ANALISA HARGA SATUAN

= HARGA TGL. 04 - 10 - Pasir pasang/beton/split Rp 750.000,-/truck/6,80 m3


Pasir urug Rp 600.000,-/truck/6,80 m3( UD.DEBBY SETIAWAN MANDIRI
Batu kali Rp 650.000,-/truck/6,80 m3
Sirdam Rp 600.000,-/truck/6,80 m3
Makadam Rp 700.000,-/truck/6,80 m3

LOKASI : PONDOK INDAH


PERIODE : AGUSTUS 2005

= HARGA TGL. 12 - 02 - 2004.


* Besi beton harga tgl 03-6-2005
= HARGA TGL 11 - 04 - 2005

* HARGA SATUAN MATERIAL :


Semen
Rp
Pasir pasang
Rp
Pasir beton
Rp
Pasir urug / sirdam Rp
Koral
Rp
Split
Rp
Batu Kali
Rp
Batu bata
Rp
Besi beton polos
Rp
Multiplek 9 mm
Rp
Multiplek 12 mm
Rp
Kaso 4/6
Rp
Paku
Rp
Minyak
Rp
Kawat beton
Rp
Galian tanah
Rp
Papan terentang
Rp
Baud/besi plat/kanal Rp
Residu + Upah
Rp
Kayu kamper singkil Rp
Kayu borneo 5/7
Rp
Triplek 4 mm
Rp
Pipa galvanished 2" Rp
Cat pipa galvanished 2"Rp
Railing balkon M5 & M6
wrooth iron Rp
Bak cuci piring stainlees
steel Rp
Ijuk
Rp
Closet jongkokCE 7(w)Rp
Bak mandi fiberglass
60 x 60 Rp
Roof drain 4"
Rp
Pipa galvanished 4" Rp
Rantai portal
Rp
Arde
Rp

40,000.00
111,000.00
111,000.00
88,500.00
111,000.00
111,000.00
95,600.00
240.00
4,850.00
95,000.00
130,000.00
2,344,000.00
8,000.00
1,000.00
9,000.00
20,000.00
825,000.00
8,000.00
2,000.00
3,300,000.00
2,344,000.00
39,000.00
26,000.00
8,000.00
2,200,000.00
225,000.00
6,000.00
85,000.00
175,000.00
120,000.00
50,000.00
6,000.00
1,000,000.00

* Beton Readymix harga tgl 22 Juli 2005


/ Beton Bo
Rp
281,000.00 / m3
/ Beton K.175
Rp
331,000.00 / m3
/ Beton K.225
Rp
345,000.00 / m3
/ Beton K.250
Rp
440,000.00 / m3
/ Beton K.300
Rp
373,000.00 / m3
/ Beton K.350
Rp
485,000.00 / m3
/ Beton K.400
Rp
330,000.00 / m3
/ Keramik 20x25 Roman
35,000.00 / m2
/ Keramik 20x20 Roman
25,750.00 / m2
/ Keramik 30x30 Roman
34,000.00 / m2
/ Keramik 40x40 Roman
28,000.00 / m2
/ Niro Granit 40x40 Polish
101,400.00 / m2
/ Grouting
1,760.00 / kg
/ Drymix Tile Addesive
110,000.00 / zak
/ Floor screed tebal = 2,50 cm
25,000.00 / m2
/mTutup beton bak kon
/ trol air hujan 60x60 cm
75,000.00 /bh
/ Genteng nok M Class premi
13,200.00 / bh
/ Genteng badan Mclass pre
4,922.00 / bh
/ Seng plat BJLS 20
16,000.00 / m'
/ Triplek 3 mm
26,000.00 / lbr
/ Almunium Foil " ABFOIL 710
2,000.00 / m2
/ Gypsum board 9 mm
22,500.00 / m2
/ Gypsum board water resistance
13 mm
60,000.00 / m2
/ List profil gypsum 7 cm
9,000.00 / m'
List profil gypsum 9 cm
14,000.00 / m'
/ Stella awning ( telp: 5555081 ) :
/ Tenda awning kanfas faade
2,516,000.00 / unit
/ Tenda awning kanfas faade
4,539,000.00 / unit
Tenda awning kanfas faade
3,885,000.00 / unit
/ Tenda awning kanfas faade
5,195,300.00 / unit
/ Kloset duduk exTotocw420J
863,000.00 / bh
/ Soap holder ex.toto S11 N "
20,000.00 / bh
/ Floor drain ex.Toto TX 1 B
104,000.00 / bh
/ Kran T 30 AR 13 V 7 N
90,000.00 / bh
Septictank ST 10 Dusaspun
2,185,000.00 / bh
Pipa PVC dia 4" AW ex.Wafin
30,000.00 / m'
Elbow / Tee dia 4"AW exWafi
10,000.00 / bh
Elbow / Tee dia 2"AW exWafi
5,000.00 / bh
Buat lubang2 PVC dia 4"
1,000.00 ttk
Pipa Overflow dia 2" AW Ex
8,500.00 / m'
Pipa Ventilasi dia 2" AW Ex
5,000.00 / bh
Alat bantu
100,000.00 / ls
Step noosing/kuku macan 1
1,000.00 / bh

* HARGA SATUAN UPAH + ALAT :


Upah urugan
Rp
Upah pas.bt.kali
Rp
Upah pas.bekisting Rp
Upah cor + alat
Rp
Upah pasangbesi
Rp
Upah pas.batu bata Rp
Upah plesteran 2 cm Rp
Perancah/scafolding Rp
Upah pas.bouwplank Rp
Upah buat/pas.kuda2 Rp
Upah pas.rangka atapRp
Upah pasang closet Rp
Upah pas.shop holder Rp
Upah pas. floor drain Rp
Upah galian tanah
Rp

13,750.00
38,500.00
7,920.00
66,000.00
605.00
10,670.00
10,670.00
8,250.00
5,500.00
726,000.00
9,680.00
24,200.00
12,100.00
6,050.00
25,000.00

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Alat + upah potong keramik


Upah pasang keramik :
* Adukan biasa
* Adukan drymix
Alat + upah tali air beton
Upah plesteran sudut kolom
Upah pasang genteng nok
Upah pasang genteng badan
Upah pasang jurai dalam
Upah pasang triplek+ Alm.Foi
Upah pasang rangka plafon
Upah pas.pipa galv.2"+stel+
Upah pas.bak cuci piring st.s
Upah pasang kran + isolatip
Upah turun barang keramik

66,550.00 / bh
9,350.00
20,020.00
5,000.00
6,000.00
5,000.00
3,000.00
4,000.00
5,000.00
5,000.00
44,000.00
5,000.00
5,000.00
360.00

/ m2
/ m2
/ m'
/ m'
/ m'
/ m2
/ m'
/ m2
/ m2
/ m'
/ bh
/ bh
/ dus

Unloading septictank Rp
Urug tanah kembali Rp
Buang sisa tanah keluarRp
Galian strouspile
Rp

NO

25,000.00
7,260.00
42,000.00
29,000.00

/
/
/
/

Upah turun barang genteng


Upah turun barang besi beton
Upah transport besi btn(min
Upah pasang kuku macan+

JENIS PEKERJAAN

PEKERJAAN PONDASI & BETON BERTULANG :

Pasang bouwplank / m' :


Papan terentang 2x20x400
Paku
kaso 4/6
Upah pasang bouwplank / uitzet

VOLUME

120.00
60.00
60.00
6,000.00

/ bh
/kg
/kg
/ m'

HARGA SATUAN
( Rp )

0.0044 m3
0.02 kg
0.0016 m3
1 m'

825,000.00
8,000.00
2,344,000.00
5,500.00
Jumlah

J U M LAH
( Rp )

3,630.00
160.00
3,750.40
5,500.00
13,040.40

* Urugan Pasir :
Pasir urug / m3 :
Bahan material
Upah

1.000 m3
1.000 m3

88,500.00
13,750.00
Jumlah

88,500.00
13,750.00
102,250.00

Pasir pasang / m3 :
Bahan material
Upah

1.000 m3
1.000 m3

111,000.00
13,750.00
Jumlah

111,000.00
13,750.00
124,750.00

Pasir beton / m3 :
Bahan material
Upah

1.000 m3
1.000 m3

111,000.00
13,750.00
Jumlah

111,000.00
13,750.00
124,750.00

Koral / m3 :
Bahan material
Upah

1.000 m3
1.000 m3

111,000.00
13,750.00
Jumlah

111,000.00
13,750.00
124,750.00

Split / m3 :
Bahan material
Upah

1.000 m3
1.000 m3

111,000.00
13,750.00
Jumlah

111,000.00
13,750.00
124,750.00

* Pas. Batu kali 1 : 2 / m3 :


Batu kali
Semen
Pasir pasang
Upah

1.200
5.432
0.435
1.000

m3
zak
m3
m3

95,600.00
40,000.00
111,000.00
38,500.00
Jumlah
Dibulatkan

114,720.00
217,280.00
48,285.00
38,500.00
418,785.00
419,000.00

* Pas. Batu kali 1 : 3 / m3 :


Batu kali
Semen
Pasir pasang
Upah

1.200
4.020
0.473
1.000

m3
zak
m3
m3

95,600.00
40,000.00
111,000.00
38,500.00
Jumlah
Dibulatkan

114,720.00
160,800.00
52,503.00
38,500.00
366,523.00
367,000.00

* Pas. Batu kali 1 : 4 / m3 :


Batu kali
Semen
Pasir pasang
Upah

1.200
3.260
0.522
1.000

m3
zak
m3
m3

95,600.00
40,000.00
111,000.00
38,500.00
Jumlah
Dibulatkan

114,720.00
130,400.00
57,942.00
38,500.00
341,562.00
342,000.00

10 * Pas. Batu kali 1 : 5 / m3 :


Batu kali
Semen
Pasir pasang
Upah

1.200
3.040
0.544
1.000

m3
zak
m3
m3

95,600.00
40,000.00
111,000.00
38,500.00
Jumlah
Dibulatkan

114,720.00
121,600.00
60,384.00
38,500.00
335,204.00
335,000.00

NO

JENIS PEKERJAAN

11 Beton Bo / M3 :
Beton Bo
Upah cor + alat

VOLUME

HARGA SATUAN
( Rp )

