Escolar Documentos
Profissional Documentos
Cultura Documentos
Casing
James Hemingway
New Technology Advisor
CHFR Toolstring
13.0m
Telemetry
Top current
electrode
Insulating joint
Electronics
Arm section
Hydraulics
Bottom
current
electrode
0.0m
Rc
Rt
Current Source
Measure
Calibrate
I
I
V1
Vo
V2
I and Rc
Rc
Laterolog Physics
Logging Tool
Invaded Zone/
Cement/Rxo
Cement/Rxo
Borehole/
Casing
Uninvaded Zone
e spon
R
g
o
l
L a t e ro
Rt
Rx o
Rm
se
CHFR
Rm
Rx o
Rt
p o n se
s
e
R
t io n
I n d uc
Pressure/Temperature
Stationary measurement
~ 1 - 5 minutes
Resistivity range
planner)
Vertical Resolution
Depth of investigation
SPE 76730
GR
1
CHFR
0
ILD
300
OIL
FLOW
0
3000
WATER
FLOW
0
5000
Water
entries, low
resistivity
Oil entries,
high
resistivity
Gas
Water
breakthrough
Multi-layered reservoir
Oil production dropped to
4bopd
Water-cut of 99 %.
Remediation based on
CHFR-Plus results:
Bridge-plug set at xx96 ft.
Results:
Oil production increased
to 970 bopd
Water-cut reduced to 32%.
32
the Bridge-plug will be set
later at xx50 ft.