ENTIDAD
CONTRATISTA
RESIDENTE DE OBRA
SUPERVISION DE OBRA
INSPECCION DE OBRA
PLAZO DE EJECUCIN
VALOR REFERENCIAL
MONTO CONTRACTUAL
FACTOR DE RELACION
CODIG.
DESCRIPCION PARTIDA
Und.
VA
MEJORAMIENTO DE POZO TUBULAR DEL SEC
MUNICIPALIDAD DISTRITAL DE MOLLEBAYA
HIDRAULICA Y CONSTRUCCIONES S.R.L.
ING. RAUL VILCA MAMANI
ING. MILTON FARJI REY DE CASTRO
NO CORRESPONDE
75 DIAS CALENDARIO
S/. 220,544.99
S/. 220,544.00
0.999995476
PRESUPUESTO REFERENCIAL
Metrado
01
01.01
01.02
01.03
OBRAS PROVISIONALES
CARTEL DE OBRA
CONSTRUCCIONES PROVISIONALES PARA OFICINA, ALMACEN Y CACETA
DE
GUARDIANA
GUARDIANA
DE OBRA
UND
M2
MES
1.00
40.00
1.50
02
02.01
02.02
02.03
02.04
OBRAS PRELIMINARES
TRAZO Y REPLANTEO, CON HERRAMIENTAS MANUALES
MOVILIZACION Y DESMOVILIZACIN DE EQUIPOS
MOVILIZACION DE EQUIPO MENOR Y HERRAMIENTAS P/OBRA
DESBROCE Y LIMPIEZA DE VEGETACIN Y ARBUSTOS
M2
EST
EST
M2
6,480.00
1.00
1.00
4,400.00
03
03.01
03.02
03.03
03.04
03.05
SEGURIDAD Y SALUD
ELABORACIN, IMPLEMENTACIN Y ADMINISTRACIN DEL PLAN DE
SEGURIDAD
SALUD EN ELINDIVIDUAL
TRABAJO
EQUIPOS DEYPROTECCIN
EQUIPOS DE PROTECCIN COLECTIVA
SEALIZACIN TEMPORAL DE SEGURIDAD
CAPACITACIN EN SEGURIDAD Y SALUD
GLB
UND
GLB
GLB
GLB
1.00
15.00
1.00
1.00
1.00
04
04.01
04.02
04.03
ENCAUZAMIENTO
DESCOLMATACIN Y ENCAUZAMIENTO EN TERRENO COMN SECO CON
ROCA
SUELTA , C/MAQUINARIA
CONFORMACIN
DE TALUD CON MATERIAL PROPIO ACOMODADO
ELIMINACIN DE MATERIAL EXCEDENTE, PROCEDENTE DE LA
DESCOLMATACIN Y ENCAUZAMIENTO
M3
M3
M3
4,867.00
3,481.19
1,663.09
05
05.01
05.02
05.03
05.04
05.05
05.06
M3
M3
M3
M2
M2
M3
528.58
225.84
363.29
114.25
114.25
319.90
06
06.01
06.02
06.03
06.04
06.05
M3
M3
M2
M2
M2
86.48
103.78
216.20
216.20
216.20
07
07.01
MITIGACIN AMBIENTAL
RIEGO EN ZONA DE TRABAJO PARA MIITIGAR CONTAMINACIN (POLVO)
M2
6,480.00
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
FACTOR DE RELACION
SUB TOTAL * FACTOR DE RELACION
IMPUESTO GENERAL A LAS VENTAS
TOTAL VALORIZACION
AVANCE MENSUAL
AVANCE ACUMULADO (%)
15.00%
7.00%
18.00%
VALORIZACION DE OBRA N 02
RAMIENTO DE POZO TUBULAR DEL SECTOR PAMPA SANTA ANA EN EL DISTRITO DE MOLLEBAYA PROVINCIA AREQUIPA - REGION AREQUIPA
CIPALIDAD DISTRITAL DE MOLLEBAYA
AULICA Y CONSTRUCCIONES S.R.L.
AUL VILCA MAMANI
MILTON FARJI REY DE CASTRO
ORRESPONDE
AS CALENDARIO
44.99
44.00
995476
PRESUPUESTO REFERENCIAL
Avance Anterior
Avance Actual
P.Unit.
Subtotal
Met.
Valor S/.
%
Met.
Valor S/.
732.81
200.48
9,676.80
732.81
8,019.20
14,515.20
0.00
40.00
1.00
0.00
8,019.20
9,676.80
0%
100%
67%
1.00
0.50
732.81
0.00
4,838.40
2.19
4,295.79
1,000.00
1.21
14,191.20
4,295.79
1,000.00
5,324.00
4,880.00
1.00
1.00
3,000.00
10,687.20
4,295.79
1,000.00
3,630.00
75%
100%
100%
68%
1,600.00
0.00
0.00
1,400.00
3,504.00
0.00
0.00
1,694.00
2,500.00
247.10
1,308.44
2,565.00
2,400.00
2,500.00
3,706.50
1,308.44
2,565.00
2,400.00
1.00
8.00
1.00
0.50
0.50
2,500.00
1,976.80
1,308.44
1,282.50
1,200.00
50%
0.00
7.00
0.00
0.50
0.50
0.00
1,729.70
0.00
1,282.50
1,200.00
10.89
6.69
17.89
53,001.63
23,289.16
29,752.68
3,624.90
3,171.30
544.32
39,475.16
21,216.00
9,737.88
74%
91%
33%
0.00
0.00
0.00
0.00
0.00
0.00
53%
100%
18.66
23.46
17.89
1.82
14.93
162.29
9,863.30
5,298.21
6,499.26
207.94
1,705.75
51,916.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18.66
17.89
1.82
14.93
76.05
1,613.72
1,856.62
393.48
3,227.87
16,442.01
0.00
0.00
0.00
0.00
0.00
1.81
11,728.80
4,480.00
277,355.14
41,603.27
19,414.86
338,373.27
1.00000000
338,373.27
60,907.19
399,280.46
0%
0%
0%
528.58
225.84
363.29
114.25
114.25
319.90
9,862.18
5,298.21
6,499.26
207.94
1,705.75
51,916.57
0.00
0.00
0.00
0.00
0.00
0%
0%
86.48
103.78
216.20
216.20
216.20
1,613.72
1,856.62
393.48
3,227.87
16,442.01
8,108.80
69%
2,000.00
3,620.00
124,114.57
18,617.19
8,688.02
151,419.78
1.00000000
151,419.78
27,255.56
178,675.33
44.75%
44.75%
117,625.02
17,643.75
8,233.75
143,502.52
1.00000000
143,502.52
25,830.45
169,332.98
42.41%
399,280.46
277,355.14
Periodo al 29.02.2016
Actual
%
Met.
Avance Acumulado
Valor S/.
Saldo
% de Avance
Met.
Valor S/.
1.00
0.00
0.33
1.00
40.00
1.50
732.81
8,019.20
14,515.20
100%
100%
100%
0.00
0.00
0.00
0.00
0.00
0.00
0.25
0.00
0.00
0.32
6,480.00
1.00
1.00
4,400.00
14,191.20
4,295.79
1,000.00
5,324.00
100%
100%
100%
100%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
1.00
15.00
1.00
1.00
1.00
2,500.00
3,706.50
1,308.44
2,565.00
2,400.00
100%
100%
100%
100%
100%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,624.90
3,171.30
544.32
39,475.16
21,216.00
9,737.88
74%
91%
33%
1,242.20
309.89
1,118.77
0.47
0.00
13,527.56 +0.10
2,073.16
20,014.83 +0.03
1.00
1.00
1.00
528.58
225.84
363.29
114.25
114.25
319.90
9,862.18
5,298.21
6,499.26
207.94
1,705.75
51,916.57
100%
100%
100%
100%
100%
100%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
86.48
103.78
216.20
216.20
216.20
1,613.72
1,856.62
393.48
3,227.87
16,442.01
100%
100%
100%
100%
100%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.31
6,480.00
11,728.80
100%
0.00
0.00
42.41%
399,280.46
277,355.14
241,739.59
36,260.94
16,921.77
294,922.30
1.00000000
294,922.30
53,086.01
348,008.31
35,615.55
5,342.33
2,493.09
43,450.97
1.00000000
43,450.97
7,821.17
51,272.15
87.16%
12.84%
VALORIZACION DE OBRA N 02
OBRA
MEJORAMIENTO DE POZO TUBULAR DEL SECTOR
ENTIDAD
MUNICIPALIDAD DISTRITAL DE MOLLEBAYA
CONTRATISTA
HIDRAULICA Y CONSTRUCCIONES S.R.L.
RESIDENTE DE OBRA
ING. RAUL VILCA MAMANI
SUPERVISION DE OBRA
ING. MILTON FARJI REY DE CASTRO
INSPECCION DE OBRA
NO CORRESPONDE
PLAZO DE EJECUCIN
75 DIAS CALENDARIO
VALOR REFERENCIAL
S/.
220544.99
MONTO CONTRACTUAL
S/.
220544
FACTOR DE RELACION
0.99999548
CODIG.
DESCRIPCIONPRESUPUESTO REFERENCIAL
Und.
Metrado
P.Unit.