1.025 m3
1.000 m3

281,000.00
66,000.00

J U M LAH
( Rp )
288,025.00
66,000.00

Jumlah
Dibulatkan

354,025.00
354,000.00

12 Beton K.175 / M3 :
Beton K.175
Upah cor + alat

1.025 m3
1.000 m3

331,000.00
66,000.00
Jumlah
Dibulatkan

339,275.00
66,000.00
405,275.00
405,000.00

13 Beton K.225 / M3 :
Beton K.225
Upah cor + alat

1.025 m3
1.000 m3

345,000.00
66,000.00
Jumlah
Dibulatkan

353,625.00
66,000.00
419,625.00
420,000.00

14 Beton K.250 / M3 :
Beton K.250
Upah cor + alat

1.025 m3
1.000 m3

440,000.00
66,000.00
Jumlah

451,000.00
66,000.00
517,000.00

15 Beton K.300 / M3 :
Beton K.300
Upah cor + alat

1.025 m3
1.000 m3

373,000.00
66,000.00
Jumlah
Dibulatkan

382,325.00
66,000.00
448,325.00
448,000.00

16 Beton K.350 / M3 :
Beton K.350
Upah cor + alat

1.025 m3
1.000 m3

485,000.00
66,000.00
Jumlah
Dibulatkan

497,125.00
66,000.00
563,125.00
563,000.00

17 Beton K.400 / M3 :
Beton K.400
Upah cor + alat

1.025 m3
1.000 m3

330,000.00
66,000.00
Jumlah

338,250.00
66,000.00
404,250.00

18 Beton 1:3:5 / M3 :
Semen ( 1 zak = 50 kg )
Pasir beton
Split
Upah cor + alat

4.544
0.540
0.910
1.000

zak
m3
m3
m3

40,000.00
124,750.00
124,750.00
66,000.00
Jumlah
Dibulatkan

181,760.00
67,365.00
113,522.50
66,000.00
428,647.50
429,000.00

19 Beton 1:2:3 / M3 :
Semen ( 1 zak = 50 kg )
Pasir beton
Split
Upah cor + alat

6.800
0.540
0.820
1.000

zak
m3
m3
m3

40,000.00
124,750.00
124,750.00
66,000.00
Jumlah
Dibulatkan

272,000.00
67,365.00
102,295.00
66,000.00
507,660.00
508,000.00

20 Beton 1:1,5:2,5 / M3 :
Semen ( 1 zak = 50 kg )
Pasir beton
Split
Upah

8.144
0.490
0.810
1.000

zak
m3
m3
m3

40,000.00
124,750.00
124,750.00
66,000.00
Jumlah
Dibulatkan

325,760.00
61,127.50
101,047.50
66,000.00
553,935.00
554,000.00

21 Pembesian / kg :
Besi beton polos
Upah turun barang
kawat beton
Upah pasang

1.100
1.000
0.020
1.000

kg
kg
kg
kg

4,850.00
60.00
9,000.00
605.00
Jumlah
Dibulatkan

5,335.00
60.00
180.00
605.00
6,180.00
6,000.00

NO

JENIS PEKERJAAN

VOLUME

HARGA SATUAN
( Rp )

J U M LAH
( Rp )

22 Bekisting Precast kolom ( 2x pakai ) / m2 :


Mulitiplek 12 mm
Kaso 4/6
Paku
Minyak
Upah

0.191
0.019
0.200
1.000
1.000

lbr
m3
kg
m2
m2

130,000.00
2,344,000.00
8,000.00
1,000.00
7,920.00
Jumlah
Dibulatkan

24,830.00
44,536.00
1,600.00
1,000.00
7,920.00
79,886.00
80,000.00

23 Bekisting Precast sloof ( 2x pakai ) / m2 :


Mulitiplek 9 mm
Kaso 4/6
Paku
Minyak
Upah

0.191
0.019
0.200
1.000
1.000

lbr
m3
kg
m2
m2

95,000.00
2,344,000.00
8,000.00
1,000.00
7,920.00
Sub J u m l a h
Koefisien material sloof
Jumlah
Dibulatkan

18,145.00
44,536.00
1,600.00
1,000.00
7,920.00
73,201.00
0.50
36,600.50
37,000.00

24 Bekisting Precast balok / plat ( 2x pakai ) / m2 :


Mulitiplek 12 mm
Kaso 4/6
Paku
Minyak
Upah
Perancah / scafolding

0.191
0.021
0.200
1.000
1.000
1.000

lbr
m3
kg
m2
m2
m2

130,000.00
2,344,000.00
8,000.00
1,000.00
7,920.00
5,000.00
Jumlah
Dibulatkan

24,830.00
49,224.00
1,600.00
1,000.00
7,920.00
5,000.00
89,574.00
90,000.00

PEKERJAAN PASANGAN & PLESTERAN :

Pas.Batu bata 1:2 / m2 :


Batu bata
Semen
Pasir pasang
Upah

66.500
0.412
0.033
1.000

bh
zak
m3
m2

240.00
40,000.00
111,000.00
10,670.00
Jumlah
Dibulatkan

15,960.00
16,480.00
3,663.00
10,670.00
46,773.00
47,000.00

Pas.Batu bata 1:3 / m2 :


Batu bata
Semen
Pasir pasang
Upah

66.500
0.315
0.039
1.000

bh
zak
m3
m2

240.00
40,000.00
111,000.00
10,670.00
Jumlah
Dibulatkan

15,960.00
12,600.00
4,329.00
10,670.00
43,559.00
44,000.00

Pas.Batu bata 1:4 / m2 :


Batu bata
Semen
Pasir pasang
Upah

66.500
0.254
0.040
1.000

bh
zak
m3
m2

240.00
40,000.00
111,000.00
10,670.00
Jumlah
Dibulatkan

15,960.00
10,160.00
4,440.00
10,670.00
41,230.00
41,000.00

Pas.Batu bata 1:5 / m2 :


Batu bata
Semen
Pasir pasang
Upah

66.500
0.238
0.043
1.000

bh
zak
m3
m2

240.00
40,000.00
111,000.00
10,670.00
Jumlah
Dibulatkan

15,960.00
9,520.00
4,773.00
10,670.00
40,923.00
41,000.00

0.285 zak
0.023 m3
1.000 m2

40,000.00
111,000.00
10,670.00
Jumlah
Dibulatkan

11,400.00
2,553.00
10,670.00
24,623.00
25,000.00

0.244 zak

40,000.00

9,760.00

Plesteran 1:2 tebal = 2 cm / m2


Semen
Pasir pasang
Upah

Plesteran 1:3 tebal = 2 cm / m2


Semen

NO

JENIS PEKERJAAN

VOLUME

HARGA SATUAN
( Rp )
0.026 m3
111,000.00
1.000 ls
10,670.00
Jumlah
Dibulatkan

Pasir pasang
Upah

Plesteran 1:4 tebal = 2 cm / m2


Semen
Pasir pasang
Upah

Plesteran 1:5 tebal = 2 cm / m2


Semen
Pasir pasang
Upah

J U M LAH
( Rp )
2,886.00
10,670.00
23,316.00
23,000.00

0.195 zak
0.028 m3
1.000 ls

40,000.00
111,000.00
10,670.00
Jumlah
Dibulatkan

7,800.00
3,108.00
10,670.00
21,578.00
22,000.00

0.162 zak
0.029 m3
1.000 ls

40,000.00
111,000.00
10,670.00
Jumlah
Dibulatkan

6,480.00
3,219.00
10,670.00
20,369.00
20,000.00

0.544
2.160
2.280
1.000

m3
m2
m2
bh

20,000.00
41,000.00
20,000.00
75,000.00
Jumlah
Dibulatkan

10,880.00
88,560.00
45,600.00
75,000.00
220,040.00
220,000.00

10 Tali air beton ( di dak beton ) 1:3 / m' :


Semen
Alat + Upah

0.017 zak
1.000 ls

40,000.00
5,000.00
Jumlah
Dibulatkan

680.00
5,000.00
5,680.00
6,000.00

11 Plesteran sudut - sudut kolom 1:5 / m' :


Semen
Pasir pasang
Upah

0.017 zak
0.012 m3
1.000 ls

40,000.00
111,000.00
6,000.00
Jumlah
Dibulatkan

680.00
1,332.00
6,000.00
8,012.00
8,000.00

1.000 m3
22.500 m2
162.700 kg

448,000.00
90,000.00
6,000.00
Jumlah
Dibulatkan

448,000.00
2,025,000.00
976,200.00
3,449,200.00
3,449,000.00

Bak kontrol air hujan / bh :


Galian tanah
Pas.Batu bata 1:5
Plesteran 1:5
Tutup beton bertulang 1:2:3

12 Beton janggutan 10/40 sekitar tangga / m3 :


Beton ready mix K.300
Bekisting
Besi beton

* PEKERJAAN DINDING & LANTAI :

Keramik dinding 20x25 ( adukan biasa ) / m2 :


Keramik 20x25 ex.Roman
Upah turun barang keramik
Semen
Pasir pasang
Grouting
Alat + upah potong keramik
Upah pasang

1.050
1.000
0.170
0.027
0.162
0.010
1.000

m2
dus
zak
m3
kg
bh
ls

35,000.00
360.00
40,000.00
111,000.00
1,760.00
66,550.00
9,350.00
Jumlah
Dibulatkan

36,750.00
360.00
6,800.00
2,997.00
285.82
665.50
9,350.00
57,208.32
57,000.00

Keramik lantai 20x20 ( adukan biasa ) / m2 :


Keramik 20x20 ex.Roman
Upah turun barang keramik
Semen
Pasir pasang
Grouting
Alat + upah potong keramik
Upah pasang

1.050
1.000
0.170
0.027
0.162
0.010
1.000

m2
dus
zak
m3
kg
bh
ls

25,750.00
360.00
40,000.00
111,000.00
1,760.00
66,550.00
9,350.00
Jumlah
Dibulatkan

27,037.50
360.00
6,800.00
2,997.00
285.82
665.50
9,350.00
47,495.82
47,000.00

Keramik lantai 40x40 ( adukan biasa ) / m2 :

NO

JENIS PEKERJAAN

VOLUME

HARGA SATUAN
( Rp )
28,000.00
360.00
40,000.00
111,000.00
1,760.00
66,550.00
9,350.00
Jumlah
Dibulatkan

J U M LAH
( Rp )
29,400.00
360.00
6,800.00
2,997.00
285.82
665.50
9,350.00
49,858.32
50,000.00

Keramik 40x40 ex.Roman


Upah turun barang keramik
Semen
Pasir pasang
Grouting
Alat + upah potong keramik
Upah pasang

1.050
1.000
0.170
0.027
0.162
0.010
1.000

m2
dus
zak
m3
kg
bh
ls

Keramik lantai 20x20 ( adukan drymix ) / m2 :


