Escolar Documentos
Profissional Documentos
Cultura Documentos
TOTAL 7 PAGES
(Including Cover)
PROJECT NAME
DOCUMENT NO.
: KP-00+++-CQ712-G0011
For Information
TITLE
For Review
OWNER
05.11.2014
Rev.
No.
DATE
For Issue
DESCRIPTION
Purpose
For Approval
For Construction
As-Built
M.D
F.B
A.Z
T.C
PREPARED
CHECKED
REVIEWED
APPROVED
Owner
POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor
1
2
3
4
5
Checked
Description
Subcontrac
tor
Check Conformity
Rectifier
Check Conformity
Check Conformity
Check Conformity
Test Stations
Check Conformity
Verified
GAM
A
POSC
O
COMMENTS:
Above items must be checked against the Project Specifications and Approved Drawings
Subcontractor
Name
:
.
GAMA
Name
:.
POSCO
Name: .
Signature:..
Signature:.
.
Date
:.
.
Date
:..
OWNER
.
.
Signature:.
Date:
.
1
2
3
4
5
6
7
8
9
10
TANK ID
Checked
xxxx
Subcontrac
tor
Verified
Description
GAM
A
POSC
O
Check and verify the anode are free from severe scratches
and damages
Check the spacing between anodes and Conductor bars
Check proper spot welds on anodes/conductor bars
Check proper depth between anode and tank base is
maintained
Check proper connection of DC cables to Conductor Bar
Check the tank base is free from scrap and debris
First phase of backfilling commencement ensuring no
damages to cables
Check the resistance of anode system prior to final backfilling
Initial performance check of anode and reference electrodes
with temporary
Power supply when 50% of the tank plate is installed
Final performance check of anode and reference electrodes
with temporary
Power supply when 100% of the tank plate is installed
COMMENTS:
Installation must be done against approve for construction drawings
Subcontractor
Name
:
.
GAMA
Name
:.
POSCO
Name: .
Signature:..
Signature:.
.
Date
:.
.
Date
:..
Signature:.
Date:
.
OWNER
.
1
2
3
4
5
6
7
TANK ID
Checked
xxxx
Subcontrac
tor
Verified
Description
GAM
A
POSC
O
COMMENTS:
Reference Electrodes must be installed against the approve for construction drawings
Reference Electrodes shall be backfilled with clean naturel soil and free from sharp Stones
Reference Electrodes shall be thoroughly saturated with clean water after backfilling
Subcontractor
GAMA
POSCO
OWNER
Name
:
.
Name
:.
Name: .
Signature:..
Signature:.
.
Date
:..
Date
:.
.
Signature:.
Date:
.
1
2
3
4
5
6
Description
Junction
Box
ID
Check and verify the Junction boxes are free from Corrosion
and other damages
Check the location and proper orientation of Junction Boxes
Check the installation height and alignment of junction box
Check and verify the Junction Box name plates are fixed
properly for
Correct identification
Check the proper termination of cables with correct
identification tags
Check all cables inside the junction box are neatly tied with
cables ties
Checked
Subcontrac
tor
COMMENTS:
Junction Boxes must be installed against the approve for construction drawings
Verified
GAM
A
POSC
O
Subcontractor
Name
:
.
GAMA
Name
POSCO
:.
Name: .
Signature:..
Signature:.
.
Date
:..
Date
:.
.
Signature:.
Date:
.
OWNER
.
1
2
3
4
5
6
7
8
9
Description
TANK
ID
xxxx
Checked
Subcontrac
tor
Verified
GAM
A
POSC
O
COMMENTS:
Transformer Rectifier must be installed against the approve for construction drawing
Subcontractor
Name
:
.
GAMA
Name
:.
POSCO
Name: .
Signature:..
Signature:.
.
Date
:.
.
Date
:..
Signature:.
Date:
.
OWNER
.