Você está na página 1de 3

Pgina :

S10

MDH

Precio S/.

Precios y cantidades de recursos requeridos por tipo


Obra

0201146

Subpresupuesto

001
15/06/2012
090709

Fecha
Lugar

CREACION DE PISTAS Y VEREDAS DE LA AVENIDA SALCABAMBA Y PROLONGACION


HUANCAVELICA, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
CONSTRUCCIN DE PISTAS Y VEREDAS
HUANCAVELICA - TAYACAJA - HUARIBAMBA

Cdigo

Recurso

Unidad

0147010001
0147010003
0147000022
0147010002
0147010004
0147000032

CAPATAZ
OFICIAL
OPERADOR DE EQUIPO LIVIANO
OPERARIO
PEON
TOPOGRAFO

MANO DE OBRA
hh
1,953.7533
hh
4,811.4640
hh
1,752.7754
hh
6,922.9142
hh
39,433.4774
hh
173.0449

0202970002
0239010100
0202040010
0202000007
0204000000
0205010004
0213000006
0239800006
0239130001
0221000000
0202010061
0243510061
0203000032
0233000017
0205000001
0238000004
0253000000
0243010003
0239900115
0239900075
0205300085
0232970003
0213510002
0205000003
0205000009
0205020020
0213550003
0202970043
0239900116
0230220003
0272080032
0273010039
0230990080
0254440080
0230020001

ACERO DE REFUERZO FY=4200 GRADO 60


AGUA
ALAMBRE NEGRO N8
ALAMBRE NEGRO RECOCIDO # 16
ARENA FINA
ARENA GRUESA
ASFALTO RC-250
CARTEL DE OBRA DE 8.50x3.60m. TIPO
PANAFLEX INC. INSTALACIN, ACC. Y TRANSP.
CASETA Y ALMACEN
CEMENTO PORTLAND TIPO I (42.5KG)
CLAVOS C/CABEZA P/MADERA PROMEDIO
ESTACA DE MADERA
FIERRO CORRUGADO PROMEDIO
FLETE TERRESTRE HUANCAYO - HUARIBAMBA
GRAVILLA
HORMIGON (PUESTO EN OBRA)
KEROSENE INDUSTRIAL
MADERA TORNILLO
MANTENIMIENTO DE ALCANTARILLAS DE
CONCRETO
MANTENIMIENTO DE TRANSITO
MATERIAL GRANULAR
MOVILIZACION Y DESMOVILIZACION DE
EQUIPO
PEGAMENTO
PIEDRA CHANCADA DE 1/2"
PIEDRA GRANDE DE 8"
PIEDRA MEDIANA
PINTURA PARA TRAFICO
REJILLA FIERRO CORRUGADO (0.50m. ANCHO)
REUBICACION DE POSTES DE LUZ
TECKNOPORT E=2"
TUBERIA PVC SAP 3/4" CLASE 7.5
TUBERIA PVC SAP C-5 2"
WINCHA
XILOL
YESO DE 28 Kg

Cantidad

16.63
13.14
13.14
15.12
11.84
19.65

Parcial S/.

Presupuestado

32,490.86
63,222.58
23,031.53
104,674.40
466,892.40
3,400.24

32,587.81
63,266.51
23,041.23
104,561.80
466,964.47
3,460.90

693,712.01

693,882.72

MATERIALES
kg
m3
kg
kg
m3
m3
gln
GLB

15,505.8836
3,392.5549
1,325.8034
362.2870
293.4166
1,763.3526
1,177.1796
1.0000

4.50
1.00
4.70
4.70
105.00
107.00
12.50
1,200.00

69,776.46
3,392.55
6,231.26
1,702.76
30,809.10
188,678.45
14,714.75
1,200.00

69,848.93
3,473.88
6,257.62
1,738.98
30,808.74
188,755.73
14,714.76
1,200.00

GLB
BOL
kg
p2
kg
GLB
m3
m3
gln
p2
GLB

1.0000
30,264.6094
2,257.6324
346.0898
264.0000
1.0000
37.9500
1,200.4750
95.9025
12,161.4151
3.0000