Keramik 20x20 ex.Roman
Upah turun barang keramik
Drymix Tile addesive
Floor screed, tebal 2,5 cm
Alat + upah potong keramik
Upah pasang

1.050
1.000
0.150
1.200
0.010
1.000

m2
dus
zak
m2
bh
ls

25,750.00
360.00
110,000.00
25,000.00
66,550.00
20,020.00
Jumlah
Dibulatkan

27,037.50
360.00
16,500.00
30,000.00
665.50
20,020.00
94,583.00
95,000.00

Keramik lantai 40x40 ( adukan drymix ) / m2 :


Keramik 40x40 ex.Roman
Upah turun barang keramik
Drymix Tile addesive
Floor screed 2,5 cm
Alat + upah potong keramik
Upah pasang

1.050
1.000
0.150
1.200
0.010
1.000

m2
dus
zak
m2
bh
ls

28,000.00
360.00
110,000.00
25,000.00
66,550.00
20,020.00
Jumlah
Dibulatkan

29,400.00
360.00
16,500.00
30,000.00
665.50
20,020.00
96,945.50
97,000.00

Keramik lantai Homogenious / Niro Granit 40x40


( adukan drymix ) / m2 :
Keramik Homogenious / Niro Granit 40x40 P
Upah turun barang keramik
Drymix Tile addesive
Floor screed 2,5 cm
Alat + upah potong keramik
Upah pasang

1.050
1.000
0.150
1.200
0.010
1.000

m2
dus
zak
m2
bh
ls

101,400.00
360.00
110,000.00
25,000.00
66,550.00
20,020.00
Jumlah
Dibulatkan

106,470.00
360.00
16,500.00
30,000.00
665.50
20,020.00
174,015.50
174,000.00

3,300,000.00
8,000.00
8,000.00
2,000.00
726,000.00
Jumlah
Dibulatkan

3,630,000.00
40,000.00
200,000.00
83,240.00
726,000.00
4,679,240.00
4,679,000.00

* PEKERJAAN ATAP KUDA - KUDA, KONSOL * TOWER :


1

Pek.Kuda-kuda / konsol / gording kayu singkil / m3 :


Balok kayu kamper singkil 8/12
1.100 m3
Paku 10 cm
5.000 kg
Baud + besi plat
25.000 kg
Residu
41.620 m2
Upah stel + pasang
1.000 m3

Rangka atap borneo / m2 :


Kaso borneo 5/7
Reng borneo 3/4
Paku 7 cm
Upah pasang rangka atap

0.018
0.006
0.250
1.000

m3
m3
kg
m2

2,344,000.00
2,344,000.00
8,000.00
9,680.00
Jumlah
Dibulatkan

42,192.00
14,064.00
2,000.00
9,680.00
67,936.00
68,000.00

Genteng nok / bubungan M Class / m' :


Genteng nok / bubungan M Class premium
Upah turun barang genteng
Semen
Pasir pasang
Upah pasang

4.000
4.000
0.280
0.032
1.000

bh
bh
zak
m3
m'

13,200.00
120.00
40,000.00
111,000.00
5,000.00
Jumlah
Dibulatkan

52,800.00
480.00
11,200.00
3,552.00
5,000.00
73,032.00
73,000.00

14.000 bh
14.000 bh
1.000 m2

4,922.00
120.00
3,000.00
Jumlah

68,908.00
1,680.00
3,000.00
73,588.00

Genteng badan M Class premium / m2 :


Genteng badan M Class premium
Upah turun barang genteng
Upah pasang

NO

JENIS PEKERJAAN

VOLUME

HARGA SATUAN
( Rp )
Dibulatkan

J U M LAH
( Rp )
74,000.00

Flashing / m' :
Beton K.300
Bekisting
Besi

0.012 m3
0.230 m2
1.200 kg

448,000.00
90,000.00
6,000.00
Jumlah
Dibulatkan

5,376.00
20,700.00
7,200.00
33,276.00
33,000.00

Talang jurai dalam / m' :


Papan talang
Seng plat BJLS 20
Paku
Upah pasang

0.008 m3
1.000 m'
0.050 kg
1.000 m'

4,026,000.00
16,000.00
8,000.00
4,000.00
Jumlah
Dibulatkan

32,208.00
16,000.00
400.00
4,000.00
52,608.00
53,000.00

Triplek 3 mm + almunium foil / m2 :


Triplek 3 mm
Almunium foil " ABFOIL 710 s/s "
Paku
Upah pasang

0.347
1.100
0.070
1.000

lbr
m2
kg
m2

26,000.00
2,000.00
8,000.00
5,000.00
Jumlah
Dibulatkan

9,022.00
2,200.00
560.00
5,000.00
16,782.00
17,000.00

Plafond gypsum 9 mm + rangka / m2 :


Gypsum board 9 mm
Rangka kaso 5/7
Paku
Upah pasang rangka kaso 5/7

1.000
0.014
0.050
1.000

m2
m3
kg
m2

22,500.00
2,344,000.00
8,000.00
5,000.00
Jumlah
Dibulatkan

22,500.00
32,816.00
400.00
5,000.00
60,716.00
61,000.00

Plafond gypsum water resistance13 mm + rangka / m2


Gypsum board water resistance13 mm
Rangka kaso 5/7
Paku
Upah pasang rangka kaso 5/7

:
1.000
0.014
0.050
1.000

m2
m3
kg
m2

60,000.00
2,344,000.00
8,000.00
5,000.00
Jumlah
Dibulatkan

60,000.00
32,816.00
400.00
5,000.00
98,216.00
98,000.00

Plafond triplek 4 mm + rangka / m2 :


Triplek 4mm
Rangka kaso 5/7
Paku
Upah pasang rangka kaso 5/7

0.347
0.014
0.050
1.000

lbr
m3
kg
m2

39,000.00
2,344,000.00
8,000.00
5,000.00
Jumlah
Dibulatkan

13,533.00
32,816.00
400.00
5,000.00
51,749.00
52,000.00

Railing balkon faade type M3 / unit :


Pipa galvanished dia 2"
Cat besi
Upah pasang + stel + las

13.600
13.600
1.000

m'
m'
m'

26,000.00
8,000.00
44,000.00
Jumlah
Dibulatkan

353,600.00
108,800.00
44,000.00
506,400.00
506,000.00

Railing balkon faade type M7 / unit :


Pipa galvanished dia 2"
Cat besi
Upah pasang + stel + las

12.000
12.000
1.000

m'
m'
m'

26,000.00
8,000.00
44,000.00
Jumlah
Dibulatkan

312,000.00
96,000.00
44,000.00
452,000.00
452,000.00

Railing balkon faade type M5 / unit :


Wrooth iron

1.000

ls

2,200,000.00

2,200,000.00

Railing balkon faade type M6 / unit :


Wrooth iron

1.000

ls

2,200,000.00

2,200,000.00

* PEKERJAAN PLAFON :
1

* PEK.BESI ALAT-ALAT PENGGANTUNG &


PENGUNCI :
1

NO

JENIS PEKERJAAN

VOLUME

HARGA SATUAN
( Rp )

J U M LAH
( Rp )

Tenda awning kanfas faade M.1

1.000

ls

2,516,000.00

2,516,000.00

Tenda awning kanfas faade M.3

1.000

ls

4,539,000.00

4,539,000.00

Tenda awning kanfas faade M.4

1.000

ls

3,885,000.00

3,885,000.00

Tenda awning kanfas faade M.6

1.000

ls

5,195,300.00

5,195,300.00

Kloset duduk ex.Toto cw 420 J/SW 516 JPT4 / BH :


Kloset duduk ex.Toto cw 420 J/SW 516 JP
Semen
Pasir pasang
Upah pasang

1.000
0.016
0.004
1.000

bh
zak
m3
bh

863,000.00
40,000.00
111,000.00
24,200.00
Jumlah
Dibulatkan

863,000.00
640.00
444.00
24,200.00
888,284.00
888,000.00

SOAP HOLDER ex.TOTO S11 N / BH :


Soap holder ex.toto S 6 N " White "
Upah pasang

1.000 bh
1.000 bh

20,000.00
12,100.00
Jumlah
Dibulatkan

20,000.00
12,100.00
32,100.00
32,000.00

FLOOR DRAIN ex.TOTO TX 1B / BH :


Floor drain ex.Toto TX 1 B
Upah pasang

1.000 bh
1.000 bh

104,000.00
6,050.00
Jumlah
Dibulatkan

104,000.00
6,050.00
110,050.00
110,000.00

BAK CUCI PIRING STAINLESS STEEL / BH :


Bak cuci piring stainless steel
Semen untuk perapihan permukaan
Upah pasang

1.000 bh
0.020 zak
1.000 bh

225,000.00
40,000.00
5,000.00
Jumlah
Dibulatkan

225,000.00
800.00
5,000.00
230,800.00
231,000.00

KRAN BAK CUCI PIRING T 30 AR 13 V 7 N / BH :


Kran T 30 AR 13 V 7 N
Upah pasang + isolatip

1.000 bh
1.000 bh

90,000.00
5,000.00
Jumlah
Dibulatkan

90,000.00
5,000.00
95,000.00
95,000.00

* PEKERJAAN SANITAIR :
1

SEPTICTANK DUSASPUN ST 10 + RESAPAN / BH :


* SEPTICTANK :
Uitzet + bouwplank
Galian tanah
Urug pasir
Precast material Septictank ST 10 Ex.Dusa
Unloading septictank
Urug tanah kembali
Buang sisa tanah keluar proyek
Pipa PVC dia 4" AW ex.Wafin
Pipa PVC Elbow dia 4" AW ex.Wafin
Tee dia 4"
Buat lubang2 PVC dia 4"
Pipa PVC Over flow dia 2" AW Ex.Wafin
Pipa PVC Elbow dia 2" AW Ex.Wafin
Pipa PVC ventilasi dia 2" AW Ex.Wafin
Tee dia 2"
Alat bantu

* R E SAPAN :
Galian tanah
Batu koral
Ijuk
Urug tanah kembali
Buang sisa tanah keluar proyek

2.130
5.940
0.830
1.000
1.000
0.690
5.250
4.000
3.000
1.000
80.000
4.700
2.000
1.000
1.000
1.000

m'
m3
m3
unit
unit
m3
m3
m'
bh
bh
ttk
m'
bh
bh
bh
ls

13,040.40
25,000.00
102,250.00
2,185,000.00
25,000.00
7,260.00
42,000.00
30,000.00
10,000.00
10,000.00
1,000.00
8,500.00
5,000.00
5,000.00
5,000.00
100,000.00
Sub J u m l a h

