Você está na página 1de 29

COSTO MINA

COSTO DOTACIN (KUS$/AO)


COSTO DOTACIN (US$/TON)
COSTO PRODUCCIN MINA (KUS$/AO)
COSTO PRODUCCIN MINA (US$/TON)
COSTO PREPARACIN MINA (KUS$/AO)
COSTO PREPARACIN MINA (US$/TON)
COSTO PLANTA CHANCADO / PIQUE SKIP (KUS$/AO)
COSTO PLANTA CHANCADO / PIQUE SKIP (US$/TON)
CONTINGENCIAS (5%) (KUS$/AO)
CONTINGENCIAS (5%) (US$/TON)

COSTO TOTAL MINA (KUS$/AO)


COSTO TOTAL MINA (US$/TON)

AO 1

AO 2

AO 3

AO 4

AO 5

AO 6

AO 7

AO 8

AO 9

AO 10

AO 11

AO 12

AO 13

AO 14

AO 15

AO 16

AO 17

3,347

5,578

7,513

10,705

10,705

10,705

10,705

10,705

10,705

10,705

10,705

10,705

10,705

10,705

10,705

10,705

5,578

2.45

2.07

1.64

1.70

1.70

1.70

1.70

1.70

1.70

1.70

1.70

1.70

1.70

1.70

1.70

1.70

2.15

3,790

6,808

10,026

11,548

11,548

11,548

11,548

11,548

11,548

11,548

13,013

13,013

13,013

13,013

13,013

13,013

7,575

2.77

2.52

2.18

1.83

1.83

1.83

1.83

1.83

1.83

1.83

2.07

2.07

2.07

2.07

2.07

2.07

2.92

13,138

19,512

22,409

22,602

22,625

23,926

24,088

24,636

24,339

23,634

24,773

20,261

24,875

20,597

17,479

8,426

1,017

9.60

7.23

4.88

3.59

3.59

3.80

3.82

3.91

3.86

3.75

3.93

3.22

3.95

3.27

2.77

1.34

0.39

1,924

3,410

5,407

7,455

7,455

7,455

7,455

7,455

7,455

7,455

7,455

7,455

7,455

7,455

7,455

7,455

3,556

1.41

1.26

1.18

1.18

1.18

1.18

1.18

1.18

1.18

1.18

1.18

1.18

1.18

1.18

1.18

1.18

1.37

1,110

1,765

2,268

2,615

2,617

2,682

2,690

2,717

2,702

2,667

2,797

2,572

2,802

2,588

2,433

1,980

886

0.81

0.65

0.49

0.42

0.42

0.43

0.43

0.43

0.43

0.42

0.44

0.41

0.44

0.41

0.39

0.31

0.34

23,307

37,072

47,623

54,925

54,949

56,315

56,485

57,060

56,748

56,009

58,743

54,005

58,850

54,358

51,084

41,578

18,613

17.04

13.73

10.38

8.72

8.72

8.94

8.97

9.06

9.01

8.89

9.32

8.57

9.34

8.63

8.11

6.60

7.18

Turnos/Da

Turnos/Totales

Dotacin Mina
1.- Gerencia Mina
Gerente Mina
Secretaria
Sub-Total (1)
2.- Superintendencia Ingeniera, Geologa y Geomecnica
Superintendente Mina
Ingenieros Planificacin
Gelogos

Dotacin
Dotacin/Turno
Dotacin Total
2
2
1
1
1
1

Tarifas
KUS$/Mes

Tarifas
KUS$/Ao

8.5
1.5

102.0
18.0

2
18
1
3
2

2
19
1
3
2

7.0
5.0
5.0

84.0
60.0
60.0

1
2
3
2
2

1
2
3
2
2

5.0
3.0
2.5
2.5
1.5

60.0
36.0
30.0
30.0
18.0

1
1
18
27
1

1
2
19
91
1

2.5
1.5

30.0
18.0

7.0

84.0

Supervisor Produccin
Supervisor Chancado y Skip
Supervisor Perforacin y Tronadura Produccin
Operadores Cargadores Frontales Sala Control
Operadores Camiones Sala Control

1
1
1
2
2

4
4
4
8
8

5.5
5.5
5.5
3.0
3.0

66.0
66.0
66.0
36.0
36.0

Operadores Perforadoras Radiales Sala Control


Operadores Chancador y Skip Sala Control
Operadores Perforadoras Radiales Terreno
Operador Equipo Tronadura
Operadores Equipos Apoyo

1
1
3
2
6

4
4
12
8
12

3.0
3.0
3.0
2.5
2.5

36.0
36.0
36.0
30.0
30.0

3
2
1
27
18

12
8
2
91
67

2.0
2.0
3.5

24.0
24.0
42.0

Superintendente Construccin y Preparacin


Supervisor Preparacin
Operador Jumbo Avance
Operador LHD Preparacin
Capataz Tronadura Avance

1
1
3
3
1

1
4
12
12
4

7.0
5.5
2.5
2.5
3.5

84.0
66.0
30.0
30.0
42.0

Mineros Tronadura
Operador Shotcretera
Operador Empernador
Mineros Fortificacin
Operador Equipo Servicio

1
1
1
1
1

4
4
4
4
4

2.0
2.5
2.5
2.0
2.5

24.0
30.0
30.0
24.0
30.0

Mineros Servicios
Inspector Construccin ITO
Ayudante Inspector Construccin ITO
Geomecnicos Terreno

1
1
1
1

4
4
4
2

2.0
3.0
2.5
4.0

24.0
36.0
30.0
48.0

18
19
1
1
1

67
73
1
4
4

7.0
5.5
5.5

84.0
66.0
66.0

Mantenedores Mecnicos

24

2.5

30.0

Mantenedores Elctricos
Mantenedores Instrumentacin
Mantenedores Planta Chancado

3
2
2

12
8
8

2.5
2.5
2.5

30.0
30.0
30.0

Mantenedores Pique Skip y Correas


Paolero

2
1

8
4

2.5
2.5

30.0
30.0

19
4
1

73
4
1

Geomecnicos
Ayudantes Geologo
Proyectistas/Dibujantes
Topografos
Alarifes
Laboratoristas
Ayudante Laboratorio (Muestrero)
Sub-Total (2)
3.- Superintendencia Produccin Mina
Superintendente Produccin

Operadores Ayudante Produccin


Ayudantes Tronadura Produccin
Control Produccin
Sub-Total (3)
4.- Superintendencia Construccin y Preparacin

Sub-Total (4)
5.- Superintendencia Mantencin Mina
Superintendencia Mantencin
Supervisor Mecnico
Supervisor Elctrico e Instrumentacin

Sub-Total (5)
6.-Subgerencia Seguridad y Medio Ambiente
Subgerente Seguridad y Medio Ambiente

4.0

48.0

Prevencionista
Medio Ambientalista

2
1

2
1

3.5
3.5

42.0
42.0

Sub-Total (6)
7.- Unidad de Soporte y Mantencin
Jefe Unidad

4
5
1

4
11
1

4.0

48.0

Ingeniero de Soporte
Ingeniero Mantencin

1
2

4
2

3.0
3.0

36.0
36.0

Ingeniero Desarrollo
Sub-Total (7)

