ANEXO N ________

PLANILHA PARA CLCULO DE REDES DE DRENAGEM

PREFEITURA DO MUNICPIO DE TABOO DA SERRA

PAC-HBB - NCLEO IRATI

9.16
9.7

GALERIA DE GUAS PLUVIAIS - 400 mm/ 500 mm

9.8

9.14

9.19

9.17

VOLUME DE
ESCAVAO (M3)

APILOAMENTO
DE VALA (M2)

VOLUME DE
LASTRO (M3)

CARGA E REM
DE TERRA (M3)

Transp. Do Material
escavado (M3xKm)

Aterro Compactado
sem controle G.C. (M3)

BASE DE
RACHO

ESCORAMENTO
DESCONTNUO (M2)

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

315.36
250.56
218.40
163.80
131.04
325.50
136.80
269.33
134.38
102.49
33.59

86.40
86.40
84.00
63.00
54.60
130.20
57.00
119.70
65.55
55.10
24.70

12.96
12.96
12.60
9.45
8.19
19.53
8.55
17.96
9.83
8.27
3.71

315.36
250.56
218.40
163.80
131.04
325.50
136.80
269.33
134.38
102.49
33.59

614.49
452.49
406.82
305.11
237.13
598.02
260.40
501.95
242.10
177.34
48.62

176.23
111.43
107.06
80.29
58.67
152.92
71.52
132.24
59.31
39.38
5.30

21.60
21.60
21.00
15.75
13.65
32.55
14.25
29.93
16.39
13.78
6.18

262.80
208.80
208.00
156.00
124.80
310.00
144.00
283.50
141.45
107.88
35.36

1.70
1.70
1.70
1.50
1.50
1.50
1.70
1.70

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

51.30
40.59
93.51
26.40
21.45
19.80
67.18
44.64

26.86
21.25
48.96
12.00
9.75
9.00
30.26
22.10

4.03
3.19
7.34
1.80
1.46
1.35
4.54
3.32

51.30
40.59
93.51
26.40
21.45
19.80
67.18
44.64

95.49
75.55
174.07
54.73
44.47
41.05
131.03
84.65

25.09
19.85
45.74
17.38
14.13
13.04
37.65
23.08

6.72
5.31
12.24
3.00
2.44
2.25
7.57
5.53

60.36
47.75
110.02
35.20
28.60
26.40
79.03
52.52

1.80
1.70
1.70
1.70

1.28
1.16
1.16
1.16

0.15
0.15
0.15
0.15

20.74
17.55
227.17
16.56

11.52
10.32
133.63
9.74

1.73
1.55
20.04
1.46

20.74
17.55
227.17
16.56

40.52
34.77
450.01
32.81

11.68
10.26
132.83
9.69

2.88
2.58
33.41
2.44

32.40
30.26
391.68
28.56

169.50

158.00

72.00

603.51
2,124.63

1,172.05

175.81

2,728.14

5,103.62

1,354.77

293.01

2,905.36

9.8

9.14

9.19

9.17

800 mm/ 1000 mm/ 1200 mm/ 1500 mm


TRECHO
DE
PARA

*DIMETRO
TUBULAO

MATERIAL

M.ALA PV-14
1.80
CONCRETO
PV-14 PV-13
1.80
CONCRETO
PV-13 PV-12
1.44
CONCRETO
PV-12 PV-11
1.44
CONCRETO
PV-11 PV-10
1.44
CONCRETO
PV-10 PV-09
1.44
CONCRETO
PV-09 PV-08
1.20
CONCRETO
PV-08 PV-07
1.20
CONCRETO
PV-07 PV-06
1.20
CONCRETO
PV-06 PV-05
1.20
CONCRETO
PV-05 PV-04
1.20
CONCRETO
PV-04 PV-03
PVA-12 PV-17
0.96
CONCRETO
PV-17 PVG-25
0.96
CONCRETO
PVG25 PV-19
0.96
CONCRETO
PV-17
ESC
0.62
CONCRETO
ESC
PV-20
0.62
CONCRETO
PV-20 PV-26
0.62
CONCRETO
PV-13 PV-15
0.96
CONCRETO
PV-15 PV-16
0.96
CONCRETO
LIGAES BOCAS DE LOBO - PV'S
PV'S
BL 3
0.62
CONCRETO
PV'S
BL 1
0.48
CONCRETO
PV'S
BL 2
0.48
CONCRETO
PV'S
BL 3
0.48
CONCRETO

EXTENSO

LARGURA
DA VALA

ALTURA
N. D'GUA

ALTURA
DA VALA

LASTRO
LARGURA
ALTURA

36.00
36.00
40.00
30.00
26.00
62.00
30.00
63.00
34.50
29.00
13.00

2.40
2.40
2.10
2.10
2.10
2.10
1.90
1.90
1.90
1.90
1.90

3.25
2.50
2.20
2.20
2.00
2.10
2.00
1.85
1.65
1.46
0.96

3.65
2.90
2.60
2.60
2.40
2.50
2.40
2.25
2.05
1.86
1.36

2.40
2.40
2.10
2.10
2.10
2.10
1.90
1.90
1.90
1.90
1.90

15.80
12.50
28.80
8.00
6.50
6.00
17.80
13.00

1.70
1.70
1.70
1.50
1.50
1.50
1.70
1.70

1.51
1.51
1.51
1.80
1.80
1.80
1.82
1.62

1.91
1.91
1.91
2.20
2.20
2.20
2.22
2.02

9.00
8.90
115.20
8.40

1.28
1.16
1.16
1.16

VAR
VAR
VAR
VAR

132.50

29.50

87.90

9.20

ESCADA HIDRULICA
CANALETA COM TAMPA

TOTAL

7.00

12.00

h>2,00
PV-01

H<2,00
PV-02

400

500

800

1000

1200

1500

9.16
9.7

ACUMULADO

UN
0.00

UN
0.00

M
0.00

M
0.00

M
8.80

M
0.00

M
0.00

M
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

MEDIDO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SALDO

0.00

0.00

0.00

0.00

8.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

* O DIMETRO DA TUBULAO DEVE INCLUIR A ESPESSURA DAS PAREDES ( 20% do nominal )


6.00
28.00
3.00

MURO

ACUMULADO
MEDIDO
SALDO

ALA
UN
0.00
0.00
0.00

BL-01

BL-02

BL-03

UN
0.00
0.00
0.00

UN
0.00
0.00
0.00

UN
0.00
0.00
0.00

OBS: A BOCA DE LOBO TRIPLA FOI CONSIDERADA COMO 3 X SIMPLES

9.20