CONTENTS

SUMMARYANALYSIS
DESIGNCRITERIA
TOWERANALYSIS
TOWEROUTLINE

SUMMARYANALYSIS

1. Loading

Standard
SurvivalWindSpeed
OperationalWindSpeed
No.
AntennaType
1 RFAntennaSF
2 RFAntennaTSEL
3 RFAntennaHCPT
4 MW0.6M
5 MW0.6M
6 RRU
7 RRU
8 Lamp
9 BTSSF
10 BTSTSEL
11 BTSHCPT
12 RectifierTSEL
13 RectifierHCPT
14 KWH

EIA/TIA222F
120
80.64
Quantity
3
3
3
1
1
3
3
2
1
1
1
1
1
1

Km/h
Km/h
Elevation
+17.0
+20.0
+15.0
+21.0
+15.0
+14.5
+14.0
+9.0
+5.0
+5.0
+4.0
+4.0
+4.0
+4.0

2. PoleAnalysis
Description
StressRatioLeg
Twist
Sway
Displacement
Compress
Shear
Moment

Value
Limits
120kphasmaximumwindspeed
0.787
1.0
80.64kphasservicewindspeed
0.0011deg
1.0deg
0.7960deg
1.0deg
20.81cm
18cm
SupportReaction
35.814
kN
17.975
kN
227.558
kN.m

Remarks
OK!
OK!
OK!
OK!

1. DESIGN CRITERIA

DESIGN STANDARD

The design of the tower applied is EIA standard EIA-222-F Structural standards
for Antenna Tower and Supporting Structure.

Material strengthen : BJ37 with Fy = 245 kg/cm2 and Fu = 370 kg/cm2

The fabrication and materials of the tower will be according to the relevant
Indonesia Standard and/or Japanese Industrial standard.

Software : MSTOWER version v6.0

TOWER ANALYSIS CONDITION


1.

Tower Height: 9 m

2.

Maximum wind velocity (V)


In the design of tower structure, a basic wind speed is taken:
V = 120 km/hour =33.3 m/sec

3.

Operational wind velocity


for displacement analysis, a basic wind speed is taken:
V = 84 km/ hour = 23.3 m/sec

4.

Displacement = H/100

LOADS
1. Dead Load Dead load is the weight of tower, splitzen, net load etc :
Weight Sector antenna

= 30 kg

Weight MW antenna

= 20 kg

Weight Ladder

= 5 kg/m

2. Wind Load on tower Structure Wind load calculation method on the tower and
appurtenance are according to EIA-222-F.
The pressure to the tower varies as a function of height.
a. Wind load calculation method on the tower and appurtenance are as follow:
F

= qz . GH . CF . AE and not exceed 2. qz . GH . AG

qz = 0.613 . Kz . V2 Kz = [z/10]2/7 GH = 1.69


Cf = 4.0 e2 5.9 e + 4.0 ( Square cross section)
Cf = 3.4 e2 4.7 e + 3.4 ( TriangularSquare cross section)
E

= AF / AG

AE = DF.AF

b. Wind load calculation method on the parabolic antenna


Fa = Ca * A *Kz * GH * V2
Fs = Cs * A * Kz * GH * V2
M

= Cm * D * A * Kz * GH * V2

Ha = (Fa2 + Fs2)
Mt = Fa * X + Fs * Y + M
3. Load Combination
According to EIA Standard EIA-222-F, only the following load combination shall be
investigated when calculating the maximum member stresses and structure
reaction: 1.0 DL + 1.0 WL
4. Materials
Steel Steel materials to be used for the tower and appurtenance conform to the
relevant Indonesian standard and or Japanese Industrial standard :
Concrete
2

Design compressive of concrete (fc) at 28 days : K-175 fc = 175 kg/cm .


Material

Standard

Grade

Fy (MPa)

Fu (MPa)

Pipe (Leg)

ASTM A53

SCH40

245

400

Angle (Support)

ASTM A53

SS400

245

400

Bolt (Connection)

ASTM A325/JIS B1180

8.8

Anchor

ASTM A307

800
240

400

ANALYSIS
Pole structure will be modeling by software MSTOWER v6.0. Structure modeled as 3D
space frame. This parameter to check the result of Structure analysis:
1.