1
5

4
11

2.5

30.0

93

267

TOTAL DOTACIN MINA

Dotacin Mina
1.- Gerencia Mina
Gerente Mina
Secretaria
Sub-Total (1)
2.- Superintendencia Ingeniera, Geologa y Geomecnica
Superintendente Mina
Ingenieros Planificacin
Gelogos
Geomecnicos
Ayudantes Geologo
Proyectistas/Dibujantes
Topografos
Alarifes
Laboratoristas
Ayudante Laboratorio (Muestrero)
Sub-Total (2)
3.- Superintendencia Produccin Mina
Superintendente Produccin
Supervisor Produccin
Supervisor Chancado y Skip
Supervisor Perforacin y Tronadura Produccin
Operadores Cargadores Frontales Sala Control
Operadores Camiones Sala Control
Operadores Perforadoras Radiales Sala Control
Operadores Chancador y Skip Sala Control
Operadores Perforadoras Radiales Terreno
Operador Equipo Tronadura
Operadores Equipos Apoyo
Operadores Ayudante Produccin
Ayudantes Tronadura Produccin
Control Produccin
Sub-Total (3)
4.- Superintendencia Construccin y Preparacin
Superintendente Construccin y Preparacin
Supervisor Preparacin
Operador Jumbo Avance
Operador LHD Preparacin
Capataz Tronadura Avance
Mineros Tronadura
Operador Shotcretera
Operador Empernador
Mineros Fortificacin
Operador Equipo Servicio
Mineros Servicios
Inspector Construccin ITO
Ayudante Inspector Construccin ITO
Geomecnicos Terreno
Sub-Total (4)
5.- Superintendencia Mantencin Mina
Superintendencia Mantencin
Supervisor Mecnico
Supervisor Elctrico e Instrumentacin
Mantenedores Mecnicos
Mantenedores Elctricos
Mantenedores Instrumentacin
Mantenedores Planta Chancado
Mantenedores Pique Skip y Correas
Paolero
Sub-Total (5)
6.-Subgerencia Seguridad y Medio Ambiente
Subgerente Seguridad y Medio Ambiente

