Você está na página 1de 57
MHAN BANGUNAN DAN | 7.070 ss Denn cranmecarrarrwercrners ree DAFTAR STANDAR SATUAN HARGA KOTASURABAYA. URAIAN PEKERJAAN: SPESIFIKASI SATUAN] HARGA(Rp.}| jatang Pakai Habis fang Pakai Habis Bahan Bangunan dan Konstruksi iter 4.900 ter 14.400 ko 41.500 ko 82.800 ko 10.900 AG 60/70 Incl anghut | kg 12.900 (fermasuk angkutan) Ton 4.095.400 RO 6070 kg +1.000 Ton 1.494.500 40g zak 63.000 50 kg zak 66.000 ~—yitan ko 11,200 5) kg zak 100.000 40kg zak 22.200 40k9 zak 470.000, 40g ‘ak 216.400 Bg kg 421.400 a0 kg ak 4.440.000 2ke kg 216.000 5mm m2 136.700 3mm m2 126.000 amm ma 419.000 5mm m2 100.000 El faca Graver ma 4.890.000 stainglass m2 2.680.000 m3 143.500 m3 248.400, m3 468.400 m3 232100 m3 186.000 m3 116.400 m3 162.000 m3 vig.100 m3 247.000 m3, 252.000 ma 232.000 m3 250.000 Gerinda potong U3 Bh 23.000 jay Gerinda potong U6 Bh 29.000 | all Ganda potong URS Bh 47.000 15/20 em ma 426.000 Pecah Mesin 412 mg 486.000 23, m3. 282.000 BT m3 255.000, 8 om & 416 orn ma 279,000 JuRNAL Harca SaTuaN BAAN BANGUNAN, KONSTRUKSI & INTERIOR: 563 YNIALL VME ISNIdOU¥d Qdemncranmecouerenmeancerveres ‘URAIAN PEKERJAAN ‘SPESIFIKASI SATUAN | HARGA (Rp) (BAJA ‘Baja WF y/{Besi promt WF kg 24.000 Boja Siku L jf Bosi sik ukuran standar /umum kg 14.000 |Bos! siku 1 20.202 kg 9.400, Bost siku £30303 kg 3.400 [Besi sku £.40.40.0 kg 20.000 40140 m 22.500 /Sesi Begel baut Uk. 12 dim buah 52.900 Bes! begel Uk’. 6 dim ‘ouah 42.500 Besi Hollow 20/20 a 24.000 Bos! Hollow 20140 m 25.000 [Angker Bost Dia. 16 mm kg 7.600 lAngker besi 49 mm kg 7.600 Elecirode Baia kg 58.100 Bes! Angkur Dia 16 mm, Pj. 70 m bush 35.000 ‘ees Angkur Dia 19 mm, PI. 70 m buah 53.000 Bos! Oxtagonal Dia § inch! tebal 4.5 mm buah 416.667 féesi Kanal UNP 10 buah 44.800 JSosi Angkur ‘3/4 panjang 90 cm ‘buah 53.000 | }fesi Hollow 60/40 m 22.510 PabrikasifElektroda Baja (20%) m2 133.600 Beuge! + Mur Baut ornamen buah 420.000 JAngker Besi PJU kg 412.794 Bes! Begel Lengkap Mur buah 120,000, Best Kanat (anal U Ux. 80 x 45 x5) kg 21.000 Best Kanat UNP 6.5 kg 415.000 # }Besi Kanalic UNP & kg 15.000 Sril Cossing UNP 42 kg 13.500 Bending Spring buah 4.800.000 BajaRangkaC buah 81.000 | BESIBETON Besibeton Dim esi beton polos [Besi beton ulir kg 42.000 Buls beton. F}Buis beton Bulat Ukuran 100 x 50 om bush 320,000 U-Ditch Precast 40.40.120 t-6om (Gandsr § Ton} buah 559.000, U-Ditch Precast 40.60.420 te6om (Gandar 6 Ton} bush 728.000 U-Ditch Precast {60.60.120 tom (Gandat 5 Ton) buah 812.000, U-Dtch Precast 160.80.120 t=6cm (Gandar § Ton) bush 981.000 {u-Ditch Precast £80.80.120 t=6cm (Gandar 5 Ton) bualt 4.496.000 UDiten Precest 80,100.120 t= 10cm {Gandar 5 fon) buat 2.167.000 Buls Beton. Bulat Ukuran 89 x 50 em bush 280.000 UsDlich Precast 100.100.126 t=10em (Gandar § Ton} bush 2.398.000 Uciten Precast 400.120.120 t=120m (Gandar 6 Ton} buah 3.218.000, Bitch Precast 120,120,120 t=12cm (Gandar 5 Ton} buah 3.988.000 UcDitch Precast 40.40.1290 t = 6om {Gendar 10 Ton) buah 888.000, lu-Ditch Precast “40.60.120 t=6cm (Gandar 10 Ton) buah 784.000 u-Ditch Precast 660,60.120 t=6cm (Gandar 19 Ton) buah 953,000 : |U-Ditch Precast 60,80.120 t=8em (Gandar 10 Ton) buah 1.387.000 u-Diteh Procast 80.80.4120 t= 10cm (Gandar 10 Ton} buah 1.979.000 U-bitch Precast £80.100.120 t=12em (Gandar 10 Ton) buah 2.785.000 {U-Diteh Precast 100.100:420 t=t2em (Gandar 10 Ton)} bua 3.025.000, [U-Ditch Procast 400.120.120 t=t2cm (Gandar 10 Yon)| —buah 3.380.000 U-Diteh Precast 120.120.120 t=12cm (Gandar 10 Ton)} —buah 3.867.000 JuDitch Precast 120,150,120 t=15cm (Gandar 10 Ton)} —buah 5.142.000 JuDitch Precast 450,150.120 t=15cm (Gandar 10 Ton)| —buah 5.475.000 LUDiich Precast 200.200.120 t=20em (Gandar 10 Ton)| bua 9.747.000 &1 35 Tanun XXM 2015 Jurnat Haraa SaTUAN BaHAN BANGUNAN, KONSTRUKS! & INTERIOR 565 YNIALL VM ISNIdOud QD iemvwormuosnoomecrenatencranrenaenes URAIAN PEKERJAAN ‘SPESIFIKAS! ‘SATUAN HARGA (Rp) Profile Tank [Asbes fAsbes Datar shes DatarlEtemit uk, 100 x 100 x 04 mm lembar 22.000 tecnit Asbes gel mini EGIEF uk. 210x10804 mm} lembar 62.000 [Aates Golombang sbes Gelombang Kec. uk. 150%105%0.4 om lembar 48.000 Asbes Gelombang Kec uk 180% 05x0.4 crm lembar 0,000 /Asbes Gelombang Kooi. uk, 210x105x0,¢ om iembar 67.000 [Asbes Gelombang Bosar uk. 200x410x0.5 om lembar 90.000 s lashes Gelombang Supe. uk. 750x105x0.5 om iembar 100.000 " |Asbes Galombang ‘Super, uk. 180x108x0.5 cm lembar 110.600 fasbes Gelombang Super. uk 240xi08x0.5 om lambar 81.200 BAHANLAS leLecirode Las a 38.000 JeNeseL gee! pintu Poseng 39.000 ; ngset Jendola Pasang 20.000 Ms [Engsel H Pasang 40.900 ‘ {SOTTALANG “elang R. 40 (segmen) bua 28,000 [Got Telang R. 15 (eegmen) uh 27,000 ot Tetang R25 (seamen) buh 34.000 (Got Talang R10 (1/2 Hingkaran) buah 28.000 [cet Talana RAS (12 lingkaran) buah 32.000 [Got Talang R26 (412 Bagkaran) uah 35.000 [GRENDEL Grendel Biasa (Kecil) buah 10,000, Srendet Besar bush 22.000 [Grende Panjang bah 37.000 rend! Tanam buah +12.000 ‘3 JENDELA 2 ‘Htical bind m2 224.000 WKrepyak nako buah 14.100, JEssanyolet buah 87.100 tool Bind Black Out m2 230.100 orls jendela ™ 490.000 fj Papan Somen | [Fenan Semon 200x2400%35 mm lembar 63.000 uk: 240 x 120 x9 ram lembar 280,000 fia. 10-42 om. P 3.00 mit batang 22000 tia, 10-12 om. P 3.00 mir ‘atang 36.000 m2 50.000 lembar 64.000 buah 122.000 to bua 2.300 340 bush 500 20 buah 500 uk, 80 «30 em m2 70.000 ik 4040 om mz 79,000 uk, 2025 om m2 60.000 uke 20 20 em m2 31.000 tk, 20x 25 em m2 400.000 erik lantal grat alam uk, 8030 em m2 130,090 mi tanta} poreelin uk, 80 x30 om m2 35.000 rit glasie tk, 80 x 30 em m2 420.000 nie Pia uk. 20 x40 orn m2 4.248.000 ‘JURNAL Haren SaTuan BAHAN BANGUNAN, KONSTRUKS! & INTERIOR ‘867 3 3 = 8 § HNL Qe rncransnccarmimnneeensnenrc URAIAN PEKERJAAN ‘SPESIFIKAS! SATUAN HARGA (Rp) 3 Stoperiuskup 6 em abwabu bush 4.800| Stoper/uskup tb 8 om abu-abu buah 6.000 U Stoportiskup Wb 6 em warna bush 5.500] we Slopentuskup Bem warna buah 7000 | Curbing beton type B panjang £0 cm buab 5800 | Curbing beton Type A Panlang 69 em buah 0.000} @ Paving stone merah persegi ‘ebal 6 cin m2 64.000, Paving stone merah persegi tebal 8 cm m2 74.000} Sw sorajl eg, | Pavna sions abu-20u persnt tebal 6 em m2 70000 | 3 40008 | Paving stone ain-abu persegi tebal 8 em mz 75.000 Grass block Ssdemx36omc0cm m2 7000 | Kenn tap uk, 48.25.40 (me) ™ 62.000] Togel Trotear m2 2.000, Paving tebal 8 om m2 91.400] WASTAFEL = srotgl a | wstora bush ar0.000| & wuas Kuas 4 nen ban 12.000) & kuae 2 iment bua 6.500 | 3 kas 3 inch buen 8.000 kas rool buat 30.000 SEPTIC TANK ASBES SELANGPLASTI Setang spiral 2 nent m 99.000 Selang Terpal Plat ral 08.000 TRPLEK Telok uc t10x2t0x4 mm | fembar 87.700 Plywood tk 122x244x9mm | fembar 93.600 Tealewood uk t22x24ax4mm | lembar 23.700 “rpiek ic t22 x244x 12mm | lembar 232.000 Hs | Kawat 98.0088 AN | Kawat Beton aon | Kewat beton ¥g 24.400 20000. | Kaivat Sondrat 9 20.000 ai08e Kawatlalnya 4000te Kawat Ikat ka 23.000 AGS | Kavot harenonica lebar 90 em m2 24.000 asthe | xewat aut rol <000 9 Ott Kawat nyamuk Kasa Plastik, Lbr 90 cm m2 12.000 102866 | kawat avamuk esa Alumunium m2 35.000 30.04 Kawa Segel rol 84000 Kawa dinamo Kg 157.200 Kewat Las R626 dos 187.300 Kawat Saing 4mm meter 3.000 Tal kat Kabel ral 189.000 KEM em PVE buah 3.000 ‘dom/Bracket buah 36.000 ‘om Galvanis Rembu unit 20.000 Kem Kabel uk. 6 mm pak 9.000 lem Kabel ak, 8 mn pak 9.000 Kiem s/@ mn bua 4.500 lem Bangkok 4 on buah 417375 Kem Bangkok 25cm buah 124200 em Lures tem buah 447.300 Kem Lurus tem buah 126.350 Kem Pipa pak 6.000 Klom Bost buah 18.900 Kom Kabel tue, 19 mm -8 mm pak 42500 XH 2¢ 35 Tarun XXH 2015 Jurna HAGA SATUAN BAHAN BANGUNAN, KoNSTRUKS! & INTERIOR 569 Pron cenasecoern meron | URAIAN PEKERJAAN SPESIFIKASI SATUAN | HARGA(Rp.) Plaque Marmer Buah 147.900 a FA Atur Wastafel Stainless Bush 196.000 AM | Atur tempat cucl pking Buah 89.800 f Wh Flexble Pendek Buah 31,700 lial HSPHC $42,385.00, 4 Pokoyjaan Pomasangan Batu Kall Balan ms = 1520 cm (1 Po: 3 Ps) = E baton ¢ Harmen PC 60 Ka 406 ak 66,000.00 266.640.00 i Pasir Pasang/Plester ass ma 168.400.00 81,674.00] "Edu Kai Belah 15/20 cm 120 ma 428,000.00 513,600.00 umtah 861,914.00 a Iendor 0.075 ongine 420.000.00 9,000.00 Kepala Tukang 0.075 orginr ‘110.000.00 8,250.00 frukang 078 oir +108,000.00 78.750.00, Ipembantu tukang 18 orghr 99,000.00 448,500.00 [iumtah 244,500.00 [wi SPH 4.106.414.00 |Pokerjaan Pemasangan Batu Kall Belah m3 lis0cm (1 Pe: 4Ps) han [Semen PO 60 Kg 328 zak 86,000.00 215-160.00 Pasir Pasang/Plestor os2 m3 188,400.00 87.568.00 Batu Kali Belan 15/20 em 12 m3 428,000.00 513:900.00 jurfab 816,328.00 pat Mondor 0.075 org 120,000.00 9,000.00 Kepata Tukang 0.075 orgine +10.000.00 8,250.00 i Tukang: O75 orgfnr 105.0000 78,750.00 embantu tukang 15 orgihr 99,000.00, 148,800.00 lumtah 244,500.00 ial HSK 1.060.828.00 Pekayon Pemasangan Batu Kall Botah m3 Hs20em (1Pe: 5 Ps) Bahan 'Somen PC 50 Kg 272 zak 66,000.00 179,520.00 Fl pacir PasangiPlester 0544 ma 4168.40.00 91.609.60 [Batu Kal Belah 15/20 om 120 m3 428,000.00 513,600.00 umiah 788.728.60 Yeah : Mander 0.075 orgie 120,000.00 9.00.00 Kepola Tukang 0075 orgie 10,000.00 8,250.00 Hrukeng 075 orgihe 405,000.00 78.750.00 lPambantu tukang 18 — orginr 129,000.00 148,500.90 Mumia 244,500.00 Nits HSPK 4.029.229.80 $535 Tantow XXII 2015 JURNAL Hara SATUAN BAHAN BANGUNAN, KONSTRUKSI& INTERIOR 583 _ €DProvron orp vuonsconrucnon nrencrswsrera.ewcs| URAIAN KEGIATAN, ‘OFF. [sues HARGA SATUAN HARGA pan 4 Mandor 0.075 orghhr 120.000.00 9,000.00 4 Kepala Tukang 0.08 orgihr +10.000.00 8,600.00 Tukang 0.6 © orginr 105,000.00 63,000.00 Pembantu tukang 1.6 orgfar ‘99,000.00 148.500.00 Juma 227.100.00 Misi H#SPK 984.822.20 | Perkuatan Talud dengan Pemasangan m3 | Batu Kali 15/29 em (tpe:tkpr:2ps) Bahan Semen PC 50 Kg 37218 zak 68,000.00 245,638.80 Pasir Pasang/Plester 0.3384 © m3 468,400.00 56,988.56, Batu Kel Bolah 15/20 om 42 m3 428,000.00 1513.60.00 Kapur Pasang 0.1692 m3 ‘92,900.00 15,718.68, ‘Jumah 831,944.04 [sewa Poralatan 'Sewa Concrete Miser 0.5 M3 (min 3 Jam) 065 jam 66,100.00 42.965.00 Juraby 42,985.00 pan Mondor 0.075 ogi 120.000.00 9.00.00 “Kopala Tukang 0.08 © orgihr 1110.00.00 6.60.00, jTukang 0.6 orgie 105.000.00 63,000.00 Pembentu tukang 15 ofghhe 99.00.00, 148,500.00 suman 227,100.00 Nita HSPK. 1.402.008.04 [pemasangan Batu KaliBelah Kosongan m3 (Aanstamping) 3 |ganan Pasir Urug 0492 m3 143.500.00 61.92.00 7 |Batu Kai Belzh 15/20 cm 12 m3 428,000.00 813,600.00 Jumish 575.592.00 poh (Mandor 0.032 orginr 120,000.00 4,680.00 la Tukang 0.039 orgihr 140,000.00 4,290.00 |Tukang 039 orginr 105.000.00 40,950.00 Pembants tukang 078 orginr ‘99,000.00 77.220.00 Jumtah 427.440.00 Nai HSPK 702.732,00 Pemasangan Batu Kali Kosongan Tebal 20 cm m3 Bahan F [Balu Kall Bota 15/20 om 42 m3 428.000.00 513.600.00 urntah 513.600.00 lupan andor 0.017 orgint 120,000.00 2,040.00 © [Kopala Tukang 0.015 — omfhr 440,000.00 1,890.00 lTukang 0.45 omgihr 105.000.00 15.750.00 E |Pembantu tukang 0.35 orgthr 29,000.00 34,650.00 ;|sumiah 54,090.00, = [Nai HSPKC '567.690.00 | |Pemasangan Batu Kali Kosongan Tabel 15 em m3 |pahan = ]Baw Kall Belah 45/20 em 12 m3 428,000.00 513.600.00 [| amian 513.600.00 2 35 Tanun XXH 2075 JurNAL HaRGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 585 YNINLL VM ISNIdOud Qe evtocononscormcren smracrevaree es URAIAN KEGIATAN KOEF, | SATUAN } HARGASATUAN HARGA v mmoangen Batu Acak atau bata Alam ma Ce) tos own atange——aztaasoo | aar236.00 | 5 0.015 ‘orgihy 120.000.00 1.800,00 | @ Rembant tukang 018 argine 99,000.00 +4.850.00 | Sw f 16.650.00 | @ gal SP 226.506.00 | aii |Pomasangan (sewa) Sheet Pile Baja mt = inggi= 6 m) untuk pengaman gaan! 5 jhing Pekerjasn Beton K-100 an 4 ectrode Baja 02 kg 58,100.00 +1.620.00 | wd eieg Guiing 28 m2 50,000.00, ‘as.o00.00 | dewva Grane 30 ton - rin 8 jam (ltmasuk Mob/Domob Operator BBM) os7i2 jam 139,800.00 voass.76 | & arearar6 | 385 m2 4.100.00 351.480,00 227 m2 400.00 24,870.00, 376,420.00 o4 rain 120,000.00 +2.000.00 02 orghr +10.000.00 22,000.00 04 omgine 496,000.00, 42,000.00 4 orate 99,000.00, 99,000.08 475,000.00 767,898.76 ms 0175 zak 83,000.00 380,025.00 05431253 232,100.00 428.058.81 lsat Pecan mesin 1/2 om oszmreosrs7 m3 ‘468.000 245,017.89 218 iter 27.00 5,805.00 765,907.21 0.083 orgy 120,000.00, 9.980.00 0.028 organ +10.000.00, 3.080.00 0.275 org/hr 105,000.00 (28.875.00 185 ovine 99,000.00 163.350.00 205,265.00 o71.a72.24 m3 69 nk 63,000.00 434,700.00 o517s m3 232,100.00 120.111.75 Psat Pecan mesin 1/2 om ossasstsr29 m3 486,000.00 243,208.52 218 liter 27.00 5,805.00 908.823.07 0.083 orgihr 120,000.00 9,960.00 0026 orginr 110,000.00, 3,080.00 0275 orglhr +08.000.00 28.878.00 165 otgihr 99,000.00 183,350.00 2205.265.00 4.014.088.07 ‘35 TaHun XI 2075 JURNAL HaRGA SATUAN BAHAN BANGUNAN, KONSTRUKSI& INTERIOR 587 PDvnscrenneccnaren menanrenenes fF URAIAN KEGIATAR [rom [prem [esencaroan [ance tenon Beton Kaz8 = 9.275 zak 83.000.00 584.325.00 0.43625, m3 232.100.00 101,253.63 osm ms 255.000.00 250.790.58 pra 2.00 008.00 eea.rats oss ote 12000000 2.960.00 0.028 corgihr 410,000.00 3.080.00 oars Sate =————t08 000.00 2eers.00 168 org 6000.90 188260.00 208 268.00 assas0 48 Iain Baton K-250 m3 a 88 ak ss.on0.00 601,800.00 a Fr corbun oaaes mo 252,100.00 foo.sKe 25 8053 Heats Pecah mesin 1/2 cm 05168421063 m3 466,000.00 (254,828.42 S058 Arona ae ter er.00 00800 3 anan ster er ah 2 er aoe argh 120,900.00 0,290.00 008) [Senale Tukang 9.028 orghnr 110,000.00 3.080.00 00899 Fentaw stang ies ihe se.00 90 163 80.00 2 176300.00 20008) F ansPK s.44220667 a |Pekerjaan Beton K-275 m3. Fen 450.0 HSemen PC 40 Kg 10.15 zak 63.000.00 639.450.00 a cars m8 zazs00.a0 0202.75 55305 | Alloa pecan meso 12 om ost ins fa600.90 261 40.00 7 asker 2s er 209 803.00 A mish 06.4778 ‘83H ipa 960, jidandor 0,083 orgihr 120,000.00 9.960.00 086.9 Kepala Tukang 0.028 corg/hr 110.000.00 3.080.00 pe [Tokang 0275 oir 4105.000.00 28,875.00 575 rents tkong 138 gh sen00 00 12 350.93 £500 I onion 205 268.00 reise saotaeers 9 rotriaan Baton K-200 ms a enon 400161 1|Semen PC 40 Kg 10.325, zak 63.000.00 650.475.00 tcf par oro cton owzoa2s ma asz-o0.00 2875736 00 An rocon mon 12 om cssreeies ma ee000.00 250.4368 ec ar kona reer or 8 805,00 ea 1.008828 rage oe ; andor 0.083 corgihr 120,000.00 9,980.00 ceo ovla Tuan doz emt = 70000.00 2.08000 ee ore Grghr 708 000.00 ans. a0 P7SI8 penta thang veg 38.00.00 188.360.00 $5008 A ian 205288.00 fe 1074638 HA 35 Tanun XXH 2015 “JURNAL HarGa SATUAN BaHAN BANGUNAN, KONSTRUKS! & INTERIOR 58a YNIALL VME ISNIdOud Verma conrcnecoumronrncenssarsenes Koer, | saTuan | HARGASATUAN HARGA ‘ m2 a 00s Kg 23,000.00 41.180.00 734 41.02 m2 78,000.00 791580.00 30.710.00 9.001 orgie 1120.00.00 120.00 9.002 corginr 110.000,00 220.00 0.025 orgfar 108,000.00 2,625.00 FPombantu tukang 0.025 orghar 99,000.00 2.475.00 Pumiah 5.40.00 ‘ae Niet BSP 86-150.00 okerjaan Pemasangan Kebel ko a [prestressed polos ! stand (Saban os 203) Boton polos 4.05 kg 12,900.00 12,600.00 755 Kawat teat 0.01 ke 23,000.00 230.00 reat uma 12.830.00 008.4 Yan tak Manor 0.0003 orgitr +420.000.00 36.00 APE AS) koala Takano 0.0008 orghtr +10.000.00 55.00 sooit Tukang 0.005 orgihr 405.000.00 525.00 : f|Pembantu tukang 0.005 oxgihr 199,000.00 495.00 Jumiah 4.414.00 Ns HSPK 13,941.00 2 Petersen Boisting Soot m2 " Bahan fe Paku Triplek/Eternit 0.03 kg 22,000.00 8,600.00 Koyu Morandi Bekisting 0.048 m3 3.200.000.00 144,900.00 Sinyak Bekisting on iter 28.300 830. Alivia 453,430.00 pat |Mandor 0.026 orgibr 120,000.00 3.120.600 Kopala Tukang 0.026 orgihr 410,000.00 2.880.00 Bi tukang 0.26 orgihr 405,000.00 27,300.00 [Pembantu tukang 052 orginr 99,000.00 51,480.00, Bunion 84,760.00 Mal SP 238,190.00 Pekerjaan Bekisting Kolom m2 Bahan Pau TeplekdEternit 0.04 ‘9 22,000.00 8,800.00 Phwood uk, 122 x 244 x9 mm 035 lembar 92,600.00 2760.00 Kay Kemper Balok 4/6, 517 001s m3 6.400,000.00 96,000.00 on pd fe | tu Morant Berstng 6.04 m3 3.200.000.00 128,000.00 45% sinyak Bekisting 02 Wer 28,300.00 5,600.00 45.0 [Sumter 271,220.00 pat, 79 Mandor 0.033 ong/hr 120.000.00 3.960.009 2600: {kepala Tukang 0.033, orginr 1140.00.00 3,630.00 oo kag 0.33 orainr 108,000.00, 34,880.00 5a Pembantu tukeng 086 oghr 98,000.00 65,340.00 E:]sumiah 407,580.00 “< Nilai HSPC 378,800.00 —| 35 Tarun XXH 2015 Jor: Harca Saran Baw BAnGUNAN, KONSTRUKSI& INTERIOR 591 YNWIL VME ISNIdOud Qdormsserousnecarrucrenrenonsunenn re URAIAN KEGIATAN OER [SATUAN | HARGASATUAN | HARGA 0038 onminr 420,000.00 4,960.00 boss org *10:000.00 3690.00, 0.83 orgie 105,000.00 34,650.00 0.66 orgie 99,000.00 65.340.00 t07.800.00 345,388.00 mo ea ak 63,000.00 529,200.00 cee m8 282,100.00 425,334.00 Pocan Mesin 12 en oat m3 466.000.00 ar7ae000 Bolon polos iss 12,000.00, +.890/000.00 15 kg 22.000.00 33,000.00 2.25 kg 23,000.00 $1,750.00 eran Bekisting 02 m 3200.00, 40,000.00 Ink Bevitng oa ter 78.300 14-320.00 ah idor 0.265 orgihr 120.000.00 31.800.00 ia Tukang 0262 argh ¥10.000.00 2ae20.00 13 oh 405.000.00 138.500.00 0275 orghr 408,000.00 23,875.00 ‘05 orghr 408,000.00 110.250.00, bantu kang 53 ohn 36.000,00 $24-700.00 860,948.00 nsPK 4.518.009.00 Kerjaan Sloof Beton Bertulang m3 (g Boel + Bekisting) men PC 40 kg os zak 83,000.00 520200.00 fr CorfBeton ost ms 282.400.00 425.984.00 Ost m3 46,000.00 37748000 210 "9 ‘2,000.00 2.620:000.00 2 3 2000.00 24,000.00, 3 kg 23,000.00 69.000.00 027 mt 2.:200,000.00 964.000.00 vk Boeing, 08 ier 25-300.00 16.080.00 4.845.074.00 t 0283 ori 120,000.00 33,960.00 (ehala Tukang 0.323 orgihr 110,000.00 35,530.00 tang 196 orghr ‘08,000.00 193.8000 lhap 0275 oghr {08.000.00 28.76.00, eng 14 orgie {0s.000.00 147.000.00 [eebenty tukang 585 Org 98,000.00 559,980.00 Eitan 968.818.00 SPIE 6:514.488.00 ma a4 zak 63,000.00 529,200.00 Fost Corfaeton ose ma 252.100.00 25.384.00, Pa Pocah Mosin 122 om ost ma 466,000.00 377480.00 Besi Boton polos 210 kg 12,000.00 2.520,000.00 593 YNIANLL VMVE ISNIdO4d \Diccrovrcreumscoorecnen nreeensnerenente URAIAN KEGIATAN Koer, | SATUAN | HARGASATUAN HARGA vu 0275 orgiht 105,000.00 28.8750] Q 24 orghnr 108,000.00 720,500.00 | Sy tu tukeng 7.05 orgie 199,000.00 697.960.00 | s-207-26800 | PK waaaasoo | & fisan Dinding Beton Bertulang m3 = Basi + Bekisting) & C40 kg 84 23k 69,000.00 «2020000 | B SorfBeton 0.54 m3 232.100.00 125.334.00 | & [Pecan Mesin 1/2 om 0.81 m3 ‘486,000.00, s77.as0.00 | SS jon polos 1978 kg 12,000.00 1,890.000.00 riplekieternit 32 kg 22,000.00 70,400.00 | aq od uk. 122 x 244 x9 mm 28 lombar 99,600.00 282,080.00 | wy kat 2.28 kg 23,000.00 5175000 | & jiKamper Batok 4/6, 5/7 016 m3 6.400,000.00 1.024.000.00 ‘Merant Bekisting 0.24 m3 3.200.000.00 768,000.00 | & ‘Bekisting 16 Wer 28,300.00 45,280.00 | 55 5.443.504.00, 0.268 corgi 120,000.00 31,800.00 0.262 orgie +440.000.00 28,820.00 13, orghhr 405,000.00 136,500.00 0.275 orghhr 405,000.00 28,876.00 1.05 orgiht 105,000.00 110.250.00 parity tukang 83 engine 99.00.00 524,700.00 360,945.00 HIP 6.004.449.00, Haan Dinding Seton Bertulang m3 eg Bosl + Bekisting) PC 40 kg ea zak 63.00.00 29,200.00 Hr CoriBeton 0.58 m3, 232,100.00 425,334.00 faxcPecah Mesin 1/2 cm ost m3 466,000.00 377,460.00 Beton polos 210 tg 12,000.00 2.820.000.00 Aripiekieternit 3 kg 22.00.00 66,000.00 od uk. 122 x 244 x9 men 28 lembar 193,600.00 284,000.00 ptilkat 3 kg 123,000.00 69,000.00 gst Kompor Balok 4/6, 5/7 0.408 m3 6.400.000.00 672,000.00 Meranti Bekisting 0.25 ma 3:200.000.00 300.000.00 ak Bekisting 12 tor 28.200.00 33,850.00 5.428.954.00 0.283 orgie 120,000.00 33.960.00 lt Tukang 0323 ‘orgfht ‘10.000.00 35,520.00 1.56 orghhe 108,000.00 463,800.00 0275 orgihe 1106.00.00 28,875.00 14 orgie 105,000.00 147,000.00 entu tukang 5.05 orgmhr £89.000.00 1559 360.00 968.545.00 ist HSPK 6.395.460.00 [Petarjaan Kolom Praktis 14 x 41 em mt PC 40 kg oA zak 63,000.00 6,300.00 CorfBieton 6.008 m3 292,000.00 1,892.60 Pecah Mesin 1/2 cm 6.008 m3 486,000.00 4484.00 edd Tanun XXI! 2015 JURNAL. HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 585, QVovmscrencrecaarroretscenaren URAIAN KEGIATAN, KOEF, | SATUAN | HARGASATUAN HARGA acangan Saluran Buls Beton f1m m n ‘Belon Bulet Ukuran 400x560 Cm 2 buah 320.000.00 640,000.00 6 tah 640.000.00 5 Peralatan ka. Crane 30 ton - min. 8 jam on jam 199,800.00 13,980.00 Kgimacuk MobiDemob Operator BBM) 13,980.00 ‘o.o3e088238 orgihr 120.000.00 457.44 ‘embantu tukang 0.9880862581orgihr 199,000.00 3774.43 4228.57 (858.208.57 ping & Concreting / Jacketing m3 Bpinon PC 40 Kg 0.864 ak 63,000.00 54,492.00 Pasir PasangiPlester az m3 168,400.00 70,728.00 ht Kerikil Befon O77 m3 238.500 183.645.00 208.805.00 Poralatan ms Concrete Mixer 0.50 ra (min 3 jam) o.252 jem 66.00.00 16.857.20 ua Concrate Pump (min 3 jam) 0.084 jem 66,100.00 5,552.40. wa Concrete Vibrator 1.08 jam 15.300,00 16,524.00 28,733.60 084 orgihr 120,000.00 10,980.00 ang Kayu 02% orginr 105.000.00 122.050.00 bantu tukang 24 orginr 99,000.00 207.900.00 240,030.00 HSPK '587.568.60 iikerjaan Pemasangan Besi Profil ke 6} Profl WF >= 200 rom 118 kg 21,000.00 24,180.00 24.150.00 0.003 orgihr 420.000.00 380.00 0.908 orgihr 410.000.00 880.00 0.06 orgihr 105.000.00 6.300.00 0.06 orgibr 99,000.00 5,940.00 13.260.00 37.410.00 em 0.04 kg 38,000.00 4,520.00 0.03 Iter 7,500.00 22500 9.004 iter 28,500.00 113.20 1,858.20 9.0002 orghhr 120.000.00 24.00 0.0002 orgthr 140.000.00 22.00 0.002 orgie 105,000.90 210.00 00a orgihe ‘99,000.00 396.00 652.00 2510.20 Hei35 Tavun XXH 2075 —_JuRNaL Harca SATUAN BaHAN BaNGUNAN, KONSTRUKS! & INTERIOR 5o7 MNWILL VM ISNIdOud QV cranenccmicrn arene i). URAIAN KEGIATAN oer. | SaTUAN | HARGASATUAN HARGA [bpan andor 0.003 orghr 120,000.00 260,00 Kepaia Tukang 0.008 orgfhr 10.00.00 60.00 ftukang 0.08 oramhr 105,000.00 6.30.00 Pembantu tukang 0.08 orghr 99,000.00, 5,940.00 uma 13,280.00 HSPK 24,070.00 |Pomas. Dinding Batu Merah 1P¢: 2 Pp Tbl 1 Bata m2 [Bahan men PC 50 Kg 087 zak 66.000.00 57.420.00 Shir Pasang/Plester 003 m3 168,400.00 13:472.00 lu Bata Merah Kis 1 (uk. 22 x 11 x 4.5¢m) 1.40 buah 950.00 133.000.00 dria 203,892.00 [Képata Tukang 0.02 omghr 110.000.00 2.20.00 rurang 02° omginr 405.000.00 2.000.090 zembantu tukang 08 oxgmr 99,000.00 59,400.00 lumiaiy 36.200.00 ini SPR 290,082.00 a8. Dinding Batu Marah 1Pe: 3 Pp TDI1 Bata m2 han Semen PC 50 Ko 639 zak 66.000.00 43.495.00 asir Pasang/Plaster_ 0.091 m3 188.400.00 15,324.40 tu Bala Marah Kolas 1 (uk. 22x 11 4.5 cin) 140 buah 950.00 4138.000.00 suman 191,818.40 ‘pan Wor 0.03 orgthr 120.000.00 3.600.00 fepala Tukang 0.02 org/hr 110,000.00 2200.00 lukengs 02 ongihr 105,000.00 21,000.00 fembantu tukang 08 orga 99,000.00 59.400.00 hjratah 86,200.00 isl HSPKC 278,018.40, eras. inaing Bats Moran 1Pe: 4p TO11 Bata m2 PC 50 Kg 0531 zak 66.000.00 38.046.00 ‘ssir Pasang/Plester 0.093 m3 168.400.00, 15.661.20 Bala Merah Kis. 1 (uk. 22 x 11 x 4.5 cm) 440° buah 950.00 133.000.00 h 403,707.20 ipa dor 0.03 argh 120,000.00 3.60.00 FKepala Tukang 0.02 orgir 110.000.00, 2.20.00 Phang 0.2 orghhr 105,000.00 211000.00 emantu tukong 08 omihr 199,000.00 559.400.00 mish 36,200.00 pial srk 269,907.20 Dinding Batu Merah Po: SPpTbI1 Gata ma S| in 1 PC 50 Kg 0444 ak 65.000.00 29,304.00 "asi Pasang/Plester 0.402 m3 168.400.00, 17,176.80 Bata Morah Kis, 1 (uk. 22% 11 x45 em) 140 buan 950.00 133,000.00, Jumlah 179,400.80 andor 6.03 orgie 120,000.00 3,600.00 “Heepala Tukang 0.02 orghr 410,000.00 2.20.00 kang 02 orgitr 105.000.00 21/000.00 Pombantu tukang 08 orgie 88,000.00 59,400.00 Humlah 36,200.00, ini HSPK 265,680.80 B35 Tanuw XXI1 2016. JurNaL HARGA SATUAN Blatant ancussant Kewserninices 8 Iareeints ‘aa, NAL VMVE ISNIAONd Qos serseanencosnnucrn smercrsuravare URAIAN KEGIATAN, koer.