAN

2 EXTERNAL PLANKS STOPPER


-PROVIDE EXTERNAL PLANKS STOPPER OR
EQUIVALENT TO AVOID PROPS SLIDING OUTSIDE
THE BUILDING. [BY THE CLIENT]

Supporting head DF

3 EXTERNAL RAILINGS
4400

-PROVIDE EXTERNAL RAILINGS,


PIPE OR EQUIVALENT. [BY THE CLIENT]

4 BRACING CLAMP B
-LUMBER (BY SITE) CAN BE ATTACHED TO THE
FLOOR PROPS AS A DIAGONAL BRACE USING THE
BRACING CLAMP B

3382

3732

3282

3282

3732

Doka floor prop


Eco 20 400

3732

3382

4-way head H20

Date Received:

A - APPROVED.
B - APPROVED WITH COMMENTS.
C - REVISED & RESUBMIT.
D - REJECTED.
N - NOTED.

5 SECURE EDGE FORM


-CROSS BEAM WITH EDGE FORMS MUST BE
SECURED AGAINST HORIZONTAL PULL-OUT AND
TIPPING OVER. THEREFORE PLYWOOD MUST BE
SECURE BY NAILS OR SCREWS.

removable folding tripod

DOKA MAIN BEAM PARALLEL


TO SLAB/BEAM EDGE
1000

1075

1600

1600

1125

1000

1275

1600

1600

1275

1000

1250

1600

1600

1200

1000

REFERENCE DRAWINGS

NO HEAVY LOADS

CROSS BEAMS
PRIMARY BEAMS

FIRST AID BUILDING-17


BEAM & SLAB FORMWORK - DOKAFLEX 20
SECTION THRU A~A

DRAWING NO.

TITLE

1981-ST-B17-1-001

PLAN

1981-ST-B17-1-002

PLAN

1981-ST-B17-2-001

DETAILS

1981-ST-B17-2-002

DETAILS

1
3
2

SCALE 1 : 50A1

1 BRACING CHAIN OR CABLE WIRE

THIS REVIEW IS TO VERIFY GENERAL


CONFORMANCE WITH THE DESIGN CONCEPT
AND IT DOES NOT RELIEVE THE CONTRACTOR
OF HIS OBLIGATIONS UNDER THE CONTRACT.

-PROVIDE BRACING CHAIN OR CABLE WIRE FOR


ALL PRIMARY BEAMS AND TO BE FIXED TO THE
EXISTING CONCRETE SLAB. [BY THE CLIENT]

2 EXTERNAL PLANKS STOPPER

Handrail clamp S

18mm thk. plywood


by site

Siding by site

Structural
Electrical
Mechanical
Infrastructure

4 BRACING CLAMP B

Building Coordination

-LUMBER (BY SITE) CAN BE ATTACHED TO THE


FLOOR PROPS AS A DIAGONAL BRACE USING THE
BRACING CLAMP B

600

250

700

250

Sign

Architectural

-PROVIDE EXTERNAL RAILINGS,


PIPE OR EQUIVALENT. [BY THE CLIENT]

750

Name

Trade

3 EXTERNAL RAILINGS

Siding by site

750
600

Date

-PROVIDE EXTERNAL PLANKS STOPPER OR


EQUIVALENT TO AVOID PROPS SLIDING OUTSIDE
THE BUILDING. [BY THE CLIENT]

Handrail clamp S

18mm thk. plywood


by site

Co-ordination Table

SHOP DRAWING

5 SECURE EDGE FORM


-CROSS BEAM WITH EDGE FORMS MUST BE
SECURED AGAINST HORIZONTAL PULL-OUT AND
TIPPING OVER. THEREFORE PLYWOOD MUST BE
SECURE BY NAILS OR SCREWS.

Supporting head DF
4400

DOKA MAIN BEAM PERPENDICULAR TO SLAB/BEAM EDGE

3382

3732

PROPS MODEL

minimum

removable folding tripod

maximum
(range)

3282

3382

Doka floor prop


Eco 20 400

3732

4-way head H20

EXTENSION
RANGE

ECO 20 250
ECO 20 300

152-250 cm
172-300 cm

ECO 20 350
ECO 20 400
EUREX 20 550

197-350 cm
227-400 cm
297-550 cm

20.05.2015

AS

REV. No.

DATE

BY

ISSUED FOR APPROVAL


DESCRIPTION

RA

JL

CH'KD APP'D

CLIENT

CONSULTANT

LEGEND :
1000

1350

1500

1500

1500

325

720

440

1500

1500

1500

1350

365

1000

DOKA TIMBER BEAM H20 ECO N

350
4-WAY HEAD H20

MAIN CONTRACTOR

LEIGHTON
CONTRACTING

SUPPORTING HEAD H20 DF

FIRST AID BUILDING-17


BEAM & SLAB FORMWORK - DOKAFLEX 20
SECTION THRU B~B

REMOVABLE FOLDING TRIPOD

P.O. Box 11346 DOHA-QATAR, Tel. 44059444 Fax. 44410494

SUBCONTRACTOR

DOKA QATAR WLL.