AO 1

AO 2

AO 3

AO 4

AO 5

AO 6

AO 7

AO 8

AO 9

AO 10

AO 11

AO 12

AO 13

AO 14

AO 15

AO 16

1
1

1
1

1
1

1
1

1
1

1
1

1
1

1
1

1
1

1
1

1
1

1
1

1
1

1
1

1
1

1
1

AO 17

1
1

19
1

1
1
1
1
1

2
2
1
1
2

3
2
1
1
3

3
2
1
2
3

3
2
1
2
3

3
2
1
2
3

3
2
1
2
3

3
2
1
2
3

3
2
1
2
3

3
2
1
2
3

3
2
1
2
3

3
2
1
2
3

3
2
1
2
3

3
2
1
2
3

3
2
1
2
3

3
2
1
2
3

2
2
1
1
2

15
10
5
6
7.5

1
1
1
1

1
1
1
1

2
2
1
2

2
2
1
2

2
2
1
2

2
2
1
2

2
2
1
2

2
2
1
2

2
2
1
2

2
2
1
2

2
2
1
2

2
2
1
2

2
2
1
2

2
2
1
2

2
2
1
2

2
2
1
2

1
1
1
1

5
3
2.5
3

10

13

18

19

19

19

19

19

19

19

19

19

19

19

19

19

13

1
1
1
1

1
2
2
1

1
2
2
2

1
4
4
4

1
4
4
4

1
4
4
4

1
4
4
4

1
4
4
4

1
4
4
4

1
4
4
4

1
4
4
4

1
4
4
4

1
4
4
4

1
4
4
4

1
4
4
4

1
4
4
4

1
2
2
1

2
2
1
1
4

4
4
2
2
6

6
6
3
3
8

8
8
4
4
12

8
8
4
4
12

8
8
4
4
12

8
8
4
4
12

8
8
4
4
12

8
8
4
4
12

8
8
4
4
12

8
8
4
4
12

8
8
4
4
12

8
8
4
4
12

8
8
4
4
12

8
8
4
4
12

8
8
4
4
12

4
4
2
2
6

2
1
1
2
1

3
6
6
3
1

4
8
8
4
2

8
12
12
8
2

8
12
12
8
2

8
12
12
8
2

8
12
12
8
2

8
12
12
8
2

8
12
12
8
2

8
12
12
8
2

8
12
12
8
2

8
12
12
8
2

8
12
12
8
2

8
12
12
8
2

8
12
12
8
2

8
12
12
8
2

3
6
6
3
1

21

43

59

91

91

91

91

91

91

91

91

91

91

91

91

91

43

1
1

1
1

1
3

1
4

1
4

1
4

1
4

1
4

1
4

1
4

1
4

1
4

1
4

1
4

1
4

1
4

1
1

3
3
1
1
1

6
6
2
2
2

9
9
3
3
3

12
12
4
4
4

12
12
4
4
4

12
12
4
4
4

12
12
4
4
4

12
12
4
4
4

12
12
4
4
4

12
12
4
4
4

12
12
4
4
4

12
12
4
4
4

12
12
4
4
4

12
12
4
4
4

12
12
4
4
4

12
12
4
4
4

6
6
2
2
2

1
1
1
1
1

2
2
2
2
2

3
3
3
3
3

4
4
4
4
4

4
4
4
4
4

4
4
4
4
4

4
4
4
4
4

4
4
4
4
4

4
4
4
4
4

4
4
4
4
4

4
4
4
4
4

4
4
4
4
4

4
4
4
4
4

4
4
4
4
4

4
4
4
4
4

4
4
4
4
4

2
2
2
2
2

91

1
1

2
1

3
2

4
2

4
2

4
2

4
2

4
2

4
2

4
2

4
2

4
2

4
2

4
2

4
2

4
2

2
1

18

33

51

67

67

67

67

67

67

67

67

67

67

67

67

67

33

1
1
4
4

2
2
8
8

3
3
10
10

4
4
24
12

4
4
24
12

4
4
24
12

4
4
24
12

4
4
24
12

4
4
24
12

4
4
24
12

4
4
24
12

4
4
24
12

4
4
24
12

4
4
24
12

4
4
24
12

4
4
24
12

2
2
8
8

2
2

4
4

4
4

8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8

8
8

4
4

2
1

4
2

4
3

8
4

8
4

8
4

8
4

8
4

8
4

8
4

8
4

8
4

8
4

8
4

8
4

8
4

4
2

18

35

42

73

73

73

73

73

73

73

73

73

73

73

73

73

35

Prevencionista
Medio Ambientalista

1
1

1
1

1
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

2
1

1
1

Sub-Total (6)
7.- Unidad de Soporte y Mantencin
Jefe Unidad

Ingeniero de Soporte
Ingeniero Mantencin

1
1
1

2
1
2

3
2
3

4
2
4

4
2
4

4
2
4

4
2
4

4
2
4

4
2
4

4
2
4

4
2
4

4
2
4

4
2
4

4
2
4

4
2
4

4
2
4

2
1
2

11

11

11

11

11

11

11

11

11

11

11

11

11

76

135

184

267

267

267

267

267

267

267

267

267

267

267

267

267

135

Ingeniero Desarrollo
Sub-Total (7)
TOTAL DOTACIN MINA

AO 1

AO 2

AO 3

AO 4

AO 5

AO 6

AO 7

AO 8

AO 9

AO 10

AO 11

AO 12

AO 13

AO 14

AO 15

AO 16

AO 17

3,800

7,500

12,750

17,500

17,500

17,500

17,500

17,500

17,500

17,500

17,500

17,500

17,500

17,500

17,500

17,500

7,200

Camin Bajo Pefil (50 Toneladas)

Cargador LHD (12 Toneladas)

Perforadora Radial (3")

Camin Cargador de Explosivos

Martillo Mvil

Camin Aljibe

Camin Petrolero

Camin Utilitario

Total Equipos Produccin

17

23

27

27

27

27

27

27

27

29

29

29

29

29

29

17

Cargador Bajo Pefil (LHD)

Perforadora Avance

Shotcretera

Equipos Empernador

Acuador

14

14

14

14

14

14

14

14

14

14

14

14

14

14

14

14

14

Extraccin Mina
Material (Tpd)
Equipos Produccin

Equipos Preparaciones

Total Equipos Preparacin

PERFORACIN RADIAL 3"


Perforacin Requerida/Ao
EQUIPOS
JUMBO RADIAL 3"
TOTAL EQUIPOS
MATERIALES
BARRAS 6'
BITS 3"
CULATIN
COPLAS
TOTAL MATERIALES
COSTO DIRECTO (US$/mb)

TRONADURA RADIAL 3"