27,776.05
148,500.00
84,867.50
2,185,000.00
25,000.00
5,009.40
220,500.00
120,000.00
30,000.00
10,000.00
80,000.00
39,950.00
10,000.00
5,000.00
5,000.00
100,000.00
3,096,602.95

Including
2.200
7.570
Including
Including

m3
m3
m3
m3
m3

0.00
111,000.00
6,000.00
0.00
0.00
Sub J u m l a h

0.00
244,200.00
45,420.00
0.00
0.00
289,620.00

Total

3,386,222.95

NO

JENIS PEKERJAAN

VOLUME

HARGA SATUAN
( Rp )
Dibulatkan

J U M LAH
( Rp )
3,386,000.00

CLOSET JONGKOK ( PUTIH ) / BH :


Material closet CE 7 ( white ) ex.Toto
Semen
Upah pasang

1.000 bh
0.020 zak
1.000 bh

85,000.00
40,000.00
24,200.00
Jumlah
Dibulatkan

85,000.00
800.00
24,200.00
110,000.00
110,000.00

BAK MANDI FIBER GLASS 60 X 60 / BH :


Material bak mandi fiber glass 60 x 60
Semen untuk perapihan permukaan
Upah pasang

1.000 bh
0.020 zak
1.000 bh

175,000.00
40,000.00
5,000.00
Jumlah
Dibulatkan

175,000.00
800.00
5,000.00
180,800.00
181,000.00

PLAT BETON BERTULANG PELINDUNG PIPA


SEPTICTANK / BH :
Galian tanah
Beton 1:3:5 lantai kerja tebal 5 cm
Bekisting
Beton 1:2:3
Buang tanah keluar

0.063
0.235
0.800
0.065
0.063

m3
m3
m3
m3
m3

25,000.00
429,000.00
37,000.00
508,000.00
42,000.00
Jumlah
Dibulatkan

1,575.00
100,815.00
29,600.00
33,020.00
2,646.00
167,656.00
168,000.00

1.000 bh
1.000 bh

120,000.00
6,050.00
Jumlah
Dibulatkan

120,000.00
6,050.00
126,050.00
126,000.00

10 ROOF DRAIN / BH :
Material roof drain 4"
Upah pasang

PEKERJAAN LAIN - LAIN :


1

PONDASI P.J.U / BUAH :


Galian tanah
Beton 1:2:3
Besi
Bekisting

0.450
0.317
39.660
2.100

m3
m3
kg
m2

25,000.00
508,000.00
6,000.00
37,000.00
Jumlah
Dibulatkan

11,250.00
161,036.00
237,960.00
77,700.00
487,946.00
488,000.00

PONDASI PANEL INDUK ( P.I ) + ARDE / BUAH :


Galian tanah
Pasangan bata merah 1:5
Plesteran + aci 1:5
Arde

0.840
1.730
4.680
1.000

m3
m3
m2
bh

25,000.00
410,000.00
20,000.00
1,000,000.00
Jumlah
Dibulatkan

21,000.00
709,300.00
93,600.00
1,000,000.00
1,823,900.00
1,824,000.00

PONDASI PANEL PEMBAGI ( P.P ) + ARDE / BUAH:


Galian tanah
Pasangan bata merah 1:5
Plesteran + aci 1:5
Arde

0.320
0.690
2.120
1.000

m3
m3
m2
bh

25,000.00
410,000.00
20,000.00
1,000,000.00
Jumlah
Dibulatkan

8,000.00
282,900.00
42,400.00
1,000,000.00
1,333,300.00
1,333,000.00

PONDASI PANEL J.T.R 30 X 65 X 100 CM / BUAH:


Galian tanah
Pasangan bata merah 1:5
Plesteran + aci 1:5

0.320 m3
0.195 m3
0.760 m2

25,000.00
410,000.00
20,000.00
Jumlah
Dibulatkan

8,000.00
79,950.00
15,200.00
103,150.00
103,000.00

PORTAL RANTAI / M' :


Galian strous pondasi
Cor beton pondasi 1:2:3
Pipa galvanished 4"
Rantai

0.002 m3
0.002 m3
0.060 btg
1.000 m'

29,000.00
508,000.00
50,000.00
6,000.00
Jumlah
Dibulatkan

58.00
1,016.00
3,000.00
6,000.00
10,074.00
10,000.00

NO
6

JENIS PEKERJAAN
STEP NOOSING ( KUKU MACAN ) / M' :
Step noosing ( kuku macan )
Upah pasang + adukan

VOLUME

10.000
1.000

HARGA SATUAN
( Rp )

J U M LAH
( Rp )

bh
ls

1,000.00
6,000.00
Jumlah
Dibulatkan

10,000.00
6,000.00
16,000.00
16,000.00

BETON STROUS PILE DIA 30 CM / M' :


Galian strous
Beton 1:2:3
Besi beton
Bekisting

1.000 m'
0.070 m3
5.670 kg
0.000 m2

29,000.00
508,000.00
6,000.00
0.00
Jumlah
Dibulatkan

29,000.00
35,560.00
34,020.00
0.00
98,580.00
99,000.00

BETON JEPIT 12/70 / M' :


Beton 1:2:3
Besi beton
Bekisting

0.084 m3
5.630 kg
1.400 m2

508,000.00
6,000.00
37,000.00
Jumlah
Dibulatkan

42,672.00
33,780.00
51,800.00
128,252.00
128,000.00

JAKARTA, 27 AGUSTUS 2004.

Pasir pasang

0.027 m3

0.00

0.00

Grouting
Alat + upah potong keramik
Upah pasang

0.162 kg
0.010 bh
1.000 ls

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Jumlah
Dibulatkan
4

Keramik lantai 20x20 ( adukan drymix ) / m2 :


Keramik 20x20 ex.Roman
Upah turun barang keramik
Semen mortar MU-450
Floor screed, tebal 2,5 cm
Alat + upah potong keramik
Upah pasang

1.050
1.000
0.125
1.200
0.010
1.000

m2
dus
zak
m2
bh
ls

0.00
0.00
62,000.00
0.00
0.00
0.00
Jumlah
Dibulatkan

0.00
0.00
7,750.00
0.00
0.00
0.00
7,750.00
8,000.00

Keramik lantai 40x40 ( adukan drymix ) / m2 :


Keramik 40x40 ex.Roman
Upah turun barang keramik
Semen mortar MU-450
Floor screed 2,5 cm
Alat + upah potong keramik
Upah pasang

1.050
1.000
0.125
1.200
0.010
1.000

m2
dus
zak
m2
bh
ls

0.00
0.00
62,000.00
0.00
0.00
0.00
Jumlah
Dibulatkan

0.00
0.00
7,750.00
0.00
0.00
0.00
7,750.00
8,000.00

Keramik lantai Homogenious / Niro Granit 40x40


( adukan drymix ) / m2 :
Keramik Homogenious / Granito 40x40 unpolish
Upah turun barang keramik
Semen mortar MU-450
Floor screed 2,5 cm
Alat + upah potong keramik
Upah pasang

1.050
1.000
0.125
1.200
0.010
1.000

m2
dus
zak
m2
bh
ls

88,500.00
0.00
62,000.00
0.00
0.00
0.00
Jumlah
Dibulatkan

92,925.00
0.00
7,750.00
0.00
0.00
0.00
100,675.00
101,000.00

1.100
5.000
25.000
41.620
1.000

m3
kg
kg
m2
m3

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

17,000.00
0.00
0.00
0.00
0.00
Jumlah
Dibulatkan

68,000.00
0.00
0.00
0.00
0.00
68,000.00
68,000.00

* PEKERJAAN ATAP KUDA - KUDA, KONSOL * TOWER :


1

Pek.Kuda-kuda / konsol / gording kayu singkil / m3 :


Balok kayu kamper singkil 8/12
Paku 10 cm
Baud + besi plat
Residu
Upah stel + pasang

Jumlah
Dibulatkan
2

Rangka atap borneo / m2 :


Kaso borneo 5/7
Reng borneo 3/4
Paku 7 cm
Upah pasang rangka atap

0.018
0.006
0.250
1.000

m3
m3
kg
m2
Jumlah
Dibulatkan

Genteng nok / bubungan M Class / m' :


Genteng nok / bubungan M Class premium
Upah turun barang genteng
Semen
Pasir pasang
Upah pasang

4.000
4.000
0.280
0.032
1.000

bh
bh
zak
m3
m'

Genteng badan M Class premium / m2 :


Genteng badan M Class premium
Upah turun barang genteng
Upah pasang

14.000 bh
14.000 bh
1.000 m2

8,000.00
0.00
0.00
Jumlah
Dibulatkan

Flashing / m' :
Beton K.300
Bekisting
Besi

0.012 m3
0.230 m2
1.200 kg

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Jumlah
Dibulatkan
6

112,000.00
0.00
0.00
112,000.00
112,000.00

Talang jurai dalam / m' :


Papan talang
Seng plat BJLS 20
Paku
Upah pasang

0.008
1.000
0.050
1.000

m3
m'
kg
m'

0.00
25,000.00
0.00
0.00
Jumlah
Dibulatkan

0.00
25,000.00
0.00
0.00
25,000.00
25,000.00

Triplek 4 mm + almunium foil / m2 :


Triplek 4 mm
Almunium foil " ABFOIL 720 D/S "
Paku
Upah pasang

0.347
1.100
0.070
1.000

lbr
m2
kg
m2

0.00
7,500.00
0.00
0.00

0.00
8,250.00
0.00
0.00
8,250.00
8,000.00

Jumlah
Dibulatkan
* PEKERJAAN PLAFON :
1

Plafond gypsum 9 mm + rangka / m2 :


Gypsum board 9 mm
Rangka kaso 5/7
Paku
Upah pasang rangka kaso 5/7

1.000
0.014
0.050
1.000

m2
m3
kg
m2

41,000.00
0.00
0.00
0.00
Jumlah
Dibulatkan

41,000.00
0.00
0.00
0.00
41,000.00
41,000.00

Plafond gypsum board 12 mm + rangka / m2 :


Gypsum board 12 mm
Rangka kaso 5/7
Paku
Upah pasang rangka kaso 5/7

1.000
0.014
0.050
1.000

m2
m3
kg
m2

48,000.00
0.00
0.00
0.00
Jumlah
Dibulatkan

48,000.00
0.00
0.00
0.00
48,000.00
48,000.00

Plafond triplek 4 mm + rangka / m2 :


Triplek 4mm
Rangka kaso 5/7
Paku
Upah pasang rangka kaso 5/7

0.347
0.014
0.050
1.000

lbr
m3
kg
m2

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

Jumlah
Dibulatkan

ANALISA HARGA SATUAN

LOKASI

: JAKSEL

* HARGA SATUAN MATERIAL :


