Project

WCR No

Prepared by
Checked by
Date

: Lifting of Rocker Arm


:

: Azlan
:
: 27-07-2009

1.0 C.O.G GEOMETRY DIMENSION PLAN DETAILS


6096
3048

3048

A1

B1

3201

3201

6402

C.L

CoG
3201

3201

CL

A2

B2
3048

3048

2.0 PADEYE ORIENTATION

A1

3048

3201

tan 1 =

1 =

3201

tan 2 =

3201
3048

3201
3048

2 =

46.40 deg.

3201

A2

B1

3048

46.40 deg.

3201

3048

tan 4 =

4 =

3048

3201
3048
46.40 deg.

tan 3 =

3 =

B2

3201
3048
46.40 deg.

0
Project
WCR No

:
:

Prepared by
Checked by
Date

Lifting of Rocker Arm


0

:
:
:

3.0 PADEYE CENTRE HOLE COORDINATE

Z =

-200

X1

A1

X2

46.40

B1
46.40

Y2
Y1

X1 = -200
= -138

cos 46.40
mm

X2 = -200
= -138

Y1 = -200
= -145

sin
46.40
mm

Y2 = -200 sin
46.40
= -144.84 mm

Y4

A2

46.40
X4

cos 46.40
mm

Y3

46.40
X3

B2

X4 = -200
= -138

cos 46.40
mm

X3 = -200
= -138

cos 46.40
mm

Y4 = -200
= -145

sin
46.40
mm

Y3 = -200
= -145

sin
46.40
mm

Azlan
0
27-07-2009

0
Project
WCR No

Prepared by
Checked by
Date

: Lifting of Rocker Arm


: 0

: Azlan
: 0
: 27-07-2009

4.0 RIGGING GEOMETRY ON PLANE

-138

3186

3186

-138

A1

B1

-145

-145

L A1
L B1
3346

3346

3346

3346

L B2
L A2
-145

-145

A2

B2
-138

3186

3186

-138

L A1

= [( 3186 )2 + (
= 4620 mm

3346

)2]1/2

L B1

= [( 3186 )2 + (
= 4620 mm

3346

)2]1/2

L A2

= [( 3186 )2 + (
= 4620 mm

3346

)2]1/2

L B2

= [( 3186 )2 + (
= 4620 mm

3346

)2]1/2

5.0 VERTICAL REACTION AT PADEYES: BASE CASE

Jacket Base Weight = 142

MT

Contingencies of 10% = 4.3

MT

Padeye Design Weight, WL = 146.3

Rigging Weight = 20
Sling Design Weight,WP = 166.3

MT

RA1

3048
6096

x
x

3201
6402

166.26

41.6

MT

RB1

3048
6096

x
x

3201
6402

166.26

41.6

MT

RB2

3048
6096

x
x

3201
6402

166.26

41.6

MT

RA2

3048
6096

x
x

3201
6402

166.26

41.6

MT

166.3

MT

Total

MT
MT ( 183 ST)

0
Project
WCR No

Prepared by
Checked by
Date

: Lifting of Rocker Arm


: 0

6.0 VERTICAL REACTION AT PADEYES: OPTION CASE


Vertical Reaction based on 75/25 load distribution method.

(As per SES 11.4)

6.1 SUPPORT LOADS


*equations derived from sketch above
Equ. 1

RA1

RB1

83.1

MT

Equ. 2

RB1

RB2

83.1

MT

Equ. 3

Equ. 2

Equ. 1,

RB2

RA1

0.0

6.2 LOAD CASE 1 - 75% OF LOAD ACROSS DIAGONAL A1 - B2


Equ. 4

Equ. 5

Equ. 5

RB1

into

into

RA1

Equ. 4

Equ. 2

Equ. 1

RA1

RB2

Equ. 3,

RB1

RA1

0.75 x W L =

RB1

RB2

0.75 x

166

125

MT

2 RB2

125

RB2

62.35

RB1

20.7825 MT

20.78

83.13

RA1

62.3475 MT

+ RA2

RA2

62.3475 MT
83.1

166
20.7825 MT

6.3 LOAD CASE 2 - 25% OF LOAD ACROSS DIAGONAL A1 - B2


Equ. 6

Equ. 7

Equ. 7

RB1

into

into

RA1

Equ. 6

Equ. 2

Equ. 1

RA1

RB2

0.25 x W L

0.25 x

41.57

Equ. 3,

RB1

RA1

RB1

RB2

166
MT

2 RB2

41.565

RB2

20.7825 MT

20.78

RB1

62.35

RA1

+ RA2

RA2

83.13
62.3475 MT
83.13
20.7825 MT
166
62.3475 MT

MT

: Azlan
: 0
: 27-07-2009

0
Project
WCR No

Prepared by
Checked by
Date

: Lifting of Rocker Arm


: 0

: Azlan
: 0
: 27-07-2009

7.0 TRUE SLING ANGLE

H = Vertical height

S1

= 8000

8000

S2

8000

A1

4620

= tan-1

8000
4620

= 59.99

S1 = 4620.0345
cos 59.99

S4

= tan-1

deg.

S2 =

= 9238
mm
( 30.3 ft )

8000

8000
4620

4620
cos 59.99

S4 =

deg.

= 9238
mm
( 30.3 ft )

4620

= tan-1

= 59.99

S3

8000

A2

B1

4620

B2

4620

8000
4620

4620
cos 59.99

= 59.99

= tan-1

deg.

S3 =

= 9238
mm
( 30.3 ft )

8000
4620

4620
cos 59.99

= 59.99

deg.

= 9238
mm
( 30.3 ft )

8.0 SUMMARY OF VERTICAL REACTION AT PADEYES.


Padeye
Base Case

Vertical Load
Opt. Case 1

Opt. Case 2

Max. Load
(MT)

SSL*
(MT)

Required
MBL (MT)

A1

41.57

62.35

20.78

62.35

72

288

B1

41.57

20.78

62.35

62.35

72

288

B2

41.57

62.35

20.78

62.35

72

288

A2

41.57

20.78

62.35

62.35

72

288

Total

166.26

166.26

166.26

249.39

288

1152

ATLAS OFFSHORE - TES


Project
: Lifting of Rocker Arm
WCR No
: 0

Prepared by
Checked by
Date

:
:
:

Azlan
0
27-07-2009

STRUCTURAL WEIGHT CALCULATION


1.0 For Padeye Design
a) Roker Arm (Weighing) given wgt

162.0 MT

( Including

20.0 MT

Rigging Weight)

b) Actual Module 2 weight

142.0 MT

( Excluding 20.0 MT

Rigging Weight)

c) Contingencies of 10%

14.2 MT

d) Weight for Padeye Design

= Item b + Item c
=

e) Load for Padeye Design Calculation

156.2

MT

= Static Sling Load (SSL) x 2.0

2.0 For Sling Design


a) Roker Arm (Weighing) given wgt

162.0 MT

( Including

20.0 MT

Rigging Weight)

b) Actual Module 2 weight

142.0 MT

( Excluding 20.0 MT

Rigging Weight)

c) Contingencies of 10%

4.26 MT

d) Actual Rigging Weight

20 MT

d) Lift Weight for Sling Design

= Item b + Item c + Actual Rigging Weight


=

e) Load for Sling Design Calculation

166.3

MT

= Static Sling Load (SSL) x 4.0