| SaTuaN| HARGASATUAN HARGA ET Pemas. Dining Batu Merah 1Pc 6Pp3KpTol 12 Bata m2 Bahan ‘Semen PC 50 Kg 0.4938 zak 66,000.00 12.77.60 [Pasir Pasang/Piester 0.045 m3 168.400.00 7,578.00 Hdatu Bala Morah kis. t (uk. 22x 11 4.5 om) 70 buah 950.00 66.500.00 utah 86,855.60 ‘Upah andor 0.015 120.000.00 7,800.00 Kopala Tukang 001 10.00.00 1/100.00 akan at 08.00.00 4101500.00 [Pembantu tukang 03 199,000.00, 29.70.00 Jivmiah 43,100.00 nar sex 129.955.60 f5;| Pomas, Dinding Batu Merah {Pc : 10Pp 3 Kp Tbl 1/2 Bata |eanan [Semen PC 50 Ka 0.03 66.000.00 5,940.00 Pasir PasangiPlester 0.05 166.400.00, 8,420.00 [Batu Bate Merah Kis. # (uk, 22 x 11 4.5 om) 70 9350.00 166,500.00 ia #| Kapur Pasang ots 92,900.00 1139.50, r dumiah 82,253.50 WUpah 9 yandor 0.015 120,000.00 1.800.090 5 {Kepala Tukeng 0.01 110.000.00 1100.00 Tukaag ot 105.000.00 10.00.00 Hembantu tukang 03 98,000.00 29.70.00 »|sumiah 43,100.00 i flat HSPK 126,383.50 i E Ao ingan Batu Merah Kosongan han Jau Bala Merah Kis, 1 (uk. 22 xt4xd,5 om) 755 950.00 717,250.00 “Dumlah 717250.00 im andor 0.0995 120.000.00 5,940.00 ala Tukang 0.093 110.000.00 3,630.00 kang 0.38 105.000.00 34,650.00 smbantu tukang 0.98 98,000.00 98,010.00 mah 4142.230.00 ai SPC 859.480.00 | embongkaran Dinding Tembok Dengan Pembersihen an indoe 0.05 120,000.00, 6.000.00 Feembanlu tukang 1 9.000.00 99.00.00 Hah 108.000.00 ial ASP 408,000.00 steran halus 1 PC : 4 Ps Tebal 1.5 cm PC 50 Kg 0.31008 66,000.00 20.485.28 lr Pacang/Plastoran 0.016 +168.400.00 2604.40 iniah 23,159.68, iat vior 0.015 4120.00.00 4.80.00 ala Tukang 0.015 *10.000.00 11650.00 fakanay 0.5 105,000.00 18:750.00 bonty takang 03 99,000.00 29700.00 arta 48,900.00 ph ‘HSPK 72,059.68 x 135 Tanun XH 2075 Jun SA lursane 604 YNIALL VMS ISNIdOYd QVerrercessracrieronreassraire [ oer, | SATUAN | HARGA SATUAN HARGA nm ont zak 66,000.00 660.00 0013 m3 4168,400.00 2189.20 2,849.20 0.004 orghr 420.000.00 480.00 0.04 orghhr 110,000.00, 4,400.00 0.04 orghr 4106.000.00 4200.90 0.98 orgie 99,000.00 7920.00 17,000.00 49,849.20 m2 0.0864 zak 66,000.00 §.702.40 0.008 m3 168,400.00 4,010.40, 6712.80 fh 0.015 orghhr 120,000.00 1,800.00 pte Tukong 0.01 orghhr +10.000.00, 4400.00 ofan 0.4 oWgihe 495,000.00, 301500.00, panty tukang 03 orgie 9.000.00 239,760.00 43.100.00 sie SP 49.812.80 Kolkolan m aan men PC 80 Ka 001 zak 98,000.00 sr Pasong/Piostoran 0.002 m3 468,400.00 0.057 ogihr 405.000.00 an Acian m2 en PC 80 Kg 0.085 zak 66.000.00 4,290.00 minh 4390.00 rah Hindor 0.94 orginr 120.000.00 4200.00 Wepala Tukang oot oghr io.000.00 100.00 kang 04 engine 105,000.00 +01500.00, Penbantu tukang 9.2 orghhr 99.000.00 19.800.00 mia 32,600.00, Wat HSPK 36.890.00 |Pomasangan Batu iiingkor m2 n amen PC 50 Ko 028 mk 68,000,090 16.510.00 sit Pasang/Plesteran 0.032 m3 168.400.00 5,894.00 atu Kingker 70 buah 336.000.00 1.890.000.00 [suntan 4.914.404.00 flupsh #. Mandor 0.015 orgihr 120,000.00 3,600.00 Ikepala Tukang 0018 orghr 410,000.00 3,850.00 brakang 0.48 orghhr 4108.000.00, 36.750.00 [Pembanta tukang 0.3 ompihr 99,000.00 61.380.00 405,560.00, B35 Tarun XX 2015 HARGA SATUAN BAHAN BaNGUNAN, KoNsTRUKS! & INTERIOR 2,046:984.00 603 YNIIL VAT ISNIdOdd CD rercemnanscrner eneeanen re URAIAN KEGIATAN [ KOEF. [servant HARGA SATUAN HARGA dor 0.03 orgine 120.000.00 3.600.00 pela Tukeng 0.035 onhr 110,000.00, 3,850.00 rkang 0.35. onghhr 405,000.00 38,750.00 pambanty tukang 082 orghr 99,000.00, 1,380.00, 408.590.00 426.984.00, an Batu Bobos Uk (1020 x 15m) m2 0235 zak 68,000.00 15,510.00 0035 ms. 468,400.00 5.84.00 fu Bobos uk. 10 x20 x 4,5 em m2 4190.00.00 208,000.00 230.404.00 0.93 orgie 120,000.00, 3,600.00 0.035 orghr 10,000.00, 3.850.00 0.35 omgfhr 405.000.00 36.750.00 082 argh 99,000.00 '51'380.00 405.580.00 335,904.00 m2 o1 ig 57,700.00 8770.00 05 tembar 48:000.00 8:000.00 43.770.00, 0.001 orgihe 120,000.00, 12000 0.008 orgfhr 110.000.00, 330.00 0.03 orgihr 405,000.00, 3.150.00 002 orgthr 99,000.00 4980,00 5,580.00 49,350.00, m2 of kg 63,000.00, 6.30.00 oot bush 12,000.00 120.00, 6426.00 0.01 oxwinr 420,000.00 1.200.00 0.02 orgie +10,600.00, 2200.00 02 orgie 405.000.00 21,000.00, 0.02 orginr 99,000.00, 41,980.00 28:380.00, 32,800.00, eeatanDinding Dalam Lame TonpaPlamir (sewarta) m2 0.072 ksteng 168.600.00 42.21.20 atz kg 33,000.00 31960.00 0.4 tembar +6.000.00 4600.00 4777.20 0.0028 orgine 420,000.00 300.00 0.0082 ome 70,000.00, 462.00 0.042 orginr 495.000.00 4,410.00 0.028 orgie 98,000.00 2772.00 7944.00 25:745:20, JJunna. Hanca SATUAN Brian BaNGURAN, KONSTRUKS!& INTERIOR 605 UNL UML ISNIdOU4d Peres cr aunsonescont ection 1 =RI0R8 MATERIAL PRI URAIAN KEGIATAN KOEF.| SATUAN| HARGA SATUAN HARGA . ivan aps Melons Guco x Laps Baral Raa) ma 3 or 0.837 ter 30.00.00 2s.110.00 | jumpound 0.2 perkelng 33.800.00 676000 | or er 02 te Seoo.0e ro000 | t Gloss 0.2 kg 63.000.00 42.600.00 | hae te oe $0000.00 300000 | & [ios osok Hus { tembar 40.000.00 ‘soma | @ Rerlas Gosok Kasar 1 lembar 20.000.00 20.000. 128.070.00 | Ds fe Poraltan KovBoras 1 Set @.3 Ast + ome 4100.00 4.100.00 ‘Comprosear 250°CFM (rn 8 fm) ose jam se000.00 2228000 | 3 le 0.025 Org/hr 120.000.00 3,000.00 | = i Tokang G08 Orghr Vooto.o0 ooo | ‘ 18 Org {as.000.00 .aso.c0 shan wkang 0.075 Orgihr '99.000.00 7425.00 | & f 2036500 | 3 Sek ser 20800 m2 roof 038 kg 65,000.00 20,750.00 Ter + tomar 49.100.00 fo-t0o.00 seaso.c0 ti 0028 orgie ——=—«120.00000 00.00 fo Tukeng G0075 Grate ‘yo.000.00 e500 cars Oi tos000 00, rs7s.00 Feats tukang cas Ohe 1.00000 Koso.00 43380.00 3800.00 ma 02 196,000.00 36,200.00 Ss20e00 : 0.0025 orp 420.000.00 200.00 Hetoe kang Deore oh ‘70,000.00 2800 lone sors Sm =‘ 1os000.00 7are00 ant tukang O08 Omi 99.0000 tos000 13.980.00 Pa Seasoo0 Ipbhigecatan Kayu fm, Laps Cat Ds, 3 Lapia Cat penutyp) m2 Uber bost os ke sp.100.00 2620.00 al kay 02 ke 50,800.00 10.480.00, Eaton! Kaya oe ty 5000.00 375000 Hor chs as seap0.00 12.800.09 : izaeo.00 Wetor 0.0025 orghr 120.000.00 300.00 Hkepela Tukang 0004 Ongihr +110.900.00 440.00 a Ofos One tos000.00 1102500 Fra tkang cor Or 3000000 920.00 : ss05.00 INSP etssson 35 Tanun XX 2015 Jurnat Harca SATUAN BAHAN BaNGUNAN, KONSTRUKS! & INTERIOR 607 Cems crnnonoconmacnoencrsnames ne URAIAN KEGIATAN KOEF. | SATUAN | HARGASATUAN HARGA angen Tegal Kramik 40 x 40 om m2 an PC 60 kg 0198 ak 85,000.09 12,936.00 Win Berwarna Yiitan 13 kg 11.200.00 14,580.00 ir Pasang/Plestor 0.015 m3 18.400.00 7878.00 snk lantal putin uk. 40 x 40 om 1.0808 m2 73,000.00 83,803.20 448,877.20 0.038 orgihe 4120.00.00 4,200.00 Tukang 0.035 omgihr +10.000.00 3,850.00 0.35 orgine 105,000.00 36,750.00 bantu tukang 07 orgie £98.000.00 69.300.00 114-100.00 rHSPK 232.977.20 asangan Tegal Kramik 20x25cm (Dinding) ma on PC 50 Kg 0486 zak 68,000.00 12,278.09 en: Berwarna Yiyitan 194 kg 11,200.00 24.728.00 sir Pasang/Plester cow m3 168,400.00 3,091.20 ink Dining uk. 20 x 25 om 4.05 ma ‘60,000.00 63.00.00 100,035.20 0.045 ongthr 120,000.00 5.40.00 a Tukang 9.045 orgihr 110.600.00 4,950.00 0.45 orgihr 405,000.00 47-250.00 banty tukang 02 orghhr 99.00.00 89,100.00 348,700.00 Shial aSPK. 246,735.20 jmasangan Tegel Porsolen (Dinding) ma men PC 50 Kg one zak 66.000.00 12,276.09 mon Berwama Vivian 15 kg 11,200.00 16.800.00 sir PasangiPlesler 0018 m3 168,400.00 3.034.20 fami Lanai (Porcelain uk, 30 x 30 4.0406 m2 +20.000.00 424.972.00 lah 156.979.20 dot 0.08 orgihe 4120.000.00 6,000.00 aia Tukang 0.08 orgihr 110,000.00 5,500.00 ang 05 orghr 105.000.00 52,500.00 bantu tukang 1 orgie 99,000.00 99,600.00 163.009.00 lal HSPIC 319,878.20 smasangan Togol Pn Dinding Keramik uk 75x20 cm ~ 0 yen PC 50 Kg 0.0228 zak 66.00.00 1.504.80 [Semen Berwama Viyitan 0.025 kg 14.200.00 280.00 ir PasangPlester 0.003 m3 168,400.00 505.20 ik (Pint) uk. 75x20 om 4.05 buah 1.000.009, 64,050.00 66.240.00 0.008 orgihe 120.000.00 00.09 [képala Tukang 0.009 orgihr 110.090.00 990.00 0.09 ongihe 105,000.00 9.450.00 FPembantu tukang 0.03 orghr 9.00.00 8,910.00 umiah 19,950.00 86.290.00 35 Tanun XXH 2015 JURNAL Harca SaTUAN BaHan BANGUNAN, KONSTRUKS! & INTERIOR 609 YNINLL VM ISNIdOU¥d QDernecennervcrracro encom URAIAN KEGIATAN KOEF | SATUAN | HARGASATUAN nance | my dor 0.035 org 120,000.00 «20000 | Q SF eras Tuxang 0.038 orghtr 410,000.00 3.60.00 | 038 ont 196,000.00 3675000 | = 07 orgihe 98,000.00 9200.00 | s14300.00 | 240,000.00 | @ m3 $ 1s kg 25,000.00 378,000.00 om (no. 4) / Beton 86 aoe 49,000.00 408.400.00 Jali balok 5/7, 6/15, 6/12, 8/12 1 m3 48.417.200.00 20.258.920.00 b fh 20.740.320.00 02 omite 120.000.00 zacv0.0 | ot 4.2 og/hr 110.000.00 132,000.00 = 42 orgie 405,000.08 4.280.000.00 ¢ omne 99,000.00 seaoo000 | © ss12.000.00 | 3 221882.820.00 ma BeciBale 16 kg 2,000.00 375,000.00 "Kem (no. 4) / Beton 88 doz 18,000.00 408. 400.00 Kaper bok 8/12 4 ma .000.000.00 .900.000.00 40.384.400.00 a 0.2 ogi 120,000.00 24,000.00 pola Tokang 42 ome “10.000.00 132,000.00 42 orgie 105,000.00 4.260,000.00 ty tukang 4 onghhr $9,000.00 398.000.00 4.812.000.00, 42.199.400.00 ma 18 ke 25,000.00 375,000.00 Nate (00. 4) / Bator 38 dor 48,000.00 406-400.00 Moran balk 6/15, 612, 8/12 toma 4.100,000.00 4510.00.90 44.301.400.00 02 orgie 120,000.00 24,000.00 agile Tukang 1.2 orghhr 140.600.00 432,000.00 42 ome 105,000.00 4.260.000.00, ant tukang 4 orgie ‘99 000,00 '396.000.00 +.812,000.00 6.203.400.00 angan Rangka Kuda-tuda WF kg . Hip Pro Wr >= 200 mm 145 kg 21,000.00 24,150.00 (init 24,150.00 0.003 orgie 420,000.00 360.00 0.006 oie ‘10,000.00 860.00 0.08 orgie 408.000.00 6,300.00 0.08 orghir 28,000.00 $940.00 13,260.00 37.410.00 ‘JuRNAL Hanca SATUAN Baran Bancunan, KonsTRuks! & INTERIOR ott Qdiesesconnencoommerenrnencresewrecs : URAIAN KEGIATAN KoEF. | saTuan | HARGASATUAN HARGA jfasangan Rangka Atap Galvanume TbIO5 mum m2, n° ingka Galvalume 0.5 mm 1 m2 245,000.00 269,600.00 ah 269,500.00 ah iaidor 0.005 orgihr 120,000.00 600.00 a Tukang 0.01 orgie 140,000.00 2.100.00 " 04 orgihe 108,000.00 10,500.00 anty tukang 04 omgihr 199,000.00 39,600.00 51,800.00 fal HSPK 324,300.00 masangan Rangka Atap Galvanume Campuran m2 tan jagka Galvalume Campuran 1A m2 264,900.00 291,390.00 infah 201.300,00 vidoe 0.05 orginr +20.000.00 600.00 gpala Tukang 0.01 orgihr +10.000.00 4.100.00 9 0.4 omginr 405,000.00 +40:506.00, imbantu tukang 04 orgihe 99,000.00 39,600.00, ioioh 51.900.00 ib SPC 343,190.00 Pimasangan Gontong Jawa (Soka) m2 han lang Flam Pres Jawa 25 buan 3.00.00 75,000.00 lah 75,000.00 inth nor 0.08 orgihr 120.000.00 960.00 pala Tukang 0.008 orgthr 110.000.00 880.00 kang 0.075 orgihr 405,000.00 7,875.00 ‘ombantu tukang 0.48. oxgihr ‘99,000.00 14,850.00 lah 24.565.00 iat HSPK 99.565.00 Ieemasangan Genteng Kaca ma Bshan tong Kaca 25 buah 41,000.00 278,000.00 suntats 275,000.00 pan lendor 0.008 orgie 120,000.00 960.00 pala Tukang 0.008 orgihr 110.000.00 880.00 Tekang 0.075 orgihe ‘108,000.00 7.875.00 bantu takang 0.45 ongihr 99.00.00 14.860.00 24,565.00 Wal HSPK, | Pemasangan Gentong Karang Pilang ! Wisma ma chan ng Karang PilangfWisma 25 buah 20,000.00 500,000.00 lah 300.000.00 jan lor 0.008 arghhr 420,000.00 960.00 wala Tukang 0.008 orghhe 410.000.00 880.00 kang 0.0975 ongihr 405,000.00 7,875.00 Rombantu tukang 0.15 orghhe ‘99,000.00 44,850.00 Somtan 24,565.00 Rist HSPK 524,565.00 35 Tarun XXI 2015, JuRNAL HaRGA SATUAN BAHAN BANGUNAN, KONSTRUKS! & INTERIOR 613 YNWILL VMAS ISNIdO4d roe] SATUAN| HARGASATUAN HARGA at 016 zak 65,000.09 10,500.00 0.0a23 m3 168.400.00, 5.499.392 3 buah 12,000.00 60.000.00, 75,999.32 0.002 oxgihr +20.000.00 240.00 0.02 orgfhr 110.000.00 2,200.00 02 omit 4196.000.00 21.000.00 04 ogior 99,000.00 39,800.00 63,040.00 439,039.32 mt ote 2k 66,000.00 40,500.00 Pasang/Plester 00323 m3 468,400.00 5439.32 eng Wuwung Karang Peangiviema 5 buah 13,000.00 5.00.00 lah 80,998.32 hn 0.002 orgitr 420,000.00 240.00 002 ogihr 410,000.00, 2200.00 02 omginr 408,000.00 21 1000.00 04 omgihr 199,000.00 39,800.00 3.040.00 144,030.32 mt Gelombang Keel uk. 150x10510,¢ om 4 tembar 48,000.00 48,000.00 ‘asbes Sekrup 4 inch 8 buat 7.50.00 45,000.00 93,000.00 0.004 orgihr 120,000.00 4480.00 0013 oxgihr 110.000.00 4.480.00, 0.325 orgihr 105.000.00 13.125.00 ant tukang 91084 orgie '39.000.00, 8:316.09 23,351.00 116.354.00 Jangan Wawung Asbes Gelombang Kecil mt shan fet Gotombang Super uk. 150x105x0,5 om 1 tember +100.000.00 400,000.00 iu Asbes Sekrup 4 inchi 6 buat 7.600.00 45.00.00, 445,000.00 0.004 orgihr 120,000.00 490,00 0.013 orgihr 110,000.00 1,430.00 125 orghhr 4105.000.00 13:125.00 1084 orghhe 98,000.00 8316.00 23,351.00 168,354.00 . Wasmng!Jural Strap Asbos Thl 4 mm mt 3 Gal, Super Uk 150 x 105 Tb 0,5 om 1 tember 4109.00.00 100.000.00, ‘Rabes Sekrup 4 inchi 6 buah 7°500.00 +4§.000.00 148,060.00 0.004 orgihr 120,000.00 480,00 pola Tukeng 0.013 ommihr 770,000.00 1,430.00 0125 orgihr 198,000.00, 19:125.00 znjantu tukang 0.084 omgihr 99.006.00, 5'316.00 28:351.00 168,351.00 “JURNAL HARGA SATUAN BAHAN BanGuNaN, KONSTRUKS! & INTERIOR 815 YNANL VAT ISNIdO#d DQ vocescrvnnnocanecrovnrrseusorars a ie ia [i URAIAN KEGIATAN KOEF.