528,517 mb/ao
CANTIDAD
mb/hr
21.70

COSTO
US$/hr
50.32

COSTO
US$/mb
2.32
2.32

VIDA TIL
mb
800
450
1,100
200

VALOR
US$/un
150
700
200
150

COSTO
US$/mb
2.63
1.56
0.18
9.75
14.11

Perforacin Requerida/Ao
Dimetro Perforacin (3")
EQUIPOS
CARGADOR EXPLOSIVO
TOTAL EQUIPOS
EXPLOSIVOS
ANFO (kg)
TRONEX (un)
FULMINANTE (un)
NONEL (m)
CORDON DETONANTE (m)
TOTAL MATERIALES

528,517 mb/ao
7.62 cm
Rend.
COSTO
US$/hr
mb/hr
50.00
34.17

CONSUMO
un/mb
1.8
0.4
0.6
0.4
2.0

VALOR
US$/un
1.00
0.75
1.00
0.50
0.35

COSTO
US$/mb
0.68
0.68
COSTO
US$/mb
1.80
0.30
0.60
0.20
0.70
3.60

16.43
COSTO DIRECTO (US$/mb)

4.28

CAMIN 50 TON
ITEM

CANTIDAD

UNIDAD

CONSUMO
PRECIO
COSTO

40
1.2
48.00

lt/hr
US$/lt
US$/hr

12
1.20
14.40

lt/hr
US$/lt
US$/hr

VIDA UTIL
PRECIO
COSTO

5,500
30,000
5.45

hr/set
US$/set
US$/hr

VIDA UTIL
PRECIO
COSTO

2,500
9,000
3.60

hr/un
US$/un
US$/hr

OTROS COSTOS
(20% ANTERIORES)

14.29

US$/hr

COSTOS OPERACIN EQUIPO

85.75

US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION)

26.97

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

21.58

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

85.75
26.97
21.58

US$/hr
US$/hr
US$/hr

134.29

US$/hr

COMBUSTIBLE

LUBRICANTES
CONSUMO (30% COMBUSTIBLE)
PRECIO
COSTO
NEUMATICOS

TOLVA

TOTAL COSTO OPERACIN

LHD 12 Ton
ITEM

CANTIDAD

UNIDAD

CONSUMO
PRECIO
COSTO

30
1.2
36.00

lt/hr
US$/lt
US$/hr

9
1.2
10.80

lt/hr
US$/lt
US$/hr

CONSUMO
PRECIO
COSTO

1,250
7,000
5.6

hr/set
US$/set
US$/hr

VIDA UTIL
PRECIO
COSTO

1,750
3,200
1.8

hr/un
US$/un
US$/hr

OTROS COSTOS
(20% ANTERIORES)

10.85

US$/hr

COSTOS OPERACIN EQUIPO

65.07

US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION)

27.33

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

21.86

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

65.07
27.33
21.86

US$/hr
US$/hr
US$/hr

114.26

US$/hr

COMBUSTIBLE

LUBRICANTES
CONSUMO (30% COMBUSTIBLE)
PRECIO
COSTO
NEUMATICOS

BALDE

TOTAL COSTO OPERACIN

ITEM

JUMBO RADIAL 3"


CANTIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

UNIDAD

80
0.092
7.36

kwh
US$/kwh
US$/hr

1
1.20
1.20

lt/hr
US$/lt
US$/hr

0.08
1.20
0.10

lt/hr
US$/lt
US$/hr

CONSUMO
PRECIO
COSTO

4,000
4,000
1.0

hr/set
US$/set
US$/hr

AGUA INDUSTRIAL
CONSUMO
PRECIO
COSTO

0.05
1.0
0.05

m3/hr
US$/m3
US$/hr

OTROS COSTOS
(20% ANTERIORES)

1.94

US$/hr

COSTOS OPERACIN EQUIPO

11.64

US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION)

