Você está na página 1de 21
RRU3804 Quick Installation Guide Wz HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Safety Informatio Following All Safety Precautions Before any operation, read the instructions and precautions In this document carefully to minimize the possibility of accidents, The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be followed. They only provide the generic safety precautions for operations. Complying with the Local Safety Regulations When operating the device, comply with the local safety regulations. The safety precautions provided in the documents are supplementary. You must comply with the local safety regulations. Qualified Personnel Only The personnel in charge of installation and maintenance must be trained and master the correct operating methods and safety precautions before beginning work. symbols A This symbol indicates that casualty or serious accident may occur if you ignore DANGER the safety instruction. This symbol indicates that serious or major injury may occurif you ignore the CAUTION safety instruction, NOTE: This symbol indicates that the operation may be easier if you pay attention to the safety instruction. Safety of Personnel + The high voltage power supply provides power for running the system. Direct contact with the high voltage power supply or contact through damp objects may result in fatal danger. ‘+ Non-standard and improper high voltage operations may result in fire and electric shock. + Ina thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel tower and mast. ‘= Ground the device before powering on the device. Otherwise, the personnel and device are in danger. '* Power off the device before performing operations on the power supply equipment. * High power radio-frequency signals are harmful to human body. Before installing or maintaining {an antenna on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all parties to ensure that the transmitter antennas are shut down. ‘+ When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes. * Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust. * Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur. * When working at a height, be cautious about falling objects Device Safety ‘= Check the electrical connection of the device before operation and ensure that the device is reliably grounded + The static electricity generated by the human body may damage the electrostatic sensitive components on the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when performing the operation. ‘+ When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spili/loss. The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards. Installation Tools Be Percussion drill (214) ESD gloves Vacuum cleaner “Tt 48K = Straight screwdriver (M3~M6) (withthe diameter of no more than 10 mm Multimeter Heat gun Cross screwdriver (M3-M6) Claw hammer Knife Cable peeler i —- =—— - _ Adjustable wrench Power cable crimping pliers Wire cutter (withthe diameter of at least 32 mm) l — Combination wrench (2amm-21mm) for pole installation Inner hexagon spanner (5mm) Torque screwdriver a7mm~17mm) for wall instalation a= = Marking pen Long measuring tape Space Requirements (Unit: mm) a RRU Dimensions Recommended Clearance for a Single RRU 170 nin ca fl - a Minimum Clearance for a og Clearance for Two Single RRU Combined RRUs fe ol | fe ve Recommended refi Minimum Clearance for Clearance for Multiple 4 d Centralized RRUs a Multiple Centralized RRUs — Modes Bip On a metal pole Ona wall Onan angle steel Ona U-steel CO note The following figure describes the specifications for the metal pole, angle steel, and U-steel where the RRU is installed. Installati 60mm~ 114mm. £ § z | E 8 50mm~100mm 63mm~somm Metal pole Angle steel U-steel The following figures show the installation of multiple RRUs on the metal pole. Installation Procedure Prepare the installation Tata he cables 0 RRU (slide14~18) ‘Check the hardware instalation (slide19) Power on the RRU {slide19) Installing the RRU on a Metal Pole Bi Installing a Single RRU in Ordinary Mode @ Install the main fixture. A CAUTION a. When installing the main fixture, ensure that the arrow on the main fixture is upward. b. When installing the main fixture, ensure that the contact piece on the fixture is secured. CO note To facilitate maintenance, you should ensure that the bottom of the main fixture is 1200 mm to 1600 mm above the ground. © Use an adjustable wrench to tighten the nuts until the main and auxiliary fixtures are secure on the pole @ Install the auxiliary fixture between the heads of the dual- head nuts on the main fixture. Installation position for the auxiliary fixture UF Ensure that the arrow on the auxiliary fixture is upward O=3 TIP You may fit one end of the auxiliary fixture on the dual-head nut before installing the fixtures. When installing the auxiliary fixture, you only need to fit the other end of the auxiliary fixture on the other daul-head nut. @ Fit the tabs on the attachment plate on the RRU into the anchor slots on the main fixture. This screw is fastened only if the RRU needs to be removed. nstalling the RRU on a Metal Pole GB Installing Two RRUs in Back-To-Back Mode @ Install an RRU first. For details, @ Install the main fixture of another RRU see slide 7 Installing a Single Ensure that the main and auxiliary RRU in Ordinary Mode. fixtures are perfectly matched. t © Reinstall the attachment plate and cover plate on the second RRU by interchanging their positions. SS SS u i W 7 4 @G Fit the tabs on the attachment (CO note plate on the second RRU into the . anchor slots on the main fixture. Ensure that the cabling cavities of the two RRUs face the same direction when installing the RRUs. This screw is fastened only if the RRU needs to be removed. Ld; In reverse mode In ordinary Cabling cavities mode Installing the RRU on a Metal Pole ga Installing Multiple RRUs in Centralized Mode @ Relocate the attachment plate. i i @ Fit the tabs on the attachment plate on @ Install the second main fixture. the RRU into the anchor slots on the main fixture ional @ Fit the tabs on the attachment plate on the second RRU into the anchor slots on the second main fixture. This screw is fastened only if the RRU needs to be removed. Installing the RRU on a Metal Pole ga Installing Multiple RRUs in Centralized Mode @ Install the third main fixture This screw is fastened only if the RRU needs to be removed. @ Install the third RRU. note Four RRUs and six RRUs installation are as follows: Four RRUs Six RRUs EAE Installing the RRU A Installing a Single RRU @ Place the auxiliary fixture on the @ Drill holes at the anchor points and then wall at the installation position install the expansion bolt assembly. and then mark the anchor points by using a marking pen. 2 Bolt 10x65. Spring washer 10 ‘ — Plastic tube Fat washer 10 rs Expansion tube < } 7 - - Z I a i : ° ae After the expansion bolt is removed, dispose of the plastic tube. NOTE It is recommended that the auxiliary fixture be 1200 mm to A 1600 mm above the ground. CAUTION Do not hammer the bolt entirely into the © Fit the auxiliary fixture expansion tube, and leave the bolt 20 on the expansion bolts mm to 30 mm outside the wall downward, and then tighten the bolts by @ install the main fixture. © Install the RRU using a combination wrench(17mm-17mm). Ensure that the arrow on the auxiliary fixture is upward. Installing the RRU on a Wall GB Installing Multiple RRUs in Centralized Mode Top view A\ caunon To prevent mutual disturbance of the first main fixture and the second one when installing the second auxiliary fixture, leave at least 70 mm between the neighboring expansion bolts. For details about installing multiple centralized RRUs, refer to the related operations in slide 9 Installing Multiple RRUs in Centralized Mode. Installing the RRU on a U-Steel &, B faunal Four installation modes (O note The procedure for install a metal pole. ling the RRU on a U-steel is the same as that on Installing the RRU on an Angle Steel Angle steel Angle stee! Top view CO note Mode 1 The procedure for installing the RRU on an angle steel is the same as that on a metal pole. Installing the Cables of the RRU B Connections of a Single RRU Cables © — Boclean/RS485 input cable @ — CPRI optical cable © — Power cable © — Interconnect jumper © — Ais mutt-wire cable —— Feeder jumper — Feeder O— ASSenersoncae RCH] | @—— PGND cable CPRI optical cable Power cable Feeder jumper @— PGND cable ‘Antenna ‘Antenna ‘Antenna 5 [Exemal power supoly BBU3900, Instat te PGND cable Insta ths power cable Install the CPRIoptca cable Insta te alarm cae(optonsl) Tata the AISG raowre ele anid extension cabe(opicna) relat he PGND eable rata a Feaderarpar Airierconnectiumper's obtonel) Instat ome cable Insta he CPRI optical cae Instat ne alam cabl(opsona) efoptionel) land exionsion cat Connector Type Connected to--- PGND cable OT or 2-hole terminal Grounding bolt on the RRU OT or 2-hole terminal Grounding bar OR] HO Antenna jumper DIN connector Ports labeled ANT_TX/RXA and ANT_RXB at the bottom of the RRU DIN connector Feeder or antenna I aSE Power cable Two OT terminals Sockets labeled NEG(-) and RTN(+) in the RRU cabling cavity Bare wire External power supply e o Es CPRI optical cable DLC connector Port labeled CPRI_W or CPRI_E in the RRU3804 cabling cavity DLC connector Port labeled CPRIO, CPRI1, or CPRIZ on the BBU3900 =a

Você também pode gostar