Escolar Documentos
Profissional Documentos
Cultura Documentos
Contractor Logo
CLIENT
PROJECT MANAGER
Project Title
DOCUMENT
DESCRIPTION:
MANIFOLD
CRANE AND PIPE SUPPORTING
SUPPORTING
STRUCTURE DESIGN.
XXX
XXX
XXX
XXX
Prepared
Checked
Reviewed
Approved
Rev.
Date
Revision Description
DOCUMENT NUMBER
Type
Discp
Job
SJ
Seq
Format
A4
PAGES
OF
51
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Record of Revisions
Rev.
A
Date
Revision Description
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
TABLE OF CONTENTS
Sr.
Description
No.
Page No.
1.
Introduction
2.
Scope
3.
Design considerations
4.
5.
16
6.
31
7.
Annexure
Annexure 1-Crane Layout Data
48
49
50
51
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
1. Introduction:
This document is produced to cover the design calculations of crane girder, supporting
structure pipe supporting and operation platform for manifold. It is optional to fabricate the
crane girder or vendor supplied. In both cases it is required to assess the forces, design
parameter of the girder as the span is high, and installation of girder is outdoor.
2. Scope:
This document presents design calculations of crane girder, supporting structure pipe
supporting and operation platform for manifold.
3. Design considerations:
a)
Geometry:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
5000
EL +
11.8M
TOP OF
RAIL
750x 800 D
BEAM
CL
775
25GAP
1000
750
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Central support
Crane span = 40000+150+375-500=40025mm:
Crane span = 30000+150+375-500=30025mm
4. Crane girder design:
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Node Numbers:
Member Numbers:
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
a) Loading
Dead load: Self weight of crane block is assumed 500 Kgs = 5kN.
Girder self weight as per self weight command.
Walkway dead weight is 200 kgs/m = 2kN/m (UDL) along one long girder.
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Live load: Crane lifting weight is considered as live load. Crane capacity 2T =20 kN
Walkway Live load is 500 kgs/m = 5kN/m (UDL) along one long girder.
Vertical Impact factor as per clients design basis = 25% = 1.25 x 20 = 25kN.
Transverse and longitudinal load along crane movement is considered conservatively equal
to 10% of weight of crab + lifted weight = 0.1 x (5 + 20) = 2.5 kN.
Seismic load: Seismic load and crane operating load will not act simultaneously. But crane
girder in parked position will be checked for seismic forces.
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Seismic load combination and load factor. While using UBC force for BS8110 combination
shall be divided by 1.4 hence
Ve= 0.1/1.4 W = 0.0714 W.
= (1.4) x Dead load + (1.6) x crane load.
Seismic load combination.
= (1.2) x Dead load + (1.2) x Seismic load.
Wind load:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Wind Load on crane built up girder 1200 deep= 2 x 1.2 x 0.971 = 2.33 kN/m.
Load combination: Clients design basis does not provides appropriate load combination so
reference is made to shell DEP for load combination.
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Stress ratio:
Deflection check:
Deflection limits,
Vertical deflection of girder: L/600
Span/300 = 40025/600 = 66.70mm > (76-12) 63mm hence ok.
Lateral deflection direction wind and eq case : = span /300 BS 5950-1 Table 8
40025/300= 133.4167mm > 49 mm hence ok.
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 13 of 57
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
General BMD:
SFD:
AFD:
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Seismic and wind reaction is less critical that DL + CL so only DL + CL is considered on RC beam
design of manifold.
New load case is generated to assess highest load on RC beam when crane is closer to support.
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Dimensions
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Member Properties:
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Bracing:
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
At +7.050M
At +5.500M
At +2.900M
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 21 of 57
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Member Numbers:
At +7.050M
At +5.500M
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
G1
3300
G2
Load on middle girder G1 = 3.5/2 x 100 kg/sqm = 1.75kN/m.
Load on middle Girder G1 contribution on both sides= (3.5 + 3.3)/2x 100 kg/sqm = 3.4 kN/m.
Load on side girder G2 = 3.3/2 x 100 kg/sqm = 1.65kN/m.
Consider 3.5 kN/m UDL for all Girders.
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Piping load: Refer annexure B for white oil Manifold load by piping.
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
At +7.050M
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
At +5.500M
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Bracings:
Deflection limits: Horizontal
Horizontal deflection of plat form: L/300
XX-X-XXXX-XX-XXXX-Rev XX-Manifold Crane supporting structure and pipe supporting platforms.doc
Page 28 of 57
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Consider E-W 2 kN Vertical 191 kN and N-S 45 kN force for manifold slab design.
Braced bay loads:
Consider E-W 118 kN Vertical 443 kN and N-S 11 kN force for manifold slab design.
Platform loads:
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Consider E-W 5 kN Vertical 55 kN and N-S 5 kN force for manifold column design.
Platform bracing:
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
E-W 118 kN Vertical 443 kN and N-S 11 kN force for manifold slab design same as .braced bay load.
BMD, SFD and AFD:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Dimensions
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Member Properties:
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
At +7.050M
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
At +5.500M
At +2.900M
Member Numbers:
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
At +7.050M
At +5.500M
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Column Numbers:
Bracing Numbers:
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
G1
3300
G2
Load on middle girder G1 = 3.5/2 x 100 kg/sqm = 1.75kN/m.
Load on middle Girder G1 contribution on both sides= (3.5 + 3.3)/2x 100 kg/sqm = 3.4 kN/m.
Load on side girder G2 = 3.3/2 x 100 kg/sqm = 1.65kN/m.
Consider 3.5 kN/m UDL for all Girders.
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Piping load: Refer annexure B for white oil Manifold load by piping.
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Stress check:
At +7.050M
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
At +5.500M
Column Platform:
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Support Reactions: To transfer manifold base slab: Nodes: Unbraced pipe supports:
Consider E-W 2 kN Vertical 257 kN and N-S 38 kN force for manifold slab design black oil.
Braced pipe supports::
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Consider E-W 94 kN Vertical 180 kN and N-S 17 kN force for manifold slab design.
Reaction on wall
Consider E-W 5 kN Vertical 55 kN and N-S 5 kN force for manifold column design.
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Consider E-W 1 kN Vertical 218 kN and N-S 89 kN force for manifold column design.
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Revision :
A
Doc. No
Date:
Reaction Summary
White oil Manifold.
Location
Unbraced Pipes support
frames
EW
NS
EW
NS
191
45
257
38
Remark
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Revision :
A
Doc. No
Date:
118
433
11
94
180
17
110
233
218
89
110
233
45
Reaction on wall
55
94
257
94
55
1. Annexures
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date:
Client Logo
MANIFOLD CRANE
AND PIPE
SUPPORTING
STRUCTURE
DESIGN.
Contractor Logo
Contractor Name
Job No:
Doc. No
Revision :
A
Date: