Escolar Documentos
Profissional Documentos
Cultura Documentos
Student Name
Mohammed Salman
Farooq Khan
Student Number
00307879
Date of Submission :
10/11/2015
provider 1152
Student number
00307879
Course
name
Name of assessor :
provider
Student name
Criteria
Maximum
marks
available
1.1
15
1.2
15
2.1
2.2
Executive summary
3.1
3.2
3.3
4.1
15
4.2
15
TOTAL MARKS
100
Grades:
15
10
Assessors
marks awarded
NEBOSH
moderated
marks(if
different)
The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.
ssd
Student name
Salman
: Mohammed
Karan Chaurasia
Farooq Khan
Shobha Construction, Thane
Place inspected : Rustomjee
Control Measures
Immediate and longer term actions
Divert the workers pathway from near
the air compressor running area.
Timescale
1 Day
1 Week
02
Immediate
1 Day
Immediate
1 Day
Immediate
1 Week
03
04
Hazard
Cement bricks were scattered on the pathway for
workers and the workers were using this way.
Consequence
Scattered cement bricks on pathway can cause
tripping and falling off workers and thereby serious
injuries can happen to them.
Hazard
Excavation was going on at site and the reposed
soil was kept near the edges of excavation. Safe
distance from the edges of excavation for keeping
reposed soil was not maintained.
Consequence
Reposed soil may fall down to excavation and
thereby serious injuries or even death of workers
can happen.
Hazard
Underground water pipe line found inside the
excavation. Pipe line was slightly broken and water
was coming out of the hole on pipe line. Water line
was not isolated.
Consequence
Hole on pipe line can get bigger and thus
excavation may get flooded and thus drowning and
thereby death of workers working inside
excavation can happen.
Immediate
05
06
Hazard
In the canteen for workers, uncovered waste bins
were found. Waste bins were full with food waste and
food waste were scattered around it. Flies were
present over food waste.
Consequence
Flies over food waste can spread diseases like cholera,
dysentery etc to the workers.
Immediate
1 Day
Hazard
Staircase giving access to first floor was found wet
and slippery and the workers were using this way.
Immediate
1 Day
Hazard
Workers found shifting cement bags from ground
floor to second floor and they were followed wrong
lifting techniques.
Consequence
Adoption of wrong lifting techniques can cause back
injury, bone injury etc to the workers
Immediate
1 Week
Hazard
Workers found doing the steel frame work of second
floor top and they had not worn safety harness.
Consequence
Non usage of safety harness by the workers while
working at height can lead to falling of them from
height and thus severe injuries like head injury or
even death can happen to them.
Immediate
Hazard
Mason as well as labours involved in the cement
plastering work of first floor were not worn PPEs
against chemicals like cement.
Consequence
Contact with chemicals like cement can cause
corrosive effect, allergic effect, carcinogenic effect
etc. on workers body
Immediate
2 Week
Hazard
Acetylene gas cylinder was found leaking and welding
was going on nearby.
Consequence
Leaked acetylene gas may catch fire from flying
Immediate
1 Day
Consequence
During the course of work, workers may get slip on
staircase and thereby serious injuries can happen to
them.
07
08
09
10
1 Week
Training programme to be conducted
for workers working at height regarding
the safe practices to be followed while
working at height.
11
12
13
14
15
16
1 Week
Hazard
At one part of work site, piling was going on and
heavy noise was coming out of piling equipments.
Consequence
Exposure to heavy noise from piling equipments can
cause NIHL, tinnitus etc. to the workers working
nearby.
Hazard
Workers were found using welding machine whose
cable insulation was broken at several places.
Consequence
Usage of cables for welding machine with broken
insulation can lead to severe electric shock to the
welders as well as workers passing nearby and
thereby serious burns and death can happen to
workers.
Hazard
Mobile crane was operating at work site. Safe load
was not maintained on it. SWL certificate was absent
for the mobile crane. Workers were found working
beneath the suspended load.
Consequence
As safe working load was not maintained on mobile
crane and as SWL certificate was absent on it, the
load may fell on top of workers working beneath and
thus serious injuries or death can happen to the
workers.
Hazard
Jack hammer was used by the workers for concrete
breaking near entrance of work site without wearing
PPEs against vibration from the equipment. The
process was continuous and exposure to vibration
was maximum.
Consequence
Exposure to heavy vibration for a longer duration can
cause HAVS, WRULD etc. to the workers.
Hazard
Welders were found using welding glass instead of
face shield during welding.
Consequence
Flying objects from the welding process can cause eye
injury or facial burns to welders.
Immediate
Hazard
Workers were found using grinding machine which
was without guard.
Immediate
Immediate
2 Days
1 Week
Immediate
2 Weeks
Work rotation system and shift system
to be provided for the workers
1 Week
Consequence
Absence of guard on grinding machine can cause cuts
from its sharp blades to the operator.