Maximum Wind Speed (120 kph)

2.

Stress Ratio, with maximum limit 1.0

Service Wind Speed (80.64 kph)

Sway, with maximum limit 1.0 degrees

Twist, with maximum limit 1.0 degrees

Displacement, with maximum limit H/100, where H is height of tower

2. POLE ANALYSIS

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M

27 Jun 2014
09:51 PM

Y
X
theta: 300 phi: 30

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M

27 Jun 2014
09:51 PM

Y
X
theta: 180 phi: 0

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M

27 Jun 2014
09:52 PM

Z
X
theta: 0 phi: 90

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok

DEMONSTRATION SOFTWARE

Page 1 of 1
27 Jun 2014
9:52 PM

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.td

Page 1 of 3
27 Jun 2014
9:52 PM

DEMONSTRATION SOFTWARE

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.twr

Page 2 of 3
27 Jun 2014
9:52 PM

DEMONSTRATION SOFTWARE

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.twr

Page 3 of 3
27 Jun 2014
9:52 PM

DEMONSTRATION SOFTWARE

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.twr

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M

27 Jun 2014
09:53 PM

Design Ratios - % of Code Capacity:


<= 50
<= 95
<= 100
<= 105
<= 110
> 110

Y
X
theta: 300 phi: 30

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok

Page 1 of 5
27 Jun 2014
9:53 PM

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M

L O A D
C A S E S

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.rpt

Page 2 of 5
27 Jun 2014
9:53 PM

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M
L O A D
C A S E S

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.rpt

Page 3 of 5
27 Jun 2014
9:53 PM

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.rpt

Page 4 of 5
27 Jun 2014
9:53 PM

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.rpt

Page 5 of 5
27 Jun 2014
9:53 PM

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.rpt

Page 1 of 2
27 Jun 2014
9:55 PM

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M
I N P U T / A N A L Y S I S

R E P O R T

N O D E

D I S P L A C E M E N T S

N O D E

D I S P L A C E M E N T S

N O D E

D I S P L A C E M E N T S

N O D E

D I S P L A C E M E N T S

N O D E

D I S P L A C E M E N T S

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.p1

Page 2 of 2
27 Jun 2014
9:55 PM

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M
N O D E

D I S P L A C E M E N T S

N O D E

D I S P L A C E M E N T S

N O D E

D I S P L A C E M E N T S

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.p1

Page 1 of 2
27 Jun 2014
9:55 PM

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M
I N P U T / A N A L Y S I S

R E P O R T

S U P P O R T

R E A C T I O N S

S U P P O R T

R E A C T I O N S

S U P P O R T

R E A C T I O N S

S U P P O R T

R E A C T I O N S

S U P P O R T

R E A C T I O N S

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.p1

Page 2 of 2
27 Jun 2014
9:55 PM

DEMONSTRATION SOFTWARE
Job: Pole 21M HD ok
PT. IBS
POLE 21M

S U P P O R T

R E A C T I O N S

S U P P O R T

R E A C T I O N S

S U P P O R T

R E A C T I O N S

S U P P O R T

R E A C T I O N S

MStower [V6.02.011: ]

D:\IBS\Pole 18 & 21\analisis\Pole 21M HD ok.p1

RESUME ANALYSIS FLANGE POLE 21M HD

NO

ELV

1
2
3
4
5
6
7

18
15
12
9
6
3
0

BOLT
DIAMETER
M16
M16
M16
M16
M20
M20
M24

QTY
6
6
8
8
8
8
10

FLANGE
DIAMETER
THICK
452 MM
PLT 12
452 MM
PLT 12
508 MM
PLT 15
508 MM
PLT 18
597 MM
PLT 20
597 MM
PLT 22
680 MM
PLT 26

THICK
PLT 8
PLT 8
PLT 8
PLT 8
PLT 8
PLT 8
PLT 10

STIFFNER
QTY
6
6
8
8
8
8
10

HEIGHT
75 MM
75 MM
75 MM
75 MM
100 MM
100 MM
150 MM

PERHITUNGAN BASE PLATE (EL. +0.0)