Semen
Rp
Pasir pasang
Rp
Pasir beton
Rp
Pasir urug
Rp
Koral
Rp
Split
Rp
Batu Kali
Rp
Batu bata
Rp
Besi beton polos
Rp
Multiplek 9 mm
Rp
Multiplek 12 mm
Rp
Kaso 4/6
Rp
Paku
Rp
Minyak
Rp
Kawat beton
Rp
Galian tanah
Rp
Papan terentang
Rp
Baud/besi plat/kanal Rp
Residu + Upah
Rp
Kayu kamper singkil Rp
Kayu borneo 5/7
Rp
Triplek 4 mm
Rp
Pipa galvanished 2" Rp
Cat pipa galvanished 2"Rp
Railing balkon M5 & M6
wrooth iron Rp
Bak cuci piring stainlees
steel Rp
Ijuk
Rp
Closet jongkokCE 7(w)Rp
Bak mandi fiberglass
60 x 60 Rp
Roof drain 4"
Rp
Pipa galvanished 4" Rp
Rantai portal
Rp
Arde
Rp
Sirdam .Rp
Makadam..Rp

Tukang batu
Pekerja

Rp
Rp

40,000.00
150,000.00
150,000.00
100,000.00
125,000.00
150,000.00
95,600.00
250.00
5,500.00
110,000.00
145,000.00
2,344,000.00
9,000.00
1,000.00
9,000.00
30,000.00
825,000.00
8,500.00
2,000.00
7,000,000.00
4,150,000.00
39,000.00
26,000.00
8,000.00

/ 50 kg / zak
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ bh 28-10-2005
/ kg
/ lbr 28-10-2005
/ lbr 28-10-2005
/ m3
/ kg
/ m2
/ kg 28-10-2005
/m3
/ m3
/ kg
/ m2
/ m3
/ m3
/ lbr
/ m'
/ m'

2,200,000.00 / bh
225,000.00 / bh
6,000.00 / m2
85,000.00 / bh
175,000.00
120,000.00
50,000.00
6,000.00
1,000,000.00
115,000.00
125,000.00

/ bh
/ bh
/ m'
/ m'
/ bh
/ m3
/ m3

50,000.00
40,000.00

Beton Bo
Rp
Beton K.175
Rp
Beton K.225
Rp
Beton K.250
Rp
440,000.00 18-11-2005
Beton K.300
Rp
Beton K.350
Rp
485,000.00 18-11-2005
Beton K.400
Rp
Keramik 20x25 Roma
55,000.00
Keramik 20x20 Roma
36,000.00 28-10-2005
Keramik 30x30 Roma
38,000.00
Keramik 40x40 Roma
85,000.00 28-10-2005
Niro Granit40x40Pol
155,000.00
Grouting
2,000.00 28-10-2005
Drymix Tile Addesive Rp
Floor screed t=2,50cm Rp
Tutup beton bak kon
trol air hujan 60x60 cm
75,000.00
Genteng nok M Class premium Rp
Genteng badan Mclass premiumRp
Seng plat BJLS 20
Rp
Triplek 3 mm
Rp
Almunium Foil " ABFOIL 710 " Rp
Gypsum board 9 mm
Rp
Gypsum board water resistance
13 mm
Rp
List profil gypsum 7 cm
Rp
List profil gypsum 9 cm
Rp
Stella awning ( telp: 5555081 ) :
Tenda awning kanfas faade M.1Rp
Tenda awning kanfas faade M.3Rp
Tenda awning kanfas faade M.4Rp
Tenda awning kanfas faade M.6Rp
Kloset duduk exTotocw420J/SW516JPT
Soap holder ex.toto S11 N " White "
Floor drain ex.Toto TX 1 B
Rp
Kran T 30 AR 13 V 7 N
Rp
Septictank ST 10 Dusaspun
Rp
Pipa PVC dia 4" AW ex.Wafin Rp
Elbow / Tee dia 4"AW exWafin Rp
Elbow / Tee dia 2"AW exWafin Rp
Buat lubang2 PVC dia 4"
Rp
Pipa Overflow dia 2" AW ExWafinRp
Pipa Ventilasi dia 2" AW ExWafinRp
Alat bantu
Rp
Step noosing/kuku macan 10 cm Rp
Perekat keramik diat
27,000.00 16-11-2005.Don Bosco
Pengisi nat keramik
2,800.00 16-11-2005.Don Bosco

* HARGA SATUAN UPAH + ALAT :


Upah urugan
Rp
Upah pas.bt.kali
Rp
Upah pas.bekisting Rp
Upah cor + alat
Rp
Upah pasangbesi
Rp
Upah pas.batu bata Rp
Upah plesteran 2 cm Rp
Perancah/scafolding Rp
Upah pas.bouwplank Rp
Upah buat/pas.kuda2 Rp
Upah pas.rangka atapRp
Upah pasang closet Rp
Upah pas.shop holder Rp
Upah pas. floor drain Rp
Upah galian tanah
Rp
Unloading septictank Rp
Urug tanah kembali Rp

13,000.00
60,000.00
7,920.00
80,000.00
2,700.00
15,000.00
16,000.00
8,250.00
5,500.00
726,000.00
9,680.00
24,200.00
12,100.00
6,050.00
25,000.00
25,000.00
7,260.00

/ m3
/ m3
/ m2
/ m3
/ kg
/ m2
/ m2
/ m2
/ m'
/ m3
/ m2
/ bh
/ bh
/ bh
/ m3
/ bh
/ m3

Alat + upah potong ke


Upah pasang keramik :
* Adukan biasa
* Adukan drymix
Alat + upah tali air bet
Upah plesteran sudut
Upah pasang genteng n
Upah pasang genteng
Upah pasang jurai dala
Upah pasang triplek+
Upah pasang rangka p
Upah pas.pipa galv.2
Upah pas.bak cuci piri
Upah pasang kran + iso
Upah turun barang ker
Upah turun barang gen
Upah turun barang bes

70,000.00
12,500.00 28-10-2005
20,020.00
5,000.00
6,000.00
5,000.00
3,000.00
4,000.00
5,000.00
5,000.00
44,000.00
5,000.00
5,000.00
500.00 28-10-2005
120.00
60.00

Buang sisa tanah keluarRp


Galian strouspile
Rp

42,000.00 / m3
29,000.00 / m'

Upah transport besi


Upah pasang kuku m

60.00
6,000.00

ANALISA HARGA SATUAN ( SUDAH DIKOREKSI PAK FAKRI )


PEKERJAAN : BONGKAR DINDING RAILING RAMP
LOKASI
: RUKAN PLAZA 5 BLOK D
JAKSEL

NO

5.a

10

JENIS PEKERJAAN

Bongkar dinding bata railing basemen t= 90 cm / m2 :


Pekerja
Pas.Kansteen B.M 15/20 yang baru (Volume 2 m')/m':
Beton 1:2:3
Bekisting
Besi
Adukan tebal 3 cm 1:5
Tenaga kerja tukang batu

VOLUME UNIT HARGA SATUAN


( Rp )

0.40 hr

0.030
0.400
3.600
0.300
0.080

m3
m2
kg
m2
hr

Bongkar dinding beton tg = 35 cm, tb= 12 cm / m' :


Pekerja tukang bongkar / gali

0.38 hr

Plester + aci ex.bongkaran tg = 20 cm / m' :


Plester + aci

0.20 m2

Bongkar atap beton rumah knalpot ukr. 0.12x2.15x2,15 = 0.56 m3 / Ls :


Pekerja tukang bongkar / gali
5.04 hr

J U M LAH
( Rp )

40,000.00

16,000.00

521,000.00
37,000.00
8,000.00
30,000.00
50,000.00
Jumlah
Dibulatkan

15,630.00
14,800.00
28,800.00
9,000.00
4,000.00
72,230.00
72,000.00

50,000.00
Dibulatkan

18,750.00
19,000.00

26,000.00

5,200.00

50,000.00
Dibulatkan

252,000.00
252,000.00

Bongkar dinding beton / m3 :


Bongkar dinding beton

1.00 m3

450,000.00
Dibulatkan

450,000.00
450,000.00

Bongkar dinding beton 5.00 x 0.50 m x 0.12 m / Ls :


Bongkar dinding beton 5.00 x 0.50 m x 0.12 m

0.30 m3

450,000.00
Dibulatkan

135,000.00
135,000.00

Buat atap beton 0.12 x 2.15 x 2.15 / Ls :


Beton 1:2:3
Bekisting
Besi Wire Mesh M.10

0.56 m3
5.64 m2
1.00 lbr

521,000.00
37,000.00
800,000.00
Jumlah
Dibulatkan

291,760.00
208,680.00
800,000.00
1,300,440.00
1,300,000.00

Plester + aci atap & lysplank / ls :


Plester + aci atap
Plester + aci lysplank

4.62 m2
8.60 m2

26,000.00
26,000.00
Jumlah
Dibulatkan

120,120.00
223,600.00
343,720.00
344,000.00

Angkutan puing ex.bongkaran / ls :


Sewa kendaraan kijang

1.00 hr

150,000.00

150,000.00

Potong tralis besi / bh :

ANALISA HARGA SATUAN ( SUDAH DIKOREKSI PAK FAKRI )


PEKERJAAN : BONGKAR DINDING RAILING RAMP
LOKASI
: RUKAN PLAZA 5 BLOK D
JAKSEL

NO

JENIS PEKERJAAN
Bongkar tralis besi ( tukang las )
Potong tralis besi
Sewa mesin potong

11

12

13

Las penuh tralis besi / bh :


Pengelasan 2 x 15 cm

VOLUME UNIT HARGA SATUAN


( Rp )
0.50 hr
60,000.00
0.12 hr
60,000.00
0.12 hr
150,000.00
Jumlah
Dibulatkan

J U M LAH
( Rp )
30,000.00
7,200.00
18,000.00
55,200.00
55,000.00

30.00 cm

2,000.00

60,000.00

Plester + aci ex.bobokan / ls :


Plester + aci ex.bobokan

7.80 m2

26,000.00
Dibulatkan

202,800.00
200,000.00

Pengecatan di ruang knalpot / ls :


Cat dinding
Pekerja tukang cat
Kaso 5/7 untuk steger

2.00 klg
1.00 hr
3.00 btg

30,000.00
50,000.00
35,000.00

60,000.00
50,000.00
105,000.00
215,000.00

Jakarta, 13 Desember 2005.

