Você está na página 1de 2

INPUT:

----------------------------------------------------------------------Fluid to be transferred is diesel oil


Tankers to be empty in one hour
----------------------------------------------------------------------Road tanker volume (each)
30m3
Elevation of road tanker
2m
----------------------------------------------------------------------Elevation of pumps

---> http://www.engineeringtoolbox.com/ <--- contains useful information for solving this exercise

0m

Pump redundancy
2 x 100% - 2 pump capable of delivering 100% of required output each. In this case one pump is working one is spare.
----------------------------------------------------------------------Elevation of storage tank

30m

Tank is atmospheric
Height of the tank

12m

----------------------------------------------------------------------Recommended fluid flow velocities:


pump suction line
< 1m/s
pump discharge line
< 2.5 m/s
----------------------------------------------------------------------Length of pump suction line

50m

Length of pump discharge line


250m
----------------------------------------------------------------------OUTPUT:
1) Define minimum internal pipe diameters (diesel oil suction line and discharge line)
2) Define pipe thickness (consider carbon steel A106 Gr. B, design temperature 40C)
3) Choose a standard piping schedule (Sch.40, Sch.80, etc..)
4) Define diesel oil pump head
5) Define diesel oil pump rated power

Você também pode gostar