| SATUAN| HARGASATUAN HARGA z te ze panes. Tolang Tloan Dari Song BILS 40 Lbr 50 cm wt 9 Talang Gu. 40 Lebar 80 em 1 mt 52,800.00 52,800.00 % ‘Asbes Soknup 4 inchi 5 buah 7500.00 37,500.00 Moran Papan 2/20, 4/40 ote ma 2,930,000.00 45.280.00 Merant suk 4/6, 577 0.0073 m3 4,500.000.00 32,850.00 lama 190.430.00 dor 0.025 orgie 4120.000.00 3.090.00 a fa Tukang 0.08 orghr 140,000.00 8,800.00, 6 kang 0.8 orgie 105,000.00 4,000.00 ‘Feembantu tukang 95 owhr 99,000.00 49,500.00, “Bumiat 145,300.00 Hilal ISP 343,730.00 as, Talang Gerobong Dari Song BULS 40/12 em mi Rong Datar BJLS 40 04144 lembar 155,000.00 22.79.00 Fegks Asbos Sekrup 4 incht 22.5 buah 7.50.00 468. 750.00 LJuriah 491.842.00 Hoan endor 0.28 orgihr 420,000.00 30,000.00 fgpala Tukang 0.025 orgitr ¥10.000.00, 2750.00 nang 025 orgihr 405,000.00 26,250.00 enbanty tukang 045 ovgihr 98,000.00 %4.050.00 4 miah 73,850.00 au BIHSPK 205.392.00 Pomas, Talang Polakan Lbr 60 om dari Seng BULS 40 m shan eng Detar BLS 40 1 lembar 5.000.009 55.000.00 su Asbes Skrup 4 inch 35 bush 7-500.00 282,500.00 ah 317,500.00 aah indor 0.025 ortnr 4120.00.00 3.900.00 pala Tukang 0.025 orghnr 110.000.00, 2750.00 kang 025. orghhr 4105.000.00 26.280.00 Pembantu tukang 0418 orgie 90.000.00 14.880.00 jum 46,850.00 ai SP 364,350.00 femasangan Talang Pembuluh Pipa PVC 3" Type AW mt a fom PVC 1 buah 3,000.00 3.000.00 pa Piste PVC Tipe AW uk. 3 Pj 4 mic 03° balang 210,000.00 63,000.00 iinlah 66,000.00 rukang 0.135 orgy 4108.90.00 14,175.00 mbanty tukang 0.981 orgie 98,000.00 8,019.00 *|dumlah 22.194.00 HSPK 88,194.00 Pamnasangan TalangPembuluh Pipa PVC” Type AW mt Hm PVC 41 bush 3.00.00 3,000.00 po Plastik PVC Tipe AW uk, 4 Pj. 4 att 0.3 bateng 305,000.00 91-500.00, uals 94.500.00 pah LFfukang 0.135 orgihr 105,000.00 14,175.00 [Pembantu tukang 0.081 orgrhr 99,000.00 8,019.00 ‘jumiah 22,194.00 nia ASK 416.694.00 (35 Tanun XXi1 2015 JURNAL Hara SATUAN BAHAN BaNGUNAN, KONSTRUKS! & INTERIOR 617 YNWLL VMAS ISNIdOUd Prose coursvoencerrovwrenssuccenes [soe] SATUAN paren saruan HARGA 2 Reps a8 37 n dem (No, 4) / Botan Jali Papan 2120, 4/10 Raku Klem (No. 4} { Beton fayu Jali Papen 2/20, 4/10 jimtah Kepala Tukang [Tukang masangan List Plank Kayu Jati 3/30 em mi ot doz 49,900.00 1,900.00 9.0108 = m3. 6.400.000.00 60.120.00 74,020.00 0,005 onghr 120.000.00 600.00 0.02 omghhr 110.009.00 2,200.00 0.2 orghe 405,000.00 21,000.00 04 oglhr 98.000.00 ‘9,000.00 33,700.00, 4104.720.00 mt ot doz 19,000.00 1,900.00 oo m3 418.417.200.009 202:588.20 204.489.20 9.905 o1g/hr 420.000.00 800.00 0.02 orghhr 119.000.00 2,200.00 0.2 oghr 105,000.00 21,000.00 0.4 orgmnr 98,000.00 9,900.00, 33,700.00 238.189.20 mt 0.05 doz 19,000.00 1950.00 011 m3 6.400.000.00 70.40.00, 71.380.00 0.005 orglir 120.000.00 800.00 0.02 orgfhr 40,000.00 2,200.00 02 orghr 408,000.00 24.000.00, 04 orght 99,000.00 9:900.00 33,700.00 105.050.00 mt 0.87 lombar 49,000.00 34,200.00 042 kg 6.400.000.00 2,640.00 36.240.00 9.007 orginr 120,000.00 840.00 9.007 orginr 110,000.00 770.00 087 orghr 405,000.00 7,035.00 O14 orgie 99,000.00 13,860.00 22,505.00 ‘59,345.00 m2 067 tembar 160.000.00 38.199.00 042 kg 22,000.00 2,640.00 40,830.00, 9.007 orgihr 120,000.00 840.00 0.007 orghr ‘110.000.00 770.00 0.067 orghhr 105.000.00 7.038.00 0.14 orgie ‘99.00.00 13.880.00 22,505.00, 63,335.00 35 Tavun XXH 2015 ‘JURNAL HarGa SATUAN BaHAN BANGUNAN, KONSTRUKS! & INTERIOR 619 YNINLL UMP ISNIdOUd Dover cessenscaeneroi neers URAIAN KEGIATAN, KOEF| SATUAN] HARGASATUAN WARGA "Tporacangan Plafon Eierrit Rangka Kaya Kamper md Bahan emit 14 lembar 62,000.00 68,200.00 ku Tipe / Eternt 0.08 kg 22,000.00 4320.00 (yu kamper balok 4/6, 5/7 0.012 m3 6.400.600.00 76.800.00 [dumtah 146.320.00 pan htandor 0.009 orghnr 120,000.00 4,980.00 pala Tokang 0.032 orghhr 7710.000.00 3,520.00 “Frokang 9032 orgine 108.000.00, 33,600.00, Hfembante tukang 0.18 orgie 99,000.00 17,820.00 ‘|Jumiah §6.026.00 mine 202,340.00 emasangan Plafon Eternt Gresik Rangka KayulLams m2 Htomit 44 lambar 62.00.00 68.200.00 eal ‘Tripiek / Etemit 0.01 kg 22,000.00 220.00 [utr 69,420.00 ‘pan dor 0.0018 orafhr 120,000.00 480.00 Kepcta Tukong 0.007 oxgihe 410,000.00 179.00 “)Tukang 0.07 — ong/hr 105.000,00 7.350,00, | [Pembantu tukeng 0.03 omghr £89.000.00 2'970.00 [Jumiok +1.270.00 Niel HSPK 79,690.00 “| pammasangan Plafon Etemnit Rangka Kayu Morant! m2 = [banan \Etemit 14 lembar 62,000.00 68,200.00 Pate Triple 7 Eom 008 kg 22,000.00 1320.00, lok uk. 110x240 x4 mm 0012 ma 4,500.000,00 54,000.00, ayy Meranti sul 4/6, 5/7 128.520.00 ear dor 0.009 orghr 420.000.00 4080.00 “{Kepala Tukang 0.032 angie 410.000.00° 3,526.00 Fukang 0.32 orgihr 105.000,00 39,600.00 embantu tukang: 0.18 — orgiir 99,000.00 17.820.00 urna 36,020.00, fai HSPK 479,540.00 omesangan Paton Tne Ranga Kay Morn m2 han “WPaku Triplek / Etemit 0.06 kg 22.000.00 1.320.00 | ftiplok uk, 110 x 210 x4 mm 0.38 lembar 67,700.00 26.403.00 ays Merant Uauk 4/6, 87 9.023 ma 4500.00.00 4103.500.00, 431.223.00 0.0135 orghr +420.000.00 4620.00 ={Kepala Tukang 0.04 — orgthr 110.000.00 4,400.00 ‘Hukang 04 ongfhr 105.000.00 42,000.00 :}embantu tukang 027 orghr 99,000.00 26,730.00 “fumlah 74,750.00 =| hat HSK 205,973.00 gist 35 Tanun XXII 2015 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKS! & INTERIOR, 624 YNMNL VMS ISNIdOUd PQerencrsunccerin neon URAIAN KEGIATAN KOEF.| SATUAN| HARGASATUAN HARGA jeangan List Plank Asbes Dalar Kayu Kamper wae n 28 Daterterit uk. 100 x 100 x 0,4 mm 41 tembar 22,000.00 22.00.00 4 Kem (No, 4) Beton ot doz 49.000.00 *1'900.00 Kamper Balok 416, 5/7 ooze md 6.400.000.00 449,000.00 164,700.00 andor 0.0078 orgie 129,000.00 938.00 ala Tukang 0.0482 ompihr 110,000.00 5,082.00 fikang (0482 orgihr 405.000.00 48.510.00 panty tukang 0136 orghr 189,000.00 45.444.00 a 69.072.00 734.672.00 Inasangan List Plank Asbes Oatar Kayu Meranti ma 2 Datarfterit uk. 100 x 400 x 0.4 mm 4 tombar 22,000.00 22,000.90 gaa Kiem (No. 4) / Beton 0A doz 49.00.00 4900.00 Kamper Balok 416, 5/7 002 m3 4.500.000.00 9.00.00 122,900.00 0.0078 orgihr 120,000.00 938.00 13 Tukang 0.0462 orgie 110,000.00 5,082.00, 3 0.462 orgfnr 4108.00.00 48,510.00 bantu tukang 0456 orginr 99.000.00 6,444.00 69,972.00 192,872.00 Hasangan Plafon Kalsboard Ranga Aumunium me Semen 1200 x 2400 x 95 mm 0.9619 tember 63.00.00 24,058.70 ku Asbes Sokrup 4 inchi 4 bush 7.800.00, 30,000.00 Auunium Coklat ‘uk. 3 x 7.5 Profll3 Incht 275m 73,000.00 200,750.00 enor 0.075 orghnr 120,000.00 9.000.00, la Tukang 0.025 orgie 410.000.00 2,750.00 3 025 orgie 105,000.00 28.250.00 srbantu tukang 0.45 orgihr ‘99,000.00 14,850.00 fh 307,689.70 1, Plafon Kalsiboard Rangka Piafon Metal Furing m2 i Hollow 40/40 075m 22,500.00 18.875.00 Bel Hollow 20/40 20m 25.00.00 150,000.00 ‘Samen 1200 x 2400 x 35 mm 0.3819 tember 3.00.00 24.059.70 ‘Asbos Sekrup 4 inchi 4 buah 7,500.00, 30,000.00 120.934.70 0.075 orgihr 4120.00.00 9,000.00 pala Tukang 0.025 orainr 110,000.00 2,750.00, i 0.25 orgthr 405,000.00 28.20.00 0.48 oxgthr 29,000.00 74.850.00 32,850.00 473.784.70 m3 1 kg 42.000.00 12,000.00 klom (No.4) / Beton 1.25 doz 19.000.00 23.70.00 Jali Batok 5/7, 6/15, 6/12, 8/12 4A md 18.417.200.00 20.258,920.00 20294.670.00 oI 0.35 orginr 120,000.00 42,000.00 opala Tukang 24 omghe 110,090.00 231 000.00 ang 21 erghhe 405,000.00 2.205,000.00 F FPerbantu tukang 7 orghr 99,000.00 '693.200.00 [ faumiah 3.471.000.00 231465,670.00 Bis 35 Tarun XX 2075 JurNaL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKS! & INTERIOR 623 YNIANL UMS ISNIDOUd ee URAIAN KEGIATAN oer SATUAN] HARGASATUAN HARGA [Baun Pinte Kiam (Kaya Jat Kias i) ma 0 i Klem (No. 4) / Beton 0.08 doz 19,000.00 950.00 Jatt Papan 2/20, 4/40 004 m3. 18.417.200.00 738,688.00 737.638.00 0018 orgie 4120.00.00 2,160.00 pala Tukeng 0.105 orginr 4140.00.00 4111550.00 Kang 4.05 orgine 4105.00.00 +10.250.09 fembantu tukang 035 orgihr 99,000.00 34,680.00 foumiah 156.610.60 THSPK 361.050.00 F (Daun Pinta Kiam (Kaye Kamper) m2 Bohan F pana Kiam (Wo. 4) i Beton 0.05 doz 19,000.00 980.00 ayn Jali Papan 46, 5/7 aoa ms. 6.400,000.00 1738.668.00 ldumiah 737,638.00 andor 0.018 orghhr 120.000.00 2,160.00 gala Tukang 0.105 orghhr ‘10,000.00 41.50.00 kang 4.05 oramhr +405,000.00 1140.00.00 Pembantt tukang 035. orgihr 98,000.00 34.650.00 ah 158,610.00 liars 418,560.00 E [aun Pintu Panil Kayu Jati Kias @ mz, an aku Kiem (No. 4) f Beton 0.08 doz 19,000.00 950.09 Kay Jali Papan 2120, 4/10 00d ma 48.417.200.00 736,688.00 Hiumish . 737.638.00 Weer 005 orgihr 120,000.00 .000.00 HH epata Tukang 03 orgihe #10.000.00 33,000.00 | kang 3 orginr 4105.00.00 315,000.00 [Pembantu tukang + orgihr 99,000.00 99.00.00 piimiah 453,000.00 ai SPC 4.100.638.00 intu Pani (Kayu Kamper) m2 ct Kiem (No. 4) / Beton 0.05 doz 49.00.00 1950.00 dys Joti Papan 46, 5/7 004 md 6.400,000.00 256,000.00 mt 256,950.00 dor 0.08 orginr 120,000.00 6.00.00 pale Tukang 03 orgint +140.000.00 38,000.00 kang 3 orgie 105,000.00 315,000.00 "embantu tukang 4 oxgine 189,000.00 98,000.00 jamiah 453,000.00 iis HSPK 709,950.00 [Gints /Jendela Kaca Papan Kayu Jat! m2 {Bahan Fetem Kayu 1/2 kg 03 kg 412,000.00 3,600.00 ays Jan Pepan 2120, 40 0024 ma 1@.417.200.00 442,012.80 F qgumiah . 