1 Day
Provide temporary guard for grinding
machine.
3 Weeks
17
18
19
Hazard
Fork lift truck was found reversing without banks man
and the workers were working near fork lift truck.
Consequence
Absence of banks man for Fork lift truck while
reversing can cause collisions of it with the workers
and thus serious injuries or even death of workers
can happen.
Hazard
Workers involved in steel frame work erection were
exposed to direct heat from sun for a long duration.
Consequence
Health problems like dehydration, heat cramp, heat
stroke etc. can happen to the workers due to direct
heat exposure for a longer duration.
Hazard
Workers involved in concrete mixing were not worn
nose mask and were exposed to cement dust.
Consequence
Cement dust can be inhaled by the workers and thus
breathing problems, lung cancer etc. can happen to
them.
20
Hazard
On the first floor of the building, welding work was
going on. Wastes like papers, empty cement bags etc.
were scattered around the welding area.
Consequence
Flying hot particles coming out of welding process
can give ignition to papers, empty cement bags etc.
and thus fire can happen and due to the spread of
fire, severe burns to the workers in the proximity and
damages to the material can happen.
21
22
23
24
Immediate
2 Days
Immediate
1 Day
3 Weeks
Immediate
1 Day
Depute competent supervisor for
monitoring.
1 Week
Shobha Constructions
Location: Rustomjee
Constructions
Date of review: 01
30 november
Sep 2014 2015
INTRODUCTION INCLUDING OVERVIEW OF THE AREA INSPECTED AND ACTIVITIES TAKING PLACE
Construction's
Site visit was carried out on 26 Sep 2014 at one of the construction site of Shobha
Rustomjee
Constructions
Construction
Ind. Pvt. Ltd. is one of the leading construction companies in
Pvt. Ltd., Thane. Shobha
Rustomjee
Constructions
India. The major activities of the company are to construct housing buildings, complexes, roadways
etc. The area of construction site was approximately 8 acres and there were approximately 300
workers working in each shift. Office of the construction site was situated near the entrance.
Construction related activities like concreting, cement plastering, loading and unloading, mobile
crane operation, fork lift truck operation, hot works like welding and cutting, steel frame work
erection etc were going on during the visit. The purpose of the visit was to identify the health and
safety standard maintenance of the company.
EXECUTIVE SUMMARY
This report focuses on five major issues which were identified at work site and were
immediately dangerous to health and life of workers. Elimination of these issues is required to avoid
legal, social and economical implications on the company. These issues are listed below as per the
order of importance.
Risk of falling of objects on top of workers
Reposed soil was kept near the edges of excavation without maintaining safe distance from
excavating area. Falling of reposed soil on top of workers working inside excavation can lead to
serious injuries or even death. This issue to be addressed immediately.
Risk of drowning of workers
Underground water pipe line found inside the excavation and it was leaking too. Water supply was
not isolated before commencement of excavation. Leaked water can lead to flooding of excavation
and in turn death of workers due to drowning. This issue requires immediate remedial action.
Risk of falling of workers from height
Non compliance of PPEs like safety harness while working at height can lead to falling of workers
from height and thereby serious injuries or death can happen to them. At site, workers involved in
steel frame work on second floor were without safety harness. Issue is serious and to be addressed
immediately.
Risk of explosion
Welding was going on and nearby it was found that acetylene gas cylinder is leaking. Acetylene gas
can catch fire from the flying hot particles coming out of welding process and thereby heavy
explosion can take place and in turn death of workers in the vicinity. Issue to be seriously considered
by the management.
In short term, remove the reposed soil from near the edges of excavation.
In long term, depute a competent person to monitor the activity.
In short term, stop the excavation activity and isolate the water supply to the pipe line
running beneath excavation.
In long term, water pipe line to be re routed away from excavation area.
In short term, enforce the workers to wear safety harness while working at height and if
insufficient, and provide them with the same.
In long term, training programme to be conducted for workers working at height regarding
the safe practices to be followed while working at height.
In short term, stop the welding work and stop the leakage of acetylene cylinder.
In long term, replace the cylinder with a new one.
In long term, awareness programme on safe practices to be followed during hot work to be
imparted to welders.
In short term, stop the work and the welding equipments cable to be insulated temporarily
with insulating tape.
In long term, renew the cable of welding equipment.
RECOMMENDATIONS
LIKELY RESOURCE
IMPLICATIONS
PRIORITY
TARGET DATE
HIGH
05/10/2014
Rs. 12,000/-
Rs. 30,000/-
MEDIUM
15/10/2014
Rs. 15,000/-
HIGH
05/10/2014
Rs. 15,000/-
Total
Procurement cost of new acetylene gas
cylinder
Rs. 30,000/-
Rs. 10,000/-
Total
Rs. 20,000/-
Rs. 5,000/-
Rs. 10,000/-
20/10/2014
HIGH
12/10/2014
15/10/2014
MEDIUM
22/10/2014