21.49

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

17.19

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

11.64
21.49
17.19

US$/hr
US$/hr
US$/hr

TOTAL COSTO OPERACIN

50.32

US$/hr

COMBUSTIBLE
CONSUMO
PRECIO
COSTO
LUBRICANTES
CONSUMO (8% COMBUSTIBLE)
PRECIO
COSTO
NEUMATICOS

ITEM

MARTILLO MVIL
CANTIDAD

UNIDAD

COMBUSTIBLE
CONSUMO
PRECIO
COSTO

10
1.2
12.00

lt/hr
US$/lt
US$/hr

3
1.20
3.60

lt/hr
US$/lt
US$/hr

VIDA UTIL
PRECIO
COSTO

3,000
5,000
1.7

hr/set
US$/set
US$/hr

VIDA UTIL
PRECIO
COSTO

5,000
8,000
1.6

hr/un
US$/un
US$/hr

2.83

US$/hr

21.70

US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION)

6.25

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

5.00

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

21.70
6.25
5.00

US$/hr
US$/hr
US$/hr

TOTAL COSTO OPERACIN

32.95

US$/hr

LUBRICANTES
CONSUMO (30% COMBUSTIBLE)
PRECIO
COSTO
NEUMATICOS

CABEZAL

OTROS COSTOS
(15% ANTERIORES)
COSTOS OPERACIN EQUIPO

CAMIN EXPLOSIVOS
ITEM
CANTIDAD

UNIDAD

COMBUSTIBLE
CONSUMO
PRECIO
COSTO

14
1.2
16.80

lt/hr
US$/lt
US$/hr

4
1.20
5.04

lt/hr
US$/lt
US$/hr

100,000
5,000
0.05

hr/set
US$/set
US$/hr

3.28

US$/hr

25.17

US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION)

5.00

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

4.00

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

25.17
5.00
4.00

US$/hr
US$/hr
US$/hr

TOTAL COSTO OPERACIN

34.17

US$/hr

LUBRICANTES
CONSUMO (30% COMBUSTIBLE)
PRECIO
COSTO
NEUMATICOS
VIDA UTIL
PRECIO
COSTO
OTROS COSTOS
(15% ANTERIORES)
COSTOS OPERACIN EQUIPO

ITEM

CAMIN PETROLERO
CANTIDAD

UNIDAD

COMBUSTIBLE
CONSUMO
PRECIO
COSTO

12
1.2
14.40

lt/hr
US$/lt
US$/hr

4
1.20
4.32

lt/hr
US$/lt
US$/hr

100,000
5,000
0.05

hr/set
US$/set
US$/hr

2.82

US$/hr

21.59

US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION)

2.40

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

1.92

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

21.59
2.40
1.92

US$/hr
US$/hr
US$/hr

TOTAL COSTO OPERACIN

25.91

US$/hr

LUBRICANTES
CONSUMO (30% COMBUSTIBLE)
PRECIO
COSTO
NEUMATICOS
VIDA UTIL
PRECIO
COSTO
OTROS COSTOS
(15% ANTERIORES)
COSTOS OPERACIN EQUIPO

CAMIN ALJIBE
ITEM

CANTIDAD

UNIDAD

CONSUMO
PRECIO
COSTO

12
1.2
14.40

lt/hr
US$/lt
US$/hr

4
1.20
4.32

lt/hr
US$/lt
US$/hr

100,000
5,000
0.05

hr/set
US$/set
US$/hr

2.82

US$/hr

21.59

US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION)

3.00

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

2.40

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

21.59
3.00
2.40

US$/hr
US$/hr
US$/hr

TOTAL COSTO OPERACIN

26.99

US$/hr

COMBUSTIBLE

LUBRICANTES
CONSUMO (30% COMBUSTIBLE)
PRECIO
COSTO
NEUMATICOS
VIDA UTIL
PRECIO
COSTO
OTROS COSTOS
(15% ANTERIORES)
COSTOS OPERACIN EQUIPO

CAMIN UTILITARIO
ITEM
CANTIDAD

UNIDAD

COMBUSTIBLE
CONSUMO
PRECIO
COSTO

8
1.2
9.60

lt/hr
US$/lt
US$/hr

2
1.20
2.88

lt/hr
US$/lt
US$/hr

50,000
3,000
0.1

hr/set
US$/set
US$/hr

1.88

US$/hr

14.42

US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION)