POLE 21M HD
t
b
m
Bolt
D

A. PERHITUNGAN ANCHOR BOLT


1) Maximum force in column :
- compression
- tension
- shear

=
=
=

4 278
4,278
28,954
2,400

kg
kg
kg

P=
T=
X=
Y=
S=

41 945
41.945
283.866
23.528
0.000
23.528

kN
kN
kN
kN
kN

2) Allowable tensile stress of anchor bolt


TRY

10 - O
ASTM A - 325
A=
10
Ft =
3059.149 kg/cm2
Fv =
1529.574 kg/cm2
Fy =
2330 kg/cm2
fv' =
2,400 /
38.03
Fv = Fv x 1.3333 =
1683
Ft = Ft x 1.3333 =
3365
Fts

1 4 x Ft
1.4

Fts = Ft =
ft' =

16
1.6

22 mm
x

3.80285714 =

=
kg/cm2
kg/cm2

38.03 cm2

63.11 kg/cm2

63 11 =
63.11

< Fv .......... OK

4610

t/cm2 > Ft .....

OK

3365 kg/cm2
28,954 /

fv'/Fv + ft' / Ft

Perhitungan Anchor Bolt dan Base plate

38.03 =
0.04 +

761 kg/cm2
0.23 =

< Ft ...........OK
0.26 < 1 .......

OK

Page1

3) Required embeded length of anchor bolt


a.

Fcv = 0.53 x V
Le =
28,954

225
(

=
7.95

7.95 kg/cm2
10 x

b. Le = 2 ( 0.02 Ab Fy/Vfc') =

747 mm

c. Le = 2 ( 0.06 db Fy) =

615 mm

USE

10 - O

2.2 x 3.14) =

22 mm

52.72 cm

1000 mm

B. PERHITUNGAN BASE PLATE

1) Steel

SS - 400
Fy

2) Concrete
Fp

2500 kg/cm2

K=

225
0.35 x

225

45.7 cm (diameter pipa)

1.43 cm (tebal pipa)

Bmin

Use B

fp

tp

Tf

tp

Design Base plate


Used base plate
Stiffner

Perhitungan Anchor Bolt dan Base plate

4,278 / (1.33 x Fp) =


VA =

78.75 kg/cm2

40.84869316 cm2

6.39129824 cm

48.56 cm
68 cm or
4,278

3629.84

3629.84 cm2
1.178671787 kg/cm2

5 cm (jarak pusat baut ke tepi base plate)


0.19 cm
28,954

10

2895.43 kg

5 cm (jarak pusat baut ke muka kolom)


2895.43

14477.17 kgcm

36 deg
16.36982 cm (jarak antara pusat baut)
2.53 cm

680
mm x
680
mm x
10 x
PLT 10

25.3 mm
26.0 mm

Page2

PERHITUNGAN FLANGE EL. +3.0


POLE 21M HD
t
b
m
Bolt
D

A. PERHITUNGAN BOLT
1) Maximum force in column :
- compression
- tension
- shear

=
=
=

2 997
2,997
21,457
1,897

kg
kg
kg

P=
T=
X=
Y=
S=

29 385
29.385
210.366
18.595
0.000
18.595

kN
kN
kN
kN
kN

2) Allowable tensile stress of anchor bolt


TRY

8 - O
ASTM A - 325
A=
8
Ft =
3059.149 kg/cm2
Fv =
1529.574 kg/cm2
Fy =
2330 kg/cm2
fv' =
1,897 /
25.14
Fv = Fv x 1.3333 =
1683
Ft = Ft x 1.3333 =
3365
Fts

1 4 x Ft
1.4

Fts = Ft =
ft' =

16
1.6

20 mm
x

3.14285714 =

=
kg/cm2
kg/cm2

25.14 cm2

75.44 kg/cm2

75 44 =
75.44

< Fv .......... OK

4590

t/cm2 > Ft .....