445.612.80 F Pyfandor 0.04 orgie 4120.00.00 4.20.00 fopala Tukang 0.24 orghhr 10.00.00 26.40.00 ‘Tukong 24 orghr 4108.000.00 252,000.00 Rembants tukang 08 ome 99.00.00 79,200.00 iumians 362,400.00 iia SPC 308,012.80 9135 Tanun XXiF 2015 JURNAL HARGA SATUAN BaHAN BaNGUNAN, KONSTRUKS! & INTERIOR 625 YNALL VM ISNIdOYd PD ovr oransonscontmucTn reaonsnTERA PCE ‘URAIAN KEGIATAN | oer | ‘SATUAN| HARGA SATUAN HARGA ‘inding Teakwood Lapla Tanpa Rangka m2 008 kg 419,000.00 950.00 pad uk. 122x244 x4 mm 04 lembar 83,700.00 33,480.00 34,430.00 0.0013 orginr 420,000.00 456.00 Tukang 0.007 oiginr 410,000.00 825.00 0.075 onginr 405,000.00 7.87500 banks kang 0.025 orghvr 99,000.00 2475.00 41.31.00 45.761.00 «:PavtsiDb! Gypsum 12mm Rangka Kayu Kamper m2 ‘Ashes Sekrup 4 inch 28 buah 7,500.00 2410.00.00 Kamper Balok 4/6, 577 0.0195 ma 6.400,000.00 124,800.00, 334 800.00 0.075 orgie +120,000.00 8,000.00 0.045 orghhr 10,000.00 4,950.00 0.45 orgine 405,000.00 47,250.00 045 orgie 199,000.00 4141850.00 76.050.00 440,850.00 buh 4 buah 70,000.00 70.900.09 70,000.00 Tukang 0.005 orgie +120,090.00 600.00 0.01 orginr 140.000.00 4.100.00 0.5 ongihe 405,000.00, 52,500.00 0.01 orgine 199,000.00 990.00 55.190.00 425,190.00 bush 1 buah 420,000.00 120,000.09 420,000.00 or 0.008 orgmr 420,000.00 600.00 0.01 orghr 170,000.00 4.10.00 05 orgie 105,000.00 52,500.00 0.01 orgihr 99.000.00 90.00 55.190,00 4175.90.00 ste! 4 pasang 410,900.00 40,900.00 FE imtah 40,900.00 Plupan: 0.00075 orate 420,000.00 20.00 0.018 orgmr 410-000.00, 4,650.00 045 orgihr 405,000.00 418750.00 0015 ongine 99,000.00 1.485.00 418.975.00 29.875,00 YNMIL VAT ISNIdOU4d “JURNAL HaRGA SATUAN BAHAN BANGUNAN, KONSTRUKS! & INTERIOR 627 Dermncrnamecremoroinrsnnovr ‘URAIAN KEGIATAN | KKOEF| SATUAN| HARGASATUAN waca | _Tigeasangan Gronds Faningn Croum (weet) Bush nan Grendel Tanam 4 buah 112,000.00 112,000.00 jumiah 412,000.00 = [Upal: Fukang 042 orga 108,000.00 412,800.00 [pembantu twkang 0.08 orgihr 98,000.00, 5,940.00 =| uma 16.540.00 nal HSPK 130,540.00 ]pomacangan Grendel Espanyolet bush ‘Bahan = |Eepanyoiat 4 bush 87.100,00 87,100.00 = | Jumiah 87,100.00 ah frukang 04 orgie 4105.00.00 44,700.00 FPombanty tukang 0.98 orgihr 99,000.09, 7,920.00 -{dumlah 22.620.00 aiai HSK 109,720.00 :|pemasangan Hak Angin (Stkutan} stel ‘Aeahan 2 ial Angin Sikwtan Biasa + pasana 48,000.00 +18.000.00 url 15,000.00 “\upan: Tekan 024 orgihr 105,000.00 44,700.00 [Pombantu tukeng 0.08 orghhr 98.000.00, 7.920.00 -|oumiah 22,620.00 # ganar 37,620.00 P| Pemasangan Hak Angin Sikutan Lurus bush “Yeanan Hak Angin Kuningan Lurus Maju/Mundur + Pasng 416,500.00 16,500.00 ;) Juma 45,500.00 fUpah: token 0.12 orgmr 408.000.00 412,600.00 _[Pembantytukong 0.08 orgie £99.000.00 5,940.00 #fsumiah 18,540.00 flat SP 34,040.00 1] Pemasangan Fitrase m2 Bahan Fitrase 1 m2 358,500.00 9358.500.00, Hi funntah 388,500.00 1} Upab : | Mandar 0.04 orghhr 120,000.00 4,800.00 Tukang 0.25 orgiir 1105.00.90 26,250.00 Pembanta tukang 0.13. orgihr 99,000.00 12.870.00 F, joamiah 43,920.00 i iat SPE 402,420.00 Pomasangen Vertical Blind m2 Behan Vertical Bind 4 m2 224,000.00 224,000.00 somiah 224,000.00 {| pan: Mandor 0.918 orghr 120,000.09, 2.180.00 Kepala Tukang 0.035 orgihr +10.000.00 3,850.00 FTukane 0.38 orginr 105,000.00 36.750.00 Pembantu tukang 035 ogi 199,000.00 34/650.00 suri 77,410.00 301.440.00 ila! HSPI Ur ISNIdOud i : a 3135 TaHUN XXII 2015 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKS! & INTERIOR, 629 ux Oe — . = D*ovenmoesnonsconserenrson sures Pee] URAIAN KEGIATAN KOEF| SATUAN| HARGA SATUAN HARGA [anal Jembotan Dar Papasibsiok Kays Kampar wma han Poku Kiem (No. 4)! Beton 078 doz 419,000.00 44.250.00 Kay Kamper Balok 6/12, 6/15, 8/12 0.033 ma 6.985.000.00 227.535.00 Kayu Kampor Balok 8/12 ootat m3 9.000.000.00 420.900.00, Ro) 1368.685,00 ivpan: ¥ Mondor 0.0067 orgie +120.000.00 804.00 Kepala Tukang 0.0333 orair 140,000.00 3,663.00 a Tukang 0.3833 orgihr 4108.000.00 34,996.50 “il Pembantu tukeng 0.1833 orghr £99.000.00 49,198.70 4 sumiah 52.660.20 tat SPC 424,345.20 Lata Jembatan Darl Papen Balok Kaye Jat ma ” Paku Klom (No. 4) / Baton 07s coz 19,000.00 44,250.00 Kaya dati Balok 5/7, 6/15, 6/12, 8/12 cota m3 18.417.200.00 259,682.52 Kays Jati Papan 2/20, 4/10 0.033 m3 48.417.200.00 807.787.60 surah 881.700.12 Upah : andor 0.0967 organ 420.000.00 204.00 Kepala Tukang 0.0323 orathr 1140.00.00 3.653.00 Frukang 0.3333 orgihr 4195.00.00, 134.998 50 Pembantu tung 01333 orgihr 89,000.00 18.108.70 Jumlah 52.60.20 aL SPK 934.360.32 Pomasangan Kusen Alumunluin Profil 4” ot | [Bahan Pak Asbes Sekrup 4 inchi 2 buh 7,500.00 15,000.00 JAurmunkim Putt Uk. 4x 10, Profil 4 inchi 440m 78,600.00 85,800.00 'Sealont 0.08 tube 32,100.00 4,926.00 Jamia 402.726.00 Upah: andor 0.0021 orghhr 120,000.00 252.00 Kepata Tukang 6.0043. orghir 410-000.00 473.00 HTukeng 0.043 orghhr 105,000.00 4515.00 Perabantu tukang 6.043 orghhr 99.000.00 4257.00, jumiah 9497.00 aula #SP 112.223.00 Pemasangan Kusen Alumunium Profil 3/8" mt }} Baran aku Asbes Setrup 4 inch 2 buah buah 48,000.00 Sealent 0.06 tube tube 1926.00 FE] Stimar Alumuniam 3/8 140m m 199,000.00 umiah 115.926.00 pan | andor 9.00221 orgint 120,000.00 265.20 (pala Tukeng 0.0048 orginr 110.000.00 475.00 kang 0.043 orgine 1105.00.00 4.515,00 Pembantu tukang 0.043 oreine 199,000.00, 4257.00 tumiah 9,510.20 Will HSPK 125.436.20 ~|pomasangan Daun Pintu PVC bh Bahan, aun Pint PVC 1 buh 816,500.00 346,500.00 lumiah 316,500.00 pan: Manéor 0.03 orgihr 4120.000.00 3.60.00 Kepala Tukang 0.03 orgihr ¥10.900.00 3,300.00 Tukeng 06 orghr 7105.000.00 63,000.00 Pambanti tukang 08 omgihr 98,000.09, 58,400.00 sumiah 129,300.00 445,800.00 nilat HSPK isi 35 Tanun XXH 2018 ‘JURNAL HaRGA SATUAN BAHAN BANGUNAN, KoNSTRUKS! & INTERIOR 634 YNIWIL VME ISNIdOUd QDinrescesnsrcsnmneerorsicnsrec URAIAN KEGIATAN KoEr.] SATUAN | HARGA SATUAN HARGA ‘Tremasangan Titik Lampu gedung ‘tk an NYM 9 x 2,5 mm 10 om 15,100.00 154,000.00 lator 4 unit 58,900.00 235,600.00 ling Plafon 1 buah 17,490.00 17.400.00 } ipa Prolonbio 25° batang 7500.00 18,750.00 “|rboos Pvc 4 buah 2,650.00 2.860.00 ab 425,400.00 ah Kopala Tukang 0.05. orgthe 110,000.00 5,500.00 Tikeng 05 orgihr 195,000.00 52,600.00 feymbanty tukang 03 orgie 99,000.00 29.70.00 limlah 87,700.00 r fyjai ise 513.100.00 i Z masangan Sakiar Tunggal stk 06 ban ita Tunggal 1 unit 29,300.00 29,300.00 | Jimiah 29:300.00 pan Kents Tukeng 0.05 orgihr 110,000.00 5,500.00 fukang 02 omhr 4105.00.00 21,000.00 Fembantu tukang 0.00% orgihr 99,000.00 92.00 rh 26.599.00 oi HSPKC 35.889.00 80); SF itemasangan Saklar Ganda ‘atk a lohan ilar Ganda 1 unit 45,400.00 45.40.00 inlah 45,400.00 iat Heepala Tukong 9.08 —orgine 410,000.00 5.50.00 Hkeng 02 orght 408.000.00 2,000.00 jembantu tukeng 0.001 exginr 199,000.00, 99,00 jumlah 26,509.00 iHSPK 71.999.00 masangan Dasar Saluran R.10 Segmen ™ ban Est Talang .10 (Segmen) 1 buah 26,000.00 28,000.00, Humniah 26.00.00, mh larder 0.0238 orginr +20.000.00 2,886.00 Leembante tukang 0475 orgie 99,000.00 47,025.00 (Mulan 49,881.00 ‘BuaiHsPK 75,884.00 {pemasangan Dasar Saluran R18 Segmen m ganar Got Talang P18 (Semen) 4 buah 27,000.00 27,000.00 “utah 27,000.00 ipa : ‘bandor 0.019 orgthr 420,000.00 2,200.00 fr -/bembantu tukang 9.38 orginr 99,000.00, 37:620.00 tap og (dumtah 39,900.00 CNet ASP 66,900.00 35 Tanun XXI 2015 _Jurnat HARGA SATUAN BAHAN BaNncunaN, KonsTRUKS! & INTERIOR 633 YNMIL VMS ISNIdONd QDinussennonocccerouncaneserrny : URAIAN KEGIATAN KOEF. satuan] HARGA SATUAN HARGA Iomosangan Pipa AirBersih bia 12" 7 [Baten [pba Plast PVC Tipo AW uk. 1/2" Pjang 4m 0.3 bateng 29.000.00 8,700.00 Hepa Platk PVC Tipe AW uk. 172 Phang 4en 0.408 balang 29,000.00, 3.045.00 ijumtah 41.748.00 |Upah |Wandor 6.0018 orgihe +20.000.00 216.00 pala Tukang 0.006 orghhr {10.00.00 360.00 Hokano 0.95 olhr 408,900.00 6.500.00 embantu tukang 038 org 99,000.00 3564.00 umlah 40,740.00 p {Nai SK 22.485.00, omasangan Pipa Air Borsth Dia 3/4” m Bahan IBipa Plastik PVC Tipe AW uk, 3/4" Pjang 4m 0.3 batang 36.000.00 10,800.00 Pipa Plastik PVC Tipe AW uk, 3/4* Pjang 4m 0.106 batang 36,000.00 +3.780,00 ura 44:580.00 sah ‘Mondor 0.0018 orgihr 120,000.00 216.00 \Kepala Tukang 0.006 org/hr 110.000,00 860.00 oten ‘006 rahe 4105.00.00 8,800.00 [pembantu tukang 0.036 orgfhr 99.000.00 3.564.00 math 40.740.00, ila HSPK 25.520.00 femasangan Pipa Air Bersih Dia 1” m “ [Bohan Pipa Past PVC Tipe AW uk, 1" Pjang 4m 03° bateng 42,000.00 42,500.00, Pipa Pastk PVG Tipe AW uk. 4" Plang 4m 0.105 batang 42,000.00 4410.00 umiah 17,910.00 rah andor 0018 orgie 420.000.09 216.00 Kopala Tukang 0.008 ovgfnr +10,000.00 60.00 FTakang 0.08 orgihr 408.000.00 6.300.00 embantu tukang 0.038 orter 99,000.00 3,564.00 Jumlah 48,740.00 st SPI 27:750.00 i. pemasangan Pipa Air Bersih Dia t 1/2" n fan pa Plastik PVC Tipe AW uk. 2° Pjang 4m 0.8 bateng 427,090.00 38.100.00 pa Plast PVG Tipe AW Uk. 2" Plang 4m 0.1088 batang 127,000.00, 13,335.00 [surah 51.438.00, Upah andor 0.0018 orgie 420,000.00 216.00 {Kepala Tukeng 0.008 orgfhr 410,000.00, 680.00 FTokang 0.08 orgihe 405.009.00, 8.300.00 Pambantu tukang 0.036 orafhe ‘99,000.00 3.554.00 | [lumen 40.740,00, tai HSK 62.175.00, Pemasangan Pipa Air Kotor Dia 1 12" m {| sation -W[bipa Piastk PVE Tipe C Uk. 1 12° Plan 4m 0.3 batang 27,700.00 8,310.00 ‘Noppa Paste PVC Tipe G uk. 1472 Pjang 4rn 04108 batang 27'700.00 2908.50 sumiah 14.218.50 “pan ‘I handor 0.0018 orgie +20.000.00 216,00 epala Tukang 0.008 erghhr 110,000.00, 860,00, <\ruken 0.08 orgfe 405,000.00 6.300.00 =| Pombants tukeng 0038 orgmhr 99.000.00 31564.00 |. |sumian 40,740.00 24,958.50, ‘JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKS! & INTERIOR ee _ 636 YALL VAT ISNIdOUd P¥iomacencoresomsresreeera re] > Tenn ESTA ou] cava] wancncaow | anon Q ingan Kran Air buah 3 4 buah 40.00.00 40,000.00 "Q 50,000.00 2 et Joahok Pore bush . oc Ky oo eC egumngo= 78 For sh me Seheas ate See tan wa eh 1S HSA aahonde gig gate ORGS He ee mh ct rer gamg wwe rom tush «game, HRSA FBloset Ouduk Porseien (komplf) Werna Putin 0.08 buah 2,500.000.60 150,000.00 = 2esnnos nn vcore MRSS} Tab aen ae z umian 261.200.00 Iipcangan Want! Bsa Wr wah 7 ma REE a ee ee ass 41.2 orgihe 99,000.00 148,800.00 wa buh fF {Sapu Guk 0.05 bah 27,500.00 1,375.00 Be Nove tuk Pa Ant a ee ee ts {::|Unah eee kag age ote tno om fe ie ooh eee; Py Jumlah 9,720.00 BS Bann 2076 Ivo ex Suu BnvnEweaKoemens bY CD eonssounrnccrscrtes eu URAIAN KEGIATAN KOEF| SATUAN| HARGASATUAN HARGA » vmasangan Pipa PE fmm m 5 Pvc 01 tobe 44,300.00, a: [dpa PE Waa Hitam 42mm vom 24,000.00, 5 sane owme ——soganoan natn | embarks tukang 0.8128 orghr 99,000.00 80.487.20, 9.05620 | Ga st 3K Ararea |S jémasangan Pager Mode! BRCIPMG A m2 26 Dia, 6 mn pj. 240 om, tinggi 120m 0287222 unit 348,200.00 120,902.78, 420.002.78 | wy 4.95 omgine 105,000.00 1025000 | a wkang 108. ore 99,000.00 qoxseo00 | & 21420000 | & Jas aSPK sess02 78 | | ena easing canine BRPMG (28 mt) m2 ” ‘Swing Ganda BROIPMG Uk, 1,298. our unit 493,300.00 197.027.78, jlimiah 497,027.78 kang 4.98 orghhr 405.000.00 110,250.00 Pombantu tukang 4.05 erginr 99,000.00, 403.950.00 P ovniah 214.200.00 hina sPK 351.227.78 Toomas. Pintu Dorong Type BRCIPMG (1,2 3 mtr) m2 Bohan Dats Dorong Gandaiype BREIPMS ozTT778 nit 4499.300.00 ser.92778 Juma 43702778 3 0.017 ohn 408,000.00 4.785.00 Pombantu tukang $105 ergihe 199,000.00 403,960.00 rah 405.735.00 isi SK 242,762.78 \gan Pintu Pagar Best m2 Pagar Besi Kompit Dengan Aksasoris 1 me 790,000.00 790,000.00 ah 790,000.00 F [Tikes 4.05 orpfar 495.000.00 +10.250.00, Pembantu tukang 405 orgihr 9,000.00 4103.950.00, umiah 214.200.00 {lat HSPK 4-004:200.00 lpek. Pomb. Pagar Bosi Model PMG 1,5 mx2,4.m m Bahan [esi Beton Polos TEI kg 412,000.00 454,560.84 Besi Beton Polos ‘orm +2:000.00 127 848.28, Pat BesiBaia 72608 kg 25:000.00 366.200.00, Pica Bosi Gatvanish Dia. & 36 om 261,942.00 2.252.708.08 | retacsnayt pla, apscatnsr, Specatpemaun 2882 01.155.00 70.128.40, b Nsimiah 3.576.440.52 A pan [pest angkur O'a. 48 ma paniang 70 om 468 buah 38,000.00 588,000.00 sumiah 588,000.00 “lial SPR 4.464.480.52 S56 Tan 30x 2075 Junna Hanca Sanh Bavan Bangunns, Konsrnues & INTERIOR 639 So _ Peni oroanrocenmycnensreonanresunics ‘URAIAN KEGIATAN oer SATUAN] HARGASATUAN HARGA jaan Beal Pipa Galvanis 5/4" (medium) ™ ” lies! Pipa Galvonis mod A Dia, 3/4" 1020 m 45,600.00 46,512.00 lumi 46,512.00, }Upah fFemasonean Pipa Gatanis temasuk Elektodo + om 10.301.10 49.301.10 amish 49.30.10 iia HSPK 36,813.10 pokorjaan Bosi Pipa Galvanis 4” (medium) m an § [des Pipa Gatanis Medium 1° 4920 om 58,900.00 80.0780 + Mumah 86.078.00 Hupan fmasangan Pipa Galvanis Termasuk Elektrode 14719 40.20.40 toceat9 fumiat 4946249 jilai HSPK 75,240.19 acon Pipa Glvorts 2" (med) m esi Pipa Galvanis Medium 2 1/2" 102 m 187.000.00 190.740.00 Hamtah 190:740.00, pa Fpemasengan Pipa Galvanish termosuk alektode 2.9428 m 40,201.10 30,324.38 [Jamia 30,324.38 ai HSPK 221,084.38 ekerjaan Best Pipa Galvanis2 1/2" (medium) m Bahan [Sesi Pipa Galvanis Medium 2° 402m 487.000.00 190,740.00 uma 490:740,00, pat eemasangan Pipa Galvanish termasuk electrode: 344 m 10.304.16 30.324.38 umian 30.924.38, -Vilat HEPK 221,064.38 Pakorjaan Bos! Pipa Galvanis 3° (mecium) m Bahan |Besi Pipa Galvanis Dia. 3" 1.02 m 261,942.80 190.740.00 iumiah 490,740.00 Upat Pemasangan Pipa Galvenis Termasuk Elektrode 3.2708 mm 49.01.10 92,348.48 lumiah 3234045, hla #SPK 273.085.45 Pokerjaan Besi Pipa Galvanis 4” (medium) m Bahan Bosi Pipa Gatvanis Dia. 4020 m 261,942.80 207.101.68 siumiah 267.101.66 “| Upah Pomasangan Pipa Galvants Termasuk Elekirode 5.8876 om 10.301.40 39,092.84 = oumtan 33.002.84 Nia HSPK 300,874.49 Pekorjnan Best Pipa Galvanis 6° (medium) m Bahan Besi Pipa Galvans Keclum 5° 4020 om 97.60.00 267.181.65 Sumiah 367.181.86 -|Upan Pemesangan Pipa Galvanis Termasuk Flektrode 628m 10.01.10 90.648.76 1} damian 50,648.76 “ital SP 327.83041 pis 35 Tanun XXW 2015 JuRNAL. HARA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 641 YNILL VME ISNIdO4d Pvesin ronsrecnneenesnsineres UNWIL WMT ISNIdOud ol URAJAN KEGIATAN, KOEF.