Escolar Documentos
Profissional Documentos
Cultura Documentos
Item
no
May
7
2012
MAY
8
2012
Field of Practice
- Revised the
working drawings
of the
Multipurpose
Center due to the
given
columnation of
the engineer
consultants for
the structural
design of the
building.
- Meeting with
engineer
consultant Mr.
Harold Aquino
regarding the
structural design
Total No. of
Hours
of the
infrastructure
project in ADB
Sitio Pulo
Navotas, he
discuss regarding
the preparation
and computation
of load for able to
design the
structurabilty of
the said buildings
- Associate with
fellow
engineering
trainees in
preparing the
structural design
of the
infrastructure
projects and
continue the
working drawings
of the
multipurpose
center in
rodriguez rizal
MAY
9
2012
- Monitoring visit on
the curing of
foundation footings to
be used in the bamboo
bridge and clarifications
on the design of the
multi-purpose center
4
- Working drawings of
the multi purpose center
MAY
10
2012
ABSENT
(PAGIBIG HOUSE DESIGN
COMPETITION)
ABSENT
(PAGIBIG HOUSE DESIGN COMPETITION)
ABSENT
(PAGIBIG HOUSE DESIGN
COMPETITION)
29
________________________
(Signature over printed name)
Students Name
Date submitted:______,2012
Conformed:
_______________________
(Signature over printed name)
Student Intern