01
01.01
01.02
01.03
OBRAS PROVISIONALES
CARTEL DE O UND
CONSTRUCCIO
M2
GUARDIANA MES
02
02.01
02.02
02.03
02.04
OBRAS PRELIMINARES
TRAZO Y REP M2
MOVILIZACIO EST
MOVILIZACIO EST
DESBROCE Y M2
03
03.01
03.02
03.03
03.04
03.05
SEGURIDAD Y SALUD
ELABORACINGLB
EQUIPOS DE UND
EQUIPOS DE GLB
SEALIZACIGLB
CAPACITACI GLB
04
04.01
04.02
04.03
ENCAUZAMIENTO
DESCOLMATAC
M3
CONFORMACI
M3
ELIMINACIN M3
05
05.01
05.02
05.03
05.04
05.05
05.06
1
40
1.5
732.81
200.48
9676.8
6480
1
1
4400
2.19
4295.79
1000
1.21
1
15
1
1
1
2500
247.1
1308.44
2565
2400
4867
3481.19
1663.09
10.89
6.69
17.89
528.58
225.84
363.29
114.25
114.25
319.9
18.66
23.46
17.89
1.82
14.93
162.29
06
06.01
06.02
06.03
06.04
06.05
86.48
103.78
216.2
216.2
216.2
18.66
17.89
1.82
14.93
76.05
07
07.01
MITIGACIN AMBIENTAL
RIEGO EN ZON
M2
6480
1.81
COSTO DIRECTO
GASTOS GENERALES
0.15
UTILIDAD
0.07
SUB TOTAL
FACTOR DE RELACION
SUB TOTAL * FACTOR DE RELACION
IMPUESTO GENERAL A LAS
0.18
TOTAL VALORIZACION
AVANCE MENSUAL
AVANCE ACUMULADO (%)
399280.46
DE POZO TUBULAR DEL SECTOR PAMPA SANTA ANA EN EL DISTRITO DE MOLLEBAYA PROVINCIA AREQUIPA - REGI
DISTRITAL DE MOLLEBAYA
ONSTRUCCIONES S.R.L.
I REY DE CASTRO
Subtotal
Avance Anterior
Met.
Valor S/.
Avance Actual
Met.
Valor S/.
732.81
8019.2
14515.2
0
40
1
0
0
8019.2
1
9676.8 0.66666667
0.5
732.81
0
4838.4
14191.2
4295.79
1000
5324
4880
1
1
3000
10687.2 0.75308642
4295.79
1
1000
1
3630 0.68181818
1600
0
0
1400
3504
0
0
1694
2500
3706.5
1308.44
2565
2400
1
8
1
0.5
0.5
2500
1976.8 0.53333333
1308.44
1
1282.5
1200
0.5
0
7
0
0.5
0.5
0
1729.7
0
1282.5
1200
53001.63
23289.1611
29752.6801
3624.9
3171.3
544.32
39475.161 0.74479145
21215.997 0.91098159
9737.8848 0.32729437
0
0
0
0
0
0
9863.3028
5298.2064
6499.2581
207.935
1705.7525
51916.571
0
0
0
0
0
0
528.58
225.84
363.29
114.25
114.25
319.9
9863.3028
5298.2064
6499.2581
207.935
1705.7525
51916.571
0
0
0
0
0
0
0
0
1613.7168
1856.6242
393.484
3227.866
16442.01
0
0
0
0
0
11728.8
4480
277355.14
41603.271
19414.8598
338373.271
1
338373.271
60907.1887
0
0
0
0
0
0
0
86.48
103.78
216.2
216.2
216.2
1613.7168
1856.6242
393.484
3227.866
16442.01
8108.8 0.69135802
2000
3620
124114.57 0.44749331
18617.1855
8688.0199
151419.775
1
151419.775
27255.5596
178675.335
0.44749331
117626.14
17643.921
8233.8298
143503.891
1
143503.891
25830.7003
169334.591
0.42409937
Periodo al 29.02.2016
Avance Acumulado
Met.
Valor S/.
Saldo
% de Avance Met.
Valor S/.
1
0
0.33333333
1
40
1.5
732.81
8019.2
14515.2
1
1
1
0
0
0
0
0
0
0.24691358
0
0
0.31818182
6480
1
1
4400
14191.2
4295.79
1000
5324
1
1
1
1
0
0
0
0
0
0
0
0
0.5
1
15
1
1
1
2500
3706.5
1308.44
2565
2400
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
3624.9
3171.3
544.32
39475.161 0.74479145
21215.997 0.91098159
9737.8848 0.32729437
1
1
528.58
225.84
363.29
114.25
114.25
319.9
9863.3028
5298.2064
6499.2581
207.935
1705.7525
51916.571
0.46666667
0
1
1
1
1
1
1
1242.2 13527.558
309.89 2073.1641
1118.77 20014.8253
0
0
0
0
0
0
0
0
0
0
0
0
1
1
86.48
103.78
216.2
216.2
216.2
1613.7168
1856.6242
393.484
3227.866
16442.01
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0.30864198
6480
11728.8
0.42409937
241740.71
36261.1065
16921.8497
294923.666
1
294923.666
53086.2599
348009.926
35615.55
5342.3325
2493.0885
43450.971
1
43450.971
7821.17478
51272.1458
0.87159268
0.12841136
+0.1
+0.03