| SATUAN| HARGASATUAN HARGA FPemasangan Pipa Gookor 150 (70 em) = Bohan Lem PVG 04 tube 14,900.00 41,430.00 F Pipa Cooker 150 ‘300m 484,400.00 202,840.00 ‘{vamiah 204.270.00 pat -[Tukeng 0.01 orginr 105,000.00 4,050.00 Plpembantu Tekang 05 orgie 99,000.00 49°500.00 Jaumtah 50,550.00 nneitisPK 254,820.00 *|pemasangan Tee 150 x 100 bush Bahan Lem PY ot buab 14,300.00 41,430.00 *|Pipa PVG 150 x 100 41 buat 748,000.00 23,900.00 Je ap }aumian 828,330.00 F lUpan Frukang 0.047 orgine 406,000.00 1,785.00 AER pembantu Tukeng 0.75 orginr 199,000.00 74.250.00 EAE sunita 76.035.00 ‘TNial HSK 201.365.00 | pemasangan Tos 150 x 160 bush ,|banan item PVC 04 tube 44,300.00 7,430.00 Pina PVC 150 x 180 1 buan "765.000.00 a44509.00 -\uarasah £247.930.00 |jUpah ‘|tukang 0.017 orgint 105.000.00 4,798.00 Pembantu Tukang 078 ongihe 29,000.00 74,750.00 3 Jummiah 76,035.00 Nai HSPK 918,968.00 -[eemesangan Toe 100 x 100 buah _|Bahan hem PYC oa tube 414.300.00 41,430.00 S Hee 100 x 100, vt buen 430,000.00 473,000.00 uretah 474,430.00 [af Urah -FTukang 017 orghe 4408.000.00 4.785.00 erbantes Tukang 075 orginr £89.000.00 74:250,00 jJumiah 76,035.00 ial HSPK 1550.465.00 F |pemasangan Valve 100 buah [Botan Lem PVG 04 buah 44,900.00 4,430.00 Wane 150 14 buah +,086.100.00 4.4931610.00 [Jamia 11195.040.00 pat Fiukang 001 orgie 405.000.00 1,050.00 (pembantu Tukang 48 orgie 99.00.00 +48, 500.00 juumiah 149,580.00 lal HSPK 4.344.590.00 “| pemasangan Valve 180 bbuah Bahan “}Lom PVG 04 bush 414,300.00 4,430.00 : Walve 180 471 buah 2.277-100.00 2.504,810.00 -[urciah 2.506.240.00 Ayan = |rukang 0.01 orgihr +105.000.00 41,050.00 /[Pomants Tukang, 18 orginr 99,000.00 4148.500.00 Surmtak 449,550.00 {nal HSPK 2,688.780.00 : isi 36 Tarun XXH 2075 Jurews Haran Saruan Banas Bancunan, Konstruxst& Inrerion 643 LE Deron cra sips conrucnen NTENOREMATERA TST URAIAN KEGIATAN, oer] SATUAN] HARGASATUAN WARGA ‘| -]Pemasangan Tegel Trotoar m2 -|dahaniMaterial ESS og cone ak 45.000.00 4sis20 Seeogihenr wo eels ‘Bangs (ean ome me S0.00 ies Sacon tom Ss.s0000 939000 [Jumiah 75,614.16 Upah Ihendor 0.025 orginr 120.000.00 3,000.00 Kopala Tukang 0.028 org 10.00.00 2750.00 fukang 025 orgfhe 105.000.00 26.250.00 Tees Taare eee “a. 08 ‘300.00 ism joo. jase ine panasangan Paina Stone (68) T&A wa AGRE persairanins ecto [Sanaa prs Pann IS eh + 6.00000 4.00000 Samia ‘64.000.00 ups Troe cous ory = za. gc0.g0 4.00008 ee rakang goss a eauo oe 39888 ed 2g mem —_—t.00009 p00 oma tase gos ery Segue. $400 (ian s5ssn.00 | i dex 133s0.00 _Tpemasangan Paving Sone (}H) T18 em ma Garment perseipeona |Bahan/iMaterial _ [Saas ype Panne 8 on 1 m2 74.0000 14.00.00 Hine 8000.00 lee “(iar coos om ——_#20.00000 3.00099 ra Takong gees ai Meee no 272000 are 23 arog ge.08 32000 eS Takano a 550.00 Aecth 1950.08 _lwiatiseK 99,950.00 omasangan Paving tone (218) Tm wa eee reac Panna sae eee pee! Panjng 8m 1 ma 70,000.00 7000000 eae boo.e0 ‘an Mor o.o0s org ©—=—tzan000 3.00090 Nee stan ga ato ao 30.00 {kang oa fo 0 0 3.80.8 ea Tuan gem Teg eon 00 $30.00 /[ionen sB2s080 Aiton 3550.88 ‘Voemasangan Paving tone 1H) H186m oa saereanst peaugh Parana sreeamotoal erat > rel Palos 818 + m2 75.00.00 1.00009 enh roe. pa “Weer oes oman «7000000 3.09000 [ie rane 3ess gah n.oo.80 3008 Ween 23 amr ——_—Yo3.00.08 3 oet0 eS rukng gos cm “gp. 0 4 so.0 seh 3350.00 90.950.00 ital HSPK Bg fois 35 Tan XXU) 2015 “Jorma, Haron SaTUAN BAHAN BANGUNAN, KONSTRUKS! & INT ERIOR 645 NNW wae ISNIdOUd ©PYomnsvsarenconrno rennin URAIAN KEGIATAN | oer SATUAN| HARGA SATUAN HARGA | StopperiUskup tebal8 cm warna _|penanatoriat ‘|pesir PasangiPtostor 0.001 ma 198.400.00 468.40 SoppertUskup tb 8 om warna 3.34 buah 7,000.00 23,380.00 PEA | aumion 23,548.40 Lupa LA Mondor 0.091 orginr +120.000.00 120.00 “Kopala Tukang 0.025 ogi +40.000.00 2,750.00 LER |Tukang 008 orgihr +105.000.00 5,250.00 AEE | Bembantu Tukang 6.05. orghhe 99,000.00 4,960.00 or 13,070.00 Hg Niel sex 36.618.40 “11 | pembongkaran Paving Dipakal Kembalh m2 ‘Ypan Mondor 0.02 omghhr 1120.00.00 2,400.00 -fTenaga Kasar 0.04 orgie 99,000.00 3,900.00 Eg, niet sPK 6,360.00 HG renponakaran Paving nao Dipakal Kemball m2 pan # Mondor 0.01 orgine 120,000.00 4,200.00 i Tenaga Kasar 0.92 ereinr 99,000.00 4,980.00 Nai HSPK 3.180.00 F Lpemasangan Grass Block m2 J, fesnantenec i Pasang/Plestor O41 ma 468.400.00 16,840.00 “Gite lock 94 om # 96cm x 10 om 44 ma 87,000.00 95,700.00 Juri 112,540.00 [upon 1 Mendor 0.025 orgie 120,000.00 3.000.00 1 fat} Kopala Tukang 0.025 omghhr 110.000.00 2,760.00 Jukana 0.05 orgint 405,000.00 5:250.00 Fa) |Pemoane Tuxana 0.05 orgie 99,000.00 4950.00 | umiats 45,950.00 “nila SP 178.490.00 F | Biaya Menggilas dongan Mesin Giles (Walles) jam ‘(hari = § Jam) $1) | Seva Poralatan * sowa Walles Min 5 jam 1 jam 107,400.00 107,400.09 _Jumiah +107-400.00 “Npah Lea [sovir 0.414285 org/nr 405,000.00 45,000.00 Bg |pembantu Tukang 074288 orgihr 98.000,00 14:142.86 4 Pembantu Operator 04285 orgihr 410,000.00 4.714.298 ) | a 2umiah 46,087.14 PAE niaiisex 4s2.257.44 Biaya Menghampar dengan Finisher (hari =4 jam) jam Sewa Poralatan | Sowa Ashpalt Finisher Min 3 jam + Jam 4.062.300.00 4.062.900.00 iumiat : 1.062'300.00 pat sonir 014285 orgine 108.000.00 48.00.00 Pembanta Tukang 0.44285 orghtr 98,000.00, 14,142.86 Pembantu Operator 014285 org/nr 419.000.00 48,714.28 | sumiat aag57-44 Nia HSPIC 4.907.187.14 YNALL UMP ISNIdOud 35 Tanun XX 2015 JURNAL, Haran SATUAN Baan BaNcuNaN, Konstruxst & INTERIOR Gar Prev cesanaconnrsea menassrames URAIAN KEGIATAN KOEF.| SATUAN| HARGASATUAN HARGA ET agregat Lapis Pondasi Alas (LPA) m3, Kas AMenggunakan lat [Bahan/Materiat asit Urug 0.1268 ma 143,500.00 18.176.71 Satu Pecan Mesin 1/2 om 0.4068 m3 466.000.00 189/508.82 Hsau Pecan Mesin 2/8 om 048, m3. 262,000.00 125,760.00 Balu Pecah Mesin 5/7 cm 0.2933 m3 253.000.00 74,213.25 |dumiah 407.656.79 /|\Sewa Peralaten 4 Sewe Truk Tangki Air min 6 jam 0.0066 hari 503,200.06 3.954.63 Sowa Wales Min 5 jam 0.0333 jam 407400.00 3579.96, [Seva Motor Grader 125 - 140 plc min 6 jam 0.0333 jam 278,600.00 9319.91 ‘Jurntah 16.254.50 ‘upan Sapir 0.0088 orgihr 4105.00.00 700.04 iMandor 0.0067 orghhr 120,000.00 804.00 fPembanty Tukang 0.0% omgihr 99,000.00 3.960.90 Operator Alat Konstruksi (Excavator) 0.0134 —orgihr 120,000.00 1,608.00 lPembantu Operator 0.0068 orgmr 10.00.00 73337 [embantu Operator 9.0134 orgie 110,000.00 4,474.00 |Jumtah 9.279.41 fiat SPK 433.190.69 HAgregat Lapis Pondasi Bawah (LPB) Klas B m3 BahaniMaterial p [Pasir Urug 016 m3. 143,600.00 22,980.00 eatu Kerli Beton 404 ma 238,500.00 248,040.00 ‘umion 271,000.00 [Sowa Peratatan [Sewa Truk Tanghi Air mh § Jam 0.0333 hari 02,200.00 16.173.17 {Sewa Welles Min 5 jam 0.0333 = jam 107.400.00 3.579.864 [Sewa Motor Grader 125 - 140 pk min § jam 0.0333 jam 279,600.00 9318.91 jjumiah 29.872.71 2 pa Sopir 0.0986 onihr 408,000.00 200.04 Mendor 0.0087 orgih 1120.00.00 304.00 '[Pembantu Tukang 0.04 orgihr 99,000.00 3.960.00 [Operator Alat Konstruksi (Excavator) 0.01384 orgine 120,000.00 1.800.80 ambanit Operator 0.0086 orginr 10.00.00 733.37 fPembantu Operator 0.01334 orginr 110,000.00 1,487.40 umish 9265.64 pi [iialHsPK |Agrogat Lapis Pondasl Bawah (LPB) Klas C m3 |Bahan/Material site 1.02 ma 186,000.00 189.120.00 [Batu Kerlll Boton 025804 m3 238,500.00 60,421.59 Jumlah 219.541.59 Sowa Poralatan Sewa Truk Tangki Ai min 5 jam 0.0333 had 503.200.00 16.73.17 Sowa Wales Min 5 jem 00333 jam 107.400.00 3579.64 Sowa Motor Grador 125 - 140 pk min 5 jam 0.0833 jam 279,500.00 es1991 “Human 29.672.71 upon Sopir 0.0086 oxgthr 108.000.00 “700.04 _ Mentor 0.0086 orgihr 4120.00.00 800.04 Pernbantu Tukang 0.04 orgie 99,000.00 3,980.00 ‘Operator Alat Konstruksi (Excavator) 9.0133 orgihr 120,000.00, +.599.96 Pambantu Operator 0.0133 ore 110.000.00 1496.63, Pembantu Operator 0.0088 orgihr 410.000.00 733.37 9,260.04 258,478.34 ‘JURNAL HaRGA SATUAN BAHAN BANGUNAN, KONSTRUKSI& INTERIOR 649 YNALL VM ISNIdOUd ee URAIAN KEGIATAN Koer, savuas] HARGA SATUAN HARGA Sewa Peralatan 2] Sana Dump Truck 5 109 osi48 jam 66,100.00 20,008.28 Sowa Generetor 6000 watt Does! unk 700,000.00 46.070.00 [sea Ashpati Finisher Win 3 Jom Oorst jam 1.962-300.00 46.040.73 Sewa Pneumatic Tie Roller in 5 Jom 9.0107 Jam 223:700.00 230959, sewa Tandem Rollor 0.0097 jam 368,400.00 2e08.48 f lasohan Mixing Plant oozat jam 4,025:400.00 e724 va Wheel Loader 17 -2.m (min § jam) DONT jam 587,500.00 6.80355, fora Ala Bantu Pembuatan Aepal Emucion + jam 20,400.00, 20,400.00 Hiumiah sezgotr? =lUsah “|Mandor 0.0023 ompihr 120,000.00 276.00 Pombanta Tukang 2.045 orghhr {99/000:00 4,455.00 Luumiah 4731.00 iat HSK, 4.0611586.77 pradukst Lapis tipis aspal beton AG (Lataston) Ton ‘ggunakan Alat Bahan/Matertal Panas AC 60/70 (termasuk angkulen) 7 kg 12.90.00 903,000.00 Pl semen PC 50 ka o8 za 66,000.00, 52,000.00 Pasir Pasang/Plester 0.27 m3 168.400,00 45,468.00 [Eslu Pecan Mesin 1/2 om 0075 m3 466,000.00 24.950.00 [patu Pecah Mesin 422 6m 02 m3 456:000.00 $3,200.00 jiumish 4.129°448.00 Sewa Peralaton ewe Dump Truck 6 fon 0.24 jam 68,100.00 415.804.00 Sowa Ainp 10°T Min § Jem 005 jam 263,900.00 1319500 Sowa Wheel Loader 17-2 (nn 5 jam) 008 Jam 581°500.00 29107500 Siumiah 58,134.00 lupan Estsopie 0.04 orgine 498.000.00 4200.00 andor Oot orgihr +20.000.00, 4200.00 Pembanty Tukang 0.03 orghhr {99,000.00 2970.00 ‘FTenoge Kasar 0.08 orght 99:00:00 5,940.00, Operator Alat Konstruks (Excavator) 0.925 orghr 120,000.00 3,000.00, FPembantu Operator 0.08 orginr 410,000.00 3400.00, [Pembantu Operator 0.025. orghir 410,000.00 2780.00 \sumla 24,460.00 F | Mlat HSPK 4.242.01200 Produks! Lapis tiple aspal beton HRS (Lataston) “Tor * | Mengaunakan Alat haniMatorial al Cutan 7 ko 40.90.00 763,000.00 Semen PC 50 ko 08 7 66,000.00 52,800.00 Peck. Pasang/Plester oar m3 168,400.90 445.498.00 Balu Pecan Mesin 1/2 om on7 m3 486,000.00 24'950.00 Batu Pecah Mesin 472 cin 02 m3 466,000.00 33.200.00 Kepur Pasang oot ma 92,900.00, ‘92800 fiumtal 990.347.00 [sewa Peralatan Seva Dump Truck 5 ton 024 Jam 66.100.00 15.864.00 Seva Amp 10 T Min 5 Jem 005 jam 263,400.00 43,198.00 [Sowa Vitiee! Loader 1.7 2. (in § jam) 805 jam 561.500,00 29,075.00, iumfah 58.134,00 pan sopit 0.04 oxgihe 4105.000.00 4,200.00 Mandor 0.01 orgihr 420,000.00 4200.00 Panbantu Tukang 0.03 orghr 99,000.00 21970.00 ‘Tenaga Kacar 8.08 orgihr 98,000.00 940,00 |Sperator Alt Konstruls! (Excavator) 0.025 orghr 420,000.00 3,000.00 Pembantu Operator ‘004 oigihr +10.000.09, 400.00 Pembantu Operator 0.025 orir 410,000.00, 2.75000, fiumian 24.480.00 ial HSPK 4.072°941'00 si 35 Tanun XXH 2015 ‘JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKS! & INTERIOR, 651 YNNIL UMTS ISNIdOUd PDremoncrmnonoconnenoussercraers ea URAIAN KEGIATAN KOEF.