1.00

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

0.80

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

14.42
1.00
0.80

US$/hr
US$/hr
US$/hr

TOTAL COSTO OPERACIN

16.22

US$/hr

LUBRICANTES
CONSUMO (30% COMBUSTIBLE)
PRECIO
COSTO
NEUMATICOS
VIDA UTIL
PRECIO
COSTO
OTROS COSTOS
(15% ANTERIORES)
COSTOS OPERACIN EQUIPO

ITEM

VENTILADOR 450 KCFM


CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

470
0.092
43.3

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

12.98

US$/hr

11.2

US$/hr

COSTOS OPERACIN EQUIPO

67.49

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS ADQUISICION)

11.13

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

5.24

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

67.49
11.13
5.24

US$/hr
US$/hr
US$/hr

TOTAL COSTO OPERACIN

83.85

US$/hr

OTROS COSTOS
(20% ANTERIORES)

ITEM

VENTILADOR 370 KCFM


CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

455
0.092
41.9

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

12.56

US$/hr

10.9

US$/hr

COSTOS OPERACIN EQUIPO

65.34

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS ADQUISICION)

10.94

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

5.15

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

65.34
10.94
5.15

US$/hr
US$/hr
US$/hr

TOTAL COSTO OPERACIN

81.42

US$/hr

OTROS COSTOS
(20% ANTERIORES)

ITEM

VENTILADOR 200 KCFM


CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

101
0.092
9.3

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

2.79

US$/hr

2.4

US$/hr

14.53

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS ADQUISICION)

1.43

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

0.67

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

14.53
1.43
0.67

US$/hr
US$/hr
US$/hr

TOTAL COSTO OPERACIN

16.63

US$/hr

OTROS COSTOS
(20% ANTERIORES)
COSTOS OPERACIN EQUIPO

ITEM

VENTILADOR 75 KCFM
CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

47
0.092
4.3

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

1.29

US$/hr

1.1

US$/hr

COSTOS OPERACIN EQUIPO

6.72

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS ADQUISICION)

1.04

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

0.49

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

6.72
1.04
0.49

US$/hr
US$/hr
US$/hr

TOTAL COSTO OPERACIN

8.24

US$/hr

OTROS COSTOS
(20% ANTERIORES)

ITEM

VENTILADOR 25 KCFM
CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

21
0.092
1.9

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

0.58

US$/hr

0.5

US$/hr

COSTOS OPERACIN EQUIPO

3.01

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS ADQUISICION)

0.24

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

0.11

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

3.01
0.24
0.11

US$/hr
US$/hr
US$/hr

TOTAL COSTO OPERACIN

3.37

US$/hr

OTROS COSTOS
(20% ANTERIORES)

Tipo
VENTILADOR 450 KCFM
VENTILADOR 370 KCFM
VENTILADOR 200 KCFM
VENTILADOR 75 KCFM
Total Costos ventilacin principal

Cantidad
2
2
1
1

US$/hr
83.85
81.42
16.63
8.24

US$/hr
167.70278
162.84163
16.634178
8.2389582
355.41754

MARTILLO FIJO
ITEM

CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

30
0.092
2.76

kwh
US$/kwh
US$/hr

LUBRICANTES
COSTO (30% EE)

0.83

US$/hr

5,000
8,000
1.6

hr/un
US$/un
US$/hr

OTROS COSTOS
(20% ANTERIORES)

1.04

US$/hr

COSTOS OPERACIN EQUIPO

6.23

US$/hr

COSTO MANTENCION/REPARACION
(50% COSTOS ADQUISICION)

5.00

US$/hr

COSTO OVERHAUL
(40% COSTOS ADQUISICION)