Analisa Plesteran
ukuran Dolaks = 20 cm x 40 cm x 60 cm = 0.048 m3
PERBANDINGAN
Semen
Pasir
1
5
1
4
1
3

Tebal Plaster
(M')
0.01
0.015
0.02
0.025
0.03

Untuk 1:5
Tebal 10 mm
Tebal 15 mm
Tebal 20 mm
Tebal 25 mm
Tebal 30 mm

Untuk 1:4
Tebal 10 mm
Tebal 15 mm
Tebal 20 mm
Tebal 25 mm
Tebal 30 mm

Untuk 1:3
Tebal 10 mm
Tebal 15 mm
Tebal 20 mm
Tebal 25 mm
Tebal 30 mm

Semen
M
0.048
0.048
0.048

Pasir
M
0.24
0.192
0.144

Uk. Kubikasi / m
(M)
0.01
0.015
0.02
0.025
0.03

1:5

1:4

1:3

0.041666667
0.0625
0.083333333
0.104166667
0.125

0.05
0.075
0.1
0.125
0.15

0.0625
0.09375
0.125
0.15625
0.1875

Semen

Pasir

0.0069444444
0.0104166667
0.0138888889
0.0173611111
0.0208333333

0.034722222
0.052083333
0.069444444
0.086805556
0.104166667

Semen

Pasir

0.0083333333
0.0125
0.0166666667
0.0208333333
0.025

Semen
0.0104166667
0.015625
0.0208333333
0.0260416667
0.03125

Total
(Loose)
0.288
0.24
0.192

Hrg sat
Hrg Sat
Total
Semen(sak) Pasir(M) Semen(sak)
35,000
150,000
243
35,000
150,000
365
35,000
150,000
486
35,000
150,000
608
35,000
150,000
729

Hrg sat
Hrg Sat
Total
Semen(sak) Pasir(M) Semen(sak)
0.041666667
35,000
150,000
292
0.0625
35,000
150,000
438
0.083333333
35,000
150,000
583
0.104166667
35,000
150,000
729
0.125
35,000
150,000
875

Pasir

Hrg sat
Hrg Sat
Total
Semen(sak) Pasir(M) Semen(sak)
0.052083333
35,000
150,000
365
0.078125
35,000
150,000
547
0.104166667
35,000
150,000
729
0.130208333
35,000
150,000
911
0.15625
35,000
150,000
1,094

Total
(Bank) 20 %
0.24
0.2
0.16

Harga (Rp)
Pasir(M)
5,208
7,813
10,417
13,021
15,625

5,451
8,177
10,903
13,628
16,354

Harga (Rp)
Pasir(M)
6,250
9,375
12,500
15,625
18,750

6,542
9,813
13,083
16,354
19,625

Harga (Rp)
Pasir(M)
7,813
11,719
15,625
19,531
23,438

8,177
12,266
16,354
20,443
24,531

ANALISA HARGA SATUAN ( Sebagai Gudang )


LOKASI : JAKSEL
PERIODE : SEPTEMBER 2005
NO
1

JENIS PEKERJAAN
Galian tanah kedalaman max. 1,00 m' / m3 :
Tenaga kerja

VOLUME

J U M LAH
( Rp )

hr

40,000.00

30,000.00

Galian tanah pondasi 0,30x0,30x0,50 / Bh :


Galian tanah pondasi 0,30x0,30x0,50

0.045 m3

30,000.00

1,350.00

Cor beton 1:2:3 pondasi 0,30x0,30x0,50 / Bh :


Beton 1:2:3

0.045 m3

508,000.00
Dibulatkan

22,860.00
23,000.00

4.a. Pas.Tiang BRC dia 2" tinggi 1,50 m' / Bh :


Tiang BRC t=1,50 m
Transport dari pabrik ke Proyek = 119 bh
Kaso 5/7 untuk penunjang
Tenaga kerja

1.000
0.008
0.125
0.083

bh
trk
btg
hr

90,000.00
600,000.00
26,000.00
40,000.00
Sub J u m l a h
Dibulatkan

90,000.00
4,800.00
3,250.00
3,320.00
101,370.00
101,000.00

4.b. Pas.Tiang BRC dia 2" tinggi 2,20 m'/ Bh :


Tiang BRC t=2,20 m
Transport dari pabrik ke Proyek = 119 bh
Kaso 5/7 untuk penunjang
Tenaga kerja

1.000
0.008
0.125
0.083

bh
trk
btg
hr

132,000.00
600,000.00
26,000.00
40,000.00
Sub J u m l a h
Dibulatkan

132,000.00
4,800.00
3,250.00
3,320.00
143,370.00
143,000.00

0.083 btg
0.067 hr

130,000.00
40,000.00
Sub J u m l a h
Dibulatkan

10,790.00
2,680.00
13,470.00
13,000.00

6.a. Pagar BRC t = 1,20 m Hot Depped ex. Bumi Kaya / m' :
Pagar BRC t = 1,20 m
Transport dari pabrik ke Proyek = 119 bh
Tenaga kerja

0.417 lbr
0.008 trk
0.125 hr

210,500.00
600,000.00
40,000.00
Sub J u m l a h
Dibulatkan

87,778.50
4,800.00
5,000.00
97,578.50
98,000.00

6.b. Pagar BRC t = 1,75 m Hot Depped ex. Bumi Kaya / m' :
Pagar BRC t = 1,75 m
Transport dari pabrik ke Proyek = 119 bh
Tenaga kerja

0.417 lbr
0.008 trk
0.125 hr

322,500.00
600,000.00
40,000.00
Sub J u m l a h
Dibulatkan

134,482.50
4,800.00
5,000.00
144,282.50
144,000.00

Pembuangan tanah ex.galian / ls = 1,60 m3 :


Sewa mobil kijang + sopir

1.000 hr

75,000.00

75,000.00

Pasang baud mur / bh :


Tanaga kerja

0.020 hr

40,000.00

800.00

Pasang U clip / bh :
Tanaga kerja

0.020 hr

40,000.00

800.00

Besi siku L 50.50.5 panjang = 0,50 m / Bh :


Besi siku L 50.50.5
Tenaga kerja

10.a Las - lasan / ttk = 1 cm = 1 menit :

0.75

HARGA SATUAN
( Rp )

ANALISA HARGA SATUAN ( Sebagai Gudang )


LOKASI : JAKSEL
PERIODE : SEPTEMBER 2005
NO

HARGA SATUAN
( Rp )
150,000.00
15,000.00
60,000.00
Sub J u m l a h
Dibulatkan

J U M LAH
( Rp )
150.00
15.00
60.00
225.00
250.00

150,000.00
15,000.00
60,000.00
Sub J u m l a h
210,015.00
Dibulatkan

150,000.00
15.00
60,000.00
210,015.00
2,000.14
2,000.00

1,500.00
Jumlah

1,500.00
1,500.00

0.004 m3
0.080 m2
0.120 m2

521,000.00
37,000.00
8,000.00
Sub J u m l a h
Dibulatkan

2,084.00
2,960.00
960.00
6,004.00
6,000.00

13.a. Penyediaan air kerja / ls :


Sewa kendaraan angkut air dari M.K
Tenaga kerja

4.000 hr
2.000 org

75,000.00
40,000.00
Sub J u m l a h
Dibulatkan

300,000.00
80,000.00
380,000.00
380,000.00

13.b. Penyediaan air kerja di lokasi turap bt.kali = 14 hari / ls :


Sewa kendaraan angkut air dari M.K
Tenaga kerja

2.333 hr
2.333 org

75,000.00
40,000.00
Sub J u m l a h
Dibulatkan

175,000.00
93,333.33
268,333.33
268,000.00

JENIS PEKERJAAN
Sewa mesin las
Kawat las ( 1 kg = 30 cm x 30 bh = 9,00 m' )
Tenaga kerja tukang las

0.001 hr
0.001 kg
0.001 hr

Las - lasan / ttk = 1 cm ( volume sedikit = max 105 ttk ) :


Sewa mesin las
Kawat las ( 1 kg = 30 cm x 30 bh = 9,00 m' )
Tenaga kerja tukang las

1.000 hr
0.001 kg
1.000 hr

Harga satuan 1 ttk

11

12

VOLUME

Pasang tutup tiang BRC dia 2" / bh :


Upah pasang

Umpak 20 x20 x10 / bh :


Beton 1:2:3
Bekisting
Acian

0.0095 ls

1.000 bh

14.a. Keamanan proyek / ls :


Tenaga keamanan

10.000 hr

25,000.00

250,000.00

14.b. Keamanan poyek dilokasi turap batu kali / ls :


Tenaga keamanan

14.000 hr

25,000.00

350,000.00

14.c. Keamanan proyek diluar lokasi Pondok Indah / ls :


Tenaga keamanan

15.000 hr

40,000.00

600,000.00

Galian pondasi strous dia 40 cm / m' :


Galian pondasi strous dia 40 cm

1.000 m'

30,000.00

30,000.00

Cor beton bertulang strous dia 40 cm / m' :


Cor beton 1:2:3 strous dia 40 cm
Besi beton

0.125 m3
5.670 kg

521,000.00
8,000.00
Sub J u m l a h
Dibulatkan

65,125.00
45,360.00
110,485.00
110,000.00

Cor beton bertulang 10/25 / m' :


Beton 1:2:3

0.025 m3

521,000.00

13,025.00

15

16

17

ANALISA HARGA SATUAN ( Sebagai Gudang )


LOKASI : JAKSEL
PERIODE : SEPTEMBER 2005
NO

18

19

20

21

22

23

24

25

JENIS PEKERJAAN

VOLUME

HARGA SATUAN
( Rp )
8,000.00
37,000.00
Sub J u m l a h
Dibulatkan

J U M LAH
( Rp )
32,640.00
18,500.00
64,165.00
64,000.00

Besi beton
Bekisting

4.080 kg
0.500 m2

Galian tanah 30 cm dan pemadatan /m2 :


Galian tanah 30 cm
Pemadatan

0.300 m3
1.000 m2

30,000.00
2,000.00
Sub J u m l a h
Dibulatkan

9,000.00
2,000.00
11,000.00
11,000.00

Tebar pasir 5 cm padat / m2 :


Pasir beton

0.050 m3

124,750.00
Dibulatkan

6,237.50
6,000.00

Pasir beton 5 cm padat + filler / m2 :


Pasir beton
Filler

0.050 m3
0.005 m3

124,750.00
124,750.00
Sub J u m l a h
Dibulatkan

6,237.50
623.75
6,861.25
7,000.00

Beton rabbat 1:2:3 t = 10 cm / m2 :