| SATUAN] HARGASATUAN HARGA [Fenghamparan ATE tb. 6 em Ton |Bahan/Material Ejatpal Cureh 66 kg 10.9009, 71.940.00 Hiinyak Tanah 1.66 IRer 8.70.00 44442.00 _[Produksi ATB/ATBLLapis Beton uk LPA 98868 ton 4,083.328.00 1.028.987.56 |{uston Ata) Menggunakan lat 4.944°769.64 !sumlah [sowa Peralatan "wa Asphal Finisher Min 9 Jam coisa jam +.062.300.00 52,964.39 Q [Sewa Preumatic Tire Roler Min 5 jam pez jam '223.700.00 1.026.838, ‘Sowa Tandem Roller 010284 jam 268,400.00 43.227. 83 FSewa Aspal Sprayer min 4 jam 0.02957 Jam 28.000.00 927.96 |Sewa Compressor min 5 jam ome jam 95.10.00 3.749.541 jes 81.186.52 i andor onnses? —orgihe +120.000.00 embantu Tukang ‘o07ee64 orghhr 99,000.00 Henaga Kasar ites orghhr 9,000.00 «| Eperator Alat Konstruksi (Excavator) cose orate 420,000.00 {Sembantu Operator 203027 orgie +¥40:000.00 ¢ mia 20,767.51 OU RE nab SPK 1.228.72187 ||Penghamparan ATB tb. 4 em ton |) BahaniMatorial spa Cura 443556 ko 40,900.00 48,347.60 “Tanah ‘scam iter 8,700.00 9604.47 rodukst ATB/ATBL/Lapis Beton utk LPA 0.98538 on 1.043.328.00 4.028.987.54 ‘ sion Alas) Menggunakan Alat 1.086.338 62 [Jurtah [Sowa Peralaten a [Sowa Asphal Finisher Min 3 Jam opseaat Jem 4.062.300.00 52.954.39 fete Prete Tro Role Mn Jam oodgass = jam '228.700.00 11,024.83, i awa Tandem Roller gees jam 268,400.00 18.227 88, [Sowa Apel Sprayor min 4 jam 0.0287 jam 28.00.00 827.96 |Sena Compressor min § Jam onze? = Jam '85.100.00 3,749.51 umiah 311184.52 i _jMandor coo orghhe 120,000.00 4,182.82 © ermbanty Tukang ‘g7eEG’ —orgihr '99°000.00 7.806.58 i ‘VHenaga Kasar oxig2 — ongihr 99,000.00 1070992 : |Operater Alst Konstruksi (Excavator) onsec7 orghr 4120.000:00 4731.24 ‘ [pont Oporatr ocsea7 — oraihr 140,000.00 4336.97 “damian 29.787.49 \Nllai HSPK 4.197.291.62 | Fénghamparan Laps Perr, Aspal Beton Laston(AC}tb.4om ma. ‘Bahan/Matorial |Sspal curen oso 40.90.00 4816.49 _|Myak Tanah 0099 iter 2.70000, '381.30 oduksi Lapis tipis aspal beton AC Laston 0.083 ton 4.242.012.00 108.657.08 “Jmenggunakan alat 1.838.785 ria Sowa Per | |Soua Asphal 0.0085 Jam 4.052.800.00 5842.65 _|Soua Poeumatic Tre Roler Min § Jem 00055 jam 223,700.00 1230.38 _ |Sewa Tandem Roller 010055 jam 268,400.00 4476.20 [Sewa Aspal Sprayer min 4 jam 0.0033 jain 26,000.00 92.40 “\Sewa Compressor min 5 Jam 0.0044 jam 95:100.00 16.44 20 |imish 9080.04 6.76.| 9 |Mandor c.0011 orgihr 120,000.00 132.00 2G) |Pembantu Tukeng 0.01 orgih {99.000,00 41.089.00 6.26 f 4) |Tenaga Kasar 0.011 orgihr 99.000.00 1086.00 8 -Joperator Alat Kanstrukst (Excavator) 0.0085 orgihr 420,000.00 1860.00 ||pembantu Operater 0.0055 orgitr 10.00.00 605.00 [suman 3.575.00 [Wil SPC 124.460.80 8°35 Tarun XXII 2075 Jura Harn Saruan Bavian Banicunan, KonsTrex! & INTEROR 653 YNMIL UMUT ISNIdOdd PDrcomurcnemnevornucrosscemaanvrres URAIAN KEGIATAN | KOE! | SATUAN| HARGASATUAN HARGA IAL anicon Aspal Penetrasi (Koleken)) tb 2-4 em m2 0.0060 orgtsr 420,000.00 720.00 (0.0100 orgihr 105,000.00 4,050.00 bantu Sopit 0.0100 orgie 98,500.00 985.00 ante Tukang 0.1200 orgfnr 29,000.00 41,880.00 ‘aga Pemasak Aspel 0.0800 orgihr 99,000.00 5,240.00 ah 20,575.00 F (Sihanmaterial Hgpal panas AG 60170 (lermasuk angkutan) 45000 kg 12,900.00 158,050.00 E|aat0 Pecan Mesin 1/2 om oo140 m3 466,000.00 6,524.00 Naty Pecah Mesin 2/3 om 0.0400 m3 262,000.00 10.480.00 Eddy Pecan Mesin 0,5/1 cm 0.0149 m3 466,000.00 6,524.00 81,578.00 Sawa vrlles {min 6 jam) 0.0070 jam 4107.400.00 751.80 menggilas dengan Mesin Gilas (walles) 0.0150 jam 182.257.00 2,286.86 3.035.60, 405.188.65 m2 pis ParokatTack Coat 04 iter 16,137.90 6.495.16 roguksi Lapis tpis aspal betan AG (lataston) 0.044 ton 4.212.012.00 53,328.59 lenggurakan alat 59,789.69 EAlamiah Seva Poralatan F Iriya Menggias dengan Mesin Gilas (Walls) 0.003 Jam 482.257.14 456.77 EG hari=5 jar) 45677 ‘Jumiah {pan Itendor 0915 orgie 420.000.00 1.80.00 Ipembantu Tukana 0.45 opine 98,000.00 14.850.00 uta 16,650.00 lai HSPKC 76,890.00 Lap. AC Levelling 3-4 cm, tanpa Finisherdan PTR m2 untuk perbaikan jatan) Bahan/Material Lapis Perekat/Tack Coat 04 ier 16.197.90 6485.16 Produksi dan Penghamperan Leston Lapis 0.0798 ton 1.061.588.77 04.714.62 lantara Leveling/AC-BC Leveling 91.169.78 suman Sewa Porolatan Biaya Menggilas dengan Mosin Gilas (Wales) o.oo jam 162,257.14 603.03 11 harie6 jam) 608.03 0.015 orghhr 120,000.00 1,800.00 Pempanty Tukeng 0.48 orghr 99,900.00 14,850.00 umiah 46,650.00 108,428.81 ila HSPIC YNIIL UMTS ISNIdOdd 35 Tanun XXIf 2015 Juana HARGA SATUAN BAHAN BANGUNAN, KonsTRUKS! & INTERIOR 655 ce fF URAIAN KEGIATAN oar saruan] wanensaruan [HARA 3 smasangan dan Penarikan Kabel 7 8 ab ont Tukang 0.05 ora 29,000.00 4290.00 | iHSPK 4,950.00 z 111 snwcangan Kobe awa Tanah a & TA roratora @ Mesin Br os jam 490,000.00 95,000.00 | & imma 95.000.00 b a e sndor 0.025 — orgihr 420,000.00 3,000.00 Tukang 0.5 ergiht 105,000.00 52,500.00 b pevoaiu Tokang ove oan $9.00000 yazan ian erent | wy WingPx yearoco | of RoiPipa ts unit 2 1] lose Pevalten e va Alt Bart Rol Pea + Jam 2,900.00 2.80000 bumiaty 2eoo.00 | ro 1087 orgie 408 00.00 .208.50 erage Kasot Sates ome 99 00000 aatero Sia aae020 i SP gase0.20 ipa 2" nit [Sone Peralatan =}Sewa Alat Bantu Roll Pipa t Jam 2,600.00 2,600.00 : Jumbah 2,600.00 | 0.1933 orgihr 4108.000.00 13.98.50 0.2667 orghhr 99,000.00 28,403.30 a 49,399.80 i 42,998.80 =| Roll Pipa 3” unit :|Sewa Peratatan [Sewa Alat Bantu Roll Pipa 1 jam 2,600.00 2,600.00, sumiah 2,600.00, = fUpah : Tukang 0.25 ogi 405.000.00 28,250.00 ‘Tenaga Kasar 0.5 orgthr 99,000.00, 49,900.00, || Sumtah 78,750.00 =| Witai HSPK 78,350.00 RollPipa 4” unit |sewa Peralatan Sea Alat Bantu Roll Pipa 4 jam 2,600.00 2,800.00 jJaumian 2,600.00 04 omgihe 105.000.00 42,000.00 0.8 orgihr ‘99,000.00 79,200.00 421/200.00 123.800.00 Pemasangan Kabel dalam Pipa Pekerjaan m F |instatasi Jaringan Bawah Tanah F|Upah 0.01 orgie 420.000.00 1,200.00 0.08 orgihr 9,000.00 2.970.00 Nia HSPK 4170.00 35 Tanun XXH 2015 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKS! & INTERIOR 657 PDerrusorenvneceecrogrtnsirnrey URAIAN KEGIATAN, [roe SATUAN] HARGASATUAN HARGA "14 Vingtalast 1 ttik Lampu PdU (Tarikan Udara) 4 m #[Bahanitatorial cael NYM_ 3.x 2.5 mm am 48.10.00 60,400.00 : Lita 60.400.00 4 Upan ‘ _}Pemasangan dan Penarikan Kabel 40m 4950.00 18.809.00 : jumtat +49.000.00 Tal isPK ntatasi 1 tittk Lampu PJU (Farikan Udara) 7,5 o {Bahan/Materiat abel NYM 3 x 2.5 mm 7 om 48.100.00 143,250.00 mir 113.280.00 “Hbpah “|pamasangen dan Penarkan Kobo! 7 om 4,960.00 37.128.00 stan 87.12600 Hl HEPC 150,375.00 “igstatas 1 tt Lampu PAU (Tarkan Udara) 10,9 m m Ijahan/Material Kabel NYM 3.x2,5 mm 105m 45,100.00 +188.560.00 {|Jomtah 1158.550.00 :|pah IPemasangan dan Ponarikan Kabel 05 om 4,950.00 51.976.00 -faumian 51,975.00 = Alla HSPK 240,525.00 Jnstatast 4 tttk Lampu PJU (Tarikan Udara) 14,5 m m /BananiMatertal abet NYM 8 x25 mm ns om 48.100.00 179,680.00 = [bumiah 173,650.00 | |Upab Tpemasangan dan Penarikan Kebel 15m 4980.00 56.925.00 = Jumtah §6.926.00 Saat usPK 230,875.00 | [fnotalasi 4 titi Lampu PJU (Tarikan Udara) 13 m ™ |aahanvttaterial ‘abel NYM 3 «2,5 mm rr) 45.100.00 +496.200.00 = [surotah 496.300.00 a Fs|pemasangan dan Penarkan Kabel 1m 4.95.00 64,350.00 2 lumlah 64,350.00 Nal HSPIC 260,850.00 nstatasi 4 tik Lampu PJU (Tarikan Udara) 13 m ” _[pahaniMatorial | [Rabel NYM 8 x2,5 mm 180m +16.000.00, 271.800.00 dumish 271,800.00 lah [> |Pemasangan dan Penaran Kabs! 480m 4,960.00 89,100.00 5 |sumiah 89.100,00 Nila HSPKC '360.900,00 35 Tamu OXI 2075 JuRWAL Harca Saruan BaHan Bancunan, KonstRuist & INTEROR 659 YNIL UMP ISNIdOdd QDdormuoonanocoumerorraciorsneea rs URAIAN KEGIATAN KOEF,| SATUAN| HARGASATUAN HARGA "Tromasangan Omamen Lampu PJU Panjang 6m buat Bahan/tateriat Bougel + Mur Baut Omemen 3 buah 420,000.00 360,000.00 Plat BesiBoja 51874 kg 225.000.00 87.893.59 Pica Bost Galvanish Dim 2 6 om 140.622.91 603,737.48 |L2A0 Pemkot untae PALL 2 buah 75.000.00 160,000.00 “{fol Pipa 2 + unit 42,999.80 42.999.80 |Jumiat 1.204.630.85 [Sewa Peralatan =| Sewa ALat Bantu Pererangan Jalan Umum (PJU) 2 jam 6,760.00 13,400.00 uma 13,400.00 pah andor 0.125 orghe +20.000.00 15.000.00 ‘fukang 0.2 orgihr 105,000.00 21,000.00 Pempamy Tukang 06 orgthr 99,000.00 59,400.00 uma 95,400.00 Nel SP 1.413.430.88 Pemasangan Panel Lampu PJU -1 Phase 2200VA nit BahaniMateriat Kabel Glen | Wator Mur PG-T 1 bua 1.925.000 1.325.00 Kabel Glen / Water Mur PG-19 4 buah 4.326.00 47300.00 Kabel 10 mm 300m 9.750.00 2.250.00 ‘Perel Psu 4 buah 1.421 600.00 41.121.600.00 MCB CGON 6.1 Phase 4 bush 180,000.00 '696.000.00 MCB CBON 16 At Phase 2 bush 159,000.00 31,000.90 Bougel + Mur Bast Omamen + buah 120,000.00 120.000.00 Senless The + Clip (ule) + Ring 3 buah 11,900.00 35.700.00 Grouncing Roud (Arde) 16 mm 4 buah 98,150.00 339,130.00 Pipa PVC Pelaluan Ante Dim. 12 incht (Putin) 30m 6,350.00 +91050.90 =| Keni Pipa PVC 1/2 inchi (Putlh) 2 buah 3,700.00, 7,400.00 2[Time Swich Sul 101 ¢ + unit 487.500.00 487°500.00 umtah 3.192275.06 [pat Perckitan Panel Penerangan Jalan Umum (P40) 4 unit 1162.00.00 162,000.00 lemesangan Panel Lampu PJ 1 unit 169,000.00, 189.200.06 mia 331,200.00 Noi NSP 3483475.00 _|Pemasangan Panel Lampu PJU ~1 Phase 3500VA unit _ | Bahanitdaterial = |Kabel Glen / Water Mur PGT 4 buah 1.928.00 1325.00 Kabel Glen / Water Mur PG-19 4 buan 4228.00 47,300.00 Kobo! 10. mm 200m 2750.00 28,250.00 = |Panel PIU 41 buah 4.421.600.00 1.421,600,00 CB C6ON 61 Phase 4 buah 189.090.00 "159,000.00 MCE C6ON 10.84 Phase 3. buah 459.000.00 477,000.00 CB CEON 40.4 1 Phase 2 buah 159.090.00 318,000.00 Beugel + Mur Baut Omamen 1 buah 120,000.00 4120.00.00 Stentsss Tie + Cip (Yake) + Ring 3 buah 41,900.00 35,700.00 [Grouncing Roud (Arde) 18 mm 4 buh 339,180.00 329,150.00 Pha PVC Pelaluan Arde Dim. 1/2 inchi (Poth) 300m 350.00 +91050.00 | |kenl Pipa PVC 12 inchi (Push) 2 buah 3700.09, 7,400.00, ime Switch Sul 181 d 41 unit 487.500.00 487,500.00 | umtatt 3.432.275.00 lupan Perakitan Panel Panerangan Jalan Umum (PJU) 1 unit 462,000.00 462,000.09, JPemasangen Panel Lampu PJU 1 uit 469,200.00 4169.20.00 -Jumiah 331.200.00 ital NSP 3483.475.00 Epis 35 Tanun Xi 2015 ‘JURNAL Hara SaTuaN BaHian BANGUNAN, KONSTRUKS! & INTERIOR 661 YNIALL VMUP ISNIdOu4d FD eurmn crseupnscensuoTOn NiERIORANATERML PCE iat FHSPK 35 Tan XO 2078 ura. Haron SATAN BAAS BANGUN Konsrnoxe) & INTERIOR. URAIAN KEGIATAN xoer| SATUAN| HARGASATUAN HARGA [Pemasangan Panel Lampu PJU -3 Phase 6600VA ont F |bananfMdaterial [kabel Glon / Water Mur PG-7 4 buat 4.328.00 4.825.00 bel Glen / Waller Mur PG-9 4 bush 4°325.00 47'300.00 40 ram 300m 9780.00 29.260.00 plot Lamp 3 buah 42'500.00 427,500.00 JPanel PJ 4 buah 4.421.600.00 4.421-600.00 hice CSON 6 A 1 Phase 4 buah 158,000.00 10,000.00 NCB COON 101 Phase 6 bush +159,000.00 984,000.00 ICE. COON 25 A 3 Phase 2 buah 536,500.00 4.071.000.00 Fy beugel > Mur Beut Omamen 4 buah 120,000.00 1120.00.09 Stenloss Te + Clip (fuko) + Ring 3 buah 41/900.00 35,700.00 ‘Grounding Roud (Asce) 16 rim 4 buen 339,150.00 339.150,00 Pipa PVG Polaluan Arde Dim, 1/2 inchi (Putin) 300m 6,350.00 "19,080.00, Keri Pipa PVG 12 inchi (Putib) 2 buah 3,700.00 7,400.00 rime Switch Sul 18% d 5 unk 487,500.00 487,500.00 sumiah 4.489.775.00 ean Porakitan Panel Penerangan Jalan Umurn (PJU) 4 unit 462,000.00, +162.000.00 [Pemasangan Panel Lampu PUU 4 unit 169.200.00 +168.200.00 sumieh 391-200.00 Wile BSPK 4.820.975.00 Pemasangan Penel Lampu PJU-3 Phase 19600VA unit [P| Bahaniifetenal Kabel Glen / Water Mur PG-7 4 buah 1.325.00 4.325.00 Kabel Glen / Water Mur PG-19 4 buah 4325.00 47:300.00 Kabel 10 mm 30m 2170.00 29°250.00 Pilat Lemp 3 buah 421'500.00 Panel PIU 1 buah 3 4.4241600.00 MCB C6ON BA 1 Phase 4 bush ‘159,000.00 "189,000.00 ACB COON 10.441 