OK

3365 kg/cm2
21,457 /

fv'/Fv + ft' / Ft

25.14 =

USE bolt :

0.04 +

8 - O

Perhitungan Anchor Bolt dan Base plate

853 kg/cm2
0.25 =

< Ft ...........OK
0.30 < 1 .......

OK

20 mm

Page1

B. PERHITUNGAN FLANGE
F
Fy

2500 kg/cm2
k / 2

45.6 cm (diameter pipa)

1.43 cm (tebal pipa)

Bmin

Use B

fp

tp

Tf

tp

Design Base plate


Used base plate
Stiffner

Perhitungan Anchor Bolt dan Base plate

62.46 cm
65 cm or
2,997

A
3316.625

3316.625 cm2

0.903710851 kg/cm2

5 cm (jarak pusat baut ke tepi base plate)


0.16 cm
21,457

2682.17 kg

5 cm (jarak pusat baut ke muka kolom)


2682.17

13410.83 kgcm

45 deg
19.66 cm (jarak antara pusat baut)
2.22 cm

650
mm x
650
mm x
8x
PLT 8

22.2 mm
22.0 mm

Page2

PERHITUNGAN FLANGE EL. +6.0


POLE 21M HD
t
b
m
Bolt
D

A. PERHITUNGAN BOLT
1) Maximum force in column :
- compression
- tension
- shear

=
=
=

2 160
2,160
16,025
1,590

kg
kg
kg

P=
T=
X=
Y=
S=

21 180
21.180
157.112
15.587
0.000
15.587

kN
kN
kN
kN
kN

2) Allowable tensile stress of anchor bolt


TRY

8 - O
ASTM A - 325
A=
8
Ft =
3059.149 kg/cm2
Fv =
1529.574 kg/cm2
Fy =
2330 kg/cm2
fv' =
1,590 /
25.14
Fv = Fv x 1.3333 =
1683
Ft = Ft x 1.3333 =
3365
Fts

1 4 x Ft
1.4

Fts = Ft =
ft' =

16
1.6

20 mm
x

3.14285714 =

=
kg/cm2
kg/cm2

25.14 cm2

63.23 kg/cm2

63 23 =
63.23

< Fv .......... OK

4610

t/cm2 > Ft .....

OK

3365 kg/cm2
16,025 /

fv'/Fv + ft' / Ft

25.14 =

USE bolt :

0.04 +

8 - O

Perhitungan Anchor Bolt dan Base plate

637 kg/cm2
0.19 =

< Ft ...........OK
0.23 < 1 .......

OK

20 mm

Page1

B. PERHITUNGAN FLANGE
F
Fy

2500 kg/cm2
k / 2

45.6 cm (diameter pipa)

1.43 cm (tebal pipa)

Bmin

Use B

fp

tp

Tf

tp

Design Base plate


Used base plate
Stiffner

Perhitungan Anchor Bolt dan Base plate

62.46 cm
65 cm or
2,160

A
3316.625

3316.625 cm2

0.651373007 kg/cm2

5 cm (jarak pusat baut ke tepi base plate)


0.14 cm
16,025

2003.18 kg

5 cm (jarak pusat baut ke muka kolom)


2003.18

10015.89 kgcm

45 deg
19.66 cm (jarak antara pusat baut)
1.92 cm

650
mm x
650
mm x
8x
PLT 8

19.2 mm
20.0 mm

Page2

PERHITUNGAN FLANGE EL. +9.0


POLE 21M HD
t
b
m
Bolt
D

A. PERHITUNGAN BOLT
1) Maximum force in column :
- compression
- tension
- shear

=
=
=

1 677
1,677
11,256
1,490

kg
kg
kg

P=
T=
X=
Y=
S=

16 444
16.444
110.355
14.604
0.000
14.604

kN
kN
kN
kN
kN

2) Allowable tensile stress of anchor bolt


TRY

8 - O
ASTM A - 325
A=
8
Ft =
3059.149 kg/cm2
Fv =
1529.574 kg/cm2
Fy =
2330 kg/cm2
fv' =
1,490 /
16.09
Fv = Fv x 1.3333 =
1683
Ft = Ft x 1.3333 =
3365
Fts

1 4 x Ft
1.4

Fts = Ft =
ft' =

16
1.6

16 mm
x

2.01142857 =

=
kg/cm2
kg/cm2

16.09 cm2

92.57 kg/cm2

92 57 =
92.57

< Fv .......... OK

4563

t/cm2 > Ft .....