5,500.00
16.98
4.50
5.00
4.50
76,778.37
55.00
110.00
10.50
4.50
1,800.00

5,500.00
513,893.08
10,159.34
1,730.45
1,188.00
76,778.37
2,087.25
132,051.70
1,006.95
54,726.39
5,400.00

5,500.00
513,881.48
10,179.97
1,730.45
1,188.00
76,778.37
2,086.56
132,052.25
1,052.73
54,786.55
5,400.00

GLB
m3
GLB

1.0000
3,572.2750
1.0000

4,500.00
55.00
17,492.81

4,500.00
196,475.40
17,492.81

4,500.00
196,534.89
17,492.81

gln
m3
m3
m3
gln
m
GLB
m2
m
m
und
gln
BOL

10.9308
2,176.4808
200.5120
235.0200
27.0840
112.0000
2.0000
170.0055
3,123.0800
284.2800
17.3045
6.7710
155.7404

125.00
119.00
65.00
65.00
49.00
98.50
1,200.00
15.00
3.50
4.50
4.50
20.00
8.50

1,366.25
259,001.12
13,033.15
15,276.30
1,326.92
11,032.00
2,400.00
2,550.15
10,930.78
1,279.26
77.85
135.40
1,323.79

1,374.16
258,998.25
13,033.28
15,276.30
1,329.72
11,032.00
2,400.00
2,550.08
10,930.78
1,280.64
0.00
135.42
1,384.36

1,659,228.04

1,659,687.69

EQUIPOS
0348040003
0349040008
0349030001
0349010002
0337900102
0337010001
0349060003
0348010007
0349090000
0337540012
0349030007
0337540011
0349040033
0349070004
0348110003

CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000


CARGADOR S/LLANTAS 100-115 HP 2-2.25 YD3
COMPACTADOR VIBR. TIPO PLANCHA 4 HP
COMPRESORA NEUMATICA 250-330 PCM, 87
HP
EQUIPO DE PINTURA PARA TRAFICO
HERRAMIENTAS MANUALES
MARTILLO NEUMATICO DE 24 Kg.
MEZCLADORA DE CONCRETO DE 11 P3-18 HP
MOTONIVELADORA DE 125 HP
NIVEL TOPOGRAFICO
RODILLO LISO VIBR AUTOP 101-135HP 10-12T
TEODOLITO
TRACTOR DE ORUGAS DE 140-160 HP
VIBRADOR DE CONCRETO 4 HP 2.40"
VOLQUETE DE 8 M3

hm
hm
hm
hm
hm
%MO
hm
hm
hm
HE
hm
HE
hm
hm
hm

240.6184
179.0798
1,269.1331
22.0721

156.86
151.52
21.66
78.04

37,743.65
27,134.20
27,489.36
1,722.34

37,777.09
27,144.72
27,485.02
1,722.02

103.7255

26.50

44.1441
2,235.7246
240.6184
173.0449
240.6184
173.0449
80.5375
1,650.7130
1,077.3061

4.58
15.00
162.99
15.00
146.43
20.00
250.19
5.27
211.82

2,748.85
30,193.15
202.16
33,535.80
39,218.65
2,595.60
35,233.99
3,460.80
20,150.30
8,699.24
228,195.80

2,751.75
30,193.15
202.01
33,548.55
39,220.80
2,595.67
35,250.59
3,460.90
20,134.38
8,685.59
228,185.30

498,323.90

498,357.54

Pgina :

S10

MDH

Precio S/.

Precios y cantidades de recursos requeridos por tipo


Obra

0201146

Subpresupuesto

001
15/06/2012
090709

Fecha
Lugar
Cdigo

Recurso

CREACION DE PISTAS Y VEREDAS DE LA AVENIDA SALCABAMBA Y PROLONGACION


HUANCAVELICA, DISTRITO DE HUARIBAMBA - TAYACAJA - HUANCAVELICA
CONSTRUCCIN DE PISTAS Y VEREDAS
HUANCAVELICA - TAYACAJA - HUARIBAMBA
Unidad

Cantidad

S/.
S/.

Parcial S/.

Presupuestado

2,851,263.95

2,851,927.95
2,851,927.95

Precio S/.

La columna parcial
es el producto del

Você também pode gostar