GENERAL NOTES FOR DOKAFLEX

SCALE 1 : 50A1

P.O. BOX 23439, DOHA, QATAR


PHONE: +974 44500628, FAX: +974 44500608
EMAIL: qatar@doka.com

ALL FLOOR PROPS HAVE TO BE PLACED CENTRALLY UNDER THE MAIN BEAMS.

PROJECT
ALL FLOOR PROPS HAVE TO BE ERECTED VERTICALLY.

NOTES :

DISTANCES BETWEEN BEAMS AND DISTANCES BETWEEN FLOOR PROPS HAVE TO CORRESPOND WITH THE DRAWING.
OVERLAPPING OF THE MAIN BEAM MEASURED FROM THE CENTRE OF THE MAIN BEAM TO THE FLOOR PROPS
WITH TRIPOD MAX. 50 CM.

Drawn:

Romeo Apolinario

20.05.2015

Drawing-No.:

Rev.:

Checked:

Jerico Lanto

20.05.2015

345-001037-1011

Scale:

Revised:

RISK OF FORMWORK BEAM


TIPPING OVER!
ONLY ATTACH THE HANDRAIL CLAMP-S TO
FORMWORK BEAMS IF THESE CANNOT TIP OVER.
NEVER MOUNT GUARD-RAIL BOARDS IN THE
LONGITUDINAL DIRECTION OF THE FORMWORK
BEAMS.

RISK OF BREAKING THE


FORMWORK SHEETS!
IT IS FORBIDDEN TO FASTEN THE CLAMP-S TO THE
FORMWORK SHEETING ONLY.

MAXIMUM ALLOWABLE
LIVE LOAD:

xx

INTERMEDIATE FLOOR PROPS WITHOUT TRIPOD SHOULD BE PLACED AT EQUAL DISTANCES BETWEEN THE FLOOR
PROPS WITH TRIPOD. THE NUMBER OF INTERMEDIATE FLOOR PROPS HAS TO BE TAKEN FROM THE DRAWING.

AS SHOWN

Safety instruction:
Do not weld or heat tie rods!

USE OF INTERMEDIATE FLOOR PROPS BY COSTUMER: THE DESIGN CONSIDERS PROPS WITH A LOAD CAPACITY
OF 20kN. THE NUMBER OF PROPS HAS TO BE INCREASED IN THE RATIO OF ITS ALLOWABLE LOAD CAPACITY.
ALL INTERMEDIATE FLOOR PROPS HAVE TO BE SECURED
AGAINST TIPPING OVER.

ALL MEASUREMENTS OF THE STRUCTURE HAVE


TO BE CHECKED!

ALL HORIZONTAL FORCES MUST BE BORNE WITH APPLIANCES.

ALL MEASUREMENTS IN MM!

BEFORE PLACING LOADS ON THE SLAB FORMWORK (PLYWOOD,


TIMBER BEAMS, REINFORCEMENT ETC.( INTERMEDIATE FLOOR
PROPS HAVE TO BE PLACED.

TO AVOID RISKS REGARDING HEALTH & SAFETY OF USERS OR THIRD PERSONS, "USER INFORMATION",
"OPERATING INSTRUCTIONS" AND "FITTING INSTRUCTIONS" HAVE TO BE NOTED IN ADDITION TO THE INFORMATION
GIVEN ON THE DRAWINGS.
IF REQUIRED ASK YOUR DOKA PARTNER FOR THESE DOCUMENTS.

IF FLOOR PROPS WITH MOUNTED LOWERING HEADS, 4-WAY HEADS


OR SUPPORTING HEADS ARE MOVED, THEY HAVE TO BE SECURED
AGAINST FALLING OUT WITH SPRING LOCKED CONNECTING PINS 16 MM.

SCAFFOLD BOARDS FOR PLATFORMS AND RAILING ARE TO BE PROVIDED BY SITE AND MUST BE FIXED ACCORDING
TO HEALTH & SAFETY REGULATIONS AND LOCAL LAW!

TO PROTECT THE FORMWORK SHEET AGAINST DAMAGING USE VIBRATORS WITH PROTECTIVE CAPS.

CONSTRUCTION OF KAHRAMAA
CENTRAL WORKSHOP
TITLE

FIRST AID - BUILDING 17


BEAM & SLAB FORMWORKS
DOKAFLEX20 SYSTEM
SECTION A~A / B~B

PROJECT No. SCALE

DRAWN BY CHECKED BY APPROVED BY

DRAWING No.

GTC517-17-S-S-D-501

DATE

SHT.

REV.

6/6