OK

3365 kg/cm2
11,256 /

fv'/Fv + ft' / Ft

16.09 =

USE bolt :

0.06 +

8 - O

Perhitungan Anchor Bolt dan Base plate

700 kg/cm2
0.21 =

< Ft ...........OK
0.26 < 1 .......

OK

16 mm

Page1

B. PERHITUNGAN FLANGE
F
Fy

2500 kg/cm2
k / 2

40.6 cm (diameter pipa)

1.27 cm (tebal pipa)

Bmin

Use B

fp

tp

Tf

tp

Design Base plate


Used base plate
Stiffner

Perhitungan Anchor Bolt dan Base plate

54.34 cm
50 cm or
1,677

1962.5

1962.5 cm2
0.854669045 kg/cm2

5 cm (jarak pusat baut ke tepi base plate)


0.16 cm
11,256

1407.03 kg

5 cm (jarak pusat baut ke muka kolom)


1407.03

7035.13 kgcm

45 deg
17.89 cm (jarak antara pusat baut)
1.68 cm

500
mm x
500
mm x
8x
PLT 8

16.8 mm
18.0 mm

Page2

PERHITUNGAN FLANGE EL. +12.0


POLE 21M HD
t
b
m
Bolt
D

A. PERHITUNGAN BOLT
1) Maximum force in column :
- compression
- tension
- shear

=
=
=

1 142
1,142
6,633
1,205

kg
kg
kg

P=
T=
X=
Y=
S=

11 192
11.192
65.029
11.816
0.000
11.816

kN
kN
kN
kN
kN

2) Allowable tensile stress of anchor bolt


TRY

8 - O
ASTM A - 325
A=
8
Ft =
3059.149 kg/cm2
Fv =
1529.574 kg/cm2
Fy =
2330 kg/cm2
fv' =
1,205 /
16.09
Fv = Fv x 1.3333 =
1683
Ft = Ft x 1.3333 =
3365
Fts

1 4 x Ft
1.4

Fts = Ft =
ft' =

16
1.6

16 mm
x

2.01142857 =

=
kg/cm2
kg/cm2

16.09 cm2

74.90 kg/cm2

74 90 =
74.90

< Fv .......... OK

4591

t/cm2 > Ft .....

OK

3365 kg/cm2
6,633 /

fv'/Fv + ft' / Ft

16.09 =

USE bolt :

0.04 +

8 - O

Perhitungan Anchor Bolt dan Base plate

412 kg/cm2
0.12 =

< Ft ...........OK
0.17 < 1 .......

OK

16 mm

Page1

B. PERHITUNGAN FLANGE
F
Fy

2500 kg/cm2
k / 2

40.6 cm (diameter pipa)

1.27 cm (tebal pipa)

Bmin

Use B

fp

tp

Tf

tp

Design Base plate


Used base plate
Stiffner

Perhitungan Anchor Bolt dan Base plate

54.34 cm
50 cm or
1,142

1962.5

1962.5 cm2
0.581698854 kg/cm2

5 cm (jarak pusat baut ke tepi base plate)


0.13 cm
6,633

829.12 kg

5 cm (jarak pusat baut ke muka kolom)


829.12

4145.60 kgcm

45 deg
17.89 cm (jarak antara pusat baut)
1.29 cm

500
mm x
500
mm x
8x
PLT 8

12.9 mm
15.0 mm

Page2

PERHITUNGAN FLANGE EL. +15.0


POLE 21M HD
t
b
m
Bolt
D

A. PERHITUNGAN BOLT
1) Maximum force in column :
- compression
- tension
- shear

=
=
=

694
3,027
743

kg
kg
kg

P=
T=
X=
Y=
S=

6 805
6.805
29.672
7.284
0.000
7.284

kN
kN
kN
kN
kN

2) Allowable tensile stress of anchor bolt


TRY

6 - O
ASTM A - 325
A=
6
Ft =
3059.149 kg/cm2
Fv =
1529.574 kg/cm2
Fy =
2330 kg/cm2
fv' =
743 /
12.07
Fv = Fv x 1.3333 =
1683
Ft = Ft x 1.3333 =
3365
Fts