4.00

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
COSTO OVERHAUL

6.23
5.00
4.00

US$/hr
US$/hr
US$/hr

15.23

US$/hr

CABEZAL
VIDA UTIL
PRECIO
COSTO

TOTAL COSTO OPERACIN

ITEM

APRON/GRIZZLY
CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

78
0.092
7.2

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

2.15

US$/hr

1.9

US$/hr

11.19

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIN)

9.52

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION

11.19
9.52

US$/hr
US$/hr

TOTAL COSTO OPERACIN

20.71

US$/hr

OTROS COSTOS
(20% ANTERIORES)
COSTOS OPERACIN EQUIPO

CHANCADOR
ITEM

CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

216
0.092
19.9

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

5.97

US$/hr

5.2

US$/hr

COSTOS OPERACIN EQUIPO

31.04

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIN)

26.39

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION

31.04
26.39

US$/hr
US$/hr

TOTAL COSTO OPERACIN

57.43

US$/hr

OTROS COSTOS
(20% ANTERIORES)

CORREA TRANSPORTADORA 48"


ITEM
CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

93
0.092
8.6

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

2.57

US$/hr

2.2

US$/hr

COSTOS OPERACIN EQUIPO

13.36

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIN)

11.36

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION

13.36
11.36

US$/hr
US$/hr

TOTAL COSTO OPERACIN

24.72

US$/hr

OTROS COSTOS
(20% ANTERIORES)

ITEM

SISTEMA SKIP
CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

2,310
0.092
212.6

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

63.77

US$/hr

55.3

US$/hr

COSTOS OPERACIN EQUIPO

331.59

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIN)

281.85

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION

331.59
281.85

US$/hr
US$/hr

TOTAL COSTO OPERACIN

613.43

US$/hr

OTROS COSTOS
(20% ANTERIORES)

ITEM

HUINCHE TAMBOR
CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

638
0.092
58.7

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

17.60

US$/hr

15.2

US$/hr

COSTOS OPERACIN EQUIPO

91.49

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIN)

77.77

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION

91.49
77.77

US$/hr
US$/hr

169.26

US$/hr

OTROS COSTOS
(20% ANTERIORES)

TOTAL COSTO OPERACIN

ITEM

ALIMENTADOR
CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

33
0.092
3.0

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

0.91

US$/hr

0.8

US$/hr

COSTOS OPERACIN EQUIPO

4.74

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIN)

4.03

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION

4.74
4.03

US$/hr
US$/hr

TOTAL COSTO OPERACIN

8.76

US$/hr

OTROS COSTOS
(20% ANTERIORES)

CORREA TRANSPORTADORA 48" SUPERFICIE


ITEM
CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

111
0.092
10.2

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

3.06

US$/hr

2.7

US$/hr

COSTOS OPERACIN EQUIPO

15.93

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIN)

13.54

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION

15.93
13.54

US$/hr
US$/hr

TOTAL COSTO OPERACIN

29.47

US$/hr

OTROS COSTOS
(20% ANTERIORES)

ITEM

EQUIPOS AUXILIARES
CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

126
0.092
11.6

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

3.47

US$/hr

3.0

US$/hr

COSTOS OPERACIN EQUIPO

18.04

US$/hr

COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIN)

15.33

US$/hr

RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION

18.04
15.33

US$/hr
US$/hr

TOTAL COSTO OPERACIN

33.37

US$/hr

OTROS COSTOS
(20% ANTERIORES)

BOMBAS
ITEM

CANTIDAD

UNIDAD

ENERGA ELCTRICA
CONSUMO
PRECIO
COSTO

336
0.092
30.9

kwh
US$/kw
US$/hr

LUBRICANTES
COSTO (30% EE)

9.27

US$/hr

8.0

US$/hr

48.22

US$/hr

40.99

US$/hr

48.22
40.99

US$/hr
US$/hr

89.21

US$/hr

OTROS COSTOS
(20% ANTERIORES)
COSTOS OPERACIN EQUIPO
COSTO MANTENCION/REPARACION
(85% COSTOS OPERACIN)
RESUMEN
COSTO OPERACIN
COSTO MANTENCION/REPARACION
TOTAL COSTO OPERACIN

Você também pode gostar