Beton 1:2:3

0.100 m3

521,000.00
Dibulatkan

52,100.00
52,000.00

Pas.keramik 20x20 merah maron ex.Roman / m2 :


Keramik 20x20 merah maron ex.Roman
Semen
Pasir pasang
Grouting
Alat + upah potong keramik
Upah pasang

1.000
0.170
0.027
0.162
0.010
1.000

m2
zak
m3
kg
bh
m2

28,000.00
40,000.00
124,750.00
1,600.00
66,000.00
10,000.00
Sub J u m l a h
Dibulatkan

28,000.00
6,800.00
3,368.25
259.20
660.00
10,000.00
49,087.45
49,000.00

Bongkar 6 bh pondasi tiang halte bus / ls :


Tenaga kerja 3 orang 2 hari kerja

6.000 org

40,000.00

240,000.00

4.280 org
2.860 org

80,000.00
80,000.00

342,400.00
228,800.00

1.000 hr
0.140 kg
1.000 org

150,000.00
15,000.00
60,000.00
Jumlah
Dibulatkan

150,000.00
2,100.00
60,000.00
783,300.00
783,000.00

2.000 org
1.800 m3
0.750 m3

40,000.00
35,000.00
35,000.00
Sub J u m l a h
Dibulatkan

80,000.00
63,000.00
26,250.00
169,250.00
169,000.00

Pemindahan halte bus di malam hari / ls :


Tenaga kerja potong tiang + angkut ( 10 orang / 3 jam )
Tenaga kerja pasang tiang ( 10 orang / 2 jam )
Las kembali tiang terdiri :
Sewa mesin las
Kawat las
Tenaga kerja tukang las

Bongkar lantai halte bus lama + buang puing


+ tanah sisa galian / ls :
Bongkar lantai halte bus 3,00 mx 6,00 m
Buang puing
Buang tanah

ANALISA HARGA SATUAN ( Sebagai Gudang )


LOKASI : JAKSEL
PERIODE : SEPTEMBER 2005
NO

26

JENIS PEKERJAAN

Pas. Saluran air PVC dia 4" ex.Wafin type AW / m' :


Pipa PVC dia 4" ex.Wafin type AW
Sock dia 4" + lem
Upah pasang

VOLUME

HARGA SATUAN
( Rp )

J U M LAH
( Rp )

0.250 btg
1.000 unit
1.000 m'

170,000.00
6,000.00
3,000.00
Sub J u m l a h
Dibulatkan

42,500.00
6,000.00
3,000.00
51,500.00
52,000.00

27.a. Pasang tenda plastik / m2 :


Tenda plastik
Kaso 5/7
Tenaga kerja

1.000 m2
0.444 btg
0.222 hr

3,000.00
26,000.00
40,000.00
Sub J u m l a h
Dibulatkan

3,000.00
11,555.56
8,888.89
23,444.44
23,000.00

27.b. Pasang bedeng kerja diluar Pondok Indah / m2 :


Sewa kontrakan rumah

0.111 bln

700,000.00
Sub J u m l a h
Dibulatkan

77,700.00
77,700.00
78,000.00

28.a. Rambu pengaman tiap jarak 3 m' / titik / m' :


Kaso 5/7
Triplek 6 mm
Tenaga kerja

0.150 btg
0.025 lbr
0.075 org

26,000.00
60,000.00
40,000.00
Sub J u m l a h
Dibulatkan

3,900.00
1,500.00
3,000.00
8,400.00
8,000.00

28.b. Rambu pengaman tiap jarak 1,0 m' / titik / m' :


Kaso 5/7
Triplek 6 mm
Tenaga kerja

0.450 btg
0.075 lbr
0.225 org

26,000.00
60,000.00
40,000.00
Sub J u m l a h
Dibulatkan

11,700.00
4,500.00
9,000.00
25,200.00
25,000.00

29

30

31

32

33

34

Pengukuran / ls :
Tenaga kerja

2.500 hr

40,000.00

100,000.00

Bongkar kansteen BM / m' :


Tenaga kerja

0.143 hr

40,000.00
Dibulatkan

5,714.29
6,000.00

Cor beton 1:2:3 dibawah dudukan kansteen / m' :


Beton 1:2:3

0.040 m3

521,000.00
Dibulatkan

20,840.00
21,000.00

Cor beton 1:2:3 lantai kerja tebal 5 cm / m2 :


Beton 1:2:3

0.050 m3

521,000.00
Dibulatkan

26,050.00
26,000.00

Pas.Kansteen BM yang lama / m' :


Adukan tebal 3 cm 1:5
Tenaga kerja

0.300 m2
0.080 hr

30,000.00
40,000.00
Sub J u m l a h
Dibulatkan

9,000.00
3,200.00
12,200.00
12,000.00

Pas.Kansteen B.M 25/30 yang baru (Volume 2 m')/m':

ANALISA HARGA SATUAN ( Sebagai Gudang )


LOKASI : JAKSEL
PERIODE : SEPTEMBER 2005
NO

JENIS PEKERJAAN

VOLUME

J U M LAH
( Rp )
41,250.00
37,000.00
9,000.00
3,200.00
90,450.00
90,000.00

Beton K.350
Bekisting
Adukan tebal 3 cm 1:5
Tenaga kerja

0.075
1.000
0.300
0.080

Pasang besi wire mesh M.8 / m2 :


Besi wire mesh M.8 ukuran 2,10 m x 5,40 m
Transport dari pabrik ke Proyek ( 109 m2 )
Upah potong dan pasang besi

0.088 lbr
0.009 trk
0.125 hr

478,500.00
600,000.00
40,000.00
Sub J u m l a h
Dibulatkan

42,108.00
5,400.00
5,000.00
52,508.00
53,000.00

Besi cakar ayam / penyangga dia 12 mm - 80 / bh :


Besi cakar ayam / penyangga dia 12 mm - 80 cm

0.712 kg

8,000.00
Dibulatkan

5,696.00
6,000.00

37.a. Besi beton dia 12 mm - 1,00 m' dideletasi / bh :


Besi beton dia 12 mm - 1,00 m'

0.890 kg

8,000.00
Dibulatkan

7,120.00
5,500.00

37.b. Besi beton dia 12 mm - 0,50 m' / bh :


Besi beton dia 12 mm - 0,50 m'

0.445 kg

8,000.00
Dibulatkan

3,560.00
2,750.00

Lapisan plastik diatas lantai kerja / m2 :


Plastik
Upah gelar

1.000 m2
1.000 m2

2,500.00
500.00
Sub J u m l a h
Dibulatkan

2,500.00
500.00
3,000.00
3,000.00

Deletasi 2 cm dengan aspal / m' :


Aspal 2 cm
Upah cor aspal

0.250 m2
0.250 m2

11,000.00
3,000.00
Sub J u m l a h
Dibulatkan

2,750.00
750.00
3,500.00
4,000.00

Beton ready mix K.350 tebal 25 cm / m2 :


Beton ready mix K.350 tebal 25 cm

0.250 m3

550,000.00
Dibulatkan

137,500.00
138,000.00

Permukaan beton selalu dibasahi air / ls :


* Luas beton = 168,00m2
Tenaga kerja

5.000 hr

40,000.00
Jumlah

200,000.00
200,000.00

Perataan tanah berm + perapihan / m2 :


Tenaga kerja

0.075 org

40,000.00

3,000.00

61.000 m2

2,000.00
Dibulatkan

122,000.00
122,000.00

35

36

38

39

40

41

42

43

44

Penanaman rumput ex.galian tepi kansteen / ls :


* Volume rumput = 122,00 m x 0,50 m = 61,00 m2
Rumput embun

Besi beton dia 25 mm - 1,00 m' dideletasi / bh :

m3
m2
m2
hr

HARGA SATUAN
( Rp )
550,000.00
37,000.00
30,000.00
40,000.00
Sub J u m l a h
Dibulatkan

ANALISA HARGA SATUAN ( Sebagai Gudang )


LOKASI : JAKSEL
PERIODE : SEPTEMBER 2005
NO

45

46

47

48

49

JENIS PEKERJAAN

VOLUME

HARGA SATUAN
( Rp )
8,000.00
Dibulatkan

J U M LAH
( Rp )
30,800.00
31,000.00

Besi beton dia 25 mm - 1,00 m'

3.850 kg

Selang plastik dia 1" / m' :


Selang plastik dia 1"
Upah pasang

1.000 m'
0.025 org

3,000.00
40,000.00
Sub J u m l a h
Dibulatkan

3,000.00
1,000.00
4,000.00
4,000.00

Bongkar pondasi P.J.U / bh :


Galian tanah
Bongkar pondasi beton P.J.U + naikkan keatas tanah
Buang puing ex.bongkaran

0.120 m3
0.500 hr
0.443 m3

30,000.00
40,000.00
35,000.00
Sub J u m l a h
Dibulatkan

3,600.00
20,000.00
15,505.00
39,105.00
39,000.00

2.000 m'
0.443 m3
27.500 kg

30,000.00
521,000.00
8,000.00
Sub J u m l a h
Dibulatkan

60,000.00
230,803.00
220,000.00
510,803.00
511,000.00

0.250 hr
0.250 org
0.250 hr

150,000.00
40,000.00
450,000.00

37,500.00
10,000.00
112,500.00

0.250 bh
0.250 org
0.250 hr

150,000.00
40,000.00
450,000.00
Sub J u m l a h
Dibulatkan

37,500.00
10,000.00
112,500.00
320,000.00
320,000.00

Beton bertulang pondasi P.J.U. / bh :


Bor strospile
Beton 1:2:3
Besi beton

Bongkar & pasang tiang P.J.U / bh :


* Bongkar tiang PJU :
Sewa takel
Tenaga kerja ( 4 orang / tiang )
Sewa truck ( 4 tiang / hari )
* Pasang tiang PJU :
Sewa takel
Tenaga kerja ( 4 orang / tiang )
Sewa truck ( 4 tiang / hari )

Pembersihan akhir / ls :
Tenaga kerja

2.500 hr

40,000.00

100,000.00

Bongkar dan Pasang conblock / m2 :


Tenaga kerja bongkar conblock
Tenaga kerja pasang conblock
Tenaga kerja angkut conblock

0.083 hr
0.125 hr
0.067 hr

40,000.00
40,000.00
40,000.00
Sub J u m l a h
Dibulatkan

3,320.00
5,000.00
2,680.00
11,000.00
11,000.00

51.a. Sirdam 15 cm padat / m2 :


Sirdam 15 cm
Upah gelar

0.188 m3
0.041 hr

115,000.00
40,000.00
Sub J u m l a h
Dibulatkan

21,562.50
1,640.00
23,202.50
23,000.00

51.b. Makadam 10 cm padat / m2 :