Phase 6 buah +¥60,000.00 1953.000.00 CB COON 25 A:3 Phase 2 buah 535,500.00 4.074.000.00 Beugel Mur aut Omarmon 1 buh $720,000.00 "120,000.00 Senless Tie + Gip (Vike) + Ring 3 bush 41,900.00 38.700.00 [Grouning Rowd (Arde) 19 mm + buah 230,180.00 339,150.00 {ipa PVG Pelalian Arde Din, 12 snchi (Putin) 300m 61350.00 "19,050.00 :| Keni Pipa PVC 172 inchi Putin) 2 buah 3'700.00 7,400.00 [Time Swich Sui 184-4 4 unit 487,500.00 487-500.00 uma 4.489.775.00 ‘[Upan Perakitan Panel Penerangan Jalan Umum (PSU) + unit 162,090.00 +162.000.00 F [Pemasangan Panel Lampu PuU + unit 469,200.00 368.200.00 Aumtah 334.200.00 ial HSPK. 4.820975.00 [Pemasangan Panel Lampu PJU-3Phese 13200 VA unit Bahan Material Kabel Glen / Water Mur PGT 4 buh 4.325.00 1,325.00 KKabet Gien / Water Mur PG-A9 4 buah 4325.00 47'300.00 Kabel 10 mm 3 im 91750.00 28°250.00 Plot Lamp 3 buan 42'800.00, 137 '500.00 Panel PaU 1 bush 4.121:600.00 4.424.800.00 = |MGB CB0N 6A 4 Phase 4 buah 159,000.00 “1§9,000.00 NCR CAON 16.A1 Pheso 6 buh 48.00.00 1954.00.00 = |race Coon 40.43 Phase 2 buah £882.900.00 4.168.800.00 Beugel * Mur Baut Omamnen 5 buah 420,000.00 1720.000.09, Sionless Tie + Clip (Yoke) * Rog 3 bush 4,900.00 '35.790.00 [Grounding Roud (Arde) 16 mm 4 Buah 339,150.00 939.150.00 Pipa PVC Pelahuan Arde Dim. 1/2 Incht (Putt) 300m 6:360.00 %19.050.00 Uf |ikeni Pipa PVC 1/2 inchi Putin) 2 buan 3,700.00 7'400.00 ‘ime Switch Sul 481-d 4 unit 487/500.00 4487/500.00 Jumma 4.894.575.00 | upan Porakitan Panel Penorangan Jalan Umum (PSU) 4 unit 162,000.00 162,000.90 Pemasangan Panel Lampu PJU 1 unit 4169.200.00 +469.200.00 surmiah 331,200.00 4.918.775.00 YNWIL VMVT ISNIdOdd cana \PDiarren orsuonccormerrea nrencreee racy URAIAN KEGIATAN KOEF.] SATUAN] HARGASATUAN HARGA FPemasengan Panel Lampu PJU -8 Phase 41500VA nit [Sahanitdaterial Kabel Gion | Water Mur PG-7 + buah 4.328.00 1825.00 ¢|kabel Gion / Water Mur PG-19 4 buah 4825.00 47,300.00 Kabel 40 mm 3 oom 9.760.00 29.260.00 Pot Lamp 3° bush 42,500.00 127,500.60, Panet PUL + bush 4.121,600.00 1.421,600.00 IMCB CGON 6 1 Phase + baah 4159.00.00 459,000.00, MCB CBON 401 Phase 6 buah 159,000.00 $54,000.00, NCB C6ON 100 A3 Phase 2 buah 4.757 800.00 3.518.600.00 Bougel + Mur Baut Ornamen + buah +20.000.00 20,000.00 stenioss To + Clip (Yate) + Ring 3 buah 41,900.00 35,700.00, JGrouncing Roud (Arde) 16 rm 4 buah 399,150.00 929.150.00 ‘Veiga PVG Pelakian Arce Din, 1/2 inci (Puth) 300m 6.350.900 49,050.00 Keni Pipa PYG 1/2 Inché (Puth) 2 bua 3.70.00 7.40000 rime Switch Sul 481 d 4 unit 487,500.00 497.500.00 "Juma 6.934.976.00 pa '|Peraktan Panel Penerangan alan Umum (PSU 1 unit 462,000.00 +162.000.00 Pemasangan Panel Lampu PIU 4 unit 489,200.00 4169.20.00 utah 334,200.00 Niloi WSPK 7.265.875.00 Pemasangan Panol Meter 1 Phase unit Bahanisateriat abot Glon { Water Mur PG-7 4 bush 41.325.00 1.825.00 -\Kabel Glon / Water Mur PG-19 2 buan 4325.00 8,680.00 JPanel Kwh meter 1 phase 4 buah 4.421:600.00 4.121.660.00 _|Beuget + Mur Baut Omemen 4 buah 420,000.00 120,000.00, | dumiah 1.251.575.00 “lupan -|Pomasangan Panel Lampu PJ 4 unit 169,200.00 4169.20.90 amish 160,200.00, - fat SPC 4 .420.775.00 Pemasangan Panel Meter 3 Phase unit , | Bahanitisteriat Kabel Glen / Water Mur PG-7 1 buah 1,325.00 4.326,00 Kabel Glen / Water Mur PG-19 2 buah 4325.00 2,680.00 “|anet tewh meter 3 phaso + buen 4,064000.00 4.,084.000.00 Bougol + Mur Baut Omarren 4 buen "120.000.00 120,000.00, | sumiah 1.198.975.00 -[upan |pemasongan Panel Lampu PAU 1 unit 4168.200.00 169.200,00 _ | sumiah 169,200.00, Nii HSPKC 4,383.175.90 Pomasangan instalas! Petaluan Arde Pane! Moter unit Bahanttdateriat abet 10 mn 20m 9,750.00 19.500.08 Pipa PVC Pelatian Arde Dim. 1/2 inchi (putin) 200m 6.360.00 42.70.00 Keni Pipa PVG 4/2 inchi (Putih) 2 buah 3.700,00 7400.00 durmtah 395600.00 Yeah Tenaga Keser 0036 orghhr 99,000.00 3.584.00 sumiah 3.864.00 43.464.00, YNMIL UMP ISNIdOdd Proersvrcravunnccerarucren arene anaes er GRAANKEGINTAN wor] runs] wamensoruaw [waren] sianangan Lamu Jalan Raya ED a 8 menage q Sa ye LED 1 unt 88000000 © aaszonnce | |.dumlah 8.568.000.00 2 f|Sewa Peralatan Sava Atel Banty Penorangan Jskon Umum (PIU) + Jam 6,700.00 5,100.00 | mn ores |B Neko 02s wm 12000000 so.c00.00 | Se id ee seen |S jPembantu Tukang 075 orgie 99.000.00 74.250.00 anh og0000 |S Nill HSPK 8.705.200.00 Db ofdastBtesa PLU sk | ohio a oes cox ma 2219000 ssroso FE letter ees wae 3 Bree, ashes |S : Sun Poe Sis Besose Sesease inom one if ‘eoen0 areeo |S ‘Meranfl Bekisting 0144 m3 /3.200.009.00 46,080.00 a ee Rita el buh 120.0 ‘3280.80 Penggalian Tanah Keras 024 m3 102,840.00 24,851.60 eee att Sot ps: 96) GHOSE areas ao wesiae [BEN boratatan ee Te te in 8 Jom sare jam ‘3730000 1.0.08 f(Sewa Concrete Mixer 0,50 m3 (min 3 jam) noes jam 66:100.00 "508.62 Alat Bantu 1'set @ 3 alat atvessa jam 1100.00 494.35 4,744.08 0.088 orgie 120,000.00 7,800.00 {Kopala Tukang 0.03 ogi 140,000.00 3:800.00 : 4.03 orpih 105.000.00 4108.150.00 Futana 0425. orginr 199,000.00 48.126.00 9 |Pombantu Tukang 025 axgine 24,750.00 junta 267,125.00 ‘Auta HSPK 749'513.04 _Pondasi Strous PIU ‘ai [ [Benanittatorial blake Coritieton an2d ms 232,100.00 5,570.40 [agker Bas! PIU 7.1581 kg 12,784.00 91.50.73 Bes! Baton Polos 25.018 kg +12.000.00 300,216.00 Pat Ship uk. 3 x40 mm 48 0m 40.000.00 $4,000.00 Paks Reng 0125 ko 416.000.00, 11875.00 Kiwat tka 05 kg 23,000.00 +1.500.00 f fkays Moranti Bakisting 0.0176 me 3.200.060.00 56.320.00 E Teur Ring watuke Angkor 4 buah 3,420.00 13.680.00 -|Penggatian Tenan Keras 02077 m3 402.840.00 21.998.87 | |Ponclaian SposiCanpuran Steus Pie (1Pe:1Ps:2.5K6) 0.1032 m3. 1981.908.00 104.332 91 ekerjaan Beton (1 PC: 2Ps 73 Ki) 0.1045 m3 4.183.498.18 420.534.39 umians 787.988.30 Sowa Peralatan Sena Vibrator Roler Min 5 jam ante jam 437.200.00 2,092.04 fewa Concrete Mixer 0,50 m3 (min 3 jam) ote? jam 6.100.00 1.007.17 | |Seora Alt BAnks Strous Puc 12 jam 40,200.00 12.2400 ‘Soir Ala! Bantu 1 set @ 3 alat comes m3 1100.00 297.58 98.697.18, jpah Mandor 0.088 orgthr 120,000.00 7.09.00 Kepaia Tukang 0.03 omgihe 410.000.00 3'300.00 1103 orghhr +195.000.00 108,150.00 0.125 orgthr 99,000.00 13,125.00 “[Pembantu Tukang 025 orm 24°760.00 187.125.00 2960.731.48 Jornal Hanca Srruan Baran Banaunay, KovoTRurs'& Invenion 967 QDromvcrrucracrmacrerrrennesrearn URAIAN KEGIATAN KOEF. saruany HARGA SATUAN HARGA 3 sangan Tiang Oktagonal 7 mSingle Hot ‘unit 8 ‘Galvanized dengan Fenders 3 fan/ateral a : Re Oktagonal 7 m Single Hot Dipped Gawenized == unk! 2.991.500.00 2931.90000 | 5 gan fendbes sso | & iah Peraiatan 2 ‘senasObn tin Sam lemawikehDemeb Ope BBM) 0.8 Jam +129.800.00 69,900.00 mia 9,900.00 $ ior 0.42 orghr 120,000.00 418.600.00 3 025 Sahn 405,000.00 26.250.00 | & : panty Tukang 026 oramr 39,000.00 22'750.00 | : fpoa Kacar 075 eran 99,000.00 74.280.00 dah 140,880.00 itSP saaziaso00 | Smangan Tang oktngers!7 meine unt S oped Galvanized dongan Flenders anifaterial ¢ fans Oktagonal 7 rx Double Mot Dipped Galvanized —batang———3.808.900.00 3.062.90000 | 33 : Pigan Wonders." 3.062.900.00 af nla : : Poralatan Esbandsdon ninSlendemaskNiDsncb Oped Sem) 0.5 jam 139,200.00 69,900.00 rian 69,900.00 6 dor 0.13 orgie 120,000.00 15,600.00 Fang 025 orga 405,000.90 36,280.00 , bantu Tukeng 928 orgihn 99:000.00 24,750.90 Fsage Kesar 975 orgie 99.000.00 74.20.00 ah 140.860.90 ins : Iemasangan Tlang Oktagonal9 m Single Hot unit [ipped Galvanized dengan Flendrs {BahanitAaterial Be oKiagoaal © m Single Hot Dipped Galenized «1 atang ——=—9.863.900.00 3.883.900.00 Hiengan fondors 3,863,800 00 Timah Peralatan [eC Senn Slam emasukMiDane Oper. 6BM) «0.5 Jam 190,500.00 59.900.00 imi 9/800.00 IMandor 0.13 ogi 120,000.00 15,000.00 ken 025 aighy 408.000.00 26,280.00 IPenbants Tukang 026 creme ‘88,000.00 24:760.00 (ierege Kava O78 or oo.000.00 7350.00 140,080.00 4.074'880.00 jPemasangan Tiang Oktagonal 9m Double Hot st [bpped Galvanized dengan Flenders [Bahan /Matoral Meare Oleanonel 9 m Double Hot Dipped Galvenized «baton ———4.796,600.00 4,796 600.00 ldngan forders 4.796.00.00 jsumiah Bewa Peralatan [Som Cone 0on ninSjom(emankMehDonch Overt) 0.5 jam 139,800.00 69,900.00 -Taumiah 9900.00 F [upan Rioncor 0.43 orgie +$20.000.00 15,500.00 kena 025 organ 405.000.00 26.250.00 “{pombante Tukang 925 org 39,000.00 24,750.00 | Tenaga Kasse 878 ogi 0,000.00 74.280.00 _ imi 140,850.00 ial HSPK 8,007/380.00 35 Taxun XXH 2075 “JURNAL HARGA SATUAN BAHAN BANGUNAN, KOnsTRUKS! & INTERIOR 669 CD eamcranmacoansinsesoneiesen URAIAN KEGIATAN KOEF. | ‘SATUAN | HARGASATUAN HARGA 3 [fomasangan Tlang Tanam Sm nie 9 SHpananiitatorial 3 e[fang Biaca § m tanam 4 unit 2,500,000.00 2,500.000.00 | mg 2aoacooas | fa Peralatan ‘sane Stor iin jam emanskMob/Dornb Oper. 3k) 0.5 fant 799,800.00 «9.000.00 | 69.900.00 | 043 omgihr 20,000.00 15.000.00 | Se 025 orgihr 105,009.00 26,250.00 | Ba bantu Tukang 025 orgihr 99,000.00 24.70.00 fehaga Kasat 0.75 orgih 98.000.00 74.250 00 140,850.00 | 3S at HSPK 2.710.750.00 jongkar Panel Lama buen a 0.04 orgie 120,000.00 4800.00 | & 04 oraihir 105 .000.00 42'000.00 fenaga Kasar 08 axginr 99,000.00 72.20.00 | & 126,000.00 | Fy iat HSPK gagkar Instalas! Lama F\Pomasangan dan Penarkan kabel 400m 4,950.00 4,950.00 jai HSPK 4850.00 [zefabongkaran Ornamen te P}sewa Poralatan a Alst BAnti Panerangan Jalan Umum 2 jam 6.700.00 +13.400.00, mia 418.400.00 andor 02 ome 120.000.00 24,000.00 naga Kasar 08 omginr ‘99,000.00 59,400.00 fala 23.400.00 al HSPK 96.800.00 ‘pembongkaran Thang ik [Sowa Peralatan eva Alat Bantu Peaorangan Jalon Umum (PU) 05 jem 6.70.00 3.50.00 3,360.00 4 0.13 orgihe 4120.00.00 45,600.00 f [Tenaga Kasar 3 orgéhr 99.00.00 297.000.00 2 [Jumiah 312.600.00 f|iairisrkc 345,950.00 Bindah Panel Lama unit [eahanittaterial rounding Roud (Arde) 16 mm + buan 339.180.00 338.150.00 jJumian 330.150,00 [Pemasangan Panei Lampu PIU 4+ emit 169,200.00 4169.200.00 Jumiah 168:200.90 MiaiHSPK 508,350.00 Pemasangan Armatur busi Sowa Poralatan [Seva Ajat Bans Penerangan Jolan Umurn (JPU) 1 Jam 6,700.00 8,700.00, uml 8.70.00 Upah wandor 025 orghr 420,000.00 30,000.00 Frukang 025 ongihe 105,000.00 26,250.00 Hanaga Kasar 075 orgie '99.000.00 74.250.00, Jura 430,500.00 iat HSPK 197:200.00 si 35 Tarun XI 2015 JORNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUGS! & INTERIOR at 671 Drosrn oesvaonescommucronnrencrssarern race ; URAIAN KEGIATAN KOEF] SATUAN] HARGASATUAN | _HARGA Efemasangan Omamon § m bush Baharitdaterial Boagout + Mur Baut Omamen 3 buah 420,000.00 260,000.00 [iret besibaja asts7 kg 25,000.00 87-302.50 Hea Best Galvanish Dim 2 oom 110.622.91 €63.73748 ot Pipe 2 + unt 42,800.80 42.990 80 Stak 4.154.628.78 [sewe Peralatan Sowa Alat Bantu Penorangan Jalan Unum 2 Jam 6:700.00 418.400.00 Simlah 43:400.00 oan itandor 0.125 orgie 120,000.00 5 18,0000 fe tTukang 0.2 orgvhr 105.000.00 | 24,000.00 enoga Kasar 08 omhr 8.000.00 58.4000 ESiJumiah 95.400.00 frase 1.283.429.78 [ Pangecatn dengan Cat Road Line me F sahen p, Thinner A Special 03 liter: 37,500.00 11.250.00 at Road tine 0.045 kaleng 54,000.00 18,090.00, Suh 29,880.00 pan andor 0.008 orgie 120,000.00 00.00 kepala Tukang 018 org +10.000.00, 4.650.00 kang 018 on +as.000.00 15,780.00 F pembaru Tukang 0.4 ogi 9¢.000.00 8.900.00 E |urntan 27.800.00 | | statis 57-780-00 Pemasangan Service Kabel boa | /Bahaniaterial serie Kabel 1 buan 31,200.00 31.200.00 | mia 31.200.00 pan ang 0.0% oramr 105,000.00 1,060.00 utah #.080.00 vii SP 32.280.00 FAA |PomasangarvPonartkan KabolNFOBY 4x10 mm buan TA loshanvtate Kabel NYRIFGBY 4x 10 mm 1 om 51.800.00 1,500.00 uratah 31.800.00, Upah Pemasangan dan Penarkan Kabel tom 4,950.00 4,950.00 duaniah 4,950.00 iii SPI 58.460.00 “Jur Hara Saruan Bacan BaNGUNAN, KONSTRUKS!& INTERIOR YNINNL VME ISNIdOUd

Você também pode gostar