1 4 x Ft
1.4

Fts = Ft =
ft' =

16
1.6

16 mm
x

2.01142857 =

=
kg/cm2
kg/cm2

12.07 cm2

61.56 kg/cm2

61 56 =
61.56

< Fv .......... OK

4613

t/cm2 > Ft .....

OK

3365 kg/cm2
3,027 /

fv'/Fv + ft' / Ft

12.07 =

USE bolt :

0.04 +

6 - O

Perhitungan Anchor Bolt dan Base plate

251 kg/cm2
0.07 =

< Ft ...........OK
0.11 < 1 .......

OK

16 mm

Page1

B. PERHITUNGAN FLANGE
F
Fy

2500 kg/cm2
k / 2

35.6 cm (diameter pipa)

Bmin

Use B

fp

tp

Tf

tp

Design Base plate


Used base plate
Stiffner

Perhitungan Anchor Bolt dan Base plate

0.953 cm (tebal pipa)


48.706 cm
55 cm or
694

A
2374.625

2374.625 cm2

0.292302995 kg/cm2

5 cm (jarak pusat baut ke tepi base plate)


0.09 cm
3,027

504.42 kg

5 cm (jarak pusat baut ke muka kolom)


504.42

2522.12 kgcm

60 deg
19.75 cm (jarak antara pusat baut)
0.96 cm

550
mm x
550
mm x
6x
PLT 8

9.6 mm
12.0 mm

Page2

PERHITUNGAN FLANGE EL. +15.0


POLE 21M HD
t
b
m
Bolt
D

A. PERHITUNGAN BOLT
1) Maximum force in column :
- compression
- tension
- shear

=
=
=

308
998
444

kg
kg
kg

P=
T=
X=
Y=
S=

3 016
3.016
9.788
4.356
0.000
4.356

kN
kN
kN
kN
kN

2) Allowable tensile stress of anchor bolt


TRY

6 - O
ASTM A - 325
A=
6
Ft =
3059.149 kg/cm2
Fv =
1529.574 kg/cm2
Fy =
2330 kg/cm2
fv' =
444 /
12.07
Fv = Fv x 1.3333 =
1683
Ft = Ft x 1.3333 =
3365
Fts

1 4 x Ft
1.4

Fts = Ft =

16
1.6

16 mm
x

2.01142857 =

=
kg/cm2
kg/cm2

12.07 cm2

36.82 kg/cm2

36 82 =
36.82

< Fv .......... OK

4652

t/cm2 > Ft .....

OK

3365 kg/cm2

ft' =

998 /

fv'/Fv + ft' / Ft

12.07 =

USE bolt :

0.02 +

6 - O

Perhitungan Anchor Bolt dan Base plate

83 kg/cm2
0.02 =

< Ft ...........OK
0.05 < 1 .......

OK

16 mm

Page1

B. PERHITUNGAN FLANGE
F
Fy

2500 kg/cm2
k / 2

35.6 cm (diameter pipa)

Bmin

Use B

fp

tp

0.06 cm

Tf

998

tp

Design Base plate


Used base plate
Stiffner

Perhitungan Anchor Bolt dan Base plate

0.953 cm (tebal pipa)


48.706 cm
55 cm or
308

A
2374.625

2374.625 cm2

0.129549718 kg/cm2

5 cm (jarak pusat baut ke tepi base plate)

166.40 kg

5 cm (jarak pusat baut ke muka kolom)


166.40

831.98 kgcm

60 deg
19.75 cm (jarak antara pusat baut)
0.55 cm

550
mm x
550
mm x
6x
PLT 8

5.5 mm
12.0 mm

Page2

3. TOWER OUTLINE

Você também pode gostar