Makadam 10 cm
Upah gelar

0.125 m3
0.028 hr

125,000.00
40,000.00
Sub J u m l a h
Dibulatkan

15,625.00
1,120.00
16,745.00
17,000.00

50

ANALISA HARGA SATUAN ( Sebagai Gudang )


LOKASI : JAKSEL
PERIODE : SEPTEMBER 2005
NO

JENIS PEKERJAAN

VOLUME

HARGA SATUAN
( Rp )

J U M LAH
( Rp )

52.a. Pas. Conblock baru merah t = 6 cm type unik


ex. BP.Block / m2 :
Conblock merah t = 6 cm type unik
Tenaga kerja pasang conblock
Tenaga kerja angkut conblock

1.000 m2
0.125 hr
0.033 hr

58,000.00
40,000.00
40,000.00
Sub J u m l a h
Dibulatkan

58,000.00
5,000.00
1,320.00
64,320.00
64,000.00

52.b. Pas. Conblock baru abu2 t = 8 cm type segi empat


ex. BP.Block / m2 :
Conblock abu-abu t = 8 cm type segi empat
Tenaga kerja pasang conblock
Tenaga kerja angkut conblock

1.000 m2
0.125 hr
0.033 hr

112,575.00
40,000.00
40,000.00
Sub J u m l a h
Dibulatkan

112,575.00
5,000.00
1,320.00
118,895.00
119,000.00

2.100 m2
5.180 m2

88,000.00
20,000.00

184,800.00
103,600.00

0.098 m3
0.560 m2
9.260 kg

521,000.00
37,000.00
8,000.00
Sub J u m l a h
Dibulatkan

51,058.00
20,720.00
74,080.00
434,258.00
434,000.00

Bongkar dan pasang kansteen conblock / m' :


Upah tenaga bongkar kansteen conblock
Adukan dibawah kansteen conblock tebal 3 cm 1:5
Upah pasang kansteen conblock

0.082 hr
0.120 m2
0.067 hr

40,000.00
30,000.00
40,000.00
Sub J u m l a h
Dibulatkan

3,280.00
3,600.00
2,680.00
9,560.00
10,000.00

Penyuntikan ( galian tanah= 75 cm ) untuk cek


jaringan kabel PAM + Telpon / titik :
Galian tanah 1,50 m x 1,00 m x 0,75 m
Urugan kembali

1.125 m3
1.125 m3

30,000.00
9,900.00
Sub J u m l a h
Dibulatkan

33,750.00
11,137.50
44,887.50
45,000.00

Bongkar dinding turap yang roboh / m3 :


Tenaga kerja

1.000 org

40,000.00

40,000.00

Angkut keatas dari kali ex.sisa bongkaran turap = 12,33 m3 / ls :


Tenaga kerja

4.000 org

40,000.00

160,000.00

Bongkar dinding bata 1/2 batu termasuk membersihkan / m2 :


Tenaga kerja

0.400

40,000.00

16,000.00

Turap bt.kali 1:4 memakai bt.kali ex.bongkaran / m3 :


Batu kali
Semen
Pasir pasang
Upah

0.000
3.260
0.522
1.000

95,600.00
40,000.00
111,000.00
38,500.00

0.00
130,400.00
57,942.00
38,500.00

53

54

55

56

57

58

59

Peninggian bak kontrol 50 cm + tutup ukuran


1,40 m x 0,70 m / bh :
Pasangan batu bata 1 batu 1:5
Plester 1:5 t = 2 cm
Tutup plat beton bertulang :
Beton 1:2:3
Bekisting
Besi beton

m3
zak
m3
m3

ANALISA HARGA SATUAN ( Sebagai Gudang )


LOKASI : JAKSEL
PERIODE : SEPTEMBER 2005
NO

JENIS PEKERJAAN

60

Turap bt.kali 1:4 memakai bt.kali / m3 :


Batu kali
Semen
Pasir pasang
Upah

1.200
3.260
0.522
1.000

m3
zak
m3
m3

95,600.00
40,000.00
111,000.00
38,500.00
Sub J u m l a h
Dibulatkan

114,720.00
130,400.00
57,942.00
38,500.00
341,562.00
342,000.00

Kistdam / m' :
* Asumsi tinggi air 1.00 m' :
Karung
Isi tanah ( upah kerja )
Dolken
Upah pasang dolken

5.000
0.350
0.500
0.050

bh
m3
btg
hr

2,000.00
30,000.00
15,000.00
40,000.00
Sub J u m l a h
Dibulatkan

10,000.00
10,500.00
7,500.00
2,000.00
30,000.00
30,000.00

Siar timbul / m2 :
Semen
Pasir pasang
Tk.batu
Pekerja

0.112
0.009
0.120
0.360

zak
m3
hr
hr

40,000.00
111,000.00
50,000.00
35,000.00
Sub J u m l a h
Dibulatkan

4,480.00
943.50
6,000.00
12,600.00
24,023.50
24,000.00

Suling2 PVC dia 2" / m2 = 1 bh :


PVC dia 2"
Tenaga kerja

0.125 btg
0.012 hr

51,000.00
40,000.00
Sub J u m l a h
Dibulatkan

6,375.00
480.00
6,855.00
7,000.00

Pas.Ijuk t = 5 cm uk.40x40 cm digapit bambu / bh : 1kat = 53x30x13 cm = Rp 7.000.-/ikat


Ijuk
0.387 ikat
7,000.00
Tali ijuk
0.320 m'
1,000.00
bambu
0.080 btg
10,000.00
Tk.batu
0.008 hr
50,000.00
Pekerja
0.008
35,000.00
Sub J u m l a h
Dibulatkan

2,709.00
320.00
800.00
400.00
280.00
4,509.00
5,000.00

61

62

63

64

65

66

VOLUME

HARGA SATUAN
( Rp )
Sub J u m l a h
Dibulatkan

J U M LAH
( Rp )
226,842.00
227,000.00

Sloof 15/20 / m' :


Beton 1:2:3
Besi beton dia 8 mm dan 12 mm
Bekisting

0.030 m3
5.060 kg
0.400 m2

521,000.00
8,000.00
37,000.00
Sub J u m l a h
Dibulatkan

15,630.00
40,480.00
14,800.00
70,910.00
71,000.00

Kolom praktis 15/15 / m' :


Beton 1:2:3
Besi beton dia 8 mm dan 12 mm
Bekisting

0.023 m3
4.860 kg
0.300 m2

521,000.00
8,000.00
37,000.00
Sub J u m l a h
Dibulatkan

11,722.50
38,880.00
11,100.00
61,702.50
62,000.00

ANALISA HARGA SATUAN ( Sebagai Gudang )


LOKASI : JAKSEL
PERIODE : SEPTEMBER 2005
NO

JENIS PEKERJAAN

VOLUME

HARGA SATUAN
( Rp )

J U M LAH
( Rp )

66.a. Ring balk 10/15 / m' :


Beton 1:2:3
Besi beton dia 8 mm dan 12 mm
Bekisting

0.015 m3
4.860 kg
0.300 m2

521,000.00
8,000.00
37,000.00
Sub J u m l a h
Dibulatkan

7,815.00
38,880.00
11,100.00
57,795.00
58,000.00

67.a. Tali air beton terbuka U 30/30 tebal 8 cm / m' :


Galian tanah
Beton 1:2:3
Besi beton dia 8 mm dan 10 mm
Bekisting
Acian

0.175
0.085
4.877
1.360
1.060

m3
m3
kg
m2
m2

30,000.00
521,000.00
8,000.00
37,000.00
8,000.00
Sub J u m l a h
Dibulatkan

5,250.00
44,285.00
39,016.00
50,320.00
8,480.00
147,351.00
147,000.00

67.b. Tali air beton tertutup U 30/30 tebal 8 cm / m' :


Galian tanah
Beton 1:2:3
Besi beton dia 8 mm dan 10 mm
Bekisting
Acian

0.211
0.122
7.093
1.520
1.060

m3
m3
kg
m2
m2

30,000.00
521,000.00
8,000.00
37,000.00
8,000.00
Sub J u m l a h
Dibulatkan

6,330.00
63,562.00
56,744.00
56,240.00
8,480.00
191,356.00
191,000.00

Pasang kansteen type Puri Indah 15/22 / m' :


Beton k.350
Bekisting
Adukan t = 3 cm 1:5
Tenaga kerja

0.029
0.506
0.250
0.075

m3
m2
m2
m2

550,000.00
37,000.00
30,000.00
40,000.00
Sub J u m l a h
Dibulatkan

15,950.00
18,722.00
7,500.00
3,000.00
45,172.00
45,000.00

Bongkar tutup saluran beton / bh :


Tenaga kerja bobok konst.jalan kanan-kiri
Tenaga kerja bongkar & angkut tutup saluran

0.600 hr
0.125 hr

40,000.00
40,000.00
Jumlah

24,000.00
5,000.00
29,000.00

Tutup beton 0,15x 0,80 x 1,60 / bh :


Beton 1:2:3
Besi
Bekisting

0.192 m3
31.120 kg
0.720 m2

521,000.00
8,000.00
37,000.00
Sub J u m l a h
Dibulatkan

100,032.00
248,960.00
26,640.00
375,632.00
376,000.00

Bak kontrol 80 x 80 x 140 / bh :


( Untuk saluran buis beton dia 60 cm )
Galian tanah
Pas.bata 1/2 batu
Plester + aci 1:5
Beton 1:2:3 untuk tutup
Bekisting
Besi

1.600
5.270
5.270
0.100
0.400
14.640

m3
m3
m2
m3
m2
kg

30,000.00
44,000.00
26,000.00
521,000.00
37,000.00
8,000.00
Sub J u m l a h
Dibulatkan

48,000.00
231,880.00
137,020.00
52,100.00
14,800.00
117,120.00
600,920.00
601,000.00

0.064 m3

30,000.00

1,920.00

68

69

70

71

72

Beton jepit 16/40 m' :


Galian tanah

ANALISA HARGA SATUAN ( Sebagai Gudang )


LOKASI : JAKSEL
PERIODE : SEPTEMBER 2005
NO

JENIS PEKERJAAN
Beton 1:2:3
Bekisting
Besi

VOLUME
0.064 m3
0.800 m2
6.030 kg

HARGA SATUAN
( Rp )
521,000.00
37,000.00
8,000.00
Sub J u m l a h
Dibulatkan

J U M LAH
( Rp )
33,344.00
29,600.00
48,240.00
113,104.00
113,000.00

Jakarta, 23 Desember 2005.